Burton, R, Dickson, M and Harris, R (1998) The use of roundwood thinnings in buildings: a case study. Building Research & Information, 26(02), 76–93.

Cheung, S O and Li, K (2019) Biases in construction project dispute resolution. Engineering, Construction and Architectural Management, 26(02), 321–48.

Chiang, Y-H, Tang, B-S and Wong, F K W (2008) Volume building as competitive strategy. Construction Management and Economics, 26(02), 161–76.

Edirisinghe, R (2019) Digital skin of the construction site. Engineering, Construction and Architectural Management, 26(02), 184–223.

  • Type: Journal Article
  • Keywords: Information systems; Innovation; Technology; Construction; Information and communication technology (ICT) applications; Novel method;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-04-2017-0066
  • Abstract:
    The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of the future smart construction site. Design/methodology/approach The paper provides a systematic and hierarchical classification of 114 articles from both industry and academia on the digital skin concept and evaluates them. The hierarchical classification is based on application areas relevant to construction, such as augmented reality, building information model-based visualisation, labour tracking, supply chain tracking, safety management, mobile equipment tracking and schedule and progress monitoring. Evaluations of the research papers were conducted based on three pillars: validation of technological feasibility, onsite application and user acceptance testing. Findings Technologies learned about in the literature review enabled the envisaging of the pervasive construction site of the future. The paper presents scenarios for the future context-aware construction site, including the construction worker, construction procurement management and future real-time safety management systems. Originality/value Based on the gaps identified by the review in the body of knowledge and on a broader analysis of technology diffusion, the paper highlights the research challenges to be overcome in the advent of digital skin. The paper recommends that researchers follow a coherent process for smart technology design, development and implementation in order to achieve this vision for the construction industry.

Hong, Y, Hammad, A W, Sepasgozar, S and Akbarnezhad, A (2019) BIM adoption model for small and medium construction organisations in Australia. Engineering, Construction and Architectural Management, 26(02), 154–83.

Hwang, B-G, Thomas, S R, Degezelle, D and Caldas, C H (2008) Development of a benchmarking framework for pharmaceutical capital projects. Construction Management and Economics, 26(02), 177–95.

Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: an analysis of 30 Melbourne case studies. Construction Management and Economics, 26(02), 147–60.

Lin, Y-H, Lee, P-C and Chang, T-P (2008) Integrating grey number and Minkowski distance function into grey relational analysis technique to improve the decision quality under uncertain information. Construction Management and Economics, 26(02), 115–23.

Lizarralde, G and Root, D (2008) The informal construction sector and the inefficiency of low cost housing markets. Construction Management and Economics, 26(02), 103–13.

Loosemore, M and Galea, N (2008) Genderlect and conflict in the Australian construction industry. Construction Management and Economics, 26(02), 125–35.

Parn, E A and Edwards, D (2019) Cyber threats confronting the digital built environment. Engineering, Construction and Architectural Management, 26(02), 245–66.

Petrovic-Lazarevic, S (2008) The development of corporate social responsibility in the Australian construction industry. Construction Management and Economics, 26(02), 93–101.

Plantinga, H, Voordijk, H and Doree, A (2019) The reasoning behind infrastructure manager’s choice of procurement instruments. Engineering, Construction and Architectural Management, 26(02), 303–20.

Steemers, K, Baker, N, Crowther, D, Dubiel, J and Nikolopoulou, M (1998) Radiation absorption and urban texture. Building Research & Information, 26(02), 103–12.

Sutrisna, M and Goulding, J (2019) Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, Construction and Architectural Management, 26(02), 267–84.

Thomas, T (1998) Domestic water supply using rainwater harvesting. Building Research & Information, 26(02), 94–101.

Ungureanu, L C, Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules’ quality. Engineering, Construction and Architectural Management, 26(02), 224–44.

Utama, W P, Chan, A P, Zahoor, H, Gao, R and Jumas, D Y (2019) Making decision toward overseas construction projects. Engineering, Construction and Architectural Management, 26(02), 285–302.

Waara, F (2008) Mitigating contractual hazards in public procurement: a study of Swedish local authorities. Construction Management and Economics, 26(02), 137–45.