Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 45 results ...

Al-Hammad, A M, Assaf, S A and Al-Hazmi, T (1996) Assessment of the types of public building maintenance contracts in Saudi Arabia. Building Research & Information, 24(06), 358–62.

AlKhaiat, H and Fereig, S M (1996) The role of precast concrete systems in Kuwaiti housing projects. Building Research & Information, 24(06), 374–8.

Babatunde, S O and Perera, S (2017) Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria. Engineering, Construction and Architectural Management, 24(06), 875-900.

Battikha, M G and Davidson, C H (1996) Cause and effect 3-D model for measuring performance in construction acceleration: a decision support system. Building Research & Information, 24(06), 351–7.

Beitelmal, W, Molenaar, K R, Javernick-Will, A and Pellicer, E (2017) Challenges and barriers to establishing infrastructure asset management: A comparative study between Libya and the USA. Engineering, Construction and Architectural Management, 24(06), 1184-202.

Bubshait, A A and Tahir, B M (1996) Planning and scheduling concrete repair work - a case study. Building Research & Information, 24(06), 363–8.

Caldas, C and Gupta, A (2017) Critical factors impacting the performance of mega-projects. Engineering, Construction and Architectural Management, 24(06), 920-34.

Chan, A P C, Wong, F K W, Hon, C K H, Ali, J A and Lyu, S (2017) Construction safety and health problems of ethnic minority workers in Hong Kong. Engineering, Construction and Architectural Management, 24(06), 901-19.

Chang, C-Y, Chou, H-Y and Wang, M-T (2006) Characterizing the corporate governance of UK listed construction companies. Construction Management and Economics, 24(06), 647-56.

Dada, J O (2017) An appraisal of paradigm shifts required of competence of the Nigerian quantity surveyors. Engineering, Construction and Architectural Management, 24(06), 1269-80.

Damci, A, Arditi, D and Polat, G (2017) Civil engineers’ personal values/demographics linkage in project team building. Engineering, Construction and Architectural Management, 24(06), 1337-49.

de Paula, N, Arditi, D and Melhado, S (2017) Managing sustainability efforts in building design, construction, consulting, and facility management firms. Engineering, Construction and Architectural Management, 24(06), 1040-50.

Duncan, K, Philips, P and Prus, M (2006) Prevailing wage legislation and public school construction efficiency: a stochastic frontier approach1. Construction Management and Economics, 24(06), 625-34.

Edirisinghe, R, London, K A, Kalutara, P and Aranda-Mena, G (2017) Building information modelling for facility management: Are we there yet?. Engineering, Construction and Architectural Management, 24(06), 1119-54.

Egbu, C O, Young, B A and Torrance, V B (1996) Refurbishment management practices in the shipping and construction industries - lessons to be learned. Building Research & Information, 24(06), 329–38.

El-Hamrawy, S A-K, Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(06), 988-1003.

Gledson, B J and Greenwood, D (2017) The adoption of 4D BIM in the UK construction industry: An innovation diffusion approach. Engineering, Construction and Architectural Management, 24(06), 950-67.

Hamzeh, F, Abdul, G O, Saleh, B M B and Abbas, Y (2017) Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon. Engineering, Construction and Architectural Management, 24(06), 935-49.

Hartmann, A (2006) The context of innovation management in construction firms. Construction Management and Economics, 24(06), 567-78.

Hyari, K and El-Rayes, K (2006) Field experiments to evaluate lighting performance in nighttime highway construction. Construction Management and Economics, 24(06), 591-601.

Jaeger, M, Yu, G and Adair, D (2017) Organisational culture of Chinese construction organisations in Kuwait. Engineering, Construction and Architectural Management, 24(06), 1051-66.

Koops, L, van Loenhout, C, Bosch-Rekveldt, M, Hertogh, M and Bakker, H (2017) Different perspectives of public project managers on project success. Engineering, Construction and Architectural Management, 24(06), 1294-318.

Lema, N M and Price, A D F (1996) Construction process performance variability: focus on labor productivity. Building Research & Information, 24(06), 339–50.

Li, H (1996) Towards quantitatively measuring the performance of construction IT systems. Building Research & Information, 24(06), 379–82.

Morosi, J A, Boldes, U and Colman, J (1996) Ornament and function. Building Research & Information, 24(06), 323–8.

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(06), 1004-17.

Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(06), 635-46.

Nikmehr, B, Hosseini, M R, Rameezdeen, R, Chileshe, N, Ghoddousi, P and Arashpour, M (2017) An integrated model for factors affecting construction and demolition waste management in Iran. Engineering, Construction and Architectural Management, 24(06), 1246-68.

Osei-Kyei, R and Chan, A P C (2017) Empirical comparison of critical success factors for public-private partnerships in developing and developed countries: A case of Ghana and Hong Kong. Engineering, Construction and Architectural Management, 24(06), 1222-45.

Phua, F T T (2006) When is construction partnering likely to happen? An empirical examination of the role of institutional norms. Construction Management and Economics, 24(06), 615-24.

Ritson, N H, Wilson, M M J and Cohen, D A (2017) Managing engineering contractors in the UK petrochemicals industry. Engineering, Construction and Architectural Management, 24(06), 1067-80.

Sánchez-Romero, M and Alavedra-Ribot, P (1996) Experimental study of the thermal behaviour of radiant floors. Building Research & Information, 24(06), 369–73.

Senaratne, S, Jin, X-H and Balasuriya, K (2017) Exploring the role of networks in disseminating construction project knowledge through case studies. Engineering, Construction and Architectural Management, 24(06), 1281-93.

Sepasgozar, S M E and Loosemore, M (2017) The role of customers and vendors in modern construction equipment technology diffusion. Engineering, Construction and Architectural Management, 24(06), 1203-21.

Soetanto, R, Dainty, A R J, Glass, J and Price, A D F (2006) Towards an explicit design decision process: the case of the structural frame. Construction Management and Economics, 24(06), 603-14.

Song, Y, Liu, C and Langston, C (2006) Linkage measures of the construction sector using the hypothetical extraction method. Construction Management and Economics, 24(06), 579-89.

Staykova, G and Underwood, J (2017) Assessing collaborative performance on construction projects through knowledge exchange: A UK rail strategic alliance case study. Engineering, Construction and Architectural Management, 24(06), 968-87.

Teo, A L E, Ofori, G, Tjandra, I and Kim, H (2017) Framework for productivity and safety enhancement system using BIM in Singapore. Engineering, Construction and Architectural Management, 24(06), 1350-71.

Tran, D Q, Nguyen, L D and Faught, A (2017) Examination of communication processes in design-build project delivery in building construction. Engineering, Construction and Architectural Management, 24(06), 1319-36.

Trigunarsyah, B (2017) Organizational culture influence on client involvement. Engineering, Construction and Architectural Management, 24(06), 1155-69.

Venselaar, M and Wamelink, H (2017) The nature of qualitative construction partnering research: Literature review. Engineering, Construction and Architectural Management, 24(06), 1092-118.

  • Type: Journal Article
  • Keywords: research methods; partnership; supply chain management; construction management; collaboration
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-04-2016-0098
  • Abstract:
    Purpose The purpose of this paper is to investigate the nature of qualitative construction partnering research. Design/methodology/approach In total, 20 qualitative peer-reviewed papers about construction partnering research are reviewed. Findings The results show four methodological gaps. All identified gaps have in common that specific time and place dependent details that may have influenced understanding of studied individuals are underexposed. Research limitations/implications The main limitation of this study is that empirical-based papers are divided into either qualitative or quantitative research, but the boundary between those categories is not as black and white as it may look like in first instance. Practical implications The identified gaps are translated to recommendations for further study. This will help the reader to become more aware of the difficulties and decisions encountered by the researcher, and in that way the reader is more aware and gains more understanding of the context-related character of the study. Applying the recommendations will lead to different conclusions and recommendations to improve construction partnering in working practice. Social implications More focus on local time- and place-dependent factors of the studied individuals as well as the process of studying it, inevitably leads to encountering (and becoming more aware of) personal, subjective and unexplainable decisions and behavior. Describing and analyzing these personal, subjective and unexplainable points in the research process will improve the quality of the research. Originality/value This study contributes to the further development of academic research on this topic and increase effectiveness of partnering in the construction sector.

Vu, H A, Cu, V H, Min, L X and Wang, J Q (2017) Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model. Engineering, Construction and Architectural Management, 24(06), 1018-39.

Wang, C, Li, B, Li, B and Baldwin, A (2017) Case study of “project controlling” on a large HOPSCA project in China. Engineering, Construction and Architectural Management, 24(06), 862-74.

Yu, A T W (2017) Using jigsaw method to enhance the learning of research and consultancy techniques for postgraduate students. Engineering, Construction and Architectural Management, 24(06), 1081-91.

Yu, J, Ma, G and Jiang, X (2017) Impact of the built environment and care services within rural nursing homes in China on quality of life for elderly residents. Engineering, Construction and Architectural Management, 24(06), 1170-83.