Ahmadian, F F A, Rashidi, T H, Akbarnezhad, A and Waller, S T (2017) BIM-enabled sustainability assessment of material supply decisions. Engineering, Construction and Architectural Management, 24(04), 668-95.

Al-Hammad, A M, Al-Mubaiyadh, S and Mahmoud, T (1996) Public versus private sector's assessment of problems facing the building maintenance industry in Saudi Arabia. Building Research & Information, 24(04), 245–54.

Best, R and Langston, C (2006) Evaluation of construction contractor performance: a critical analysis of some recent research. Construction Management and Economics, 24(04), 439-45.

Buijs, A and Silvester, S (1996) Demonstration projects and sustainable housing. Building Research & Information, 24(04), 195–202.

Cheung, F K T and Skitmore, M (2006) A modified storey enclosure model. Construction Management and Economics, 24(04), 391-405.

Ejohwomu, O A, Oshodi, O S and Lam, K C (2017) Nigeria’s construction industry: Barriers to effective communication. Engineering, Construction and Architectural Management, 24(04), 652-67.

Enshassi, A (1996) Training for Palestinian engineers to face the challenges of multinational enterprises in the Gaza Strip. Building Research & Information, 24(04), 222–7.

GhaffarianHoseini, A, Tien, D D, Naismith, N, Tookey, J and GhaffarianHoseini, A (2017) Amplifying the practicality of contemporary building information modelling implementations for New Zealand green building certification (green star). Engineering, Construction and Architectural Management, 24(04), 696-714.

Gunning, J G and Cooke, E (1996) The influence of occupational stress on construction professionals. Building Research & Information, 24(04), 213–22.

Hassanein, A A G (1996) Factors affecting the bidding behaviour of contractors in Egypt. Building Research & Information, 24(04), 228–36.

Hassanein, A A G and Hakam, Z H R (1996) A bidding decision index for construction contractors. Building Research & Information, 24(04), 237–44.

Hu, X and Liu, C (2017) Total factor productivity measurement with carbon reduction. Engineering, Construction and Architectural Management, 24(04), 575-92.

Huang, Y-L and Chou, S-P (2006) Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics, 24(04), 379-89.

Johnson, C, Lizarralde, G and Davidson, C H (2006) A systems view of temporary housing projects in post-disaster reconstruction. Construction Management and Economics, 24(04), 367-78.

  • Type: Journal Article
  • Keywords: Natural disasters; organizational design; post-disaster reconstruction; systems approach; temporary housing
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190600567977
  • Abstract:

    Natural cataclysms (earthquakes, hurricanes and so forth) become natural disasters when they coincide with vulnerabilities; unfortunately, informal settlements in developing countries are only too often highly vulnerable – a reality amply and unhappily confirmed by available statistics. In this context, reconstruction projects are sandwiched between the short‐term necessity to act promptly and the long‐term requirements of sustainable community development – a situation that is currently reflected in alternative and conflicting paradigms at the policy level. Adopting a case‐study approach, we explore the use of temporary housing within two post‐disaster environments, where the impact of different organizational designs leads to fundamentally different solutions to the short‐term housing problem. Our research adopts a dynamic systems approach, associating strategic organizational team design with the development of tactical technical proposals. Two case studies from Turkey and Colombia show that a coherent approach to the sequential stages of providing immediate shelter, temporary housing and permanent reconstruction is not always obtained. The research results emphasize that the performance of reconstruction projects is directly linked to the design and management of the project team.

Kazemi, R M, Riley, D, Asadi, S and Delgoshaei, P (2017) Improving the performance profile of energy conservation measures at the Penn State University Park campus. Engineering, Construction and Architectural Management, 24(04), 610-28.

Kindangen, J I (1996) Artificial neural networks and naturally ventilated buildings. Building Research & Information, 24(04), 203–8.

Panahi, B, Moezzi, E, Preece, C N and Wan, Z W N (2017) Value conflicts and organizational commitment of internal construction stakeholders. Engineering, Construction and Architectural Management, 24(04), 554-74.

Parchami, J M and Shoar, S (2017) A hybrid SD-dematel approach to develop a delay model for construction projects. Engineering, Construction and Architectural Management, 24(04), 629-51.

Rahmani, F, Maqsood, T and Khalfan, M (2017) An overview of construction procurement methods in Australia. Engineering, Construction and Architectural Management, 24(04), 593-609.

Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: a case study. Construction Management and Economics, 24(04), 339-48.

Tang, C M, Wong, C W Y, Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: a Hong Kong case study. Construction Management and Economics, 24(04), 349-65.

Thomas, A V, Kalidindi, S N and Ganesh, L S (2006) Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24(04), 407-24.

Wilson, J G and Gupta, N K (1996) Assessment of structure formation in fresh concrete by measurement of its electrical resistance. Building Research & Information, 24(04), 209–12.

Wong, J T Y and Hui, E C M (2006) Construction project risks: further considerations for constructors' pricing in Hong Kong. Construction Management and Economics, 24(04), 425-38.