Burton, R, Dickson, M and Harris, R (1998) The use of roundwood thinnings in buildings: a case study. Building Research & Information, 26(02), 76–93.

Cheung, S O and Li, K (2019) Biases in construction project dispute resolution. Engineering, Construction and Architectural Management, 26(02), 321–48.

Chiang, Y-H, Tang, B-S and Wong, F K W (2008) Volume building as competitive strategy. Construction Management and Economics, 26(02), 161–76.

Edirisinghe, R (2019) Digital skin of the construction site. Engineering, Construction and Architectural Management, 26(02), 184–223.

Hong, Y, Hammad, A W, Sepasgozar, S and Akbarnezhad, A (2019) BIM adoption model for small and medium construction organisations in Australia. Engineering, Construction and Architectural Management, 26(02), 154–83.

Hwang, B-G, Thomas, S R, Degezelle, D and Caldas, C H (2008) Development of a benchmarking framework for pharmaceutical capital projects. Construction Management and Economics, 26(02), 177–95.

Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: an analysis of 30 Melbourne case studies. Construction Management and Economics, 26(02), 147–60.

Lin, Y-H, Lee, P-C and Chang, T-P (2008) Integrating grey number and Minkowski distance function into grey relational analysis technique to improve the decision quality under uncertain information. Construction Management and Economics, 26(02), 115–23.

Lizarralde, G and Root, D (2008) The informal construction sector and the inefficiency of low cost housing markets. Construction Management and Economics, 26(02), 103–13.

Loosemore, M and Galea, N (2008) Genderlect and conflict in the Australian construction industry. Construction Management and Economics, 26(02), 125–35.

Parn, E A and Edwards, D (2019) Cyber threats confronting the digital built environment. Engineering, Construction and Architectural Management, 26(02), 245–66.

Petrovic-Lazarevic, S (2008) The development of corporate social responsibility in the Australian construction industry. Construction Management and Economics, 26(02), 93–101.

Plantinga, H, Voordijk, H and Doree, A (2019) The reasoning behind infrastructure manager’s choice of procurement instruments. Engineering, Construction and Architectural Management, 26(02), 303–20.

  • Type: Journal Article
  • Keywords: Knowledge management; Case study; Strategic management;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-02-2018-0068
  • Abstract:
    The purpose of this paper is to show that for frequently procuring public clients: the reasoning behind the use of procurement instruments is a process in its own right that requires managerial and scientific attention; modeling this process contributes to making sensible procurement choices; and managing this process is a relevant factor in the client’s development toward strategic procurement. Design/methodology/approach A model is developed to conceptualize the reasoning behind procurement instruments. Using this model in a case study, the reasoning behind the evolution of a particular procurement instrument as applied by a public infrastructure management organization is reconstructed. Findings The case study results show that an initially explicitly formulated set of main reasons for operating a qualification system can implicitly evolve over time into a different set of reasons. From a managerial point of view, explication of implicit reasons is important to both avoid the risk that the real value of the procurement instrument remains undetected as well as properly assess its strategic alignment with higher level strategies. The conceptual model proves to be a useful tool to support that. Originality/value Bringing the reasoning behind the use of procurement instruments to the fore, this study explores an area of construction procurement research that is positioned between the disciplines of purchasing and supply management, knowledge management and strategic management.

Steemers, K, Baker, N, Crowther, D, Dubiel, J and Nikolopoulou, M (1998) Radiation absorption and urban texture. Building Research & Information, 26(02), 103–12.

Sutrisna, M and Goulding, J (2019) Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, Construction and Architectural Management, 26(02), 267–84.

Thomas, T (1998) Domestic water supply using rainwater harvesting. Building Research & Information, 26(02), 94–101.

Ungureanu, L C, Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules’ quality. Engineering, Construction and Architectural Management, 26(02), 224–44.

Utama, W P, Chan, A P, Zahoor, H, Gao, R and Jumas, D Y (2019) Making decision toward overseas construction projects. Engineering, Construction and Architectural Management, 26(02), 285–302.

Waara, F (2008) Mitigating contractual hazards in public procurement: a study of Swedish local authorities. Construction Management and Economics, 26(02), 137–45.