Afzal, F, Yunfei, S, Sajid, M and Afzal, F (2019) Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects. Engineering, Construction and Architectural Management, 27(04), 825–49.

Bonanomi, M M, Hall, D M, Staub-French, S, Tucker, A and Talamo, C M L (2019) The impact of digital transformation on formal and informal organizational structures of large architecture and engineering firms. Engineering, Construction and Architectural Management, 27(04), 872–92.

Cole, R J (1999) Building environmental assessment methods: clarifying intentions. Building Research & Information, 27(04), 230–46.

Cole, R J (1999) Postscript: Green Building Challenge 2000. Building Research & Information, 27(04), 342–3.

Cole, R J and Larsson, N K (1999) GBC '98 and GBTool: background. Building Research & Information, 27(04), 221–9.

Cole, R J and Mitchell, L (1999) Customizing and using GBTool: two case-study projects. Building Research & Information, 27(04), 257–76.

  • Type: Journal Article
  • Keywords: case study; environmental assessment; green building; Sweden; USA
  • ISBN/ISSN: 0961-3218
  • URL: http://taylorandfrancis.metapress.com/link.asp?id=7vytjlwng6k7a502
  • Abstract:
    This paper highlights the differences in the customization and use of GBTool during the GBC '98 process by contrasting the assessments of two multiunit residential case-study projects: the Ekoporten project (renovation project), Norrkoping, Sweden and Co-housing project (new build), Cambridge, Massachusetts, USA. The application of GBTool in the two projects suggests that the differences between assessing new and refurbishments is much more significant than initially envisaged. The customizing of the default Performance scales was extensive. The wide range of interpretations that different National Teams placed on the various criteria reinforced the importance of regionally specific assessment methods. The Non-applicability designation was often applied due to technical difficulties in performing an evaluation rather than whether or not the performance issue was pertinent to the case-study project. The Criticality-Non-criticality designation was ineffectively used during this first testing of the assessment process, primarily due to the absence of meaningful guidance. Although an option existed for National Teams to propose the addition of a limited number subcriteria unique to the region or building type it was not used. The GBC process clearly showed that users need time to become familiar with an assessment procedure and it is evident that a much clearer and consistent set of directives must be provided to assist in any customization process than currently evident within the GBC process.

Comet, C (2009) Social capital and profits of small firms in the French construction industry. Construction Management and Economics, 27(04), 411–8.

El-Sayegh, S M (2009) Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27(04), 385–98.

Feghaly, J, El Asmar, M, Ariaratnam, S and Bearup, W (2019) Selecting project delivery methods for water treatment plants. Engineering, Construction and Architectural Management, 27(04), 936–51.

Glaumann, M, Malm, T and Larsson, J (1999) Evaluation of green buildings in Sweden. Building Research & Information, 27(04), 276–85.

Kannimuthu, M, Raphael, B, Ekambaram, P and Kuppuswamy, A (2019) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Engineering, Construction and Architectural Management, 27(04), 893–916.

Li, H, Lu, W and Huang, T (2009) Rethinking project management and exploring virtual design and construction as a potential solution. Construction Management and Economics, 27(04), 363–71.

Lingard, H C, Cooke, T and Blismas, N (2009) Group-level safety climate in the Australian construction industry: within-group homogeneity and between-group differences in road construction and maintenance. Construction Management and Economics, 27(04), 419–32.

Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(04), 331–42.

Luo, M, Fan, H and Liu, G (2019) Measuring regional differences of construction productive efficiency in China. Engineering, Construction and Architectural Management, 27(04), 952–74.

Ma, H, Liu, Z, Zeng, S, Lin, H and Tam, V W (2019) Does megaproject social responsibility improve the sustainability of the construction industry?. Engineering, Construction and Architectural Management, 27(04), 975–96.

Manoliadis, O G, Pantouvakis, J-P and Christodoulou, S E (2009) Improving qualifications-based selection by use of the fuzzy Delphi method. Construction Management and Economics, 27(04), 373–84.

Rees, W E (1999) The built environment and the ecosphere: a global perspective. Building Research & Information, 27(04), 206–20.

Smyth, H and Fitch, T (2009) Application of relationship marketing and management: a large contractor case study. Construction Management and Economics, 27(04), 399–410.

Todd, J A and Geissler, S (1999) Regional and cultural issues in environmental performance assessment for buildings. Building Research & Information, 27(04), 247–56.

Tone, K, Skitmore, M and Wong, J K W (2009) An investigation of the impact of cross-cultural communication on the management of construction projects in Samoa. Construction Management and Economics, 27(04), 343–61.

Viles, E, Rudeli, N C and Santilli, A (2019) Causes of delay in construction projects: a quantitative analysis. Engineering, Construction and Architectural Management, 27(04), 917–35.

Wang, S, Tang, J, Zou, Y and Zhou, Q (2019) Research on production process optimization of precast concrete component factory based on value stream mapping. Engineering, Construction and Architectural Management, 27(04), 850–71.