Burton, R, Dickson, M and Harris, R (1998) The use of roundwood thinnings in buildings: a case study. Building Research & Information, 26(02), 76–93.

Cheung, S O and Li, K (2019) Biases in construction project dispute resolution. Engineering, Construction and Architectural Management, 26(02), 321–48.

Chiang, Y-H, Tang, B-S and Wong, F K W (2008) Volume building as competitive strategy. Construction Management and Economics, 26(02), 161–76.

Edirisinghe, R (2019) Digital skin of the construction site. Engineering, Construction and Architectural Management, 26(02), 184–223.

Hong, Y, Hammad, A W, Sepasgozar, S and Akbarnezhad, A (2019) BIM adoption model for small and medium construction organisations in Australia. Engineering, Construction and Architectural Management, 26(02), 154–83.

Hwang, B-G, Thomas, S R, Degezelle, D and Caldas, C H (2008) Development of a benchmarking framework for pharmaceutical capital projects. Construction Management and Economics, 26(02), 177–95.

Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: an analysis of 30 Melbourne case studies. Construction Management and Economics, 26(02), 147–60.

Lin, Y-H, Lee, P-C and Chang, T-P (2008) Integrating grey number and Minkowski distance function into grey relational analysis technique to improve the decision quality under uncertain information. Construction Management and Economics, 26(02), 115–23.

Lizarralde, G and Root, D (2008) The informal construction sector and the inefficiency of low cost housing markets. Construction Management and Economics, 26(02), 103–13.

Loosemore, M and Galea, N (2008) Genderlect and conflict in the Australian construction industry. Construction Management and Economics, 26(02), 125–35.

Parn, E A and Edwards, D (2019) Cyber threats confronting the digital built environment. Engineering, Construction and Architectural Management, 26(02), 245–66.

Petrovic-Lazarevic, S (2008) The development of corporate social responsibility in the Australian construction industry. Construction Management and Economics, 26(02), 93–101.

Plantinga, H, Voordijk, H and Doree, A (2019) The reasoning behind infrastructure manager’s choice of procurement instruments. Engineering, Construction and Architectural Management, 26(02), 303–20.

Steemers, K, Baker, N, Crowther, D, Dubiel, J and Nikolopoulou, M (1998) Radiation absorption and urban texture. Building Research & Information, 26(02), 103–12.

Sutrisna, M and Goulding, J (2019) Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, Construction and Architectural Management, 26(02), 267–84.

Thomas, T (1998) Domestic water supply using rainwater harvesting. Building Research & Information, 26(02), 94–101.

Ungureanu, L C, Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules’ quality. Engineering, Construction and Architectural Management, 26(02), 224–44.

Utama, W P, Chan, A P, Zahoor, H, Gao, R and Jumas, D Y (2019) Making decision toward overseas construction projects. Engineering, Construction and Architectural Management, 26(02), 285–302.

Waara, F (2008) Mitigating contractual hazards in public procurement: a study of Swedish local authorities. Construction Management and Economics, 26(02), 137–45.

  • Type: Journal Article
  • Keywords: contracting; procurement law; public sector; Sweden
  • ISBN/ISSN: 0144-6193
  • URL: http://www.informaworld.com/openurl?genre=article&issn=0144-6193&volume=26&issue=2&spage=137
  • Abstract:
    Private sector buyers often award construction contracts through negotiation rather than through open competitive tendering. Negotiating with a reputable contractor is a way to mitigate contractual hazards. For many public sector buyers, however, open competitive tendering is required by law. The practices of procurement officers in local authorities are examined in regard to the selection of construction contractors, focusing particularly on their use of scoring-based competitive tendering and ex ante information exchange between procurement officers and the firms competing for contracts. Semi-structured interviews were carried out with 15 procurement officers in 10 local authorities in Sweden. Using the contractor's staffing of the project organization as a contract award criterion allows procurement officers to select reputable contractors. Arranging face-to-face meetings with contractors before the final award decision allows procurement officers to resolve at least some technical problems in complex construction projects. When negotiations are prohibited by law, these practices can be seen as combined responses to hazards of construction contracting.