Abstracts – Search Results

Search or browse again, or refine search.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Amadi, C, Carrillo, P and Tuuli, M (2019) PPP projects: improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(02), 544–60.

Amadi, C, Carrillo, P and Tuuli, M (2018) Stakeholder management in PPP projects: external stakeholders’ perspective. Built Environment Project and Asset Management, 8(04), 403–14.

  • Type: Journal Article
  • Keywords: PPP; Projects; Stakeholder management; Roads; Construction works; End-users;
  • ISBN/ISSN: 2044-124X
  • URL: https://doi.org/10.1108/BEPAM-02-2018-0048
  • Abstract:
    This paper focusses on external stakeholders’ perspective of stakeholder management in public–private partnerships (PPP) projects within the context of developing countries where public opposition to PPP projects is prevalent. The purpose of this paper is to identify the key enablers to PPP projects’ success from the perspective of external stakeholders. Design/methodology/approach Data were collected from two case studies via semi-structured interviews in two PPP project locations in Nigeria. In total, 14 external stakeholders comprising community leaders, trade unionists and human right activist participated in the research. Findings Five key enablers of external stakeholder management were identified. These are as follows: the choice of project location; transparency of the internal stakeholders; timing of stakeholder engagement; knowledge of PPP; and relationship with internal stakeholders. Originality/value External stakeholders’ perspective of stakeholder management in PPP projects within the context of developing countries new to PPP has been established. The practical implications of the five enablers can be used by policy makers and industry professionals to ensure effective stakeholder management of PPP projects.

Amadi, C, Carrillo, P and Tuuli, M (2014) Stakeholder management in public private partnership projects in Nigeria: Towards a research agenda. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 423–32.

Blay, K B, Tuuli, M M and France-Mensah, J (2019) Managing change in BIM-Level 2 projects: benefits, challenges, and opportunities. Built Environment Project and Asset Management, 9(05), 581–96.

Gunathilaka S, Tuuli M M and Dainty A R J (2013) Critical analysis of research on project success in construction management journals. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 979–988.

Koh T Y, Tuuli M M and Rowlinson S (2013) A relational approach to high reliability organising for construction project safety: a conceptual framework. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 369–379.

Liu, A M M, Fellows, R and Tuuli, M M (2011) The role of corporate citizenship values in promoting corporate social performance: towards a conceptual model and a research agenda. Construction Management and Economics, 29(02), 173–83.

Sackey, E, Tuuli, M and Dainty, A (2019) Expansive learning in contemporary construction organisations. Built Environment Project and Asset Management, 9(03), 383–98.

Tuuli, M and Acquah, S (2012) Do you feel what I feel? Empowerment contagion in project teams. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 563–74.

Tuuli, M M (2009) Empowerment and control dynamics in project teams: a multilevel examination of the antecedents and jobperformance consequences, Unpublished PhD Thesis, , University of Hong Kong.

Tuuli, M M and Koh, S R T Y (2009) Portfolio of control modes in project teams: A Hong Kong case study. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 2, 927–37.

Tuuli, M M and Rowlinson, S (2009) Empowerment in project teams: a multilevel examination of the job performance implications. Construction Management and Economics, 27(05), 473–98.

Tuuli, M M and Rowlinson, S (2010) Impact of leadership style and team context on psychological empowerment in construction project teams. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 1, 411–20.

Tuuli, M M and Rowlinson, S (2009) Performance Consequences of Psychological Empowerment. Journal of Construction Engineering and Management, 135(12), 1334–47.

Tuuli, M M and Rowlinson, S (2007) Towards a conceptual framework of empowerment and job performance in project teams. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 1, 3–12.

Tuuli, M M and Rowlinson, S (2010) What empowers individuals and teams in project settings? A critical incident analysis. Engineering, Construction and Architectural Management, 17(01), 20.

Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Control modes and mechanisms in construction project teams: drivers and consequences. Construction Management and Economics, 28(05), 451–65.

Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Dynamics of control in construction project teams. Construction Management and Economics, 28(02), 202.