Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 31 results ...

Abdullah, A H, Yaman, S K, Mohammad, H and Hassan, P F (2018) Construction manager’s technical competencies in Malaysian construction projects. Engineering, Construction and Architectural Management, 25(02), 153–77.

  • Type: Journal Article
  • Keywords: Construction; Management; Construction planning;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-07-2016-0176
  • Abstract:
    Problems of Malaysian construction industry have often been associated, in part to incompetent construction manager (CM) when managing the construction projects. Although various education and training provisions have been introduced, critics argue that the provisions have not been effective. Central in the debate on the adequacy of the CM education and training offered is the answer to the question of “what constitutes the technical competency of the CM?” The purpose of this paper is to present the study that identifies the technical competencies required by the CM to address the question. Design/methodology/approach Multi-layered thematic analysis of literature was first carried out to identify the technical competency elements. Then, interviews were undertaken to confirm the elements of competencies. It was followed with questionnaire surveys to test the validity of the technical competencies against different contractors’ category and grade/size. Findings The findings suggest that the technical competencies of CM are generic, regardless of the size of construction organisation or the types of projects they undertake. A total of 16 CM technical competencies were identified which include the ability to manage: staff, materials, labour, plant, sub-contractors, safety, money, quality, time, environment, site administration, pre-construction activities, project closeout and handover, third parties, computer literacy, and construction contract. Originality/value The findings suggest that generic education and training is possible to develop technically competent CM. It also provides insights to the CM technical competencies which the industry is expecting.

Abejide, O S (1997) Solid soilcrete blocks for low-cost buildings: a Nigerian case study. Building Research & Information, 25(02), 115–9.

Alkoc, E and Erbatur, F (1997) Productivity improvement in concreting operations through simulation models. Building Research & Information, 25(02), 82–91.

Arantes, A and Ferreira, L M D (2020) Underlying causes and mitigation measures of delays in construction projects. Journal of Financial Management of Property and Construction , 25(02), 165–81.

Besaiso, H, Fenn, P, Emsley, M and Wright, D (2018) A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine. Engineering, Construction and Architectural Management, 25(02), 241–56.

El-Rasas, T and Marzouk, M (2020) Fuzzy model for assessing delays in Egyptian residential projects. Journal of Financial Management of Property and Construction , 25(02), 225–46.

Enshassi, A (1997) Construction projects and the environment in Palestine. Building Research & Information, 25(02), 111–4.

Forsythe, P J (2007) A conceptual framework for studying customer satisfaction in residential construction. Construction Management and Economics, 25(02), 171–82.

Gavieta, R C (1997) Socio-economic and spatial indicators for household energy for a tropical urban community in urban Manila. Building Research & Information, 25(02), 124–8.

Gavieta, R C and Onate, C E (1997) Building regulations and disaster mitigation: the Philippines. Building Research & Information, 25(02), 120–3.

Giti, D M, K'Akumu, O A and Ondieki, E O (2020) Enhanced role of private sector through public private partnerships in low income urban housing in Kenya. Journal of Financial Management of Property and Construction , 25(02), 293–312.

Graafland, J and Nijhof, A (2007) Transparency, market operation and trust in the Dutch construction industry: an exploratory study. Construction Management and Economics, 25(02), 195–205.

Gunarathna, C, Yang, R J and Fernando, N (2018) Conflicts and management styles in the Sri Lankan commercial building sector. Engineering, Construction and Architectural Management, 25(02), 178–201.

Hua, G B (2007) Applying the strategic alignment model to business and ICT strategies of Singapore's small and medium-sized architecture, engineering and construction enterprises. Construction Management and Economics, 25(02), 157–69.

Jannadi, M O (1997) An effective safety programme for a concrete product manufacturing plant. Building Research & Information, 25(02), 92–100.

Jolly Cyril, E and Singla, H K (2020) Comparative analysis of profitability of real estate, industrial construction and infrastructure firms: evidence from India. Journal of Financial Management of Property and Construction , 25(02), 273–91.

Kavishe, N, Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects. Engineering, Construction and Architectural Management, 25(02), 202–40.

Leung, M-Y and Chan, H K L (2007) Antecedents of commitment in construction management. Construction Management and Economics, 25(02), 113–27.

Li, H (1997) Determinants of knowledge-based expert system success in construction engineering. Building Research & Information, 25(02), 101–6.

Liu, J, Lin, S and Feng, Y (2018) Understanding why Chinese contractors are not willing to purchase construction insurance. Engineering, Construction and Architectural Management, 25(02), 257–72.

Loffler, M (1997) Foamglass as spacer in multiple-glazing. Building Research & Information, 25(02), 107–10.

Lu, X and Davis, S (2018) Priming effects on safety decisions in a virtual construction simulator. Engineering, Construction and Architectural Management, 25(02), 273–94.

McCord, M (2020) An exploratory investigation into the relationship between energy performance certificates and sales price: a polytomous universal model approach. Journal of Financial Management of Property and Construction , 25(02), 247–71.

Pan, W, Gibb, A G F and Dainty, A R J (2007) Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(02), 183–94.

Pheng, L S and Tan, S K L (1997) The measurement of just in time wastage for a public housing project in Singapore. Building Research & Information, 25(02), 67–81.

Radosavljevic, M and Horner, M (2007) Process planning methodology: dynamic short-term planning for off-site construction in Slovenia. Construction Management and Economics, 25(02), 143–56.

Sa'eed, A, Gambo, N, Inuwa, I I and Musonda, I (2020) Effects of financial management practices on technical performance of building contractors in northeast Nigeria. Journal of Financial Management of Property and Construction , 25(02), 201–23.

Trigunarsyah, B (2007) Project designers' role in improving constructability of Indonesian construction projects. Construction Management and Economics, 25(02), 207–15.

Wang, C-H, Tsai, C-C and Cheng, Y-Y (2007) Knowledge-based diagnosis model for PCM executing problems in public construction. Construction Management and Economics, 25(02), 129–42.

Wesz, J G B, Formoso, C T and Tzortzopoulos, P (2018) Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(02), 134–52.

Zhang, Z, Koh, Z Y and Ling, F (2020) Benchmarking contractors’ financial performance: case study of Singapore. Journal of Financial Management of Property and Construction , 25(02), 183–99.