Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 31 results ...

Abdullah, A H, Yaman, S K, Mohammad, H and Hassan, P F (2018) Construction manager’s technical competencies in Malaysian construction projects. Engineering, Construction and Architectural Management, 25(02), 153–77.

Abejide, O S (1997) Solid soilcrete blocks for low-cost buildings: a Nigerian case study. Building Research & Information, 25(02), 115–9.

Alkoc, E and Erbatur, F (1997) Productivity improvement in concreting operations through simulation models. Building Research & Information, 25(02), 82–91.

Arantes, A and Ferreira, L M D (2020) Underlying causes and mitigation measures of delays in construction projects. Journal of Financial Management of Property and Construction , 25(02), 165–81.

Besaiso, H, Fenn, P, Emsley, M and Wright, D (2018) A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine. Engineering, Construction and Architectural Management, 25(02), 241–56.

El-Rasas, T and Marzouk, M (2020) Fuzzy model for assessing delays in Egyptian residential projects. Journal of Financial Management of Property and Construction , 25(02), 225–46.

Enshassi, A (1997) Construction projects and the environment in Palestine. Building Research & Information, 25(02), 111–4.

Forsythe, P J (2007) A conceptual framework for studying customer satisfaction in residential construction. Construction Management and Economics, 25(02), 171–82.

Gavieta, R C (1997) Socio-economic and spatial indicators for household energy for a tropical urban community in urban Manila. Building Research & Information, 25(02), 124–8.

Gavieta, R C and Onate, C E (1997) Building regulations and disaster mitigation: the Philippines. Building Research & Information, 25(02), 120–3.

Giti, D M, K'Akumu, O A and Ondieki, E O (2020) Enhanced role of private sector through public private partnerships in low income urban housing in Kenya. Journal of Financial Management of Property and Construction , 25(02), 293–312.

Graafland, J and Nijhof, A (2007) Transparency, market operation and trust in the Dutch construction industry: an exploratory study. Construction Management and Economics, 25(02), 195–205.

Gunarathna, C, Yang, R J and Fernando, N (2018) Conflicts and management styles in the Sri Lankan commercial building sector. Engineering, Construction and Architectural Management, 25(02), 178–201.

Hua, G B (2007) Applying the strategic alignment model to business and ICT strategies of Singapore's small and medium-sized architecture, engineering and construction enterprises. Construction Management and Economics, 25(02), 157–69.

Jannadi, M O (1997) An effective safety programme for a concrete product manufacturing plant. Building Research & Information, 25(02), 92–100.

Jolly Cyril, E and Singla, H K (2020) Comparative analysis of profitability of real estate, industrial construction and infrastructure firms: evidence from India. Journal of Financial Management of Property and Construction , 25(02), 273–91.

Kavishe, N, Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects. Engineering, Construction and Architectural Management, 25(02), 202–40.

Leung, M-Y and Chan, H K L (2007) Antecedents of commitment in construction management. Construction Management and Economics, 25(02), 113–27.

Li, H (1997) Determinants of knowledge-based expert system success in construction engineering. Building Research & Information, 25(02), 101–6.

Liu, J, Lin, S and Feng, Y (2018) Understanding why Chinese contractors are not willing to purchase construction insurance. Engineering, Construction and Architectural Management, 25(02), 257–72.

Loffler, M (1997) Foamglass as spacer in multiple-glazing. Building Research & Information, 25(02), 107–10.

Lu, X and Davis, S (2018) Priming effects on safety decisions in a virtual construction simulator. Engineering, Construction and Architectural Management, 25(02), 273–94.

  • Type: Journal Article
  • Keywords: Decision making; Construction management; Safety; Virtual reality; Training methods; Priming;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-05-2016-0114
  • Abstract:
    The purpose of this paper is to investigate the influence of priming on people’s risk perceptions and safety decisions in a virtual construction simulator. Design/methodology/approach Civil engineering students were recruited to interact with a virtual reality (VR) safety simulator. They were divided into four groups covering with and without sound and with and without priming factors. Data were collected on the risks that they perceived and the safety levels of their actions. Findings It was found that obvious stimuli in a virtual environment with sound help people to recognise more hazards near the location of the stimuli. Sound is helpful in training simulations to create high levels of presence. However, priming factors are not suitable to be added to VR simulators for training purposes. Priming of safe choice results in people taking fewer risks in the VR simulator, but this does not carry over into other situations. Compared to priming effects, being “injured” in a training simulator with sound improves trainees’ ability to make safe decisions. Originality/value VR simulation is helpful in construction training because of its unique ability to give trainees exposure to dangerous situations without physical risk. However, the overloading the working memory of users is detrimental to the outcomes. Therefore, the optimum level of complexity in VR simulators should be further studied.

McCord, M (2020) An exploratory investigation into the relationship between energy performance certificates and sales price: a polytomous universal model approach. Journal of Financial Management of Property and Construction , 25(02), 247–71.

Pan, W, Gibb, A G F and Dainty, A R J (2007) Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(02), 183–94.

Pheng, L S and Tan, S K L (1997) The measurement of just in time wastage for a public housing project in Singapore. Building Research & Information, 25(02), 67–81.

Radosavljevic, M and Horner, M (2007) Process planning methodology: dynamic short-term planning for off-site construction in Slovenia. Construction Management and Economics, 25(02), 143–56.

Sa'eed, A, Gambo, N, Inuwa, I I and Musonda, I (2020) Effects of financial management practices on technical performance of building contractors in northeast Nigeria. Journal of Financial Management of Property and Construction , 25(02), 201–23.

Trigunarsyah, B (2007) Project designers' role in improving constructability of Indonesian construction projects. Construction Management and Economics, 25(02), 207–15.

Wang, C-H, Tsai, C-C and Cheng, Y-Y (2007) Knowledge-based diagnosis model for PCM executing problems in public construction. Construction Management and Economics, 25(02), 129–42.

Wesz, J G B, Formoso, C T and Tzortzopoulos, P (2018) Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(02), 134–52.

Zhang, Z, Koh, Z Y and Ling, F (2020) Benchmarking contractors’ financial performance: case study of Singapore. Journal of Financial Management of Property and Construction , 25(02), 183–99.