Abstracts – Search Results

Search or browse again, or refine search.

Click on the titles below to expand the information about each abstract.
Viewing 32 results ...

Aggeli, A, Christensen, T H and Larsen, S P A K (2022) The gendering of energy household labour. Buildings and Cities, 3(01), 709–24.

Amakali, T R, Cook, G and Larsen, G D (2012) Striving for inclusive design in the built environment: Learning strategy adopted by policy implementers at Local Authorities in England . In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 285–94.

Ballesteros-Pérez, P, Sanz-Ablanedo, E, Soetanto, R, González-Cruz, M C, Larsen, G D and Cerezo-Narváez, A (2020) Duration and Cost Variability of Construction Activities: An Empirical Study. Journal of Construction Engineering and Management, 146(01).

Boyd, P, Larsen, G D and Schweber, L (2014) Perspectives on the specification of Building Integrated Photovoltaic (BIPV) technology in construction projects. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 153–62.

Boyd, P, Larsen, G D and Schweber, L (2015) The co-development of technology and new buildings: incorporating building integrated photovoltaics. Construction Management and Economics, 33(05), 349-60.

Dania, A A, Larsen, G D and Ewart, I J (2014) Sustainable construction: Exploring the capabilities of Nigerian construction firms. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 3–12.

De Place Hansen, E J and Larsen, J N (2011) Employment and winter construction: a comparative analysis of Denmark and western European countries with a similar climate. Construction Management and Economics, 29(09), 875–90.

Duman, D U, Green, S D and Larsen, G D (2017) Competitive Strategy And The Role Of Narrative Infrastructure: The Case Of Turkish Contractors . In: Chan, P W and Neilson, C J (Eds.), Proceedings 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK. Association of Researchers in Construction Management, 622–631.

Duman, D U, Green, S D and Larsen, G D (2019) Historical narratives as strategic resources: analysis of the Turkish international contracting sector. Construction Management and Economics, 37(07), 367–83.

Gade, A N, Larsen, T S and Selman, A D (2021) Leaving No One Behind: A Glimpse into the State of Adoption of the Sustainable Development Goals in the Danish Construction Industry. In: Scott, L and Neilson, C J (Eds.), Proceedings 37th Annual ARCOM Conference, 6-7 September 2021, UK, Association of Researchers in Construction Management, 654-663.

Green, S D, Harty, C, Elmualim, A A, Larsen, G D and Kao, C C (2008) On the discourse of construction competitiveness. Building Research & Information, 36(05), 426–35.

Green, S D, Kao, C and Larsen, G D (2010) Contextualist Research: Iterating between Methods While Following an Empirically Grounded Approach. Journal of Construction Engineering and Management, 136(01), 117–26.

Green, S D, Larsen, G D and Kao, C-C (2008) Competitive strategy revisited: contested concepts and dynamic capabilities. Construction Management and Economics, 26(01), 63–78.

Haugbølle, K, Larsen, J N and Nielsen, J (2019) Construction productivity revisited: towards measuring performance of construction output. Engineering, Construction and Architectural Management, 26(05), 794–813.

Kao, C-C, Green, S D and Larsen, G D (2009) Emergent discourses of construction competitiveness: localized learning and embeddedness. Construction Management and Economics, 27(10), 1005–17.

Koch, C and Larsen, A (2018) Performance of Retrofit with ICT of Social Housing – Proving Technology Optimists Wrong?. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 667–676.

Koch, C and Larsen, C S (2006) Quality in construction: a supply chain perspective. In: Boyd, D (Ed.), Proceedings 22nd Annual ARCOM Conference, 4-6 September 2006 Birmingham, UK. Association of Researchers in Construction Management, Vol. 1, 459–69.

Koch, C and Larsen, C S (2007) User driven innovation in mobile technologies?. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 2, 481–91.

Larsen, G D (2005) A polymorphic framework for understanding the diffusion of innovations within the UK construction industry, Unpublished PhD Thesis, School of Construction Management and Engineering, University of Reading.

Larsen, G D (2005) Horses for courses: relating innovation diffusion concepts to the stages of the diffusion process. Construction Management and Economics, 23(08), 787-92.

Larsen, G D (2011) Understanding the early stages of the innovation diffusion process: awareness, influence and communication networks. Construction Management and Economics, 29(10), 987–1002.

Larsen, G D and Ballal, T M A (2005) The diffusion of innovations within a UKCI context: an explanatory framework. Construction Management and Economics, 23(01), 81-91.

Larsen, G D and Whyte, J (2013) Safe construction through design: perspectives from the site team. Construction Management and Economics, 31(06), 675-90.

Larsen, J, K, Lindhard, S, M, Brunoe, T. D and Jensen, KN (2018) The Relation between Pre-planning, Commissioning and Enhanced Project Performance. Construction Economics and Building, 18(02), 1-14.

Lindhard, S and Larsen, J K (2016) Identifying the key process factors affecting project performance. Engineering, Construction and Architectural Management, 23(05), 657-73.

Maradza, E, Whyte, J and Larsen, G D (2014) Interactive learning in UK construction practice: examining the role of BIM process standards. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 613–22.

Marsh, R, Larsen, V G and Kragh, M (2010) Housing and energy in Denmark: past, present, and future challenges. Building Research & Information, 38(01), 92–106.

Mejlænder-Larsen, & (2017) Using a change control system and building information modelling to manage change in design. Architectural Engineering and Design Management, 13(01), 39–51.

  • Type: Journal Article
  • Keywords: Building information modelling; change control system; change management process; design change; project execution model;
  • ISBN/ISSN: 1745-2007
  • URL: https://doi.org/10.1080/17452007.2016.1220360
  • Abstract:
    Today, there are few satisfying change management systems to handle changes in design, both internal changes initiated by the engineering team and external changes initiated by the client. How can changes in design be managed using a change control system (CCS), and how can building information modelling (BIM) be utilized to optimize evaluation of changes? This paper introduces a change management process and a corresponding CCS for managing changes in detailed design, and assesses how BIM can be used to identify consequences of changes. Findings are based on experiences from execution of major oil and gas projects. Data are gathered from projects, primarily through a Norwegian engineering, procurement and construction (EPC) contractor, using case study research. The research portrays how changes can be handled using the CCS. When a design change request is created, it is presented to a Change Board, where it is processed, categorized, evaluated and either approved or rejected. BIM is used to consider impact and consequences for affected disciplines. The client will be added in the decision process and presented for cost and schedule impact. Results indicate that the dynamics of the CCS combined with the utilization of BIM can keep control of changes in detailed design and reduce overall impacts of changes.

Mejlænder-Larsen, & (2019) A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering, Construction and Architectural Management, 26(04), 648–67.

Piroozfar, P, Altan, H and Popovic-Larsen, O (2012) Design for sustainability: A comparative study of a customized modern method of construction versus conventional methods of construction. Architectural Engineering and Design Management, 8(01), 55-75.

Rohde, L, Jensen, R L, Larsen, O K, Jønsson, K T and Larsen, T S (2021) Holistic indoor environmental quality assessment as a driver in early building design. Building Research & Information, 49(04), 460–81.

Rohde, L, Steen Larsen, T, Jensen, R L, Larsen, O K, Jønsson, K T and Loukou, E (2020) Determining indoor environmental criteria weights through expert panels and surveys. Building Research & Information, 48(04), 415–28.