Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 33 results ...

Adesi, M, Owusu-Manu, D and Murphy, R (2018) Strategic competences for pricing quantity surveying consultancy services. Engineering, Construction and Architectural Management, 25(03), 458–74.

Ahmadi Esfahani, N and Shahandashti, M (2020) Post-hazard labor wage fluctuations: a comparative empirical analysis among different sub-sectors of the U.S. construction sector. Journal of Financial Management of Property and Construction , 25(03), 313–30.

Akinradewo, O I, Aigbavboa, C O and Oke, A E (2020) Improving accuracy of road projects’ estimates in the Ghanaian construction industry. Journal of Financial Management of Property and Construction , 25(03), 407–21.

Bon, R (1997) The future of international construction. Building Research & Information, 25(03), 137–41.

Bordass, B and Leaman, A (1997) Design for manageability. Building Research & Information, 25(03), 148–57.

Deng, X, Low, S P, Zhao, X and Chang, T (2018) Identifying micro variables contributing to political risks in international construction projects. Engineering, Construction and Architectural Management, 25(03), 317–34.

Fo, S and Hietanen, x (2007) Interorganizational use of building information models: potential for automational, informational and transformational effects. Construction Management and Economics, 25(03), 289–96.

Gupta, P K and Verma, H (2020) Risk perception in PPP infrastructure project financing in India. Journal of Financial Management of Property and Construction , 25(03), 347–69.

Hassim, S, Muniandy, R, Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia. Engineering, Construction and Architectural Management, 25(03), 443–57.

Holt, G D (2018) Let’s change tack, not wind direction: a response to Kog and Yaman (2016). Engineering, Construction and Architectural Management, 25(03), 335–41.

Jin, X-H, Doloi, H and Gao, S-Y (2007) Relationship-based determinants of building project performance in China. Construction Management and Economics, 25(03), 297–304.

K'Akumu, O A (2007) Construction statistics review for Kenya. Construction Management and Economics, 25(03), 315–26.

Kappia, J G, Dainty, A R J and Price, A D F (2007) Prioritising career development in relation to recruitment and retention: a trade and craft perspective. Construction Management and Economics, 25(03), 239–53.

Ling, F Y Y and Hui, D (2007) Enablers for Singapore contractors to internationalize construction services. Construction Management and Economics, 25(03), 267–75.

Meintjes, I, Bowen, P and Root, D (2007) HIV/AIDS in the South African construction industry: understanding the HIV/AIDS discourse for a sector-specific response. Construction Management and Economics, 25(03), 255–66.

Ngowi, A B (1997) A hybrid approach to house construction: a case study in Botswana. Building Research & Information, 25(03), 142–7.

Obeng, K, Ocran, K A G and Anaba, D (1997) Palm kernel shell as fuel for burning bricks. Building Research & Information, 25(03), 131–6.

Olander, S (2007) Stakeholder impact analysis in construction project management. Construction Management and Economics, 25(03), 277–87.

Onubi, H O, Yusof, N and Hassan, A S (2020) Effects of green construction on project’s economic performance. Journal of Financial Management of Property and Construction , 25(03), 331–46.

Pellegrino, R and Costantino, N (2018) An empirical investigation of the learning effect in concrete operations. Engineering, Construction and Architectural Management, 25(03), 342–57.

Pheng, L S and May, C F (1997) Quality management systems: a study of authority and empowerment. Building Research & Information, 25(03), 158–69.

Praticò, F G (2007) Quality and timeliness in highway construction contracts: a new acceptance model based on both mechanical and surface performance of flexible pavements. Construction Management and Economics, 25(03), 305–13.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1997) Factors influencing the choice of concrete supply methods. Building Research & Information, 25(03), 176–84.

Rowlinson, S (2007) The temporal nature of forces acting on innovative IT in major construction projects. Construction Management and Economics, 25(03), 227–38.

Shurrab, M, Abbasi, G and Al Khazaleh, R (2018) Evaluating the effect of motivational dimensions on the construction project managers in Jordan. Engineering, Construction and Architectural Management, 25(03), 412–24.

Sundquist, V, Hulthén, K and Gadde, L E (2018) From project partnering towards strategic supplier partnering. Engineering, Construction and Architectural Management, 25(03), 358–73.

W., F A (2020) Impacts of capital structure: profitability of construction companies in Ethiopia. Journal of Financial Management of Property and Construction , 25(03), 371–86.

Wang, Q, Guo, Z, Mei, T, Li, Q and Li, P (2018) Labor crew workspace analysis for prefabricated assemblies’ installation. Engineering, Construction and Architectural Management, 25(03), 374–411.

Wild, S, Gailius, A, Hansen, H, Pederson, L and Szwabowski, J (1997) Pozzolanic properties of a variety of European clay bricks. Building Research & Information, 25(03), 170–5.

Williams, C and Kosta, B (2020) Explaining the cash-in-hand consumer culture in the European home repairs and renovations sector. Journal of Financial Management of Property and Construction , 25(03), 387–405.

Windapo, A O, Olugboyega, O and Odediran, S (2020) Impacts of procurement strategies on construction SMEs’ growth. Journal of Financial Management of Property and Construction , 25(03), 423–46.

Zhang, R P, Pirzadeh, P, Lingard, H and Nevin, S (2018) Safety climate as a relative concept. Engineering, Construction and Architectural Management, 25(03), 298–316.

  • Type: Journal Article
  • Keywords: Organization; Project management;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-09-2016-0207
  • Abstract:
    The purpose of this paper is to use a longitudinal approach to measure safety climate at construction projects, and explore the relationship between safety climate and the level of project completion in the dynamic construction project environments. Design/methodology/approach Multi-wave safety climate surveys were conducted at four processing plant construction projects in New Zealand. Safety climate was measured with a multi-level measurement instrument, which measured construction workers’ perceptions of client’s organisational safety response (COSR), principal contractor’s organisational safety response (PCOSR), supervisors’ safety response (SSR) and co-workers’ safety response (CWSR). Findings At the organisational level, the research identifies a general downward change trend in workers’ perceptions of COSR and PCOSR. At the group level, no clear or consistent change trend is identified between the level of project completion and workers’ perceptions of SSR and CWSR. Research limitations/implications The research suggests that the construction project management should consistently emphasise the importance of safety, even when they are facing production pressure. The research highlights the opportunity to examine the role of supervisors’ leadership as an antecedent to the group-level safety climate and the development of workers’ safety concerns for their co-workers over time. Originality/value This research provides the starting point for understanding safety climate in the dynamic and constantly changing construction project environments, in which the relative priorities change, adverse events arise and production pressures fluctuate over time.

Zuo, J, Zhao, X, Nguyen, Q B M, Ma, T and Gao, S (2018) Soft skills of construction project management professionals and project success factors. Engineering, Construction and Architectural Management, 25(03), 425–42.