Abstracts – Search Results

Search or browse again, or refine search.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Amadi, C, Carrillo, P and Tuuli, M (2019) PPP projects: improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(02), 544–60.

Amadi, C, Carrillo, P and Tuuli, M (2018) Stakeholder management in PPP projects: external stakeholders’ perspective. Built Environment Project and Asset Management, 8(04), 403–14.

Amadi, C, Carrillo, P and Tuuli, M (2014) Stakeholder management in public private partnership projects in Nigeria: Towards a research agenda. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 423–32.

  • Type: Conference Proceedings
  • Keywords: frameworks; public private partnership; stakeholder management
  • ISBN/ISSN: 978-0-9552390-8-3
  • URL: http://www.arcom.ac.uk/-docs/proceedings/ar2014-0423-0432_Amadi_Carrillo_Tuuli.pdf
  • Abstract:
    Over the last couple of decades, Public Private Partnerships (PPPs) have been identified as a viable alternative for procuring public infrastructure. PPPs bring together the best of both worlds; private sector managerial expertise and public sector regulatory and supervisory capacity to procure public infrastructure. While several PPP projects have been delivered successfully, others have experienced challenges such as stakeholders' opposition. PPP projects are by their nature complex involving multiple stakeholders and thus far, there is a lack of adequate and well- structured means of managing these stakeholders and their varied interests which has resulted in neglect of stakeholders. Neglect of interest of stakeholders has been identified as a major factor that undermines the success of PPP projects in Nigeria. To this end, managing stakeholders in PPP projects in Nigeria has become necessary owing to the fact that support for PPP projects by the general public and transparency in the PPP process are enhanced when end users, local communities and other stakeholders are involved in all phases of the PPP scheme. This paper reviews literature on stakeholder management and concludes that existing frameworks do not provide adequate guidance on how stakeholders in PPP projects should be managed from project conception to operation and maintenance. Some of the main flaws identified with existing frameworks are their lack of attention to multiple parties involved in PPP projects and the inadequacy of stakeholder identification process. This paper thus identifies the gaps in existing stakeholder management frameworks and makes a case for developing a framework for managing stakeholders in PPP projects which would be all inclusive, transparent and that gives end users, local communities and other stakeholders their rightful place as co-owners of the project. This will enhance public support for PPPs and attract private sector investment in infrastructure in Nigeria.

Blay, K B, Tuuli, M M and France-Mensah, J (2019) Managing change in BIM-Level 2 projects: benefits, challenges, and opportunities. Built Environment Project and Asset Management, 9(05), 581–96.

Gunathilaka S, Tuuli M M and Dainty A R J (2013) Critical analysis of research on project success in construction management journals. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 979–988.

Koh T Y, Tuuli M M and Rowlinson S (2013) A relational approach to high reliability organising for construction project safety: a conceptual framework. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 369–379.

Liu, A M M, Fellows, R and Tuuli, M M (2011) The role of corporate citizenship values in promoting corporate social performance: towards a conceptual model and a research agenda. Construction Management and Economics, 29(02), 173–83.

Sackey, E, Tuuli, M and Dainty, A (2019) Expansive learning in contemporary construction organisations. Built Environment Project and Asset Management, 9(03), 383–98.

Tuuli, M and Acquah, S (2012) Do you feel what I feel? Empowerment contagion in project teams. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 563–74.

Tuuli, M M (2009) Empowerment and control dynamics in project teams: a multilevel examination of the antecedents and jobperformance consequences, Unpublished PhD Thesis, , University of Hong Kong.

Tuuli, M M and Koh, S R T Y (2009) Portfolio of control modes in project teams: A Hong Kong case study. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 2, 927–37.

Tuuli, M M and Rowlinson, S (2009) Empowerment in project teams: a multilevel examination of the job performance implications. Construction Management and Economics, 27(05), 473–98.

Tuuli, M M and Rowlinson, S (2010) Impact of leadership style and team context on psychological empowerment in construction project teams. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 1, 411–20.

Tuuli, M M and Rowlinson, S (2009) Performance Consequences of Psychological Empowerment. Journal of Construction Engineering and Management, 135(12), 1334–47.

Tuuli, M M and Rowlinson, S (2007) Towards a conceptual framework of empowerment and job performance in project teams. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 1, 3–12.

Tuuli, M M and Rowlinson, S (2010) What empowers individuals and teams in project settings? A critical incident analysis. Engineering, Construction and Architectural Management, 17(01), 20.

Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Control modes and mechanisms in construction project teams: drivers and consequences. Construction Management and Economics, 28(05), 451–65.

Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Dynamics of control in construction project teams. Construction Management and Economics, 28(02), 202.