Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 33 results ...

Adesi, M, Owusu-Manu, D and Murphy, R (2018) Strategic competences for pricing quantity surveying consultancy services. Engineering, Construction and Architectural Management, 25(03), 458–74.

Ahmadi Esfahani, N and Shahandashti, M (2020) Post-hazard labor wage fluctuations: a comparative empirical analysis among different sub-sectors of the U.S. construction sector. Journal of Financial Management of Property and Construction , 25(03), 313–30.

Akinradewo, O I, Aigbavboa, C O and Oke, A E (2020) Improving accuracy of road projects’ estimates in the Ghanaian construction industry. Journal of Financial Management of Property and Construction , 25(03), 407–21.

Bon, R (1997) The future of international construction. Building Research & Information, 25(03), 137–41.

Bordass, B and Leaman, A (1997) Design for manageability. Building Research & Information, 25(03), 148–57.

Deng, X, Low, S P, Zhao, X and Chang, T (2018) Identifying micro variables contributing to political risks in international construction projects. Engineering, Construction and Architectural Management, 25(03), 317–34.

Fo, S and Hietanen, x (2007) Interorganizational use of building information models: potential for automational, informational and transformational effects. Construction Management and Economics, 25(03), 289–96.

Gupta, P K and Verma, H (2020) Risk perception in PPP infrastructure project financing in India. Journal of Financial Management of Property and Construction , 25(03), 347–69.

Hassim, S, Muniandy, R, Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia. Engineering, Construction and Architectural Management, 25(03), 443–57.

Holt, G D (2018) Let’s change tack, not wind direction: a response to Kog and Yaman (2016). Engineering, Construction and Architectural Management, 25(03), 335–41.

Jin, X-H, Doloi, H and Gao, S-Y (2007) Relationship-based determinants of building project performance in China. Construction Management and Economics, 25(03), 297–304.

K'Akumu, O A (2007) Construction statistics review for Kenya. Construction Management and Economics, 25(03), 315–26.

Kappia, J G, Dainty, A R J and Price, A D F (2007) Prioritising career development in relation to recruitment and retention: a trade and craft perspective. Construction Management and Economics, 25(03), 239–53.

Ling, F Y Y and Hui, D (2007) Enablers for Singapore contractors to internationalize construction services. Construction Management and Economics, 25(03), 267–75.

Meintjes, I, Bowen, P and Root, D (2007) HIV/AIDS in the South African construction industry: understanding the HIV/AIDS discourse for a sector-specific response. Construction Management and Economics, 25(03), 255–66.

Ngowi, A B (1997) A hybrid approach to house construction: a case study in Botswana. Building Research & Information, 25(03), 142–7.

Obeng, K, Ocran, K A G and Anaba, D (1997) Palm kernel shell as fuel for burning bricks. Building Research & Information, 25(03), 131–6.

Olander, S (2007) Stakeholder impact analysis in construction project management. Construction Management and Economics, 25(03), 277–87.

Onubi, H O, Yusof, N and Hassan, A S (2020) Effects of green construction on project’s economic performance. Journal of Financial Management of Property and Construction , 25(03), 331–46.

Pellegrino, R and Costantino, N (2018) An empirical investigation of the learning effect in concrete operations. Engineering, Construction and Architectural Management, 25(03), 342–57.

Pheng, L S and May, C F (1997) Quality management systems: a study of authority and empowerment. Building Research & Information, 25(03), 158–69.

Praticò, F G (2007) Quality and timeliness in highway construction contracts: a new acceptance model based on both mechanical and surface performance of flexible pavements. Construction Management and Economics, 25(03), 305–13.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1997) Factors influencing the choice of concrete supply methods. Building Research & Information, 25(03), 176–84.

Rowlinson, S (2007) The temporal nature of forces acting on innovative IT in major construction projects. Construction Management and Economics, 25(03), 227–38.

Shurrab, M, Abbasi, G and Al Khazaleh, R (2018) Evaluating the effect of motivational dimensions on the construction project managers in Jordan. Engineering, Construction and Architectural Management, 25(03), 412–24.

Sundquist, V, Hulthén, K and Gadde, L E (2018) From project partnering towards strategic supplier partnering. Engineering, Construction and Architectural Management, 25(03), 358–73.

W., F A (2020) Impacts of capital structure: profitability of construction companies in Ethiopia. Journal of Financial Management of Property and Construction , 25(03), 371–86.

Wang, Q, Guo, Z, Mei, T, Li, Q and Li, P (2018) Labor crew workspace analysis for prefabricated assemblies’ installation. Engineering, Construction and Architectural Management, 25(03), 374–411.

Wild, S, Gailius, A, Hansen, H, Pederson, L and Szwabowski, J (1997) Pozzolanic properties of a variety of European clay bricks. Building Research & Information, 25(03), 170–5.

Williams, C and Kosta, B (2020) Explaining the cash-in-hand consumer culture in the European home repairs and renovations sector. Journal of Financial Management of Property and Construction , 25(03), 387–405.

Windapo, A O, Olugboyega, O and Odediran, S (2020) Impacts of procurement strategies on construction SMEs’ growth. Journal of Financial Management of Property and Construction , 25(03), 423–46.

Zhang, R P, Pirzadeh, P, Lingard, H and Nevin, S (2018) Safety climate as a relative concept. Engineering, Construction and Architectural Management, 25(03), 298–316.

Zuo, J, Zhao, X, Nguyen, Q B M, Ma, T and Gao, S (2018) Soft skills of construction project management professionals and project success factors. Engineering, Construction and Architectural Management, 25(03), 425–42.

  • Type: Journal Article
  • Keywords: Project management; Construction industry; Vietnam; Structural equation modelling; Soft skill;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-01-2016-0016
  • Abstract:
    The purpose of this paper is twofold: first, to identify the soft skills of construction project management; and second, to investigate the influence of these soft skills on project success factors in the Vietnamese construction industry. Design/methodology/approach A questionnaire survey was conducted with 108 project management professionals from the Vietnamese construction industry. Partial least square structural equation modelling was employed in data analysis. Findings Four-dimensional structure of project success factors was confirmed in this study. Results also showed that soft skills of project managers significantly contributed to project success factors and hence the project success. Research limitations/implications There may be geographical limitation on the conclusions drawn from the findings. Similarly, the sample size was still small, despite a relatively high response rate. In addition, the majority of the respondents were contractors and clients as other project players were reluctant to respond to the survey. Practical implications This study provides an understanding of the relationship between soft skills and project success factors. Originality/value Although there have been studies focused on soft skills of project management and project success factors, few have attempted to analyse the effects of these soft skills on critical success factors. Thus, this study adds significantly to the existing research on both project management skills and project success factors.