Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 32 results ...

Adams, F K (2006) Expert elicitation and Bayesian analysis of construction contract risks: an investigation. Construction Management and Economics, 24(01), 81-96.

Aibinu, A A (2006) The relationship between distribution of control, fairness and potential for dispute in the claims handling process. Construction Management and Economics, 24(01), 45-54.

Andi (2006) The importance and allocation of risks in Indonesian construction projects. Construction Management and Economics, 24(01), 69-80.

Arif, M, Al Zubi, M, Gupta, A D, Egbu, C, Walton, R O and Islam, R (2017) Knowledge sharing maturity model for Jordanian construction sector. Engineering, Construction and Architectural Management, 24(01), 170-88.

Asiedu, R O, Frempong, N K and Alfen, H W (2017) Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management, 24(01), 21-39.

Assaf, S A and Barhamain, S Y (1996) Factors affecting construction practices in Makkah Al-Mukkaramah, Saudi Arabia. Building Research & Information, 24(01), 27–30.

Assaf, S A, Al-Musallami, A I and Shash, A A (1996) Professional architectural/engineering consultancy practices in Saudi Arabia. Building Research & Information, 24(01), 59–62.

Bubshait, A A, Tahir, B M and Jannadi, M O (1996) Use of microsilica in concrete construction. Building Research & Information, 24(01), 41–9.

  • Type: Journal Article
  • Keywords: concrete; microsilica; silica fume concrete; Saudi Arabia
  • ISBN/ISSN: 0961-3218
  • URL: https://doi.org/10.1080/09613219608727497
  • Abstract:
    The advantages of using microsilica can be considerable as it reduces thermal cracking caused by the heat of cement hydration and can improve durability to attack by sulphate and acidic waters. The advantages and applications are reviewed and a number of test core illustrations are included.

Chang-Richards, Y, Wilkinson, S, Seville, E and Brunsdon, D (2017) Effects of a major disaster on skills shortages in the construction industry: Lessons learned from New Zealand. Engineering, Construction and Architectural Management, 24(01), 2-20.

Dann, N, Hills, S and Worthing, D (2006) Assessing how organizations approach the maintenance management of listed buildings. Construction Management and Economics, 24(01), 97-104.

Davies, K, McMeel, D J and Wilkinson, S (2017) Making friends with Frankenstein: Hybrid practice in BIM. Engineering, Construction and Architectural Management, 24(01), 78-93.

Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(01), 19-30.

De Silva, G, Perera, B and Rodrigo, M (2019) Adaptive reuse of buildings: the case of Sri Lanka. Journal of Financial Management of Property and Construction, 24(01), 79–96.

Enshassi, A (1996) Materials control and waste on building sites. Building Research & Information, 24(01), 31–4.

Friedman, A and Cammalleri, V (1996) The impact of R-2000 building technology on Canadian housing. Building Research & Information, 24(01), 5–13.

Huang, Y C (2006) Graphical-based multistage scheduling method for RC buildings. Construction Management and Economics, 24(01), 5-18.

K.V., P, V., V, R., V and Bhat, N (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(01), 58–78.

Kärnä, S and Junnonen, J-M (2017) Designers’ performance evaluation in construction projects. Engineering, Construction and Architectural Management, 24(01), 154-69.

Kalutara, P, Zhang, G, Setunge, S and Wakefield, R (2017) Factors that influence Australian community buildings’ sustainable management. Engineering, Construction and Architectural Management, 24(01), 94-117.

Leung, M-Y, Liu, A M M and Wong, M M-k (2006) Impact of stress-coping behaviour on estimation performance. Construction Management and Economics, 24(01), 55-67.

Lu, W, Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(01), 118-32.

Lu, W, Li, Z and Wang, S (2017) The role of justice for cooperation and contract’s moderating effect in construction dispute negotiation. Engineering, Construction and Architectural Management, 24(01), 133-53.

Mbachu, J and Nkado, R (2006) Conceptual framework for assessment of client needs and satisfaction in the building development process. Construction Management and Economics, 24(01), 31-44.

Osei-Kyei, R, Chan, A P, Yao, Y and Mazher, K M (2019) Conflict prevention measures for public–private partnerships in developing countries. Journal of Financial Management of Property and Construction, 24(01), 39–57.

Santoso, D S and Bourpanus, N (2019) Moving to e-bidding. Journal of Financial Management of Property and Construction, 24(01), 2–18.

Sarkar, A, Godbole, P N and Chakrabarti, S C (1996) Potential for expert systems in the assessment and repair of fire damaged buildings in India. Building Research & Information, 24(01), 51–8.

Semaan, N and Salem, M (2017) A deterministic contractor selection decision-support system for competitive bidding. Engineering, Construction and Architectural Management, 24(01), 61-77.

Shahtaheri, M, Haas, C T and Salimi, T (2017) A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects. Engineering, Construction and Architectural Management, 24(01), 40-60.

Singla, H K and Samanta, P K (2019) Determinants of dividend payout of construction companies: a panel data analysis. Journal of Financial Management of Property and Construction, 24(01), 19–38.

Thomas, H R, Rees, S W and Lloyd, R M (1996) Measured heat losses through a real ground floor slab. Building Research & Information, 24(01), 15–26.

Velho Júnior, V E, Costa Melo, I, Alves Junior, P N and Rebelatto, D A d N (2019) Analysis of real estate management of lease service agreements by the public sector of a Latin American metropolis. Journal of Financial Management of Property and Construction , 24(01), 97–122.

Wild, S (1996) Observations on the use of ground waste clay brick as a cement replacement material. Building Research & Information, 24(01), 35–40.