Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 45 results ...

Al-Hammad, A M, Assaf, S A and Al-Hazmi, T (1996) Assessment of the types of public building maintenance contracts in Saudi Arabia. Building Research & Information, 24(06), 358–62.

AlKhaiat, H and Fereig, S M (1996) The role of precast concrete systems in Kuwaiti housing projects. Building Research & Information, 24(06), 374–8.

Babatunde, S O and Perera, S (2017) Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria. Engineering, Construction and Architectural Management, 24(06), 875-900.

Battikha, M G and Davidson, C H (1996) Cause and effect 3-D model for measuring performance in construction acceleration: a decision support system. Building Research & Information, 24(06), 351–7.

Beitelmal, W, Molenaar, K R, Javernick-Will, A and Pellicer, E (2017) Challenges and barriers to establishing infrastructure asset management: A comparative study between Libya and the USA. Engineering, Construction and Architectural Management, 24(06), 1184-202.

Bubshait, A A and Tahir, B M (1996) Planning and scheduling concrete repair work - a case study. Building Research & Information, 24(06), 363–8.

Caldas, C and Gupta, A (2017) Critical factors impacting the performance of mega-projects. Engineering, Construction and Architectural Management, 24(06), 920-34.

Chan, A P C, Wong, F K W, Hon, C K H, Ali, J A and Lyu, S (2017) Construction safety and health problems of ethnic minority workers in Hong Kong. Engineering, Construction and Architectural Management, 24(06), 901-19.

Chang, C-Y, Chou, H-Y and Wang, M-T (2006) Characterizing the corporate governance of UK listed construction companies. Construction Management and Economics, 24(06), 647-56.

Dada, J O (2017) An appraisal of paradigm shifts required of competence of the Nigerian quantity surveyors. Engineering, Construction and Architectural Management, 24(06), 1269-80.

Damci, A, Arditi, D and Polat, G (2017) Civil engineers’ personal values/demographics linkage in project team building. Engineering, Construction and Architectural Management, 24(06), 1337-49.

de Paula, N, Arditi, D and Melhado, S (2017) Managing sustainability efforts in building design, construction, consulting, and facility management firms. Engineering, Construction and Architectural Management, 24(06), 1040-50.

Duncan, K, Philips, P and Prus, M (2006) Prevailing wage legislation and public school construction efficiency: a stochastic frontier approach1. Construction Management and Economics, 24(06), 625-34.

Edirisinghe, R, London, K A, Kalutara, P and Aranda-Mena, G (2017) Building information modelling for facility management: Are we there yet?. Engineering, Construction and Architectural Management, 24(06), 1119-54.

Egbu, C O, Young, B A and Torrance, V B (1996) Refurbishment management practices in the shipping and construction industries - lessons to be learned. Building Research & Information, 24(06), 329–38.

El-Hamrawy, S A-K, Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(06), 988-1003.

Gledson, B J and Greenwood, D (2017) The adoption of 4D BIM in the UK construction industry: An innovation diffusion approach. Engineering, Construction and Architectural Management, 24(06), 950-67.

Hamzeh, F, Abdul, G O, Saleh, B M B and Abbas, Y (2017) Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon. Engineering, Construction and Architectural Management, 24(06), 935-49.

Hartmann, A (2006) The context of innovation management in construction firms. Construction Management and Economics, 24(06), 567-78.

Hyari, K and El-Rayes, K (2006) Field experiments to evaluate lighting performance in nighttime highway construction. Construction Management and Economics, 24(06), 591-601.

Jaeger, M, Yu, G and Adair, D (2017) Organisational culture of Chinese construction organisations in Kuwait. Engineering, Construction and Architectural Management, 24(06), 1051-66.

Koops, L, van Loenhout, C, Bosch-Rekveldt, M, Hertogh, M and Bakker, H (2017) Different perspectives of public project managers on project success. Engineering, Construction and Architectural Management, 24(06), 1294-318.

Lema, N M and Price, A D F (1996) Construction process performance variability: focus on labor productivity. Building Research & Information, 24(06), 339–50.

Li, H (1996) Towards quantitatively measuring the performance of construction IT systems. Building Research & Information, 24(06), 379–82.

Morosi, J A, Boldes, U and Colman, J (1996) Ornament and function. Building Research & Information, 24(06), 323–8.

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(06), 1004-17.

Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(06), 635-46.

Nikmehr, B, Hosseini, M R, Rameezdeen, R, Chileshe, N, Ghoddousi, P and Arashpour, M (2017) An integrated model for factors affecting construction and demolition waste management in Iran. Engineering, Construction and Architectural Management, 24(06), 1246-68.

Osei-Kyei, R and Chan, A P C (2017) Empirical comparison of critical success factors for public-private partnerships in developing and developed countries: A case of Ghana and Hong Kong. Engineering, Construction and Architectural Management, 24(06), 1222-45.

Phua, F T T (2006) When is construction partnering likely to happen? An empirical examination of the role of institutional norms. Construction Management and Economics, 24(06), 615-24.

Ritson, N H, Wilson, M M J and Cohen, D A (2017) Managing engineering contractors in the UK petrochemicals industry. Engineering, Construction and Architectural Management, 24(06), 1067-80.

Sánchez-Romero, M and Alavedra-Ribot, P (1996) Experimental study of the thermal behaviour of radiant floors. Building Research & Information, 24(06), 369–73.

Senaratne, S, Jin, X-H and Balasuriya, K (2017) Exploring the role of networks in disseminating construction project knowledge through case studies. Engineering, Construction and Architectural Management, 24(06), 1281-93.

Sepasgozar, S M E and Loosemore, M (2017) The role of customers and vendors in modern construction equipment technology diffusion. Engineering, Construction and Architectural Management, 24(06), 1203-21.

Soetanto, R, Dainty, A R J, Glass, J and Price, A D F (2006) Towards an explicit design decision process: the case of the structural frame. Construction Management and Economics, 24(06), 603-14.

Song, Y, Liu, C and Langston, C (2006) Linkage measures of the construction sector using the hypothetical extraction method. Construction Management and Economics, 24(06), 579-89.

Staykova, G and Underwood, J (2017) Assessing collaborative performance on construction projects through knowledge exchange: A UK rail strategic alliance case study. Engineering, Construction and Architectural Management, 24(06), 968-87.

Teo, A L E, Ofori, G, Tjandra, I and Kim, H (2017) Framework for productivity and safety enhancement system using BIM in Singapore. Engineering, Construction and Architectural Management, 24(06), 1350-71.

Tran, D Q, Nguyen, L D and Faught, A (2017) Examination of communication processes in design-build project delivery in building construction. Engineering, Construction and Architectural Management, 24(06), 1319-36.

Trigunarsyah, B (2017) Organizational culture influence on client involvement. Engineering, Construction and Architectural Management, 24(06), 1155-69.

Venselaar, M and Wamelink, H (2017) The nature of qualitative construction partnering research: Literature review. Engineering, Construction and Architectural Management, 24(06), 1092-118.

Vu, H A, Cu, V H, Min, L X and Wang, J Q (2017) Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model. Engineering, Construction and Architectural Management, 24(06), 1018-39.

Wang, C, Li, B, Li, B and Baldwin, A (2017) Case study of “project controlling” on a large HOPSCA project in China. Engineering, Construction and Architectural Management, 24(06), 862-74.

Yu, A T W (2017) Using jigsaw method to enhance the learning of research and consultancy techniques for postgraduate students. Engineering, Construction and Architectural Management, 24(06), 1081-91.

  • Type: Journal Article
  • Keywords: methodology; constructions education; questionnaire survey
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-03-2016-0080
  • Abstract:
    Purpose Students find courses in research methods delivered by lectures, both difficult and boring. The purpose of this paper is to provide empirical research on another teaching and learning method, jigsaw method, to three groups of postgraduate students over three academic years. Design/methodology/approach The fifth topic of the course, qualitative research methods, was selected for implementation of the jigsaw class. The students completed a feedback questionnaire after classes to express their opinions and comments on the new method. Descriptive statistics and content analysis were used to test these data. Findings The students believed that the jigsaw method is an innovative teaching and learning activity and were generally satisfied with the process and the execution. They stated that participation was a valuable experience which enabled them to share knowledge with other classmates and gain a better understanding of the subject. Further improvements were also proposed by the students. Research limitations/implications First, the analysis of the implementation of the jigsaw methods is based on student perceptions rather than objective measures of learning gains. Second, the classes for full-time postgraduate students are relatively small. Data were collected, therefore, over three academic years to provide enough valid responses for analysis. Originality/value The research may be regarded as pioneering in relation to jigsaw classes for teaching and learning research methods in postgraduate course. The findings provide confidence to architecture, engineering and construction (AEC) academics to incorporate jigsaw methods in their courses. The results of this study provide useful information for AEC lecturers assisting them to design their classes using jigsaw methods.

Yu, J, Ma, G and Jiang, X (2017) Impact of the built environment and care services within rural nursing homes in China on quality of life for elderly residents. Engineering, Construction and Architectural Management, 24(06), 1170-83.