Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 24 results ...

Bryde, D J (2008) Is construction different? A comparison of perceptions of project management performance and practices by business sector and project type. Construction Management and Economics, 26(03), 315–27.

Chang, C-H, Lin, Y-C and Tserng, H P (2008) Distilling and managing engineers' experience in construction projects using a pattern approach. Construction Management and Economics, 26(03), 209–23.

Chen, C (2008) Entry mode selection for international construction markets: the influence of host country related factors. Construction Management and Economics, 26(03), 303–14.

  • Type: Journal Article
  • Keywords: international business; marketing strategy; international construction; market entry strategy; market entry mode
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190701882382
  • Abstract:
    The increasing necessity to establish a permanent presence in overseas markets challenges the tradition of tide-like market entry mode of international contractors and confronts them with an important dichotomous selection between permanent entry mode and mobile entry mode. By borrowing theories and previous findings from the general international business area, the hypotheses regarding the influences of specific host country related factors upon the selection between the two generic entry modes, including cultural difference, trade link, host market potential, investment risk, institutional entry barrier and competition intensity are developed. Measures are proposed for these factors as well as some control variables and the dependent variable (entry mode). Data were collected from multiple sources for these variables. A binary logistic regression analysis was performed to test the hypotheses and develop a statistical model for entry mode selection. The model is statistically significant and not all the hypotheses are supported, confirming the uniqueness of the population of international contractors in market entry mode selection.

Dean, Y and Warwick, S (1998) Building, the suppression of seasonal response and the effects on health. Building Research & Information, 26(03), 146–56.

Edwards, D, Parn, E A, Sing, M C and Thwala, W D (2019) Risk of excavators overturning. Engineering, Construction and Architectural Management, 26(03), 479–98.

Ekanayake, E, Shen, G and Kumaraswamy, M M (2019) Mapping the knowledge domains of value management: a bibliometric approach. Engineering, Construction and Architectural Management, 26(03), 499–514.

Galbraith, G H, McLean, R C and Guo, J S (1998) Moisture permeability data presented as a mathematical relationship. Building Research & Information, 26(03), 157–68.

Gan, X, Chang, R, Langston, C and Wen, T (2019) Exploring the interactions among factors impeding the diffusion of prefabricated building technologies. Engineering, Construction and Architectural Management, 26(03), 535–53.

Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects. Engineering, Construction and Architectural Management, 26(03), 386–407.

Juan, Y, Lin, I and Tsai, J (2019) A hybrid approach to optimize initial design strategies for pre-sale housing projects. Engineering, Construction and Architectural Management, 26(03), 515–34.

Matar, M M, Georgy, M E and Ibrahim, M E (2008) Sustainable construction management: introduction of the operational context space (OCS). Construction Management and Economics, 26(03), 261–75.

Newaz, M T, Davis, P R, Jefferies, M and Pillay, M (2019) Validation of an agent-specific safety climate model for construction. Engineering, Construction and Architectural Management, 26(03), 462–78.

Ng, S T and Tang, Z (2008) Delineating the predominant criteria for subcontractor appraisal and their latent relationships. Construction Management and Economics, 26(03), 249–59.

Ning, Y, Feng, M, Feng, J and Liu, X (2019) Understanding clients’ experience of trust and distrust in dwelling fit-out projects. Engineering, Construction and Architectural Management, 26(03), 444–61.

Shen, Q and Spedding, A (1998) Priority setting in planned maintenance: practical issues in using the multi-attribute approach. Building Research & Information, 26(03), 169–80.

Smallwood, J (1998) Client influence on contractor health and safety in South Africa. Building Research & Information, 26(03), 181–9.

Wanigarathna, N, Sherratt, F, Price, A and Austin, S (2019) Design re-use: critical application of healthcare building design evidence. Engineering, Construction and Architectural Management, 26(03), 350–66.

Wu, G, Zhao, X, Zuo, J and Zillante, G (2019) Effects of team diversity on project performance in construction projects. Engineering, Construction and Architectural Management, 26(03), 408–23.

Yeung, J F Y, Chan, A P C and Chan, D W M (2008) Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong. Construction Management and Economics, 26(03), 277–301.

Yong, K T and Low, P S (2008) Organizational culture and TQM implementation in construction firms in Singapore. Construction Management and Economics, 26(03).

Zhang, L, Fenn, P and Fu, Y (2019) To insist or to concede? Contractors’ behavioural strategies when handling disputed claims. Engineering, Construction and Architectural Management, 26(03), 424–43.

Zhang, R, Xing, J, Ye, K, Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(03), 367–85.

Zhao, Z Y and Shen, L Y (2008) Are Chinese contractors competitive in international markets?. Construction Management and Economics, 26(03), 225–36.

Zhou, Y, Yang, Y and Yang, J (2019) Barriers to BIM implementation strategies in China. Engineering, Construction and Architectural Management, 26(03), 554–74.