Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 30 results ...

Aalto, L, Sirola, P, Kalliomäki-Levanto, T, Lahtinen, M, Ruohomäki, V, Salonen, H and Reijula, K (2019) User-centric work environments in modular healthcare facilities. Engineering, Construction and Architectural Management, 26(06), 1047–62.

Chapman, C and Ward, S (2008) Developing and implementing a balanced incentive and risk sharing contract. Construction Management and Economics, 26(06), 659–69.

Chinyio, E and Akintoye, A (2008) Practical approaches for engaging stakeholders: findings from the UK. Construction Management and Economics, 26(06), 591–9.

Daniel, E I and Pasquire, C (2019) Creating social value within the delivery of construction projects: the role of lean approach. Engineering, Construction and Architectural Management, 26(06), 1105–28.

Du, J, Wang, Q and Shi, Q (2019) Description–experience gap under imperfect information. Engineering, Construction and Architectural Management, 26(06), 1151–70.

Edwards, P and Bowen, P (2019) Language and communication issues in HIV/AIDS intervention management in the South African construction industry. Engineering, Construction and Architectural Management, 26(06), 962–88.

Fraser, C and Zhu, C (2008) Stakeholder perception of construction site managers' effectiveness. Construction Management and Economics, 26(06), 579–90.

Galbraith, G H, McLean, R C, Gillespie, I, Guo, J S and Kelly, D (1998) Non-isothermal moisture diffusion in porous building materials. Building Research & Information, 26(06), 330–9.

Layzell, J and Ledbetter, S (1998) FMEA applied to cladding systems: reducing the risk of failure. Building Research & Information, 26(06), 351–7.

Li, H, Love, P E D and Ogunlana, S (1998) Genetic algorithm compared to non-linear optimization for labour and equipment assignment. Building Research & Information, 26(06), 322–9.

Li, L, Li, Z, Li, X and Wu, G (2019) A review of global lean construction during the past two decades: analysis and visualization. Engineering, Construction and Architectural Management, 26(06), 1192–216.

Lingard, H, Zhang, R P and Oswald, D (2019) Effect of leadership and communication practices on the safety climate and behaviour of construction workgroups. Engineering, Construction and Architectural Management, 26(06), 886–906.

Mathur, V N, Price, A and Austin, S (2008) Conceptualizing stakeholder engagement in the context of sustainability and its assessment. Construction Management and Economics, 26(06), 601–9.

  • Type: Journal Article
  • Keywords: Stakeholder; sustainability; strategic management; ethics; social learning; dialogue; sustainability assessment
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190802061233
  • Abstract:
    Stakeholder engagement in construction projects can be conceptualized in different ways. It can be seen from a strategic management perspective aimed at capturing knowledge, increasing ownership of the project by users, reducing conflict, encouraging innovation and facilitating spin-off partnerships. From an ethical perspective, meaningful stakeholder engagement can be seen to enhance inclusive decision making, promote equity, enhance local decision making and build social capital. The benefits from both of these perspectives are vital for sustainability; however, stakeholder engagement can also be seen from the perspective of an opportunity for social learning—a social process where diverse stakeholders share a common forum, learn about each other's values, reflect upon their own values and create a shared vision and shared objectives. Dialogue is also useful in increasing awareness, changing attitudes and affecting behaviours. Existing practices view stakeholder engagement: mostly from a management perspective; sometimes from an ethical perspective; less often as a combination of the two; and rarely have any element of the social learning perspective. There is a need for an approach that combines all the three perspectives if sustainability is to be pursued. A dialogue-oriented approach to integrated sustainability assessment could provide an ideal means to do so.

Moodley, K, Smith, N and Preece, C N (2008) Stakeholder matrix for ethical relationships in the construction industry. Construction Management and Economics, 26(06), 625–32.

Munir, M, Kiviniemi, A and Jones, S W (2019) Business value of integrated BIM-based asset management. Engineering, Construction and Architectural Management, 26(06), 1171–91.

Ngowi, A B (1998) Is construction procurement a key to sustainable development?. Building Research & Information, 26(06), 340–50.

Olander, S and Landin, A (2008) A comparative study of factors affecting the external stakeholder management process. Construction Management and Economics, 26(06), 553–61.

Rowlinson, S and Cheung, Y K F (2008) Stakeholder management through empowerment: modelling project success. Construction Management and Economics, 26(06), 611–23.

Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(06), 945–61.

Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(06), 1004–23.

Shrestha, K, Shrestha, P P and Lidder, M (2019) Life-cycle cost comparison of chip seal and striping: in-house workers versus private contractors. Engineering, Construction and Architectural Management, 26(06), 927–44.

Shrestha, P P, Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(06), 1087–104.

Shurrab, J, Hussain, M and Khan, M (2019) Green and sustainable practices in the construction industry. Engineering, Construction and Architectural Management, 26(06), 1063–86.

Smyth, H (2008) The credibility gap in stakeholder management: ethics and evidence of relationship management. Construction Management and Economics, 26(06), 633–43.

Walker, D, Bourne, L M and Shelley, A (2008) Influence, stakeholder mapping and visualization. Construction Management and Economics, 26(06), 645–58.

Wang, Q and Shi, Q (2019) The incentive mechanism of knowledge sharing in the industrial construction supply chain based on a supervisory mechanism. Engineering, Construction and Architectural Management, 26(06), 989–1003.

Ward, S and Chapman, C (2008) Stakeholders and uncertainty management in projects. Construction Management and Economics, 26(06), 563–77.

Yalcinkaya, M and Singh, V (2019) Exploring the use of Gestalt’s principles in improving the visualization, user experience and comprehension of COBie data extension. Engineering, Construction and Architectural Management, 26(06), 1024–46.

Zhu, F, Sun, M, Wang, L, Sun, X and Yu, M (2019) Value conflicts between local government and private sector in stock public-private partnership projects. Engineering, Construction and Architectural Management, 26(06), 907–26.

Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(06), 1129–50.