Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 29 results ...
Abdulai, S F; Zayed, T; Taiwo, R; Ali, A H (2025) Hybrid statistical analysis of critical alignment factors in modular integrated construction. Journal of Construction Engineering and Management, 151(9).
Chen, Y; Fang, Q; Lan, Y (2025) Development of a modular assembling, suspended, and sliding scaffold. Journal of Construction Engineering and Management, 151(9).
Fang, X; Yang, L; Zhang, C; Yang, J; Zhou, W (2025) Large diameter shafts in fractured strata: Equipment and construction procedures. Journal of Construction Engineering and Management, 151(9).
Gao, H; Zou, L (2025) How to improve customer trust in residential quality: An analysis of quality information disclosure strategies considering blockchain. Journal of Construction Engineering and Management, 151(9).
Guha, P; Kar, S; Jha, K N (2025) Exploring leadership styles and their effect on the safety and quality performances in construction projects. Journal of Construction Engineering and Management, 151(9).
Guo, S (2025) Optimizing profit distribution in IPD projects: A fuzzy cooperative game approach to address resource-based input uncertainty. Journal of Construction Engineering and Management, 151(9).
Huang, X; Zhang, J; Meng, X; Wang, R; Li, J; Tao, X; Yang, Z; Li, L (2025) Verifiable safety path planning: Utilizing planar analysis for improved lifting operations. Journal of Construction Engineering and Management, 151(9).
- Type: Journal Article
- Keywords: collision judgment; lifting analysis; multi crane collaborative lifting; safest path
- ISBN/ISSN: 0733-9364
- URL: https://doi.org/10.1061/JCEMD4.COENG-15866
- Abstract:
Lifting feasibility analysis is crucial for ensuring the safety of lifting operations, especially in multicrane coordinated scenarios. Prior research has delved into shortest paths, smooth trajectories, fuel-efficient routes, and closed-loop control systems. However, the study of open-loop control algorithms focused on optimizing safety-first paths has been conspicuously lacking. Traditional three-dimensional (3D) space-based methods have drawbacks. They consume abundant computational resources, resulting in high-cost and time-consuming computations. Also, the complex 3D-presented results make it arduous for users to evaluate safety margins and optimization potential across diverse working conditions, even with multiple viewpoint changes. This greatly challenges the assessment of existing solutions' reliability and optimization potential, hampering their practical application. This paper presents an innovative planar analysis method for lifting feasibility. By eliminating elevation views and 3D modeling, it substantially cuts down the analysis complexity. Moreover, we introduce the first open-loop control algorithm for finding the safest path. Optimizing within a planar framework, it boosts computational efficiency and enables clear two-dimensional (2D) result visualization. This allows users to quickly identify key conditions without rotating 3D models and easily assess result feasibility and optimality, thus filling a research void. In real-world cases, the safest paths generated by our algorithm outperformed traditional shortest-path methods. The average safety margin increased by 58%, and overall safety risks decreased by 74%. This research fills multiple gaps in the field and shows excellent practicality and safety advantages, especially in high-risk multicrane coordinated lifting operations.
Ibrahim, A; Xu, J; Cheon, S; Wang, X; Nnaji, C (2025) Human-robot interaction in dynamic work environment: Implications for workers' situational awareness. Journal of Construction Engineering and Management, 151(9).
Jaskula, K; Kifokeris, D; Papadonikolaki, E; Rovas, D (2025) Blockchain-based decentralized common data environment: User requirements and conceptual framework. Journal of Construction Engineering and Management, 151(9).
Jeong, E; Jang, J; Kim, T W; Lee, S (2025) Divide-and-conquer-based stratified models for predicting precast concrete installation times. Journal of Construction Engineering and Management, 151(9).
Jezzini, Y; Assaad, R H; El-Adaway, I H (2025) Risk allocation model for price escalations in construction projects: Integrating bargaining game theory and probabilistic Bayesian modeling. Journal of Construction Engineering and Management, 151(9).
Karim, M T; Ahmed, S; Hoque, M N; Iorio, J; Abudayyeh, O (2025) Evaluating the management's role in addressing gender and racial disparities to promote DEI in the US construction industry: Exploratory study. Journal of Construction Engineering and Management, 151(9).
Kumi, L; Jeong, J; Jeong, J; Mun, H (2025) Development of multimodal recommender system for advancing design for safety with expert validation. Journal of Construction Engineering and Management, 151(9).
Li, Y; Liu, J; Du, X; Zhong, R Y (2025) Creating value from data resources: Research on a service ecosystem symbiosis model of digital transportation infrastructure. Journal of Construction Engineering and Management, 151(9).
Liu, C; González, V A; Lee, G; Davies, R; Cabrera-Guerrero, G; Zou, Y (2025) Assessing an immersive virtual reality-based simulation game capability to study the social mechanisms enabled by the Last Planner system in projects. Journal of Construction Engineering and Management, 151(9).
Liu, Y; Xiang, Q; Goh, Y M; Ye, G; Shao, Z; Safiena, S (2025) Exploring the mechanism of hazard detection failure of construction workers from a capability-demand matching perspective. Journal of Construction Engineering and Management, 151(9).
Martin, H; James, J; Chadee, A (2025) Exploring large language model AI tools in construction project risk assessment: ChatGPT limitations in risk identification, mitigation strategies, and user experience. Journal of Construction Engineering and Management, 151(9).
Mun, H; Jeong, J; Jeong, J; Kumi, L (2025) Statistical hypothesis test approach considering workers' thermal comfort to determine nonworking days in different climate zones. Journal of Construction Engineering and Management, 151(9).
Shen, W; Xue, J; Xiong, J; Zhai, X; Lee, S; Lu, J (2025) A social network-based approach for analyzing interproject risks in large-scale programs. Journal of Construction Engineering and Management, 151(9).
Shiha, A; Elazhary, M; El-Adaway, I H (2025) Price adjustment clauses: Enhanced price volatility forecasting for construction materials. Journal of Construction Engineering and Management, 151(9).
Sun, B; Wu, J; You, H; Du, J (2025) Estimating belief updates in AI-driven drone controls for urban search and rescue operations. Journal of Construction Engineering and Management, 151(9).
Wang, J; Xiahou, X; Lin, Y; Liu, Y; Han, Z; Song, Y (2025) A novel approach for pipeline generation using a mixed GA and tree strategy. Journal of Construction Engineering and Management, 151(9).
Wang, J; Xu, Y; Fang, D; Liao, P C (2025) How project-based learning improves construction contract management training: Evidence from eye-tracking searching strategies for contract risk recognition performance. Journal of Construction Engineering and Management, 151(9).
Wang, X; Li, J; Wang, R; Zhang, J; Ma, G (2025) Automated evaluation and optimization of subgrade construction based on intelligent compaction. Journal of Construction Engineering and Management, 151(9).
Wu, J; Yan, B; Sun, G; Liu, M; Li, Y; Zhou, C (2025) Research on the construction-forming model of a single-layer orthogonal saddle-shaped cable net with an opening. Journal of Construction Engineering and Management, 151(9).
Yang, S; Zhang, J; Xu, S; Deng, T; He, Q; Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9).
Yang, Y; Wei, Z; Zhang, Z; Xie, H (2025) Modeling the enablers for blockchain technology adoption in the construction supply chain. Journal of Construction Engineering and Management, 151(9).
Zhang, J; Jiang, S (2025) Construction safety decision-making system based on improved integration of case-based reasoning and rule-based reasoning. Journal of Construction Engineering and Management, 151(9).
Zhu, W; Li, J; Shen, K; Li, X (2025) Carbon dioxide emission reduction assessments of recycled aggregate concrete applications for infrastructure by incorporating vegetation carbon sink. Journal of Construction Engineering and Management, 151(9).