Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 13 results ...

Briscoe, G (2006) How useful and reliable are construction statistics?. Building Research & Information, 34(03), 220–9.

Clarke, L (2006) Valuing labour. Building Research & Information, 34(03), 246–56.

Crawford, P and Vogl, B (2006) Measuring productivity in the construction industry. Building Research & Information, 34(03), 208–19.

Ekeskär, A, Rudberg, M, Institutionen för teknik och, n, Linköpings, u, Kommunikations- och, t and Tekniska, f (2016) Third-party logistics in construction: The case of a large hospital project. Construction Management and Economics, 34(03), 174-91.

  • Type: Journal Article
  • Keywords: case study; third-party logistics; supply chain management; construction logistics; construction supply chain; supply chains; logistics; construction industry
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2016.1186809
  • Abstract:
    The construction supply chain is of temporary nature and complex, with many interactions between multiple actors in different construction projects. This challenging context typically leads to relatively higher costs and lower productivity, compared to other industries. Supply chain management (SCM) has been put forward as a mean to better handle this challenging context. As a part of SCM initiatives some construction industry stakeholders have turned to third-party logistics (TPL) providers, especially in large construction projects. The use of TPL providers is a new, and under-investigated, phenomenon in the construction industry. The main purpose of this study is thus to explore the use of a TPL provider in a large construction project and to analyse its resulting effects. Driving forces and possible concerns for implementing TPL are identified and the possibility for TPL to be a facilitator for implementing SCM in construction is investigated. The research is based on a literature review and an explorative case study of a large hospital project in Sweden, where the client and the main contractor have initiated the use of a TPL provider to coordinate sourcing and materials handling activities on site. The results show positive effects on establishing an effective interface between the construction site and the supply chain. The results also show that a TPL solution facilitates an increase in productive work at the construction site itself, a reduction of costs and an increased utilisation of site assets. On the downside, the study also shows a lack of SCM knowledge amongst the involved actors in the project, hindering them to reap the full potential of TPL.;The construction supply chain is of temporary nature and complex, with many interactions between multiple actors in different construction projects. This challenging context typically leads to relatively higher costs and lower productivity, compared to other industries. Supply chain management (SCM) has been put forward as a mean to better handle this challenging context. As a part of SCM initiatives some construction industry stakeholders have turned to third-party logistics (TPL) providers, especially in large construction projects. The use of TPL providers is a new, and under-investigated, phenomenon in the construction industry. The main purpose of this study is thus to explore the use of a TPL provider in a large construction project and to analyse its resulting effects. Driving forces and possible concerns for implementing TPL are identified and the possibility for TPL to be a facilitator for implementing SCM in construction is investigated. The research is based on a literature review and an explorative case study of a large hospital project in Sweden, where the client and the main contractor have initiated the use of a TPL provider to coordinate sourcing and materials handling activities on site. The results show positive effects on establishing an effective interface between the construction site and the supply chain. The results also show that a TPL solution facilitates an increase in productive work at the construction site itself, a reduction of costs and an increased utilisation of site assets. On the downside, the study also shows a lack of SCM knowledge amongst the involved actors in the project, hindering them to reap the full potential of TPL.;  The construction supply chain is of temporary nature and complex, with many interactions between multiple actors in different construction projects. This challenging context typically leads to relatively higher costs and lower productivity, compared to other industries. Supply chain management (SCM) has been put forward as a mean to better handle this challenging context. As a part of SCM initiatives some construction industry stakeholders have turned to third-party logistics (TPL) providers, especially in large construction projects. The use of TPL providers is a new, and under-investigated, phenomenon in the construction industry. The main purpose of this study is thus to explore the use of a TPL p ovider in a large construction project and to analyse its resulting effects. Driving forces and possible concerns for implementing TPL are identified and the possibility for TPL to be a facilitator for implementing SCM in construction is investigated. The research is based on a literature review and an explorative case study of a large hospital project in Sweden, where the client and the main contractor have initiated the use of a TPL provider to coordinate sourcing and materials handling activities on site. The results show positive effects on establishing an effective interface between the construction site and the supply chain. The results also show that a TPL solution facilitates an increase in productive work at the construction site itself, a reduction of costs and an increased utilisation of site assets. On the downside, the study also shows a lack of SCM knowledge amongst the involved actors in the project, hindering them to reap the full potential of TPL.;

Franz, B W and Leicht, R M (2016) An alternative classification of project delivery methods used in the United States building construction industry. Construction Management and Economics, 34(03), 160-73.

Hu, X and Liu, C (2016) Profitability performance assessment in the Australian construction industry: A global relational two-stage DEA method. Construction Management and Economics, 34(03), 147-59.

Ive, G (2006) Re-examining the costs and value ratios of owning and occupying buildings. Building Research & Information, 34(03), 230-45.

Khan, K I A, Flanagan, R and Lu, S-L (2016) Managing information complexity using system dynamics on construction projects. Construction Management and Economics, 34(03), 192-204.

Kohler, N (2006) A European perspective on the Pearce report: policy and research. Building Research & Information, 34(03), 287–94.

Macmillan, S (2006) Added value of good design. Building Research & Information, 34(03), 257–71.

Pearce, D (2006) Is the construction sector sustainable?: definitions and reflections. Building Research & Information, 34(03), 201–7.

Tombesi, P (2006) Good thinking and poor value: on the socialization of knowledge in construction. Building Research & Information, 34(03), 272–86.

Turner, R K (2006) Sustainability auditing and assessment challenges. Building Research & Information, 34(03), 197–200.