Abstracts – Search Results
Search or browse again, or refine search.
Click on the titles below to expand the information about each abstract.
Viewing 1882 results ...
Ibem, E, O, Onyemaechi, P, C.E and yo-Vaughan, K. N. (2018) Project Selection and Transparency Factors in Housing Public-Private Partnerships in Nigeria . Construction Economics and Building, 18(02), 15-40.
Ke, Y, Davis, P and Jefferies, M (2016) A conceptual model of psychological contracts in construction projects . Construction Economics and Building, 16(03), 20-37.
Çıdık, M S (2020) Project Managing the Social Value of Built Assets: A Call for a Focus on Value Manifestation. In: Scott, L and Neilson, C J (Eds.), Proceedings 36th Annual ARCOM Conference, 7-8 September 2020, UK, Association of Researchers in Construction Management, 35-44.
Ababio, B K, Lu, W and Ghansah, F A (2023) Transitioning from green to circular procurement in developing countries: a conceptual framework for Ghana’s construction sector. Building Research & Information, 51(07), 798–815.
Abaza, M; Kisi, K (2024) Improper risk management outcomes and lessons learned from an EPC water transmission project. Journal of Construction Engineering and Management, 150(11).
Abbas, N M A (1998) The impact of construction contract models on construction claims in Saudi Arabia. In: Hughes, W (Ed.), Proceedings 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK. Association of Researchers in Construction Management, Vol. 2, 438–46.
Abd Jamil, A H and Fathi, M S (2018) Contractual challenges for BIM-based construction projects: a systematic review. Built Environment Project and Asset Management, 8(04), 372–85.
Abdel Meguid, T A (1998) Managed claims procurement strategy (MCPS): A comparative study of the performance of alternate building procurement strategies, Unpublished PhD Thesis, , Universite de Montreal.
Abdel-Galil, E, Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(09), 1618-31.
Abdelrahman, M, Zayed, T and Elyamany, A (2008) Best-Value Model Based on Project Specific Characteristics. Journal of Construction Engineering and Management, 134(03), 179–88.
Abdi, A (2014) Efficient winter road maintenance: A study of technical and contractual issues, Unpublished PhD Thesis, TRITA-TSC-PHD, KTH Royal Institute of Technology.
Abduh, M, Sukardi, S N, Wirahadikusumah, R D, Oktaviani, C Z and Bahagia, S N (2023) Maturity of procurement units for public construction projects in Indonesia. International Journal of Construction Management, 23(13), 2171-84.
Abdul-Aziz, A-R (1998) Adapting procurement practices to suit a host country as a probable localization tactic. Journal of Construction Procurement, 4(01), 45–58.
Abdul-Aziz, A-R and Tan, A C N (1998) GATT, GATS and the global construction industry. Engineering, Construction and Architectural Management, 5(01), 31–7.
Abdullahi Ahmed, U, Noor Amila Wan Abdullah, Z and Abdul-Rashid, A-A (2021) Malaysian regulators' ranking of PPP contract governance skills. Built Environment Project and Asset Management, 11(01), 88-102.
Abdullahi, B, Ibrahim, Y M, Ibrahim, A and Bala, K (2019) Development of e-tendering evaluation system for Nigerian public sector. Journal of Engineering, Design and Technology , 18(01), 122–49.
Abdullahi, B, Ibrahim, Y M, Ibrahim, A D and Bala, K (2022) Development of web-based e-tendering system for Nigerian public procuring entities. International Journal of Construction Management, 22(02), 278-91.
Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria, Unpublished PhD Thesis, , University of Salford.
Abrahams, G (2017) Constructing definitions of sustainable development. Smart and Sustainable Built Environment, 6(01), 34-47.
Abu-Hijleh, S F (1991) A model for variance-based exception reporting with user-defined criteria, Unpublished PhD Thesis, , University of California, Berkeley.
Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection, Unpublished PhD Thesis, School of the Built Environment, Edinburgh Napier University.
Adade-Boateng, A O, Fugar, F and Adinyira, E (2021) Framework to improve the attitudes of construction workers towards safety helmets. Journal of Construction in Developing Countries, 26(2), 65-86.
Adafin, J, Rotimi, J O B and Wilkinson, S (2020) Risk impact assessments in project budget development: Quantity surveyors' perspectives. International Journal of Construction Management, 20(01), 13-28.
Adafin, J, Rotimi, J O B and Wilkinson, S (2015) Why do the design stage elemental cost plan and final tender sum differ in New Zealand?. Journal of Financial Management of Property and Construction, 20(02), 116-31.
Adaku, E, Ankrah, N A and Ndekugri, I E (2022) Prevention through design: conceptual models for the assessment of a principal designer’s skills, knowledge and experience. Journal of Engineering, Design and Technology, 20(03), 595-623.
Adams, C D (1995) Procurement of microtunnelling projects, Unpublished PhD Thesis, , The University of Manchester.
Adams, J D and Brown, A W (2002) Project management in public sector construction projects: assessing value for money. Journal of Construction Procurement, 8(02), 84–100.
Adamtey, S A (2022) An Empirical Study to Assist Owners in Selecting the Right Procurement Method for Design-Build Projects. International Journal of Construction Education and Research, 18(01), 67–84.
Addy, M N, Addo, E T, Kwofie, T E and Yartey, J E (2023) Predicting the adoption of e-procurement in construction project delivery in Sub-Saharan Africa: an application of UTAUT2. Construction Innovation, 23(05), 1038-53.
Adediran, A (2018) Modelling targeted procurement strategies and relationship quality criteria influencing the development of small contractors in South Africa, Unpublished PhD Thesis, Department of Construction Economics and Management, University of Cape Town.
Adedokun, O A, Egbelakin, T, Adedokun, D O and Adafin, J (2023) Success criteria-based impacts of risk factors on education building projects in southwestern Nigeria. Journal of Engineering, Design and Technology, 21(06), 1901-24.
Adedokun, O, Aje, I, Awodele, O and Egbelakin, T (2022) Are the public tertiary education building projects devoid of risks in the Nigerian construction context?. Journal of Financial Management of Property and Construction, 27(02), 259-78.
Adeleke, A (2017) Linking effective project management to business strategy in oil and gas industry through decision-making processes, Unpublished PhD Thesis, , Northcentral University.
Adighibe, C, Skitmore, M and Wong, J (2010) The management of transport construction projects: A survey of public sector organisations in Queensland Australia. International Journal of Construction Management, 10(01), 17-33.
Adinyira, E, Agyekum, K, Manu, P, Mahamadu, A M and Olomolaiye, P (2022) Lessening procurement deviations using procurement post reviews: evidence from Ghana. Journal of Financial Management of Property and Construction, 27(02), 199-219.
- Type: Journal Article
- Keywords: Ghana; procurement post review; procurement risk; world bank
- ISBN/ISSN:
- URL: https://doi.org/10.1108/JFMPC-05-2020-0038
- Abstract:
Purpose: Multilateral aid agencies generate most of their funds from taxpayers, and therefore, it is necessary to ensure that recipients or borrowers use the funds for the intended purposes. The World Bank is one of the major multilateral aid agencies that fund infrastructure projects in developing countries. Like other multilateral aid agencies, the World Bank uses oversight instruments/auditing tools to manage procurement risk on their funded projects. However, empirical insight about the effectiveness of these auditing tools is limited. This paper aims to assess the effectiveness of one of such multilateral aid agencies’ auditing tools (i.e. World Bank’s procurement post review [PPR]) in procurement risk mitigation on funded projects in a developing country context. Design/methodology/approach: The study is based on secondary data obtained from the World Bank PPR reports carried out in the 2014, 2015 and 2016 financial years. Five projects with the highest loan amounts and five with the lowest loan amounts for the three-year period were selected from the 24 active World Bank projects during the time of the study. A purposive sampling technique was used to select a representative sample from a list of contracts under the 10 projects. Findings: The results of the analysis showed a clear decline in the number of both major and minor deviations over the three-year period while an increase in the number of contracts with “No Deviation”. The study therefore concludes that procurement risk experienced a decline amongst the World Bank projects in Ghana where post reviews were carried out on yearly basis. Originality/value: The study identifies the need for more frequent PPR and makes a case for the need to investigate whether PPR is a superior auditing tool compared to the other tools. © 2021, Emerald Publishing Limited.
Adu Gyamfi, T, Aigbavboa, C O and Thwala, W D (2024) Risk resources management influence on public-private partnership risk management in construction industry: Confirmatory factor analysis approach. Journal of Engineering, Design and Technology, 22(05), 1544-69.
Aduwo, E B, Ibem, E O, Afolabi, A O, Oluwnmi, A O, Tunji-Olayeni, P F, Ayo-Vaughan, E A, Uwakonye, U O and Oni, A A (2020) Exploring anti-corruption capabilities of e-procurement in construction project delivery in Nigeria. Construction Economics and Building, 20(01), 56-76.
Adzroe, E K (2015) A study of e-business technology transfer via foreign direct investment in the Ghanaian construction industry, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
af Hällström, A, Bosch-Sijtsema, P, Poblete, L, Rempling, R and Karlsson, M (2021) The role of social ties in collaborative project networks: A tale of two construction cases. Construction Management and Economics, 39(09), 723–38.
af Hällström, A and Bosch-Sijtsema, P (2021) Creating Collaboration: The Use of Collaborative Space in Large-Scale Infrastructure Development. In: Scott, L and Neilson, C J (Eds.), Proceedings 37th Annual ARCOM Conference, 6-7 September 2021, UK, Association of Researchers in Construction Management, 502-511.
af Hällström, A and Bosch-Sijtsema, P (2019) Early contractor involvement in the construction industry: a literature review. In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 314-323.
Afolabi, A, Ibem, E, Aduwo, E and Tunji-Olayeni, P (2022) Digitizing the grey areas in the Nigerian public procurement system using e-procurement technologies. International Journal of Construction Management, 22(12), 2215-24.
Afolabi, A, Ibem, E, Aduwo, E, Tunji-Olayeni, P, Oluwunmi, O and Ayo-Vaughan, E (2022) Gauging parameters for e-procurement acquisition in construction businesses in Nigeria. International Journal of Construction Management, 22(03), 426-35.
Agapiou, A and Dainty, A R J (2003) Client-led approaches to increasing participation of women, ethnic minorities and disabled people in the construction workforce: a framework for change. Journal of Construction Procurement, 9(02), 4–16.
Agbesi, K, Fugar, F D and Adjei-Kumi, T (2018) Modelling the adoption of sustainable procurement in construction organisations. Built Environment Project and Asset Management, 8(05), 461–76.
Agbesi, K, Kissi, E and Adjei-Kumi, T (2020) Implementation of Sustainable Procurement Practices in Public Sector Construction Organisation in Ghana. In: Scott, L and Neilson, C J (Eds.), Proceedings 36th Annual ARCOM Conference, 7-8 September 2020, UK, Association of Researchers in Construction Management, 526-535.
Aggiag, M A A (2005) The impact of client attributes on project success: a study of UK public construction projects, Unpublished PhD Thesis, School of the Built Environment, Northumbria University.
Agyekum, A K, Fugar, F D K, Agyekum, K, Akomea-Frimpong, I and Pittri, H (2023) Barriers to stakeholder engagement in sustainable procurement of public works. Engineering, Construction and Architectural Management, 30(09), 3840-57.
Agyekum, K, Ghansah, F A, Tetteh, P A and Amudjie, J (2021) The role of project managers (PMs) in construction health and safety implementation in Ghana. Journal of Engineering, Design and Technology, 19(01), 245-62.
Ahadzi, M and Bowles, G (2004) Public-private partnerships and contract negotiations: an empirical study. Construction Management and Economics, 22(09), 967-78.
Ahadzi, M and Bowles, G (2001) Public-private partnerships in UK infrastructure development: the macroeconomic perspective. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 971–9.
Ahadzi, M and Bowles, G (2001) The private finance initiative: the procurement process in perspective. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 991–9.
Ahadzie, D K (2007) A model for predicting the performance of project managers in mass house building projects in Ghana, Unpublished PhD Thesis, School of Engineering and the Built Environment, University of Wolverhampton.
Ahadzie, D K, Proverbs, D G and Olomolaiye, P (2006) Development of research instrument for project managers' performance measures in mass house building projects. In: Boyd, D (Ed.), Proceedings 22nd Annual ARCOM Conference, 4-6 September 2006 Birmingham, UK. Association of Researchers in Construction Management, Vol. 1, 165–75.
Ahiaga-Dagbui, D and Smith, S D (2012) Neural networks for modelling the final target cost of water projects. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 307–16.
Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation, Unpublished PhD Thesis, School of Engineering, University of Edinburgh.
Ahmadu, H A, Ibrahim, Y M, Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(01), 65-84.
Ahmed Namadi, S i (2019) A framework for collaborative costing in the UK construction industry, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.
Ahmed, S, Mahmud, A, Akoh, S and Tariq, U (2024) Exploring IPD as an Antidote to Fragmentation Within the UK Construction Sector. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK. Association of Researchers in Construction Management, 657-666.
Ahmed, V, Aziz, Z, Tezel, A and Riaz, Z (2018) Challenges and drivers for data mining in the AEC sector. Engineering, Construction and Architectural Management, 25(11), 1436–53.
Ahn, C R, Lewis, P, Golparvar-Fard, M and Lee, S (2013) Integrated Framework for Estimating, Benchmarking, and Monitoring Pollutant Emissions of Construction Operations. Journal of Construction Engineering and Management, 139(12).
Aibinu, A A and Papadonikolaki, E (2020) Conceptualizing and operationalizing team task interdependences: BIM implementation assessment using effort distribution analytics. Construction Management and Economics, 38(05), 420–46.
Aibinu, A A, Ofori, G and Ling, F Y (2008) Explaining Cooperative Behavior in Building and Civil Engineering Projects’ Claims Process: Interactive Effects of Outcome Favorability and Procedural Fairness. Journal of Construction Engineering and Management, 134(09), 681–91.
Aibinu, A and Papadonikolaki, E (2016) BIM Implementation and Project Coordination in Design-Build Procurement . In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 15–24.
Ajayi, S O (2017) Design, procurement and construction strategies for minimizing waste in construction projects, Unpublished PhD Thesis, Bristol Enterprise, Research and Innovation Centre , University of the West of England, Bristol.
Aje, I (2012) The impact of contractors' prequalification on construction project delivery in Nigeria. Engineering, Construction and Architectural Management, 19(02), 159-72.
Aje, O I, Odusami, K T and Ogunsemi, D R (2009) The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. Journal of Financial Management of Property and Construction, 14(02), 171–87.
Akbiyikli, R (2005) The holistic realisation of PFI road project objectives in the UK, Unpublished PhD Thesis, , University of Salford.
Akbiyikli, R and Eaton, D (2006) Operation and maintenance (O&M) management in PFI road projects in the UK. In: Boyd, D (Ed.), Proceedings 22nd Annual ARCOM Conference, 4-6 September 2006 Birmingham, UK. Association of Researchers in Construction Management, Vol. 1, 393–402.
Akbiyikli, R and Eaton, D (2004) Risk management in PFI procurement: a holistic approach. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 2, 1269–79.
Akerele, D and Gidado, K (2003) The risks and constraints in the implementation of PFI/PPP in Nigeria. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 1, 379–91.
Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria, Unpublished PhD Thesis, , University of Newcastle (Australia).
Akinbo, T F, Fagbenle, O I and Amusan, L M (2024) Assessment of knowledge management barriers and improvement strategies on public-private partnership projects in Nigeria. International Journal of Construction Management, 24(09), 1018–28.
Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(01), 77-89.
Akintoye, A (1994) Design and build: a survey of construction contractors' views. Construction Management and Economics, 12(02), 155-63.
Akintoye, A and Chinyio, E (2005) Private Finance Initiative in the healthcare sector: trends and risk assessment. Engineering, Construction and Architectural Management, 12(06), 601–16.
Akintoye, A and Fitzgerald, E (1995) Design and build: a survey of architects' views. Engineering, Construction and Architectural Management, 2(01), 27–44.
Akintoye, A, Beck, M, Hardcastle, C, Chinyio, E A and Asenova, D (2000) Management of risks within the PFI project environment. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 261–70.
Akintoye, A, Beck, M, Hardcastle, C, Chinyio, E A and Asenova, D (2001) The financial structure of private finance initiative projects. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 361–9.
Akintoye, A, Hardcastle, C, Beck, M, Chinyio, E A and Asenova, D (2003) Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(05), 461-70.
Akintoye, A, Taylor, C and Fitzgerald, E (1998) Risk analysis and management of Private Finance Initiative projects. Engineering, Construction and Architectural Management, 5(01), 9–21.
Akmam Syed Zakaria, S, Gajendran, T, Rose, T and Brewer, G (2018) Contextual, structural and behavioural factors influencing the adoption of industrialised building systems: a review. Architectural Engineering and Design Management, 14(01–02), 3–26.
Akmam Syed Zakaria, S, Gajendran, T, Skitmore, M and Brewer, G (2018) Key factors influencing the decision to adopt industrialised building systems technology in the Malaysian construction industry: an inter-project perspective. Architectural Engineering and Design Management, 14(01–02), 27–45.
Akomea-Frimpong, I, Jin, X, Osei Kyei, R, Tetteh, P A, Tumpa, R J, Ofori, J N A and Pariafsai, F (2024) A review of circular economy models and success factors on public-private partnership infrastructure development. Built Environment Project and Asset Management, 14(01), 109-26.
Al Bunni, A (2020) Refurbishment of UK state school buildings: a strategy and framework for BIM-based digital twinning, Unpublished PhD Thesis, , De Montfort University.
Al Hosani, S (2022) A framework for the implementation of 'Lean' construction principles in Engineering, Procurement and Construction (EPC) in the oil and gas industry, Unpublished PhD Thesis, , Aberystwyth University.
Al Rashdi, A (2012) A strategic framework for the further enhancement of the standard forms of construction contract in the Sultanate of Oman, Unpublished PhD Thesis, , University of Salford.
Al Saudi, I S A (2011) The impediments to the adoption of the design and build project procurement strategy in the Saudi construction industry, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.
Al Subaih, A (2016) A framework for implementation of IPD principles in oil & gas projects, Unpublished PhD Thesis, , University of Salford.
Al Yahya, M, Skitmore, M, Bridge, A, Nepal, M and Cattell, D (2018) e-Tendering readiness in construction: the posterior model. Construction Innovation, 18(02), 0.
Al-Ajam, M (2008) Integrating collaborative extranets with project integrated databases to improve the construction tender stage, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Al-Ashaikh, M H (1996) Project management in the public sector of Saudi Arabia, problems and solutions, Unpublished PhD Thesis, , University of Liverpool.
Al-Atawi, S (2005) An ICT framework to improve the tendering process in the governmental construction sector in the Kingdom of Saudi Arabia, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Al-Azemi, K (2012) Risk management for build, operate and transfer projects within Kuwait, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Al-Barghouthi, M T (2010) Capturing tacit knowledge in the construction industry in Saudi Arabia, Unpublished PhD Thesis, , University of Phoenix.
Al-Bizri, S and Gray, C (2010) Management framework for technology clusters implementation. Construction Management and Economics, 28(07), 82.
Al-Derham, H R (1999) The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the State of Qatar, Unpublished PhD Thesis, Centre for Research in Built Environment, University of Glamorgan.
Al-Harthi, A S A (2016) Modelling the relationship between client activities and construction procurement performance in Oman, Unpublished PhD Thesis, School of Civil and Building Engineering, Loughborough University.
Al-Hazmi, T A (1999) Project procurement system selection model (with particular reference to Saudi Arabia), Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Al-Keim, A (2017) Strategies to reduce cost overruns and schedule delays in construction projects, Unpublished PhD Thesis, , Walden University.
Al-Mansouri, O (1988) The relationship between the designer and contractor in Saudi Arabia, Unpublished PhD Thesis, Department of Construction Management, University of Reading.
Al-Momani, A H (2000) Structuring information on residential building: a model of preference. Engineering, Construction and Architectural Management, 7(02), 179–90.
Al-Saleh, F S (1980) A case study and evaluation of a technological delivery system: Construction management in Saudi Arabia, Unpublished PhD Thesis, , University of Washington.
Al-Sharif, F and Kaka, A (2004) PFI/PPP topic coverage in construction journals. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 711–9.
Al-Sharif, F and Kaka, A (2003) Potential of PFI/PPP as a financing source for public services projects in Saudi Arabia. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 1, 71–80.
Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.
Al-Sinan, F M (1986) Evaluation of construction management contracts in developing countries, Unpublished PhD Thesis, , Purdue University.
Al-Tabtabai, H (2002) Construction procurement strategy selection using analytical hierarchy process. Journal of Construction Procurement, 8(02), 117–32.
Alahmadi, N H (2018) Nudging contracting firms rivals within municipal road projects in Saudi Arabia to bid competitively, Unpublished PhD Thesis, Department of Architecture , University of Strathclyde.
Alani, Y (2023) A semantic framework for the life cycle of water assets data exchange, Unpublished PhD Thesis, , Teesside University.
Alaqad, M (2021) Critical success factors for integration of value, financial risk, and environmental management systems in medium sized design and build projects, Unpublished PhD Thesis, , University of Brighton.
Alaqad, M, Gidado, K, Piroozfar, P, Alkhadim, M and Dorgham, A (2020) Efficacy of Value Management System in Building Projects: A UK Perspective. In: Scott, L and Neilson, C J (Eds.), Proceedings 36th Annual ARCOM Conference, 7-8 September 2020, UK, Association of Researchers in Construction Management, 146-155.
Alashwal, N and Alashwal, A (2023) Rural access programs in Yemen: delay of international funded road projects. Engineering, Construction and Architectural Management, 30(04), 1746-67.
Alazemi, T (2011) On the integration of value engineering in the procurement of public housing in the state of Kuwait, Unpublished PhD Thesis, Department of Mechanical, Aerospace & Civil Engineering, University of Manchester.
Albaloushi, H and Skitmore, M (2008) Supply chain management in the UAE construction industry. International Journal of Construction Management, 8(1), 53-71.
Alcaraz Carrillo de Albornoz, V, Ke, Y and Molina Millán, J (2024) Public-private partnerships: Pro-cyclical or counter-cyclical? An empirical study. International Journal of Construction Management, 24(01), 97–107.
Aldhaheri, M, Bakchan, A and Sandhu, M A (2018) A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects. Engineering, Construction and Architectural Management, 25(09), 1226–52.
Alfieri, E, Seghezzi, E, Sauchelli, M, Di Giuda, G M and Masera, G (2020) A BIM-based approach for DfMA in building construction: framework and first results on an Italian case study. Architectural Engineering and Design Management, 16(04), 247–69.
Alharthi, A, Soetanto, R and Edum-Fotwe, F (2014) The changing role of the public client in construction procurement. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 403–12.
Alhazmi, T and McCaffer, R (2000) Project Procurement System Selection Model. Journal of Construction Engineering and Management, 126(03), 176–84.
Alhudaithy, I M (2006) Rights of tenderers and contractors under Saudi public procurement contract regulations: a comparative study with England and Wales, Unpublished PhD Thesis, Department of Law, Durham University.
Alhusban, M (2018) Conceptual procurement framework for building information modelling uptake to enhance buildings' sustainability performance in the Jordanian public sector, Unpublished PhD Thesis, School of Civil Engineering & Surveying, University of Portsmouth.
Ali, A S and Au-Yong, C P (2022) Risk factors in the refurbishment design process: the case of Malaysia. International Journal of Building Pathology and Adaptation, 40(04), 622-35.
Ali, A S, Azmi, N F and Baaki, T K (2018) Cost performance of building refurbishment works: the case of Malaysia. International Journal of Building Pathology and Adaptation, 36(01), 41–62.
Ali, M M A (2011) A framework for enhancing the success of construction projects undertaken in Libya, Unpublished PhD Thesis, Department of the Built Environment, Sheffield Hallam University.
Alinaitwe, H and Ayesiga, R (2013) Success factors for the implementation of public-private partnerships in the construction industry in Uganda. Journal of Construction in Developing Countries, 18(2), 1-14.
Aljarbou, M H (2022) A new sustainable public-private partnership (PPP) procurement system for infrastructure projects in the Kingdom of Saudi Arabia, Unpublished PhD Thesis, , University of Bristol.
Aljohani, A (2019) Cost overrun causality model in Saudi Arabian public sector construction projects, Unpublished PhD Thesis, The Scott Sutherland School of Architecture & Built Environment, Robert Gordon University.
Alketbi, S R (2020) Effective implementation of value engineering in the housing construction programmes of the UAE, Unpublished PhD Thesis, School of Architecture and Built Environment, University of Wolverhampton.
Alkhateeb, A M, Hyari, K H and Hiyassat, M A (2021) Analyzing bidding competitiveness and success rate of contractors competing for public construction projects. Construction Innovation, 21(04), 576-91.
Alkhraisha, A (2023) Approaches for enhancing the construction and demolition waste management strategy in Jordan, Unpublished PhD Thesis, , Anglia Ruskin University.
Almarri, K (2021) Comparative analysis of the value for money factors of PPPs between the UAE and the UK. International Journal of Construction Management, 21(04), 416-26.
Almarri, K (2019) Perceptions of the attractive factors for adopting public-private partnerships in the UAE. International Journal of Construction Management, 19(01), 57-64.
Almarri, K (2023) The value for money factors and their interrelationships for smart city public–private partnerships projects. Construction Innovation, 23(04), 815-32.
Almarri, K and Boussabaine, H (2017) Interdependency of the critical success factors and ex-post performance indicators of PPP projects. Built Environment Project and Asset Management, 7(05), 546-56.
Almazkoor, F B (2014) Two-stage methodology for managing and controlling material flow between multiple construction projects, Unpublished PhD Thesis, , Clemson University.
Almazroa, D A (2003) Project delivery system decision framework using the weighting factors and analytic hierarchy process methods, Unpublished PhD Thesis, , University of Pittsburgh.
Alofi, A (2017) Improving the Saudi Arabia procurement system: Perception and development of the construction industry, Unpublished PhD Thesis, , Arizona State University.
Alolote Ibim, A and Dimkpa, K (2022) Assessing the cost accuracy of electrical works towards sustainable procurement of building services. International Journal of Construction Management, 22(10), 1974-82.
Aloyce, D, Monko, R J and Luvara, V G M (2024) Critical audit indicators for assessing construction projects performance (cpp) at pre-contract stage in Tanzania. International Journal of Construction Management, 24(05), 530–9.
Alsakini, W (2012) Two models for managing the virtualisation of construction management firms in the context of Finnish construction markets, Published PhD Thesis, Department of Civil and Structural Engineering, Aalto University.
Alsamarraie, M M and Ghazali, F (2023) Evaluation of organizational procurement performance for public construction projects: Systematic review. International Journal of Construction Management, 23(14), 2499–508.
Alsedairy, F and Smith, S D (2016) Understanding the Drivers and Needs for Mega Infrastructure Project Development in Saudi Arabia. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 793–802.
Alshdiefat, A a (2017) Developing an assessment model for the adoption of building information modelling to reduce the cost of change orders in the Jordanian construction industry, Unpublished PhD Thesis, , University of Salford.
Alshdiefat, A S (2018) Developing an assessment model for the adoption of building information modelling to reduce the cost of change orders in the Jordanian construction industry, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Alvanchi, A, Baniassadi, F, Shahsavari, M and Kashani, H (2021) Improving materials logistics plan in road construction projects using discrete event simulation. Engineering, Construction and Architectural Management, 28(10), 3144-63.
Alzaben, A A (2016) Under the shadow of sharia law: the implementation of Government Procurement Agreement provisions by Saudi Arabian government tenders and procurement law, Unpublished PhD Thesis, Law School, University of Hull.
Alzara, M (2016) Measuring the construction performance in Saudi Arabia and proposing new procurement model based on BV PIPS (a university case study), Unpublished PhD Thesis, , Arizona State University.
Amadi, A (2019) A cross-sectional snapshot of the insider view of highway infrastructure delivery in the developing world. International Journal of Construction Management, 19(06), 472-91.
Amadi, A I and Higham, A (2019) Putting context to numbers: a geotechnical risk trajectory to cost overrun extremism. Construction Management and Economics, 37(04), 217–37.
Amaratunga, D, Malalgoda, C I and Keraminiyage, K (2018) Contextualising mainstreaming of disaster resilience concepts in the construction process. International Journal of Disaster Resilience in the Built Environment, 9(04–05), 348–67.
Ambrose, M D and Tucker, S N (2000) Procurement system evaluation for the construction industry. Journal of Construction Procurement, 6(02).
Ameyaw, C, Adjei-Kumi, T and Owusu-Manu, D-G (2015) Exploring value for money (VfM) assessment methods of public-private partnership projects in Ghana: A theoretical framework. Journal of Financial Management of Property and Construction, 20(03), 268-85.
Aminian, E, Kirkham, R and Fenn, P (2011) Contracting strategies in construction industries. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 755–64.
Amiri Ara, R, Paardenkooper, K and van Duin, R (2022) A new blockchain system design to improve the supply chain of engineering, procurement and construction (EPC) companies – a case study in the oil and gas sector. Journal of Engineering, Design and Technology, 20(04), 887-913.
Amiri, O, Ayazi, A, Rahimi, M and Khazaeni, G (2022) Risks of water and wastewater PPP projects: an investors’ perspective. Construction Innovation, 22(04), 1104-21.
Amiri, O, Rahimi, M, Ayazi, A and Khazaeni, G (2024) Multi-criteria decision-making model for EPC contractor prequalification: a hybrid approach. International Journal of Building Pathology and Adaptation, 42(03), 369-85.
Amirtash, P, Majid Parchami, J and Jelodar, M B (2021) Integration of project management services for International Engineering, Procurement and Construction projects. Built Environment Project and Asset Management, 11(02), 330-49.
Amoah, C (2023) Quality management framework for government social housing construction in South Africa. International Journal of Building Pathology and Adaptation, 41(06), 217-36.
Amoah, C and Bikitsha, L (2022) Emerging contractor's management and planning skills to overcome business risk factors. International Journal of Building Pathology and Adaptation, 40(04), 670-89.
Amoo, O, Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in Eastern Cape South Africa: A case study. Journal of Construction Business and Management, 5(2), 54-67.
Amponsah, C T (2010) Public-private partnerships: Critical success factors for procurements of capital projects, Unpublished PhD Thesis, , Capella University.
An, T and Watanabe, T (2011) Towards the sustainable improvement in construction labour's employment in China: Cultivating subcontractor's role. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 663–72.
Ancell, D (2005) Reducing costs: a practical application of performance-based specification and transaction cost theories. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 2, 721–9.
Ancell, D J (2007) Performance-based contracting in construction: innovation for the brave?, Unpublished PhD Thesis, , University of Reading.
Ang, G, Groosman, M and Scholten, N P M (2005) Dutch performance-based approach to building regulations and public procurement. Building Research & Information, 33(02), 107–19.
Ankrah, N A, Proverbs, D and Debrah, Y (2009) Factors influencing the culture of a construction project organisation: an empirical investigation. Engineering, Construction and Architectural Management, 16(01), 26–47.
Ankrah, N A, Proverbs, D and Debrah, Y (2008) Towards a framework for diagnosing the culture of a construction project organisation. International Journal of Construction Management, 8(2), 17-31.
Ansah, R H and Sorooshian, S (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25(01), 62-76.
Ansell, M (2009) A study of a collaborative framework arrangement for highways renewals schemes, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Ansell, M, Holmes, M, Evans, R, Pasquire, C and Price, A (2009) Delivering Best Value in Highways Major Maintenance Schemes: Case Study. Journal of Construction Engineering and Management, 135(04), 235–45.
Anumba, C J and Evbuomwam, N F O (1997) Concurrent engineering in design-build projects. Construction Management and Economics, 15(03), 271-81.
Aouad, G F and Barrett, P S (1998) The feasibility of using hybrid concrete structures within the context of cost and time. In: Hughes, W (Ed.), Proceedings 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK. Association of Researchers in Construction Management, Vol. 1, 155–64.
Aouad, G F, Kirkham, J A, Brandon, P S, Brown, F E, Cooper, G S, Ford, S R, Oxman, R E, Sarshar, M and Young, B A (1993) Information modelling in the construction industry: the information engineering approach. Construction Management and Economics, 11(05), 384-97.
Apa, R and Sedita, S R (2017) How (do) internal capabilities and the geography of business networks shape the performance of contractors in public procurement tenders? Evidence from the construction industry. Construction Management and Economics, 35(07), 404-16.
Arafa, E A B (2015) The impact of knowledge management on project success, Unpublished PhD Thesis, Business School, University of Portsmouth.
Arai, K and Morimoto, E (2014) A comparative analysis of the desired and actual bidding behaviour of construction companies. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 433–42.
Arai, K and Morimoto, E (2023) Case study in shikoku: Changes in the bidding behaviour of businesses. International Journal of Construction Management, 23(02), 225–33.
Arai, K and Morimoto, E (2016) Construction Industry and (dis)Economies of Scope. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 279–287.
Arai, K and Morimoto, E (2021) Productivity and innovation in the Japanese construction industry. Construction Innovation, 21(04), 917-33.
Arai, K and Morimoto, E (2021) What is Required for Recovering from Disaster: Theoretical and Empirical Verification. In: Scott, L and Neilson, C J (Eds.), Proceedings 37th Annual ARCOM Conference, 6-7 September 2021, UK, Association of Researchers in Construction Management, 117-126.
Arbulu, R J, Tommelein, I D, Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(02), 161–71.
Arditi, D and Mochtar, K (1996) Productivity improvement in the Indonesian construction industry. Construction Management and Economics, 14(01), 13-24.
Arijeloye, B T, Aje, I O and Oke, A E (2024) Evaluating the key risk factors in PPP-procured mass housing projects in Nigeria: a Delphi study of industry experts. Journal of Engineering, Design and Technology, 22(01), 60-76.
Arimoro, A E (2018) Ensuring a healthy legal and regulatory environment for public-private partnership in Nigeria, Unpublished PhD Thesis, , Kingston University.
Arowosafe, O I (2020) Contractors' selection criteria for sustainable infrastructure delivery in Nigeria, Unpublished PhD Thesis, , University of Derby.
Asad, S, Fuller, P, Pan, W and Dainty, A R J (2005) Learning to innovate in construction: a case study. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 2, 1215–24.
Asadi, R, Wilkinson, S and Rotimi, J O B (2021) Towards contracting strategy usage for rework in construction projects: a comprehensive review. Construction Management and Economics, 39(12), 953–71.
Ashton, P and Gidado, K (2001) Risk associated with inadequate site investigation procedures under design and build procurement systems. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 961–9.
Asiedu, R O, Manu, P, Mahamadu, A M, Booth, C A, Olomolaiye, P, Agyekum, K and Abadi, M (2023) Critical skills for infrastructure procurement: insights from developing country contexts. Journal of Engineering, Design and Technology, 21(06), 1948-74.
Ateloye, A, Bowles, G and Oyegoke, A (2016) Private Sector Participation in Nigeria Higher Education Infrastructure Development. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 921–929.
Athapaththu, K I and Karunasena, G (2018) Framework for sustainable construction practices in Sri Lanka. Built Environment Project and Asset Management, 8(01), 51–63.
Athena, R and Nicola, C (2010) A strategic partnering framework analysis methodology for public-private partnerships. Journal of Financial Management of Property and Construction, 15(03), 235–46.
Atin, A (2016) Project risk propagation modeling of engineering, procurement and construction, Unpublished PhD Thesis, , Wayne State University.
Atkins, J and Wild, A (2000) Automotive facilities procurement and the new construction paradigm. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 189–98.
Atkinson, A R and Westall, R (2010) The relationship between integrated design and construction and safety on construction projects. Construction Management and Economics, 28(09), 17.
Atkinson, R J, Tennakoon, M and Wedawatta, G (2023) Use of new models of construction procurement to enhance collaboration in construction projects: the UK construction industry perspective. Journal of Financial Management of Property and Construction, 28(01), 45-63.
Atmo, G and Duffield, C (2014) Improving investment sustainability for PPP power projects in emerging economies: Value for money framework. Built Environment Project and Asset Management, 4(04), 335-51.
Atout, M M M (2008) Causes of delays in construction projects & how the project manager can act to avoid delays, Unpublished PhD Thesis, , University of South Wales.
Attarzadeh, M, Chua, D K H, Beer, M and Abbott, E L S (2017) Options-based negotiation management of PPP-BOT infrastructure projects. Construction Management and Economics, 35(11-12), 676-92.
Atuahene, B T, Kanjanabootra, S and Gajendra, T (2020) Benefits of Big Data Application Experienced in the Construction Industry: A Case of an Australian Construction Company. In: Scott, L and Neilson, C J (Eds.), Proceedings 36th Annual ARCOM Conference, 7-8 September 2020, UK, Association of Researchers in Construction Management, 346-355.
Auchey, F L and Auchey, G J (2004) Picking successful projects by using the prism LLTM model. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 2, 1135–44.
Austin, R B, Pishdad-Bozorgi, P and de la Garza, J M (2016) Identifying and Prioritizing Best Practices to Achieve Flash Track Projects. Journal of Construction Engineering and Management, 142(02).
Austin, S A, Baldwin, A N and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(05), 445-55.
Austin, S, Baldwin, A and Waskett, P (1997) Development of a prototype building design management tool. In: Stephenson, P (Ed.), Proceedings 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK. Association of Researchers in Construction Management, Vol. 2, 399–407.
Awodele, O A, Aghimien, D O, Akinkunmi, O G and Aigbavboa, C O (2019) Labour-only procurement. Journal of Engineering, Design and Technology, 17(02), 347–61.
Awuzie, B O (2014) A viable infrastructure delivery systems model for achieving socio-economic benefits in the Nigerian oil and gas industry, Unpublished PhD Thesis, , University of Salford.
Awuzie, B O, McWari, Z P, Chigangacha, P S, Aigbavboa, C O, Haupt, T C and Obi, L (2024) Analysing outsourced and insourced public infrastructure projects’ performance in a provincial department of public works: a grounded theory approach. Journal of Engineering, Design and Technology, 22(02), 456-79.
Ayegba, C (2018) Duties and required competencies of a management contractor. Journal of Construction Business and Management, 2(1), 1-9.
Ayman Ahmed Ezzat, O and Lamis Yasser Wagih, Y (2021) A framework for implementing integrated project delivery in architecture design firms in Egypt. Journal of Engineering, Design and Technology, 19(03), 721-57.
Ayodeji, A A (2008) Managing building and civil engineering project claims to reduce conflict intensity and contractors' potential to dispute, Unpublished PhD Thesis, Building, National University of Singapore.
Azam, M A M, Ross, A D, Fortune, C J and Jaggar, D (1998) An information strategy to support effective construction design decision making. In: Hughes, W (Ed.), Proceedings 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK. Association of Researchers in Construction Management, Vol. 1, 248–56.
Azambuja, M M B (2009) A decision support system for rapid evaluation and selection of engineered equipment suppliers, Unpublished PhD Thesis, , University of Texas at Austin.
Azambuja, M M, Ponticelli, S and O’Brien, W J (2014) Strategic procurement practices for the industrial supply chain. Journal of Construction Engineering and Management, 140(07), 06014005.
Azman, M A (2016) Bidding competitiveness: a comparative analysis of different bid auctions in Malaysia. Journal of Engineering, Design and Technology, 14(04), 678-98.
Büsch, M P (2013) The role of procurement professionals in industrial projects: organisation, roles, and tasks for professional project procurement, Unpublished PhD Thesis, , University of Gloucestershire.
Babatunde, S O and Perera, S (2017) Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria. Engineering, Construction and Architectural Management, 24(06), 875-900.
Baden-Hellard, R (1996) The partnering philosophy: a procurement strategy for satisfaction through a teamwork solution to project quality. Journal of Construction Procurement, 2(01), 41–55.
Bahrami, S and Zeinali, D (2023) The sustainability challenge of product information quality in the design and construction of facades: lessons from the Grenfell Tower fire. Smart and Sustainable Built Environment, 12(03), 488-506.
Baiden, B K (2006) Framework for the integration of the project delivery team, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Baird, A (1995) Pioneering the NEC system of documents. Engineering, Construction and Architectural Management, 2(04), 249–69.
Baker, S, Ponniah, D and Smith, S (1999) Risk response techniques employed currently for major projects. Construction Management and Economics, 17(02), 205-13.
Bakhtawar, B, Thaheem, M J, Arshad, H and Qadeer, A (2018) How to Embrace the Stakeholder in Public Private Partnership Decision-Making? A Theoretical Discourse. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 373–382.
Baldwin, A, Li, H, Huang, T, Kong, C W, Guo, H L, Chan, N and Wong, J (2009) Supporting pre-tender construction planning with virtual prototyping. Engineering, Construction and Architectural Management, 16(02), 150–61.
Ball, D and Fortune, C (2000) Building project procurement processes and the development of environmentally friendly housing schemes. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 271–9.
Ballesteros-Pérez, P and Skitmore, M (2016) Estimating the number of new and repeated bidders in construction auctions. Construction Management and Economics, 34(12), 919-34.
Ballesteros-Pérez, P, González-Cruz, M C, Fuentes-Bargues, J L and Skitmore, M (2015) Analysis of the distribution of the number of bidders in construction contract auctions. Construction Management and Economics, 33(09), 752-70.
Baloi, D (2002) A framework for managing global risk factors affecting construction cost performance, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Bamisile, A (1991) A communication system approach to the management of quality in construction, Unpublished PhD Thesis, , Open University.
Banwo, O (2016) The development of a procurement decision support system to enhance construction claims management practice, Unpublished PhD Thesis, School of Energy, Construction and Environment, Coventry University.
Barajei, C, Appiah-Kubi, E, Kheni, N A, Yalley, P P K and Iddrisu, W (2024) Success factors of pre-construction stages of Ghanaian public road construction project life cycle. International Journal of Construction Management, 24(13), 1444–53.
Barajei, C, Kusi, E, Ackon, F, Osman, A M, Mohammed, A M Z, Simpeh, F and Gyimah, F (2024) Success factors of the consultant selection stage of the Ghanaian public construction projects: The road sector’s perspective. Construction Economics and Building, 24(01-02), 144-62.
Barkokebas, B, Khalife, S, Al-Hussein, M and Hamzeh, F (2021) A BIM-lean framework for digitalisation of premanufacturing phases in offsite construction. Engineering, Construction and Architectural Management, 28(08), 2155-75.
Barnes, G R (2016) Market creation in the European Union: the case of the public procurement directives, Unpublished PhD Thesis, School of Politics and International Studies, University of Leeds.
Baroudi, B and McAnulty, S (2013) Management of remote construction projects: The Australian experience. International Journal of Construction Management, 13(02), 1-12.
Barr, D W J (2004) The department of trade and industry key performance indicators: A critical appraisal, Unpublished PhD Thesis, , University of Southampton.
Barraket, J and Loosemore, M (2018) Co-creating social value through cross-sector collaboration between social enterprises and the construction industry. Construction Management and Economics, 36(07), 394–408.
Barrett, P and Barrett, L (2006) The 4Cs model of exemplary construction projects. Engineering, Construction and Architectural Management, 13(02), 201–15.
Barry, W, Leite, F and O’Brien, W J (2015) Late Deliverable Risk Catalog: Evaluating the Impacts and Risks of Late Deliverables to Construction Sites. Journal of Construction Engineering and Management, 141(04).
Basílio, M d S B (2011) Infrastructure public-private partnerships risk factors and agents' participation, Unpublished PhD Thesis, , Universidade Tecnica de Lisboa (Portugal).
Bassioni, H A (2004) A framework for measuring business performance in construction contracting organisations, Unpublished PhD Thesis, Department of Building and Civil Engineering, Loughborough University.
Bastien, A N (2002) Successful organisational and human practices in the UK construction industry: proposing the CONSTRUCT framework of good practice, Unpublished PhD Thesis, Warwick Manufacturing Group, University of Warwick.
Bataw, A (2015) On the integration of building information modelling in undergraduate civil engineering programmes in the UK, Unpublished PhD Thesis, Department of Mechanical, Aerospace & Civil Engineering, University of Manchester.
Baxendale, A T (1992) Construction management information systems for production control, Unpublished PhD Thesis, , Bristol Polytechnic.
Bayat, M, Khanzadi, M and Nasirzadeh, F (2020) Bargaining Game Model to Determine Concessionary Items in Build-Operate-Transfer Contracts. Journal of Construction Engineering and Management, 146(02).
Bayat, M, Khanzadi, M, Nasirzadeh, F and Chavoshian, A (2020) Financial conflict resolution model in BOT contracts using bargaining game theory. Construction Innovation , 20(01), 18–42.
Bediawan, D (2003) Determinants of process innovation on construction projects from contractors' perspective, Unpublished PhD Thesis, , Queensland University of Technology.
Bellizzi, J A (1978) A multivariate analysis of buying in the commercial construction industry, Unpublished PhD Thesis, , University of Nebraska - Lincoln.
Bemelmans, J, Voordijk, H and Vos, B (2012) Supplier-contractor collaboration in the construction industry: A taxonomic approach to the literature of the 2000-2009 decade. Engineering, Construction and Architectural Management, 19(04), 342-68.
Bengtsson, S H and Rosander, L (2018) Public clients' possibilities to initiate sustainable change: exploring two Swedish clients' procurement strategies. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 424–434.
Berg, J B, Thuesen, C and Jensen, P A (2023) Procurement innovation as a vehicle for sustainable change – a case study of the Danish model of strategic partnerships. Construction Innovation, 23(03), 665-82.
Bernold, L E and Treseler, J F (1991) Vendor Analysis for Best Buy in Construction. Journal of Construction Engineering and Management, 117(04), 645–58.
Betts, M (1990) Methods and data used by large building contractors in preparing tenders. Construction Management and Economics, 8(04), 399-414.
Bhagat, G and Jha, K N (2023) Stage-wise evaluation of integrity risks in public works procurement in India. International Journal of Construction Management, 23(16), 2818–29.
Bibby, L (2003) Improving design management techniques in construction, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Bibby, L, Austin, S and Bouchlaghem, D (2006) The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(01), 7–26.
Binions, O (2019) A study of corruption using the Institutional Analysis and Development framework with an application to the bidding phase of infrastructure procurement, Unpublished PhD Thesis, Department of Civil, Environmental and Geomatic Engineering, University College London.
Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools, Unpublished PhD Thesis, School of Art, Design and Architecture, University of Huddersfield.
Birnie, J (1999) Private Finance Initiative (PFI): UK construction industry response. Journal of Construction Procurement, 5(01), 5–14.
Bishop, E (2014) The use of Department of Health standards and guidance: effects on, and benefits to, healthcare accommodation, Unpublished PhD Thesis, , Loughborough University.
Biziorek, S, De Marco, A and Castelblanco, G (2023) Public-Private Partnership National Programs through the Portfolio Perspective: A System Dynamics model of the UK PFI/PF2 programs. In: Tutesigensi, A and Neilson, C J (Eds.), Proceedings 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK. Association of Researchers in Construction Management, 670-679 .
Blay-Armah A and Ross A (2013) The impact of varying asset specificities of subcontractors on relationships development in construction . In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 533–543.
Blayse, A M and Manley, K (2004) Key influences on construction innovation. Construction Innovation, 4(03), 143–54.
Blismas, N, Gibb, A and Pasquire, C (2005) Assessing project suitability for off-site production. Construction Economics and Building, 5(01), 9-15.
Blomberg, D, Cotellesso, P, Sitzabee, W and Thal, A E (2014) Discovery of Internal and External Factors Causing Military Construction Cost Premiums. Journal of Construction Engineering and Management, 140(03).
Bo, X and Chan, A P C (2012) Investigation of Barriers to Entry into the Design-Build Market in the People’s Republic of China. Journal of Construction Engineering and Management, 138(01), 120–7.
Boadu, E (2022) A framework for promoting health and safety through procurement in the construction industry in developing countries: A case of Ghana, Unpublished PhD Thesis, , University of New South Wales.
Boadu, E F, Sunindijo, R Y, Wang, C C and Frimpong, S (2023) Factors constraining the promotion of health and safety in public works procurement in developing countries. International Journal of Construction Management, 23(09), 1611–21.
Boadu, E F, Sunindijo, R Y, Wang, C C and Frimpong, S Y (2022) Health and safety integration into the procurement stages of public construction projects in developing countries: A case of Ghana. Construction Economics and Building, 22(03), 43-64.
Boes H and Dorée A (2013) Public procurement at local level in the Netherlands: towards a better client-contractor cooperation in a competitive environment. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 717–727.
Boes, H and Dorée, A (2008) Public procurement of local authorities in the Netherlands: a case of breaking tradition for a more strategic approach?. In: Dainty, A (Ed.), Proceedings 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK. Association of Researchers in Construction Management, 477–86.
Boes, H and Dorée, A (2011) The development of public procurement at local level in the Netherlands: A longitudinal study. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 725–34.
Boes, H and Holmen, E (2003) Changing supplier-customer interfaces in design-construct contracts?. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 2, 807–16.
Boes, H, Dorée, A and Veen, B v d (2002) First evaluation of new scheme for design-construct procurement in the Netherlands. In: Greenwood, D (Ed.), Proceedings 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK. Association of Researchers in Construction Management, Vol. 1, 137–44.
Bologna, R and Nord, R D (2000) Effects of the law reforming public works contracts on the Italian building process. Building Research & Information, 28(02), 109–18.
Bong, S, Rameezdeen, R, Zuo, J, Li, R Y M and Ye, G (2015) The designer's role in workplace health and safety in the construction industry: Post-harmonized regulations in South Australia. International Journal of Construction Management, 15(04), 276-87.
Bordalo Faustino, P (2017) Public procurement award criteria in the EU member states: a comparative study of the discretionary powers of contracting authorities, Unpublished PhD Thesis, School of Law, University of Nottingham.
Bordass, B (2000) Cost and value: fact and fiction. Building Research & Information, 28(05), 338–52.
Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 3: Case studies of the use of techniques in the feedback portfolio. Building Research & Information, 33(04), 361–75.
Borg, L (2015) Procurement contracts, innovation and productivity in the construction sector: Five studies, Unpublished PhD Thesis, TRITA-FOB-DT, KTH Royal Institute of Technology.
Borg, L and Lind, H (2014) Framework for structuring procurement contracts. Construction Economics and Building, 14(04), 71-84.
Boudjabeur, S (1997) Design and build defined. In: Stephenson, P (Ed.), Proceedings 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK. Association of Researchers in Construction Management, Vol. 1, 72–82.
Bowen, P A, Edwards, P J and Cattell, K (2012) Corruption in the South African construction industry: a thematic analysis of verbatim comments from survey participants. Construction Management and Economics, 30(10), 885-901.
Bowen, P A, Pearl, R G and Edwards, P J (1999) Client briefing processes and procurement method selection: a South African study. Engineering, Construction and Architectural Management, 6(02), 91–104.
Bowen, P, Cattel, K, Hall, K, Edwards, P and Pearl, R (2002) Perceptions of time, cost and quality management on building projects. Construction Economics and Building, 2(02), 48-56.
Bowles, G and Morgan, J (2016) An evaluation of the performance of a large-scale collaborative procurement initiative in the social housing sector. Engineering, Construction and Architectural Management, 23(01), 60-74.
Bowron, John (2002) Re-engineering the project procurement process through concurrent engineering, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Boyal-Seth, H (2011) Assessing the business case for supplier diversity in the construction housing sector, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.
Boyd, D (2011) An evaluation of a system change in the purchasing of construction materials by local authorities. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 695–704.
Boyd, D and Fellowes, J (2018) The Problem of Evaluating 'Value for Money' of School Building Programmes. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 363–372.
Boyd, N J P (2016) From bicycles to buildings: a SCOT analysis of project level adoption of BIPV, Unpublished PhD Thesis, School of Construction Management and Engineering, University of Reading.
Bröchner, J (1994) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(02), 91–101.
Brandon, P S (1990) The development of an expert system for the strategic planning of construction projects. Construction Management and Economics, 8(03), 285-300.
Bremer, W and Kok, K (2000) The Dutch construction industry: a combination of competition and corporatism. Building Research & Information, 28(02), 98–108.
Brewer, G, Gajendran, T, Jefferies, M, McGeorge, D, Rowlinson, S and Dainty, A (2013) Value through innovation in long-term service delivery: Facility management in an Australian PPP. Built Environment Project and Asset Management, 3(01), 74-88.
Bridgeman, J (2025) Examining Social Procurement Policy: Progress, Gaps and Future Directions . In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 41st Annual ARCOM Conference, 1-3 September 2025, Abertay University, Dundee, UK. Association of Researchers in Construction Management, 711-720.
Bridgeman, J and Loosemore, M (2021) Designing Theoretically and Evidence-Based Social Procurement Programmes in Construction: A Capability Empowerment Approach. In: Scott, L and Neilson, C J (Eds.), Proceedings 37th Annual ARCOM Conference, 6-7 September 2021, UK, Association of Researchers in Construction Management, 168-177.
Bridgeman, J and Loosemore, M (2024) Evaluating social procurement: a theoretically informed and methodologically robust social return on investment (SROI) analysis of a construction training initiative developed to reduce the risk of youth homelessness in Wales. Construction Management and Economics, 42(05), 387–411.
Briscoe, G H, Dainty, A R J, Millett, S J and Neale, R H (2004) Client-led strategies for construction supply chain improvement. Construction Management and Economics, 22(02), 193-201.
Brodie, M (2010) Building information modelling: the UK legal context. International Journal of Law in the Built Environment, 2(03), 246–59.
Broft, R, Badi, S M and Pryke, S (2016) Towards supply chain maturity in construction. Built Environment Project and Asset Management, 6(02), 187-204.
Brooks, T and Spillane, J P (2015) The impact of the recent economic recession on the NEC contract in Northern Ireland: A preliminary study. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 1219–1228.
Browne, M (2007) Towards a thematic approach to research within a taught postgraduate programme in construction and project management: a Northern Ireland context. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 1, 285–92.
Brunes, F (2015) Essays on behavioural economics and cost overuns, Unpublished PhD Thesis, , KTH Royal Institute of Technology.
Buertey, J T, Dadadzogbor, E and Atsrim, F (2021) Procurement path influencing factors in Ghana: Managing the challenge of cultural shift. International Journal of Construction Management, 21(01), 78-92.
Bullen, P A and Davis, P R (2003) Explorations in sustainable construction and procurement in Western Australia. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 2, 745–54.
Burati, J L, Matthews, M F and Kalidindi, S N (1991) Quality Management in Construction Industry. Journal of Construction Engineering and Management, 117(02), 341–59.
Burke, C and King A (2015) Generating social value through public sector construction procurement: A study of local authorities and SMEs. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 387–396.
Burman, E (2016) Assessing the operational performance of educational buildings against design expectations: a case study approach, Unpublished PhD Thesis, , University College London (University of London).
Butcher, D C A (2011) Learning organization principles and processes: UK construction organization experiences, Unpublished PhD Thesis, , University of South Wales.
Butcher, D C A and Sheehan, M J (2010) Excellent contractor performance in the UK construction industry. Engineering, Construction and Architectural Management, 17(01), 35–45.
Butt, A A (2014) Life cycle assessment of asphalt roads: Decision support at the project level, Unpublished PhD Thesis, TRITA-TSC-PHD, KTH Royal Institute of Technology.
Bygballe, L E, Endresen, M and Fålun, S (2018) The role of formal and informal mechanisms in implementing lean principles in construction projects. Engineering, Construction and Architectural Management, 25(10), 1322–38.
Caerteling, J S, Halman, J I M, Song, M and Dorée, A G (2009) Impact of Government and Corporate Strategy on the Performance of Technology Projects in Road Construction. Journal of Construction Engineering and Management, 135(11), 1211–21.
Calahorra Jiménez, M I (2020) Advancing knowledge of design-build and best-value in highway projects, Unpublished PhD Thesis, , Pontificia Universidad Catolica de Chile (Chile).
Calzadilla, E, Awinda, K and Parkin, A (2012) An examination of the risk management process in Venezuelan construction projects. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 1209–18.
Camfield, F E (1998) Guidelines for Quarrystone Armor Units. Journal of Construction Engineering and Management, 124(06), 465–6.
Campagnac, E (2000) The contracting system in the French construction industry: actors and institutions. Building Research & Information, 28(02), 131–40.
Candel, M, Gustavsson, T K and Eriksson, P E (2019) Beyond National Building Regulations: Exploring Public-Private Negotiations Over Sustainability Requirements. In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 740-749.
Candel, M, Karrbom Gustavsson, T and Eriksson, P (2021) Front-end value co-creation in housing development projects. Construction Management and Economics, 39(03), 245–60.
Cao, D and Wang, G (2014) Contractor-subcontractor relationships with the implementation of emerging interorganizational technologies: Roles of cross-project learning and pre-contractual opportunism. International Journal of Construction Education and Research, 10(04), 268-84.
Carbonara, N and Pellegrino, R (2020) The role of public private partnerships in fostering innovation. Construction Management and Economics, 38(02), 140–56.
Carbonara, N, Costantino, N and Pellegrino, R (2016) A transaction costs-based model to choose PPP procurement procedures. Engineering, Construction and Architectural Management, 23(04), 491-510.
Carey, G (2017) An evaluation of how VfM can be achieved from a government's perspective in relation to school building projects in Ireland, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Carrick, D (2022) How factors of collaboration affect delivery of construction projects with a high degree of reliance on building services: an action research and cross-case study analysis of Edinburgh primary schools, Unpublished PhD Thesis, , University of Salford.
Carrillo, P (2005) Lessons learned practices in the engineering, procurement and construction sector. Engineering, Construction and Architectural Management, 12(03), 236–50.
Carter, K (2005) ConSus: a decision support tool for the procurement of sustainable social housing, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.
Carter, K and Fortune, C (2003) Procuring sustainable projects: a grounded approach. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 2, 755–64.
Carter, K and Fortune, C (2007) Sustainable development policy perceptions and practice in the UK social housing sector. Construction Management and Economics, 25(04), 399–408.
Casady, C B (2019) Assessing public-private partnership (PPP) governance, institutionalization, and market maturity in the United States and abroad, Unpublished PhD Thesis, , Stanford University.
Castelblanco, G, Fenoaltea, E M, De Marco, A and Chiaia, B (2025) Influence of macroeconomic factors on construction costs: an analysis of project cases. Construction Management and Economics, 43(03), 196–212.
Castro-Lacouture, D (2003) B2b e-work intranet solution design for rebar supply interactions, Unpublished PhD Thesis, , Purdue University.
Challender J, Farrell P and Sherratt F (2013) Collaborative procurement: an exploration of practice and trust in times of austerity . In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 827–836.
Challender, J, Farrell, P and Sherratt, F (2016) Collaborative Trust In UK Further Education (FE) Procurement Strategies. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 893–902.
Challender, J, Farrell, P and Sherratt, F (2015) Exploration of factors which affect trust within the context of construction partnering. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 1189–1198.
Challender, J, Farrell, P and Sherratt, F (2014) Partnering practices: An investigation of influences on project success. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 1039–48.
Chan, A P C (1996) Determinants of project sucess in the construction industry of Hong Kong, Unpublished PhD Thesis, Faculty of Business and Management, University of South Australia.
Chan, A P C (2000) Evaluation of enhanced design and build system: a case study of a hospital project. Construction Management and Economics, 18(07), 863-71.
Chan, A P C (1995) Towards an expert system on project procurement. Journal of Construction Procurement, 1(02), 111–23.
Chan, A P C, Chan, D W M and Ho, K S K (2003) An empirical study of the benefits of construction partnering in Hong Kong. Construction Management and Economics, 21(05), 523-33.
Chan, A P C, Chan, E H W and Chan, A P L (2003) Managing health care projects in Hong Kong: A case study of the North district hospital. International Journal of Construction Management, 3(2), 1-13.
Chan, A P C, Ho, D C K and Tam, C M (2001) Design and Build Project Success Factors: Multivariate Analysis. Journal of Construction Engineering and Management, 127(02), 93–100.
Chan, A P C, Ho, D K C and Tam, C M (2001) Design and build: views from some major public clients in Hong Kong. Construction Economics and Building, 1(01), 22-31.
Chan, A P C, Lai, M K, Tam, C M and Akintoye, A (2001) Analysis of construction cost variation factors. Journal of Financial Management of Property and Construction, 6(01), 51–60.
Chan, A P C, Lam, P T I, Chan, D W M, Cheung, E and Ke, Y (2010) Critical Success Factors for PPPs in Infrastructure Developments: Chinese Perspective. Journal of Construction Engineering and Management, 136(05), 484–94.
Chan, A P C, Lam, P T I, Chan, D W M, Cheung, E and Ke, Y (2009) Drivers for Adopting Public Private Partnerships—Empirical Comparison between China and Hong Kong Special Administrative Region. Journal of Construction Engineering and Management, 135(11), 1115–24.
Chan, A P C, Yung, E H K, Lam, P T I, Tam, C M and Cheung, S O (2001) Application of Delphi method in selection of procurement systems for construction projects. Construction Management and Economics, 19(07), 699-718.
Chan, A P L, Chan, A P C and Chan, D W M (2003) A study of managing healthcare projects in Hong Kong. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 2, 513–22.
Chan, C T W (2007) Fuzzy procurement selection model for construction projects. Construction Management and Economics, 25(06), 611–8.
Chan, D M, Chan, A P C, Lam, P T I, Lam, E W M and Wong, J M W (2007) Evaluating guaranteed maximum price and target cost contracting strategies in Hong Kong construction industry. Journal of Financial Management of Property and Construction, 12(03), 139–50.
Chan, D W M, Chan, A P C, Lam, P T I and Wong, J M W (2010) Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction. Journal of Construction Engineering and Management, 136(05), 495–507.
Chan, D W M, Lam, P T I, Chan, A P C and Wong, J M W (2011) Guaranteed maximum price (GMP) contracts in practice: a case study of a private office development project in Hong Kong. Engineering, Construction and Architectural Management, 18(02), 188–205.
Chan, H L J (2011) Developing a fuzzy risk assessment model for target cost and guaranteed maximum price contracts in the construction industry of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University.
Chan, T K and Gao, S (2019) Can We Really Measure Construction Productivity?. In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 143-152.
Chan, W T, Chen, C, Messner, J I and Chua, D K (2005) Interface Management for China’s Build–Operate–Transfer Projects. Journal of Construction Engineering and Management, 131(06), 645–55.
Chang, C (2014) Principal-Agent Model of Risk Allocation in Construction Contracts and Its Critique. Journal of Construction Engineering and Management, 140(01).
Chang, C and Chen, S (2016) Transitional Public–Private Partnership Model in China: Contracting with Little Recourse to Contracts. Journal of Construction Engineering and Management, 142(10).
Chang, C-Y (2013) A critical review of the application of TCE in the interpretation of risk allocation in PPP contracts. Construction Management and Economics, 31(02), 99-103.
Chang, C-Y (2002) An economic interpretation of construction procurement behaviour for the commercial and industrial buildings, Unpublished PhD Thesis, Bartlett School of Construction and Project Management, University College London.
Chang, C-Y (2013) When might a project company break up? The perspective of risk-bearing capacity. Construction Management and Economics, 31(12), 1186-98.
Chang, C-Y and Ive, G (2002) Rethinking the multi-attribute utility approach based procurement route selection technique. Construction Management and Economics, 20(03), 275-84.
Chang, C-Y and Ive, G (2007) Reversal of bargaining power in construction projects: meaning, existence and implications. Construction Management and Economics, 25(08), 845–55.
Chang, H-H (2002) N-dimensional construction management information system (NDCON): System design and performance modeling through the zero -buffered project management philosophy, Unpublished PhD Thesis, , Columbia University.
Chang, K (2004) Multiattribute weighting models for best-value selection in public sector design-build projects, Unpublished PhD Thesis, , University of Colorado at Boulder.
Chang, Y, Wilkinson, S, Potangaroa, R and Seville, E (2011) Identifying factors affecting resource availability for post-disaster reconstruction: a case study in China. Construction Management and Economics, 29(01), 37–48.
Chang, Y, Wilkinson, S, Potangaroa, R and Seville, E (2010) Resourcing challenges for post-disaster housing reconstruction: a comparative analysis. Building Research & Information, 38(03), 247–64.
Charef, R (2019) A BIM-based framework to integrate a sustainable end-of-life into the asset lifecycle: towards the circular economy, Unpublished PhD Thesis, , Coventry University.
Charlson J and Chinyio E (2013) A case study of joint procurement and provision of legal services to a group of a universities in the Midlands . In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 493–502.
Charlson, J and Dimka, N (2021) Design, manufacture and construct procurement model for volumetric offsite manufacturing in the UK housing sector. Construction Innovation, 21(04), 800-17.
Charlson, J and Oduoza, C (2014) Legal risk identification for SMEs in the construction industry. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 507–15.
Chen, C (2007) Institutional barriers to private participation in infrastructure: the case of electronic toll collection in Taiwan. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 2, 673–82.
Chen, C and Messner, J I (2010) A recommended practices system for a global virtual engineering team. Architectural Engineering and Design Management, 6(03), 207–21.
Chen, C and Messner, J I (2005) An investigation of Chinese BOT projects in water supply: a comparative perspective. Construction Management and Economics, 23(09), 913-25.
Chen, C, Goldstein, A and Orr, R J (2009) Local operations of Chinese construction firms in Africa: An empirical survey. International Journal of Construction Management, 9(2), 75-89.
Chen, L, Manley, K, Lewis, J, Helfer, F and Widen, K (2018) Procurement and Governance Choices for Collaborative Infrastructure Projects. Journal of Construction Engineering and Management, 144(08).
Chen, Q, Jin, Z, Xia, B, Wu, P and Skitmore, M (2016) Time and Cost Performance of Design–Build Projects. Journal of Construction Engineering and Management, 142(02).
Chen, S (2013) Improving value for money in public-private partnership infrastructure projects, Unpublished PhD Thesis, , Hong Kong University of Science and Technology (Hong Kong).
Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system, Unpublished PhD Thesis, , Columbia University.
Chen, X (2019) Big data in construction project management: prospects and challenges, Unpublished PhD Thesis, , University of Hong Kong.
Chen, X, Chang-Richards, A Y, Pelosi, A, Jia, Y, Shen, X, Siddiqui, M K and Yang, N (2022) Implementation of technologies in the construction industry: a systematic review. Engineering, Construction and Architectural Management, 29(08), 3181-209.
Chen, Y, Ruikar, K and Carrillo, P M (2008) Electronic procurement benchmarking exercise in the AEC industry sector.. In: Dainty, A (Ed.), Proceedings 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK. Association of Researchers in Construction Management, Vol. 2, 647–54.
Chen, Z, Li, H, Ross, A, Khalfan, M M and Kong, S C (2008) Knowledge-Driven ANP Approach to Vendors Evaluation for Sustainable Construction. Journal of Construction Engineering and Management, 134(12), 928–41.
Cheng, J (2008) The impact of strategic decisions on construction client satisfaction: An assessment framework, Unpublished PhD Thesis, School of Engineering and the Built Environment, University of Wolverhampton.
Cheng, J and Proverbs, D G (2004) The impact of strategic decisions on construction client satisfaction. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 2, 931–8.
Cheong, S P (2004) Functional briefing for whole life performance, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Cheung, E, Chan, A P C and Kajewski, S (2010) Suitability of procuring large public works by PPP in Hong Kong. Engineering, Construction and Architectural Management, 17(03), 292–308.
Cheung, F Y K, Rowlinson, S, Jefferies, M and Lau, E (2005) Relationship contracting in Australia. Journal of Construction Procurement, 11(02).
Cheung, S-O, Lam, T, Lueng, M and Wan, Y (2001) An analytical hierarchy process based procurement selection method. Construction Management and Economics, 19(04), 427-37.
Chiang, Y and Cheng, E W L (2009) Perception of Financial Institutions toward Financing PFI Projects in Hong Kong. Journal of Construction Engineering and Management, 135(09), 833–40.
Chidiobi, C (2022) Development of frameworks for the management of materials procurement and construction waste for Nigerian contractors, Unpublished PhD Thesis, , University of the West of England, Bristol.
Chigara, B (2018) Integrating sustainability principles in construction health and safety management practices in Zimbabwe, Unpublished PhD Thesis, , Nelson Mandela University.
Chileshe, N and Kavishe, N (2021) Readiness assessment of public-private partnerships adoption in developing countries: the case of Tanzania. Built Environment Project and Asset Management, 11(01), 71-87.
Chileshe, N, Edwards, D J, Kavishe, N and Haupt, T C (2020) Perception on challenges impacting bid decision of indigenous building contractors in Dar Es Salaam, Tanzania. Journal of Engineering, Design and Technology , 18(06), 1641–62.
Chileshe, N, Njau, C W, Kibichii, B K, Macharia, L N and Kavishe, N (2022) Critical success factors for public-private partnership (PPP) infrastructure and housing projects in Kenya. International Journal of Construction Management, 22(09), 1606-17.
Chinyio, E, Gameson, R and Suresh, S (2011) The management of construction stakeholders by Higher Education Institutions (HEIs) in the United Kingdom (UK): A pilot study. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 485–94.
Choi, J O, Shrestha, B K, Kwak, Y H and Shane, J (2022) Exploring the benefits and trade-offs of design standardization in capital projects. Engineering, Construction and Architectural Management, 29(03), 1169-93.
Choudhari, S and Tindwani, A (2017) Logistics optimisation in road construction project. Construction Innovation, 17(02), 158-79.
Choudhury, I (2009) The effect of political unrest on construction time for food grain warehouses in Bangladesh. Construction Management and Economics, 27(07), 619–24.
Chritamara, S and Ogunlana, S O (2001) Problems Experienced on Design and Build projects in Thailand. Journal of Construction Procurement, 7(01), 73–93.
Chritamara, S, Ogunlana, S O and Bach, N L (2001) Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling. Engineering, Construction and Architectural Management, 8(05), 381–92.
Chritamara, S, Ogunlana, S O and Bach, N L (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2(04), 269–95.
Chua, D K and Godinot, M (2006) Use of a WBS Matrix to Improve Interface Management in Projects. Journal of Construction Engineering and Management, 132(01), 67–79.
Chua, D K H and Li, D (2000) Key Factors in Bid Reasoning Model. Journal of Construction Engineering and Management, 126(05), 349–57.
Cicmil, S and Marshall, D (2005) Insights into collaboration at the project level: complexity, social interaction and procurement mechanisms. Building Research & Information, 33(06), 523–35.
Cole, B K (2012) Building social infrastructure through public-private partnerships: The case of student housing in public higher education, Unpublished PhD Thesis, , Clemson University.
Cole, R J and Sterner, E (2000) Reconciling theory and practice of life-cycle costing. Building Research & Information, 28(05), 368–75.
Coleman, E, Nooni, I K, Fianko, S K, Dadzie, L, Neequaye, E N, Owusu-Agyemang, J and Ansa-Asare, E O (2020) Assessing contract management as a strategic tool for achieving quality of work in Ghanaian construction industry. Journal of Financial Management of Property and Construction, 25(01), 41–60.
Collins, A, Blondel, A A, Mensah, S and Manu, E (2021) Assessing the cost of competitive tendering in Ghana using transaction cost theory. Built Environment Project and Asset Management, 11(05), 835-50.
Connaughton, J N and Collinge, W H (2021) Trialling a new approach to interdisciplinary collaboration in UK construction: A projects-as-practice analysis. Construction Management and Economics, 39(07), 595–616.
Consoli, G G S (2004) Conducting an ethno-methodological study for the comparison of private and public prison delivery processes in Australia. Journal of Construction Procurement, 10(01).
Cooper, I (2001) Post-occupancy evaluation - where are you?. Building Research & Information, 29(02), 158–63.
Costin, G, Nakai Kidd, A, Simon, T and Edwards, D J (2019) Collaborative procurement and private-sector housebuilding and refurbishment works. International Journal of Building Pathology and Adaptation, 37(05), 699–717.
Coupar, G (2009) Modern approaches to repairs and maintenance procurement within the social housing sector, Unpublished PhD Thesis, Nottingham Business School, Nottingham Trent University.
Cox, A and Furlong, P (1995) European procurement rules and national preference: explaining the local sourcing of public works contracts in the EU in 1993. Journal of Construction Procurement, 1(02), 87–99.
Cox, A and Townsend, M (1997) Latham as half-way house: a relational competence approach to better practice in construction procurement. Engineering, Construction and Architectural Management, 4(02), 143–58.
Craig, R (1999) How innovative is the common law of tendering?. Journal of Construction Procurement, 5(01), 15–26.
Craig, R W (2000) Controversial aspects of Commonwealth construction and engineering procurement law , Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Crespin-Mazet, F (2007) Co-Development as an alternative to competitive bidding in project business, Unpublished PhD Thesis, Manchester Business School, University of Manchester.
Crowe, P and Fortune, C J (2012) A preliminary method of classifying collaborative contractual behaviour in higher education construction projects. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 901–11.
Crowley, L G (1997) Robust Statistical Estimators for Use within Competitive Bid Data. Journal of Construction Engineering and Management, 123(01), 53–63.
Crowley, L G and Hancher, D E (1995) Evaluation of Competitive Bids. Journal of Construction Engineering and Management, 121(02), 238–45.
Crowley, L G and Hancher, D E (1995) Risk Assessment of Competitive Procurement. Journal of Construction Engineering and Management, 121(02), 230–7.
Cruz, N F d and Marques, R C (2012) Delivering Local Infrastructure through PPPs: Evidence from the School Sector. Journal of Construction Engineering and Management, 138(12), 1433–43.
Curtis, B (1994) Roles, responsibilities and risks in management contracts, Unpublished PhD Thesis, , University of Southampton.
Dabarera, G, Perera, B and Rodrigo, M (2019) Suitability of public-private-partnership procurement method for road projects in Sri Lanka. Built Environment Project and Asset Management, 9(02), 199–213.
Dada, J O (2017) An appraisal of paradigm shifts required of competence of the Nigerian quantity surveyors. Engineering, Construction and Architectural Management, 24(06), 1269-80.
Dada, J O and Jagboro, G O (2007) An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 12(01), 37–44.
Dada, J O and Jagboro, G O (2012) Core skills requirement and competencies expected of quantity surveyors: perspectives from quantity surveyors, allied professionals and clients in Nigeria. Construction Economics and Building, 12(04), 78-90.
Dada, M O (2012) Predictors of procurement selection: An investigation of traditional and integrated methods in nigeria. Journal of Construction in Developing Countries, 17(1), 71-85.
Dada, M O (2014) The influence of project team relationships on cost growth. Journal of Financial Management of Property and Construction, 19(01), 76-94.
Dainty, A R J and Moore, D R (2000) The performance of integrated D&B project teams in unexpected change event management. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 281–9.
Dalgliesh, C D, Bowen, P A and Hill, R C (1997) Environmental sustainability in the delivery of affordable housing in South Africa. Engineering, Construction and Architectural Management, 4(01), 23–39.
Dalton, M (2008) A risk breakdown structure for public sector construction projects, Unpublished PhD Thesis, Manchester Business School, University of Manchester.
Damnjanovic, I, Duthie, J and Waller, S T (2008) Valuation of strategic network flexibility in development of toll road projects. Construction Management and Economics, 26(09), 90.
Damoah, I S (2015) An investigation into the causes and effects of project failure in government projects in developing countries: Ghana as a case study, Unpublished PhD Thesis, Liverpool Business School, Liverpool John Moores University.
Dams, B, Maskell, D, Shea, A, Allen, S, Cascione, V and Walker, P (2023) Upscaling bio-based construction: challenges and opportunities. Building Research & Information, 51(07), 764–82.
Dang, C N and Le-Hoai, L (2016) Critical success factors for implementation process of design-build projects in Vietnam. Journal of Engineering, Design and Technology, 14(01), 17-32.
Danso, H, Obeng-Ahenkora, N K and Manu, D (2021) Prices trend of selected building and construction materials on Ghanaian construction market: 2011–2016. International Journal of Construction Management, 21(03), 284-91.
Daoud, A O E (2021) Materials procurement conceptual framework for minimising waste in the Egyptian construction industry, Unpublished PhD Thesis, , London South Bank University.
Daoud, A O, Othman, A A E, Ebohon, O J and Bayyati, A (2023) Analysis of factors affecting construction and demolition waste reduction in Egypt. International Journal of Construction Management, 23(08), 1395–404.
DarConte, F X (2017) Best value alignment process for public works construction in New York state, Unpublished PhD Thesis, , Polytechnic Institute of New York University.
Darvish, A and Sepehri, M (2025) From Clauses to Carbon: A Smart Sustainable Procurement Toolkit Using NLP and LCA for Infrastructure Projects . In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 41st Annual ARCOM Conference, 1-3 September 2025, Abertay University, Dundee, UK. Association of Researchers in Construction Management, 802-811.
Das, M, Cheng, J C P and Law, K H (2015) An ontology-based web service framework for construction supply chain collaboration and management. Engineering, Construction and Architectural Management, 22(05), 551-72.
Davenport, D M (1998) A comparative study of the effectiveness of the UK and French construction industries in the achievement of satisfaction with performance as perceived by the construction client, Unpublished PhD Thesis, School of Built and Natural Environment, University of Central Lancashire.
Davenport, D M and Smith, R (1995) International procurement systems: assessment of required levels of client participation in construction projects. Journal of Construction Procurement, 1(01), 38–49.
Davidson, C H (2009) The challenge of organizational design for manufactured construction. Construction Innovation, 9(01), 42–57.
Davies, P J (2015) Assessing initial embodied energy in UK non-domestic construction projects, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Davies, P J, Emmitt, S and Firth, S K (2013) On-site energy management challenges and opportunities: a contractor's perspective. Building Research & Information, 41(04), 450-68.
Davis, P R (2004) Relationship marketing techniques in construction projects: a case study approach. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 2, 877–85.
Davis, P R (2003) The application of relationship marketing in the construction industry: work in progress report. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 2, 827–36.
Davis, P R and Walker, D H T (2009) Building capability in construction projects: a relationship-based approach. Engineering, Construction and Architectural Management, 16(05), 475–89.
Davis, P R and Walker, D H T (2004) Relationship based procurement. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 2, 887–95.
Davis, P R and Walker, D H T (2003) Relationship marketing: Providing opportunities and benefits for the construction industry. International Journal of Construction Management, 3(2), 69-78.
Davis, P R, Jefferies, M and Ke, Y (2017) Psychological Contracts: Framework for Relationships in Construction Procurement. Journal of Construction Engineering and Management, 143(08).
Davtalab, O (2018) A data driven software platform for process automation, planning and inspection of contour crafting large-scale robotic 3D printing system, Unpublished PhD Thesis, , University of Southern California.
de Blois, M, Herazo-Cueto, B, Latunova, I and Lizarralde, G (2011) Relationships between construction clients and participants of the building industry: structures and mechanisms of coordination and communication. Architectural Engineering and Design Management, 7(01), 3–22.
de Castro e Silva Neto, D, Cruz, C O, Rodrigues, F and Silva, P (2016) Bibliometric Analysis of PPP and PFI Literature: Overview of 25 Years of Research. Journal of Construction Engineering and Management, 142(10).
de la Garza, J M and Pishdad-Bozorgi, P (2018) Workflow Process Model for Flash Track Projects. Journal of Construction Engineering and Management, 144(06).
De Luca, A, Chen, L and Gharehbaghi, K (2021) Sustainable utilization of recycled aggregates: robust construction and demolition waste reduction strategies. International Journal of Building Pathology and Adaptation, 39(04), 666-82.
De Marco, A, Rafele, C and Thaheem, M J (2016) Dynamic Management of Risk Contingency in Complex Design-Build Projects. Journal of Construction Engineering and Management, 142(02).
de Melo, R S S, Do, D, Tillmann, P, Ballard, G and Granja, A D (2016) Target value design in the public sector: evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(02), 125–37.
de Ridder, H and Vrijhoef, R (2008) Developing a strategy for 'living buildings': beyond cradle to cradle with living building concept.. In: Dainty, A (Ed.), Proceedings 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK. Association of Researchers in Construction Management, Vol. 2, 1165–74.
De Silva, D G (2002) Asymmetries in procurement auctions, Unpublished PhD Thesis, , The University of Oklahoma.
de Valence, G (2010) Innovation, procurement and construction industry development. Construction Economics and Building, 10(04), 50-59.
Debela, G Y (2022) Critical success factors (CSFs) of public-private partnership (PPP) road projects in Ethiopia. International Journal of Construction Management, 22(03), 489-500.
Decarolis, F (2009) When the highest bidder loses the auction: Theory and evidence from public procurement, Unpublished PhD Thesis, , The University of Chicago.
Deep, S (2021) Influence of ‘power’ and ‘dependence’ attributes on main contractor and sub-contractor collaboration in construction projects, Unpublished PhD Thesis, , University of Newcastle (Australia).
Deep, S, Gajendran, T and Jefferies, M (2023) Antecedents of “power” and “dependence” in the context of collaborations in construction projects: a systematic literature review. Construction Innovation, 23(05), 1279-99.
Deep, S, Gajendran, T, Jefferies, M, Uggina, V S and Patil, S (2024) Influence of subcontractors' “strategic capabilities” on “power”, “dependence” and “collaboration”: an empirical analysis in the context of procurement decisions. Engineering, Construction and Architectural Management, 31(02), 571-92.
Deep, S, Joshi, R and Patil, S (2023) Identifying the Contractor’s core competencies in post-COVID-19 scenario: developing a survey instrument. Engineering, Construction and Architectural Management, 30(09), 3781-97.
Deep, S; Gajendran, T; Jefferies, M; Jha, K N (2025) Defining the attributes of power and dependence in general contractor and subcontractor project-based relationships: Understanding the subcontractor's perspective. Journal of Construction Engineering and Management, 151(10).
Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects, Unpublished PhD Thesis, , State University of New York at Buffalo.
Delavar, M (2017) BIM assisted design process automation for pre-engineered buildings (PEB), Unpublished PhD Thesis, , The University of Western Ontario.
Delgado, L, Shealy, T, Garvin, M and Pearce, A (2018) Framing Energy Efficiency with Payback Period: Empirical Study to Increase Energy Consideration during Facility Procurement Processes. Journal of Construction Engineering and Management, 144(05).
Denny-Smith, G (2021) How Compliance Imperatives Stifle the Impact of Social Procurement. In: Scott, L and Neilson, C J (Eds.), Proceedings 37th Annual ARCOM Conference, 6-7 September 2021, UK, Association of Researchers in Construction Management, 634-643.
Denny-Smith, G (2022) The social value of indigenous procurement policies in the Australian construction industry, Unpublished PhD Thesis, , University of New South Wales.
Denny-Smith, G and Loosemore, M (2020) A Theoretical Framework of Social Value in Construction Employment. In: Scott, L and Neilson, C J (Eds.), Proceedings 36th Annual ARCOM Conference, 7-8 September 2020, UK, Association of Researchers in Construction Management, 45-54.
Denny-Smith, G and Loosemore, M (2017) Assessing The Impact Of Australia's Indigenous Procurement Policy Using Strain Theory. In: Chan, P W and Neilson, C J (Eds.), Proceedings 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK. Association of Researchers in Construction Management, 652–661.
Denny-Smith, G and Loosemore, M (2018) Cultural Counterfactuals: Assessing the Impact of Indigenous Social Procurement in Australia. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 435–444.
Denny-Smith, G and Loosemore, M (2017) Integrating indigenous enterprises into the Australian construction industry. Engineering, Construction and Architectural Management, 24(05), 788-808.
Denny-Smith, G, Loosemore, M, Barwick, D, Sunindijo, R and Piggott, L (2019) Decolonising Indigenous Social Impact Research Using Community-Based Methods. In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 64-73.
Denny-Smith, G, Williams, M and Loosemore, M (2020) Assessing the impact of social procurement policies for Indigenous people. Construction Management and Economics, 38(12), 1139–57.
Denny-Smith, G, Williams, M, Loosemore, M, Sunindijo, R Y and Piggott, L (2024) What social value do Indigenous contractors create?. Construction Management and Economics, 42(01), 16–34.
Deshpande, A S (2009) Best practices for the management of design in fast track industrial projects, Unpublished PhD Thesis, , University of Cincinnati.
Deshpande, A S, Salem, O M and Miller, R A (2012) Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects. Journal of Construction Engineering and Management, 138(06), 716–24.
Dewberry, C, Hayes, A and Sarhan, S (2018) Behavioural Assessments in Construction Procurement: A Bandwagon of Institutional Waste? . In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 159–168.
Dharmapuri Tirumala, R, Dangol, N, Tiwari, P and Vaz-Serra, P (2021) Comparative analysis of outcomes under PPP and traditional modes of delivery: a study of schools in Melbourne. Construction Management and Economics, 39(11), 894–911.
Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective, Unpublished PhD Thesis, , University of Manchester.
Dickens, G (2002) Teamworking, perceptions and communication within construction projects, Unpublished PhD Thesis, , University of Nottingham.
Dike, I U and Kapogiannis, G (2014) A conceptual model for improving construction supply chain performance. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 1029–38.
Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(03), 287–98.
Dissanayake, N, Xia, B, Skitmore, M, Trigunarsyah, B and Menadue, V (2023) Ranked generic criteria for EPC contractor selection. Engineering, Construction and Architectural Management, 30(10), 4933-54.
Dithebe, K, Aigbavboa, C O, Thwala, W D and Oke, A E (2019) Analysis on the perceived occurrence of challenges delaying the delivery of water infrastructure assets in South Africa. Journal of Engineering, Design and Technology , 17(03), 554–71.
Dithebe, K, Thwala, W D D, Aigbavboa, C O, Edwards, D J, Hayhow, S and Talebi, S (2023) Stakeholder management in the alleviation of legal and regulatory disputes in public-private partnership projects in South Africa. Journal of Engineering, Design and Technology, 21(02), 325-42.
Dixit, V (2022) Risk assessment of different sourcing contract scenarios in project procurement. International Journal of Construction Management, 22(08), 1537-49.
Dixit, V, Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(03), 189-206.
Dobgegah, R Owusu-Manu, D-G and Omoteso, K (2011) A principal component analysis of project management construction industry competencies for the Ghanaian. Construction Economics and Building, 11(01), 26-40.
Dolla, T and Laishram, B (2020) Factors affecting public-private partnership preference in Indian municipal waste sector. International Journal of Construction Management, 20(06), 567-84.
Dolla, T and Laishram, B (2019) Prequalification in municipal solid waste management public-private partnerships of India . Construction Economics and Building, 19(01), 40-56.
Dolla, T and Laishram, B S (2018) Procurement of low carbon municipal solid waste infrastructure in India through public-private partnerships. Built Environment Project and Asset Management, 8(05), 449–60.
Dolla, T, Devkar, G and Boeing, L (2021) Procurement governance and information asymmetry in waste management of India. Built Environment Project and Asset Management, 11(01), 38-51.
Doloi, H (2008) Analysing the novated design and construct contract from the client's, design team's and contractor's perspectives. Construction Management and Economics, 26(11), 96.
Doloi, H (2009) Relational partnerships: the importance of communication, trust and confidence and joint risk management in achieving project success. Construction Management and Economics, 27(11), 1099–109.
Domingo, N (2011) Reducing construction waste in healthcare projects: a project lifecycle approach, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Domingo, N, Osmani, M and Price, A D F (2008) Reducing construction waste in healthcare facilities: a project lifecycle approach.. In: Dainty, A (Ed.), Proceedings 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK. Association of Researchers in Construction Management, Vol. 2, 1183–92.
Donohoe, S (2010) Attitudes to sustainable construction and contracts: international perspectives and approaches. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 2, 1049–58.
Donohoe, S and Brooks, L (2007) Reflections on construction management procurement following Great Eastern Hotel Company v. John Laing. Construction Management and Economics, 25(07), 701–8.
Donohoe, S and Coggins, J K (2016) Framework Agreements in a Post-Recession Economy. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 259–268.
Donohoe, S and Coggins, J K (2015) Soft landings or a bumpy touch down? . In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 43–52.
Donyavi, S (2013) Understanding the complexity of materials procurement and the role of technology for small and medium sized enterprises in the construction sector, Unpublished PhD Thesis, School of Construction Management and Engineering, University of Reading.
Donyavi, S, Flanagan, R, Assadi-Langroudi, A and Parisi, L (2024) Understanding the complexity of materials procurement in construction projects to build a conceptual framework influencing supply chain management of msmes. International Journal of Construction Management, 24(02), 177–86.
Dorée, A G (2004) Collusion in the Dutch construction industry: an industrial organization perspective. Building Research & Information, 32(02), 146–56.
Dorée, A G (1997) Construction procurement by Dutch municipalities. Journal of Construction Procurement, 3(03), 78–88.
Dorée, A G (1996) Tendering practice of Dutch municipalities, Published PhD Thesis, Department of Construction Process Management, Universiteit Twente.
Dorée, A, Holmen, E and Caerteling, J (2003) Co-operation and competition in the construction industry of the Netherlands. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 2, 817–26.
Dorée, A, Wal, G v d and Boes, H (2011) Client leadership in sustainability: How the Dutch railway agency created CO2 awareness in the industry. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 685–94.
Dosumu, O (2018) Assessment of the likelihood of risk occurrence on tendering and procurement of construction projects. Journal of Construction Business and Management, 2(1), 20-32.
Dosumu, O, Idoro, G and Onukwube, H (2017) Causes of errors in construction contract documents in Southwestern, Nigeria. Journal of Construction Business and Management, 1(2), 11-23.
Dosumu, O, S (2018) Perceived Effects of Prevalent Errors in Contract Documents on Construction Projects . Construction Economics and Building, 18(01), 1-26.
Dow, I, Sertyesilisik, B and Ross, A D (2009) An investigation on the cost implications of methodology of sub-contract work pricing. Journal of Financial Management of Property and Construction, 14(02), 98–125.
Dowd, V G (1996) The effect of economic cycles on the development and use of alternative procurement systems in the UK construction industry during the period 1965-1995. Journal of Construction Procurement, 2(01), 11–29.
Dowd, V G (1999) The pervading role of risk allocation as the link mechanism between factors of influence and construction procurement practices adopted in the UK construction industry over the period 1965-1995, Unpublished PhD Thesis, , Nottingham Trent University.
Drews, F (2018) Designing meta-organisations: an empirical study of boundary setting in large infrastructure projects, Unpublished PhD Thesis, Manchester Business School, University of Manchester.
Du, H, Han, Q, Sun, J and Wang, C C (2023) Adoptions of prefabrication in residential sector in China: agent-based policy option exploration. Engineering, Construction and Architectural Management, 30(04), 1697-725.
Du, J (2012) Investigation of interpersonal cooperation in construction project teams: An agent-based modeling approach, Unpublished PhD Thesis, , Michigan State University.
Du, Q (2009) Integrated decision-making in the cladding supply chain, Unpublished PhD Thesis, Department of Architecture & Civil Engineering, University of Bath.
Duff, A R, Emsley, M, Gregory, M, Lowe, D and Masterman, J (1998) Development of a model of total building procurement costs for construction clients. In: Hughes, W (Ed.), Proceedings 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK. Association of Researchers in Construction Management, Vol. 1, 210–8.
Duffield, C F and Regan, M (2004) Public private partnership arrangement for the Spencer Street station upgrade in Victoria, Australia. Journal of Financial Management of Property and Construction, 9(03), 163–78.
Dulaimi, M F and Kumaraswamy, M M (2000) Procuring for innovation: the integrating role of innovation in construction procurement. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 303–12.
Dulaimi, M F and Shan, H G (2002) The factors influencing bid mark-up decisions of large and medium size contractors in Singapore. Construction Management and Economics, 20(07), 601-10.
Duncan, R I and Mortimer, J (2007) Race equality and procurement: an investigation into the impact of race equality policy on the procurement of Black and Minority Ethnic (BME) contractors and consultants in the Welsh social housing sector. Construction Management and Economics, 25(12), 1283–93.
Duren, J V, Dorée, A and Voordijk, H (2015) Perceptions of success in performance-based procurement: Differences between clients and contractors. Construction Innovation, 15(01), 107-28.
Durnall, T (2010) Attitudes to externalization and reform in local authority projects. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 1, 431–40.
Eadie, R, Browne, M, Odeyinka, H, McKeown, C and McNiff, S (2015) A survey of current status of and perceived changes required for BIM adoption in the UK. Built Environment Project and Asset Management, 5(01), 4-21.
Eadie, R, Browne, M, Odeyinka, H, McKeown, C and McNiff, S (2015) A survey of current status of and perceived changes required for BIM adoption in the UK. Built Environment Project and Asset Management, 5(01), 4-21.
Eadie, R, Millar, P and Grant, R (2013) PFI/PPP, private sector perspectives of UK transport and healthcare. Built Environment Project and Asset Management, 3(01), 89-104.
Eadie, R, Perera, S and Heaney, G (2011) Key process area mapping in the production of an e-capability maturity model for UK construction organisations. Journal of Financial Management of Property and Construction, 16(03), 197–210.
Eadie, R, Perera, S, Heaney, G and Carlisle, J (2007) Construction contractor's perspective on web-based advertising of public sector construction contracts. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 2, 767–76.
Eaton, D, Akbiyikli, R and Dickinson, M (2006) An evaluation of the stimulants and impediments to innovation within PFI/PPP projects. Construction Innovation, 6(02), 63–7.
Eaton, D, Akbiyikli, R, Lemos, T d, Gunnigan, L, Kutanis, R O, Casensky, M, Ladra, J and Sawalhi, N E (2007) An examination of the suitability of a UK PFI model within the Czech Republic, the Republic of Ireland, Palestine (Gaza-West Bank), Portugal and Turkey. Construction Innovation, 7(01), 122–42.
Ebekozien, A, Aigbavboa, C, Thwala, W D, Samsurijan, M S, Ahmed, M A H, Aliu, J and Adekunle, S A (2024) Appraising the application of cryptocurrency technologies in the Nigerian built environment: stakeholders' perspective. International Journal of Building Pathology and Adaptation, 42(07), 93-112.
Ebrahiminejad, M, Shakeri, E and Ardeshir, A (2014) Establishing abatement alternatives in construction. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 163–72.
Edema, E U (2020) Risk mitigation strategies to prevent the failure of civil engineering projects in Nigeria, Unpublished PhD Thesis, , Northcentral University.
Edet, C B and Gidado, K (2008) PFI hospitals in the UK: measuring the medical practitioners level of satisfaction. In: Dainty, A (Ed.), Proceedings 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK. Association of Researchers in Construction Management, Vol. 1, 527–34.
Edirisinghe, R (2019) Digital skin of the construction site. Engineering, Construction and Architectural Management, 26(02), 184–223.
Edirisinghe, R, London, K A, Kalutara, P and Aranda-Mena, G (2017) Building information modelling for facility management: Are we there yet?. Engineering, Construction and Architectural Management, 24(06), 1119-54.
Edum-Fotwe, F T, Thorpe, A and McCaffer, R (2000) Assessing potential of on-line transaction for information as a resource in the construction process. Journal of Construction Procurement, 6(02).
Edwards, D J and Holt, G D (2011) Mini-Excavator Safety: Toward Innovative Stability Testing, Procurement, and Manufacture. Journal of Construction Engineering and Management, 137(12), 1125–33.
Edwards, P J and Bowen, P A (1999) Risk and risk management in construction projects: concepts, terms and risk categories re-defined. Journal of Construction Procurement, 5(01), 47–57.
Edwards, P J and Bowen, P A (1998) Risk and risk management in construction: a review and future directions for research. Engineering, Construction and Architectural Management, 5(04), 339–49.
Edwards, P J and Bowen, P A (1998) Risk and risk management in construction: towards more appropriate research techniques. Journal of Construction Procurement, 4(02), 103–15.
Egbu, C O and Bernard, P (2000) Organizational core competencies and their influence on strategic partnering in registered social landlords (RSLS). In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 127–35.
Egbu, C, Vines, M P and Tookey, J (2003) The role of knowledge management in e-procurement initiatives for construction organizations. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 2, 661–9.
Egwunatum, S I, Anumudu, A C, Eze, E C and Awodele, I A (2022) Total quality management (TQM) implementation in the Nigerian construction industry. Engineering, Construction and Architectural Management, 29(01), 354-82.
Ejohwomu, O, Olugboyega, O, Omopariola, E D and Ejohwomu, I J (2024) Exploring the Discrepancy Between Bribery-Related Legal and Social Norms in Public Project Procurement in Nigeria. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK. Association of Researchers in Construction Management, 677-686.
Ekanayake, B J, YSandanayake, Y and Ramachandra, T (2018) Application of Value Management to Refurbishment Projects: A Sri Lankan Case Study. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 597–606.
Ekstrom, M A (2002) Accounting for rater credibility when evaluating construction industry service providers, Unpublished PhD Thesis, , Stanford University.
Ekung, S, Okonkwo, C and Nwosu, E (2021) Claims culture and client-contractors' willingness to engage in future projects: a multivariate analysis. African Journal of Built Environment Research, 5(1), 19-40.
El Reifi, M H and Emmitt, S (2013) Perceptions of lean design management. Architectural Engineering and Design Management, 9(03), 195-208.
El Asmar, M, Lotfallah, W, Whited, G and Hanna, A S (2010) Quantitative Methods for Design-Build Team Selection. Journal of Construction Engineering and Management, 136(08), 904–12.
El Sawalhi, N I and El Agha, O (2017) Multi-attribute utility theory for selecting an appropriate procurement method in the construction projects. Journal of Construction in Developing Countries, 22(1), 75-96.
El Wardani, M A, Messner, J I and Horman, M J (2006) Comparing Procurement Methods for Design-Build Projects. Journal of Construction Engineering and Management, 132(03), 230–8.
El-Hasia, A M (2005) The effects of state's construction procurement policy implementation on the outcome of local construction projects: the Libyan case, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Elfving, J A (2003) Exploration of opportunities to reduce lead times for engineered-to-order products, Unpublished PhD Thesis, , University of California, Berkeley.
Elghaish, F, Abrishami, S, Hosseini, M R and Abu-Samra, S (2021) Revolutionising cost structure for integrated project delivery: a BIM-based solution. Engineering, Construction and Architectural Management, 28(04), 1214-40.
Elhag, T M S and Boussabaine, A H (1999) Evaluation of construction cost and time attributes. In: Hughes, W (Ed.), Proceedings 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK. Association of Researchers in Construction Management, Vol. 2, 473–80.
Elhag, T, Eapen, S and Ballal, T (2020) Moderating claims and disputes through collaborative procurement. Construction Innovation , 20(01), 79–95.
Elliman, T and Orange, G (2003) Developing distributed design capabilities in the construction supply chain. Construction Innovation, 3(01), 15–26.
Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects, Unpublished PhD Thesis, , George Washington University.
Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects, Unpublished PhD Thesis, , Heriot-Watt University.
Elyamany, A and Abdelrahman, M (2010) Contractor Performance Evaluation for the Best Value of Superpave Projects. Journal of Construction Engineering and Management, 136(05), 606–14.
Elyamany, A H M (2010) Developing a rational approach for contractor selection based on history of construction quality and long-term performance, Unpublished PhD Thesis, , North Dakota State University.
Emsley, M (2005) A benefits analysis of partnering: a case study of a Community Primary School. Journal of Financial Management of Property and Construction, 10(01), 69–80.
Emuze, F A (2011) Performance improvement in South African construction, Unpublished PhD Thesis, Department of Construction Management, Nelson Mandela Metropolitan University.
Emuze, F and Smallwood, J J (2014) Collaborative working in South African construction: contractors’ perspectives. Journal of Engineering, Design and Technology, 12(03), 294-306.
Enoma, A (2005) The role of facilities management at the design stage. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 1, 421–30.
Enshassi, A A, Arain, F and El-Rayyes, Y (2014) Post-evaluation system in construction projects in gaza strip-palestine. Journal of Construction in Developing Countries, 19(2), 51-73.
Eom, C S, Yun, S H and Paek, J H (2008) Subcontractor Evaluation and Management Framework for Strategic Partnering. Journal of Construction Engineering and Management, 134(11), 842–51.
Erbas, I (2013) Construction management project delivery system as a form of project implementation in Turkish public procurement, Unpublished PhD Thesis, Department of Architecture, Istanbul Technical University.
Ergen, E and Akinci, B (2008) Formalization of the Flow of Component-Related Information in Precast Concrete Supply Chains. Journal of Construction Engineering and Management, 134(02), 112–21.
Erikson, C A (1979) Risk sharing in construction contracts, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.
Eriksson, P E (2010) Partnering: what is it, when should it be used, and how should it be implemented?. Construction Management and Economics, 28(09), 17.
Eriksson, P E (2008) Procurement Effects on Coopetition in Client-Contractor Relationships. Journal of Construction Engineering and Management, 134(02), 103–11.
Eriksson, P E (2017) Procurement strategies for enhancing exploration and exploitation in construction projects. Journal of Financial Management of Property and Construction, 22(02), 211-30.
Eriksson, P E and Laan, A (2007) Procurement effects on trust and control in client-contractor relationships. Engineering, Construction and Architectural Management, 14(04), 387–99.
Eriksson, P E and Ossi (2007) Modelling procurement effects on cooperation. Construction Management and Economics, 25(08), 893–901.
Eriksson, P E and Szentes, H (2017) Managing the tensions between exploration and exploitation in large construction projects. Construction Innovation, 17(04), 492-510.
Eriksson, P E, Atkin, B and Nilsson, T (2009) Overcoming barriers to partnering through cooperative procurement procedures. Engineering, Construction and Architectural Management, 16(06), 598–611.
Eriksson, P E, Nilsson, T, rn and Atkin, B (2008) Client perceptions of barriers to partnering. Engineering, Construction and Architectural Management, 15(06), 527–39.
Ershadi, M, Jefferies, M, Davis, P and Mojtahedi, M (2021) Achieving sustainable procurement in construction projects: The pivotal role of a project management office. Construction Economics and Building, 21(01), 45-64.
Espinoza, B A G (2023) What Have NEC Contracts Done to Public Infrastructure Projects in Peru?. In: Tutesigensi, A and Neilson, C J (Eds.), Proceedings 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK. Association of Researchers in Construction Management, 34-43.
Essa, R and Fortune, C (2008) Pre-construction evaluation practices of sustainable housing projects in the UK. Engineering, Construction and Architectural Management, 15(06), 514–26.
Evans, M (2022) Strategic frameworks for managing lean construction on megaprojects: towards global integrated delivery and corporate governance, Unpublished PhD Thesis, , University of Bolton.
Evans, M and Farrell, P (2023) A strategic framework managing challenges of integrating lean construction and integrated project delivery on construction megaprojects, towards global integrated delivery transformative initiatives in multinational organisations. Journal of Engineering, Design and Technology, 21(02), 376-416.
Ewuga, D and Adesi, M (2023) Integrating sustainability practices into the Irish construction supply chain: main contractors' perspective. Built Environment Project and Asset Management, 13(01), 105-22.
Ey, W, Zuo, J and Han, S (2014) Barriers and challenges of collaborative procurements: An exploratory study. International Journal of Construction Management, 14(03), 148-55.
Eze, E C, Aghimien, D O, Aigbavboa, C O and Sofolahan, O (2024) Building information modelling adoption for construction waste reduction in the construction industry of a developing country. Engineering, Construction and Architectural Management, 31(06), 2205-23.
Fahmy, A, Hassan, T, Bassioni, H and McCaffer, R (2020) Dynamic scheduling model for the construction industry. Built Environment Project and Asset Management, 10(03), 313–30.
Faisol, N, Dainty, A R J and Price, A D F (2005) The concept of 'relational contracting' as a tool for understanding inter- organizational relationships in construction. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 2, 1075–84.
Faith-Ell, C (2005) The application of environmental requirements in procurement of road maintenance in Sweden, Unpublished PhD Thesis, Trita-LWR. PHD, KTH Royal Institute of Technology.
Famakin, I O, Aje, I O and Ogunsemi, D R (2012) Assessment of success factors for joint venture construction projects in Nigeria. Journal of Financial Management of Property and Construction, 17(02), 153-65.
Fan, C, Binchao, D and Yin, Y (2023) Hierarchical structure and transfer mechanism to assess the scheduling-related risk in construction of prefabricated buildings: an integrated ISM–MICMAC approach. Engineering, Construction and Architectural Management, 30(07), 2991-3013.
Fang, Z (2002) Behavioral analysis of project team performance in China, Unpublished PhD Thesis, , University of Hong Kong.
Farag, F (2018) Understanding social value creation in public construction projects using systems thinking, Unpublished PhD Thesis, , University of Salford.
Farag, F F (2019) Understanding social value creation in public construction projects using systems thinking, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Farag, F, McDermott, P and Huelin, C-A (2016) The Development of an Activity Zone Conceptual Framework to Improve Social Value Implementation in Construction Projects Using Human Activity Systems. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 975–984.
Fares, A; Elazouni, A; Al-Alawi, M (2025) Using game theory to negotiate win-win payment terms between contractors and subcontractors. Journal of Construction Engineering and Management, 151(5).
Farrell, A and Sunindijo, R Y (2022) Overcoming challenges of early contractor involvement in local government projects. International Journal of Construction Management, 22(10), 1902-9.
Fateh, M A M and Mohammad, M F (2017) Industrialized building system provision in local and international standard form of contracts. Journal of Construction in Developing Countries, 22(2), 67-80.
Fathi, M and Shrestha, P P (2022) Public–Private Partnership Project Performance Analysis Compared to Design-Build in Highway Projects. Journal of Construction Engineering and Management, 148(11).
Fatokun, A O (2018) Value for money integration in the renegotiation of public private partnership road projects, Unpublished PhD Thesis, School of Built and Natural Environment, University of Central Lancashire.
Fatokun, A, Akintoye, A and Liyanage, C (2015) Renegotiation of public private partnership road contracts: Issues and outcomes. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 1249–1258.
Favie, R (2010) Quality monitoring in infrastructural design-build projects: the analysis of an audit-based monitoring system, Unpublished PhD Thesis, , Eindhoven University of Technology.
Feghaly, J (2020) Innovative delivery of water infrastructure projects, Unpublished PhD Thesis, , Arizona State University.
Fellows, R F, Liu, A and Fong, C M (2003) Leadership style and power relations in quantity surveying in Hong Kong. Construction Management and Economics, 21(08), 809-18.
Fergusson, K J (1993) Impact of integration on industrial facility quality, Unpublished PhD Thesis, , Stanford University.
Fernandes, D A, Costa, A A and Lahdenperä, P (2018) Key features of a project alliance and their impact on the success of an apartment renovation: A case study. International Journal of Construction Management, 18(06), 482-96.
Fewings, P and Hodgson, P (2005) Collaboration and learning: a business integration model. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 2, 1107–20.
Fieldson, R (2007) Towards a framework for sustainability in UK retail architecture, Unpublished PhD Thesis, , University of Newcastle upon Tyne.
Fisher, R B (2004) Partnering public sector construction contracts: A conflict avoidance process, Unpublished PhD Thesis, , Virginia Commonwealth University.
Fitch, G J (2019) System dynamics models for the valuation of real options in infrastructure investments, Unpublished PhD Thesis, , Columbia University.
Fitch, G J, Odeh, I and William Ibbs, C (2015) Economic Sustainability of DBO Water Based on Wastewater Projects in the U.S.: Three Case Studies. Journal of Construction Engineering and Management, 141(05).
Flynn, C (2020) Risk transfer in operational public private partnerships in the education sector, Unpublished PhD Thesis, Management School, Queen's University Belfast.
Ford, B, Mumovic, D and Rawal, R (2022) Alternatives to air-conditioning: policies, design, technologies, behaviours. Buildings and Cities, 3(01), 433–47.
Forsman, S, Bj_rngrim, N, Bystedt, A, Laitila, L, Bomark, P and (2012) Need for innovation in supplying engineer-to-order joinery products to construction: A case study in Sweden. Construction Innovation, 12(04), 464-91.
Fortune, C and Hinks, J (1999) Quality issues in building project price forecasting: factors affecting model selection. Journal of Construction Procurement, 5(02), 129–40.
Fortune, C and Setiawan, S (2005) Partnering practice and the delivery of construction projects for Housing Associations in the UK. Engineering, Construction and Architectural Management, 12(02), 181–93.
Francart, N (2021) Decision support for the implementation of low-carbon measures in the building sector, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.
Frances, Z and Stevenson, F (2018) Domestic photovoltaic systems: the governance of occupant use. Building Research & Information, 46(01), 23–41.
Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance, Unpublished PhD Thesis, , Pennsylvania State University.
Franz, B W and Leicht, R M (2016) An alternative classification of project delivery methods used in the United States building construction industry. Construction Management and Economics, 34(03), 160-73.
Franz, B, Leicht, R, Molenaar, K and Messner, J (2017) Impact of Team Integration and Group Cohesion on Project Delivery Performance. Journal of Construction Engineering and Management, 143(01).
Frederiksen, N, Gottlieb, S C, de Gier, A, Johansen, P and Sørensen, A S (2022) Understanding the Marketing Department's Role in the Social and Environmental Ventures of Construction Companies. In: Tutesigensi, A and Neilson, C J (Eds.), Proceedings 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK. Association of Researchers in Construction Management, 602-611.
Fredslund, L M, Gottlieb, S C and Leiringer, R (2019) Understanding Supply Chain Integration as Recoupling . In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 801-810.
Fuentes, M and Smyth, H (2016) Value Co-Creation in a Project Setting: A Service-Dominant Logic Perspective. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 1059–1068.
Gabrielli, M F (2009) Structural analysis of auction models, Unpublished PhD Thesis, , The Pennsylvania State University.
Gadisa, B and Zhou, H (2021) Exploring influential factors leading to the poor performance of public construction project in Ethiopia using structural equation modelling. Engineering, Construction and Architectural Management, 28(06), 1683-712.
Gaikwad, S V, Calahorra-Jimenez, M, Molenaar, K R and Torres-Machi, C (2021) Challenges in Engineering Estimates for Best Value Design–Build Highway Projects. Journal of Construction Engineering and Management, 147(07).
Galbraith, P J (1995) The development of a classification system for construction industry clients, Unpublished PhD Thesis, Department of Construction Management and Engineering, University of Reading.
Gale, K (2013) An evaluation of performance improvement within public sector construction framework agreements, Unpublished PhD Thesis, Department of Engineering and the Built Environment, Anglia Ruskin University.
Gamage, I S W, Osmani, M and Glass, J (2009) An investigation into the impact of procurement systems on waste generation: the contractors' perspective. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 2, 1031–40.
Gameson, R and Sher, W (2009) An investigation into perceptions of client- professional interactions at project inception: an australian clients perspective: pilot study results. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 1, 187–95.
Gannon M, Male S and Aitken J (2013) Tied supply chains in construction projects: lessons from London Underground's public-private-partnership. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 819–826.
Gao, J, Ren, H and Cai, W (2019) Risk assessment of construction projects in China under traditional and industrial production modes. Engineering, Construction and Architectural Management, 26(09), 2147–68.
Garthwaite, P M and Eckert, C M (2012) Glitches, snags and crises: a study of change in two hospital adaptation projects. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 1089–99.
Garvin, M J (2010) Enabling Development of the Transportation Public-Private Partnership Market in the United States. Journal of Construction Engineering and Management, 136(04), 402–11.
Gary, H (2010) Contractor selection innovation: examination of two decades' published research. Construction Innovation, 10(03), 304–28.
Georgekutty, C K (2014) Optimization of construction cost in construction materials, Unpublished PhD Thesis, School of Engineering, Cochin University of Science and Technology.
Georgiadou, M C (2019) An overview of benefits and challenges of building information modelling (BIM) adoption in UK residential projects. Construction Innovation, 19(03), 298–320.
Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.
Ghazali, F E M (2007) A reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitals, Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.
Ghorai, S (2017) Accelerated construction of roadways: Life cycle assessment and environmental impacts, Unpublished PhD Thesis, , Syracuse University.
Gibson, G E, McGinnis, C I, Flanigan, W S and Wood, J E (1996) Constructability in Public Sector . Journal of Construction Engineering and Management, 122(03), 274–80.
Gichuiri, J W (2001) Process modelling: An evaluation approach in support of effective management of construction project information, Unpublished PhD Thesis, , University of Salford.
Gidado, K (2000) Flowcharted model for information flow in design and build projects. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 781–92.
Gidado, K and Barter, G (1996) The constraints to effective information flow in the construction management procurement system. Journal of Construction Procurement, 2(02), 52–68.
Gidado, K and Smilas, M (2004) Development of a model for implementation of PFI/PPP in Cyprus. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 693–702.
Giddings, B, Sharma, M, Jones, P and Jensen, P (2013) An evaluation tool for design quality: PFI sheltered housing. Building Research & Information, 41(06), 690-705.
Gidigah, B K, Agyekum, K and Baiden, B K (2022) Defining social value in the public procurement process for works. Engineering, Construction and Architectural Management, 29(06), 2245-67.
Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design, Unpublished PhD Thesis, , University of California, Berkeley.
Gil, N, Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(05), 495-508.
Gkeredakis, E (2009) Explaining the distinctiveness of coordination through an in-depth study of a major construction project, Unpublished PhD Thesis, Management School, University of Liverpool.
Glass, J and Baiche, B (2001) Perceptions of hybrid concrete construction in the UK construction industry. Engineering, Construction and Architectural Management, 8(01), 67–77.
Gomez, C, Castiblanco, D, Lozano, J M and Daza, C (2020) An exact optimization approach to the principal-agent problem in infrastructure projects via PPPs. International Journal of Construction Management, 20(06), 679-89.
Goodchild, B and Beatty, C (2000) Assessing the procurement practices of housing associations: a case study of new build in Scotland. Journal of Construction Procurement, 6(01), 20–32.
Gorgolewski, M (2008) Designing with reused building components: some challenges. Building Research & Information, 36(02), 88.
Gosling, J, Hewlett, B and Naim, M (2011) A framework for categorising engineer-to-order construction projects. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 995–1004.
Gounden, S (1996) Reconstruction and development in South Africa: the construction industry and related procurement reform. Journal of Construction Procurement, 2(01), 3–10.
Graham, B, Gahan, D and Thomas, K (2007) The application of knowledge management practices in the procurement and construction of cleanroom projects. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 2, 545–54.
Graham, P M and Walker, D H T (2000) First Steps Towards Acheiving Environmental Sustainability for Developed Projects - An Holistic Life-Cycle Procurement Objective. Journal of Construction Procurement, 6(01), 67–84.
Granheimer, K, Gustavsson, T K and Eriksson, P E (2021) Public Procurement of Engineering Services: Governance and Control Mechanisms. In: Scott, L and Neilson, C J (Eds.), Proceedings 37th Annual ARCOM Conference, 6-7 September 2021, UK, Association of Researchers in Construction Management, 470-479.
Gransberg, D D (2004) Life cycle evaluation criteria for design-build highway pavement projects, Unpublished PhD Thesis, , University of Colorado at Boulder.
Greenwood, D J (2001) Subcontractor procurement: are relationships changing?. Construction Management and Economics, 19(01), 5-7.
Greenwood, D J, Osborne, A N and Aggiag, M A (2001) A comparative analysis of administrative delays in hospital buildings. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 795–802.
Greenwood, D, Walker, P and Walker, A (2008) The world turned upside-down: architects as subcontractors in design-and-build contracts. In: Dainty, A (Ed.), Proceedings 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK. Association of Researchers in Construction Management, Vol. 1, 507–16.
Grifa, M A (2006) The construction industry in Libya , with particular reference to operations in Tripoli, Unpublished PhD Thesis, School of Architecture, Planning and Landscape, University of Newcastle upon Tyne.
Griffith, A (2011) Delivering best value in the small works portfolio of public sector organizations when using preferred contractors. Construction Management and Economics, 29(09), 891–900.
Griffith, A (2006) Expanding knowledge and practice of construction management systems and procedures, Unpublished PhD Thesis, Department of Environment and Development, Sheffield Hallam University.
Griffith, A (2007) Key considerations for delivering best value in the small building works portfolio of large client organizations. Construction Management and Economics, 25(08), 903–9.
Griffith, A (2002) Key considerations for developing corporate and operational approaches for managing the small building works portfolio of large client organizations. Construction Management and Economics, 20(08), 679-87.
Griffith, A and Headley, J D (1995) Developing an effective approach to the procurement and management of small building works within large client organizations. Construction Management and Economics, 13(04), 279-89.
Griffith, A and Headley, J D (1998) Effective client management control of small works and minor maintenance. Construction Management and Economics, 16(06), 703-9.
Griffith, A and Headley, J D (1997) Using a weighted score model as an aid to selecting procurement methods for small building works. Construction Management and Economics, 15(04), 341-8.
Griffith, A and Phillips, N (2001) The influence of the Construction (Design and Management) Regulations 1994 upon the procurement and management of small building works. Construction Management and Economics, 19(05), 533-40.
Griffith, A and Sidwell, A C (1997) Development of constructability concepts, principles and practices. Engineering, Construction and Architectural Management, 4(04), 295–310.
Griffith, A, King, A and Knight, A (2003) Examining the dynamics of novation from the principal contractor's and architect's perspectives. Construction Economics and Building, 3(01), 13-18.
Griffiths, G (1999) Construction procurement arrangements of housing associations in liverpool. In: Hughes, W (Ed.), Proceedings 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK. Association of Researchers in Construction Management, Vol. 2, 725–33.
Grilo, L, Melhado, S, Silva, S A R, Edwards, P and Hardcastle, C (2007) International building design management and project performance: case study in São Paulo, Brazil. Architectural Engineering and Design Management, 3(01).
Grimsey, D and Graham, R (1997) PFI in the NHS (Private finance initiative in the UK National Health Service). Engineering, Construction and Architectural Management, 4(03), 215–31.
Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process, Unpublished PhD Thesis, , University of Johannesburg.
Gross, M E (2010) Aligning public-private partnership contracts with public objectives for transportation infrastructure, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.
Gruneberg, S and Hughes, W (2004) Analysing the types of procurement used in the UK: a comparison of two data sets. Journal of Financial Management of Property and Construction, 9(02), –74.
Gunasekara, D M H, Indikatiya, I H P R, Perera, B A K S and Senaratne, S (2023) Managing intragroup conflicts within project design teams during pre-contract stage that effect the project deliverables in Sri Lanka. Construction Innovation, 23(02), 406-24.
Gunasekara, H G and Sridarran, P (2021) Barriers in Blockchain Technology Adoption for Facilities Management Procurement Process in Sri Lanka. In: Scott, L and Neilson, C J (Eds.), Proceedings 37th Annual ARCOM Conference, 6-7 September 2021, UK, Association of Researchers in Construction Management, 371-380.
Gunatilake, S (2013) The uptake and implementation of sustainable construction: transforming policy into practice, Unpublished PhD Thesis, School of Built and Natural Environment, University of Central Lancashire.
Gunning, J G (1999) A review of the application of risk assessment procedures in construction management and research. Journal of Financial Management of Property and Construction, 4(01), 59–74.
Gunning, J G (2003) The enhancement of quality in construction project management, Unpublished PhD Thesis, , Ulster University.
Gunning, J G and Moss, J (2002) Public private partnership procurement of educational facilities in the UK. In: Greenwood, D (Ed.), Proceedings 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK. Association of Researchers in Construction Management, Vol. 1, 327–35.
Guo, Y, Liu, J, Chen, C, Luo, X and Martek, I (2024) PPP project price mode typologies: a China-based comparative case study. Engineering, Construction and Architectural Management, 31(05), 2034-52.
Gurmu, A (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects, Unpublished PhD Thesis, , University of Melbourne.
Gurmu, A T (2020) Construction materials management practices enhancing labour productivity in multi-storey building projects. International Journal of Construction Management, 20(01), 77-86.
Gurmu, A T (2019) Tools for Measuring Construction Materials Management Practices and Predicting Labor Productivity in Multistory Building Projects. Journal of Construction Engineering and Management, 145(02).
Gurmu, A T and Aibinu, A A (2017) Construction Equipment Management Practices for Improving Labor Productivity in Multistory Building Construction Projects. Journal of Construction Engineering and Management, 143(10).
Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century, Unpublished PhD Thesis, , University of Sheffield.
Häkkinen, T and Belloni, K (2011) Barriers and drivers for sustainable building. Building Research & Information, 39(03), 239–55.
Hällström, A A F (2023) Collaborative project delivery models in infrastructure construction, Unpublished PhD Thesis, , Chalmers Tekniska Hogskola (Sweden).
Habib, M and Spang, K (2014) Alternative project delivery systems for transport infrastructure in Germany. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 915–23.
Habibi, M and Kermanshachi, S (2018) Phase-based analysis of key cost and schedule performance causes and preventive strategies. Engineering, Construction and Architectural Management, 25(08), 1009–33.
Hackett, J A (2011) The role of cost estimators in UK construction: a case for, and steps towards, an estimating profession, Unpublished PhD Thesis, School of Civil Engineering, University of Birmingham.
Haddadin, K H (2003) Cultural and institutional barriers to the take-up of construction management in Jordan, Unpublished PhD Thesis, , University of Westminster.
Hagan, G N (2013) Managing complex construction projects in it multiproject environment by the contractor, Unpublished PhD Thesis, School of Civil Engineering, University of Leeds.
Hagan, G, Bower, D A and Smith, N (2012) Delivery of complex construction multi-projects in contractor-led procurement. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 1121–31.
Hagan, G, Bower, D and Smith, N (2011) Managing complex projects in multi-project environments. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 787–96.
Hairstans, R (2007) Optimisation of timber platform frame construction, Unpublished PhD Thesis, School of Engineering and the Built Environment, Edinburgh Napier University.
Hakim, H (2011) Effective contract structures and value for money in PFI social housing projects, Unpublished PhD Thesis, School of Sociology and Social Policy, University of Leeds.
Halder, A and Batra, S (2024) Navigating the ethical discourse in construction: A state-of-the-art review of relevant literature. Journal of Construction Engineering and Management, 150(03).
Hall, M A and Jaggar, D M (1998) The importance of cultural differences to British construction professionals working internationally. In: Hughes, W (Ed.), Proceedings 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK. Association of Researchers in Construction Management, Vol. 1, 60–8.
Hamani, K (2019) Developing a corporate sustainability performance evaluation model of the UAE construction contractors, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.
Hampson, K, Peters, R, Walker, D and Tucker, S (2000) Project alliancing and information technology in building construction: the national museum of Australia. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 199–208.
Hampton, G, Baldwin, A N and Holt, G (2012) Project delays and cost: stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(01), 73-91.
Hamza, N and Greenwood, D (2007) The impact of procurement methods on delivering environmentally sensitive buildings.. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 2, 723–32.
Haniff, A P (2017) The alignment of strategic objectives within the context of temporary multi-organisations, Unpublished PhD Thesis, Schoolof Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.
Haran, M, McCord, M, Hutchison, N, McGreal, S, Adair, A, Berry, J and Kashyap, A (2013) Financial structure of PPPs deals post-GFC: an international perspective. Journal of Financial Management of Property and Construction, 18(02), 184-203.
Hardie. M and Saha, S (2009) Builders' perceptions of lowest cost procurement and its impact on quality. Construction Economics and Building, 9(01), 1-8.
Harding, A, Lowe, D, Hickson, A, Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (Ed.), Proceedings 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK. Association of Researchers in Construction Management, Vol. 2, 763–72.
Hardwicke, J and King, A (2014) The use of evidence based design in NHS construction. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 185–94.
Harkin, F and Gunning, J G (1999) Evaluating quality in construction. Journal of Financial Management of Property and Construction, 4(03), 65–80.
Haroglu, H (2010) Investigating the structural frame decision making process, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Haroglu, H and Leiringer, R (2010) Achieving whole-life value: the challenges of service-led construction. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 2, 1069–78.
Hartmann, A (2006) The context of innovation management in construction firms. Construction Management and Economics, 24(06), 567-78.
Harty, J (2012) The impact of digitalisation on the management role of architectural technology, Unpublished PhD Thesis, Scott Sutherland School of Architecture & Built Environment, Robert Gordon University.
Hasan, A A B A, Fenn, P and Aminian, E (2025) Inter-Firm Conflict and Project Delay in Malaysian Construction Sector: Role of Tendering Process. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 41st Annual ARCOM Conference, 1-3 September 2025, Abertay University, Dundee, UK. Association of Researchers in Construction Management, 701-710.
Hasanzadeh, S and Esmaeili, B (2022) Influence of best value procurement on design-build projects: a grounded theory study. International Journal of Construction Education and Research, 18(03), 270–92.
Hassouna, R (2005) Viability of applying the public private partnership (PPP) strategy to the libyan construction industry. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 2, 1185–94.
Hastie, J, Sutrisna, M and Egbu, C (2017) Modelling knowledge integration process in early contractor involvement procurement at tender stage: A Western Australian case study. Construction Innovation, 17(04), 429-56.
Haupt, T and Fester, F (2012) Women-owned construction enterprises: a South African assessment. Journal of Engineering, Design and Technology, 10(01), 52-71.
Hawwash, K and Barnes, M (1997) The potential for adopting the NEC's family of contracts on PFI projects. Engineering, Construction and Architectural Management, 4(03), 203–14.
He, C (2018) Public procurement: award mechanisms and implementation process, Unpublished PhD Thesis, School of Business and Economics, Loughborough University.
Heaton, R, Martin, H, Chadee, A, Milling, A, Dunne, S and Borthwick, F (2022) The Construction Materials Conundrum: Practical Solutions to Address Integrated Supply Chain Complexities. Journal of Construction Engineering and Management, 148(08).
Hedborg Bengtsson, S, Karrbom Gustavsson, T and Eriksson, P E (2018) Users’ influence on inter-organizational innovation: mapping the receptive context. Construction Innovation, 18(04), 488–504.
Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks, Unpublished PhD Thesis, , Concordia University (Canada).
Hegazy, T, Abdel-Monem, M, Saad, D A and Rashedi, R (2013) Hands-On Exercise for Enhancing Students’ Construction Management Skills. Journal of Construction Engineering and Management, 139(09), 1135–43.
Heidemann, A and Gehbauer, F (2011) The way towards cooperative project delivery. Journal of Financial Management of Property and Construction, 16(01), 19–30.
Hellowell, M S (2012) Fair return for risk? An examination of structure, competition and profitability in the market for private finance in the National Health Service, Unpublished PhD Thesis, School of Social and Political Science, University of Edinburgh.
Henjewele, C (2010) Modelling client's value for money uncertainties in PFI projects, Unpublished PhD Thesis, Faculty of Environment and Technology , University of the West of England, Bristol.
Henry Duncan John, M, Amoah, C and Ayesu-Koranteng, E (2022) Causes of road projects' delays: a case of Blantyre, Malawi. Built Environment Project and Asset Management, 12(02), 293-308.
Hermans, M, van Zoest, S and Volker, L (2016) Assessing the Maturity of Public Construction Client Organisations. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 155–163.
Hermans, M, Veldhuis, H, Huizing, D and Rots, S (2019) The embedding of the construction client role in Dutch municipalities and its effects on professionalism and organisational learning. In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 720-729.
Hermans, M, Volker, L and Eisma, P (2014) A public commissioning maturity model for construction clients. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 1305–14.
Hermawan, F (2015) A strategic approach to enhancing sustainable practices in public building projects: a case study of Indonesian local authorities, Unpublished PhD Thesis, School of Energy, Construction and Environment, Coventry University.
Hesse, A D (1991) The management of risks in the procurement of very large construction projects (Britain and New Commonwealth): Comparative change in procurement methods for very large construction projects, Unpublished PhD Thesis, , University College London (University of London).
Hidayat, B and Egbu, C (2010) A literature review of the role of project management in post-disaster reconstruction. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 2, 1269–78.
Hindle, R D and Muller, M H (1997) The role of education as an agent of change: a two-fold effect. Journal of Construction Procurement, 3(01), 56–69.
Hindle, R D and Rwelamila, P D (1998) Resistance to change: architectural education in a turbulent environment. Engineering, Construction and Architectural Management, 5(02), 150–8.
Hinton, M A and Hamilton, R T (2015) Competitive tendering and individual behaviour in the construction industry: Convenient immorality at work. Construction Management and Economics, 33(11-12), 880-9.
Hlaing, N N, Singh, D, Tiong, R L K and Ehrlich, M (2008) Perceptions of Singapore construction contractors on construction risk identification. Journal of Financial Management of Property and Construction, 13(02), 85–95.
Ho, S P (2006) Model for Financial Renegotiation in Public-Private Partnership Projects and Its Policy Implications: Game Theoretic View. Journal of Construction Engineering and Management, 132(07), 678–88.
Ho, S P, Lin, Y, Chu, W and Wu, H (2009) Model for Organizational Governance Structure Choices in Construction Joint Ventures. Journal of Construction Engineering and Management, 135(06), 518–30.
Ho, S-P (2001) Real options and game theoretic valuation, financing and tendering for investments on build-operate-transfer projects, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.
Hobart, C, Thomson, D, Dainty, A, Fernie, S and Drewniak, D (2015) Closing the energy performance gap in zero carbon homes – Pro-active identification, prioritisation and mitigation of causes using FMEA. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 307–316.
Hoezen, M and Doree, A (2008) First Dutch competitive dialogue projects: a procurement route caught between competition and collaboration. In: Dainty, A (Ed.), Proceedings 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK. Association of Researchers in Construction Management, Vol. 1, 535–43.
Hoezen, M, van Rutten, J, Voordijk, H and Dewulf, G (2010) Towards better customized service-led contracts through the competitive dialogue procedure. Construction Management and Economics, 28(11), 1177–86.
Hoezen, M, Voordijk, H and Dewulf, G (2012) Contracting dynamics in the competitive dialogue procedure. Built Environment Project and Asset Management, 2(01), 6-24.
Holt, G D (2016) Historical British antecedents of innovative construction project organisation and social structures. Construction Innovation, 16(01), 46-66.
Holt, G D and Edwards, D J (2005) Domestic builder selection in the uk housing repair and maintenance sector: a critique. Journal of Construction Research, 6(01), 123–37.
Holt, G D, Olomolaiye, P O and Harris, F C (1996) Tendering procedures, contractual arrangements and Latham: the contractors' view. Engineering, Construction and Architectural Management, 3(01), 97–115.
Holt, G D, Proverbs, D G and Whitehouse, L (2001) A survey of public sector procurement in England. Journal of Construction Procurement, 7(01), 3–10.
Hope, A (2011) Greener homes for the future?: sustainability in PFI local authority social housing, Unpublished PhD Thesis, School of the Built Environment, Northumbria University.
Hosseini, M H, Aibinu, A, Chileshe, N and Arashpour, M (2017) Eleven Years Of ARCOM: Bibliometric Mapping Of Studies Published Between 2005 And 2016. In: Chan, P W and Neilson, C J (Eds.), Proceedings 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK. Association of Researchers in Construction Management, 502–511.
Hu, M and Skibniewski, M (2022) The impact of the design team characteristics on the sustainable building construction cost: structural equation model analysis. Architectural Engineering and Design Management, 18(05), 614–30.
Hu, W and Panthi, K (2020) Project status reporting system for pipeline relocation programs. Built Environment Project and Asset Management, 10(05), 693–708.
Hu, X and Chong, H Y (2022) Integrated frameworks of construction procurement systems for off-site manufacturing projects: Social network analysis. International Journal of Construction Management, 22(11), 2089-97.
Hu, X, Hu, X, Cui, Q, Li, Y, Lemckert, C and Wei, A (2022) Spatial-temporal analysis for the business performance of construction consultancy services in China. Engineering, Construction and Architectural Management, 29(10), 3997-4014.
Hua, Y and Liu, A M M (2017) An investigation of person-culture fit and person-task fit on ICT adoption in the Hong Kong construction industry. Architectural Engineering and Design Management, 13(06), 423–38.
Huang, B (2017) A hierarchical multi-stakeholder principal-agent model for (anti-) corruption in public infrastructure procurement, Unpublished PhD Thesis, , Cornell University.
Huang, Y-L (1995) Project and policy analysis of build-operate-transfer infrastructure development, Unpublished PhD Thesis, , University of California, Berkeley.
Hughes, D (2018) Development of an effective model for collaboration within the UK construction industry, Unpublished PhD Thesis, Faculty of Computing, Engineering & Science, University of South Wales.
Hughes, W (2003) A comparison of two editions of the RIBA Plan of Work. Engineering, Construction and Architectural Management, 10(05), 302–11.
Hughes, W (1997) Construction management contracts: law and practice. Engineering, Construction and Architectural Management, 4(01), 59–79.
Hughes, W P (1989) Organizational analysis of building projects, Unpublished PhD Thesis, Department of Surveying, Liverpool Polytechnic.
Humphrey, S D (2005) Construction procurement and profit : an analysis of the relationship from a contractor's perspective, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Hunter, K and Kelly, J (2004) Value management workshops and partnering conundrums. Journal of Construction Procurement, 10(01).
Ibbs, C W, Bates, L C and Echeverry, D (1987) Owner‐Furnished Equipment (OFE) Contract Practices. Journal of Construction Engineering and Management, 113(02), 249–63.
Ibem, E O, Aduwo, E B, Afolabi, A O, Oluwunmi, A O, Tunji-Olayeni, P F, Ayo-Vaughan, E A and Uwakonye, U O (2021) Electronic (e-) Procurement Adoption and Users’ Experience in the Nigerian Construction Sector. International Journal of Construction Education and Research, 17(03), 258–76.
Ibem, E, O, Aduwo, E, B, Tunji-Olayeni, P, Ayo-Vaughan, E, A and Uwakonye, U, O (2016) Factors influencing e-Procurement adoption in the Nigerian building industry . Construction Economics and Building, 16(04), 54-67.
Ibrahim, A D (2007) The development of a procurement strategy for primary health care facilities in Nigeria, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Ibrahim, A D, Price, A D F and Dainty, A R J (2006) An analysis of success factors for public private partnerships in infrastructure projects in Nigeria. Journal of Construction Procurement, 12(01).
Ibrahim, A D, Price, A D F and Dainty, A R J (2009) Evaluation of key practices under the Local Improvement Finance Trust (LIFT) initiative for UK healthcare facilities. Engineering, Construction and Architectural Management, 16(05), 504–18.
Ibrahim, A D, Price, A D F and Dainty, A R J (2008) Is the Local Improvement Finance Trust (LIFT) procurement initiative delivering the expected economies of scale?: Results from three case studies. In: Dainty, A (Ed.), Proceedings 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK. Association of Researchers in Construction Management, Vol. 1, 351–60.
Ibrahim, K I, Costello, S B, Wilkinson, S and Walker, D (2016) Project Alliancing: The Case of Road Infrastructure Projects in New Zealand . In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 175–184.
Ibrahim, M N, Thorpe, D and Mahmood, M N (2019) Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia. Construction Innovation , 19(04), 550–69.
Ibrahim, Y M, Kaka, A, Aouad, G and Kagioglou, M (2009) Framework for a generic work breakdown structure for building projects. Construction Innovation, 9(04), 388–405.
Idoro, G (2012) Comparing levels of use of project plans and performance of traditional contract and design-build construction projects in Nigeria. Journal of Engineering, Design and Technology, 10(01), 7-33.
Idoro, G I (2012) Influence of project plans on the outcome of construction projects procured by design-build in Nigeria. Journal of Construction in Developing Countries, 17(2), 81-103.
Idoro, G I (2012) The influence of project documents on the outcome of construction projects procured by traditional contracts in Nigeria. Journal of Construction in Developing Countries, 17(1), 1-19.
Idris, M M (1998) Assessment of the factors influencing the maintenance programme of large university buildings in Riyadh. Construction Management and Economics, 16(06), 673-9.
Igo, T and Skitmore, M (2006) Diagnosing the organizational culture of an Australian engineering consultancy using the competing values framework. Construction Innovation, 6(02), 121–39.
Ikediashi, D and Aigbavboa, C (2019) Outsourcing as a strategy for facilities management provision in Nigerian universities. International Journal of Construction Management, 19(04), 281-90.
Iles, D and Ryall, P (2016) How Can The United Kingdom Construction Industry Implement Sustainable Procurement Strategies?. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 1121–1130.
Inuwa, I I (2018) Unethical professional practices in tendering of public building procurement in Bauchi Metropolis, Nigeria. African Journal of Built Environment Research, 2(1), 55-73.
Irfan, M, Malik, M S A and Kaka Khel, S S U H (2020) Effect of factors of organizational structure influencing nonphysical waste in road projects of developing countries. Engineering, Construction and Architectural Management, 27(10), 3135–53.
Iromuanya, C (2013) A qualitative study on construction project success factors in dynamic project environments: A Delphi approach, Unpublished PhD Thesis, , Capella University.
Iroroakpo, G I (2007) A comparative study of direct labour and design-tender-construct procurement systems in Nigeria, Unpublished PhD Thesis, , University of Lagos (Nigeria).
Isaksson, T (2002) Model for estimation of time and cost based on risk evaluation applied on tunnel projects, Unpublished PhD Thesis, , Kungliga Tekniska Hogskolan (Sweden).
Islam, M S, Nepal, M P and Skitmore, M (2019) Modified Fuzzy Group Decision-Making Approach to Cost Overrun Risk Assessment of Power Plant Projects. Journal of Construction Engineering and Management, 145(02).
Ismaeel, W S E (2021) Material Selection for Sustainable Buildings . In: Scott, L and Neilson, C J (Eds.), Proceedings 37th Annual ARCOM Conference, 6-7 September 2021, UK, Association of Researchers in Construction Management, 784-793.
Ismail, S (2013) Analyzing coordination function within a governance structure: Evidence from case studies of selected housing projects in Malaysia, Unpublished PhD Thesis, , University of Malaya (Malaysia).
Israel, B (2023) The impact of clients' procurement challenges on the substance goals of roads construction projects in songwe, Tanzania. International Journal of Construction Management, 23(12), 2144–50.
Ive, G and Chang, C-Y (2007) The principle of inconsistent trinity in the selection of procurement systems. Construction Management and Economics, 25(07), 677–90.
Järvenpää, A-T (2022) How to promote innovation from an organizational control perspective a case study of a public infrastructure client, Unpublished PhD Thesis, , Luleå University of Technology.
Jaafar, M and Radzi, N M (2013) Level of satisfaction and issues with procurement systems used in the Malaysian public sector. Construction Economics and Building, 13(01), 50-65.
Jabang, S-W (2017) An investigation into the use of public procurement and commissioning to deliver community (societal) value, Unpublished PhD Thesis, School of Government and Society, University of Birmingham.
Jabour Al Hazmi, H S (2011) National culture and knowledge sharing practices: Empirical study in the context of the procurement of educational building projects in Saudi Arabia, Unpublished PhD Thesis, , Griffith University.
Jackson, S (2002) Development of a tool for whole life design appraisal. In: Greenwood, D (Ed.), Proceedings 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK. Association of Researchers in Construction Management, Vol. 1, 165–73.
Jacobs, A (2007) Will the new offence of corporate manslaughter motivate companies to prioritise safety over profit?, Unpublished PhD Thesis, School of Law, University of Birmingham.
Jacomit, A M and Granja, A D (2011) An investigation into the adoption of target costing on Brazilian public social housing projects. Architectural Engineering and Design Management, 7(02), 113–27.
Jacques de Sousa, L, Poças Martins, J and Sanhudo, L (2024) Predicting construction project compliance with machine learning model: case study using Portuguese procurement data. Engineering, Construction and Architectural Management, 31(13), 285-302.
Jambol D D, Molwus J J and Daniel M M (2013) Re-thinking the approaches to mass housing delivery in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 285–295.
Jamieson, I A (1998) The development of a concurrently engineered procurement process. In: Hughes, W (Ed.), Proceedings 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK. Association of Researchers in Construction Management, Vol. 2, 486–95.
Jaselskis, E J and El-Misalami, T (2003) Implementing Radio Frequency Identification in the Construction Process. Journal of Construction Engineering and Management, 129(06), 680–8.
Jayasena, N S, Chan, D W M, Kumaraswamy, M M and Saka, A B (2023) Applicability of public-private partnerships in smart infrastructure development: The case of Hong Kong. International Journal of Construction Management, 23(11), 1932–44.
Jayasuriya, S, Zhang, G and Jing Yang, R (2019) Challenges in public private partnerships in construction industry. Built Environment Project and Asset Management, 9(02), 172–85.
Jefferies M, Gajendran T and Brewer G (2013) Public private partnerships: the provision of healthcare infrastructure in Australia. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 809–818.
Jefferies, D and Schweber, L (2022) Professional judgement: an institutional logic approach to contractor tender pricing. Buildings and Cities, 3(01), 518–33.
Jefferies, M and McGeorge, W D (2009) Using public-private partnerships (PPPs) to procure social infrastructure in Australia. Engineering, Construction and Architectural Management, 16(05), 415–37.
Jefferies, M, Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(05), 465-80.
Jefferies, M, Gameson, R and Rowlinson, S (2002) Critical success factors of the BOOT procurement system: reflections from the Stadium Australia case study. Engineering, Construction and Architectural Management, 9(04), 352–61.
Jeffries, M and Chen, S E (2004) Identifying risk factors of BOOT procurement: a case study of Stadium Australia. Construction Economics and Building, 4(01), 11-20.
Jelodar, M B, Wilkinson, S, Kalatehjari, R and Zou, Y (2022) Designing for construction procurement: an integrated Decision Support System for Building Information Modelling. Built Environment Project and Asset Management, 12(01), 111-27.
Jelodar, M B, Yiu, T W and Wilkinson, S (2016) Relationship-Quality Judgment Model for Construction Project Procurement: A Conjoint Measurement. Journal of Construction Engineering and Management, 142(07).
Jelodar, M B, Yiu, T W and Wlikinson, S (2015) Systematic representation of relationship quality in conflict and dispute for construction projects. Construction Economics and Building, 15(01), 89-103.
Jennings, P and Holt, G D (1998) Pre-qualification and multi-criteria selection: a measure of UK contractors' opinions. Construction Management and Economics, 16(06), 651-60.
Jewell, C A (2011) A typology of construction professional service firms: A consulting engineering perspective, Unpublished PhD Thesis, , University of Reading.
Jewell, C and Flanagan, R (2012) Measuring construction professional services exports: a case for change. Building Research & Information, 40(03), 337-47.
Jewell, C, Flanagan, R and Anaç, C (2010) Understanding UK construction professional services exports: definitions and characteristics. Construction Management and Economics, 28(03), 9.
Jijingi, A T (2019) A BIM-enabled procurement framework in new buildings for the Nigerian architecture, engineering and construction industry, Unpublished PhD Thesis, School of Civil Engineering & Surveying, University of Portsmouth.
Jin, X-H, Zhang, G and Yang, R J (2012) Factor analysis of partners' commitment to risk management in public-private partnership projects. Construction Innovation, 12(03), 297-316.
Johnson, R M and Babu, R I I (2020) Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(05), 402-11.
Johnsson, H (2013) Production strategies for pre-engineering in house-building: exploring product development platforms. Construction Management and Economics, 31(09), 941-58.
Johnston, B A (2012) Characterizing virtual prototype constructability programming for the pictographic instruction of procedure, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.
Jones, R C, III (1991) An economic analysis of national society of professional engineers versus United States, Unpublished PhD Thesis, , University of California, Los Angeles.
K'Akumu, O A, Jones, B and Yang, J (2013) Factor analysis of the market environment for artisanal dimension stone in nairobi, Kenya. Journal of Construction in Developing Countries, 18(2), 15-32.
Kabiri, S (2014) Role conflict and role ambiguity in construction projects, Unpublished PhD Thesis, School of Construction Management and Engineering, University of Reading.
Kadefors, A (2005) Fairness in interorganizational project relations: norms and strategies. Construction Management and Economics, 23(08), 871–8.
Kadir, M R A (1996) Conceptual phase best practices, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Kaima, A, Zulu, S and Kavishe, N (2025) A Review of Value for Money Assessment Approaches in Public Private Partnership Projects. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 41st Annual ARCOM Conference, 1-3 September 2025, Abertay University, Dundee, UK. Association of Researchers in Construction Management, 503-511.
Kaka, A P (2001) The case for re-engineering contract payment mechanisms. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 371–9.
Kaka, A P and Khosrowshahi, F (1996) Effect of different procurement routes on contractors' cash flows. Engineering, Construction and Architectural Management, 3(01), 133-45.
Kakar, A S, Hasan, A, Jha, K N and Singh, A (2024) Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry. Journal of Engineering, Design and Technology, 22(05), 1570-90.
Kakitahi, J M (2014) Causality, magnitude and impact mitigation of rework in Uganda, Unpublished PhD Thesis, , Lund University.
Kaluarachchi, Y D and Jones, K (2007) Monitoring of a strategic partnering process: the Amphion experience. Construction Management and Economics, 25(10), 1053–61.
Kamar, K A M (2011) Critical success factors to industrialised building system contractor, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Kamara, J M (2012) Integration in the project development process of a Private Finance Initiative (PFI) project. Architectural Engineering and Design Management, 8(04), 228-45.
Kamara, J M, Anumba, C J and Hobbs, B (1999) From briefing to client requirements processing. In: Hughes, W (Ed.), Proceedings 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK. Association of Researchers in Construction Management, Vol. 1, 317–26.
Kamardeen, I (2009) Strategic safety management information system for building projects in Singapore. Engineering, Construction and Architectural Management, 16(01), 8–25.
Kaming, P F (1996) A productivity audit system for construction management in Indonesia, Unpublished PhD Thesis, School of Construction, Engineering and Technology, University of Wolverhampton .
Kan, F-K and Khalid, A G (2022) The Decision-Making Behaviour of Public Procurement Officers: An Interplay Between Procedural Rationality and Groupthink Bias . In: Tutesigensi, A and Neilson, C J (Eds.), Proceedings 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK. Association of Researchers in Construction Management, 451-460.
Kapogiannis, G, Fernando, T and Alkhard, A M (2021) Impact of proactive behaviour antecedents on construction project managers' performance. Construction Innovation, 21(04), 708-22.
Kar, S (2021) Developing a decision support system for effective material management in construction, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.
Kar, S and Jha, K N (2022) Assessing criticality of construction materials for prioritizing their procurement using ANP-TOPSIS. International Journal of Construction Management, 22(10), 1852-62.
Kar, S and Jha, K N (2019) Assessment Of Criticality Of Materials In A Construction Project. In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 679- 688.
Kar, S and Jha, K N (2020) Examining the Effect of Material Management Issues on the Schedule and Cost Performance of Construction Projects Based on a Structural Equation Model: Survey of Indian Experiences. Journal of Construction Engineering and Management, 146(09).
Kar, S and Jha, K N (2023) Examining the effect of material management practices on material availability and waste reduction in construction projects. Journal of Construction Engineering and Management, 149(08).
Kar, S and Jha, K N (2021) Investigation into Lead Time of Construction Materials and Influencing Factors. Journal of Construction Engineering and Management, 147(03).
Kar, S, Kothari, C and Jha, K N (2021) Developing an Optimum Material Procurement Schedule by Integrating Construction Program and Budget Using NSGA-II. Journal of Construction Engineering and Management, 147(04).
Kashiwagi, D and Byfield, R (2002) State of Utah Performance Information Procurement System Tests. Journal of Construction Engineering and Management, 128(04), 338–47.
Kashiwagi, D and Savicky, J (2003) A case study of the transaction cost and value of the delivering of construction. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 2, 477–84.
Kashiwagi, D T (2002) Application of information measurement theory (IMT) to construction. In: Greenwood, D (Ed.), Proceedings 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK. Association of Researchers in Construction Management, Vol. 2, 511–21.
Kashiwagi, D T and Byfield, R (2002) Minimizing political influence in performance contracting case studies. In: Greenwood, D (Ed.), Proceedings 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK. Association of Researchers in Construction Management, Vol. 1, 349–58.
Kashiwagi, D T and Byfield, R (2002) Project MA Case study of potential impact of subjective decision making on construction performance. Journal of Construction Procurement, 8(02), 101–16.
Kashiwagi, D T and Byfield, R (2002) Testing of Minimization of Subjectivity in Best Value Procurement by Using Artificial Intelligence Systems in State of Utah Procurement. Journal of Construction Engineering and Management, 128(06), 496–502.
Kashiwagi, D T and Massner, S (2005) Solving the construction craftperson skill shortage problem through construction undergraduate and graduate education. International Journal of Construction Education and Research, 1(02), 89–101.
Kashiwagi, D T and Mayo, R E (2001) Best Value Procurement in Construction Using Artificial Intelligence. Journal of Construction Procurement, 7(02), 42–59.
Kashiwagi, D T, Halmrast, C T and Tisthammer, T (1996) Intelligent procurement of construction systems. Journal of Construction Procurement, 2(01), 56–65.
Kashiwagi, D T, Slater, C and Kashiwagi, M (2002) ‘Just in time’ information for performance based systems. In: Greenwood, D (Ed.), Proceedings 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK. Association of Researchers in Construction Management, Vol. 2, 577–86.
Kashiwagi, D, Parmar, D and Savicky, J (2003) Case study of the impact of specifications, construction management and inspection on construction performance. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 1, 369–77.
Kashiwagi, D, Parmar, D and Savicky, J (2004) Traditional low-bid procurement system versus performance information procurement system (PIPS) in construction industry. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 703–9.
Kasim, N B, Anumba, C J and Dainty, A R J (2005) Improving materials management practices on fast-track construction projects. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 2, 793–802.
Kasim, T (2015) BIM-based smart compliance checking to enhance environmental sustainability, Unpublished PhD Thesis, School of Engineering, Cardiff University.
Kathri, A K D (2003) A study of project finance in Asia with emphasis on private infrastructure project finance, Unpublished PhD Thesis, , University of Hong Kong.
Kavishe, N and An, M (2016) Challenges for Implementing Public Private Partnership in Housing Projects in Dar es Salaam City, Tanzania. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 931–940.
Kavishe, N, Jefferson, I and Chileshe, N (2019) Evaluating issues and outcomes associated with public-private partnership housing project delivery: Tanzanian practitioners' preliminary observations. International Journal of Construction Management, 19(04), 354-69.
Kaya, S, Hinks, J and Alexander, K (2005) Innovation in facilities supply chain. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 1, 411–9.
Kayan, B A (2015) Conservation plan and “green maintenance” from sustainable repair perspectives. Smart and Sustainable Built Environment, 4(01), 25-44.
Ke, Y (2014) Is public-private partnership a panacea for infrastructure development? The case of Beijing national stadium. International Journal of Construction Management, 14(02), 90-100.
Ke, Y, Hao, W, Ding, H and Wang, Y (2017) Factors Influencing the Private Involvement in Urban Rail Public-Private Partnership Projects in China . Construction Economics and Building, 17(01), 90-106.
Ke, Y, Ling, F Y Y and Ning, Y (2013) Public construction project delivery process in Singapore, Beijing, Hong Kong and Sydney. Journal of Financial Management of Property and Construction, 18(01), 6-25.
Kehily, D (2016) Leveraging building information modelling to address the barriers that prevent the widespread adoption of life cycle costing by quantity surveyors, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Kenley, R and Heywood, C (2000) Corporate real estate management practice: contrasts between financial and service provision priorities in corporate and government organizations. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 157–66.
Kenley, R, London, K and Watson, J (2000) Strategic procurement in the construction industry: mechanisms for public sector clients to encourage improved performance in Australia. Journal of Construction Procurement, 6(01), 4–19.
Kennedy, R and Sidwell, A C (2001) Re-engineering the construction delivery process: The Museum of Tropical Queensland, Townsville – A Case Study. Construction Innovation, 1(02), 77–89.
Kermanshachi, S (2016) Decision making and uncertainty analysis in success of construction projects, Unpublished PhD Thesis, , Texas A&M University.
Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors), Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.
Khadour, L, Ramsay-Dawber, P and Morledge, R (2009) Case studies on the implementation of TQEM in the UK building contractors. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 2, 1051–8.
Khalfan, M M A and McDermott, P (2006) Innovating for supply chain integration within construction. Construction Innovation, 6(03), 143–57.
Khalfan, M M A and McDermott, P (2006) Once unthought, now the best practice within the construction sector. Journal of Construction Procurement, 12(01).
Khalfan, M M A, McDermott, P and Maqsood, T (2005) Achieving supply chain integration through demand and supply management. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 2, 1205–12.
Khalfan, M, McDermott, P and Cooper, R (2004) Integrating the supply chain within construction industry. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 2, 897–904.
Khatatbeh, A A (2023) Quantifying the impact of ISO 9001 standard on the project and engineering management and success factors; A case of construction industry. Engineering, Construction and Architectural Management, 30(06), 2564-81.
Kheni, N A (2008) Impact of health and safety management on safety performance of small and medium-sized construction businesses in Ghana, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(05), 474-92.
Kifokeris, D and Tezel, A (2025) Blockchain and lean construction: an exploration of bidirectional synergies and interactions. Architectural Engineering and Design Management, 21(01), 171–89.
Kifokeris, D, Troje, D and Mjörnell, K (2025) Reused or Used Up? Upscaling Material and Component Reuse in the Swedish Construction Sector. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 41st Annual ARCOM Conference, 1-3 September 2025, Abertay University, Dundee, UK. Association of Researchers in Construction Management, 971-980.
King, A P (2008) Enhancing the effectiveness of design and build tendering, Unpublished PhD Thesis, Division of Built Environment, Sheffield Hallam University.
King, A P, Knight, A D and Griffith, A (2001) Understanding the dynamics of novation: a contractor's perspective. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 951–9.
Kirkham, R J, Alisa, M, Silva, A P d, Grindley, T and Brøndsted, J (2004) Rethinking whole life cycle cost based design decision-making. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 91–103.
Kissi, E, Adjei-Kumi, T, Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(03), 252-68.
Kissi, E, Adjei-Kumi, T, Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(03), 252-68.
Kjerulf, L and Haugbølle, K (2021) Circular Prequalification and Bidding Practices at Contractor Firms. In: Scott, L and Neilson, C J (Eds.), Proceedings 37th Annual ARCOM Conference, 6-7 September 2021, UK, Association of Researchers in Construction Management, 684-693.
Koc, K and Gurgun, A P (2022) Ambiguity factors in construction contracts entailing conflicts. Engineering, Construction and Architectural Management, 29(05), 1946-64.
Koehn, E and Espaillat, C A (1984) Costs and Benefits of MBE Rules in Construction. Journal of Construction Engineering and Management, 110(02), 235–47.
Koh, T Y (2010) The effects of social capital on construction project success: exploring the mediating role of projectlearning, Unpublished PhD Thesis, , University of Hong Kong.
Kohler, N (2002) The relevance of BEQUEST: an observer's perspective. Building Research & Information, 30(02), 130–8.
Kong, A and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(01), 51-62.
Kong, C W and Li, H (2001) E-commerce application for construction material procurement. International Journal of Construction Management, 1(1), 11-20.
Kong, C W, Li, H and Love, P E D (2001) An e-commerce system for construction material procurement. Construction Innovation, 1(01), 43–54.
Konukcu, S (2011) A knowledge chain framework for construction supply chains, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Krasnokutskaya, E (2003) Identification and estimation in highway procurement auctions under unobserved heterogeneity, Unpublished PhD Thesis, , Yale University.
Kreider, R G (2013) An ontology of the uses of building information modeling, Unpublished PhD Thesis, , Pennsylvania State University.
Kristensen, E K (2011) Systemic barriers to a future transformation of the building industry from a buyer controlled to a seller driven industry: an analysis of key systemic variables in the building industry, such as 'procurement model', 'buyer perception',, Unpublished PhD Thesis, Scott Sutherland School of Architecture & Built Environment, Robert Gordon University.
Kuennen, S T (2002) Construction management practice in the execution of military construction projects, Unpublished PhD Thesis, , Texas A&M University.
Kuiper, I and Holzer, D (2013) Rethinking the contractual context for Building Information Modelling (BIM) in the Australian built environment industry. Construction Economics and Building, 13(04), 1-17.
Kuittinen, M and Häkkinen, T (2020) Reduced carbon footprints of buildings: new Finnish standards and assessments. Buildings and Cities, 1(01), 182–97.
Kumaraswamy, M and Dulaimi, M (2001) Empowering innovative improvements through creative construction procurement. Engineering, Construction and Architectural Management, 8(05), 325–34.
Kumaraswamy, M M (1998) Industry development through creative project packaging and integrated management. Engineering, Construction and Architectural Management, 5(03), 228–37.
Kumaraswamy, M M and Dissanayaka, S M (1998) Linking procurement systems to project priorities. Building Research & Information, 26(04), 223–38.
Kumaraswamy, M M and Dissanayaka, S M (1996) Procurement by objectives. Journal of Construction Procurement, 2(02), 38–51.
Kumaraswamy, M M and Morris, D A (2002) Build-Operate-Transfer-Type Procurement in Asian Megaprojects. Journal of Construction Engineering and Management, 128(02), 93–102.
Kumaraswamy, M M, Chan, D W M, Dissanayaka, S M and Yogeswaran, K (1997) Mapping methodologies and mixing methods in construction management research. In: Stephenson, P (Ed.), Proceedings 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK. Association of Researchers in Construction Management, Vol. 2, 464–73.
Kumaraswamy, M M, Ling, F Y, Rahman, M M and Phng, S T (2005) Constructing Relationally Integrated Teams. Journal of Construction Engineering and Management, 131(10), 1076–86.
Kumaraswamy, M M, Rahman, M M, Ling, F Y and Phng, S T (2005) Reconstructing Cultures for Relational Contracting. Journal of Construction Engineering and Management, 131(10), 1065–75.
Kumaraswamy, M, Rowlinson, S and Phua, F (2002) Accelerating cultural changes through innovative procurement processes: a Hong Kong perspective. Journal of Construction Procurement, 8(01), 3–16.
Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.
Kurniawan, F, Ogunlana, S and Motawa, I (2010) An integrated project evaluation tool for PFI seaport projects. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 2, 1317–27.
Kussl, S and Wald, A (2025) The role of construction clients in digital innovation: insights from scenario analysis. Construction Management and Economics, 43(05), 381–404.
Kwasafo, O K, Adinyira, E and Agyekum, K (2024) Impact of green construction procurement practices on the success of circular economy in Ghana. Built Environment Project and Asset Management, 14(05), 765-81.
Kwawu, W and Hughes, W (2005) The impact of relational contracting on the construction industry. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 2, 1195–204.
Kwawu, W and Laryea, S (2014) Governance structures in collaborative working practices. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 413–22.
Kwawu, W and Laryea, S (2013) Incentive contracting in construction. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 729–738.
Kwawu, W E K (2009) Relational contracting in the UK construction sector, Unpublished PhD Thesis, School of Construction Management and Engineering, University of Reading.
Kwofie, T E, Aigbavboa, C O and Machethe, S O (2019) Nature of communication performance in non-traditional procurements in South Africa. Engineering, Construction and Architectural Management, 26(10), 2264–88.
Kwok, C, Young, R J and Kirkham, R J (2010) Risk and asset management in privatization/private finance of public utiliities: a risk investigation of water infrastructure projects in China. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 2, 1279–88.
Kyalisiima, C, Tutesigensi, A and Kayondo, M (2022) Is the Competence of Internal Stakeholders in Construction Projects an Antidote to Construction Contract Disputes?. In: Tutesigensi, A and Neilson, C J (Eds.), Proceedings 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK. Association of Researchers in Construction Management, 104-113.
L, T A H and Sutrisna, M (2010) Developing a framework to minimize the occurrence of construction conflict and disputes in different procurement strategies: an initial review of literature. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 2, 1059–68.
Lædre, O, Austeng, K, Haugen, T I and Klakegg, O J (2006) Procurement Routes in Public Building and Construction Projects. Journal of Construction Engineering and Management, 132(07), 689–96.
Lahdenperä, P (2001) An Analysis of the Statistics on Project Procurement Methods in Finland, 1989-1998. Journal of Construction Procurement, 7(01), 27–41.
Lahdenperä, P (2010) Conceptualizing a two-stage target-cost arrangement for competitive cooperation. Construction Management and Economics, 28(07), 96.
Lahdenperä, P (2012) How to proportion capability and fee percentage for team comparison in competitive early involvement. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 945–55.
Lai, J H K (2010) Operation and maintenance budgeting for commercial buildings in Hong Kong. Construction Management and Economics, 28(04), 415–27.
Lam, E W M, Chan, A P C and Chan, D M W (2006) Drivers for design-build applications in the public sector of Hong Kong. Journal of Construction Procurement, 12(01).
Lam, E W M, Chan, A P C and Chan, D W M (2007) An empirical study on the problems of running design and build projects in construction. International Journal of Construction Management, 7(1), 1-15.
Lam, E W, Chan, A P and Chan, D W (2008) Determinants of Successful Design-Build Projects. Journal of Construction Engineering and Management, 134(05), 333–41.
Lam, E, Chan, A and Chan, D (2003) Why is design-build commonly used in the public sector? an illustration from Hong Kong. Construction Economics and Building, 3(01), 53-62.
Lam, G T W, Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (Ed.), Proceedings 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK. Association of Researchers in Construction Management, Vol. 2, 607–14.
Lam, K C and Chow, W S (1999) The significance of financial risks in BOT procurement. Building Research & Information, 27(02), 84–95.
Lam, K C, Gibb, A G F and Sher, W D (1997) An analysis of building procurement factors affecting coordination of building services. In: Stephenson, P (Ed.), Proceedings 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK. Association of Researchers in Construction Management, Vol. 1, 83–92.
Lam, K-C (2003) Co-ordination of building services and procurement methods for highly serviced buildings, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Lam, P T I, Kumaraswamy, M M and Ng, T S T (2003) A comparative study of user perceptions on prescriptive specifications versus performance-based specifications. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 1, 121–30.
Lam, T (2017) A web-based Decision Support System to assist SMEs to broker risks and rewards for BIM adoption, Unpublished PhD Thesis, Faculty of Environment and Technology , University of the West of England, Bristol.
Lam, T and Gale, K (2014) Highway maintenance: impact of framework agreements upon project financial performance. Construction Management and Economics, 32(05), 460-72.
Lam, T Y M (2022) Driving sustainable construction development through post-contract key performance indicators and drivers. Smart and Sustainable Built Environment, 11(03), 483-99.
Lam, T Y M and Gale, K S (2023) A performance-driving model for public-sector construction framework procurement in England. Built Environment Project and Asset Management, 13(06), 781-98.
Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).
Langford, D A, Kennedy, P, Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(08), 831-40.
Langston, C (2014) Construction efficiency: a tale of two developed countries. Engineering, Construction and Architectural Management, 21(03), 320-35.
Larkin, K, Odeyinka, H and Eadie, R (2012) An exploration of theoretical concepts and methods for assessing risk impacts on the variability between contract sum and final account in design and build projects. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 337–46.
Larsson, J, Eriksson, P E, Lingegård, S and Järvenpää, A (2022) Innovation outcomes and processes in infrastructure projects – a comparative study of Design-Build and Design-Build-Maintenance contracts. Construction Management and Economics, 40(02), 142–56.
Larsson, J, Eriksson, P E, Olofsson, T and Simonsson, P (2014) Industrialized construction in the Swedish infrastructure sector: core elements and barriers. Construction Management and Economics, 32(01), 83-96.
Laryea S, Alkizim A and Ndlovu T (2013) The increasing development of publication on sustainable procurement and issues in practice . In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 1285–1294.
Laryea, S (2019) Procurement strategy and outcomes of a new universities project in South Africa. Engineering, Construction and Architectural Management, 26(09), 2060–83.
Laryea, S (2011) Quality of tender documents: case studies from the UK. Construction Management and Economics, 29(03), 275–86.
Laryea, S and Watermeyer, R (2021) Structuring architectural competitions as a competitive procurement process. Engineering, Construction and Architectural Management, 28(04), 886-907.
Lavikka, R, Chauhan, K, Peltokorpi, A and Seppänen, O (2021) Value creation and capture in systemic innovation implementation: case of mechanical, electrical and plumbing prefabrication in the Finnish construction sector. Construction Innovation, 21(04), 837-56.
Lawther, P and Edwards, P (2001) Design cost modelling - the way forwad. Construction Economics and Building, 1(01), 32-42.
Lawther, P M (2000) Predictive cost modelling: investigation utilising a qualitatively biased research methodology. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 605–14.
Lazo, A G, Çidik, M S, Addyman, S and Rillie, I (2024) Perspectives on Project Management and Asset Management Integration: A Systematic Review. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK. Association of Researchers in Construction Management, 423-432.
Le, N T K (2019) Identification of risk factors, success practices, and feasibility of the best value approach application to improve construction performance in Vietnam and other developing countries, Unpublished PhD Thesis, , Arizona State University.
Le, P L, Elmughrabi, W, Dao, T M and Chaabane, A (2020) Present focuses and future directions of decision-making in construction supply chain management: A systematic review. International Journal of Construction Management, 20(05), 490-509.
Leblanc, H, Nitithamyong, P and Thomson, C (2010) Developing a knowledge management framework to promote sustainable social housing refurbishment practices. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 2, 819–28.
Lee, A, Kagioglou, M, Cooper, R and Aouad, G F (2000) Production Management: The Process Protocol Approach. Journal of Construction Procurement, 6(02).
Lee, C and Chong, H (2021) Influence of Prior Ties on Trust and Contract Functions for BIM-Enabled EPC Megaproject Performance. Journal of Construction Engineering and Management, 147(07).
Lee, C Y, Chong, H and Wang, X (2018) Enhancing BIM Performance in EPC Projects through Integrative Trust-Based Functional Contracting Model. Journal of Construction Engineering and Management, 144(07).
Lee, C, Chong, H, Li, Q and Wang, X (2020) Joint Contract–Function Effects on BIM-Enabled EPC Project Performance. Journal of Construction Engineering and Management, 146(03).
Lee, G, Lee, G, Chi, S and Oh, S (2023) Automatic classification of construction work codes in bill of quantities of national roadway based on text analysis. Journal of Construction Engineering and Management, 149(02).
Lehtonen, T (2006) Partnering relations: Justification and success factors from facilities management services perspective, Published PhD Thesis, Department of Civil and Environmental Engineering, Helsinki University of Technology.
Leicht, R and Harty, C (2017) Influence of multiparty IPD contracts on construction innovation. In: Chan, P W and Neilson, C J (Eds.), Proceedings 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK. Association of Researchers in Construction Management, 164–173.
Leiringer, R (2006) Technological innovation in PPPs: incentives, opportunities and actions. Construction Management and Economics, 24(03), 301-8.
Leiringer, R (2003) Technological innovations in the context of public-private partnership projects, Unpublished PhD Thesis, TRITA-IEO, KTH Royal Institute of Technology.
Lenard, D (1999) Future challenges in construction management: creating a symbiotic learning environment. Journal of Construction Procurement, 5(02), 197–210.
Lenderink, B, Halman, J I, Boes, H and Voordijk, H (2020) A method to encourage and assess innovations in public tenders for infrastructure and construction projects. Construction Innovation , 20(02), 171–89.
Leung, M-Y and Liu, A M M (2003) Analysis of value and project goal specificity in value management. Construction Management and Economics, 21(01), 11-9.
Leung, M-Y and Liu, A M M (1998) Developing a value management model by value-goal system approach. In: Hughes, W (Ed.), Proceedings 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK. Association of Researchers in Construction Management, Vol. 2, 496–505.
Leviäkangas, P, Wigan, M and Haapasalo, H (2013) Financial anatomy of E4 Helsinki-Lahti shadow toll PPP-project. Built Environment Project and Asset Management, 3(02), 165-80.
Lewis, J A, Odeyinka, H and Eadie, R (2011) Innovative construction procurement selection through an artificial intelligence approach. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 745–54.
Lewis, T M (2005) Public procurement and corruption in Trinidad and Tobago. Journal of Construction Procurement, 11(01).
Li, B (2008) Managing a collaborative preconstruction planning process, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Li, B, Akintoye, A and Hardcastle, C (2000) Conceptual framework for construction public private partnerships. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 229–40.
Li, B, Akintoye, A and Hardcastle, C (2001) Risk analysis and allocation in public private partnership projects. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 895–904.
Li, B, Akintoye, A and Hardcastle, C (2002) Risks and risk treatments in public private partnership projects. In: Greenwood, D (Ed.), Proceedings 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK. Association of Researchers in Construction Management, Vol. 1, 403–14.
Li, B, Akintoye, A, Edwards, P and Hardcastle, C (2004) Risk treatment preferences for PPP/PFI construction projects in the UK. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 2, 1259–68.
Li, B, Akintoye, A, Edwards, P J and Hardcastle, C (2005) Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics, 23(05), 459-71.
Li, B, Akintoye, A, Edwards, P J and Hardcastle, C (2005) PFI procurement for construction projects in the UK: Findings from a questionnaire survey. Engineering, Construction and Architectural Management, 12(02), 125–48.
Li, B, Akintoye, A, Edwards, P J and Hardcastle, C (2004) Value for money factors in the development of PPP/PFI Construction projects. Journal of Financial Management of Property and Construction, 9(01), 43–52.
Li, H, Arditi, D and Wang, Z (2014) Transaction costs incurred by construction owners. Engineering, Construction and Architectural Management, 21(04), 444-58.
Li, H, Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(03), 211–20.
Li, H, Su, L, L.V, L and Xia, Q (2021) Detecting unbalanced bidding to achieve economic sustainability using fuzzy logic approach. Construction Innovation, 21(02), 164-81.
Li, H, Su, L, Zuo, J, An, X, Dong, G, Wang, L and Zhang, C (2023) The framework of data-driven and multi-criteria decision-making for detecting unbalanced bidding. Engineering, Construction and Architectural Management, 30(02), 598-622.
Li, J (2009) Dynamic contract conditions for built operation transfer (BOT) projects in China. International Journal of Construction Management, 9(2), 55-64.
Li, J (2004) Web-based integrated project control, Unpublished PhD Thesis, , Concordia University (Canada).
Li, J J (2023) A socio-technical framework to guide implementation and value realisation of distributed ledger technologies (DLT) in the construction sector, Unpublished PhD Thesis, , Northumbria University.
Li, J, Moselhi, O and Alkass, S (2006) Internet-based database management system for project control. Engineering, Construction and Architectural Management, 13(03), 242–53.
Li, S (2006) Three essays on bidding in the construction industry, Unpublished PhD Thesis, , The University of Utah.
Liang, R, Li, R and Chong, H (2023) Sustainable supplier selection for prefabricated megaprojects during COVID-19: a novel large group decision-making model. Building Research & Information, 51(05), 533–54.
Liang, Y (2012) A study of public private partnership project success factors and risk management integration in mainland China, Unpublished PhD Thesis, , University of Hong Kong.
Liang, Y (2006) Integrated IT systems for construction site management, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).
Liang, Y, Ashuri, B and Li, M (2021) Forecasting the Construction Expenditure Cash Flow for Transportation Design-Build Projects with a Case-Based Reasoning Model. Journal of Construction Engineering and Management, 147(06).
Liang, Y, Ashuri, B and Sun, W (2020) Analysis of the Variability of Project Cost and Schedule Performance in the Design-Build Environment. Journal of Construction Engineering and Management, 146(06).
Liguori, D, Sommerville, J and Manase, D (2012) Housing association preferred form of partnering. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 935–44.
Liguori, D, Sommerville, J and Manase, D (2012) Probabilistic pre-requisites contributing to successful housing association partnering. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 924–34.
Lim, B T H, Oo, B L and Ling, F (2010) The survival strategies of Singapore contractors in prolonged recession. Engineering, Construction and Architectural Management, 17(04), 387–403.
Lin, K and Soibelman, L (2007) Knowledge-Assisted Retrieval of Online Product Information in Architectural/Engineering/Construction. Journal of Construction Engineering and Management, 133(11), 871–9.
Lin, M-C (2000) Contract design of private infrastructure concessions, Unpublished PhD Thesis, , University of California, Berkeley.
Lin, S C J (2014) A decision making framework for procurement method selection for building maintenance projects: The case of public universities in Malaysia, Unpublished PhD Thesis, , University of Malaya (Malaysia).
Lin, S L (2021) Environmental risk and delay analysis: Lessons learned from the california high speed rail project, Unpublished PhD Thesis, , University of California, Los Angeles.
Lin, T, Lyu, S, Yang, R J and Tivendale, L (2022) Offsite construction in the Australian low-rise residential buildings application levels and procurement options. Engineering, Construction and Architectural Management, 29(01), 110-40.
Lindblad, H (2019) BIM in translation: Exploring client organisations as drivers for change in construction, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.
Lindblad, H (2019) Black boxing BIM: the public client’s strategy in BIM implementation. Construction Management and Economics, 37(01), 1–12.
Lindblad, H and Guerrero, J R (2020) Client’s role in promoting BIM implementation and innovation in construction. Construction Management and Economics, 38(05), 468–82.
Lindblad, H and Gustavsson, T K (2018) Project Managers as Involuntary Policy Implementers? The Case of Implementing BIM. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 465–474.
Lindblad, H and Karrbom Gustavsson, T (2021) Public clients ability to drive industry change: the case of implementing BIM. Construction Management and Economics, 39(01), 21–35.
Lines, B C and Ravi Kumar, G G (2018) Developing More Competitive Proposals: Relationship between Contractor Qualifications-Based Proposal Content and Owner Evaluation Scores. Journal of Construction Engineering and Management, 144(05).
Lines, B C, Kakarapalli, R and Nguyen, P H (2022) Does Best Value Procurement Cost More than Low-Bid? A Total Project Cost Perspective. International Journal of Construction Education and Research, 18(01), 85–100.
Ling, F (2006) Design-build: how to increase its usage and its impact on architects and contractors in Singapore. Construction Economics and Building, 6(01), 12-24.
Ling, F and Leong, E (2002) Performance of design-build projects in terms of cost, quality and time: views of clients, architects and contractors in Singapore. Construction Economics and Building, 2(01), 37-46.
Ling, F Y Y (2005) Models for predicting quality of building projects. Engineering, Construction and Architectural Management, 12(01), 6–20.
Ling, F Y-Y and Boo, J H S (2001) Improving the accuracy estimates of building of approximate projects. Building Research & Information, 29(04), 311–8.
Ling, Y Y (2000) A theoretical framework for selection of consultants by design-build contractors. Journal of Construction Procurement, 6(02).
Lingard, H, Blismas, N, Harley, J, Stranieri, A, Zhang, R P and Pirzadeh, P (2018) Making the invisible visible: Stimulating work health and safety-relevant thinking through the use of infographics in construction design. Engineering, Construction and Architectural Management, 25(01), 39-61.
Lingard, H, Oswald, D and Le, T (2019) Embedding occupational health and safety in the procurement and management of infrastructure projects: institutional logics at play in the context of new public management. Construction Management and Economics, 37(10), 567–83.
Lingard, H, Wakefield, R and Walker, D (2020) The client’s role in promoting work health and safety in construction projects: balancing contracts and relationships to effect change. Construction Management and Economics, 38(11), 993–1008.
Liu, A M M (1997) Developing a research model for project outcome evaluation. In: Stephenson, P (Ed.), Proceedings 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK. Association of Researchers in Construction Management, Vol. 2, 474–83.
Liu, A M M and Fang, Z (2001) Project leadership styles in China. International Journal of Construction Management, 1(1), 1-10.
Liu, A M M, Lam, B C and Fellows, R (2006) Bureaucratic culture in public and private construction project organisations. International Journal of Construction Management, 6(1), 81-95.
Liu, A M M, Lau, W S W and Fellows, R (2012) The contributions of environmental management systems towards project outcome: Case studies in Hong Kong. Architectural Engineering and Design Management, 8(03), 160-9.
Liu, A M-M (1995) Evaluation of the outcome of construction projects, Unpublished PhD Thesis, Department of Real Estate and Construction, University of Hong Kong.
Liu, A M-M and Fellows, R (2001) An Eastern perspective on partnering. Engineering, Construction and Architectural Management, 8(01), 9–19.
Liu, J, Love, P E D, Smith, J, Regan, M and Palaneeswaran, E (2015) Review of performance measurement: Implications for public-private partnerships. Built Environment Project and Asset Management, 5(01), 35-51.
Liu, M (2013) The application of BIM and IPD in public design and construction, Unpublished PhD Thesis, , Polytechnic Institute of New York University.
Lloyd-Walker, B M, Mills, A J and Walker, D H T (2014) Enabling construction innovation: the role of a no-blame culture as a collaboration behavioural driver in project alliances. Construction Management and Economics, 32(03), 229-45.
Lo, W and Yan, M (2009) Evaluating Qualification-Based Selection System: A Simulation Approach. Journal of Construction Engineering and Management, 135(06), 458–65.
Loewenson, T N (2020) A weird-tender: unearthing an inclusive practice for public procurement in Lusaka through design, fiction and performance, Unpublished PhD Thesis, Bartlett School of Construction and Project Management, University College London.
London, K (2004) Construction supply chain procurement modelling, Unpublished PhD Thesis, , University of Melbourne.
London, K A and Kenley, R (2001) An industrial organization economic supply chain approach for the construction industry: a review. Construction Management and Economics, 19(08), 777-88.
London, K, Kenley, R and Agapiou, A (1998) Theoretical supply chain network modelling in the building industry. In: Hughes, W (Ed.), Proceedings 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK. Association of Researchers in Construction Management, Vol. 2, 369–79.
Loosemore, M (2015) Barriers to social enterprise in the UK construction industry . In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 407–416.
Loosemore, M (2015) Building a new third construction sector through social enterprise. Construction Management and Economics, 33(09), 724-39.
Loosemore, M and Alkilani, S (2022) The Collaborative Challenges Of Social Procurement . In: Tutesigensi, A and Neilson, C J (Eds.), Proceedings 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK. Association of Researchers in Construction Management, 176-185.
Loosemore, M and Barraket, J (2017) The Co-Creation Of Social Value Between Social Enterprises And Private Firms In The Construction Industry. In: Chan, P W and Neilson, C J (Eds.), Proceedings 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK. Association of Researchers in Construction Management, 673–682.
Loosemore, M and Denny-Smith, G (2016) Barriers to Indigenous Enterprise in The Australian Construction Industry. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 629–638.
Loosemore, M and Reid, S (2019) The social procurement practices of tier-one construction contractors in Australia. Construction Management and Economics, 37(04), 183–200.
Loosemore, M, Alkilani, S and Mathenge, R (2020) The risks of and barriers to social procurement in construction: a supply chain perspective. Construction Management and Economics, 38(06), 552–69.
Loosemore, M, Alkilani, S Z and Hammad, A W A (2022) Barriers to employment for refugees seeking work in the Australian construction industry: an exploratory study. Engineering, Construction and Architectural Management, 29(02), 619-42.
Loosemore, M, Alkilani, S Z and Hammad, A W A (2021) The job-seeking experiences of migrants and refugees in the Australian construction industry. Building Research & Information, 49(08), 912–29.
Loosemore, M, Alkilani, S Z and Mathenge, R (2019) Barriers to Employment Faced by Disadvantaged Groups Targeted by New Social Procurement Policies. In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 15-23.
Loosemore, M, Braham, R, Yiming, Y and Bronkhorst, C (2020) Relational determinants of construction project outcomes: a social network perspective. Construction Management and Economics, 38(11), 1061–76.
Loosemore, M, Bridgeman, J and Keast, R (2020) Reintegrating ex-offenders into work through construction: a case study of cross-sector collaboration in social procurement. Building Research & Information, 48(07), 731–46.
Loosemore, M, Daniele, F and Lim, B T H (2020) Integrating ex-offenders into the Australian construction industry. Construction Management and Economics, 38(10), 877–93.
Loosemore, M, Denny-Smith, G, Barraket, J, Keast, R, Chamberlain, D, Muir, K, Powell, A, Higgon, D and Osborne, J (2021) Optimising social procurement policy outcomes through cross-sector collaboration in the Australian construction industry. Engineering, Construction and Architectural Management, 28(07), 1908-28.
Loosemore, M, Hammad, A and Alkilani, S Z (2020) Refugee Experiences of Finding Decent Work in the Australian Construction Industry. In: Scott, L and Neilson, C J (Eds.), Proceedings 36th Annual ARCOM Conference, 7-8 September 2020, UK, Association of Researchers in Construction Management, 65-74.
Loosemore, M, Higgon, D and Osborne, J (2020) Managing new social procurement imperatives in the Australian construction industry. Engineering, Construction and Architectural Management, 27(10), 3075–93.
Loosemore, M, Keast, R and Alkilani, S (2023) The drivers of social procurement policy adoption in the construction industry: an Australian perspective. Building Research & Information, 51(05), 555–67.
Loosemore, M, Keast, R and Barraket, J (2022) A typology of social procurement champions in the construction and engineering industry. Construction Management and Economics, 40(05), 391–405.
Loosemore, M, Keast, R and Barraket, J (2023) How are social procurement actors shaping a new field of professional practice in the Australian construction industry?. Engineering, Construction and Architectural Management, 30(09), 4192-209.
Loosemore, M, Osborne, J and Higgon, D (2021) Affective, cognitive, behavioural and situational outcomes of social procurement: a case study of social value creation in a major facilities management firm. Construction Management and Economics, 39(03), 227–44.
Lopez, R and Love, P E D (2012) Design Error Costs in Construction Projects. Journal of Construction Engineering and Management, 138(05), 585–93.
Loraine, R K (1994) Project specific partnering. Engineering, Construction and Architectural Management, 1(01), 5–16.
Love, P E D (2002) Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects. Journal of Construction Engineering and Management, 128(01), 18–29.
Love, P E D and Li, H (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18(04), 479-90.
Love, P E D, Davis, P R, Chevis, R and Edwards, D J (2011) Risk/Reward Compensation Model for Civil Engineering Infrastructure Alliance Projects. Journal of Construction Engineering and Management, 137(02), 127–36.
Love, P E D, Edwards, D J, Irani, Z and Sharif, A (2012) Participatory Action Research Approach to Public Sector Procurement Selection. Journal of Construction Engineering and Management, 138(03), 311–22.
Love, P E D, Mandal, P and Li, H (1999) Determining the causal structure of rework influences in construction. Construction Management and Economics, 17(04), 505-17.
Love, P E D, Mistry, D and Davis, P R (2010) Price Competitive Alliance Projects: Identification of Success Factors for Public Clients. Journal of Construction Engineering and Management, 136(09), 947–56.
Love, P E D, Niedzweicki, M, Bullen, P A and Edwards, D J (2012) Achieving the Green Building Council of Australia’s World Leadership Rating in an Office Building in Perth. Journal of Construction Engineering and Management, 138(05), 652–60.
Love, P E D, Skitmore, M R and Earl, G (1998) Selecting a suitable procurement method for a building project. Construction Management and Economics, 16(02), 221-33.
Love, P E D, Teo, P and Morrison, J (2018) Revisiting Quality Failure Costs in Construction. Journal of Construction Engineering and Management, 144(02).
Love, P E D, Tse, R Y C and Edwards, D J (2005) Time–Cost Relationships in Australian Building Construction Projects. Journal of Construction Engineering and Management, 131(02), 187–94.
Love, P E D; Leonard, D; Matthews, J; Ford, G; Fang, W (2024) Setting a course to validate and operationalize quality II in construction. Journal of Construction Engineering and Management, 150(12).
Low, P S and Gao, S (2011) The application of the just-in-time philosophy in the Chinese construction industry. Journal of Construction in Developing Countries, 16(1), 91-111.
Low, S P and Min, W (2005) Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore. Construction Management and Economics, 23(08), 815-29.
Low, S P and Wu, M (2005) Just-in-time management in the ready mixed concrete industry of Chongqing, China. International Journal of Construction Management, 5(1), 21-37.
Lu, W, Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(01), 118-32.
Lu, W, Liu, A M M, Rowlinson, S and Poon, S W (2013) Sharpening Competitive Edge through Procurement Innovation: Perspectives from Chinese International Construction Companies. Journal of Construction Engineering and Management, 139(03), 347–51.
Luu, D and Sher, W (2006) Construction tender subcontract selection using case-based reasoning. Construction Economics and Building, 6(02), 32-43.
Luu, D T, Ng, S T and Chen, S E (2003) Parameters governing the selection of procurement system - an empirical survey. Engineering, Construction and Architectural Management, 10(03), 209–18.
Luu, D T, Ng, S T and Chen, S E (2003) Parameters governing the selection of procurement system - An empirical survey. Engineering, Construction and Architectural Management, 10(3), 209–18.
Lynch, T D (1996) A transaction cost framework for evaluating construction project organizations, Unpublished PhD Thesis, , Pennsylvania State University.
Lyu, K Y (1989) Internationalisation of Korean industry: A study of the performance of the plant and construction industry, Unpublished PhD Thesis, , University of Manchester.
Ma, Q, Li, S and Cheung, S O (2022) Unveiling Embedded Risks in Integrated Project Delivery. Journal of Construction Engineering and Management, 148(01).
Maauf, N A A (2021) The development of a framework to improve materials management on Libyan construction sites, Unpublished PhD Thesis, , University of Salford.
Maci, M (2010) Bid rigging in the EU public procurement markets, Unpublished PhD Thesis, School of Law (?), Queen Mary, University of London.
Mahamadu, A M, Mahdjoubi, L, Booth, C and Fewings, P (2015) Integrated delivery of quality, safety and environment through road sector procurement: The case of public sector agencies in Ghana. Journal of Construction in Developing Countries, 20(1), 1-24.
Mahamadu, A-M, Manu, P, Booth, C, Olomolaiye, P, Coker, A, Ibrahim, A and Lamond, J (2018) Infrastructure procurement skills gap amongst procurement personnel in Nigeria’s public sector. Journal of Engineering, Design and Technology, 16(01), 2-24.
Mahamadu, A, Mahdjoubi, L and Booth, C A (2017) Critical BIM qualification criteria for construction pre-qualification and selection. Architectural Engineering and Design Management, 13(05), 326–43.
Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects, Unpublished PhD Thesis, , University of Nevada, Las Vegas.
Mahmud, A T, Ogunlana, S O and Hong, W T (2022) Understanding the dynamics of cost overrun triggers in highway infrastructure projects in Nigeria: a systems thinking modelling approach. Journal of Financial Management of Property and Construction, 27(01), 29-56.
Mallawaarachchi, V T, Senanayake, S M A H, Disaratna, V and Perera, B A K S (2024) Application of subcontracting as a quality improvement tool for building constructions in Sri Lanka. International Journal of Construction Management, 24(01), 44–56.
Mallisetti, V, Dolla, T and Laishram, B (2022) Unpacking the framework of unsolicited proposal for public private partnership projects – the Indian case. Journal of Financial Management of Property and Construction, 27(02), 179-98.
Malmberg, F (2007) Introduction of a new form of quote evaluation: a case study in southern Sweden. Construction Management and Economics, 25(06), 661–9.
Mambwe, M, Mwanaumo, E M, Phiri, F and Chabota, K (2020) The construction subcontracting policy framework for developing local contractors capacities in Zambia. Journal of Construction Business and Management, 4(1), 60-70.
Mañelele, I and Muya, M (2008) Risk identification on community-based construction projects in Zambia. Journal of Engineering, Design and Technology, 6(02), 145–61.
Mangitung, D M (2005) Modelling the influence of periodic prequalification criteria on project performance, Unpublished PhD Thesis, , University of Manchester.
Mangvwat, J S and Spillane, J P (2021) Social Sustainability in Procurement of Construction Projects: A Literature Review from a Nigerian Perspective. In: Scott, L and Neilson, C J (Eds.), Proceedings 37th Annual ARCOM Conference, 6-7 September 2021, UK, Association of Researchers in Construction Management, 724-733.
Mangvwat, J S, Spillane, J P and Bradley, J G (2025) Building Better Futures: Unlocking the Potentials of Public Procurement for Sustainable Workers and Communities. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 41st Annual ARCOM Conference, 1-3 September 2025, Abertay University, Dundee, UK. Association of Researchers in Construction Management, 721-730.
Mangvwat, J S, Spillane, J P and Bradley, J G (2023) Instrumentality of Procurement Laws to Implement Social Sustainability in Nigeria. In: Tutesigensi, A and Neilson, C J (Eds.), Proceedings 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK. Association of Researchers in Construction Management, 800-809.
Mangvwat, J S, Spillane, J P and Bradley, J G (2024) Unveiling the Nexus: The Impact of Social Factors on Sustainability in Construction Procurement. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK. Association of Researchers in Construction Management, 839-848.
Manley, K (2008) Implementation of innovation by manufacturers subcontracting to construction projects. Engineering, Construction and Architectural Management, 15(03), 230–45.
Manley, K and Chen, L (2015) Collaborative learning model of infrastructure construction: A capability perspective. Construction Innovation, 15(03), 355-77.
Manley, K and Chen, L (2016) The impact of client characteristics on the time and cost performance of collaborative infrastructure projects. Engineering, Construction and Architectural Management, 23(04), 511-32.
Manoliadis, O G, Pantouvakis, J-P and Christodoulou, S E (2009) Improving qualifications-based selection by use of the fuzzy Delphi method. Construction Management and Economics, 27(04), 373–84.
Mante, J (2014) Resolution of construction disputes arising from major infrastructure projects in developing countries: case study of Ghana, Unpublished PhD Thesis, School of Technology, University of Wolverhampton.
Mante, J, Ndekugri, I, Ankrah, N and Hammond, F (2012) The influence of procurement methods on dispute resolution mechanism choice in construction. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 979–88.
Manu, E, Ankrah, N A, Chinyio, E and Proverbs, D G (2012) Influence of the macro-economy on trust in construction supply chain chains. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 665–74.
Manu, P A (2012) An investigation into the accident causal influence of construction project features, Unpublished PhD Thesis, School of Technology, University of Wolverhampton.
Manu, P, Asiedu, R O, Mahamadu, A M, Olomolaiye, P O, Booth, C, Manu, E, Ajayi, S and Agyekum, K (2021) Contribution of procurement capacity of public agencies to attainment of procurement objectives in infrastructure procurement. Engineering, Construction and Architectural Management, 28(10), 3322-45.
Manu, P, Mahamadu, A, Booth, C, Olomolaiye, P O, Coker, A, Ibrahim, A and Lamond, J (2019) Infrastructure procurement capacity gaps in Nigeria public sector institutions. Engineering, Construction and Architectural Management, 26(09), 1962–85.
Manu, P, Mahamadu, A, Booth, C, Olomolaiye, P, Ibrahim, A D and Coker, A (2018) Assessment of procurement capacity challenges inhibiting public infrastructure procurement. Built Environment Project and Asset Management, 8(04), 386–402.
Marenjak, S, El-Haram, M A and Horner, M R W (2003) Generic approach to minimize whole life costs in the building industry. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 1, 53–62.
Marguet, N, Ross, A and Johnson, D (2009) Developing supply chain procurement systems in social housing. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, 3–10.
Marinelli, M (2022) A DfX-based approach for incorporating sustainability in infrastructure project planning. Built Environment Project and Asset Management, 12(01), 20-37.
Marique, Y (2013) Cooperation and competition in complex construction projects: Implementation of EU procurement rules in England and Belgium. International Journal of Law in the Built Environment, 5(01), 53-70.
Maritz, M J and Putlitz, U (2014) Standard form construction contracts; why the need for regular changes?. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 517–26.
Maroof, A O, Said, I and Ismail, R (2016) Factors affecting building security cost sustainability using PCA. Journal of Financial Management of Property and Construction, 21(01), 21-38.
Marsh, R (2017) Building lifespan: effect on the environmental impact of building components in a Danish perspective. Architectural Engineering and Design Management, 13(02), 80–100.
Martin, H, Lewis, T M and Petersen, A (2016) Factors affecting the choice of construction project delivery in developing oil and gas economies. Architectural Engineering and Design Management, 12(03), 170–88.
Martina, M, George, H and Srinath, P (2011) A methodology for evaluating construction innovation constraints through project stakeholder competencies and FMEA. Construction Innovation, 11(04), 416–40.
Marzouk, M (2008) A superiority and inferiority ranking model for contractor selection. Construction Innovation, 8(04), 250–68.
Marzouk, M and Amin, A (2013) Predicting Construction Materials Prices Using Fuzzy Logic and Neural Networks. Journal of Construction Engineering and Management, 139(09), 1190–8.
Marzouk, M and Mohamed, E (2018) Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(01), 90-108.
Marzouk, M and Moselhi, O (2003) A decision support tool for construction bidding. Construction Innovation, 3(02), 111–24.
Mason, J R (2007) The views and experiences of specialist contractors on partnering in the UK. Construction Management and Economics, 25(05), 519–27.
Massyn, M and Lamont, S (2009) Applying the briefing process on the people s housing process projects. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 1, 207–15.
Masterman, J W E (1994) A study of the bases upon which clients of the construction industry choose their building procurement systems, Unpublished PhD Thesis, , University of Manchester.
Matsumoto, I T, Thorpe, A, Baldwin, A and McWilliams, R (2002) Linking process mapping and technology: a case study of teamwork 2001. In: Greenwood, D (Ed.), Proceedings 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK. Association of Researchers in Construction Management, Vol. 2, 831–8.
Matthews, J, Tyler, A and Thorpe, A (1996) Pre-construction project partnering: developing the process. Engineering, Construction and Architectural Management, 3(01), 117-131.
Matthewson, C (1992) The relationship between tactical management and contract procurement in the North American competitive lump sum bidding process, Unpublished PhD Thesis, , Heriot-Watt University.
Matto, M C (2023) Identifying the latent shortcomings of force account projects in Tanzania: the case of construction projects in the education sector. Engineering, Construction and Architectural Management, 30(02), 787-804.
May, D, Wilson, O and Skitmore, M (2001) Bid cutting: an empirical study of practice in South-East Queensland. Engineering, Construction and Architectural Management, 8(04), 250–6.
Mbachu, J and Frei, M (2011) Diagnosing the strategic health of an organization from SWOT analysis results: case study of the Australasian cost management profession. Construction Management and Economics, 29(03), 287–303.
Mbachu, J, Egbelakin, T, Rasheed, E O and Shahzad, W M (2017) Influence of key role players on productivity outcomes in the residential building lifecycle. Journal of Engineering, Design and Technology, 15(04), 528-51.
McCarney, M P (2017) Interface management of offsite bathroom construction: process and people factors, Unpublished PhD Thesis, School of Civil and Building Engineering, Loughborough University.
McCarney, M, Goodier, C I and Gibb, A (2023) Interface management of offsite bathroom construction: a conceptual model. Construction Innovation, 23(03), 587-605.
McDermott, P and Khalfan, M (2006) Achieving supply chain integration within construction industry. Construction Economics and Building, 6(02), 44-54.
McDermott, P, Khalfan, M and Swan, W (2005) Trust in construction projects. Journal of Financial Management of Property and Construction, 10(01), 19–32.
McErlane, A, Haran, M, McClements, S and McCord, J (2018) Modelling the Drivers for Public-Private Partnerships (PPP) Provision of United Kingdom (UK) Social Infrastructure. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 393–402.
McIntosh, G and Sloan, B (2001) The potential impact of electronic procurement and global sourcing within the UK construction industry. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 231–40.
McLain, K, Gransberg, D and Loulakis, M (2014) Managing geotechnical risk on US design-build transport projects. Construction Economics and Building, 14(01), 1-19.
Meglin, R (2022) Economic and environmental assessment of a regional construction and building materials industry in Switzerland: An applied combination of material-flow analysis, life-cycle assessment and input-output analysis, Unpublished PhD Thesis, , ETH Zürich.
Mejlænder-Larsen, & (2017) Using a change control system and building information modelling to manage change in design. Architectural Engineering and Design Management, 13(01), 39–51.
Mejlænder-Larsen, & (2019) A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering, Construction and Architectural Management, 26(04), 648–67.
Melbourne, R E (1996) Advance base construction by civilian contractors in war zones, Unpublished PhD Thesis, , University of Southern California.
Mengistu, D G, Ashene, D A and Halabo, H A (2024) Technology and innovation development in Ethiopian construction industry: the challenges and improvement mechanisms. Journal of Engineering, Design and Technology, 22(06), 1936–57.
Mengistu, D G, Beyene, M M and Wudineh, T A (2024) Public procurement practice to enhance technology and innovation development in Ethiopian construction industry. International Journal of Construction Management, 24(10), 1145–54.
Merna, A and Smith, N J (1994) Concession contracts for power generation. Engineering, Construction and Architectural Management, 1(01), 17–27.
Messah, Y, Wirahadikusumah, R and Abduh, M (2023) Structural equation model (SEM) of the factors affecting sustainable procurement for construction work. International Journal of Construction Management, 23(13), 2221–9.
Mestizo Reyes, R D (2018) Political risk and success factors in public-private partnerships at the subnational level: The case of road infrastructure concessions, Unpublished PhD Thesis, , Pontificia Universidad Catolica del Peru (Peru).
Metham, M, Benjaoran, V and Sedthamanop, A (2022) An evaluation of green road incentive procurement in road construction projects by using the AHP. International Journal of Construction Management, 22(03), 501-13.
Micelli, E (2000) Mobilizing the skills of specialist firms to reduce costs and enhance performance in the European construction industry: two case studies. Construction Management and Economics, 18(06), 651-6.
Mickovski S B, Black J D and Smith M J (2013) Innovative use of ECC (NEC3) for procurement and management of infrastructure projects with limited funding: Bervie Braes case study. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 799–808.
Migliaccio, G C (2007) Planning for strategic change in the project delivery strategy, Unpublished PhD Thesis, , University of Texas at Austin.
Milani, B (2005) Building materials in a green economy: Community-based strategies for dematerialization, Unpublished PhD Thesis, , University of Toronto.
Miller, D P (2009) Essays on subcontracting, competitive bidding, and dynamic housing demand, Unpublished PhD Thesis, , University of Minnesota.
Miller, J B (1995) Aligning infrastructure development strategy to meet current public needs, Unpublished PhD Thesis, , Massachusetts Institute of Technology.
Miller, J B and Evje, R H (1999) The practical application of delivery methods to project portfolios. Construction Management and Economics, 17(05), 669-77.
Miller, S and Dorée, A (2008) Improving logistics in the asphalt paving process: what can we learn from the planner's logic?. In: Dainty, A (Ed.), Proceedings 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK. Association of Researchers in Construction Management, Vol. 1, 381–90.
Millett, S J, Dainty, A R J and Briscoe, G H (2001) Client procurement strategies: a cross-sectoral analysis. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 907–15.
Mills, A J (2002) Client and contractor attitudes to prequalification and selection processes for construction work, Unpublished PhD Thesis, , University of Melbourne.
Mills, A, Maqsood, T, Khalfan, M and Walker, D (2011) Infrastructure development using alliances: Lessons and observations. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 911–20.
Milner, A (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Mirzaee, A M, Pourrostam, T, Majrouhi Sardroud, J, Hosseini, M R, Rahnamayiezekavat, P and Edwards, D (2024) Dispute root causes and prevention in Iranian public-private partnership projects: a causal-predictive model. Engineering, Construction and Architectural Management, 31(01), 405-31.
Mistry, D and Davis, P R (2009) A client's perspective of critical success factors in project alliances. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 1, 217–6.
Mitchell, A, Frame, I, Coday, A and Hoxley, M (2011) A conceptual framework of the interface between the design and construction processes. Engineering, Construction and Architectural Management, 18(03), 297–311.
Mohamad Kamar, K A (2011) Critical success factors to industrialised building system contractor, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Mohamed, E, Jafari, P and Hammad, A (2022) Mixed qualitative–quantitative approach for bidding decisions in construction. Engineering, Construction and Architectural Management, 29(06), 2328-57.
Mohsini, R A and Davidson, C H (1992) Determinants of performance in the traditional building process. Construction Management and Economics, 10(04), 343-59.
Mojtahedi, S and Oo, B L (2012) Stakeholders’ approaches towards natural disasters in built environment: a theoretical framework. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 133–42.
Molaei, M, Koops, L and Hermans, M (2022) Evaluating the Procurement Documents of Dutch Water Boards Portfolio: A Step Towards More Reliable Public Clients. In: Tutesigensi, A and Neilson, C J (Eds.), Proceedings 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK. Association of Researchers in Construction Management, 114-123.
Molenaar, K R (1997) Public sector design-build: A model for project selection, Unpublished PhD Thesis, , University of Colorado at Boulder.
Molenaar, K R and Songer, A D (1998) Model for Public Sector Design-Build Project Selection. Journal of Construction Engineering and Management, 124(06), 467–79.
Molwus, J J (2014) Stakeholder management in construction projects: a life cycle based framework, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.
Monahan, J, Coates, R and Clarke-Hagan, D (2014) Overcoming the barriers of green innovation in construction projects through its successful management. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 123–32.
Moncaster, A (2012) Constructing sustainability: connecting the social and the technical in a case study of school building projects, Unpublished PhD Thesis, School of Environmental Sciences, University of East Anglia.
Montalbán-Domingo, L, Torres-Machi, C, Sanz-Benlloch, A, Pellicer, E and Molenaar, K R (2023) Green public procurement in civil infrastructure construction: Current performance and main project characteristics. Journal of Construction Engineering and Management, 149(09).
Monyane, T G (2019) A lean-led-evaluation of infrastructure development improvement programme in South Africa, Unpublished PhD Thesis, , Nelson Mandela University.
Moore, D R and Abadi, M (2005) Virtual team working and associated technologies within the UK construction industry. Architectural Engineering and Design Management, 1(01), 21-32.
Moore, D R and Dainty, A R J (2001) Intra-team boundaries as inhibitors of performance improvement in UK design and build projects: a call for change. Construction Management and Economics, 19(06), 559-62.
Moore, D R and Dainty, A R J (2000) Work-Group Communication Patterns in Design and Build Project Teams: An Investigative Framework. Journal of Construction Procurement, 6(01), 44–55.
Mootanah, D P (1998) The effective management of risk in concession projects. Journal of Financial Management of Property and Construction, 3(02), 27–40.
Morgan, C, Foster, J A, Poston, A and Sharpe, T R (2017) Overheating in Scotland: Contributing factors in occupied homes. Building Research & Information, 45(01), 143-56.
Morimoto, E and Arai, K (2024) Public procurement and business performance in COVID-19 situation: Decline in firms' entry. International Journal of Construction Management, 24(14), 1589–98.
Morledge, R and Owen, K (1998) Critical success factors in PFI projects. In: Hughes, W (Ed.), Proceedings 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK. Association of Researchers in Construction Management, Vol. 2, 565–74.
Morrissey, D, Goodier, C and Demian, P (2024) Offsite Construction in Ireland’s Hospitals: Unveiling the Complexities of OSC Adoption. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK. Association of Researchers in Construction Management, 497-506.
Moselhi, O and Deb, B (1993) Project selection considering risk. Construction Management and Economics, 11(01), 45-52.
Moses, T, Heesom, D and Oloke, D (2020) Implementing 5D BIM on construction projects: contractor perspectives from the UK construction sector. Journal of Engineering, Design and Technology , 18(06), 1867–88.
Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(06), 1004-17.
Mosley, J C and Bubshait, A A (2021) Investigative study of project procurement methods and project performance indicators in Saudi Arabia. International Journal of Construction Management, 21(08), 845-57.
Muhammad Ridwan Andi, P, Adhe Rizky, A, Salvia, F A and Abdullah, A (2021) A novel optimisation model in the collaborative supply chain with production time capacity consideration. Journal of Engineering, Design and Technology, 19(03), 647-58.
Mukwanason, D E, Tutesigensi, A, Kayondo, M and Mutikanga, H E (2023) Impact of Project Quality Culture on Defects in Infrastructure Projects. In: Tutesigensi, A and Neilson, C J (Eds.), Proceedings 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK. Association of Researchers in Construction Management, 639-648.
Mulholland, S M (2021) Incentivizing effort in highly collaborative construction and design teams, Unpublished PhD Thesis, , University of Colorado at Denver.
Mulville, M, Jones, K and Huebner, G (2014) The potential for energy reduction in UK commercial offices through effective management and behaviour change. Architectural Engineering and Design Management, 10(01), 79-90.
Murguia, D, Demian, P and Soetanto, R (2023) The role of the industry's cultural-cognitive elements on actors' intention to adopt BIM: an empirical study in Peru. Engineering, Construction and Architectural Management, 30(03), 1183-200.
Muriro, A (2015) Design and build procurement method in practice: key challenges and practice based enablers, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Murphy, M and Eadie, R (2019) Socially responsible procurement. Built Environment Project and Asset Management, 9(01), 138–52.
Murphy, M E, Perera, S and Heaney, G (2015) Innovation management model: a tool for sustained implementation of product innovation into construction projects. Construction Management and Economics, 33(03), 209-32.
Murray, A (2018) Returns on public capital investment: Procurement, whole life cost and value in English schools and hospitals, from 1997-2012, Unpublished PhD Thesis, , University College London (University of London).
Murray, M D and Langford, D A (1998) Construction procurement systems: a linkage with project organizational models. In: Hughes, W (Ed.), Proceedings 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK. Association of Researchers in Construction Management, Vol. 2, 544–52.
Murray, M D, Tookey, J E, Langford, D A and Hardcastle, C (2000) Project communication variables: a comparative study of US and UK construction industry perceptions. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 813–22.
Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry, Unpublished PhD Thesis, , Nottingham Trent University.
Musonda, I and Gambo, N (2021) Mediation effect of partnership on procurement strategy factors influencing sustainable smart housing development, Nigeria. Built Environment Project and Asset Management, 11(03), 454-67.
Mustaffa, N E and Bowles, G (2004) Dispute avoidance mechanism in partnering arrangements. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 721–30.
Mustaffa, N E and Bowles, G (2005) Investigating the "hard" and "soft" issues of problem resolution in partnering: defining the research boundaries. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 2, 1153–63.
Mwanaumo, E M (2013) An integrated approach to multi-stakeholder interventions in construction health and safety, Unpublished PhD Thesis, , University of Johannesburg (South Africa).
Mwelu, N (2020) Compliance and regulatory framework in public procurement of public road construction projects in Uganda, Unpublished PhD Thesis, , University of Newcastle (Australia).
Mwelu, N, Davis, P R, Ke, Y, Watundu, S and Jefferies, M (2021) Success factors for implementing Uganda's public road construction projects. International Journal of Construction Management, 21(06), 598-614.
Mwelu, N, Davis, P, R, Ke, Y and Watundu, S (2018) Compliance within a Regulatory Framework in Implementing Public Road Construction Projects . Construction Economics and Building, 18(04), 1-23.
Mwelu, N, Watundu, S and Moya, M (2024) Demand Side Perception on Success Factors for Implementing Public Road Construction Projects. Journal of Construction in Developing Countries, 29(01), 1-22.
Myers, H, Wade, F and Webb, J (2019) Mapping Emerging Subcontracting Networks for the Energy Efficiency Retrofit of Hard-to-Treat Buildings. In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 852-861.
Nabi, M A, El-Adaway, I H and Assaad, R H (2024) Modeling inflation transmission among different construction materials. Journal of Construction Engineering and Management, 150(05).
Naismith, N, Price, A D F, Dainty, A R J, Bryman, A, Greasley, K and Soetanto, R (2005) Engendering trust in the construction supply chain. Journal of Construction Procurement, 11(02).
Naji, K K, Gunduz, M and Hamaidi, M F (2022) Major Factors Affecting Construction Waste Management in Infrastructure Projects Using Structural Equation Model. Journal of Construction Engineering and Management, 148(10).
Naji, K K, Gunduz, M and Naser, A F (2022) The Effect of Change-Order Management Factors on Construction Project Success: A Structural Equation Modeling Approach. Journal of Construction Engineering and Management, 148(09).
Naji, K, Gunduz, M and Salat, F (2021) Assessment of preconstruction factors in sustainable project management performance. Engineering, Construction and Architectural Management, 28(10), 3060-77.
Nam, C H and Tatum, C B (1992) Government‐Industry Cooperation: Fast‐Track Concrete Innovation. Journal of Construction Engineering and Management, 118(03), 454–71.
Naouin, S G and Langford, D (1987) Management Contracting—The Client's View. Journal of Construction Engineering and Management, 113(03), 369–84.
Naoum, S G (1989) An investigation into the performance of management contracts and the traditional methods of building procurement, Unpublished PhD Thesis, Department of Mechanical Aerospace and Civil Engineering, Brunel University.
Naoum, S G (1994) Critical Analysis of Time and Cost of Management and Traditional Contracts. Journal of Construction Engineering and Management, 120(04), 687–705.
Naoum, S G and Hackman, J (1996) Do site managers and the head office perceive productivity factors differently?. Engineering, Construction and Architectural Management, 3(01), 147–60.
Naoum, S G and Mustapha, F H (1995) Relationship between the building team, procurement methods and project performance. Journal of Construction Procurement, 1(01), 50–63.
Nawaz, A and Guribie, F L (2024) Impacts of institutional isomorphism on the adoption of social procurement in the Chinese construction industry. Construction Innovation, 24(03), 846-62.
Ndekugri, I and Turner, A (1994) Building Procurement by Design and Build Approach. Journal of Construction Engineering and Management, 120(02), 243–56.
Ndekugri, I, Smith, N and Hughes, W (2007) The engineer under FIDIC's conditions of contract for construction. Construction Management and Economics, 25(07), 791–9.
Nesan Lenin, J (2011) Integrated e-bidding framework for construction. International Journal of Construction Education and Research, 7(04), 243–58.
Neuman, Y, Alves, T d C L, Walsh, K D and Needy, K L (2015) Quantitative Analysis of Supplier Quality Surveillance Practices in EPC Projects. Journal of Construction Engineering and Management, 141(11).
Newcombe, R (2000) An Investigation into Simulating the Procurement Process in the United Kingdom Construction Industry. Journal of Construction Procurement, 6(02).
Newcombe, R (1999) Procurement as a learning process. Journal of Construction Procurement, 5(02), 211–20.
Newton, A J (1995) The planning and management of detailed building design, Unpublished PhD Thesis, , Loughborough University.
Ng, F P, Björnsson, H C and Chiu, S S (2004) Valuing a price cap contract for material procurement as a real option. Construction Management and Economics, 22(02), 141-50.
Ng, S T, Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(01), 46–60.
Ng, S T, Luu, D T, Chen, S E and Lam, K C (2002) Fuzzy membership functions of procurement selection criteria. Construction Management and Economics, 20(03), 285-96.
Ng, S T, Skitmore, M R and Smith, N J (1999) Decision-makers' perceptions in the formulation of pre-qualification criteria. Engineering, Construction and Architectural Management, 6(02), 155–65.
Ng, T, Luu, C and Skitmore, M (2005) Capitalising experiential knowledge for guiding construction procurement selection. Construction Economics and Building, 5(01), 32-40.
Ng, T, Luu, D and Chen, S (2002) Decision criteria and their subjectivity in construction procurement selection. Construction Economics and Building, 2(01), 70-80.
Ngoma, S, Mundia, M and Kaliba, C (2014) Benefits, constraints and risks in infrastructure development via public-private partnerships in Zambia. Journal of Construction in Developing Countries, 19(1), 15-33.
Ngowi, A B (1997) Impact of culture on construction procurement. Journal of Construction Procurement, 3(01), 3–15.
Ngowi, A B (1998) Is construction procurement a key to sustainable development?. Building Research & Information, 26(06), 340–50.
Nguyen Chau, T, Pham, T T T, Ha, T C V and Nguyen, D (2024) Corruption, market structure, and industry competition in the Vietnamese construction sector. Construction Management and Economics, 42(01), 54–69.
Nguyen Van, D, Le Dinh, T and Tran, H-B (2022) Assessing stakeholder satisfaction in PPP transport projects in developing countries: evidence from Vietnam. Built Environment Project and Asset Management, 12(02), 309-24.
Nguyen, D T and Le, P L (2022) Twenty-year application of logistics and supply chain management in the construction industry. Construction Management and Economics, 40(10), 796–834.
Nguyen, H T and Hadikusumo, B (2017) Impacts of human resource development on engineering, procurement, and construction project success. Built Environment Project and Asset Management, 7(01), 73-85.
Nguyen, H T and Hadikusumo, B H (2018) Human resource related factors and engineering, procurement, and construction (EPC) project success. Journal of Financial Management of Property and Construction, 23(01), 24–39.
Nguyen, P H D, Lines, B C and Tran, D Q (2018) Best-Value Procurement in Design-Bid-Build Construction Projects: Empirical Analysis of Selection Outcomes. Journal of Construction Engineering and Management, 144(10).
Nibbelink, J, Sutrisna, M and Zaman, A U (2017) Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects – a Western Australian perspective. Architectural Engineering and Design Management, 13(06), 439–56.
Nilsson Vestola, E, Larsson, J and Hedgren, E (2025) Public clients pursue innovation, but what’s going on at the project level? A case study of infrastructure operation and maintenance. Construction Management and Economics, 43(01), 26–39.
Nimesha Sahani, J, Chan, D W M and Kumaraswamy, M (2021) A systematic literature review and analysis towards developing PPP models for delivering smart infrastructure. Built Environment Project and Asset Management, 11(01), 121-37.
Nkado, R N and Mbachu, J I (2001) Modelling client needs and satisfaction in the built environment. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 917–27.
Noor, R N H R M, Ibrahim, C K I C and Belayutham, S (2021) Making sense of multi-actor social collaboration in building information modelling level 2 projects: A case in Malaysia. Construction Economics and Building, 21(04), 89-114.
Nyagormey, J J, Baiden, B K, Nani, G and Adinyira, E (2022) Review on criteria for evaluating unsolicited public-private partnership PPP proposals from 2004 to 2018. International Journal of Construction Management, 22(12), 2243-57.
Nyamagere Gladys, S, Rwelamila, P D and Gimbi, J J (2022) A conceptual framework for managing post-disaster reconstruction projects in emerging economies: the case of Angola. Built Environment Project and Asset Management, 12(02), 205-22.
O'Connor, J T, Rusch, S E and Schulz, M J (1987) Constructability Concepts for Engineering and Procurement. Journal of Construction Engineering and Management, 113(02), 235–48.
O’Connor, J T, O’Brien, W J and Choi, J O (2014) Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization. Journal of Construction Engineering and Management, 140(06).
Obieje, I D (2019) Improving the achievement of value for money in construction procurement under the Nigerian Public Procurement Act (2007), Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Obiozo, R N (2018) The role of psychosocial recuperative therapy in enhancing construction performance on projects, Unpublished PhD Thesis, , Nelson Mandela University.
Obonyo, E A (2004) APRON: agent-based specification and procurement of construction products, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Obonyo, E, Anumba, C and Thorpe, T (2005) APRON: an agent-based specification and procurement system for construction products. Engineering, Construction and Architectural Management, 12(04), 329–50.
Odeyinka, H A (2007) Modelling risk impacts on the budgeted cost of traditionally procured building projects. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 2, 755–63.
Odeyinka, H A and Kaka, A (2005) An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(03), 171–80.
Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 2, 557–65.
Odiba, E (2018) A model for effective quality management practices in construction organisations: The case of Nigeria, Unpublished PhD Thesis, , Loughborough University.
Ofori, G (2003) Preparing Singapore's construction industry for the knowledge-based economy: practices, procedures and performance. Construction Management and Economics, 21(02), 113-25.
Ofori, G, Dulaimi, M F and Ling, F Y Y (2004) Improving performance of construction industry in Singapore: motivators, enablers and lessons for developing countries. Journal of Construction Research, 5(02), 267–89.
Ogbeifun, E, Mbohwa, C and Pretorius, J H C (2018) Fragmentation of Capital Development Projects: A Tool for Job Creation and Skill Development. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 707–716.
Ogbu, C P and Asuquo, C F (2019) Taxonomy of indigenous construction firms in south-south nigeria. Journal of Construction in Developing Countries, 24(2), 189-206.
Ogunlana, S O (1999) Procurement lessons from Solomon's temple project. Journal of Construction Procurement, 5(02), 187–96.
Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria, Unpublished PhD Thesis, , University of Newcastle (Australia).
Ogunnusi, M, Salman, H and Laing, R (2023) TOPSIS analysis for sustainable redevelopment potential of abandoned infrastructure in Nigeria. Built Environment Project and Asset Management, 13(01), 73-88.
Ogunsanya, O A (2018) Integrated sustainable procurement model for the Nigerian construction industry, Unpublished PhD Thesis, , University of Johannesburg (South Africa).
Ogunsanya, O A, Aigbavboa, C O and Thwala, D W (2023) Sustainable procurement model for publicly funded construction projects in developing nations–a structural equation modeling approach. International Journal of Construction Management, 23(03), 449–61.
Ogunsanya, O A, Aigbavboa, C O, Thwala, D W and Edwards, D J (2022) Barriers to sustainable procurement in the Nigerian construction industry: An exploratory factor analysis. International Journal of Construction Management, 22(05), 861-72.
Ojo, A, Ogunsina, O and Ogunsemi, D R (2022) Assessment of cost management practices of civil engineering (project procurement) organisations in Ondo State, Nigeria. Journal of Financial Management of Property and Construction, 27(01), 57-75.
Ojo, S O, Adeyemi, O Y and Ikpo, I J (2000) Effects of procurement methods on clients objectives of time and cost in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 5(01), 105–8.
Ojuri, O B (2020) Prescribing social value co-creation in networks for the Nigerian water supply sector, Unpublished PhD Thesis, Bartlett School of Construction and Project Management, University College London.
Oke, A E, Ogunsemi, D R and Adeyelu, M (2019) Quadrant and gap analysis of required and exhibited quantity surveyors’ competencies. Journal of Engineering, Design and Technology , 17(06), 1161–73.
Oke, A E, Ogunsemi, D R and Adeyelu, M F (2018) Quantity surveyors and skills required for procurement management. International Journal of Construction Management, 18(06), 507-16.
Oko, J A (2008) Ethical behaviour of Nigerian building industry professionals in the procurement of building projects, Unpublished PhD Thesis, , University of Lagos.
Okoro, C, Nnaji, C, Chileshe, N and Tembo, J (2023) Perceptions of public-private partnerships transportation project success factors in developing countries: An explanatory sequential investigation. Journal of Construction in Developing Countries, 28(2), 295-327.
Oladiran, O J, Bayewun, A A and Aderogba, A M (2021) Awareness and usage of environmental waste management practices of contractors on construction sites. Journal of Construction Business and Management, 5(1), 17-27.
Olatunde, N A (2024) Stakeholder management strategies employed on building projects procured by private corporate organisations in south-western Nigeria. International Journal of Building Pathology and Adaptation, 42(03), 430-47.
Olatunde, N A, Fidelis, I M, Awodele, I A and Adebayo, B O (2024) Stakeholders prioritization of key performance indicators on public and private tertiary educational projects in Osun State, Nigeria. International Journal of Building Pathology and Adaptation, 42(05), 881–92.
Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(01), 60–79.
Olatunji, O A and Ramanayaka, C E D (2023) Client attributes that motivate contractors' bid decision. Built Environment Project and Asset Management, 13(06), 799-812.
Olayinka, R A (2015) A knowledge management framework for reducing the cost of poor quality on construction projects, Unpublished PhD Thesis, School of Technology, University of Wolverhampton.
Oliver, M (2013) Evaluation of the planning and implementation of NHS Local Improvement Finance Trust (LIFT) in East London, Unpublished PhD Thesis, , University of East London.
Oliveros-Romero, J and Aibinu, A A (2023) Ex-post impact evaluation of PPP projects from multiple stakeholder perspectives: a toll road case. Built Environment Project and Asset Management, 13(04), 574-89.
Oliveros-Romero, J and Paton-Cole, V P (2023) Infrastructure development: reflections on Sierra Leone infrastructure scheme and the Lungi Bridge project. Journal of Financial Management of Property and Construction, 28(01), 127-44.
Olojede, B O, Opawole, A, Jagboro, G O and Alao, O O (2023) Examination of roles performed by public sector organizations in the procurement of public-private partnership projects. International Journal of Building Pathology and Adaptation, 41(02), 495-511.
Olowoake, M A O (2015) A theoretical framework to support facilities maintenance management of higher education institutions buildings in Nigeria, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Olsen, J, Lee, Z-H and Pong, W (2007) Optimal selection of concrete anchors for connection cost reduction. Construction Management and Economics, 25(04), 423–34.
Olugboyega, O, Oseghale, G E and Aigbavboa, C (2023) Multiple holistic case study of project-level building information modelling (BIM) adoption in Nigeria. Construction Innovation, 23(03), 567-86.
Omar, N (2022) Enhancing agile application in construction projects using BIM, Unpublished PhD Thesis, , Heriot-Watt University.
Omoregie, A and Radford, D (2006) Polycentric cultural framework for infrastructure procurement in Nigeria. In: Boyd, D (Ed.), Proceedings 22nd Annual ARCOM Conference, 4-6 September 2006 Birmingham, UK. Association of Researchers in Construction Management, Vol. 1, 383–92.
Oo B, L (2017) Release of Construction Clients’ Pre-tender Cost Estimates: An Experimental Study . Construction Economics and Building, 17(04), 37-47 .
Oo, B L and Tang, O S (2023) Information feedback in construction contract bidding: Perceptions of Hong Kong contractors. International Journal of Construction Management, 23(06), 1044–52.
OO, B L, Abdul-Aziz, A-R and Lim, Y M (2011) Information feedback and learning in construction bidding. Construction Economics and Building, 11(03), 34-44.
Oo, Bee Lan, Yean, F, Ling, Y, Soo, A (2015) Construction Procurement: Modelling Bidders’ Learning in Recurrent Bidding . Construction Economics and Building, 15(04), 16-29.
Opawole, A and Jagboro, G O (2017) Factors affecting the performance of private party in concession-based PPP projects in Nigeria. Journal of Engineering, Design and Technology, 15(01), 44-57.
Opawole, A, Alao, O O, Yusuf, A O, Adu, E T and Ofoetan, M A (2022) Evaluation of compliance of concreting materials to standards in building projects in Lagos State, Nigeria. Journal of Construction Business and Management, 5(2), 1-19.
Opawole, A, Babatunde, S O, Kajimo-Shakantu, K and Ateji, O A (2020) Analysis of barriers to the application of life cycle costing in building projects in developing countries. Smart and Sustainable Built Environment, 9(04), 503–21.
Opawole, A, Kajimo-Shakantu, K, Alao, O O and Ogbaje, C P (2019) Risk factors associated with procuring university hostel facilities through build-operate-transfer model. Journal of Engineering, Design and Technology, 17(01), 136–54.
Opoku, A (2016) SDG2030: A Sustainable Built Environment's Role in Achieving the Post-2015 United Nations Sustainable Development Goals . In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 1101–1110.
Opoku, A and Ibrahim-Adam, R (2018) Early Contractor Involvement in Government Construction Projects in Ghana. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 199–208.
Osaily, Y (2021) Guidance for advancing demolition project management in the UK, Unpublished PhD Thesis, , University of Bath.
Osaily, Y, Copping, A and Lo, S (2018) Critical Success Factors: The Development of a Conceptual Framework for Demolition Projects. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 209–218.
Osama, M and Zafar, K (2010) Analysis of labour productivity of formwork operations in building construction. Construction Innovation, 10(03), 286–303.
Osei-Appiah, V K, Kissi, E, Karikari, V A, Ayeng, P, Danquah-Smith, E and Adesi, M (2024) Assessing the impact of early supplier involvement on public works procurement. Journal of Financial Management of Property and Construction, 29(02), 229-49.
Osei-Kyei, R and Chan, A P C (2017) Implementing public-private partnership (PPP) policy for public construction projects in Ghana: Critical success factors and policy implications. International Journal of Construction Management, 17(02), 113-23.
Osipova, E (2013) On enhancing joint risk management throughout a project's lifecycle: Empirical studies of Swedish construction projects, Unpublished PhD Thesis, , Luleå University of Technology.
Osipova, E and Eriksson, P E (2011) How procurement options influence risk management in construction projects. Construction Management and Economics, 29(11), 1149–58.
Osipova, E and Eriksson, P E (2009) The effects of procurement procedures on joint risk management. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 2, 1305–14.
Osuizugbo, I C, Okolie, K C, Oshodi, O S and Oyeyipo, O O (2023) Buildability in the construction industry: a systematic review. Construction Innovation, 23(05), 1300-22.
Othman, A A, Rahman, S A, Sundram, V P K and Bhatti, M A (2015) Modelling marketing resources, procurement process coordination and firm performance in the Malaysian building construction industry. Engineering, Construction and Architectural Management, 22(06), 644-68.
Otim, M A, Kyalisiima, C, Tutesigensi, A, Mutikanga, H E and Kayondo, M (2023) Avoiding Disputes Through Effective Procurement in Large Construction Projects. In: Tutesigensi, A and Neilson, C J (Eds.), Proceedings 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK. Association of Researchers in Construction Management, 44-53.
Ottou, J A, Baiden, B K, Nani, G and Martin Morgan, T (2021) Benefits of implementing Six Sigma in competitive tendering process. Built Environment Project and Asset Management, 11(02), 214-30.
Owen, K J (2002) Success factors in the procurement of privately financed tolled transportation infrastructure projects in the UK, Unpublished PhD Thesis, School of Property and Construction, Nottingham Trent University.
Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study, Unpublished PhD Thesis, , University of Maryland, College Park.
Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(01), 96–113.
Oyegoke, A S (2006) Construction industry overview in the UK, US, Japan and Finland: a comparative analysis. Journal of Construction Research, 7(01), 13–31.
Oyegoke, A S, Ajayi, S, Abbas, M A and Ogunlana, S (2024) Development of Adapt-ABLE smart system: An end-to-end system for speeding up disabled housing adaptation process. International Journal of Building Pathology and Adaptation, 42(04), 531-52.
Oyegoke, S A (2007) Specialist task organisations procurement approach for re-engineering construction project processes , Published PhD Thesis, Department of Civil and Environmental Engineering , Helsinki University of Technology.
Oyemomi, B, Hare, B and Tong, M (2018) Exploring Public-Private Partnership Challenges and the Effects on the Construction Workforce: A Scotland Study. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 403–412.
Oyetunji, A A and Anderson, S D (2006) Relative Effectiveness of Project Delivery and Contract Strategies. Journal of Construction Engineering and Management, 132(01), 3–13.
Pachnou, D (2003) The effectiveness of bidder remedies for enforcing the EC public procurement rules: a case study of the public works sector in the United Kingdom and Greece, Unpublished PhD Thesis, School of Law, University of Nottingham.
Paek, J H, Lee, Y W and Napier, T R (1992) Selection of Design/Build Proposal Using Fuzzy‐Logic System. Journal of Construction Engineering and Management, 118(02), 303–17.
Pahwa, J S (2009) MDSSF: a federated architecture for product procurement, Unpublished PhD Thesis, School of Computer Science & Informatics, Cardiff University.
Painting, N, Ashton, P and Gidado, K (2004) PFI in south aast England secondary schools: a school manager's perspective. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 649–59.
Pala, M (2018) Implementing inter-organisational information systems for the integration of construction supply chains , Unpublished PhD Thesis, School of Architecture, Building and Civil Engineering, Loughborough University.
Palaneeswaran, E and Kumaraswamy, M M (2000) Contractor Selection for Design/Build Projects. Journal of Construction Engineering and Management, 126(05), 331–9.
Palaneeswaran, E, Kumaraswamy, M and Ng, T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor selection. Engineering, Construction and Architectural Management, 10(6), 418–31.
Palaneeswaran, E, Kumaraswamy, M M and Ng, S T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor. Engineering, Construction and Architectural Management, 10(06), 418–31.
Pan, J, Anumba, C J and Ren, Z (2004) Potential application of the semantic web in construction. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 2, 923–9.
Pan, W (2006) A decision support tool for optimising the use of offsite technologies in housebuilding, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Pan, W, Dainty, A R J and Gibb, A G F (2012) Establishing and Weighting Decision Criteria for Building System Selection in Housing Construction. Journal of Construction Engineering and Management, 138(11), 1239–50.
Pan, W, Gibb, A G F and Dainty, A R J (2007) Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(02), 183–94.
Pan, W, Sidwell, R and Soetanto, R (2009) A longitudinal investigation into utilising crosswall construction for multi-storey residential buildings. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 1, 261–70.
Papadonikolaki, E (2017) Grasping Brutal And Incremental BIM Innovation Through Institutional Logics . In: Chan, P W and Neilson, C J (Eds.), Proceedings 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK. Association of Researchers in Construction Management, 54–63.
Papajohn, D (2019) Contract administration functions and tools for design-build and construction manager/general contractor project delivery in U.S. Highway construction, Unpublished PhD Thesis, , Arizona State University.
Parikka-Alhola, K and Nissinen, A (2012) Environmental impacts of transport as award criteria in public road construction procurement. International Journal of Construction Management, 12(02), 35-49.
Park, J (2011) Best-value in Korean public building construction, Unpublished PhD Thesis, School of Management , University of Southampton.
Park, S H (2009) Whole Life Performance Assessment: Critical Success Factors. Journal of Construction Engineering and Management, 135(11), 1146–61.
Park, S H (2009) Whole life performance tender evaluation for design-build in the Korean public sector, Unpublished PhD Thesis, , University of Reading.
Park, S H and Flanagan, R (2009) Integrating whole life cost into the evaluation of design-build in Korea. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 1, 227–37.
Parmar, D, Kashiwagi, D and Savicky, J (2003) Case study of the Dallas Independent School District’s construction value. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 1, 13–21.
Parvaneh, F and El-Sayegh, S M (2016) Project selection using the combined approach of AHP and LP. Journal of Financial Management of Property and Construction, 21(01), 39-53.
Pasquire, C (1999) The implications of environmental issues on UK construction management. Engineering, Construction and Architectural Management, 6(03), 276–86.
Pasquire, C L (1991) Builders quantities for contractors' management, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Patil, N A and Laishram, B (2016) Public‒private partnerships from sustainability perspective: a critical analysis of the Indian case. International Journal of Construction Management, 16(02), 161-74.
Patil, N A and Laishram, B S (2016) Sustainability of Indian PPP procurement process: Development of strategies for enhancement. Built Environment Project and Asset Management, 6(05), 491-507.
Pavitt, T C and Gibb, A G F (2003) Interface Management within Construction: In Particular, Building Facade. Journal of Construction Engineering and Management, 129(01), 8–15.
Pavitt, T C and Gibb, A G F (1999) Managing organizational interfaces in the cladding supply chain: initial results from expert interviews. In: Hughes, W (Ed.), Proceedings 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK. Association of Researchers in Construction Management, Vol. 2, 519–28.
Payne, H (1997) Key legal issues in projects procured under the private finance initiative. Engineering, Construction and Architectural Management, 4(03), 195–202.
Pearl, R G, Bowen, P A and Nkado, R N (1997) A communication-based examination of construction planning and tendering. In: Stephenson, P (Ed.), Proceedings 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK. Association of Researchers in Construction Management, Vol. 1, 213–22.
Perdomo-Rivera, J L (2004) A framework for a decision support model for supply chain management in the construction industry, Unpublished PhD Thesis, , Virginia Tech.
Perera, B A K S, Ekanayake, B J, Jayalath, C and Jayathilaka, G R H (2021) A study on variation-specific disputes that arise in road projects in Sri Lanka: A qualitative approach. International Journal of Construction Management, 21(06), 571-81.
Perera, G, Tennakoon, T, Kulatunga, U, Jayasena, H S and Wijewickrama, M (2021) Selecting suitable procurement system for steel building construction. Built Environment Project and Asset Management, 11(04), 611-26.
Perng, Y-H and Chang, C-L (2004) Data mining for government construction procurement. Building Research & Information, 32(04), 38.
Perng, Y-H and Chang, C-L (2004) How does Government Procurement Law affect bidding price competition in Taiwan?. Building Research & Information, 32(06), 497–509.
Perng, Y, Juan, Y and Chien, S (2006) Exploring the Bidding Situation for Economically Most Advantageous Tender Projects Using a Bidding Game. Journal of Construction Engineering and Management, 132(10), 1037–42.
Peters, R, Whitman, P and Hampson, K (2001) Skill development for innovative procurement environments in construction. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 27–36.
Petersen, D and Kadefors, A (2016) Social Procurement and Employment Requirements in Construction. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 997–1006.
Pettit, J H (2000) Clients: their role in the procurement of infrastructure projects, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Pham Van, B and Peansupap, V (2024) Confirmatory analysis on factors influencing the material management effectiveness in construction projects. Engineering, Construction and Architectural Management, 31(06), 2536-62.
Phillips, S, Martin, J, Dainty, A and Price, A (2007) Uncertainty in best value decision making. Journal of Financial Management of Property and Construction, 12(02), 72.
Phillips, S, Price, A and Dainty, A (2004) Achieving best value in social housing procurement. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 639–47.
Phua, F T T (2006) When is construction partnering likely to happen? An empirical examination of the role of institutional norms. Construction Management and Economics, 24(06), 615-24.
Phua, F T T and Rowlinson, S (2003) Cultural differences as an explanatory variable for adversarial attitudes in the construction industry: the case of Hong Kong. Construction Management and Economics, 21(07), 777-85.
Pietroforte, R and Miller, J B (2002) Procurement methods for US infrastructure: historical perspectives and recent trends. Building Research & Information, 30(06), 425–35.
Pietroforte, R and Tangerini, P (1999) From boom to bust: the case of Italian construction firms. Construction Management and Economics, 17(04), 419-25.
Ping Ho, S, Lin, Y-H, Wu, H-L and Chu, W (2009) Empirical test of a model for organizational governance structure choices in construction joint ventures. Construction Management and Economics, 27(03), 315–24.
Pipattanapiwong, J and Watanabe, T (2000) Multi-party risk management process (MRMP) for a construction project financed by an international lender. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 219–28.
Pishdad-Bozorgi, P, de la Garza, J M and Austin, R B (2016) Readiness Assessment for Flash Tracking. Journal of Construction Engineering and Management, 142(12).
Plantinga H E C and Dor_e A G (2013) Project alliances: an investigation into the logic behind the range of a Dutch public sector client's initiatives. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 789–798.
Plantinga, H E C, Voordijk, J T and Dorée, A G (2014) Assessing qualification systems: the relevance of explicating implicit reasoning. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 393–402.
Plantinga, H, Voordijk, H and Doree, A (2019) The reasoning behind infrastructure manager’s choice of procurement instruments. Engineering, Construction and Architectural Management, 26(02), 303–20.
Platten, A and Gorse, C (2010) Supply chain development for major public sector projects. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 1, 695–704.
Pollington, C (1999) Legal and procurement practices for sustainable development. Building Research & Information, 27(06), 410–2.
Pongpeng, J and Liston, J (2003) Contractor ability criteria: a view from the Thai construction industry. Construction Management and Economics, 21(03), 267-82.
Poon, C S, Yu, A T W and Jaillon, L (2004) Reducing building waste at construction sites in Hong Kong. Construction Management and Economics, 22(05), 461-70.
Poon, J (2004) Development of an expert system modelling the construction process. Journal of Construction Research, 5(01), 125–38.
Poon, J L K (2001) Development of a process model for the design stage of building projects, Unpublished PhD Thesis, School of Engineering and the Built Environment, University of Wolverhampton.
Poon, J, Potts, K and Cooper, P (1999) Development of a new best practice model for building projects. In: Hughes, W (Ed.), Proceedings 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK. Association of Researchers in Construction Management, Vol. 2, 705–14.
Potts, K and Wall, M (2002) Managing the commissioning of building services. Engineering, Construction and Architectural Management, 9(04), 336–44.
Potts, M (2017) A participatory study into the creation of a new infrastructure delivery system in the regulated UK water sector, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Preece, C, Moodley, K and Hyde, J (2000) Knowledge management strategies to improve construction business development processes: a preliminary case study. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 325–34.
Price, D A (2003) Community involvement in the design of social housing, Unpublished PhD Thesis, Department of Town and Regional Planning, University of Sheffield.
Priemus, H (2004) Dutch contracting fraud and governance issues. Building Research & Information, 32(04), 306–12.
Proverbs, D G and Holt, G D (2000) A theoretical model for optimum project (time) performance based on European best practice. Construction Management and Economics, 18(06), 657-65.
Pryke, S and Pearson, S (2006) Project governance: case studies on financial incentives. Building Research & Information, 34(06), 534–45.
Pryke, S D (2004) Analysing construction project coalitions: exploring the application of social network analysis. Construction Management and Economics, 22(08), 787-97.
Pryke, S D (2004) Analytical methods in construction procurement and management: a critical review. Journal of Construction Procurement, 10(01).
Pryke, S D (2005) Towards a social network theory of project governance. Construction Management and Economics, 23(09), 927-39.
Pryke, S D (2002) UK construction in transition: developing a social network approach to the evaluation of new procurement and management strategies, Unpublished PhD Thesis, Bartlett School of Construction and Project Management, University College London.
Pu, W, Xu, F and Marques, R C (2021) A bibliometric and meta-analysis of studies on public–private partnership in China. Construction Management and Economics, 39(09), 773–89.
Pu, W, Xu, F, Chen, R and Marques, R C (2020) PPP project procurement model selection in China: does it matter?. Construction Management and Economics, 38(02), 126–39.
Quigley, D, Heaney, G and Odeyinka, H (2012) Factors of sustainability in building design: Establishing their relative significance. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 1299–309.
Quirke, P and Wall, J (2007) The use of Public Private Partnerships in the delivery of capital projects in higher education in Ireland. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 2, 683–92.
Rahman, A (2014) The determinants of multinational contractors' willingness to bid for Australian public sector major infrastructure projects: deploying the eclectic paradigm of internationalisation, Unpublished PhD Thesis, Civil Engineering and Built Environment School, Queensland University of Technology.
Rahman, M and Alhassan, A (2012) A contractor's perception on early contractor involvement. Built Environment Project and Asset Management, 2(02), 217-33.
Rahman, M M (2003) Revitalising construction project procurement through joint risk management, Unpublished PhD Thesis, , University of Hong Kong (Hong Kong).
Rahman, M M and Kumaraswamy, M M (2005) Assembling integrated project teams for joint risk management. Construction Management and Economics, 23(04), 365-75.
Rahman, M M and Kumaraswamy, M M (2012) Multicountry Perspectives of Relational Contracting and Integrated Project Teams. Journal of Construction Engineering and Management, 138(04), 469–80.
Rahman, M M and Kumaraswamy, M M (2005) Relational Selection for Collaborative Working Arrangements. Journal of Construction Engineering and Management, 131(10), 1087–98.
Rahmani, F (2021) Challenges and opportunities in adopting early contractor involvement (ECI): client’s perception. Architectural Engineering and Design Management, 17(01–02), 67–76.
Rahmani, F, Khalfan, M, M, A and Maqsood, T (2016) Lessons learnt from the use of relationship-based procurement methods in Australia: clients’ perspectives . Construction Economics and Building, 16(02), 1-13.
Rahmani, F, Maqsood, T and Khalfan, M (2017) An overview of construction procurement methods in Australia. Engineering, Construction and Architectural Management, 24(04), 593-609.
Raiden, A and King, A (2023) Added value and numerical measurement of social value: a critical enquiry. Buildings and Cities, 4(01), 767–82.
Raisbeck, P (2024) Australian Architects and Novation: The Public Narratives of Novation Practice . In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK. Association of Researchers in Construction Management, 697-706.
Raisbeck, P (2009) Considering design and ppp innovation: A review of design factors in PPP research. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 1, 239–47.
Raisbeck, P (2017) Tribes, Warlords And Transformers: An Institutional Logics Model Of The Architectural Profession . In: Chan, P W and Neilson, C J (Eds.), Proceedings 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK. Association of Researchers in Construction Management, 471–480.
Raisbeck, P, Duffield, C and Xu, M (2010) Comparative performance of PPPs and traditional procurement in Australia. Construction Management and Economics, 28(04), 345–59.
Raisbeck, P, Millie, R and Maher, A (2010) Assessing integrated project delivery: a comparative analysis of IPD and alliance contracting procurement routes. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 2, 1019–28.
Rajeh, M (2014) Comparative analysis of construction procurement systems based on transaction costs, Unpublished PhD Thesis, , Auckland University of Technology.
Rajeh, M A, Tookey, J E and Rotimi, J O B (2015) Developing a procurement path determination chart SEM-based approach. Construction Management and Economics, 33(11-12), 921-41.
Rajeh, M, Tookey, J E and Rotimi, J O B (2015) Estimating transaction costs in the New Zealand construction procurement: A structural equation modelling methodology. Engineering, Construction and Architectural Management, 22(02), 242-67.
Rajput, B, Kore, S and Agarwal, A (2024) Competencies of civil engineering graduates: Indian construction professionals' perspective. International Journal of Construction Management, 24(11), 1240–8.
Ramabodu, M S and Moyo, T (2025) Digital Disruption and Transformation in Project Cost Management in Developing Countries: A Scoping Review. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 41st Annual ARCOM Conference, 1-3 September 2025, Abertay University, Dundee, UK. Association of Researchers in Construction Management, 120-128.
Ramsay-Dawber, P A (1995) A critique of the business performance measures of UK construction companies. Journal of Construction Procurement, 1(02), 100–10.
Ramsey, D, El Asmar, M and Gibson, G E (2016) Quantitative Performance Assessment of Single-Step versus Two-Step Design-Build Procurement. Journal of Construction Engineering and Management, 142(09).
Ranasinghe, M (1999) Private sector participation in infrastructure projects: a methodology to analyse viability of BOT. Construction Management and Economics, 17(05), 613-23.
Ranawaka, I and Mallawaarachchi, H (2018) A risk-responsive framework for green retrofit projects in Sri Lanka. Built Environment Project and Asset Management, 8(05), 477–90.
Rashid, K B A (1998) The processes of construction procurement in Malaysia: Identification of constraints and development of proposed strategies in the context of 'vision 2020', Unpublished PhD Thesis, , Nottingham Trent University.
Rashid, K B A and Morledge, R (1998) Constraints in resources and functions within the process of construction procurement in Malaysia. Journal of Construction Procurement, 4(01), 27–44.
Rashid, K B A and Morledge, R (1998) Construction procurement processes in Malaysia: constraints and strategies. In: Hughes, W (Ed.), Proceedings 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK. Association of Researchers in Construction Management, Vol. 2, 506–16.
Rashid, K B A and Morledge, R (1999) Strategies to remove or alleviate constraints affecting the processes of construction procurement in Malaysia. Journal of Construction Procurement, 5(01), 27–41.
Reed, H and Loosemore M (2012) Culture shock of alliance projects. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 543–52.
Reed, W G and Gordon, E B (2000) Integrated design and building process: what research and methodologies are needed?. Building Research & Information, 28(05), 325–37.
Regan, M, Smith, J and Love, P (2014) Government institutions and infrastructure skills development Michael Regan. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 1431–40.
Regan, M, Smith, J and Love, P E D (2011) Impact of the Capital Market Collapse on Public-Private Partnership Infrastructure Projects. Journal of Construction Engineering and Management, 137(01), 6–16.
Reid, S and Loosemore, M (2017) Motivations And Barriers To Social Procurement In The Australian Construction Industry. In: Chan, P W and Neilson, C J (Eds.), Proceedings 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK. Association of Researchers in Construction Management, 643–651.
Ren, Z, Kwaw, P and Yang, F (2012) Ghana's public procurement reform and the continuous use of the traditional procurement system: The way forward. Built Environment Project and Asset Management, 2(01), 56-69.
Render, N, Greenwood, D and Edge, J (2005) The other G.M.P: good manufacturing practice and its importance in the validation of constructed pharmaceutical facilities. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 2, 917–25.
Renukappa, S and Akintoye, A (2011) Potential opportunities for the UK construction industry in the water sector. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 765–74.
Reszka, M and Edwards, P J (1997) Joint ventures: a construction project case study. Journal of Financial Management of Property and Construction, 2(02), 5–20.
Ribeiro, F L (2001) BOT model: the Portuguese case. Journal of Construction Procurement, 7(02), 72–86.
Ribeiro, F L and Lopes, J (2001) Construction supply chain integration over the internet and web technology. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 241–51.
Riley, M J (2001) Re-engineering the construction procurement process, Unpublished PhD Thesis, , University of Southampton.
Rintala, K M (2004) The economic efficiency of accommodation service PFI projects, Unpublished PhD Thesis, , University College London.
Riverso, M E (1984) A life cycle cost system for value engineering in building design and construction (economic, cost-codes, database), Unpublished PhD Thesis, , Purdue University.
Robinson, A C (2017) ISBU modular construction and building design prototypes, Unpublished PhD Thesis, , Loughborough University.
Robles, J (2023) Fast-track projects with cost and schedule overruns: A supply chain management perspective, Unpublished PhD Thesis, , Capella University.
Robson, A, Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(06), 418-31.
Romeiras de Lemos, M T (2002) Sustainable competitive advantage in PFI: A systematic and holistic approach to identify the csfs in risk management in PFI, taking into account the whole life cycle, Unpublished PhD Thesis, , University of Salford.
Rooke, J D, Seymour, D E and Fellows, R F (2003) The claims culture: a taxonomy of attitudes in the industry. Construction Management and Economics, 21(02), 167-74.
Rooke, J, Seymour, D and Fellows, R (2004) Planning for claims: an ethnography of industry culture. Construction Management and Economics, 22(06), 655-62.
Rooney P and Allan R (2013) A case study of changing procurement practices on delivery of highways projects. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 779–788.
Root, D S (2001) The influence of professional and occupational cultures on project relationships mediated through standard forms and conditions of contract, Unpublished PhD Thesis, , University of Bath.
Rosander, L (2022) Same same but different: dynamics of a pre-procurement routine and its influence on relational contracting models. Construction Management and Economics, 40(11–12), 955–72.
Rosander, L and Kadefors, A (2019) From Project To Policy: Implementing A Collaborative Procurement Strategy in a Public Client Organisation . In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 750-759.
Rosayuru, H D R R, Waidyasekara, K G A S and Wijewickrama, M K C S (2022) Sustainable BIM based integrated project delivery system for construction industry in Sri Lanka. International Journal of Construction Management, 22(05), 769-83.
Rose, T and Manley, K (2010) Client recommendations for financial incentives on construction projects. Engineering, Construction and Architectural Management, 17(03), 252–67.
Rose, T and Manley, K (2010) Motivational misalignment on an iconic infrastructure project. Building Research & Information, 38(02), 56.
Rose, T M and Manley, K (2014) Revisiting the adoption of innovative products on Australian road infrastructure projects. Construction Management and Economics, 32(09), 904-17.
Rose, T, Manley, K and Widen, K (2019) Do firm-level barriers to construction product innovation adoption vary according to position in the supply chain?. Construction Innovation , 19(02), 212–35.
Rosenfeld, Y and Geltner, D (1991) Cost-plus and incentive contracting: some false benefits and inherent drawbacks. Construction Management and Economics, 9(05), 481-92.
Ross, A (2011) Supply chain management in an uncertain economic climate: a UK perspective. Construction Innovation, 11(01), 5–13.
Ross, A and Goulding, J (2007) Supply chain transactional barriers to design cost management. Construction Innovation, 7(03), 274–87.
Ross, A D (2005) A model of contingency factors affecting contractors' economic organisation of projects, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Ross, A D and Goulding, J S (2006) The construction estimator’s approach to the collection and assessment of supply chain price information. Journal of Construction Procurement, 12(01).
Ross, A D, Scullion, J S and Goulding, J S (2006) A decision support approach to procurement arrangement design. Journal of Construction Procurement, 12(02).
Roumboutsos, A and Saussier, S (2014) Public-private partnerships and investments in innovation: the influence of the contractual arrangement. Construction Management and Economics, 32(04), 349-61.
Rowlinson, S (2017) Building information modelling, integrated project delivery and all that. Construction Innovation, 17(01), 45-9.
Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts, Unpublished PhD Thesis, Department of Building Technology, Brunel University.
Rowlinson, S M and Yates, D (2003) nDCAD: a virtual change agent for professions and procurement systems?. Construction Management and Economics, 21(08), 849-57.
Rowlinson, S, Matthews, J, Phua, F, McDermott, P and Chapman, T (2000) Emerging issues in procurement systems. Journal of Construction Procurement, 6(02).
Ruan, X (2007) Inter-organizational Knowledge Integration on Construction Projects: a Social Network Approach, Unpublished PhD Thesis, School of Built Environment, Northumbria University.
Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques, Unpublished PhD Thesis, , Iowa State University.
Runeson, G (1988) An analysis of the accuracy of estimating and the distribution of tenders. Construction Management and Economics, 6(04), 357-70.
Rutter, D and Gidado, K (2005) PFI projects: their scope for delivering VFM. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 1, 591–9.
Rutter, D and Gidado, K (2004) Value for money and facilities performance: a systems approach. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 287–97.
Rwelamila, P D, Talukhaba, A A and Ngowi, A B (1999) Tracing the African Project Failure Syndrome: the significance of 'ubuntu'. Engineering, Construction and Architectural Management, 6(04), 335–46.
Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(01), 66–74.
Saeed, A M, Duffield, C and Hui, F K P (2018) An enhanced framework for assessing the operational performance of public-private partnership school projects. Built Environment Project and Asset Management, 8(02), 194–214.
Safa, M, Shahi, A, Haas, C T and Hipel, K W (2017) Construction contract management using value packaging systems. International Journal of Construction Management, 17(01), 50-64.
Saffar, N (2020) The development of an offsite construction adoption strategic guideline for the Iraqi construction industry, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Said, H and El-Rayes, K (2011) Optimizing Material Procurement and Storage on Construction Sites. Journal of Construction Engineering and Management, 137(06), 421–31.
Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects, Unpublished PhD Thesis, , University of Illinois at Urbana-Champaign.
Saini, V (2009) Endogenous asymmetries in dynamic procurement auctions, Unpublished PhD Thesis, , The Johns Hopkins University.
Salama, M, Aziz, H A E, Sawah, H E and Samadony, A E (2006) Investigating the criteria for contractors' selection and bid evaluation in Egypt. In: Boyd, D (Ed.), Proceedings 22nd Annual ARCOM Conference, 4-6 September 2006 Birmingham, UK. Association of Researchers in Construction Management, Vol. 1, 531–40.
Salcedo, R T B and Straub, A (2016) The role of the architect using integrated contracts for social housing renovation projects. Journal of Engineering, Design and Technology, 14(04), 802-17.
Salter, M (1989) Planning systems for small firms, Unpublished PhD Thesis, School of Construction, Sheffield Hallam University.
Salvado, F, de Almeida, N M and Azevedo, & V e (2019) Historical analysis of the economic life-cycle performance of public school buildings. Building Research & Information, 47(07), 813–32.
Samarasinghe, D A S (2014) Building materials supply chains: An evaluative study of the New Zealand residential construction, Unpublished PhD Thesis, , Auckland University of Technology.
Sanchez, A, X, Lehtiranta, L, Hampson, K D and Kenley, R (2014) Evaluation framework for green procurement in road construction. Smart and Sustainable Built Environment, 3(02), 153-69.
Sanni, A, O (2016) Factors determining the success of public private partnership projects in Nigeria . Construction Economics and Building, 16(02), 42-55.
Santoso, D S and Bourpanus, N (2019) Moving to e-bidding. Journal of Financial Management of Property and Construction, 24(01), 2–18.
Saradara, S M, Lara, J C F, Swarnakar, V, Rauf, A, Qureshi, R, Fadel, M E and Khalfan, M M A (2024) Construction and demolition waste management in the United Arab Emirates through the 3R principle. Engineering, Construction and Architectural Management, 31(13), 430–54.
Sarhan, S (2018) Institutional waste within the UK construction industry: an exploratory study, Unpublished PhD Thesis, School of Architecture, Design and the Built Environment, Nottingham Trent University.
Sariola, R (2018) Utilizing the innovation potential of suppliers in construction projects. Construction Innovation, 18(02), 0.
Sawan, R, Low, J F and Schiffauerova, A (2018) Quality cost of material procurement in construction projects. Engineering, Construction and Architectural Management, 25(08), 974–88.
Sayyed, Y, Hatamleh, M T and Alaya, A (2023) Investigating the influence of procurement management in construction projects on the innovation level and the overall project performance in developing countries. International Journal of Construction Management, 23(03), 462–71.
Scheublin, F J M (2001) Project alliance contract in The Netherlands. Building Research & Information, 29(06), 451–5.
Schulte, W D, Jr. (1999) The effect of international corporate strategies and information and communication technologies on competitive advantage and firm performance: An exploratory study of the international engineering, procurement and construction (IEPC) industry, Unpublished PhD Thesis, , The George Washington University.
Sebastian, R, Claeson-Jonsson, C and Giulio, R D (2013) Performance-based procurement for low-disturbance bridge construction projects. Construction Innovation, 13(04), 394-409.
Senaratne, S and Gunawardane, S (2015) Application of team role theory to construction design teams. Architectural Engineering and Design Management, 11(01), 1-20.
Senaratne, S and Gunawardane, S (2015) Application of team role theory to construction design teams. Architectural Engineering and Design Management, 11(01), 1–19.
Senaratne, S and Malewana, C (2011) Linking individual, team and organizational learning in construction project team settings. Architectural Engineering and Design Management, 7(01), 50–63.
Senaratne, S and Samaraweera, A (2015) Construction project leadership across the team development process. Built Environment Project and Asset Management, 5(01), 69-88.
Senaratne, S and Udawatta, N (2013) Managing intragroup conflicts in construction project teams: case studies in Sri Lanka. Architectural Engineering and Design Management, 9(03), 158-75.
Seneviratne, K, Amaratunga, D and Haigh, R (2017) Managing housing needs of post conflict housing reconstruction: Sri Lankan perspective. Engineering, Construction and Architectural Management, 24(02), 275-88.
Seo, Y C and Hyan, C T (2004) Procurement system selection model reflecting past performance. Journal of Construction Procurement, 10(02).
Sexton, M and Barrett, P (2005) Performance-based building and innovation: balancing client and industry needs. Building Research & Information, 33(02), 142–8.
Sha, K (2011) Vertical governance of construction projects: an information cost perspective. Construction Management and Economics, 29(11), 1137–47.
Shabani Ardakani, S and Nik-Bakht, M (2021) Functional Evaluation of Change Order and Invoice Management Processes under Different Procurement Strategies: Social Network Analysis Approach. Journal of Construction Engineering and Management, 147(01).
Shabbir, A (2014) Corruption in infrastructure procurement - a study based on procurement of infrastructure projects in Pakistan, Unpublished PhD Thesis, Department of Mechanical, Aerospace & Civil Engineering, University of Manchester.
Shafik, M and Martin, P (2006) The impact of procurement methods on the Scottish housebuilding industry. In: Boyd, D (Ed.), Proceedings 22nd Annual ARCOM Conference, 4-6 September 2006 Birmingham, UK. Association of Researchers in Construction Management, Vol. 1, 81–90.
Shafique, F and Mollaoglu, S (2022) Shared Transformational Leadership for Green Architecture Engineering and Construction Project Teams: A Study of LEED Projects. Journal of Construction Engineering and Management, 148(12).
Shahrin, F, Mahmood, K and Hassan, F (2021) Project Cost Overruns and Risk Allocation in Public Funded Projects in Malaysia. In: Scott, L and Neilson, C J (Eds.), Proceedings 37th Annual ARCOM Conference, 6-7 September 2021, UK, Association of Researchers in Construction Management, 825-834.
Shakeri, E (2002) An investigation of privately promoted infrastructure (ppi) strategy in developing countries: Public-private partnership (ppp) approach, Unpublished PhD Thesis, , The University of Manchester.
Shakoorian, A (2006) Performance assessment of building commissioning process as a quality assurance system, Unpublished PhD Thesis, , Georgia Institute of Technology.
Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(06), 1004–23.
Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types, Unpublished PhD Thesis, , University of Kansas.
Shammas-Toma, M, Seymour, D E and Clark, L (1996) The effectiveness of formal quality management systems in achieving the required cover in reinforced concrete. Construction Management and Economics, 14(04), 353-64.
Sharif, A (1996) A functional analysis of building procurement systems and strategies in an international context, Unpublished PhD Thesis, , Nottingham Trent University.
She L (2013) Trust, mistrust and distrust in alliancing. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 1001–1011.
Sheamar, S, Wedawatta, G, Tennakoon, M, Palliyaguru, R and Antwi-Afari, M F (2024) The potential of new models of construction procurement to counter cost overruns in construction projects: an exploratory study from a contractors’ perspective. Journal of Financial Management of Property and Construction, 29(02), 211-28.
Shehu, Z, Holt, G D, Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(01), 52-68.
Shen, L and Song, W (1998) Competitive Tendering Practice in Chinese Construction. Journal of Construction Engineering and Management, 124(02), 155–61.
Shen, L Y, Li, Q M, Drew, D and Shen, Q P (2004) Awarding Construction Contracts on Multicriteria Basis in China. Journal of Construction Engineering and Management, 130(03), 385–93.
Shen, L Y, Wu, G W C and Ng, C S K (2001) Risk Assessment for Construction Joint Ventures in China. Journal of Construction Engineering and Management, 127(01), 76–81.
Shen, L-Y (1990) Application of risk management to the Chinese construction industry, Unpublished PhD Thesis, Department of Construction Management and Engineering, University of Reading.
Shen, L, Drew, D and Zhang, Z (1999) Optimal Bid Model for Price-Time Biparameter Construction Contracts. Journal of Construction Engineering and Management, 125(03), 204–9.
Shen, L, Lee, R K H and Zhang, Z (1996) Application of BOT System for Infrastructure Projects in China. Journal of Construction Engineering and Management, 122(04), 319–23.
Shen, W, Tang, W, Wang, S, Duffield, C F, Hui, F K P and You, R (2017) Enhancing Trust-Based Interface Management in International Engineering-Procurement-Construction Projects. Journal of Construction Engineering and Management, 143(09).
Sherif, E-h and Kaka, A (2004) A multi criteria mode for the selection of the payments systems in construction projects. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 163–72.
Sherratt, F and Sherratt, S (2018) PPP Problems: Challenging Academic Compliance with Economic Opportunism and Exploitation. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 413–422.
Shi, W (2009) Framework for integration of BIM and RFID in steel construction, Unpublished PhD Thesis, , University of Florida.
Shields, B A (2018) Parallel machine replacement: an analysis in construction industry with considerations of horizon uncertainty, multi-purpose machines and transportation, Unpublished PhD Thesis, , University of Tennessee.
Shipton, C (2012) Understanding post-contract changes in partnering projects: an ethnographic approach. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 957–67.
Shoesmith, D R (1996) A study of the management and procurement of building services work. Construction Management and Economics, 14(02), 93-101.
Shohet, I M and Frydman, S (2003) Communication Patterns in Construction at Construction Manager Level. Journal of Construction Engineering and Management, 129(05), 570–7.
Shooshtarian, S, Caldera, S, Maqsood, T, Ryley, T and Khalfan, M (2022) An investigation into challenges and opportunities in the Australian construction and demolition waste management system. Engineering, Construction and Architectural Management, 29(10), 4313-30.
Short, C A, Barrett, P, Dye, A and Sutrisna, M (2007) Impacts of value engineering on five Capital Arts projects. Building Research & Information, 35(03), 287–315.
Short, C A, Cook, M and Lomas, K J (2009) Delivery and performance of a low-energy ventilation and cooling strategy. Building Research & Information, 37(01), 1–30.
Shrestha, A, Chan, T, Aibinu, A A, Chen, C and Martek, I (2017) Risks in PPP Water Projects in China: Perspective of Local Governments. Journal of Construction Engineering and Management, 143(07).
Shrestha, K (2016) Framework of performance-based contracting for chip seal and striping maintenance activities, Unpublished PhD Thesis, , University of Nevada, Las Vegas.
Shrestha, K and Shrestha, P P (2022) Framework to Implement Performance-Based Contracting for Chip-Seal Road Maintenance. Journal of Construction Engineering and Management, 148(01).
Shukor, A S A, Mohammad, M F, Mahbub, R and Ismail, F (2011) Supply chain integration challenges in project procurement in Malaysia: the perspective of IBS manufacturers. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 495–504.
Shwarka, M and Anigbogu, N A (2012) Impact of the public procurement reform on public building project delivery in Nigeria. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 969–77.
Sidwell, A C, Budiawan, D and Ma, T (2001) The significance of the tendering contract on the opportunities for clients to encourage contractorled innovation. Construction Innovation, 1(02), 107–16.
Sidwell, T and Kennedy, R (2004) Re-valuing construction through project delivery. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 55–65.
Signor, R, Love, P E D and Ballesteros-Pérez, P (2024) Detecting bid rigging in public auctions for procuring infrastructure projects: formulating the reference scenario for decision-making. Construction Management and Economics, 42(06), 545–63.
Signor, R, Love, P E D and Olatunji, O (2016) Determining Overpricing in Brazilian Infrastructure Projects: A Forensic Approach. Journal of Construction Engineering and Management, 142(09).
Signor, R, Love, P E D, Belarmino, A T N and Alfred Olatunji, O (2020) Detection of Collusive Tenders in Infrastructure Projects: Learning from Operation Car Wash. Journal of Construction Engineering and Management, 146(01).
Signor, R, Love, P E D, Marchiori, F F and Felisberto, A D (2020) Underpricing in Social Infrastructure Projects: Combating the Institutionalization of the Winner’s Curse. Journal of Construction Engineering and Management, 146(12).
Singh, A, Adachi, S and Inouye, M (2011) Quality control analysis of downtime and time to repair for water supply pipes. Built Environment Project and Asset Management, 1(01), 75-90.
Singh, E and Singh, D P (2017) Architectural profession in India: perception towards service marketing. Journal of Engineering, Design and Technology, 15(05), 574-90.
Singh, S, Chinyio, E and Suresh, S (2018) The Implementation of Stakeholder Management and Building Information Modelling (BIM) in UK Construction Projects. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 766–775.
Skaik, S and Oweineh, H (2014) Assessing the practice of project-based JV between local and international contractors in the UAE. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 443–52.
Skitmore, M and Smyth, H (2007) Pricing construction work: a marketing viewpoint. Construction Management and Economics, 25(06), 619–30.
Skitmore, M R and Drew, D S (2003) The analysis of pre-tender building price forecasting performance: a case study. Engineering, Construction and Architectural Management, 10(01), 27–35.
Skitmore, M R and Marsden, D E (1988) Which procurement system? Towards a universal procurement selection technique. Construction Management and Economics, 6(01), 71-89.
Skitmore, R M, Pettitt, A N and McVinish, R (2007) Gates’ Bidding Model. Journal of Construction Engineering and Management, 133(11), 855–63.
Smallwood, J (2006) Scaffolding health and safety: a multi-stakeholder issue. In: Boyd, D (Ed.), Proceedings 22nd Annual ARCOM Conference, 4-6 September 2006 Birmingham, UK. Association of Researchers in Construction Management, Vol. 1, 283–93.
Smallwood, J (2007) The influence of architectural designers on construction ergonomics. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 2, 619–28.
Smallwood, J and Venter, D (2002) The influence of project managers on construction health and safety in South Africa. Construction Economics and Building, 2(01), 57-69.
Smallwood, J J (2004) The influence of clients on contractor health and safety (H&S). In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 2, 1095–105.
Smith, A and Wilkins, B (1996) Team relationships and related critical factors in the successful procurement of health care facilities. Journal of Construction Procurement, 2(01), 30–40.
Smith, J and Wyatt, R (1998) Criteria for strategic decision-making at the pre-briefing stage. In: Hughes, W (Ed.), Proceedings 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK. Association of Researchers in Construction Management, Vol. 1, 300–9.
Smith, J, Georgiou, J, O’Keeffe, N and Love, P (2003) Design management in a design-construct organization. In: Greenwood, D J (Ed.), Proceedings 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK. Association of Researchers in Construction Management, Vol. 1, 131–40.
Smith, P (2001) Information technology and the QS practice. Construction Economics and Building, 1(01), 1-21.
Smyth, H (2005) Procurement push and marketing pull in supply chain management: the conceptual contribution of relationship marketing as a driver in project financial performance. Journal of Financial Management of Property and Construction, 10(01), 33–44.
Smyth, H and Fitch, T (2009) Application of relationship marketing and management: a large contractor case study. Construction Management and Economics, 27(04), 399–410.
Snippert, T, Witteveen, W, Boes, H and Voordijk, H (2015) Barriers to realizing a stewardship relation between client and vendor: the Best Value approach. Construction Management and Economics, 33(07), 569-86.
So, K L (2021) Integrated life-cycle management of highway bridges, Unpublished PhD Thesis, , Hong Kong University of Science and Technology (Hong Kong).
Soe, Y (2017) Construction supply chain risk management framework for construction projects: case studies in Myanmar, Unpublished PhD Thesis, Department of Civil Engineering, University of Birmingham.
Soetanto, R (2002) Modelling satisfaction for main participants of the construction project coalition: a study of mutual performance assessment, Unpublished PhD Thesis, School of Engineering and the Built Environment, University of Wolverhampton.
Sohail, M (1997) An investigation into the procurement of urban infrastructure in developing countries, Unpublished PhD Thesis, , Loughborough University.
Sohani, H, Hosseini Nourzad, S H and Saghatforoush, E (2024) The optimized form of building made from the reused elements. Architectural Engineering and Design Management, 20(02), 191–213.
Somboonpisan, J and Limsawasd, C (2021) Environmental Weight for Bid Evaluation to Promote Sustainability in Highway Construction Projects. Journal of Construction Engineering and Management, 147(04).
Songer, A D and Ibbs, W C (1995) Managing requests for proposal development in public sector design-build. Journal of Construction Procurement, 1(01), 64–80.
Songer, A D and Molenaar, K R (1997) Project Characteristics for Successful Public-Sector Design-Build. Journal of Construction Engineering and Management, 123(01), 34–40.
Songer, A D, Diekmann, J E and Pecsok, R (1997) Note - Risk analysis for revenue dependent infrastructure projects. Construction Management and Economics, 15(04), 377-82.
Songer, A D, Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(02), 69–82.
Soni, M S M and Smallwood, J (2024) Understanding corruption in the South African construction industry. Journal of Construction Business and Management, 7(1), 45-56.
Soni, M S M and Smallwood, J J (2024) Perceptions of corruption in the South African construction industry. International Journal of Construction Education and Research, 20(01), 43-64.
Soomro, M A (2013) Failure mechanisms in transportation public private partnerships, Unpublished PhD Thesis, , Hong Kong University of Science and Technology (Hong Kong).
Sospeter, N G and Awuzie, B O (2024) Capital Budgeting Implementation by Public Sector Construction Firms in Tanzania’s Housebuilding Industry: An Exploratory Study. Journal of Construction in Developing Countries, 29(01), 87-109.
Sourani, A (2008) Realising sustainable construction through procurement strategies, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Sphelele, K M and Amoah, C (2024) Challenges of Black Contractors with the South African Public Procurement System. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK. Association of Researchers in Construction Management, 667-676.
Sporrong, J (2011) Criteria in consultant selection: public procurement of architectural and engineering services. Construction Economics and Building, 11(04), 59-76.
Sporrong, J (2014) Selecting architectural and engineering consultants: Municipal practices in Sweden, Unpublished PhD Thesis, , Chalmers University of Technology.
Sporrong, J and Bröchner, J (2009) Public procurement incentives for sustainable design services: Swedish experiences. Architectural Engineering and Design Management, 5(01), 24–35.
Sporrong, J and Kadefors, A (2014) Municipal consultancy procurement: new roles and practices. Building Research & Information, 42(05), 616-28.
Sridarran, P and Fernando, N G (2016) Change management framework to enable sustainable outsourcing of facilities management services. Built Environment Project and Asset Management, 6(03), 317-31.
Ssengooba, F P (2010) Performance-based contracting: a case study of non-profit hospitals in Uganda, Unpublished PhD Thesis, London School of Hygiene and Tropical Medecine, University of London.
Staal, A A G (2019) Managing innovative suppliers: Exploring company, procurement, and performance variables in New Zealand construction supply chains, Unpublished PhD Thesis, , Auckland University of Technology.
Stanford, M S (2017) Competition and price analysis of indefinite delivery indefinite quantity contracts for construction, Unpublished PhD Thesis, , University of Colorado at Boulder.
Stanford, M S and Molenaar, K R (2018) Influence of Simplified Procurement Methods on Competition for Public Sector Construction. Journal of Construction Engineering and Management, 144(02).
Stansfield, F R (1995) Work in the IT industry on usability provides an agenda for improvement of construction procurement methods. Journal of Construction Procurement, 1(02), 124–49.
Sterner, E (2002) 'Green procurement' of buildings: a study of Swedish clients' considerations. Construction Management and Economics, 20(01), 21-30.
Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost, Unpublished PhD Thesis, , Luleå University of Technology.
Sterner, E (2000) Life-cycle costing and its use in the Swedish building sector. Building Research & Information, 28(05), 387–93.
Strahorn, S, Brewer, G and Gajendran, T (2017) The Influence of Trust on Project Management Practice within the Construction Industry . Construction Economics and Building, 17(01), 1-19.
Strahorn, S, Gajendran, T and Brewer, G (2014) Experiences of trust in construction project management: The influence of procurement mechanisms. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 463–72.
Strahorn, S, Galendran, T and Brewer, G (2015) The influence of trust in traditional contracting: investigating the "lived experience" of stakeholders. Construction Economics and Building, 15(02), 81-101.
Sturts, C S and (Bud) Griffis, F H (2005) Addressing Pricing: Value Bidding for Engineers and Consultants. Journal of Construction Engineering and Management, 131(06), 621–30.
Subramaniyan, A S (2020) Engineering procurement and construction companies in India: Which factors drive their willingness to pay, Unpublished PhD Thesis, , Chitkara University, Punjab (India).
Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP), Unpublished PhD Thesis, , Columbia University.
Suchowerska, R, Loosemore, M and Barraket, J (2024) How employment-focused social procurement tackles health inequities: an investigation of Australia’s construction industry using determinants of health theory. Construction Management and Economics, 42(11–12), 977–91.
Suchowerska, R, Loosemore, M and Barraket, J (2024) How employment-focused social procurement tackles health inequities: An investigation of Australia’s construction industry using determinants of health theory. Construction Management and Economics, 42(11-12), 977-91.
Sugar, K, Mose, T M, Nolden, C, Davis, M, Eyre, N, Sanchez-Graells, A and Van der Horst, D (2022) Local decarbonisation opportunities and barriers: UK public procurement legislation. Buildings and Cities, 3(01), 895–911.
Sulaiman, K (2008) A study of building procurement process as a potential tool to enhance safety practice in the construction industry, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Sullivan, K T, Kashiwagi, D, Savicky, J, Kashiwagi, M, Egbu, C and Chang, C-K (2006) Increasing performance by minimizing the passing of information. In: Boyd, D (Ed.), Proceedings 22nd Annual ARCOM Conference, 4-6 September 2006 Birmingham, UK. Association of Researchers in Construction Management, Vol. 1, 103–12.
Sun, C, Wang, M, Man, Q and Wan, D (2023) Research on the BIM application mechanism of engineering-procurement-construction projects based on a tripartite evolutionary game. Journal of Construction Engineering and Management, 149(03).
Sundaraj, G (2012) The significance and co-dependency of 'robustness' in PFI projects: A granting authority perspective, Unpublished PhD Thesis, , University of Salford.
Sundaraj, G and Eaton, D (2013) Quantifying robustness in PFIs. Journal of Financial Management of Property and Construction, 18(01), 26-52.
Sundaraj, G and Eaton, D (2011) The anticipated robustness factors in a PFI project environment from the granting authority s perspective. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 775–84.
Sundling, R (2019) A development process for extending buildings vertically – based on a case study of four extended buildings. Construction Innovation, 19(03), 367–85.
Sunindijo, R Y and Zou, P X W (2011) Influence of technical skill on safety task implementation and safety climate development in construction. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 269–78.
Suprun, E V and Stewart, R A (2015) Construction innovation diffusion in the Russian Federation: Barriers, drivers and coping strategies. Construction Innovation, 15(03), 278-312.
Suresh, M and Arun Ram Nathan, R (2020) Readiness for lean procurement in construction projects. Construction Innovation , 20(04), 587–608.
Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works, Unpublished PhD Thesis, School of Engineering and the Built Environment, University of Wolverhampton.
Swaffield, L M and McDonald, A M (2008) The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(02), 132–48.
Swan, W and Khalfan, M M A (2007) Mutual objective setting for partnering projects in the public sector. Engineering, Construction and Architectural Management, 14(02), 119–30.
Swan, W, Cooper, R, McDermott, P and Wood, G (2001) A review of social network analysis for the IMI trust in construction project. In: Akintoye, A (Ed.), Proceedings 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK. Association of Researchers in Construction Management, Vol. 1, 59–67.
Sward, A (2006) Relations as a key resource. In: Boyd, D (Ed.), Proceedings 22nd Annual ARCOM Conference, 4-6 September 2006 Birmingham, UK. Association of Researchers in Construction Management, Vol. 1, 405–14.
Sweasey, R and Skitmore, M (2007) The use of formal project management processes in the procurement of Queensland aged care facilities. International Journal of Construction Management, 7(1), 43-56.
Sweis, R, Moarefi, A, Hoseini-Amiri, S and Moarefi, S (2019) Delay factors of the schedule of strategic industrial projects. International Journal of Building Pathology and Adaptation, 37(01), 69–86.
Symons, A W (2021) Integrated design, design management and the delivery of major hospitals, Unpublished PhD Thesis, , University College London (University of London).
Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects, Unpublished PhD Thesis, , Indian Institute of Technology Delhi.
Tabish, S Z S and Jha, K N (2011) Analyses and evaluation of irregularities in public procurement in India. Construction Management and Economics, 29(03), 261–74.
Tabish, S Z S and Jha, K N (2012) The impact of anti-corruption strategies on corruption free performance in public construction projects. Construction Management and Economics, 30(01), 21–35.
Takim, R (2005) A framework for successful construction project performance, Unpublished PhD Thesis, , Glasgow Caledonian University.
Takim, R and Akintoye, A (2002) Performance indicators for successful construction project performance. In: Greenwood, D (Ed.), Proceedings 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK. Association of Researchers in Construction Management, Vol. 2, 545–55.
Taku, A M (2021) Predicting modular efficiency in oil and gas capital projects using multi-criteria decision analysis, Unpublished PhD Thesis, , The George Washington University.
Tam, V W Y, Tam, C M and Ng, W C Y (2007) On prefabrication implementation for different project types and procurement methods in Hong Kong. Journal of Engineering, Design and Technology, 5(01), 68–80.
Tang, L (2011) Effective and efficient briefing in public private partnership projects in the construction industry, Unpublished PhD Thesis, , Hong Kong Polytechnic University (Hong Kong).
Tao, Z, Baguley, P, Ejohwomu, O and Maqbool, R (2025) Developing a Conceptual Framework to Embed the Social Cost of Carbon in Cost Estimation for Commercial Buildings. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 41st Annual ARCOM Conference, 1-3 September 2025, Abertay University, Dundee, UK. Association of Researchers in Construction Management, 951-960.
Tapia, R M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.
Taylor, M D, Fisher, A and Wamuziri, S C (2009) A comparison of modern methods of bathroom construction: a project case study. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 2, 1173–82.
Tchorly, J T (2020) The development of a bidding and award process map for road PPP projects in Ghana, Unpublished PhD Thesis, , University of Salford.
Tchumtcha Wembe, P (2023) Managing stakeholders in engineering procurement construction management projects in Africa by Chinese project managers. International Journal of Construction Management, 23(02), 329–37.
Tchumtcha Wembe, P (2022) Managing stakeholders in epcm projects in Africa by Western project managers. International Journal of Construction Management, 22(12), 2279-89.
Telles, P (2011) Competitive dialogue in Portugal and Spain, Unpublished PhD Thesis, , University of Nottingham.
Tembo Silungwe, C K and Khatleli, N (2020) An analysis of the allocation of pertinent risks in the Zambian building sector using Pareto analysis. International Journal of Construction Management, 20(04), 321-34.
Tembo, M, Kahanji, C and Mwanaumo, E M u (2024) Cultivating procurement strategies to manage the tender price level for public infrastructure: : A case study of IRCP (World Bank) projects in Zambia. Journal of Construction Business and Management, 7(1), 16-33.
Tennant, S and Fernie, S (2010) A contemporary examination of framework agreements. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 1, 685–94.
Tennant, S and Fernie, S (2011) An alternative form of supply chain governance: Construction clans. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 475–84.
Tennant, S and Fernie, S (2012) The commercial currency of construction framework agreements. Building Research & Information, 40(02), 209-20.
Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects, Unpublished PhD Thesis, Civil Engineering and Built Environment School, Queensland University of Technology.
Teo, P L, Bridge, A J, Gray, J and Jefferies, M C (2011) Developing a research method to test a new first-order decision making model for the procurement of public sector major infrastructure. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 715–24.
Tepeli, E, Taillandier, F and Breysse, D (2021) Multidimensional modelling of complex and strategic construction projects for a more effective risk management. International Journal of Construction Management, 21(12), 1218-39.
Thakhtravachi, M (2017) Tacit knowledge integration within the traditional construction procurement system, Unpublished PhD Thesis, , University of Salford.
Thillai Rajan, A, Siddharth, R and Mukund, S P (2010) PPPs in road renovation and maintenance: a case study of the East Coast Road project. Journal of Financial Management of Property and Construction, 15(01), 21–40.
Thomas, A V, Kalidindi, S N and Ganesh, L S (2006) Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24(04), 407-24.
Thomas, S R, Tucker, R L and Kelly, W R (1998) Critical Communications Variables. Journal of Construction Engineering and Management, 124(01), 58–66.
Thorpe, A, Dainty, A R J and Hatfield, H (2003) The realities of being preferred: specialist subcontractor perspectives on restricted tender list membership. Journal of Construction Procurement, 9(01), 47-55.
Tijhuis, W (2015) Managing public-private partnerships: Dealing with business-culture influences. Built Environment Project and Asset Management, 5(01), 22-34.
Timm, J F G, Maciel, V G and Passuello, A (2023) Green public procurement model for environmental assessment of constructive systems. International Journal of Construction Management, 23(04), 718–28.
Tingting, L and Suzanne, W (2011) Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation, 11(04), 452–69.
Tiong, R L K and Alum, J (1997) Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(02), 83–94.
Titus, S and Bröchner, J (2005) Managing information flow in construction supply chains. Construction Innovation, 5(02), 71–82.
Toakley, A R and Marosszeky, M (2003) Towards total project quality - a review of research needs. Engineering, Construction and Architectural Management, 10(03), 219–28.
Toakley, A R and Marosszeky, M (2003) Towards total project quality - A review of research needs. Engineering, Construction and Architectural Management, 10(3), 219–28.
Tobin, N Y (2017) A framework for knowledge capture and recovery in whole life costing practice, Unpublished PhD Thesis, Scott Sutherland School of Architecture & Built Environment, Robert Gordon University.
Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria, Unpublished PhD Thesis, , University of Calgary (Canada).
Tomkins, C D (2008) Allocation and pricing of water resources, Unpublished PhD Thesis, , Stanford University.
Tookey, J E, Murray, M, Hardcastle, C and Langford, D A (2001) Construction procurement routes: re-defining the contours of construction procurement. Engineering, Construction and Architectural Management, 8(01), 20–30.
Toolanen, B (2008) Lean contracting relational contracting influenced by lean thinking, Unpublished PhD Thesis, , Luleå University of Technology.
Toor, S-U-R and Ogunlana, S (2008) Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(04), 395–408.
Toor, S-u-R and Ogunlana, S O (2009) Construction professionals' perception of critical success factors for large-scale construction projects. Construction Innovation, 9(02), 149–67.
Toosi, H, Ghaaderi, M A and Shokrani, Z (2022) Comparative study of academic research on project management in Iran and the World with text mining approach and TF–IDF method. Engineering, Construction and Architectural Management, 29(03), 1553-83.
Towner, M and Baccarini, D (2007) Risk pricing in construction tenders - how, who, what. Construction Economics and Building, 7(02), 12-25.
Towner, M and Baccarini, D (2008) Risk pricing in construction tenders - how, who, what. Construction Economics and Building, 8(01), 49-60.
Tran, D Q and Molenaar, K R (2014) Exploring critical delivery selection risk factors for transportation design and construction projects. Engineering, Construction and Architectural Management, 21(06), 631-47.
Tran, D Q, Molenaar, K R and Kolli, B (2017) Implementation of best-value procurement for highway design and construction in the USA. Engineering, Construction and Architectural Management, 24(05), 774-87.
Tran, D Q, Nguyen, L D and Faught, A (2017) Examination of communication processes in design-build project delivery in building construction. Engineering, Construction and Architectural Management, 24(06), 1319-36.
Trangkanont, S and Charoenngam, C (2014) Critical failure factors of public-private partnership low-cost housing program in Thailand. Engineering, Construction and Architectural Management, 21(04), 421-43.
Treloar, G J, Love, P E D and Smith, J (1999) Streamlined life cycle assessment: a method for considering environmental impact of road construction. In: Hughes, W (Ed.), Proceedings 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK. Association of Researchers in Construction Management, Vol. 2, 753–62.
Troje, D (2020) Can I Get Some Help Down Here? Inter-Project Support for Creating Social Value through Social Procurement. In: Scott, L and Neilson, C J (Eds.), Proceedings 36th Annual ARCOM Conference, 7-8 September 2020, UK, Association of Researchers in Construction Management, 105-114.
Troje, D (2020) Constructing social procurement: An institutional perspective on working with employment requirements, Unpublished PhD Thesis, , Chalmers University of Technology.
Troje, D (2018) Rhetorical Strategies to Diffuse Social Procurement in Construction. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 505–514.
Troje, D and Gluch, P (2020) Populating the social realm: new roles arising from social procurement. Construction Management and Economics, 38(01), 55–70.
Troje, D and Gluch, P (2019) Social Procurement in the Real World: How Employment Requirements Unfold in Construction Projects. In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 24-33.
Tsai, H, Wang, L and Lin, L (2007) A study on improving the ranking procedure for determining the most advantageous tender. Construction Management and Economics, 25(05), 545–54.
Tsai, M-T (2008) Real option-based procurement for transportation services, Unpublished PhD Thesis, , University of California, Irvine.
Tucker, S N and Ambrose, M D (1998) Innovation and evaluation in process improvement. In: Hughes, W (Ed.), Proceedings 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK. Association of Researchers in Construction Management, Vol. 2, 349–58.
Tuholski, S J, Gursel, A P, Tommelein, I D and Bomba, G (2009) “Lean” Comparison Using Process Charts of Complex Seismic Retrofit Projects. Journal of Construction Engineering and Management, 135(04), 330–9.
Tutesigensi, A and Oak, D P (2007) Feasibility of collaborative working at the second tier subcontractor level in a prime contract. In: Boyd, D (Ed.), Proceedings 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK. Association of Researchers in Construction Management, Vol. 2, 787–96.
Tuuli, M M (2009) Empowerment and control dynamics in project teams: a multilevel examination of the antecedents and jobperformance consequences, Unpublished PhD Thesis, , University of Hong Kong.
Tzortzopoulos, P and Cooper, R (2007) Design management from a contractor's perspective: the need for clarity. Architectural Engineering and Design Management, 3(01), 17–28.
Udeaja, C and Aziz, Z (2015) A case study of fostering multidisciplinary in built environment using BIM. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 701–710.
Udofia, W U, Hadikusumo, B H W and Santoso, D S (2015) Road project termination and rebidding strategies in Nigeria. Journal of Financial Management of Property and Construction, 20(03), 208-34.
Ullal, A (2018) Clear, Hold and Build: Conditions and practices characterising construction in conflict and post-conflict settings, Unpublished PhD Thesis, Faculty of Architecture, Building and Planning, University of Melbourne.
Ullal, A (2023) Construction conditions and practices during war in Afghanistan. Journal of Construction Engineering and Management, 149(05).
Umeokafor, N (2017) An appraisal of the barriers to client involvement in health and safety in Nigeria’s construction industry. Journal of Engineering, Design and Technology, 15(04), 471-87.
Umeokafor, N, Windapo, A O, Manu, P, Diugwu, I and Haroglu, H (2023) Critical barriers to prevention through design in construction in Developing Countries: a qualitative inquiry. Engineering, Construction and Architectural Management, 30(07), 3014-42.
Upadhyay, A K and Jain, K (2016) Modularity in nuclear power plants: a review. Journal of Engineering, Design and Technology, 14(03), 526-42.
Uttam, K (2014) Seeking sustainability in the construction sector: Opportunities within impact assessment and sustainable public procurement, Unpublished PhD Thesis, TRITA-LWR. PHD, KTH Royal Institute of Technology.
Vahdatmanesh, M and Firouzi, A (2018) Price risk management in BOT railroad construction projects using financial derivatives. Journal of Financial Management of Property and Construction, 23(03), 349–62.
Van Uden, M, Wamelink, H, Van Bueren, E and Heurkens, E (2025) Circular building hubs as intermediate step for the transition towards a circular economy. Construction Management and Economics, 43(06), 446–64.
Vass, S and Karrbom Gustavsson, T (2017) Challenges when implementing BIM for industry change. Construction Management and Economics, 35(10), 597-610.
Vassallo, J M (2007) Implementation of Quality Criteria in Tendering and Regulating Infrastructure Management Contracts. Journal of Construction Engineering and Management, 133(08), 553–61.
Vasserman, S (2019) Essays on industrial organization, Unpublished PhD Thesis, , Harvard University.
Vaz, D, Al Bizri, S and Gray, C (2008) The management of the design of modern curtain wall cladding systems.. In: Dainty, A (Ed.), Proceedings 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK. Association of Researchers in Construction Management, Vol. 2, 759–67.
Vennström, A and Eriksson, P E (2010) Client perceived barriers to change of the construction process. Construction Innovation, 10(02), 126–37.
Ventovuori, T (2007) Elements of sourcing strategy in facilites management services : decision categories and choices, Published PhD Thesis, Department of Structural Engineering and Building Technology, Helsinki University of Technology.
Verma, M (2012) Public private partnerships in road transport infrastructure in India: A governance perspective, Unpublished PhD Thesis, , University of Manchester.
Vernikos, V K (2016) Realising offsite construction in the civil engineering and infrastructure sector, Unpublished PhD Thesis, School of Architecture, Building and Civil Engineering, Loughborough University.
Vernikos, V K, Goodier, C I, Gibb, A G F, Robery, P C and Broyd, T W (2011) Offsite innovation in UK infrastructure: The role of the approvals process in box jacking projects. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 53–62.
Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity – a case of India. Engineering, Construction and Architectural Management, 30(02), 963-85.
Viking, A and Lidelöw, S (2014) Exploring industrialised house-builders' perceptions of local requirement setting: An institutional logics perspective. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK, Association of Researchers in Construction Management, 1133–42.
Viking, A and Lidelöw, S (2015) Exploring industrialized housebuilders’ interpretations of local requirements using institutional logics. Construction Management and Economics, 33(05), 484-94.
Vilasini, N (2014) Generating value in alliance contracts through the lean concept , Unpublished PhD Thesis, , Auckland University of Technology.
Vine, R (2018) The intelligent client: learning to govern through numbers at Heathrow, Unpublished PhD Thesis, Science Policy Research Unit, University of Sussex.
Volker, L (2010) Deciding about design quality: value judgements and decision making in the selection of architects by public clients under European tendering regulations, Published PhD Thesis, Faculty of Architecture, Delft University of Technology.
Volker, L (2010) Dutch architectural design tenders explained from a sensemaking perspective. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 1, 391–400.
Volker, L (2012) Procuring architectural services: sensemaking in a legal context. Construction Management and Economics, 30(09), 749-59.
Volker, L, Eriksson, P E, Kadefors, A and Larsson, J (2018) A case-based comparison of the efficiency and innovation potential of integrative and collaborative procurement strategies. In: Gorse, C and Neilson, C J (Eds.), Proceedings 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK. Association of Researchers in Construction Management, 515–524.
Volker, L, Scharpff, J C D, de Weerdt, M M and Herder, P M (2012) Designing a dynamic network-based approach for asset management activities. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 655–64.
Vorasubin, P and Chareonngam, C (2007) Strategic assets driving financial capability of Thai construction firms. Journal of Financial Management of Property and Construction, 12(02), 87–94.
Vosman, L, Coenen, T B J, Volker, L and Visscher, K (2023) Collaboration and innovation beyond project boundaries: exploring the potential of an ecosystem perspective in the infrastructure sector. Construction Management and Economics, 41(06), 457–74.
Votto, R, Lee Ho, L and Berssaneti, F (2020) Applying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring. Journal of Construction Engineering and Management, 146(03).
Waara, F (2008) Mitigating contractual hazards in public procurement: a study of Swedish local authorities. Construction Management and Economics, 26(02), 137–45.
Wachira, N, Root, D, Bowen, P and Olima, W (2008) Changing craft skills in the Kenyan construction sector. In: Dainty, A (Ed.), Proceedings 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK. Association of Researchers in Construction Management, Vol. 1, 63–71.
Waldman, B, Huang, M and Simonen, K (2020) Embodied carbon in construction materials: a framework for quantifying data quality in EPDs. Buildings and Cities, 1(01), 625–36.
Walker, D and Jacobsson, M (2014) A rationale for alliancing within a public-private partnership. Engineering, Construction and Architectural Management, 21(06), 648-73.
Walker, D and Lloyd-Walker, B (2011) Knowledge, skills and attributes of project alliances managers in Australasia. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 372–81.
Walker, D and Lloyd-Walker, B (2012) Understanding early contractor involvement (ECI) procurement forms. In: Smith, S.D (Ed.), Proceedings 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK. Association of Researchers in Construction Management, 877–87.
Walker, D H T (1997) Construction time performance and traditional versus non-traditional procurement methods. Journal of Construction Procurement, 3(01), 42–55.
Walker, D H T (1995) The influence of client and project team relationships upon construction time performance. Journal of Construction Procurement, 1(01), 4–20.
Walker, D H T and Rahmani, F (2016) Delivering a water treatment plant project using a collaborative project procurement approach. Construction Innovation, 16(02), 158-84.
Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(03), 278–84.
Walker, D H T and Vines, M W (1997) Construction time performance in multi-unit residential construction: insight into the role of procurement methods. In: Stephenson, P (Ed.), Proceedings 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK. Association of Researchers in Construction Management, Vol. 1, 93–101.
Walker, D H T, Harley, J and Mills, A (2015) Performance of project alliancing in Australasia: a digest of infrastructure development from 2008 to 2013. Construction Economics and Building, 15(01), 1-18.
Walker, D H T, Peters, R J, Hampson, K D and Thompson, M J (2001) Achieving a responsive industrial relations environment for construction industry workers: a project alliancing case study. Construction Innovation, 1(04), 211–25.
Walker, G (1999) A critical analysis into the factors that determine project management success: The case in railway engineering projects, Unpublished PhD Thesis, , London South Bank University.
Walker, G, Naoum, S and Howes, R (1997) Determinants of Project Management success. In: Stephenson, P (Ed.), Proceedings 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK. Association of Researchers in Construction Management, Vol. 1, 304–10.
Walraven, A and de Vries, B (2009) From demand driven contractor selection towards value driven contractor selection. Construction Management and Economics, 27(06), 597–604.
Walters, D J (2015) How do project managers become experts: An examination of the engineering procurement and construction management (EPCM) industry, Unpublished PhD Thesis, , Northern Illinois University.
Wamuziri, S (2010) Alternative models for procurement of major infrastructure projects in Scotland. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 2, 1009–18.
Wamuziri, S (2009) Using electronic reverse auctions in project procurement: perceptions of construction contractors. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 1, 167–76.
Wamuziri, S and Abu-Shaaban, N (2005) Potential of reverse auctions in construction procurement. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 1, 611–9.
Wamuziri, S and Seywright, A (2005) Risk sharing and effective incentives in collaborative procurement. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 2, 1175–84.
Wamuziri, S C and Clearie, A G F (2005) Economic feasibility of the proposed Second Forth Road Bridge using public private partnership procurement. Journal of Financial Management of Property and Construction, 10(02), 95–106.
Wang, B, Geng, L, Dang, P and Zhang, L (2022) Developing a Framework for Dynamic Organizational Resilience Analysis in Prefabricated Construction Projects: A Project Life Cycle Perspective. Journal of Construction Engineering and Management, 148(10).
Wang, C-H, Wang, M-W and Huang, Y-C (1998) Hierarchical indices for measuring the effectiveness of construction automation implementation. Construction Management and Economics, 16(03), 257-67.
Wang, C, Liu, H, Sing, M C P and Wu, J (2024) Pre-construction duration of public-private partnership projects: evidence from China. Engineering, Construction and Architectural Management, 31(04), 1715-29.
Wang, D (2004) The Chinese construction industry from the perspective of industrial organization, Unpublished PhD Thesis, , Northwestern University.
Wang, H (2015) The interplay of formal and informal institutions for procurement innovation: a social network approach, Unpublished PhD Thesis, , University of Hong Kong.
Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (1999) Political Risks: Analysis of Key Contract Clauses in China's BOT Project. Journal of Construction Engineering and Management, 125(03), 190–7.
Wang, S Q, Tiong, R L K, Ting, S K, Chew, D and Ashley, D (1998) Evaluation and Competitive Tendering of BOT Power Plant Project in China. Journal of Construction Engineering and Management, 124(04), 333–41.
Wang, T, Tang, W, Qi, D, Shen, W and Huang, M (2016) Enhancing Design Management by Partnering in Delivery of International EPC Projects: Evidence from Chinese Construction Companies. Journal of Construction Engineering and Management, 142(04).
Wang, W (2004) Electronic-Based Procedure for Managing Unbalanced Bids. Journal of Construction Engineering and Management, 130(03), 455–60.
Wang, W (2002) SIM-UTILITY: Model for Project Ceiling Price Determination. Journal of Construction Engineering and Management, 128(01), 76–84.
Wang, Y, Liu, J, Zuo, J and Rameezdeen, R (2020) Ways to improve the project management efficiency in a centralized public procurement system: A structural equation modeling approach. Engineering, Construction and Architectural Management, 27(01), 168-85.
Ward, S C, Curtis, B and Chapman, C B (1991) Objectives and performance in construction projects. Construction Management and Economics, 9(04), 343-53.
Warsame, A (2009) Organizational modes in the residential building sector in Sweden. Construction Management and Economics, 27(02), 153–63.
Warsame, A (2011) Performance of construction projects: Essays on supplier structure, construction costs and quality improvement, Unpublished PhD Thesis, TRITA-FOB, KTH Royal Institute of Technology.
Warszawski, A (1996) Strategic Planning in Construction Companies . Journal of Construction Engineering and Management, 122(02), 133–40.
Waskett, P R (1999) Management of the building design process with the analytical design planning technique, Unpublished PhD Thesis, , Loughborough University.
Watanabe, R, Watanabe, T and Skitmore, M (2025) Evaluating the implementation of innovative technology in Japan’s bidding system: a dynamic Stackelberg game theoretical analysis. Construction Management and Economics, 43(09), 657–84.
Watson, M, Deshpande, N and Lasch, C (2025) Disaster vulnerability of the construction industry: comparing impacts of hurricanes and the COVID-19 pandemic on Florida construction companies. Construction Management and Economics, 43(05), 323–39.
Watts, G (2025) A Model of Social Value Maturity for Benchmarking Construction Contractors . In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 41st Annual ARCOM Conference, 1-3 September 2025, Abertay University, Dundee, UK. Association of Researchers in Construction Management, 991-999.
Watts, G (2024) Authenticity and Negativism: Social Value in UK Construction. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK. Association of Researchers in Construction Management, 717-725.
Watts, G (2019) Measuring and managing the social value created by a diverse construction business, Unpublished PhD Thesis, School of Architecture, Building and Civil Engineering, Loughborough University.
Watts, G (2023) No Winter for Social Value: The Continued Growth of a Value Focused Construction Industry. In: Tutesigensi, A and Neilson, C J (Eds.), Proceedings 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK. Association of Researchers in Construction Management, 690-699.
Watts, G, Dainty, A and Fernie, S (2015) Making sense of CSR in construction: Do contractor and client perceptions align?. In: Raiden, A and Aboagye-Nimo, E (Eds.), Proceedings 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK. Association of Researchers in Construction Management, 197–206.
Watts, G, Dainty, A and Fernie, S (2019) Measuring Social Value in UK Construction. In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 54-63.
Watts, N, Watson, P A and Griffith, A (1999) Building procurement: the partnering paradigm. In: Hughes, W (Ed.), Proceedings 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK. Association of Researchers in Construction Management, Vol. 2, 667–74.
Way, M and Bordass, B (2005) Making feedback and post-occupancy evaluation routine 2: Soft landings – involving design and building teams in improving performance. Building Research & Information, 33(04), 353–60.
Waziri, B S (2018) Pareto analysis of critical risk factors of build operate and transfer projects in Nigeria. Journal of Construction Business and Management, 2(1), 33-40.
Weber, P A (2000) Requisite skill differences of baccalaureate graduates among three building disciplines, Unpublished PhD Thesis, , Colorado State University.
Weddikkara, C and Devapriya, K (2001) Demand and supply trends and construction industry: a case study in the Sri Lankan construction industry. Construction Economics and Building, 1(01), 91-105.
Weerasekara, D T, Disaratna, V, Withanage, K T and Perera, B A K S (2023) Procurement management in the foreign-funded construction projects implemented in Sri Lanka. International Journal of Construction Management, 23(07), 1118–30.
Weisheng, L, Liu, A M M, Hongdi, W and Zhongbing, W (2013) Procurement innovation for public construction projects: A study of agent-construction system and public-private partnership in China. Engineering, Construction and Architectural Management, 20(06), 543-62.
Weiss, A P W (2006) Value for money: defining and measuring 'value' in MoD's acquisition policy of obtaining best value for money, Unpublished PhD Thesis, Department of Mechanical Engineering, University College London.
Wennstroem, A, Havenvid, M I, Eriksson, P E and Larsson, J (2023) Incentivising Supplier Innovation in Mega Infrastructure Projects: Exploring the Result of Innovation Bonuses . In: Tutesigensi, A and Neilson, C J (Eds.), Proceedings 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK. Association of Researchers in Construction Management, 700-709.
West, J (2014) Collaborative Patterns and Power Imbalance in Strategic Alliance Networks. Journal of Construction Engineering and Management, 140(06).
Wibowo, A and Hartiati, D (2023) Value-for-money drivers in public-private partnerships in affordable housing in Indonesia: An analytic network process perspective. Journal of Construction in Developing Countries, 28(2), 101-19.
Willar, D, Estrellita Varina Yanti, W, Daisy Debora Grace, P and Rudolf Estephanus Golioth, M (2021) Sustainable construction practices in the execution of infrastructure projects: The extent of implementation. Smart and Sustainable Built Environment, 10(01), 106-24.
Williams T, Williams M and Ryall P (2013) Target cost contracts: adopting innovative incentive mechanisms to improve the project delivery process. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 759–768.
Willoughby, K A (1999) Modelling assistance for project procurement and disposal decisions, Unpublished PhD Thesis, , University of Calgary (Canada).
Wilson, O D and Sharpe, K (1988) Tenders and estimates: a probabilistic model. Construction Management and Economics, 6(03), 225-45.
Wilson, O D, Sharpe, K and Kenley, R (1987) Estimates given and tenders received: a comparison. Construction Management and Economics, 5(03), 211-26.
Wimalasena, N N and Gunatilake, S (2018) The readiness of construction contractors and consultants to adopt e-tendering. Construction Innovation, 18(03), 350–70.
Winch, G M (2000) Institutional reform in British construction: partnering and private finance. Building Research & Information, 28(02), 141–55.
Windapo, A O, Olugboyega, O and Odediran, S (2020) Impacts of procurement strategies on construction SMEs’ growth. Journal of Financial Management of Property and Construction , 25(03), 423–46.
Windapo, A, Odediran, S, Moghayedi, A, Adediran, A and Oliphant, D (2017) Determinants of building construction costs in South Africa. Journal of Construction Business and Management, 1(1), 8-13.
Wirahadikusumah, R, Abduh, M, Messah, Y and Aulia, M (2021) Introducing sustainability principles into the procurement of construction works–case of Indonesian developers. International Journal of Construction Management, 21(09), 932-44.
Withana-Gamage, I S (2011) A waste minimisation framework for the procurement of design and build construction projects, Unpublished PhD Thesis, Department of Civil and Building Engineering, Loughborough University.
Witteveen, W and Dorée, A (2011) Quick and effective: An innovative procurement scheme for six Dutch highway projects. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 705–14.
Wolbers, M, Evans, R J E, Holmes, M, Pasquire, C L and Price, A D F (2005) Construction management and lean thinking in highways maintenance. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 2, 1123–32.
Wondimu, P A, Klakegg, O J, Lohne, J and Lædre, O (2020) Experiences with Best-Value Procurement in Norway and the Netherlands. Journal of Construction Engineering and Management, 146(05).
Wondimu, P A, Lohne, J and Lædre, O (2018) Competitive Dialogue in Norwegian Public Infrastructure Projects. Journal of Construction Engineering and Management, 144(10).
Wong, C H and Sloan, B (2006) An empirical survey of the UK construction SMEs' e-procurement readiness from the e-legal aspects. Journal of Construction Research, 7(01), 81–97.
Wong, C H and Sloan, B (2004) Use of ICT for e-procurement in the UK construction industry: a survey of smes readiness. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 620–8.
Wong, C H, Nicholas, J and Holt, G D (2003) Using multivariate techniques for developing contractor classification models. Engineering, Construction and Architectural Management, 10(01), 99–116.
Wong, C H, Nicholas, J and Holt, G D (2003) Using multivariate techniques for developing contractor classification models. Engineering, Construction and Architectural Management, 10(2), 99–116.
Wood, G and McDermott, P (2001) Building on trust: a co-operative approach to construction procurement. Journal of Construction Procurement, 7(02), 4–14.
Wood, G D and Ellis, R C T (2005) Main contractor experiences of partnering relationships on UK construction projects. Construction Management and Economics, 23(03), 317-25.
Woodhead, R (1997) Exploring the hurdle rate in preparation for a Value Management Workshop Planning Session. Journal of Financial Management of Property and Construction, 2(02), 21–38.
Woolcott, G, Loosemore, M, Keast, R and Chamberlain, D (2023) Addressing youth un/underemployment through construction social procurement: an ecological systems theory perspective. Construction Management and Economics, 41(11–12), 942–60.
Wu, M (2005) Modelling just-in-time purchasing in the ready mixed concrete industry, Unpublished PhD Thesis, Building, National University of Singapore.
Wuni, I Y and Shen, G Q (2020) Critical success factors for modular integrated construction projects: a review. Building Research & Information, 48(07), 763–84.
Xenidis, Y and Angelides, D (2005) Identification and classification of risks in a new modelling process for build: operate: transfer projects. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 2, 803–12.
Xia, B, Chan, A P C and Yeung, J F Y (2009) Identification of key competences of design-builders in the construction market of the People's Republic of China (PRC). Construction Management and Economics, 27(11), 1141–52.
Xia, B, Chan, A, Molenaar, K and Skitmore, M (2012) Determining the Appropriate Proportion of Owner-Provided Design in Design-Build Contracts: Content Analysis Approach. Journal of Construction Engineering and Management, 138(09), 1017–22.
Xia, B, Skitmore, M, Wu, P and Chen, Q (2014) How Public Owners Communicate the Sustainability Requirements of Green Design-Build Projects. Journal of Construction Engineering and Management, 140(08).
Xiong, B, Skitmore, M, Xia, P, Ballesteros-Pérez, P, Ye, K and Zhang, X (2019) Impact of Corporate Credit Scoring on Construction Contractors in China. Journal of Construction Engineering and Management, 145(04).
Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects, Unpublished PhD Thesis, , Hong Kong University of Science and Technology (Hong Kong).
Xu, J and Zhao, S (2017) Noncooperative Game-Based Equilibrium Strategy to Address the Conflict between a Construction Company and Selected Suppliers. Journal of Construction Engineering and Management, 143(08).
Xu, M, Duffield, C and Ma, J (2011) Performance of mid-project reviews (MPRs): quantification based on fuzzy recognition. Built Environment Project and Asset Management, 1(02), 137-55.
Xu, T, Tiong, R L, Chew, D A and Smith, N J (2005) Development Model for Competitive Construction Industry in the People’s Republic of China. Journal of Construction Engineering and Management, 131(07), 844–53.
Xu, Y, Chong, H Y and Chi, M (2023) Modelling the blockchain adoption barriers in the AEC industry. Engineering, Construction and Architectural Management, 30(01), 125-53.
Yan, C (2006) Risk management strategy of construction projects in China, Unpublished PhD Thesis, Department of Computer Science and Technology, University of Bedfordshire.
Yang, Y, Zhang, S, Oti-Sarpong, K and Chow, V (2024) A Conceptual Framework of Building Information Modelling Capabilities: An Infrastructure Owner Perspective. In: Thomson, C (Ed.) and Neilson, C J (Ed.), Proceedings 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK. Association of Researchers in Construction Management, 149-157.
Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), 171-92.
Yap, J B H, Teh, Y H, Loo, S C and Sulaiman, Z B (2024) Benefits of green procurement: Perspectives from the Malaysian construction industry. International Journal of Construction Management, 24(14), 1530–9.
Ye, S and Liu, Y (2008) Study on Development Patterns of Infrastructure Projects. Journal of Construction Engineering and Management, 134(02), 94–102.
Yearsley, W S (2007) How differences in heavy civil project set-up practices impact performance, Unpublished PhD Thesis, , Colorado State University.
Yevu, S K and Yu, A T W (2020) The ecosystem of drivers for electronic procurement adoption for construction project procurement. Engineering, Construction and Architectural Management, 27(02), 411–40.
Yevu, S K, Yu, A T W and Darko, A (2023) Barriers to electronic procurement adoption in the construction industry: A systematic review and interrelationships. International Journal of Construction Management, 23(06), 964–78.
Yevu, S K, Yu, A T W, Darko, A and Addy, M N (2021) Evaluation Model for Influences of Driving Forces for Electronic Procurement Systems Application in Ghanaian Construction Projects. Journal of Construction Engineering and Management, 147(08).
Yevu, S K, Yu, A T W, Darko, A, Nani, G and Edwards, D J (2023) Modeling the influence patterns of barriers to electronic procurement technology usage in construction projects. Engineering, Construction and Architectural Management, 30(10), 5133-59.
Yevu, S K, Yu, A T W, Nani, G, Darko, A and Tetteh, M O (2022) Electronic Procurement Systems Adoption in Construction Procurement: A Global Survey on the Barriers and Strategies from the Developed and Developing Economies. Journal of Construction Engineering and Management, 148(01).
Ying, F J, Zhao, N and Tookey, J (2022) Achieving construction innovation in best value procurement projects: New Zealand mega projects study. Construction Innovation, 22(02), 388-403.
Yong Qiang, C, Huanqing, L, Wenxue, L and Ning, Z (2010) Analysis of project delivery systems in Chinese construction industry with data envelopment analysis (DEA). Engineering, Construction and Architectural Management, 17(06), 598–614.
Yong, Y C and Mustaffa, N E (2012) Analysis of factors critical to construction project success in Malaysia. Engineering, Construction and Architectural Management, 19(05), 543-56.
Yong, Y C and Mustaffa, N E (2011) Clients, consultants and contractors' perception of critical success factors for construction projects in Malaysia. In: Egbu, C and Lou, E C W (Eds.), Proceedings 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK. Association of Researchers in Construction Management, 735–44.
Younis, G E (2010) Minimizing construction disputes, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Yu, B (2007) Essays on structural analysis of procurement auctions, Unpublished PhD Thesis, , The Ohio State University.
Yu, K W (2014) The economics of construction price inflation: measurement, output and productivity, Unpublished PhD Thesis, Bartlett School of Construction and Project Management, University College London.
Yu, W and Wang, K (2012) Best Value or Lowest Bid? A Quantitative Perspective. Journal of Construction Engineering and Management, 138(01), 128–34.
Yu, W, Chang, H, Hsu, Y, Cheng, S and Wang, K (2020) Pretendering Decision Model for Contractor Selection of Public Procurement Projects. Journal of Construction Engineering and Management, 146(11).
Yu, W, Wang, K and Wang, M (2013) Pricing Strategy for Best Value Tender. Journal of Construction Engineering and Management, 139(06), 675–84.
Yuan, J, Zeng, A Y, Skibniewski, M J and Li, Q (2009) Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money. Construction Management and Economics, 27(03), 253–70.
Yuan, Z and Khosrowshahi, F (2005) Information system for project managers in chinese construction small and medium sized enterprises. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 1, 549–58.
Yuan, Z, Fang, Y, Hong, J, Zhang, Q, Zhang, Z and Ni, G (2022) Coupling Relationship between Capabilities and Benefits of Lean Construction for Precast Buildings from a Multivariable Moderation Perspective. Journal of Construction Engineering and Management, 148(05).
Zadawa, A N, Hussin, A A and Osmadi, A (2018) Mediating effects of enforcement on public procurement guidelines' compliance barriers and cost performance of construction projects in Nigerian federal universities: A process macro approach. Journal of Construction in Developing Countries, 23(1), 81-102.
Zawawi, M I b Z (2017) Improving competition within public private partnership (PPP) procurement process for infrastructure delivery in Malaysia, Unpublished PhD Thesis, , University of Salford.
Zedan, S and Miller, W (2018) Quantifying stakeholders’ influence on energy efficiency of housing: development and application of a four-step methodology. Construction Management and Economics, 36(07), 375–93.
Zhang, K and Cui, Q (2020) Does P3 Favour Large Companies? from Equity Financing to Social Equity. In: Scott, L and Neilson, C J (Eds.), Proceedings 36th Annual ARCOM Conference, 7-8 September 2020, UK, Association of Researchers in Construction Management, 125-134.
Zhang, S (2019) Developing commercial capabilities for infrastructure delivery : a dynamic capabilities view, Unpublished PhD Thesis, , University of Hong Kong.
Zhang, S, Pan, F, Wang, C, Sun, Y and Wang, H (2017) BIM-Based Collaboration Platform for the Management of EPC Projects in Hydropower Engineering. Journal of Construction Engineering and Management, 143(12).
Zhang, X (2005) Critical Success Factors for Public–Private Partnerships in Infrastructure Development. Journal of Construction Engineering and Management, 131(01), 3–14.
Zhang, X (2004) Improving Concessionaire Selection Protocols in Public/Private Partnered Infrastructure Projects. Journal of Construction Engineering and Management, 130(05), 670–9.
Zhang, X (2005) Paving the Way for Public–Private Partnerships in Infrastructure Development. Journal of Construction Engineering and Management, 131(01), 71–80.
Zhang, X (2006) Public Clients’ Best Value Perspectives of Public Private Partnerships in Infrastructure Development. Journal of Construction Engineering and Management, 132(02), 107–14.
Zhang, X Q and Kumaraswamy, M M (2001) Procurement Protocols for Public-Private Partnered Projects. Journal of Construction Engineering and Management, 127(05), 351–8.
Zhang, X Q, Kumaraswamy, M M, Zheng, W and Palaneeswaran, E (2002) Concessionaire Selection for Build-Operate-Transfer Tunnel Projects in Hong Kong. Journal of Construction Engineering and Management, 128(02), 155–63.
Zhang, X-Q and Kumaraswamy, M M (2000) Choosing concessionaires in BOT-type projects. In: Akintoye, A (Ed.), Proceedings 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK. Association of Researchers in Construction Management, Vol. 1, 395–404.
Zhang, Y, Oo, B L and Lim, B T H (2023) Factors affecting contractors’ bid or no-bid and mark-up decisions: a case of the Jilin province, China. Construction Innovation, 23(05), 1232-54.
Zhao, C E (2007) Financial risk management of PPP projects in the UK and China: A comparative study, Unpublished PhD Thesis, , University of London, University College London.
Zhao, J (2022) Rethinking value for money in Public Private Partnerships: a critique, analysis and model for transport infrastructure projects, Unpublished PhD Thesis, , Northumbria University.
Zhao, J, Thurairajah, N, Greenwood, D, Liu, H and Yuan, J (2023) Unpacking the context of value for money assessment in global markets: a procurement option framework for public-private partnerships. Engineering, Construction and Architectural Management, 30(08), 3583-601.
Zhao, N (2021) Developing a framework for roading infrastructure projects procurement system selection, Unpublished PhD Thesis, , Auckland University of Technology.
Zhao, N and Ying, F (2019) Method selection: a conceptual framework for public sector PPP selection. Built Environment Project and Asset Management, 9(02), 214–32.
Zhao, Y (2016) Green supply chain management drivers/pressures, practices and performance in Chinese construction industry, Unpublished PhD Thesis, Lord Ashcroft International Business School, Anglia Ruskin University.
Zhou, L (2009) Achieving sustainable development through the private finance initiative procurement process, Unpublished PhD Thesis, Dept of Construction and Real Estate, Oxford Brookes University.
Zhou, L and Lowe, D J (2004) Incorporating sustainable construction into pfi projects: an analysis of financial incentives and associated risks. In: Khosrowshahi, F (Ed.), Proceedings 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK. Association of Researchers in Construction Management, Vol. 1, 447–55.
Zhou, L, Keivani, R and Kurul, E (2013) Sustainability performance measurement framework for PFI projects in the UK. Journal of Financial Management of Property and Construction, 18(03), 232-50.
Zhou, X (2011) Three essays on construction procurement industry and public policies, Unpublished PhD Thesis, , The University of Oklahoma.
Zhu, L (2015) Design of a bankable and resilient financial arrangement for PPP projects using game theory with multi-agent simulation, Unpublished PhD Thesis, Civil & Environmental Engineering, National University of Singapore.
Zimmerman, A and Martin, M (2001) Post-occupancy evaluation: benefits and barriers. Building Research & Information, 29(02), 168–74.
Zin Zawawi, M I (2017) Improving competition within public private partnership procurement process for infrastructure delivery in Malaysia, Unpublished PhD Thesis, School of the Built Environment, University of Salford.
Zin, Z M I, Kulatunga, U and Thayaparan, M (2016) Malaysian experience with public-private partnership: Managing unsolicited proposal. Built Environment Project and Asset Management, 6(05), 508-20.
Zou, P X W (2007) An overview of China's construction project tendering. International Journal of Construction Management, 7(2), 23-39.
Zou, P X W (2006) Strategies for minimizing corruption in the construction industry in China. Journal of Construction in Developing Countries, 11(2), 15-29.
Zou, P X W and Zhang, G (2009) Managing risks in construction projects: Life cycle and stakeholder perspectives. International Journal of Construction Management, 9(1), 61-77.
Zou, P X W, Wang, S and Fang, D (2008) A life-cycle risk management framework for PPP infrastructure projects. Journal of Financial Management of Property and Construction, 13(02), 123–42.
Zou, W (2012) Relationship management in public private partnership infrastructure projects, Unpublished PhD Thesis, , University of Hong Kong.
Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology, Unpublished PhD Thesis, , North Carolina State University.
Zwikael, O (2009) Critical planning processes in construction projects. Construction Innovation, 9(04), 372–87.