Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 29 results ...

Ansah, R H and Sorooshian, S (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25(01), 62-76.

  • Type: Journal Article
  • Keywords: construction; risk management; project management
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-09-2016-0199
  • Abstract:
    Purpose As a result of the increasing challenges of time overrun, several companies regularly set up delay assessment procedures for performance improvement and profit maximization. In the construction industry, projects are enormously complicated and involve significant budgets, and therefore optimizing project performance through the root cause analysis should be imperative for every project manager. Typically issues of delays in projects are generally discussed and problematized separately, yet a comprehensive framework for systematic analysis and grouping of delays is rarely contended. The purpose of this paper is to introduce the 4P concept (project related, practices, participants, and procurement) for identifying, analyzing, and classifying delays in the internal environment of the project development process. Design/methodology/approach The 4P conceptual framework was validated through the synthesis of the existing literature. Findings Interestingly, despite the increasing concerns about delays in the construction industry, most research on delays are project and/or country specific, thus no consensus about the sources of delays. The application of the proposed concept as a theoretical framework would provide an understanding of the available delay sources, their risks and use for project delay assessment and classification. Research limitations/implications This study grouped delays based on the shared characteristics and four main sources were identified and analyzed. There may be other sources or factors, yet would be dependent or aspect of the 4P. Practical implications The study informs project teams to reduce delays in the construction industry. Originality/value The paper is an application of risk assessment tool to conceptualize delays in the internal project environment.

Babatunde, S O, Perera, S, Ekundayo, D and Adeleye, T E (2019) An investigation into BIM-based detailed cost estimating and drivers to the adoption of BIM in quantity surveying practices. Journal of Financial Management of Property and Construction , 25(01), 61–81.

Carreira, P, Castelo, T, Gomes, C C, Ferreira, A, Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users' perceptions. Engineering, Construction and Architectural Management, 25(01), 90-112.

Cheah, C Y J, Kang, J and Chew, D A S (2007) Strategic analysis of large local construction firms in China. Construction Management and Economics, 25(01), 25-38.

Chen, J J (1997) China's construction industry and foreign investment. Building Research & Information, 25(01), 5–10.

Coleman, E, Nooni, I K, Fianko, S K, Dadzie, L, Neequaye, E N, Owusu-Agyemang, J and Ansa-Asare, E O (2020) Assessing contract management as a strategic tool for achieving quality of work in Ghanaian construction industry. Journal of Financial Management of Property and Construction, 25(01), 41–60.

Fan, Y and Kokko, E (1997) Three-dimensional gaseous transfer within cellular plastic insulation and its consequences. Building Research & Information, 25(01), 25–35.

Gerbov, A, Singh, V and Herva, M (2018) Challenges in applying design research studies to assess benefits of BIM in infrastructure projects: Reflections from Finnish case studies. Engineering, Construction and Architectural Management, 25(01), 2-20.

Hatamleh, M T, Hiyassat, M, Sweis, G J and Sweis, R J (2018) Factors affecting the accuracy of cost estimate: Case of Jordan. Engineering, Construction and Architectural Management, 25(01), 113-31.

Ikuabe, M, Oke, A E and Aigbavboa, C (2020) Impact of contractors’ opportunism on construction project transaction costs. Journal of Financial Management of Property and Construction , 25(01), 125–41.

Keswani, K (1997) The contribution of building centres to low-cost housing in India. Building Research & Information, 25(01), 50–64.

Lewis, T M (2007) Impact of globalization on the construction sector in developing countries. Construction Management and Economics, 25(01), 7-23.

Lian, J K M, Foo, Z Y and Ling, F Y Y (2018) Value of internships for professional careers in the built environment sector in Singapore. Engineering, Construction and Architectural Management, 25(01), 77-89.

Lingard, H, Blismas, N, Harley, J, Stranieri, A, Zhang, R P and Pirzadeh, P (2018) Making the invisible visible: Stimulating work health and safety-relevant thinking through the use of infographics in construction design. Engineering, Construction and Architectural Management, 25(01), 39-61.

Ma, L, Reed, R and Jin, X (2018) Identify the equilibrium of residential construction output: A vector error correction model approach. Engineering, Construction and Architectural Management, 25(01), 21-38.

Mbachu, J and Nkado, R (2007) Factors constraining successful building project implementation in South Africa. Construction Management and Economics, 25(01), 39-54.

Perera, B, Samarakkody, A L and Nandasena, S R (2020) Managing financial and economic risks associated with high-rise apartment building construction in Sri Lanka. Journal of Financial Management of Property and Construction , 25(01), 143–62.

Pheng, L S and Omar, H F (1997) Integration, segmentalism and the maintenance of quality management systems in the construction industry. Building Research & Information, 25(01), 36–49.

Plessis, C D (2007) A strategic framework for sustainable construction in developing countries. Construction Management and Economics, 25(01), 67-76.

Rwelamila, P M D (2007) Project management competence in public sector infrastructure organisations. Construction Management and Economics, 25(01), 55-66.

Sha, K, Deng, X, Chen, Q and Xie, B (1997) Evolution of cost estimating system in China: intelligent estimator for Shandong Province (IES) to general intelligent estimator (GIE). Building Research & Information, 25(01), 11–4.

Shih, N-J and Lan, W-J (1997) Incorporating a 3D urban environmental model (3DUEM) into government and architectural firms. Building Research & Information, 25(01), 18–24.

Singla, H K (2020) Does family ownership affect the profitability of construction and real estate firms? Evidence from India. Journal of Financial Management of Property and Construction , 25(01), 107–24.

Tawalare, A and Laishram, B (2019) Factors hindering effective partnering in Indian public sector construction organizations. Journal of Financial Management of Property and Construction , 25(01), 83–105.

Wei, H and Xu, X (1997) Composite masonry buildings in China. Building Research & Information, 25(01), 15–7.

Wells, J (2007) Informality in the construction sector in developing countries. Construction Management and Economics, 25(01), 87-93.

Wong, J, Wong, P N K and Heng, L (2007) An investigation of leadership styles and relationship cultures of Chinese and expatriate managers in multinational construction companies in Hong Kong. Construction Management and Economics, 25(01), 95-106.

Yorucu, V and Keles, R (2007) The construction boom and environmental protection in Northern Cyprus as a consequence of the Annan Plan. Construction Management and Economics, 25(01), 77-86.

Zekri, M M and Razali, M N (2019) Volatility dynamics of Malaysian listed property companies within the Asian public property markets by using a switching regime approach. Journal of Financial Management of Property and Construction , 25(01), 5–39.