Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 22 results ...

Aziz, A M A (2007) A survey of the payment mechanisms for transportation DBFO projects in British Columbia. Construction Management and Economics, 25(05), 529–43.

Cameron, I and Duff, R (2007) A critical review of safety initiatives using goal setting and feedback. Construction Management and Economics, 25(05), 495–508.

Che Ibrahim, C K I, Costello, S B and Wilkinson, S (2018) Making sense of team integration practice through the “lived experience” of alliance project teams. Engineering, Construction and Architectural Management, 25(05), 598–622.

Cooper, I (1997) The UK's changing research base for construction: the impact of recent government policy. Building Research & Information, 25(05), 292–300.

Courtney, R (1997) Building Research Establishment: past, present and future. Building Research & Information, 25(05), 285–91.

Davidson, C H (1997) The Building Centres: CIB's information allies. Building Research & Information, 25(05), 313–7.

El-Sayegh, S (2018) Resource levelling optimization model considering float loss impact. Engineering, Construction and Architectural Management, 25(05), 639–53.

Gann, D M (1997) Should governments fund construction research?. Building Research & Information, 25(05), 257–67.

Harty, C, Goodier, C I, Soetanto, R, Austin, S, Dainty, A R J and Price, A D F (2007) The futures of construction: a critical review of construction future studies. Construction Management and Economics, 25(05), 477–93.

Kose, S (1997) Building Research Institute in Japan: past, present and future. Building Research & Information, 25(05), 268–71.

Krima, N A, Wood, G, Aouad, G F and Hatush, Z (2007) Assessing the performance of Libyan supervising engineers. Construction Management and Economics, 25(05), 509–18.

  • Type: Journal Article
  • Keywords: Supervision; delay; performance evaluation; project control; Libya
  • ISBN/ISSN: 0144-6193
  • URL: http://www.informaworld.com/openurl?genre=article&issn=0144-6193&volume=25&issue=5&spage=509
  • Abstract:
    In the Libyan construction industry, the supervising engineer plays an important role in checking time schedules and protecting the client from delays and associated claims but there is no existing means of determining their proficiency in performing this task. A list of factors identifying a broad range of characteristics and skills necessary for the effective supervision of construction projects is compiled. A field survey comprising semi-structured interviews and questionnaires with 32 client and contractor project managers experienced in the Libyan construction sector is undertaken. The responses are used to develop a method of assessing the effectiveness of supervising engineers in dealing with construction project delays through a set of weighted criteria which are scored according to currently perceived levels of performance. The results indicate that Libyan supervising engineers are currently deficient in a number of areas, particularly communication skills (33%); obtained scientific, technical and legal knowledge (34%); knowledge in dealing with claims (36%); previous experience (37%); knowledge and use of modern techniques (37%). These factors are therefore a key focus for the professional development needs of supervising engineers and the method of assessment should assist clients in the process of selection and appointment.

Lansley, P R (1997) The impact of BRE's commercialization on the research community. Building Research & Information, 25(05), 301–12.

Leppavuori, E K M (1997) Commercial building research: threat or opportunity for customer satisfaction?. Building Research & Information, 25(05), 272–8.

Ling, F Y Y, Ning, Y, Chang, Y H and Zhang, Z (2018) Human resource management practices to improve project managers’ job satisfaction. Engineering, Construction and Architectural Management, 25(05), 654–69.

Mason, J R (2007) The views and experiences of specialist contractors on partnering in the UK. Construction Management and Economics, 25(05), 519–27.

Prakash, A and Phadtare, M (2018) Service quality for architects: scale development and validation. Engineering, Construction and Architectural Management, 25(05), 670–86.

Seaden, G (1997) The future of national construction research organizations. Building Research & Information, 25(05), 250–6.

Skitmore, M and Cheung, F K T (2007) Explorations in specifying construction price forecast loss functions. Construction Management and Economics, 25(05), 449–65.

Tran, D H and Long, L D (2018) Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. Engineering, Construction and Architectural Management, 25(05), 623–38.

Tsai, H, Wang, L and Lin, L (2007) A study on improving the ranking procedure for determining the most advantageous tender. Construction Management and Economics, 25(05), 545–54.

Watts, G (1997) The National Centre for Construction in the UK. Building Research & Information, 25(05), 279–84.

Widén, K and Hansson, B (2007) Diffusion characteristics of private sector financed innovation in Sweden. Construction Management and Economics, 25(05), 467–75.