Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 12 results ...

Cole-Colander, C (2003) Designing the Customer Experience. Building Research & Information, 31(05), 357–66.

Cooper, R, Bruce, M, Wootton, A, Hands, D and Daly, L (2003) Managing design in the extended enterprise. Building Research & Information, 31(05), 367–78.

Espinoza, D and Morris, J W F (2013) Decoupled NPV: a simple, improved method to value infrastructure investments. Construction Management and Economics, 31(05), 471-96.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2013.800946
  • Abstract:
    Despite its shortcomings, because of its simplicity, the net present value (NPV) technique (or its close relative, the internal rate of return) remains the valuation method most widely used by investors. In this method, all risks associated with a project are lumped into a single parameter (i.e. the risk premium) that is added to the risk-free interest rate to obtain a risk-adjusted discount rate; thus, in essence, the time value of money is adjusted for risk. However, because risk and time are two separate variables, accounting for risk in this manner can lead to substantial valuation errors, particularly for long-term investments which are typical for large infrastructure projects. In this paper, an alternative valuation method that decouples the time value of money from the risk associated with a project is presented. The proposed method, termed decoupled net present value (DNPV), is also simple yet flexible, consistent and robust. The method allows investors to integrate heuristic (i.e. experience based) techniques with sophisticated probabilistic and stochastic techniques to price the risk associated with the value of the asset created and/or the investment needed to create the asset. The proposed method results in a consistent valuation free from the problems typically associated with traditional net present value applications and, more importantly, allows a seamless integration of project risk assessment/management performed by technical experts into the project financial valuation.

Fellows, R and Liu, A M M (2013) Use and misuse of the concept of culture. Construction Management and Economics, 31(05), 401-22.

Gann, D M, Salter, A J and Whyte, J K (2003) Design Quality Indicator as a tool for thinking. Building Research & Information, 31(05), 318–33.

Gibson, E G and Gebken, R J (2003) Design quality in pre-project planning: applications of the Project Definition Rating Index. Building Research & Information, 31(05), 346–56.

Goh, Y M and Chua, D (2013) Neural network analysis of construction safety management systems: a case study in Singapore. Construction Management and Economics, 31(05), 460-70.

Hansen, K L and Vanegas, J A (2003) Improving design quality through briefing automation. Building Research & Information, 31(05), 379–86.

Odeyinka, H A, Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(05), 423-39.

Pinder, J, Iii, R S and Saker, J (2013) Stakeholder perspectives on developing more adaptable buildings. Construction Management and Economics, 31(05), 440-59.

Thomson, D S, Austin, S A, Devine-Wright, H and Mills, G R (2003) Managing value and quality in design. Building Research & Information, 31(05), 334–45.

Whyte, J K and Gann, D M (2003) Design Quality Indicators: work in progress. Building Research & Information, 31(05), 387–98.