Abstracts – Search Results

Search or browse again, or refine search.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Amadi, C, Carrillo, P and Tuuli, M (2019) PPP projects: improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(02), 544–60.

Amadi, C, Carrillo, P and Tuuli, M (2018) Stakeholder management in PPP projects: external stakeholders’ perspective. Built Environment Project and Asset Management, 8(04), 403–14.

Amadi, C, Carrillo, P and Tuuli, M (2014) Stakeholder management in public private partnership projects in Nigeria: Towards a research agenda. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 423–32.

Blay, K B, Tuuli, M M and France-Mensah, J (2019) Managing change in BIM-Level 2 projects: benefits, challenges, and opportunities. Built Environment Project and Asset Management, 9(05), 581–96.

Gunathilaka S, Tuuli M M and Dainty A R J (2013) Critical analysis of research on project success in construction management journals. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 979–988.

  • Type: Conference Proceedings
  • Keywords: critical analysis, project success criteria, project success factor
  • ISBN/ISSN: 978-0-9552390-7-6
  • URL: http://www.arcom.ac.uk/-docs/proceedings/ar2013-0979-0988_Gunathilaka_Tuuli_Dainty.pdf
  • Abstract:
    How to deliver project success has become a prominent discourse in both academic and practitioner debates on project management. However, despite years of research, how to improve the likelihood of successfully delivering a project and the criteria for assessing project success still remain unresolved. This study reviews conceptual and empirical research papers on project success relating to project success factors (PSFs) and project success criteria (PSC) published in construction management journals with a view to investigate the link between them and the relative importance of PSFs and PSC. The findings show that the link between many PSFs and PSC remains unexplored with the link only being articulated from a conceptual perspective with less empirical evidence in support of such link. Although relative importance of PSFs and PSC can be analysed from previous studies, there is no evidence that the most important PSFs by mean ranking make a difference to project success in practice or influence PSC across different projects and different stakeholders. These issues present fertile avenue for future research as many project stakeholders continue to grapple with which areas to concentrate limited resources to improve the chance of delivering a successful project.

Koh T Y, Tuuli M M and Rowlinson S (2013) A relational approach to high reliability organising for construction project safety: a conceptual framework. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 369–379.

Liu, A M M, Fellows, R and Tuuli, M M (2011) The role of corporate citizenship values in promoting corporate social performance: towards a conceptual model and a research agenda. Construction Management and Economics, 29(02), 173–83.

Sackey, E, Tuuli, M and Dainty, A (2019) Expansive learning in contemporary construction organisations. Built Environment Project and Asset Management, 9(03), 383–98.

Tuuli, M and Acquah, S (2012) Do you feel what I feel? Empowerment contagion in project teams. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 563–74.

Tuuli, M M (2009) Empowerment and control dynamics in project teams: a multilevel examination of the antecedents and jobperformance consequences, Unpublished PhD Thesis, , University of Hong Kong.

Tuuli, M M and Koh, S R T Y (2009) Portfolio of control modes in project teams: A Hong Kong case study. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 2, 927–37.

Tuuli, M M and Rowlinson, S (2009) Empowerment in project teams: a multilevel examination of the job performance implications. Construction Management and Economics, 27(05), 473–98.

Tuuli, M M and Rowlinson, S (2010) Impact of leadership style and team context on psychological empowerment in construction project teams. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 1, 411–20.

Tuuli, M M and Rowlinson, S (2009) Performance Consequences of Psychological Empowerment. Journal of Construction Engineering and Management, 135(12), 1334–47.

Tuuli, M M and Rowlinson, S (2007) Towards a conceptual framework of empowerment and job performance in project teams. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 1, 3–12.

Tuuli, M M and Rowlinson, S (2010) What empowers individuals and teams in project settings? A critical incident analysis. Engineering, Construction and Architectural Management, 17(01), 20.

Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Control modes and mechanisms in construction project teams: drivers and consequences. Construction Management and Economics, 28(05), 451–65.

Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Dynamics of control in construction project teams. Construction Management and Economics, 28(02), 202.