Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 21 results ...

Bröchner, J (2009) Construction metaphors in Aristotle: knowledge, purpose, process. Construction Management and Economics, 27(05), 515–23.

Cooper, I (1999) Which focus for building assessment methods: environmental performance or sustainability?. Building Research & Information, 27(05), 321–31.

Crawley, D and Aho, I (1999) Building environmental assessment methods: applications and development trends. Building Research & Information, 27(05), 300–8.

Curwell, S, Yates, A, Howard, N, Bordass, B and Doggart, J (1999) The Green Building Challenge in the UK. Building Research & Information, 27(05), 286–93.

Fox, S (2009) Applying critical realism to information and communication technologies: a case study. Construction Management and Economics, 27(05), 465–72.

Gluch, P, Gustafsson, M and Thuvander, L (2009) An absorptive capacity model for green innovation and performance in the construction industry. Construction Management and Economics, 27(05), 451–64.

Kimata, N (1999) Japanese expectations for green building assessments. Building Research & Information, 27(05), 294–9.

  • Type: Journal Article
  • Keywords: environmental assessment; feedback; green building; Japan; longevity
  • ISBN/ISSN: 0961-3218
  • URL: http://taylorandfrancis.metapress.com/link.asp?id=1kmh208e4uve2c75
  • Abstract:
    The background and feedback on the Green Building Challenge '98 process in Japan is provided by a representative from one of two Japanese teams (representing the Building Constructors' Society). The positive process of validating and adapting the international criteria to particular national circumstances and then customizing these criteria is explained. Three significant benefits to the Japanese building industry are discussed: existing technologies and methodologies were validated, it was discovered that these have potential for world-wide application, the life expectancy of Japanese buildings needs to be lengthened. Future expectations from Japan include: the ongoing refinement of the international framework for the environmental assessment of buildings; the customization of criteria requires further structure and limits, a critical review of the customization process; an expansion embracing both developed and developing nations' new and existing buildings. The prototype green building assessment from GBC '98 has the potential to be refined and adopted as a worldwide methodology and is endorsed as the fastest way to achieve world-wide consensus.

Kohler, N (1999) The relevance of green building challenge: an observer's perspective. Building Research & Information, 27(05), 309–20.

Kumar, V and Lin, E T A (2020) Conceptualizing “COBieEvaluator”. Engineering, Construction and Architectural Management, 27(05), 1093–118.

Larsson, N K (1999) Development of a building performance rating and labelling system in Canada. Building Research & Information, 27(05), 332–41.

Liu, D, Wang, Y, Chen, J and Zhang, Y (2019) Intelligent compaction practice and development: a bibliometric analysis. Engineering, Construction and Architectural Management, 27(05), 1213–32.

Lu, W, Tam, V W, Chen, H and Du, L (2020) A holistic review of research on carbon emissions of green building construction industry. Engineering, Construction and Architectural Management, 27(05), 1065–92.

Tang, L C M and Leung, A Y T (2009) An entropy-based financial decision support system (e-FDSS) for project analysis in construction SMEs. Construction Management and Economics, 27(05), 499–513.

Tuuli, M M and Rowlinson, S (2009) Empowerment in project teams: a multilevel examination of the job performance implications. Construction Management and Economics, 27(05), 473–98.

Viswanathan, S K and Jha, K N (2020) Critical risk factors in international construction projects. Engineering, Construction and Architectural Management, 27(05), 1169–90.

Yun, L, Wan, J, Wang, G, Bai, J and Zhang, B (2020) Exploring the missing link between top management team characteristics and megaproject performance. Engineering, Construction and Architectural Management, 27(05), 1039–64.

Yung, P (2009) Institutional arrangements and construction safety in China: an empirical examination. Construction Management and Economics, 27(05), 439–50.

Zaman, U (2020) Examining the effect of xenophobia on “transnational” mega construction project (MCP) success. Engineering, Construction and Architectural Management, 27(05), 1119–43.

Zhang, J, Li, H, Golizadeh, H, Zhao, C, Lyu, S and Jin, R (2020) Reliability evaluation index for the integrated supply chain utilising BIM and lean approaches. Engineering, Construction and Architectural Management, 27(05), 997–1038.

Zhu, D, Wen, H and Deng, Y (2020) Pro-active warning system for the crossroads at construction sites based on computer vision. Engineering, Construction and Architectural Management, 27(05), 1145–68.

Zhu, F, Wang, L, Yu, M and Yang, X (2020) Quality of conflict management in construction project context. Engineering, Construction and Architectural Management, 27(05), 1191–211.