Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 13 results ...

Andersen, M, Kleindienst, S, Yi, L, Lee, J, Bodart, M and Cutler, B (2008) An intuitive daylighting performance analysis and optimization approach. Building Research & Information, 36(06), 593–607.

Canter, D (2008) Do we need a metatheory of the built environment?. Building Research & Information, 36(06), 663–7.

Ho, D C W, Chau, K W and Yau, Y (2008) Evaluating unauthorized appendages in private apartment buildings. Building Research & Information, 36(06), 568–79.

Hu, D, Mohamed, Y, Taghaddos, H and Hermann, U ( (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(06), 328–47.

Mahapatra, K and Gustavsson, L (2008) Multi-storey timber buildings: breaking industry path dependency. Building Research & Information, 36(06), 638–48.

  • Type: Journal Article
  • Keywords: innovation system; lock-in; multi-storey buildings; path dependency; technology systems; timber frame; wood buildings; Sweden
  • ISBN/ISSN: 0961-3218
  • URL: https://doi.org/10.1080/09613210802386123
  • Abstract:
    The Swedish legal restriction on construction of multi-storey timber buildings was imposed in 1888 and repealed in 1994. The subsequent emergence of such a timber building system in Sweden is analysed in the context of the existing concrete-based construction system. The characteristics of the construction industry and its path dependency over the past century hamper the development of a timber building system. However, government policies and funding, the wood industry's interest in an enhanced market for value-added wood products, and involvement of the wood research community has helped develop such a construction system. Investments in knowledge creation, incentives for the entry of new firms, and increased prefabrication may facilitate a transition from this formative phase to a growth phase in the diffusion of timber buildings.

Reymen, I M M J, Dewulf, G P M R and Blokpoel, S B (2008) Framework for managing uncertainty in property projects. Building Research & Information, 36(06), 580–92.

Ryu, S-R, Rhee, K-N, Yeo, M-S and Kim, K-W (2008) Strategies for flow rate balancing in radiant floor heating systems. Building Research & Information, 36(06), 625–37.

Sanchez, B and Haas, C (2018) Capital project planning for a circular economy. Construction Management and Economics, 36(06), 303–12.

Snyder, J R, Dilaver, O, Stephenson, L C, Mackie, J E and Smith, S D (2018) Agent-based modelling and construction – reconstructing antiquity’s largest infrastructure project. Construction Management and Economics, 36(06), 313–27.

Szalay, Z (2008) Modelling building stock geometry for energy, emission and mass calculations. Building Research & Information, 36(06), 557–67.

Ye, M, Lu, W, Flanagan, R and Ye, K (2018) Diversification in the international construction business. Construction Management and Economics, 36(06), 348–61.

Yun, G Y, Steemers, K and Baker, N (2008) Natural ventilation in practice: linking facade design, thermal performance, occupant perception and control. Building Research & Information, 36(06), 608–24.

Zemke, D M V and Pullman, M (2008) Assessing the value of good design in hotels. Building Research & Information, 36(06), 543–56.