Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 17 results ...

Antwi-Afari, M F, Li, H, Edwards, D J, Pärn, E A, Seo, J and Wong, A (2017) Effects of different weights and lifting postures on balance control following repetitive lifting tasks in construction workers. International Journal of Building Pathology and Adaptation, 35(03), 247–63.

Ballesteros-Pérez, P and Skitmore, M (2017) On the distribution of bids for construction contract auctions. Construction Management and Economics, 35(03), 106-21.

Barrett, P (2007) Revaluing Construction: a holistic model. Building Research & Information, 35(03), 268–86.

Clarke, L, Gleeson, C and Winch, C (2017) What kind of expertise is needed for low energy construction?. Construction Management and Economics, 35(03), 78-89.

Cummings, S, Mcdougall, J A and Swaffield, J A (2007) Hydraulic assessment of non-circular-section building drainage. Building Research & Information, 35(03), 316–28.

Edwards, D J and Holt, G D (2007) Construction hand tools: vibration emissions from alternative inserts. Building Research & Information, 35(03), 329–42.

Forsythe, P (2017) Quantifying the recurring nature of fitout to assist LCA studies in office buildings. International Journal of Building Pathology and Adaptation, 35(03), 233–46.

  • Type: Journal Article
  • Keywords: Office buildings; Adaptability; Fitout; Life cycle assessment;
  • ISBN/ISSN: 2398-4708
  • URL: https://doi.org/10.1108/IJBPA-04-2017-0020
  • Abstract:
    The purpose of this paper is to quantify fitout churn in office buildings to more accurately evaluate the recurrent embodied energy in life cycle assessment studies. Design/methodology/approach Three research methods were used in the context of Central Business District (CBD) office buildings in Sydney. Method 1 involved leasing records from 528 office buildings; method 2, a leasing history from a selective sample of three prime grade office buildings; method 3, a targeted survey of 21 property professionals concerning fitout churn cycle estimates. Findings Prime buildings are the area of most interest to fitout churn because they represent a large proportion of total office floor area. The churn rate differs according to office tenancy type (as defined by small, medium and large leased areas). Large tenants occupy the majority of floor space. Lease duration as obtained from Method 1, offers a reasonable proxy for predicting fitout churn. Using this method coupled with weighted-average calculations, the data indicate a fitout churn rate of 8.2 years. Research limitations/implications Variability concerning the situational context of Sydney CBD office buildings restricts broad generalisability of the findings. However, the research method used in this study would enable broad-based comparison and the potential for verification. Originality/value The main contribution of the research is to improve the ability to accurately predict fitout churn cycles as previous work only involves limited case studies and arbitrary estimates, thus lacking a strong evidence based.

Itard, L and Klunder, G (2007) Comparing environmental impacts of renovated housing stock with new construction. Building Research & Information, 35(03), 252–67.

Jones, W, Gibb, A, Goodier, C and Bust, P (2017) Managing the unknown: Addressing the potential health risks of nanomaterials in the built environment. Construction Management and Economics, 35(03), 122-36.

Liu, J, Gao, R, Cheah, C Y J and Luo, J (2017) Evolutionary game of investors' opportunistic behaviour during the operational period in PPP projects. Construction Management and Economics, 35(03), 137-53.

Loosemore, M and Lim, B T H (2017) Linking corporate social responsibility and organizational performance in the construction industry. Construction Management and Economics, 35(03), 90-105.

Milion, R N, Alves, T d C and Paliari, J C (2017) Impacts of residential construction defects on customer satisfaction. International Journal of Building Pathology and Adaptation, 35(03), 218–32.

Mohamed, M, Pärn, E A and Edwards, D J (2017) Brexit: measuring the impact upon skilled labour in the UK construction industry. International Journal of Building Pathology and Adaptation, 35(03), 264–79.

Nelms, C E, Russell, A D and Lence, B J (2007) Assessing the performance of sustainable technologies: a framework and its application. Building Research & Information, 35(03), 237–51.

Nielsen, K J (2017) A comparison of inspection practices within the construction industry between the Danish and Swedish work environment authorities. Construction Management and Economics, 35(03), 154-69.

Ofori-Boadu, A N, Shofoluwe, M A and Pyle, R (2017) Development of a Housing Eligibility Assessment Scoring Method for low-income urgent repair programs. International Journal of Building Pathology and Adaptation, 35(03), 194–217.

Short, C A, Barrett, P, Dye, A and Sutrisna, M (2007) Impacts of value engineering on five Capital Arts projects. Building Research & Information, 35(03), 287–315.