Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 22 results ...

Bakens, W (1997) International trends in research and technology development. Building Research & Information, 25(06), 335–7.

Bowen, P, Akintoye, A, Pearl, R and Edwards, P J (2007) Ethical behaviour in the South African construction industry. Construction Management and Economics, 25(06), 631–48.

Bubshait, A A and Tahir, B M (1997) Effect of silica fume on the concrete-steel bond. Building Research & Information, 25(06), 365–9.

Chan, C T W (2007) Fuzzy procurement selection model for construction projects. Construction Management and Economics, 25(06), 611–8.

Delgado-Hernandez, D J, Bampton, K E and Aspinwall, E (2007) Quality function deployment in construction. Construction Management and Economics, 25(06), 597–609.

Egbu, C O (1997) Refurbishment management: challenges and opportunities. Building Research & Information, 25(06), 338–47.

Enshassi, A (1997) Construction safety issues in Gaza Strip. Building Research & Information, 25(06), 370–3.

Galbraith, G H, McLean, R C and Kelly, D (1997) Moisture permeability measurements under varying barometric pressure. Building Research & Information, 25(06), 348–53.

Goodier, C and Gibb, A (2007) Future opportunities for offsite in the UK. Construction Management and Economics, 25(06), 585–95.

Green, S D and Liu, A M M (2007) Theory and practice in value management: a reply to Ellis et al. (2005). Construction Management and Economics, 25(06), 649–59.

Holt, G D (1997) Classifying construction contractors. Building Research & Information, 25(06), 374–82.

Hu, X and Liu, C (2018) Measuring efficiency, effectiveness and overall performance in the Chinese construction industry. Engineering, Construction and Architectural Management, 25(06), 780–97.

Imriyas, K, Pheng, L S and Teo, E A-L (2007) A framework for computing workers' compensation insurance premiums in construction. Construction Management and Economics, 25(06), 563–84.

Malmberg, F (2007) Introduction of a new form of quote evaluation: a case study in southern Sweden. Construction Management and Economics, 25(06), 661–9.

Modak, J P, Sohoni, V V and Aware, H V (1997) Manually powered manufacture of keyed bricks. Building Research & Information, 25(06), 354–64.

  • Type: Journal Article
  • Keywords: appropriate technology; brick-making; energy; housing; India material
  • ISBN/ISSN: 0961-3218
  • URL: http://journalsonline.tandf.co.uk/link.asp?id=x54pbjnnwp04fha4
  • Abstract:
    A study of the functional and economic factors in brick production using manually powered machines in India. The production of bricks, one of the main components in conventional construction technology, has been carried out by either a hand moulding process or by a fully mechanized process. Both processes have limitations in developing countries. An alternative solution is the use of decentralized non-power-consuming brick making units, utilizing unconventional raw materials which do not require baking to develop strength. A manually energized brick-making machine (MEBM) has proven the feasibility of extruding various mixes including a lime--fly ash--sand mixture. The production of bricks with a keyed cross-section is investigated using the MEBM to establish the functional and economic viabilities of the technology to create a construction technology which relies on abundant resources, unskilled labour and zero energy input

Newaz, M T, Davis, P R, Jefferies, M and Pillay, M (2018) Developing a safety climate factor model in construction research and practice. Engineering, Construction and Architectural Management, 25(06), 738–57.

Oke, A E (2018) Bonding capability of Nigerian contracting firms. Engineering, Construction and Architectural Management, 25(06), 707–20.

Skitmore, M and Smyth, H (2007) Pricing construction work: a marketing viewpoint. Construction Management and Economics, 25(06), 619–30.

Tripathi, K K and Jha, K N (2018) Application of fuzzy preference relation for evaluating success factors of construction organisations. Engineering, Construction and Architectural Management, 25(06), 758–79.

Umeokafor, N (2018) An investigation into public and private clients’ attitudes, commitment and impact on construction health and safety in Nigeria. Engineering, Construction and Architectural Management, 25(06), 798–815.

Yan, X and Kim, Y (2018) A conceptual framework of ITSMCA for a building collapse accident. Engineering, Construction and Architectural Management, 25(06), 721–37.

Yang, R J, Jayasuriya, S, Gunarathna, C, Arashpour, M, Xue, X and Zhang, G (2018) The evolution of stakeholder management practices in Australian mega construction projects. Engineering, Construction and Architectural Management, 25(06), 690–706.