Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 36 results ...

Adam, A, Josephson, P-E B and Lindahl, G (2017) Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications. Engineering, Construction and Architectural Management, 24(03), 393-406.

Adesi, M, Owusu-Manu, D and Boateng, F (2019) Segmentation of quantity surveying professional services for focus strategy and diversification. Journal of Financial Management of Property and Construction , 24(03), 294–308.

  • Type: Journal Article
  • Keywords: Strategy; Management; Strategic management; Competitive advantage; Business strategy; Professional quantity surveyors; Diversification; Quantity; Surveying; Professional; Segmentation; Pricing;
  • ISBN/ISSN: 1366-4387
  • URL: https://doi.org/10.1108/JFMPC-09-2018-0052
  • Abstract:
    Notwithstanding that numerous studies have focused on strategy in quantity surveying (QS) professional service firms, there is a paucity of investigation on the segmentation of QS professional services. The purpose of this study is to investigate the segmentation of QS services for diversification and a focus strategy formation.

    Design/methodology/approach

    This study adopts the positivist stance and quantitative approach in which a simple random sampling technique was used to select participants. In total, 110 survey questionnaires were administered to registered professional QS, out of which 79 completed questionnaires were returned for analysis.

    Findings

    The paper identifies three main QS service segments characterised by low, moderate and high competition. In addition, this study found that the concentration of traditional QS services in the building construction sector is due to the unwillingness of QS professional service firms to diversify into the non-construction sectors such as oil and gas. The diversification of QS services in the low competitive segment requires the adoption of agile approaches.

    Research limitations/implications

    The study was limited to numeric analyses and so would be complemented by qualitative research in the future.

    Practical implications

    This paper is useful to QS professional service firms interested in diversifying their services into the non-construction sectors to enhance the pricing of their services.

    Originality/value

    Segmentation of QS services is fundamental to the formulation of focus strategy for non-construction sectors such as oil and gas and mining to enhance the pricing of QS professional services.

Al-Musallami, A I and Assaf, S A (1996) Public owners' satisfaction with consultancy practices in Saudi Arabia. Building Research & Information, 24(03), 148–51.

Anumba, C J (1996) Issues in the investigation and reporting of housing subsidence. Building Research & Information, 24(03), 170–5.

Assaf, S A, Al-Hammad, A M and Ubaid, A (1996) Factors affecting construction contractors' performance. Building Research & Information, 24(03), 159–63.

Assaf, S A, Al-Musallami, A I and Sughaiyer, M A (1996) Value engineering in public construction projects in Saudi Arabia. Building Research & Information, 24(03), 152–8.

Bayat, F, Noorzai, E and Golabchi, M (2019) Identifying the most important public–private partnership risks in Afghanistan’s infrastructure projects. Journal of Financial Management of Property and Construction , 24(03), 309–37.

Bridge, A J and Tisdell, C (2006) The determinants of the vertical boundaries of the construction firm: response. Construction Management and Economics, 24(03), 23-36.

Chang, C-Y (2006) Comment - The determinants of the vertical boundaries of the construction firm: comment. Construction Management and Economics, 24(03), 229-32.

Daniel, E I, Pasquire, C, Dickens, G and Ballard, H G (2017) The relationship between the Last Planner® system and collaborative planning practice in UK construction. Engineering, Construction and Architectural Management, 24(03), 407-25.

Dithebe, K, Aigbavboa, C O, Thwala, W D and Oke, A E (2019) Factor analysis of critical success factors for water infrastructure projects delivered under public–private partnerships. Journal of Financial Management of Property and Construction , 24(03), 338–57.

Eftekhari, M M (1996) Ventilator air flow measurement in new houses. Building Research & Information, 24(03), 176–82.

El-Diraby, T A and Gill, S M (2006) A taxonomy for construction terms in privatized-infrastructure finance: supporting semantic exchange of project risk information. Construction Management and Economics, 24(03), 271-85.

Enshassi, A (1996) A monitoring and controlling system in managing infrastructure projects. Building Research & Information, 24(03), 183–9.

Enshassi, A, Saleh, N and Mohamed, S (2019) Application level of lean construction techniques in reducing accidents in construction projects. Journal of Financial Management of Property and Construction , 24(03), 274–93.

Griffiths, P W, Norton, B, Eames, P C and Lo, S N G (1996) Detailed simulation of heat transfer across planar evacuated glazing. Building Research & Information, 24(03), 141–7.

Jarkas, A M (2017) Beamless or beam-supported building floors: Is buildability knowledge the missing link to improving productivity?. Engineering, Construction and Architectural Management, 24(03), 537-52.

Lam, J C and Hui, S C M (1996) A review of building energy standards and implications for Hong Kong. Building Research & Information, 24(03), 131–40.

Leiringer, R (2006) Technological innovation in PPPs: incentives, opportunities and actions. Construction Management and Economics, 24(03), 301-8.

Mei, T, Wang, Q, Xiao, Y and Yang, M (2017) Rent-seeking behavior of BIM- and IPD-based construction project in China. Engineering, Construction and Architectural Management, 24(03), 514-36.

Mollo, L G, Emuze, F and Smallwood, J (2019) Improving occupational health and safety (OHS) in construction using Training-Within-Industry method. Journal of Financial Management of Property and Construction , 24(03), 655–71.

Molwus, J J, Erdogan, B and Ogunlana, S (2017) Using structural equation modelling to understand the relationships among critical success factors for stakeholder management in construction. Engineering, Construction and Architectural Management, 24(03), 426-50.

Ogunsemi, D R and Jagboro, G O (2006) Time-cost model for building projects in Nigeria. Construction Management and Economics, 24(03), 253-8.

Olatunji, O A, Aje, O I and Makanjuola, S (2017) Bid or no-bid decision factors of indigenous contractors in Nigeria. Engineering, Construction and Architectural Management, 24(03), 378-92.

Owusu-Manu, D, Jehuri, A B, Edwards, D J, Boateng, F and Asumadu, G (2019) The impact of infrastructure development on economic growth in sub-Saharan Africa with special focus on Ghana. Journal of Financial Management of Property and Construction , 24(03), 253–73.

Parchami Jalal, M and Shoar, S (2019) A hybrid framework to model factors affecting construction labour productivity. Journal of Financial Management of Property and Construction, 24(03), 630–54.

Peansupap, V and Walker, D H T (2006) Innovation diffusion at the implementation stage of a construction project: a case study of information communication technology. Construction Management and Economics, 24(03), 321-32.

Phua, F T T (2006) Predicting construction firm performance: an empirical assessment of the differential impact between industry- and firm-specific factors. Construction Management and Economics, 24(03), 309-20.

Price, A D F and Chahal, K (2006) A strategic framework for change management. Construction Management and Economics, 24(03), 237-51.

Razouki, S S and Al-Zubaidi, M A (1996) Minimum cost route for a highway in heterogeneous terrain. Building Research & Information, 24(03), 164–9.

Rostami, A and Oduoza, C F (2017) Key risks in construction projects in Italy: Contractors’ perspective. Engineering, Construction and Architectural Management, 24(03), 451-62.

Sharma, R K and Bakshi, A (2019) An evident prescience of determinants of dividend policy of Indian real estate companies. Journal of Financial Management of Property and Construction , 24(03), 358–84.

Tam, V W Y, Tam, C M, Shen, L Y, Zeng, S X and Ho, C M (2006) Environmental performance assessment: perceptions of project managers on the relationship between operational and environmental performance indicators. Construction Management and Economics, 24(03), 287-99.

Tezel, A and Aziz, Z (2017) Visual management in highways construction and maintenance in England. Engineering, Construction and Architectural Management, 24(03), 486-513.

Yu, W-D (2006) PIREM: a new model for conceptual cost estimation. Construction Management and Economics, 24(03), 259–70.

Zahoor, H, Chan, A P C, Gao, R and Utama, W P (2017) The factors contributing to construction accidents in Pakistan: Their prioritization using the Delphi technique. Engineering, Construction and Architectural Management, 24(03), 463-85.