Aka, A, Isah, A D, Eze, C J and Timileyin, O (2019) Application of lean manufacturing tools and techniques for waste reduction in Nigerian bricks production process. Engineering, Construction and Architectural Management, 27(03), 658–79.

  • Type: Journal Article
  • Keywords: Process; Construction; Productivity; Interview; Questionnaire survey;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-09-2018-0375
  • Abstract:
    Non-value adding activities or wastes in the lean term have been the major challenge of the construction industry. Numerous studies have been conducted to investigate how such wastes can be reduced so as to improve the performance of the construction industry. However, the aspect of bricks production process (BPP) has not been extensively covered. Therefore, the purpose of this paper is to investigate the application of lean manufacturing concepts in BPP with a view to identifying the various wastes in the practice, the causes of these wastes and how such wastes can be reduced. Design/methodology/approach Mixed methods research design was adopted by the researchers where literature review was first conducted to establish the fundamental theories and practice standards of lean manufacturing process. Thereafter, a phenomenological study was carried out in a Shelter Clay and Brick Factory located in Minna, Niger State, Nigeria. The data obtained in the phenomenological study were analyzed through content analysis. These data served as the basis for the validation survey that subsequently followed the phenomenological study. Findings The findings in the study show that poor or inadequate supervision is the main factor responsible for wastes such as excessive drying of bricks, overheating of bricks and re-glazing of bricks in Nigerian BPP. Research limitations/implications The study focused on the various wastes in Nigerian BPP. It also focused on the various lean tools/techniques that can be adopted to reduce the wastes. Aspects such as the percentage of the wastes and their cost implication on the factory were not covered during the study and could be further investigated by prospective researchers. Practical implications The study provides knowledge on how lean thinking can be adopted to reduce wastes in BPP. Such knowledge may be beneficial to the present and prospective bricks producers. This implies that the proposed framework in the study allows producers of bricks to identify gaps in their implementation efforts, focus attention on areas that may require improvements, and access the benefits of lean approach in their factory products. The proposed framework may also be beneficial to the academics. Originality/value This paper first gain originality in the study context to propose for a lean framework that can be adopted to reduce wastes in BPP. Furthermore, the paper has not been previously published and all the information obtained from other sources are duly referenced.

Andary, E G, Abi Shdid, C, Chowdhury, A and Ahmad, I (2019) Integrated project delivery implementation framework for water and wastewater treatment plant projects. Engineering, Construction and Architectural Management, 27(03), 609–33.

Ball, R (1999) Developers, regeneration and sustainability issues in the re-use of vacant industrial buildings. Building Research & Information, 27(03), 140–8.

Christodoulou, S E, Ellinas, G N and Aslani, P (2009) Disorder considerations in resource-constrained scheduling. Construction Management and Economics, 27(03), 229–40.

Golizadeh, H, Hosseini, M R, Martek, I, Edwards, D, Gheisari, M, Banihashemi, S and Zhang, J (2019) Scientometric analysis of research on “remotely piloted aircraft”. Engineering, Construction and Architectural Management, 27(03), 634–57.

Gravina da Rocha, C, El Ghoz, H B and Jr Guadanhim, S (2019) A model for implementing product modularity in buildings design. Engineering, Construction and Architectural Management, 27(03), 680–99.

Halliday, S, Beggs, C and Muneer, T (1999) Is solar air conditioning feasible?. Building Research & Information, 27(03), 149–64.

Hui, E C-M and Fung, H H-K (2009) Real estate development as real options. Construction Management and Economics, 27(03), 221–7.

Jia, Y A, Rowlinson, S, Kvan, T, Lingard, H C and Yip, B (2009) Burnout among Hong Kong Chinese architecture students: the paradoxical effect of Confucian conformity values. Construction Management and Economics, 27(03), 287–98.

Leiringer, R, Green, S D and Raja, J Z (2009) Living up to the value agenda: the empirical realities of through-life value creation in construction. Construction Management and Economics, 27(03), 271–85.

Liao, L, Teo Ai Lin, E and Low, S P (2019) Assessing building information modeling implementation readiness in building projects in Singapore. Engineering, Construction and Architectural Management, 27(03), 700–24.

Liu, Q, Ye, G and Feng, Y (2019) Workers’ safety behaviors in the off-site manufacturing plant. Engineering, Construction and Architectural Management, 27(03), 765–84.

Marsh, L E and Finch, E F (1999) Using portable datafiles in the construction supply chain. Building Research & Information, 27(03), 127–39.

Mwamila, B L M and Karumuna, B L (1999) Semi-prefabrication concrete techniques in developing countries. Building Research & Information, 27(03), 165–82.

Ping Ho, S, Lin, Y-H, Wu, H-L and Chu, W (2009) Empirical test of a model for organizational governance structure choices in construction joint ventures. Construction Management and Economics, 27(03), 315–24.

Pulket, T and Arditi, D (2009) Construction litigation prediction system using ant colony optimization. Construction Management and Economics, 27(03), 241–51.

Rodriguez, F S, Spilski, J, Hekele, F, Beese, N O and Lachmann, T (2019) Physical and cognitive demands of work in building construction. Engineering, Construction and Architectural Management, 27(03), 745–64.

Toor, S-U-R and Ofori, G (2009) Authenticity and its influence on psychological well-being and contingent self-esteem of leaders in Singapore construction sector. Construction Management and Economics, 27(03), 299–313.

Xu, Y and Turkan, Y (2019) BrIM and UAS for bridge inspections and management. Engineering, Construction and Architectural Management, 27(03), 785–807.

Yuan, J, Zeng, A Y, Skibniewski, M J and Li, Q (2009) Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money. Construction Management and Economics, 27(03), 253–70.

Zarghami, S A and Gunawan, I (2019) A fuzzy-based vulnerability assessment model for infrastructure networks incorporating reliability and centrality. Engineering, Construction and Architectural Management, 27(03), 725–44.