Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 36 results ...

Adam, A, Josephson, P-E B and Lindahl, G (2017) Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications. Engineering, Construction and Architectural Management, 24(03), 393-406.

Adesi, M, Owusu-Manu, D and Boateng, F (2019) Segmentation of quantity surveying professional services for focus strategy and diversification. Journal of Financial Management of Property and Construction , 24(03), 294–308.

Al-Musallami, A I and Assaf, S A (1996) Public owners' satisfaction with consultancy practices in Saudi Arabia. Building Research & Information, 24(03), 148–51.

Anumba, C J (1996) Issues in the investigation and reporting of housing subsidence. Building Research & Information, 24(03), 170–5.

Assaf, S A, Al-Hammad, A M and Ubaid, A (1996) Factors affecting construction contractors' performance. Building Research & Information, 24(03), 159–63.

Assaf, S A, Al-Musallami, A I and Sughaiyer, M A (1996) Value engineering in public construction projects in Saudi Arabia. Building Research & Information, 24(03), 152–8.

Bayat, F, Noorzai, E and Golabchi, M (2019) Identifying the most important public–private partnership risks in Afghanistan’s infrastructure projects. Journal of Financial Management of Property and Construction , 24(03), 309–37.

Bridge, A J and Tisdell, C (2006) The determinants of the vertical boundaries of the construction firm: response. Construction Management and Economics, 24(03), 23-36.

Chang, C-Y (2006) Comment - The determinants of the vertical boundaries of the construction firm: comment. Construction Management and Economics, 24(03), 229-32.

Daniel, E I, Pasquire, C, Dickens, G and Ballard, H G (2017) The relationship between the Last Planner® system and collaborative planning practice in UK construction. Engineering, Construction and Architectural Management, 24(03), 407-25.

Dithebe, K, Aigbavboa, C O, Thwala, W D and Oke, A E (2019) Factor analysis of critical success factors for water infrastructure projects delivered under public–private partnerships. Journal of Financial Management of Property and Construction , 24(03), 338–57.

Eftekhari, M M (1996) Ventilator air flow measurement in new houses. Building Research & Information, 24(03), 176–82.

El-Diraby, T A and Gill, S M (2006) A taxonomy for construction terms in privatized-infrastructure finance: supporting semantic exchange of project risk information. Construction Management and Economics, 24(03), 271-85.

Enshassi, A (1996) A monitoring and controlling system in managing infrastructure projects. Building Research & Information, 24(03), 183–9.

Enshassi, A, Saleh, N and Mohamed, S (2019) Application level of lean construction techniques in reducing accidents in construction projects. Journal of Financial Management of Property and Construction , 24(03), 274–93.

  • Type: Journal Article
  • Keywords: Construction; Safety; Lean tools; LC techniques;
  • ISBN/ISSN: 1366-4387
  • URL: https://doi.org/10.1108/JFMPC-08-2018-0047
  • Abstract:
    This paper aims to investigate the application of lean construction (LC) techniques in reducing accidents in construction projects.

    Design/methodology/approach

    A quantitative approach was used to collect the required data using a questionnaire survey and descriptive analysis was used to analyse the collected data. The LC techniques that were investigated in this paper are related to the tools of the last planner system (LPS), increased visualisation (IV), 5S, error-proofing, daily huddle meetings (DHMs), first-run studies (FRS), continuous improvement (Kaizen) and accident investigation (5Whys).

    Findings

    The overall results indicated that LC techniques are poorly implemented in construction projects in the Gaza Strip. The top three LC tools used to reduce the causes of accidents in the Gaza construction projects were 5Whys, 5S and LPS, while the highest three LC techniques applied to reduce the causes of accidents that were applicable were cleaning the workplace and removing materials and machines that are not required; conducting accident investigation and root cause analysis programmes; and using safety signs and labels on site.

    Research limitations/implications

    There is a lack of information and published studies regarding the links between LC and safety, especially in the Middle East. This paper is limited to the perceptions and geographical boundaries; therefore, it cannot be generalised. However, it could form the basis for useful comparison in the future. Triangulation research method could also be used in future research to minimise the bias and validate the conclusions.

    Practical implications

    The findings of this paper will stress professionals and construction companies in Gaza to reconsider their behaviour towards using LC techniques. The findings of this paper will aid them to shift their attention and resources towards including LC techniques in their plans to reduce the causes of accidents on construction sites.

    Social implications

    The findings of this paper will encourage professionals and construction companies in Gaza to reconsider their behaviour towards using LC techniques. The findings will also aid them to shift their attention and resources towards including LC techniques in their plans to reduce and/or avoid the causes of accidents on construction.

    Originality/value

    Because of the lack of published works that are specific to the Middle East, the authors believe that the originality lies in the paper’s serious attempt to explore the application level of the LC concept to safety in this part of the world. This paper contributes to a better understanding of the applicability of LC techniques in terms of accidents reduction. Findings from this paper provide a clear picture of the current status of using LC techniques to reduce accidents in the Gazan construction projects which drive them to investigate the main barriers and try to overcome them.

Griffiths, P W, Norton, B, Eames, P C and Lo, S N G (1996) Detailed simulation of heat transfer across planar evacuated glazing. Building Research & Information, 24(03), 141–7.

Jarkas, A M (2017) Beamless or beam-supported building floors: Is buildability knowledge the missing link to improving productivity?. Engineering, Construction and Architectural Management, 24(03), 537-52.

Lam, J C and Hui, S C M (1996) A review of building energy standards and implications for Hong Kong. Building Research & Information, 24(03), 131–40.

Leiringer, R (2006) Technological innovation in PPPs: incentives, opportunities and actions. Construction Management and Economics, 24(03), 301-8.

Mei, T, Wang, Q, Xiao, Y and Yang, M (2017) Rent-seeking behavior of BIM- and IPD-based construction project in China. Engineering, Construction and Architectural Management, 24(03), 514-36.

Mollo, L G, Emuze, F and Smallwood, J (2019) Improving occupational health and safety (OHS) in construction using Training-Within-Industry method. Journal of Financial Management of Property and Construction , 24(03), 655–71.

Molwus, J J, Erdogan, B and Ogunlana, S (2017) Using structural equation modelling to understand the relationships among critical success factors for stakeholder management in construction. Engineering, Construction and Architectural Management, 24(03), 426-50.

Ogunsemi, D R and Jagboro, G O (2006) Time-cost model for building projects in Nigeria. Construction Management and Economics, 24(03), 253-8.

Olatunji, O A, Aje, O I and Makanjuola, S (2017) Bid or no-bid decision factors of indigenous contractors in Nigeria. Engineering, Construction and Architectural Management, 24(03), 378-92.

Owusu-Manu, D, Jehuri, A B, Edwards, D J, Boateng, F and Asumadu, G (2019) The impact of infrastructure development on economic growth in sub-Saharan Africa with special focus on Ghana. Journal of Financial Management of Property and Construction , 24(03), 253–73.

Parchami Jalal, M and Shoar, S (2019) A hybrid framework to model factors affecting construction labour productivity. Journal of Financial Management of Property and Construction, 24(03), 630–54.

Peansupap, V and Walker, D H T (2006) Innovation diffusion at the implementation stage of a construction project: a case study of information communication technology. Construction Management and Economics, 24(03), 321-32.

Phua, F T T (2006) Predicting construction firm performance: an empirical assessment of the differential impact between industry- and firm-specific factors. Construction Management and Economics, 24(03), 309-20.

Price, A D F and Chahal, K (2006) A strategic framework for change management. Construction Management and Economics, 24(03), 237-51.

Razouki, S S and Al-Zubaidi, M A (1996) Minimum cost route for a highway in heterogeneous terrain. Building Research & Information, 24(03), 164–9.

Rostami, A and Oduoza, C F (2017) Key risks in construction projects in Italy: Contractors’ perspective. Engineering, Construction and Architectural Management, 24(03), 451-62.

Sharma, R K and Bakshi, A (2019) An evident prescience of determinants of dividend policy of Indian real estate companies. Journal of Financial Management of Property and Construction , 24(03), 358–84.

Tam, V W Y, Tam, C M, Shen, L Y, Zeng, S X and Ho, C M (2006) Environmental performance assessment: perceptions of project managers on the relationship between operational and environmental performance indicators. Construction Management and Economics, 24(03), 287-99.

Tezel, A and Aziz, Z (2017) Visual management in highways construction and maintenance in England. Engineering, Construction and Architectural Management, 24(03), 486-513.

Yu, W-D (2006) PIREM: a new model for conceptual cost estimation. Construction Management and Economics, 24(03), 259–70.

Zahoor, H, Chan, A P C, Gao, R and Utama, W P (2017) The factors contributing to construction accidents in Pakistan: Their prioritization using the Delphi technique. Engineering, Construction and Architectural Management, 24(03), 463-85.