Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 21 results ...

Akbari, S, Khanzadi, M and Gholamian, M R (2018) Building a rough sets-based prediction model for classifying large-scale construction projects based on sustainable success index. Engineering, Construction and Architectural Management, 25(04), 534–58.

Bordass, B and Leaman, A (1997) Future buildings and their services. Building Research & Information, 25(04), 190–5.

Carter, K and Fortune, C (2007) Sustainable development policy perceptions and practice in the UK social housing sector. Construction Management and Economics, 25(04), 399–408.

Chan, P W and Dainty, A R J (2007) Resolving the UK construction skills crisis: a critical perspective on the research and policy agenda. Construction Management and Economics, 25(04), 375–86.

Chen, J J (1997) The impact of Chinese economic reforms upon the construction industry. Building Research & Information, 25(04), 239–45.

Friedman, A and Cammalleri, V (1997) Selection criteria for energy-efficient windows. Building Research & Information, 25(04), 234–8.

Gooding, D and Thomas, T (1997) Soilcrete blocks. Building Research & Information, 25(04), 202–9.

Hagan, E B (1997) The use of stabilized soil to enhance rural housing. Building Research & Information, 25(04), 210–7.

Harris, D J and Dudek, S J M (1997) Heat losses from suspended timber floors. Building Research & Information, 25(04), 226–33.

Ismail, Z B (2018) Improving contractor social networking on IBS infrastructure maintenance projects: a review. Engineering, Construction and Architectural Management, 25(04), 479–96.

Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(04), 409–21.

Kelly, J (2007) Making client values explicit in value management workshops. Construction Management and Economics, 25(04), 435–42.

Kindangen, J I (1997) Window and roof configurations for comfort ventilation. Building Research & Information, 25(04), 218–25.

Lam, K-C, Ning, X and Ng, T (2007) The application of the ant colony optimization algorithm to the construction site layout planning problem. Construction Management and Economics, 25(04), 359–74.

Li, C Q (1997) Deterioration of concrete building structures. Building Research & Information, 25(04), 196–201.

Li, J, Yu, M and Wang, H (2018) A taxonomy of performance shaping factors for shield tunnel construction. Engineering, Construction and Architectural Management, 25(04), 574–96.

Lingard, H C, Yip, B, Rowlinson, S and Kvan, T (2007) The experience of burnout among future construction professionals: a cross-national study. Construction Management and Economics, 25(04), 345–57.

  • Type: Journal Article
  • Keywords: Burnout; work-study conflict; stress; higher education; culture
  • ISBN/ISSN: 0144-6193
  • URL: http://www.informaworld.com/openurl?genre=article&issn=0144%2d6193&issue=4&spage=345&volume=25
  • Abstract:
    A survey of undergraduate students in Australia and Hong Kong revealed that a specially adapted version of the Maslach Burnout Inventory (the MBI-SS) possesses good internal consistency reliability among construction students. A three-component model of student burnout, comprising emotional exhaustion, cynicism and personal efficacy was supported in both the Australian and Hong Kong samples. Burnout levels among construction students were similar to those reported in previous non-construction student samples. Both Australian and Hong Kong construction students reported higher personal efficacy than non-construction students. Australian students expressed considerably higher cynicism in relation to their university education than the Hong Kong students. The three dimensions of burnout were differentially correlated with work, study and socio-economic variables. In Australia, student burnout was associated with a perceived tension between paid work and study. In Hong Kong, the demands of study and concern with the economy were significant correlates of student burnout.

Mahjoubpour, B, Nasirzadeh, F, Mohammad Hosein Zadeh Golabchi, M, Ramezani Khajehghiasi, M and Mir, M (2018) Modeling of workers’ learning behavior in construction projects using agent-based approach. Engineering, Construction and Architectural Management, 25(04), 559–73.

Olsen, J, Lee, Z-H and Pong, W (2007) Optimal selection of concrete anchors for connection cost reduction. Construction Management and Economics, 25(04), 423–34.

Oo, B-L, Drew, D S and Lo, H P (2007) Applying a random coefficients logistic model to contractors' decision to bid. Construction Management and Economics, 25(04), 387–98.

Shahsavand, P, Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(04), 497–533.