Baker, M; Ali, M; Hassett, E; Jahan Tumpa, R (2025) Tapping the untapped resource to address construction skills shortages: Perceptions of Australian women career changers and construction women. Journal of Construction Engineering and Management, 151(4).

Chang, W C; Esmaeili, B; Hasanzadeh, S (2025) Impacts of physical and informational failures on worker-autonomy trust in future construction. Journal of Construction Engineering and Management, 151(4).

Charbel, G; Assaad, R H; Tejada, T R; Karaa, F (2025) Modeling the interdependencies between the risk factors contributing to preconstruction delays in construction projects. Journal of Construction Engineering and Management, 151(4).

Chen, S; Zeng, N; Li, F; Yue, H; Wang, Q; Li, Q (2025) Proactive safety risk control system for deep foundation pit construction: Situational tailoring of integrated cybernetics and dual-system theory. Journal of Construction Engineering and Management, 151(4).

Dou, Y; Zhong, L; Luo, L (2025) Supply chain resilience of prefabricated construction: Perspectives of stakeholder capabilities and vulnerabilities. Journal of Construction Engineering and Management, 151(4).

He, C; Liu, M; Hsiang, S M; Pierce, N; Megahed, S; Godfrey, A (2025) An ontological knowledge-driven smart contract framework for implicit bridge preservation decision making. Journal of Construction Engineering and Management, 151(4).

Jiang, Z; Han, Y; Cheng, Y; Wang, Z; Meng, H (2025) An improved yolov8-dyhead-wiseiou model for positioning and counting detection of grouting sleeves in a prefabricated wall. Journal of Construction Engineering and Management, 151(4).

Lin, S; Cheung, S O (2025) What organizational justice brings to project dispute negotiation. Journal of Construction Engineering and Management, 151(4).

Liu, Z; Li, X; Gao, Z; Zhang, Y; Teng, Y; Wu, C (2025) A hybrid and intuitive work packaging approach with multiple task relations, general work package precedence, and BIM in modular construction. Journal of Construction Engineering and Management, 151(4).

Mai, T P A; Doan, D T; Ghaffarianhoseini, A (2025) Utilizing multiskilled resources in addressing labor shortage issues in off-site construction: Benefits, challenges, and best practices. Journal of Construction Engineering and Management, 151(4).

Onubi, H O; Carpio, M (2025) Voluntary workplace proenvironmental behavior on construction project sites: Antecedent roles of green human resource management practices, environmental awareness, and job control. Journal of Construction Engineering and Management, 151(4).

Sharma, N; Laishram, B (2025) Decoding the emergent patterns of cost of quality through the lens of sociotechnical systems: A bibliometric analysis. Journal of Construction Engineering and Management, 151(4).

Shrestha, R; Ko, T; Lee, J (2025) Quantifying project uncertainties: Leveraging historical bid and change order data for automated detection of cost and schedule impacts in new projects. Journal of Construction Engineering and Management, 151(4).

Sun, R; Yan, Q; Zhang, C; Qiao, M; Ren, J (2025) Comprehensive evaluation of grouting effectiveness combining qualitative on-site tests and improved fuzzy integration with entropy weight method: Case study of a mountain tunnel. Journal of Construction Engineering and Management, 151(4).

Tao, Y; Hu, H; Xu, F; Zhang, Z (2025) Ergonomic risk mitigation through workforce planning for construction projects. Journal of Construction Engineering and Management, 151(4).

  • Type: Journal Article
  • Keywords: construction projects; ergonomic risk; scheduling optimization; work-related musculoskeletal disorders; workforce development
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/JCEMD4.COENG-15072
  • Abstract:
    Construction workers are facing significant ergonomic risks, which negatively affect their health, safety, and productivity, and therefore it is essential to develop effective and applicable risk control measures. In addition to instrument-based risk control methods, which have received the most attention, another easy-to-implement strategy is to consider ergonomic risks in workforce planning to balance physical stress and rest allowance. This study was aimed at mitigating ergonomic risks through workforce planning for construction projects. First, the ergonomic risk can be measured by considering task-specific and personalized features together with processing time. On this basis, a multiobjective mixed-integer programming model with ergonomic considerations was developed. Specifically, ergonomic constraints limit the cumulative ergonomic risk for each worker, and the objective is to minimize overall ergonomic risks across all workers. Small-scale basic examples were used to compare the different strategies for how to take ergonomic risks into account. Then a real-world case was conducted to demonstrate the effectiveness and practicability of the proposed method. Compared with the default plan proposed by the onsite superintendents, a 5% decrease in total ergonomic risks and a 41% decrease in max individual cumulative risk was achieved. The method is easy to adopt compared with instrument-based intervention systems, and is flexible to be adjusted according to real-life situations, contributing to sustainable workforce development in the construction sector.

Wang, H; Chen, X; Wang, J; Guan, W; Wei, S (2025) Multiobjective trade-off optimization of time, cost, quality, and carbon emission in the building construction stage. Journal of Construction Engineering and Management, 151(4).

Yan, H; Liu, C; Yang, X; Feng, K (2025) Real-time digital twin-driven 3D near-miss detection system at construction sites. Journal of Construction Engineering and Management, 151(4).

Yu, M; Ruan, W; Zhou, Y; Zhao, Y (2025) Flow shop scheduling for prefabricated components production considering parallel machines and buffer constraints. Journal of Construction Engineering and Management, 151(4).