Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 13 results ...

Andersen, M, Kleindienst, S, Yi, L, Lee, J, Bodart, M and Cutler, B (2008) An intuitive daylighting performance analysis and optimization approach. Building Research & Information, 36(06), 593–607.

Canter, D (2008) Do we need a metatheory of the built environment?. Building Research & Information, 36(06), 663–7.

Ho, D C W, Chau, K W and Yau, Y (2008) Evaluating unauthorized appendages in private apartment buildings. Building Research & Information, 36(06), 568–79.

Hu, D, Mohamed, Y, Taghaddos, H and Hermann, U ( (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(06), 328–47.

Mahapatra, K and Gustavsson, L (2008) Multi-storey timber buildings: breaking industry path dependency. Building Research & Information, 36(06), 638–48.

Reymen, I M M J, Dewulf, G P M R and Blokpoel, S B (2008) Framework for managing uncertainty in property projects. Building Research & Information, 36(06), 580–92.

  • Type: Journal Article
  • Keywords: design process; process approach; project management; property development; risk management; uncertainty management; collaboration
  • ISBN/ISSN: 0961-3218
  • URL: https://doi.org/10.1080/09613210802214259
  • Abstract:
    A primary task of property development (or real estate development, RED) is making assessments and managing risks and uncertainties. Property managers cope with a wide range of uncertainties, particularly in the early project phases. Although the existing literature addresses the management of calculated risks, the management of uncertainties is underexposed. A framework and method are presented for uncertainty management, both of which focus on the early phases of complex RED projects. To develop this method, a design method for the development of consumer-based software (SCRUM) is adapted. The traditional uncertainty management in property development was compared with the SCRUM approach. SCRUM is found to be a highly useful tool for uncertainty management in real estate, but it requires adjustment to the specific context of property. An adjusted method RESCRUM was developed and a first test of its accuracy and usefulness in practice is presented.

Ryu, S-R, Rhee, K-N, Yeo, M-S and Kim, K-W (2008) Strategies for flow rate balancing in radiant floor heating systems. Building Research & Information, 36(06), 625–37.

Sanchez, B and Haas, C (2018) Capital project planning for a circular economy. Construction Management and Economics, 36(06), 303–12.

Snyder, J R, Dilaver, O, Stephenson, L C, Mackie, J E and Smith, S D (2018) Agent-based modelling and construction – reconstructing antiquity’s largest infrastructure project. Construction Management and Economics, 36(06), 313–27.

Szalay, Z (2008) Modelling building stock geometry for energy, emission and mass calculations. Building Research & Information, 36(06), 557–67.

Ye, M, Lu, W, Flanagan, R and Ye, K (2018) Diversification in the international construction business. Construction Management and Economics, 36(06), 348–61.

Yun, G Y, Steemers, K and Baker, N (2008) Natural ventilation in practice: linking facade design, thermal performance, occupant perception and control. Building Research & Information, 36(06), 608–24.

Zemke, D M V and Pullman, M (2008) Assessing the value of good design in hotels. Building Research & Information, 36(06), 543–56.