Ahadzie, D K, Proverbs, D G, Olomolaiye, P O and Ankrah, N (2009) Towards developing competency-based measures for project managers in mass house building projects in developing countries. Construction Management and Economics, 27(01), 89–102.

Al-Kharashi, A and Skitmore, M (2009) Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27(01), 3–23.

Bageis, A S and Fortune, C (2009) Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(01), 53–71.

Burford, N K and Smith, F W (1999) Developing a new military shelter system: a case study in innovation. Building Research & Information, 27(01), 35–55.

Daget, Y T and Zhang, H (2019) Decision-making model for the evaluation of industrialized housing systems in Ethiopia. Engineering, Construction and Architectural Management, 27(01), 296–320.

Du, J, Jing, H, Castro-Lacouture, D and Sugumaran, V (2019) Multi-agent simulation for managing design changes in prefabricated construction projects. Engineering, Construction and Architectural Management, 27(01), 270–95.

Durdyev, S, Hosseini, M R, Martek, I, Ismail, S and Arashpour, M (2019) Barriers to the use of integrated project delivery (IPD): a quantified model for Malaysia. Engineering, Construction and Architectural Management, 27(01), 186–204.

Han, J, Rapoport, A and Fong, P S (2019) Incentive structures in multi-partner project teams. Engineering, Construction and Architectural Management, 27(01), 49–65.

Hossain, L (2009) Communications and coordination in construction projects. Construction Management and Economics, 27(01), 25–39.

Hwang, B, Zhao, X and Lim, J (2019) Job satisfaction of project managers in green construction projects. Engineering, Construction and Architectural Management, 27(01), 205–26.

Lam, P T I and Wong, F W H (2009) Improving building project performance: how buildability benchmarking can help. Construction Management and Economics, 27(01), 41–52.

Leaman, A and Bordass, B (1999) Productivity in buildings: the 'killer' variables. Building Research & Information, 27(01), 4–19.

Liao, X, Lee, C Y and Chong, H (2019) Contractual practices between the consultant and employer in Chinese BIM-enabled construction projects. Engineering, Construction and Architectural Management, 27(01), 227–44.

  • Type: Journal Article
  • Keywords: International construction; Case study; Project management; Construction; Building information modelling; International practice;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-02-2019-0110
  • Abstract:
    The management of building information modeling (BIM)-enabled construction projects is challenging and unstructured in nature, particularly in terms of contract administration. Even though previous studies have revealed various legal issues related to BIM, little is known regarding the contractual practices of BIM. Hence, the purpose of this paper is to explore the contractual practices between the BIM consultant and employer in detail. Design/methodology/approach An explanatory case study was carried out on four large BIM-enabled construction projects in China. Findings The contractual practices differed from one project to another in terms of ownership and intellectual property rights (IPRs) of the BIM model, roles of the BIM consultant, liability of the BIM consultant in the event of errors and delays of the BIM model, and BIM-related costs and payments. Some of the interesting findings are as follows: the employer shall retain the ownership and IPRs of the BIM model, the BIM consultant shall provide a warranty to ensure usability of the BIM model after project handover, the BIM consultant shall pay for damages or losses if the BIM model fails to deliver and the costs of BIM implementation shall be borne by both contracting parties. Originality/value This study provides a fresh, realistic insight on the development of plausible contractual practices between the BIM consultant and employer and the findings can be used to improve BIM contract protocols in future projects.

Liu, S, Jin, H, Liu, C, Xie, B and Mills, A (2019) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(01), 128–49.

Mahamadu, A, Manu, P, Mahdjoubi, L, Booth, C, Aigbavboa, C and Abanda, F (2019) The importance of BIM capability assessment. Engineering, Construction and Architectural Management, 27(01), 24–48.

Moohialdin, A S M, Lamari, F, Miska, M and Trigunarsyah, B (2019) Construction worker productivity in hot and humid weather conditions. Engineering, Construction and Architectural Management, 27(01), 83–108.

Ozyurt, B, Dikmen, I and Birgonul, M T (2019) Clustering of host countries to facilitate learning between similar international construction markets. Engineering, Construction and Architectural Management, 27(01), 66–82.

Papamichael, K (1999) Application of information technologies in building design decisions. Building Research & Information, 27(01), 20–34.

Sang, L, Xia, D, Ni, G, Cui, Q, Wang, J and Wang, W (2019) Influence mechanism of job satisfaction and positive affect on knowledge sharing among project members. Engineering, Construction and Architectural Management, 27(01), 245–69.

Sarhan, J G, Xia, B, Fawzia, S, Karim, A, Olanipekun, A O and Coffey, V (2019) Framework for the implementation of lean construction strategies using the interpretive structural modelling (ISM) technique. Engineering, Construction and Architectural Management, 27(01), 1–23.

Sezer, A A and Bröchner, J (2019) Site managers’ ICT tools for monitoring resources in refurbishment. Engineering, Construction and Architectural Management, 27(01), 109–27.

Wang, D, Fu, H and Fang, S (2019) The efficacy of trust for the governance of uncertainty and opportunism in megaprojects. Engineering, Construction and Architectural Management, 27(01), 150–67.

Wang, Y, Liu, J, Zuo, J and Rameezdeen, R (2019) Ways to improve the project management efficiency in a centralized public procurement system. Engineering, Construction and Architectural Management, 27(01), 168–85.

Yun, S and Caldas, C H (2009) Analysing decision variables that influence preliminary feasibility studies using data mining techniques. Construction Management and Economics, 27(01), 73–87.