Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 24 results ...

Bryde, D J (2008) Is construction different? A comparison of perceptions of project management performance and practices by business sector and project type. Construction Management and Economics, 26(03), 315–27.

  • Type: Journal Article
  • Keywords: performance evaluation; project management; project performance
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190701874413
  • Abstract:
    Although poor project management (PM) performance on construction projects and limitations in PM practices continue to be reported, there has been little research specifically focused on comparing perceptions of PM performance and practices of the construction business sector with other sectors and of construction projects with other types of project. This gap is addressed by a survey of 238 UK organizations, incorporating a sub-sample from the construction business sector. A questionnaire was used to obtain data relating to perceived levels of PM performance and of levels of maturity in certain PM practices. Those involved in projects in the construction business sector perceived their PM performance to be higher than did those involved in projects from other business sectors. However, there was no difference in perceptions of PM performance on specific construction projects among participants drawn from all business sectors, i.e. owner/clients from other business sectors. In terms of practices the construction business sector reported higher levels of maturity in the management of programmes and organizational support for PM than other sectors. However, in the areas of sponsorship and benefit management the construction sector practices were no more evolved than those in other business sectors.

Chang, C-H, Lin, Y-C and Tserng, H P (2008) Distilling and managing engineers' experience in construction projects using a pattern approach. Construction Management and Economics, 26(03), 209–23.

Chen, C (2008) Entry mode selection for international construction markets: the influence of host country related factors. Construction Management and Economics, 26(03), 303–14.

Dean, Y and Warwick, S (1998) Building, the suppression of seasonal response and the effects on health. Building Research & Information, 26(03), 146–56.

Edwards, D, Parn, E A, Sing, M C and Thwala, W D (2019) Risk of excavators overturning. Engineering, Construction and Architectural Management, 26(03), 479–98.

Ekanayake, E, Shen, G and Kumaraswamy, M M (2019) Mapping the knowledge domains of value management: a bibliometric approach. Engineering, Construction and Architectural Management, 26(03), 499–514.

Galbraith, G H, McLean, R C and Guo, J S (1998) Moisture permeability data presented as a mathematical relationship. Building Research & Information, 26(03), 157–68.

Gan, X, Chang, R, Langston, C and Wen, T (2019) Exploring the interactions among factors impeding the diffusion of prefabricated building technologies. Engineering, Construction and Architectural Management, 26(03), 535–53.

Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects. Engineering, Construction and Architectural Management, 26(03), 386–407.

Juan, Y, Lin, I and Tsai, J (2019) A hybrid approach to optimize initial design strategies for pre-sale housing projects. Engineering, Construction and Architectural Management, 26(03), 515–34.

Matar, M M, Georgy, M E and Ibrahim, M E (2008) Sustainable construction management: introduction of the operational context space (OCS). Construction Management and Economics, 26(03), 261–75.

Newaz, M T, Davis, P R, Jefferies, M and Pillay, M (2019) Validation of an agent-specific safety climate model for construction. Engineering, Construction and Architectural Management, 26(03), 462–78.

Ng, S T and Tang, Z (2008) Delineating the predominant criteria for subcontractor appraisal and their latent relationships. Construction Management and Economics, 26(03), 249–59.

Ning, Y, Feng, M, Feng, J and Liu, X (2019) Understanding clients’ experience of trust and distrust in dwelling fit-out projects. Engineering, Construction and Architectural Management, 26(03), 444–61.

Shen, Q and Spedding, A (1998) Priority setting in planned maintenance: practical issues in using the multi-attribute approach. Building Research & Information, 26(03), 169–80.

Smallwood, J (1998) Client influence on contractor health and safety in South Africa. Building Research & Information, 26(03), 181–9.

Wanigarathna, N, Sherratt, F, Price, A and Austin, S (2019) Design re-use: critical application of healthcare building design evidence. Engineering, Construction and Architectural Management, 26(03), 350–66.

Wu, G, Zhao, X, Zuo, J and Zillante, G (2019) Effects of team diversity on project performance in construction projects. Engineering, Construction and Architectural Management, 26(03), 408–23.

Yeung, J F Y, Chan, A P C and Chan, D W M (2008) Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong. Construction Management and Economics, 26(03), 277–301.

Yong, K T and Low, P S (2008) Organizational culture and TQM implementation in construction firms in Singapore. Construction Management and Economics, 26(03).

Zhang, L, Fenn, P and Fu, Y (2019) To insist or to concede? Contractors’ behavioural strategies when handling disputed claims. Engineering, Construction and Architectural Management, 26(03), 424–43.

Zhang, R, Xing, J, Ye, K, Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(03), 367–85.

Zhao, Z Y and Shen, L Y (2008) Are Chinese contractors competitive in international markets?. Construction Management and Economics, 26(03), 225–36.

Zhou, Y, Yang, Y and Yang, J (2019) Barriers to BIM implementation strategies in China. Engineering, Construction and Architectural Management, 26(03), 554–74.