Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 17 results ...

Al-Homoud, M S, Abdou, A A and Khan, M M (2004) Safety design practices in residential buildings in Saudi Arabia. Building Research & Information, 32(06), 538–43.

Buchmann-Slorup, R (2014) Applying critical chain buffer management theory in location-based management. Construction Management and Economics, 32(06), 506-19.

Fu, W K, Drew, D S and Lo, H P (2004) Start-up and steady-state learning in recurrent bidding. Building Research & Information, 32(06), 484–96.

Gatti, U C, Migliaccio, G C, Bogus, S M and Schneider, S (2014) An exploratory study of the relationship between construction workforce physical strain and task level productivity. Construction Management and Economics, 32(06), 548-64.

Heerwagen, J H, Kampschroer, K, Powell, K M and Loftness, V (2004) Collaborative knowledge work environments. Building Research & Information, 32(06), 510–28.

Isaac, S and Navon, R (2014) Can project monitoring and control be fully automated?. Construction Management and Economics, 32(06), 495-505.

Lansley, P, McCreadie, C, Tinker, A, Flanagan, S, Goodacre, K and Turner-Smith, A (2004) Adapting the homes of older people: a case study of costs and savings. Building Research & Information, 32(06), 468–83.

Lucko, G, Alves, T D C L and Angelim, V L (2014) Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. Construction Management and Economics, 32(06), 575-94.

Nasir, H, Ahmed, H, Haas, C and Goodrum, P M (2014) An analysis of construction productivity differences between Canada and the United States. Construction Management and Economics, 32(06), 595-607.

Perng, Y-H and Chang, C-L (2004) How does Government Procurement Law affect bidding price competition in Taiwan?. Building Research & Information, 32(06), 497–509.

Russell, A D, Tran, N and Staub-French, S (2014) Searching for value: construction strategy exploration and linear planning. Construction Management and Economics, 32(06), 520-47.

Seppänen, O, Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(06), 608-24.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2013.853881
  • Abstract:
    Location-based management systems (LBMSs) are becoming more commonly used to plan and control production in construction projects. The main use has been to compress durations and improve resource efficiency through real-time production control and forecasting. LBMS theory proposes that instead of continuously updating the plan with actualized completion dates, as with the critical path method (CPM), control actions can be used to manage an effective response to deviations in production in order to realign the schedule forecast with the approved plan. Three healthcare construction projects in California were monitored to document the effects of planning and control decisions on production rates, resources and labour consumption. First, the authors hypothesize that proposed control actions based on the system led to real actions in the field. Second, these control actions helped in controlling production rates. Third, control actions decreased subcontractor labour consumption. The results show that control actions were implemented as a response to production alarms and half of the implemented control actions were able to prevent production problems. Many control actions successfully improved production and labour consumption rates with a long-term impact. However, adding resources often increased labour consumption and negated part of the expected production rate benefit.

Sezer, A A and Brochner, J (2014) The construction productivity debate and the measurement of service qualities. Construction Management and Economics, 32(06), 565-74.

Sha, K (2004) Construction business system in China: an institutional transformation perspective. Building Research & Information, 32(06), 529–37.

Swaffield, J A and Jack, L B (2004) Simulation and analysis of airborne cross-contamination routes due to the operation of building drainage and vent systems. Building Research & Information, 32(06), 451–67.

Van der Vlist, A J, Vrolijk, M H and Dewulf, G P M R (2014) On information and communication technology and production cost in construction industry: evidence from the Netherlands. Construction Management and Economics, 32(06), 641-51.

Vilasini, N, Neitzert, T and Rotimi, J (2014) Developing and evaluating a framework for process improvement in an alliance project: a New Zealand case study. Construction Management and Economics, 32(06), 625-40.