Abstracts – Search Results

Search or browse again, or refine search.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Amadi, C, Carrillo, P and Tuuli, M (2019) PPP projects: improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(02), 544–60.

Amadi, C, Carrillo, P and Tuuli, M (2018) Stakeholder management in PPP projects: external stakeholders’ perspective. Built Environment Project and Asset Management, 8(04), 403–14.

Amadi, C, Carrillo, P and Tuuli, M (2014) Stakeholder management in public private partnership projects in Nigeria: Towards a research agenda. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 423–32.

Blay, K B, Tuuli, M M and France-Mensah, J (2019) Managing change in BIM-Level 2 projects: benefits, challenges, and opportunities. Built Environment Project and Asset Management, 9(05), 581–96.

  • Type: Journal Article
  • Keywords: Behaviour; Change management; Benefits; Challenges; BIM; Opportunities;
  • ISBN/ISSN: 2044-124X
  • URL: https://doi.org/10.1108/BEPAM-09-2018-0114
  • Abstract:
    The purpose of this paper is to validate perceived benefits and challenges of managing change in Building Information Modelling (BIM) Level 2 projects and to further explore the opportunities for enhancing the benefits and reducing the challenges. This research is timely because, hitherto, the benefits and challenges of managing change in BIM Level 2 remained largely unvalidated and the opportunities for enhancing the benefits and reducing challenges remained relatively unexplored. Design/methodology/approach A combination of a questionnaire survey and interviews with BIM Level 2 practitioners in the UK was employed in this study. In all, 41 responses were received from the questionnaire survey and ten subsequent interviews with BIM practitioners were carried out to explore opportunities for reducing challenges and increasing benefits of managing change in BIM Level 2 projects. Findings The study confirms benefits and challenges of managing change in BIM Level 2 projects identified and synthesised from literature, a much needed validation. Additional benefits and challenges were also identified in this study, such as cost saving and risk reduction (benefits) and social dimension issues in the BIM Level 2 processes (challenges). Opportunities identified to enhance benefits and reduce challenges were mainly socially driven, and were either reactive or proactive in nature. Research limitations/implications Opportunities for reducing challenges and increasing benefits identified from this research can inform the change management processes in BIM-Level 2. Practical implications The findings provide concrete basis for shaping BIM Level 2 change management processes and requirements. Social implications The identification of behaviours as shaping the social requirements for BIM-Level 2 confirms the need for a socio-technical approach to successful BIM implementation. Originality/value The identification of behaviours as shaping the social requirements for BIM Level 2 confirms the need for a socio-technical approach to successful BIM implementation.

Gunathilaka S, Tuuli M M and Dainty A R J (2013) Critical analysis of research on project success in construction management journals. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 979–988.

Koh T Y, Tuuli M M and Rowlinson S (2013) A relational approach to high reliability organising for construction project safety: a conceptual framework. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 369–379.

Liu, A M M, Fellows, R and Tuuli, M M (2011) The role of corporate citizenship values in promoting corporate social performance: towards a conceptual model and a research agenda. Construction Management and Economics, 29(02), 173–83.

Sackey, E, Tuuli, M and Dainty, A (2019) Expansive learning in contemporary construction organisations. Built Environment Project and Asset Management, 9(03), 383–98.

Tuuli, M and Acquah, S (2012) Do you feel what I feel? Empowerment contagion in project teams. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 563–74.

Tuuli, M M (2009) Empowerment and control dynamics in project teams: a multilevel examination of the antecedents and jobperformance consequences, Unpublished PhD Thesis, , University of Hong Kong.

Tuuli, M M and Koh, S R T Y (2009) Portfolio of control modes in project teams: A Hong Kong case study. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 2, 927–37.

Tuuli, M M and Rowlinson, S (2009) Empowerment in project teams: a multilevel examination of the job performance implications. Construction Management and Economics, 27(05), 473–98.

Tuuli, M M and Rowlinson, S (2010) Impact of leadership style and team context on psychological empowerment in construction project teams. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 1, 411–20.

Tuuli, M M and Rowlinson, S (2009) Performance Consequences of Psychological Empowerment. Journal of Construction Engineering and Management, 135(12), 1334–47.

Tuuli, M M and Rowlinson, S (2007) Towards a conceptual framework of empowerment and job performance in project teams. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 1, 3–12.

Tuuli, M M and Rowlinson, S (2010) What empowers individuals and teams in project settings? A critical incident analysis. Engineering, Construction and Architectural Management, 17(01), 20.

Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Control modes and mechanisms in construction project teams: drivers and consequences. Construction Management and Economics, 28(05), 451–65.

Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Dynamics of control in construction project teams. Construction Management and Economics, 28(02), 202.