Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 250 results ...

Abbasianjahromi, H, Shadhy, V P and Beykian, A (2021) Developing a smart helmet based on the internet of things to manage hearing problems in the construction projects. Journal of Construction in Developing Countries, 26(2), 231-50.

Abdullahi, U, Bustani, S A, Hassan, A and Rotimi, F E (2019) Assessing quality management practice in Nigerian construction industry. Journal of Construction Business and Management, 3(2), 17-25.

Abidin, N Z, Adros, N A and Hassan, H (2014) Competitive strategy and performance of quantity surveying firms in Malaysia. Journal of Construction in Developing Countries, 19(2), 15-32.

Adade-Boateng, A O, Fugar, F and Adinyira, E (2021) Framework to improve the attitudes of construction workers towards safety helmets. Journal of Construction in Developing Countries, 26(2), 65-86.

Adamu, N, Zubairu, I K, Ibrahim, Y M and Ibrahim, A M (2011) Evaluating the impact of product diversification on financial performance of selected nigerian construction firms. Journal of Construction in Developing Countries, 16(2), 91-114.

Adebowale, O J, Simpeh, F, Kukoyi, P O and Agumba, J N (2022) Assessment of basic measures instituted to curtail the spread of COVID-19 on construction sites in Lagos, Nigeria. Journal of Construction in Developing Countries, 27(2), 43–61.

Adinyira, E, Agyekum, K, Danku, J C, Addison, P and Kukah, A S (2020) Influence of subcontractor risk management on quality performance of building construction projects in Ghana. Journal of Construction in Developing Countries, 25(2), 175-97.

Afolabi, A, Oyeyipo, O, Ojelabi, R and Patience, T O (2019) Balancing the female identity in the construction industry. Journal of Construction in Developing Countries, 24(2), 83-104.

Agbo, E A, Izam, Y D and Ayegba, C (2022) Quantifying the impact of work environment factors on the variability of labour productivity in wall plastering. Journal of Construction in Developing Countries, 27(2), 109–25.

Ahmed, S M and Zhu, Y (2007) Pneumoconiosis trends in the us construction industry: A comparison between the coal mining and construction industries. International Journal of Construction Management, 7(2), 79-99.

Ahmed, V, Pathmeswaran, R, Baldry, D, Worrall, L and Abouen, S (2008) An investigation into the barriers facing black and minority ethnics within the UK construction industry. Journal of Construction in Developing Countries, 13(2), 83-99.

Aidoo, I, Fugar, F, Adinyira, E and Ansah, N B (2023) Assessing the level of resilience in construction safety management systems in the Ghanaian construction industry. Journal of Construction in Developing Countries, 28(2), 217-42.

Ajayi, O O, Koleoso, H, Ajayi, M and Faremi, O (2019) Maintenance performance of prison facilities in southwestern Nigeria. Journal of Construction Business and Management, 3(2), 26-34.

Akeila, M, Preece, C and Kuok, K K K (2021) Evaluating the environmental performance of 3D printed shelters in Jordan. Journal of Construction in Developing Countries, 26(2), 117-34.

Akinwale, A A and Olusanya, O A (2020) Influence of subcontracting processes on wages and workloads in the building construction industry in Nigeria. Journal of Construction Business and Management, 4(2), 1-10.

Akuete, E, Nduka, D O and Ogundipe, K E (2022) Maintenance feedback mechanisms and limiting factors of post-occupancy evaluation in student residents of higher education institutions in Nigeria. Journal of Construction in Developing Countries, 27(2), 17–41.

Al Nasseri, H and Aulin, R (2016) Enablers and barriers to project planning and scheduling based on construction projects in Oman. Journal of Construction in Developing Countries, 21(2), 1-20.

Alade, K, Oyebade, A and Nzewi, N (2018) Assessment of the use of locally available materials for building construction in Ado-Ekiti, Nigeria. Journal of Construction Business and Management, 2(2), 36-41.

Alam, M K and Hasan, M D R (2010) Protection works against wave attacks in the haor areas of Bangladesh: Analysis of sustainability. Journal of Construction in Developing Countries, 15(2), 69-85.

Alashwal, A M and Al-Sabahi, M H (2018) Risk factors in construction projects during unrest period in Yemen. Journal of Construction in Developing Countries, 23(2), 43-62.

Aligamhe, V I, Mustapa, M, Ogbu, C P and Misnan, M S (2024) Modelling cost-risk impact on Nigerian highway projects using multiple linear regression and artificial neural networks. Journal of Construction in Developing Countries, 29(2), 107–28.

Alinaitwe, H and Ayesiga, R (2013) Success factors for the implementation of public-private partnerships in the construction industry in Uganda. Journal of Construction in Developing Countries, 18(2), 1-14.

Alinaitwe, H, Apolot, R and Tindiwensi, D (2013) Investigation into the causes of delays and cost overruns in uganda's public sector construction projects. Journal of Construction in Developing Countries, 18(2), 33-47.

Aliu, J, Aigbavboa, C and Wellington Didibhuku, T (2021) Driving the fourth industrial revolution initiative through university and industry collaborations. Journal of Construction in Developing Countries, 26(2), 211-30.

Amato, A, Frewer, R and Humphrey, S (2003) A comparative sustainability assessment of standard housing blocks in Hong Kong and proposed integer concept tower alternative. International Journal of Construction Management, 3(2), 93-108.

Ameh, O J and Daniel, E I (2017) Human resource management in the Nigerian construction firms: practices and challenges. Journal of Construction Business and Management, 1(2), 47-54.

Ameh, O J, Soyingbe, A A and Odusami, K T (2010) Significant factors causing cost overruns in telecommunication projects in Nigeria. Journal of Construction in Developing Countries, 15(2), 49-67.

Amin, K F and Abanda, F H (2019) Building information modelling plan of work for managing construction projects in egypt. Journal of Construction in Developing Countries, 24(2), 23-61.

Aminorlah, A I, Rahim, N A, Mohamed, Z and Mazlan, A N (2023) Critical delay factors in typical physical projects: The case of the ministry of home affairs in Malaysia. Journal of Construction in Developing Countries, 28(2), 57-79.

Amoah, A, Berbegal-Mirabent, J and Marimon, F (2023) National cultural dimensions and their impact on construction project management in developing countries: The case of Ghana. Journal of Construction in Developing Countries, 28(2), 163-87.

Amoo, O, Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in Eastern Cape South Africa: A case study. Journal of Construction Business and Management, 5(2), 54-67.

Ankrah, N A, Proverbs, D and Debrah, Y (2008) Towards a framework for diagnosing the culture of a construction project organisation. International Journal of Construction Management, 8(2), 17-31.

Arain, F M (2009) Leveraging on information technology to teach construction law to built environment students: A knowledge-based system approach. Journal of Construction in Developing Countries, 14(2), 77-102.

Arain, F M and Low, S P (2005) The nature and frequency of occurence of variation orders for educational building projects in Singapore. International Journal of Construction Management, 5(2), 79-91.

Arain, F M and Low, S P (2006) Value management through a knowledge-based decision support system for managing variations in educational building projects. International Journal of Construction Management, 6(2), 87-102.

Ariffin, M H and Torrance, J V (2008) Social group related entry participation motivations for continuing professional development activities among malaysian registered quantity surveyors. Journal of Construction in Developing Countries, 13(2), 1-19.

Arshad, H, Qasim, M, Thaheem, M J and Gabriel, H F (2017) Quantification of material wastage in construction industry of Pakistan: An analytical relationship between building types and waste generation. Journal of Construction in Developing Countries, 22(2), 19-34.

Asiedu, E M and Mkansi, M (2023) Critical factors contributing to budget overruns in ghana’s telecommunication industry construction projects. Journal of Construction in Developing Countries, 28(2), 265-93.

Auti, A and Skitmore, M (2008) Construction project management in India. International Journal of Construction Management, 8(2), 65-77.

Awang, H and Wan Badaruzzaman, W H (2009) The bending behaviour of a 'reversed' profiled steel sheet dry board panel for application in a roofing system. Journal of Construction in Developing Countries, 14(2), 21-35.

Awodele, I A, Mewomo, M C and Eze, E C (2023) Inhibitors to the adoption of building information modelling in modular construction: A case study of the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), 19-36.

Bapat, H, Debasis, S and Rajesh, G (2021) Selection of sustainable materials for energy savings of infrastructure-transportation project in Ahmedabad, India using BIM and FCM. Journal of Construction in Developing Countries, 26(2), 135-61.

Batouli, M; Joshi, D (2025) Pathways to socially sustainable adaptation: Real-time and context-specific vulnerability assessment in South carolina after hurricane dorian. Journal of Construction Engineering and Management, 151(2).

Berawi, M A, Miraj, P, Arifuddin, R, Aulia, D and Rahma, S H (2022) Investigating current practice on disincentive programmes in the Indonesian construction industry. Journal of Construction in Developing Countries, 27(2), 87–107.

Bettemir, O H (2025) Analysis of existing resource distribution metrics and suggestion of new metrics. Journal of Construction Engineering and Management, 151(2).

Bouhamou, N E, Belas, N, Attar, A, Achour, B and Mebrouki, A (2011) Properties of self-consolidating concrete produced using local algerian materials. Journal of Construction in Developing Countries, 16(2), 1-25.

Castell, L (2004) Current trends in client briefing: A survey of architectural practices in Western Australia. International Journal of Construction Management, 4(2), 1-12.

Chakraborty, B and Das, S (2014) Mgnrega and water management: Sustainability issues of built forms in rural India. Journal of Construction in Developing Countries, 19(2), 33-50.

Chan, A P C, Chan, E H W and Chan, A P L (2003) Managing health care projects in Hong Kong: A case study of the North district hospital. International Journal of Construction Management, 3(2), 1-13.

Chau, K W (2009) Explaining total factor productivity trend in building construction: Empirical evidence from Hong Kong. International Journal of Construction Management, 9(2), 45-54.

Cheah, C Y J (2007) Construction safety and health factors at the industry level: The case of Singapore. Journal of Construction in Developing Countries, 12(2), 81-99.

Chen, C, Goldstein, A and Orr, R J (2009) Local operations of Chinese construction firms in Africa: An empirical survey. International Journal of Construction Management, 9(2), 75-89.

Chen, K, Loo, S C and Alias, A (2024) A bibliometric review of maturity model studies in the construction industry. Journal of Construction in Developing Countries, 29(2), 129–45.

Chileshe, N, Boadua, A and Yirenkyi, F (2011) Perceptions of threat risk frequency and impact on construction projects in Ghana: Opinion survey findings. Journal of Construction in Developing Countries, 16(2), 115-49.

Chileshe, N, Reza Hosseini, M and Jepson, J (2016) Critical barriers to implementing risk assessment and management practices in the Iranian construction sector. Journal of Construction in Developing Countries, 21(2), 81-112.

Choudhry, R M, Gabriel, H F, Khan, M K and Azhar, S (2017) Causes of discrepancies between design and construction in the Pakistan construction industry. Journal of Construction in Developing Countries, 22(2), 1-18.

Cruz, L M M, Echeverri, J J D, Arroyave, M G, Bejarano, D H and Florez, O F M (2017) Bioclimatic conditions: A forgotten factor in the domestic habitat in the city of palmira, Colombia. Journal of Construction in Developing Countries, 22(2), 81-100.

Dada, J O (2018) A career path framework for quantity surveyors in Nigeria private practice. Journal of Construction Business and Management, 2(2), 15-23.

Daniel, M M (2014) Evaluating the determinants for access to subsidised mortgage housing in jos, Nigeria. Journal of Construction in Developing Countries, 19(2), 87-109.

Danku, J C (2020) Exploring the concept of social licence in the construction industry of a developing country. Journal of Construction Business and Management, 4(2), 25-33.

Davis, P R and Walker, D H T (2003) Relationship marketing: Providing opportunities and benefits for the construction industry. International Journal of Construction Management, 3(2), 69-78.

Ding, G and Langston, C (2004) Multiple criteria sustainability modelling: Case study on school buildings. International Journal of Construction Management, 4(2), 13-26.

Dorji, K and Hadikusumo, B H W (2006) Safety management practices in the bhutanese construction industry. Journal of Construction in Developing Countries, 11(2), 53-75.

Dosumu, O S, Mahame, C, Niyitegeka, S and Hahiirwuwambaza, J A (2023) Applications and challenges of adopting the internet of things (IoT) in the Rwandan construction industry. Journal of Construction in Developing Countries, 28(2), 81-100.

Dosumu, O, Idoro, G and Onukwube, H (2017) Causes of errors in construction contract documents in Southwestern, Nigeria. Journal of Construction Business and Management, 1(2), 11-23.

Elijah, O O and Oluwasuji, D J (2019) An evaluation of training needs of the nigerian construction professionals in adopting building information modelling. Journal of Construction in Developing Countries, 24(2), 63-81.

Enegbuma, W I, Aliagha, G U, Ali, K N and Badiru, Y Y (2016) Confirmatory strategic information technology implementation for building information modelling adoption model. Journal of Construction in Developing Countries, 21(2), 113-29.

Enshassi, A A, Arain, F and El-Rayyes, Y (2014) Post-evaluation system in construction projects in gaza strip-palestine. Journal of Construction in Developing Countries, 19(2), 51-73.

Enshassi, A and Al Swaity, E (2015) Key stressors leading to construction professionals' stress in the gaza strip, palestine. Journal of Construction in Developing Countries, 20(2), 53-79.

Enshassi, A, Al-Hallaq, K and Mohamed, S (2006) Causes of contractor's business failure in developing countries: The case of palestine. Journal of Construction in Developing Countries, 11(2), 1-14.

Enshassi, A, Mayer, P E, Mohamed, S and El-Masri, F (2007) Perception of construction managers towards safety in Palestine. International Journal of Construction Management, 7(2), 41-51.

Enshassi, A, Shakalaih, S and AlKilani, S (2019) Strategies for community participation in pre-disaster phase in the gaza strip, palestine. Journal of Construction in Developing Countries, 23(2), 107-27.

Esteban, Y, Sowinski, D and Rollo, J (2004) Adopting a computational approach to identifying and modelling future development initiatives within the urban context. International Journal of Construction Management, 4(2), 39-52.

  • Type: Journal Article
  • Keywords: computation; mapping; urban design
  • ISBN/ISSN:
  • URL: https://doi.org/10.1080/15623599.2004.10773059
  • Abstract:
    In 2002 the State Government of Victoria, in partnership with the City of Greater Geelong and Deakin University, initiated an urban design framework to explore development opportunities of a series of redundant industrial sites adjacent to Geelong's central activities area (CAA). One of the objectives of the framework was to explore a range of initiatives based on the expansion of the Deakin University Waterfront campus from 700 students to an expected cohort of 5000 students. Working with a set of predefined constructs for different types of city-based user groups, such as net floor space requirements and time/travel distances between facilities, the following paper presents a simple computational approach to assist in identifying, mapping, and spatially exploring different development scenarios.

Fan, S, Shen, Q, Tang, R and Lin, G (2006) The effect of using group decision support system in value management workshops: An experimental study. International Journal of Construction Management, 6(2), 49-62.

Fateh, M A M and Mohammad, M F (2017) Industrialized building system provision in local and international standard form of contracts. Journal of Construction in Developing Countries, 22(2), 67-80.

Fernandes, D S and Joseph, G (2020) Organisational strategies for competitive advantage in the construction industry: Chinese dominance in southern Africa. Journal of Construction in Developing Countries, 25(2), 1-38.

Formoso, C T and Jobim, M S S (2006) Challenges in improving customer focus in small-sized house-building companies in Brazil. Journal of Construction in Developing Countries, 11(2), 77-101.

Formoso, C, Leite, F and Miron, L (2011) Client requirements management in social housing: A case study on the residential leasing program in brazil. Journal of Construction in Developing Countries, 16(2), 47-67.

Fuller, R J (2004) Innovation in construction: experiences from a hypocaust system in Australia. International Journal of Construction Management, 4(2), 63-74.

Fung, I W H, Tam, C M, Tung, K C F and Choi, D C F (2005) Use of fuzzy reasoning in marking-up tenders. International Journal of Construction Management, 5(2), 1-14.

Fung, I W H, Wong, C K, Tam, C M and Tong, T K L (2008) Optimizing material hoisting operations and storage cells in single multi-storey tower block construction by genetic algorithm. International Journal of Construction Management, 8(2), 53-64.

Georgiou, J, Smith, J and Love, P E D (2004) A benchmark study on housing defects in Victoria, Australia. International Journal of Construction Management, 4(2), 89-100.

Ghahramanpouri, A, Lamit, H and Sedaghatnia, S (2012) Behavioural observation of human stationary and sustained activities in pedestrian priority streets of johor bahru. Journal of Construction in Developing Countries, 17(2), 105-16.

Griffith, A, Stephenson, P and Bhutto, K (2005) An integrated management system for construction quality, safety and environment: A framework for IMS. International Journal of Construction Management, 5(2), 51-60.

Gunasagaran, S, Mari, T, Mohamed, R, Ng, V and Srirangam, S (2024) Students’ perception of virtual reality applications to analyse daylighting and spatial functions in architecture and environment. Journal of Construction in Developing Countries, 29(2), 147–65.

Guo, Z; Xu, X; Gao, X; Xu, Y; Liu, J; Zhang, M; Li, F (2025) Enhanced risk-based quality control for hydraulic engineering construction projects considering the risk-influencing mechanism. Journal of Construction Engineering and Management, 151(2).

Hanif, H, Khurshid, M B, Lindhard, S M and Aslam, Z (2016) Impact of variation orders on time and cost in mega hydropower projects of Pakistan. Journal of Construction in Developing Countries, 21(2), 37-53.

Hansen, S and Siregar, P H R (2020) Analytic hierarchy process-based decision-making framework for formwork system selection by contractors. Journal of Construction in Developing Countries, 25(2), 237–55.

Haupt, T C and Whiteman, D E (2003) Deploying total quality management on construction sites: Inhibiting factors. International Journal of Construction Management, 3(2), 51-68.

Hui, E C-m and Tse, R Y C (2005) Housing consumption of assisted home ownership. International Journal of Construction Management, 5(2), 15-33.

Hunt, J (2004) Project briefing and change-responsive facilities management. International Journal of Construction Management, 4(2), 53-61.

Hussein, M K, Yusof, M J M and Jaafar, N S (2020) An observational study on forest landscape conservation in Malaysia via the establishment of forestry educational centres. Journal of Construction in Developing Countries, 25(2), 153-73.

Hyari, K H, El-Mashaleh, M S and Rababeh, S M (2015) Framework for managing the traffic impacts of building construction projects. Journal of Construction in Developing Countries, 20(2), 97-113.

Ibem, E O (2010) An assessment of the role of government agencies in public-private partnerships in housing delivery in Nigeria. Journal of Construction in Developing Countries, 15(2), 23-48.

Idoro, G I (2011) Comparing occupational health and safety management efforts and performance of nigerian construction contractors. Journal of Construction in Developing Countries, 16(2), 151-73.

Idoro, G I (2011) Effect of mechanisation on occupational health and safety performance in the Nigerian construction industry. Journal of Construction in Developing Countries, 16(2), 27-45.

Idoro, G I (2012) Influence of project plans on the outcome of construction projects procured by design-build in Nigeria. Journal of Construction in Developing Countries, 17(2), 81-103.

Ingirige, B, Haigh, R, Malalgoda, C and Palliyaguru, R (2008) Exploring good practice knowledge transfer related to post-tsunami housing (re-)construction in Sri Lanka. Journal of Construction in Developing Countries, 13(2), 21-42.

Jaafar, M and Abdul-Aziz, A-R (2005) Resource-based view and critical success factors: A study on small and medium sized contracting enterprises (SMCEs) in Malaysia. International Journal of Construction Management, 5(2), 61-77.

Jibrin, I M and Aminu, S M (2023) Information technology as catalyst for value re-engineering implementation in the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), 189-216.

Joseph Oladiran, O and Rogers Simeon, D (2023) Consciousness and prospects of autoclaved aerated concrete (AAC) blocks for wall construction: Comparative study Nigeria and South Africa. Journal of Construction Business and Management, 6(2), 1-10.

K'Akumu, O A, Jones, B and Yang, J (2013) Factor analysis of the market environment for artisanal dimension stone in nairobi, Kenya. Journal of Construction in Developing Countries, 18(2), 15-32.

Kahvandi, Z, Saghatforoush, E, Ravasan, A Z and Viana, M L (2020) A review and classification of integrated project delivery implementation enablers. Journal of Construction in Developing Countries, 25(2), 219-36.

Kamal, E M and Flanagan, R (2014) Key characteristics of rural construction SMEs. Journal of Construction in Developing Countries, 19(2), 1-13.

Kang, C X, Chai, C and Lee, C K (2024) A comprehensive analysis of safety predictors in construction sites: A DEMATEL-based model. Journal of Construction in Developing Countries, 29(2), 37–58.

Kaushik, A (2019) Gating and syntactical analysis of spatial configuration of sectors of Gurgaon (Gurugram), India. Journal of Construction in Developing Countries, 23(2), 87-106.

Kim, S Y, Lee, Y S, Nguyen, V T and Luu, V T (2016) Barriers to applying value management in the Vietnamese construction industry. Journal of Construction in Developing Countries, 21(2), 55-80.

Kouch, K A, Panuwatwanich, K, Sancharoen, P and Sahachaisaree, P (2021) Development of augmented reality application for onsite inspection of expressway structures using Microsoft HoloLens. Journal of Construction in Developing Countries, 26(2), 87-116.

Langston, Y L and Langston, C (2008) Comparisons of building energy and cost equivalence: An analysis of thirty melbourne case studies. International Journal of Construction Management, 8(2), 33-52.

Latiff, A M A, Jaapar, A and Isa, C M M (2022) Factors influencing governance practices in rural development projects: A case study of rural road projects in Malaysia. Journal of Construction in Developing Countries, 27(2), 1–16.

Lee, A and Barrett, P (2006) Value in construction: An international study. International Journal of Construction Management, 6(2), 75-86.

Leo-olagbaye, F and Odeyinka, H A (2018) Evaluation of risk factors and their impact on road projects. Journal of Construction Business and Management, 2(2), 24-35.

Li, J (2009) Dynamic contract conditions for built operation transfer (BOT) projects in China. International Journal of Construction Management, 9(2), 55-64.

Liang, H (2009) Coupling relationships of land use benefits in Shenzhen China. International Journal of Construction Management, 9(2), 33-43.

Lin, G and Shen, Q (2006) Critical appraisal of performance measurement in value management. International Journal of Construction Management, 6(2), 1-14.

Ling, F Y Y and Leow, L (2008) Enabling knowledge flow: Retaining graduate women in the Singapore construction industry. Journal of Construction in Developing Countries, 13(2), 65-82.

Ling, F Y Y, Dulaimi, M F, Kumaraswamy, M and Bajracharya, A (2003) A case study of the management of innovation implementation within a construction project organization. International Journal of Construction Management, 3(2), 79-91.

Liu, Y; Xiang, Q; Goh, Y M; Ye, G; Shao, Z (2025) Exploring the mechanism of risk perception failure of construction workers from a capability-demand balance perspective. Journal of Construction Engineering and Management, 151(2).

Loosemore, M (2009) Managing public perceptions of risk on construction and engineering projects: How to involve stakeholders in business decisions. International Journal of Construction Management, 9(2), 65-74.

Love, P E D (2025) Explaining cost overrun causation in transport projects: Drawing on evidential pluralism to develop theory. Journal of Construction Engineering and Management, 151(2).

Low, S P, Liu, J Y and He, S Q (2008) Management of external risks: Case study of a Chinese construction firm at infancy stage in Singapore. International Journal of Construction Management, 8(2), 1-15.

Lowe, J (2023) Technical and organisational change in UK construction. Journal of Construction Business and Management, 6(2), 50-61.

Manchidi, T E and Rwelamila, P D (2019) A state legitimation approach of reserved built environment professional work: A case for South Africa – part 1. Journal of Construction Business and Management, 3(2), 35-48.

Maniar, H (2020) Contingency management in Indian construction projects. Journal of Construction Business and Management, 4(2), 11-24.

Manjia, M, Pettang, C and Abanda, F (2011) Urban self-building labour cost modelling in Cameroon. Journal of Construction in Developing Countries, 16(2), 69-90.

Marzuki, P, Oktavianus, A, Regina, A, Hasiholan, B and Meifrinaldi (2019) Interface problems in change order-challenged projects. Journal of Construction in Developing Countries, 24(2), 1-22.

Mat Isa, C M, Saman, H M and Preece, C N (2015) Determining significant factors influencing Malaysian construction business performance in international markets. Journal of Construction in Developing Countries, 20(2), 1-23.

Mawdesley, M J, Al-Jibouri, S H and Askew, W H (2003) Automatic generation of construction project networks from activity lists. International Journal of Construction Management, 3(2), 15-23.

Mazlan, E M, Osman, M H and Saud, M S (2019) The level of competency knowledge in safety training among construction personnel. Journal of Construction in Developing Countries, 24(2), 157-72.

Meikle, J (2019) A response to george ofori's special note. Journal of Construction in Developing Countries, 24(2), 207-8.

Mejía, G and Franco-Duran, D M (2017) Evidence-based improvement policies in public management: A case study of public projects in barrancabermeja city, Colombia. Journal of Construction in Developing Countries, 22(2), 55-66.

Mohamad, M I, Nekooie, M A and Al-Harthy, A B S (2012) Design changes in residential reinforced concrete buildings: The causes, sources, impacts and preventive measures. Journal of Construction in Developing Countries, 17(2), 23-44.

Mostafa, A, Wong, F K W and Hui, E C M (2005) A study of housing affordability in relation to economic development in Hong Kong. International Journal of Construction Management, 5(2), 35-49.

Mostafa, K; Hegazy, T (2025) Smart rehabilitation-planning framework for sustainable infrastructure: Roofing application. Journal of Construction Engineering and Management, 151(2).

Moyo, T and Chigara, B (2023) Factors affecting the competence of quantity surveying professionals in Zimbabwe. Journal of Construction in Developing Countries, 28(2), 1-17.

Moza, A and Paul, V K (2019) Analysis of claims in public works construction contracts in India. Journal of Construction in Developing Countries, 23(2), 7-26.

Murphy, P A (2009) Cost recovery pricing and urban management. International Journal of Construction Management, 9(2), 91-102.

Myrvang, R; Liu, C Y A (2025) Beyond traditional methods: Enhancing cost escalation forecasting in commercial construction amid economic turbulence. Journal of Construction Engineering and Management, 151(2).

Nana-Addy, E, Musonda, I and Okoro, C (2022) Assessing causative characteristics of abandoned completed urban market projects in Ghana. Journal of Construction in Developing Countries, 27(2), 147–61.

Nee, T S, Xing, A C and Yong, L Y (2024) Assessing the post-disaster effects of COVID-19 pandemic towards Malaysian construction industry. Journal of Construction in Developing Countries, 29(2), 59–75.

Nkeleme, E I, Mbamali, I and Shakantu, W (2022) A measure of combustion-generated pollutants in university laboratories and their effects on the indoor air quality. Journal of Construction Business and Management, 5(2), 44-53.

Nuruddin, A R, Abu Bakar, S P S and Jaafar, M (2015) Unveiling the challenges faced by Malaysian housing developers through government policy changes. Journal of Construction in Developing Countries, 20(2), 37-52.

Nyakala, S, Pretorius, J and Vermeulen, A (2020) Construction quality process implementation as a source of competitive advantage in small and medium-sized construction projects. Journal of Construction Business and Management, 4(2), 46-54.

Oei, F J and Ogunlana, S O (2006) Assessment of the development role of a statutory body from a customer perspective: A relationship marketing approach. Journal of Construction in Developing Countries, 11(2), 31-52.

Ofori-Kuragu, J K, Owusu-Manu, D G and Ayarkwa, J (2016) The case for a construction industry council in Ghana. Journal of Construction in Developing Countries, 21(2), 131-49.

Ofori, G (2007) Clients' role in attainment of sustainability in housing: The case of Singapore and lessons for developing countries. Journal of Construction in Developing Countries, 12(2), 1-20.

Ofori, G (2019) Construction in developing countries: Need for new concepts. Journal of Construction in Developing Countries, 23(2), 1-6.

Ofori, G (2015) Nature of the construction industry, its needs and its development: A review of four decades of research. Journal of Construction in Developing Countries, 20(2), 115-35.

Ogbu, C P (2017) Building quality condition and maintenance cost: the case of public low income housing in Abia Sate, Nigeria. Journal of Construction Business and Management, 1(2), 24-34.

Ogbu, C P and Asuquo, C F (2019) Taxonomy of indigenous construction firms in south-south nigeria. Journal of Construction in Developing Countries, 24(2), 189-206.

Ogbu, C P and Olatunde, N (2019) Relationship between organisational effectiveness and project performance of sme contractors: A developing country perspective. Journal of Construction Business and Management, 3(2), 1-16.

Ogunseiju, O, Odeyinka, H A and Yusuf, A O (2023) Usage of building information modelling in quantity surveying firms in Nigeria. Journal of Construction Business and Management, 6(2), 27-37.

Ojo, A E, Ammasoma, D and Adelakun, J O (2023) Responsiveness of the construction sector to fiscal policy in Nigeria. Journal of Construction in Developing Countries, 28(2), 121-37.

Okoro, C S and Musonda, I (2017) Establishing underlying structures of safety performance measures using factor analysis of data on construction workers in Gauteng, South Africa. Journal of Construction Business and Management, 1(2), 55-64.

Okoro, C, Muleya, F and Musonda, I (2022) Assessing the role of planning and considerations in the sustainability of brt-PPP projects: A South African case. Journal of Construction in Developing Countries, 27(2), 205–34.

Okoro, C, Nnaji, C, Chileshe, N and Tembo, J (2023) Perceptions of public-private partnerships transportation project success factors in developing countries: An explanatory sequential investigation. Journal of Construction in Developing Countries, 28(2), 295-327.

Oladokun, T T and Komolafe, M O (2017) Drivers of rural housing development in Edo State, Nigeria. Journal of Construction Business and Management, 1(2), 35-46.

Olugboyega, O (2019) Specific roles of builders in building information modelling processes. Journal of Construction in Developing Countries, 23(2), 27-42.

Olugboyega, O and Aina, O O (2018) Examination of the levels of development of building information models in the Nigerian construction industry. Journal of Construction Business and Management, 2(2), 1-14.

Olugboyega, O and Windapo, A (2022) Investigating the strategic planning of BIM adoption on construction projects in a developing country. Journal of Construction in Developing Countries, 27(2), 183–204.

Oluwatayo, A A and Amole, D (2012) Culture of architectural firms in Nigeria: An exploratory study. Journal of Construction in Developing Countries, 17(2), 1-21.

Omar, M R, Ayob, A, Zakaria, M H, Rahim, N S A, Mokhtar, H, Rani, H A and Rahman, F A (2023) Perspective of construction building professionals on low-carbon materials in Malaysia. Journal of Construction in Developing Countries, 28(2), 139-62.

Omer, S (2007) Integrating the islamic worldview into the planning of neighbourhoods. Journal of Construction in Developing Countries, 12(2), 63-80.

Omollo, W O (2019) Barriers to the effective regulation of the building construction industry: An empirical analysis. Journal of Construction Business and Management, 3(2), 49-58.

Onukwube, H N (2012) Leader influences on training effectiveness of construction professionals: The case of nigeria. Journal of Construction in Developing Countries, 17(2), 67-79.

Onungwa, I O and Uduma-Olugu, N (2017) Building information modelling and collaboration in the Nigerian construction industry. Journal of Construction Business and Management, 1(2), 1-10.

Opawole, A, Alao, O O, Yusuf, A O, Adu, E T and Ofoetan, M A (2022) Evaluation of compliance of concreting materials to standards in building projects in Lagos State, Nigeria. Journal of Construction Business and Management, 5(2), 1-19.

Osuizugbo, I C, Kukoyi, P O, Aluko, R O and Akindele, N A (2022) Determinants of successful completion of construction craft apprenticeship in Lagos state, Nigeria: A qualitative study. Journal of Construction in Developing Countries, 27(2), 163–82.

Otasowie, K and Oke, A (2022) An assessment of exhibited drivers of mentoring in construction professional firms: A case of Nigerian quantity surveying firms. Journal of Construction in Developing Countries, 27(2), 63–86.

Othman, A A E, Hassan, T M and Pasquire, C L (2006) The brief development manager as an it tool for managing dynamic brief development in construction. International Journal of Construction Management, 6(2), 31-47.

Oyeyipo, O O, Odusami, K T, Ojelabi, R A and Afolabi, A O (2016) Factors affecting contractors' bidding decisions for construction projects in Nigeria. Journal of Construction in Developing Countries, 21(2), 21-35.

Ozumba, A O, Ojiako, U, Shakantu, W, Marshall, A and Chipulu, M (2019) Process need areas and technology adoption in construction site management. Journal of Construction in Developing Countries, 24(2), 123-55.

Poon, C S, Yu, A T W and Ng, L H (2003) Comparison of low-waste building technologies adopted in public and private housing projects in Hong Kong. Engineering, Construction and Architectural Management, 10(2), 88–98.

Pun, S K, Liu, C, Langston, C and Treloar, G (2007) Electronic waste exchange for just-in-time building demolition. International Journal of Construction Management, 7(2), 65-77.

Rafique, M Ahmed, S and Ismail, M (2021) Impact of safety climate on safety behaviour in construction projects: Mediating mechanism and interacting effect. Journal of Construction in Developing Countries, 26(2), 163-81.

Rahim, A A and Samad, N A A (2010) Accessible built environment for the elderly and disabled in Malaysia: Hotels as case studies. Journal of Construction in Developing Countries, 15(2), 1-21.

Ramachandra, T, Rotimi, J O B and Rameezdeen, R (2013) Direction of the causal relationship between construction and the national economy of Sri Lanka. Journal of Construction in Developing Countries, 18(2), 49-63.

Rambaruth, A, Adam, J K and Krishna, S B N (2022) Contributing elements and issues to strategic management in the construction industry among small and medium enterprises: A case study in South Africa's Ethekwini region. Journal of Construction Business and Management, 5(2), 20-8.

Rasli, N B I, Ismail, M R, Ramli, N A, Shith, S, Nazir, A U M, Yusof, N F M and Zainordin, N S (2019) Compliance of indoor air contaminants within the main prayer halls of mosques in malacca with malaysia's indoor air quality standard. Journal of Construction in Developing Countries, 24(2), 105-21.

Renault, B Y, Agumba, J N and Ansary, N (2020) Correlation analysis between risk measurement and project success of small and medium contractors in gauteng, South Africa. Journal of Construction Business and Management, 4(2), 34-45.

Renault, B Y, Agumba, J N and Ansary, N (2020) Establishing core factors of risk management influencing performance outcome of small and medium firm's construction projects in gauteng. Journal of Construction in Developing Countries, 25(2), 93-127.

Renuka, S M and Umarani, C (2019) Effect of critical risk factors causing cost deviation in medium sized construction projects. Journal of Construction in Developing Countries, 23(2), 63-85.

Richard, R-B (2005) Looking for an optimal urban residential building system?. International Journal of Construction Management, 5(2), 93-103.

Rumawas, W (2022) Employees’ turnover intention in the construction industry in Indonesia. Journal of Construction in Developing Countries, 27(2), 127–46.

Sánchez, F A S, Peláez, G I C and Alís, J C (2017) Integral diagnosis of occupational health and safety management in colombian construction companies. Journal of Construction in Developing Countries, 22(2), 101-16.

Sadafi, N and Sharifi, M (2019) A study of the concept of iranian traditional architecture in bazaars and shopping centres. Journal of Construction in Developing Countries, 23(2), 151-65.

Saleh, N, Enshassi, A and Sundermeier, M (2021) Challenges hindering the resourcing for post-disaster housing reconstruction in Gaza. Journal of Construction in Developing Countries, 26(2), 183-210.

Saleki, S and Bahramani, S K (2019) Designing a low-carbon building via lcb method 3.0, case study: An educational building in tehran. Journal of Construction in Developing Countries, 23(2), 129-50.

Salleh, A G and Badarulzaman, N (2012) Quality of life of residents in urban neighbourhoods of pulau pinang, Malaysia. Journal of Construction in Developing Countries, 17(2), 117-23.

Sanga, S A (2020) Compliance with building material specifications among informal skilled construction workers in Dar es Salaam, Tanzania. Journal of Construction in Developing Countries, 25(2), 63-91.

Santoso, D S, Joewono, T B, Wibowo, A, Sinaga, H P A and Santosa, W (2012) Public-private partnerships for tollway construction and operation: Risk assessment and allocation from the perspective of investors. Journal of Construction in Developing Countries, 17(2), 45-66.

Sapian, A R (2009) Validation of the computational fluid dynamics method for predicting wind flow around a high-rise building in an urban boundary layer condition. Journal of Construction in Developing Countries, 14(2), 1-20.

Saqib, G, Hassan, M U and Zubair, M U (2023) Barriers to incident reporting in the pakistani construction industry: An exploratory factor analysis approach. Journal of Construction in Developing Countries, 28(2), 243-64.

Seddiki, M, Bennadji, A and Tehami, M (2020) Barriers to the adoption of energy efficiency measures in mostaganem, Algeria. Journal of Construction in Developing Countries, 25(2), 39-61.

Senaratne, S and Mayuran, J (2015) Documentation management based on iso for construction industries in developing countries. Journal of Construction in Developing Countries, 20(2), 81-95.

Seneviratne, K, Rameezdeen, R and Amaratunga, D (2015) Contractor capacity and waste generation: An empirical investigation. Journal of Construction in Developing Countries, 20(2), 25-36.

Shao, Y; Yang, Y; Ng, S T; Xing, J; Kwok, C Y (2025) Revelation and enhancement for pedestrian evacuation at metro station: Metamodeling-based simulation optimization approach. Journal of Construction Engineering and Management, 151(2).

Sharma, N; Laishram, B (2025) Unveiling the path to the cost of quality implementation in the construction industry: Multivariate analysis. Journal of Construction Engineering and Management, 151(2).

Shen, Q and Liu, G (2007) The selection of benchmarking partners for value management: An analytic approach. International Journal of Construction Management, 7(2), 11-22.

Sheth, A and Sarkar, D (2020) Socio-economic feasibility analysis for sustainable mass rapid transit project in western India. Journal of Construction in Developing Countries, 25(2), 129-51.

Shrestha, R B and Ogunlana, S (2007) Direct stakeholder's perception of ppa clauses in the nepalese environment. Journal of Construction in Developing Countries, 12(2), 21-41.

Sierra, F and Rodboonpha, C (2023) Building information modelling implementation models in Thailand: Drivers, benefits, barriers and lessons learned. Journal of Construction in Developing Countries, 28(2), 37-55.

Soemardi, B W, Kusuma, B, Pribadi, K S and Yuliar, S (2021) Technological capabilities of medium-sized contractors in Indonesia. Journal of Construction in Developing Countries, 26(2), 1-15.

Sonet, U N and Klufallah, M (2024) Evaluation of indicators for participatory and collaborative design process for public parks in Malaysia: Analytical hierarchy process. Journal of Construction in Developing Countries, 29(2), 1–18.

Sonet, U N and Shahruddin, S (2024) Identifying barriers for sustainable townscape development: Challenges in Malaysia. Journal of Construction in Developing Countries, 29(2), 19–35.

Sospeter, N G, Rwelamila, P D, Nchimbi, M and Masoud, M (2014) Review of theory and practice literature on women entrepreneurship in the tanzanian construction industry: Establishing the missing link. Journal of Construction in Developing Countries, 19(2), 75-85.

Soudbaksh, K, Etminan, M, Hakimazari, M and Salavatian, S (2022) Impacts of window factors and building orientation on energy consumption in residential buildings of humid temperate climatic zone in Iran. Journal of Construction in Developing Countries, 27(2), 235–62.

Ssenyange, K and Kudakwashe, C (2023) The impact of leadership styles on government construction project success: A structural equation modeling approach. Journal of Construction Business and Management, 6(2), 11-26.

Stephenson, P and Bullen, S M (2003) Mobile technology for construction and building services within a direct services organisation: A UK operational system design and implementation. International Journal of Construction Management, 3(2), 25-40.

Suraji, A (2003) Construction accidents and the lesson learnt from 1000 cases. International Journal of Construction Management, 3(2), 41-9.

Tam, V W Y, Tam, C M and Ng, W C Y (2007) An examination on the practice of adopting prefabrication for construction projects. International Journal of Construction Management, 7(2), 53-64.

Taofeeq, D M and Adeleke, A Q (2019) Factor's influencing contractors risk attitude in the Malaysian construction industry. Journal of Construction Business and Management, 3(2), 59-67.

Tehami, M and Seddiki, M (2023) Investigation toward the adoption of building information modelling in Algeria from architects’ perspective. Journal of Construction in Developing Countries, 28(2), 329-52.

Teo, E A L and Ling, F Y Y (2009) Enhancing worksite safety: Impact of personnel characteristics and incentives on safety performance. International Journal of Construction Management, 9(2), 103-18.

Thwala, W D (2007) Challenges facing labour-intensive public works programmes and projects in South Africa. International Journal of Construction Management, 7(2), 1-9.

Thwala, W D (2009) Experiences and challenges of community participation in urban renewal projects: The case of johannesburg, South Africa. Journal of Construction in Developing Countries, 14(2), 37-54.

Tiew, S Y, Hashim, H A and Zolkafli, U K B (2022) Performance barriers in relation with professional development of graduate architects in construction industry: A systematic literature review. Journal of Construction Business and Management, 5(2), 29-43.

Trethanya, S and Perera, R (2009) Environmental assessment for small- and medium-scale road projects implemented in local authority areas: A case study from Thailand. Journal of Construction in Developing Countries, 14(2), 55-76.

Tutesigensi, A, Kibwami, N and Matege, S B (2021) The status of value management practice on construction projects in Uganda and strategies for improvement. Journal of Construction in Developing Countries, 26(2), 251-67.

Ullal, A and Tombesi, P (2021) Dimensions and correlates of development in construction. Journal of Construction in Developing Countries, 26(2), 37-64.

Underwood, J and Watson, A (2003) An XML metadata approach to seamless project information exchange between heterogeneous platforms. Engineering, Construction and Architectural Management, 10(2), 128–45.

Utama, W P, Chan, A P C, Zahoor, H, Gao, R and Zulherman (2019) Preferred entry mode choices and transformation of indonesian contractors' strategy in international markets. Journal of Construction in Developing Countries, 24(2), 173-88.

van Egmond-deWilde de Ligny, E and Erkelens, P (2008) Construction technology diffusion in developing countries: Limitations of prevailing innovation systems. Journal of Construction in Developing Countries, 13(2), 43-63.

Van Roy, A F and Firdaus, A (2020) Building information modelling in Indonesia: Knowledge, implementation and barriers. Journal of Construction in Developing Countries, 25(2), 199-217.

Vee, C and Skitmore, M (2003) Professional ethics in the construction industry. Engineering, Construction and Architectural Management, 10(2), 117–27.

Verwey, J, Cumberlege, R and Crafford, G J (2023) Exploring the interplay between quantity surveyors’ conflict-handling styles and personality traits. Journal of Construction Business and Management, 6(2), 38-49.

Vu, A T and Carmichael, D G (2009) Cultural difference and conflict management: a Vietnamese-Australian and construction industry case study. International Journal of Construction Management, 9(2), 1-19.

Wang, C C (2004) The prototype model of a web-based knowledge sharing and collaboration support system for the building industry. International Journal of Construction Management, 4(2), 75-87.

Wang, J, Yuan, H and Liu, J (2009) A factor analysis model for assessing the performance of the construction industry: The case of Shanghai. International Journal of Construction Management, 9(2), 21-31.

Wang, J; Huang, W; Chen, Y (2025) Solving stochastic time-cost trade-off problems via modified double-loop procedure with adaptive domain decomposition method. Journal of Construction Engineering and Management, 151(2).

Wang, X, Fang, D and Pham, L (2009) Risk assessment of Australian construction and engineering firms in China. International Journal of Construction Management, 9(2), 119-31.

Wibowo, A and Hartiati, D (2023) Value-for-money drivers in public-private partnerships in affordable housing in Indonesia: An analytic network process perspective. Journal of Construction in Developing Countries, 28(2), 101-19.

Williams, A, Mackie, J, Gajendran, T and Brewer, G (2004) Motivation to engage: Piloting assessment techniques to encourage student engagement. International Journal of Construction Management, 4(2), 27-37.

Williamson, D, Orr, J and Fulford, D (2017) Biogas dome construction using pneumatics. Journal of Construction in Developing Countries, 22(2), 35-53.

Willis, C J and Rankin, J H (2010) Measuring the maturity of guyana's construction industry using the construction industry macro maturity model. Journal of Construction in Developing Countries, 15(2), 87-116.

Windapo, A O and Cattell, K (2013) The South African construction industry: Perceptions of key challenges facing its performance, development and growth. Journal of Construction in Developing Countries, 18(2), 65-79.

Windapo, A, Moghayedi, A, Oliphant, D and Adediran, A (2018) Exploring the components of cost on construction projects. Journal of Construction Business and Management, 2(2), 42-50.

Wong, C C, Faizul Azli, M-R and Loo, S C (2021) Enterprise risk management and risk culture in construction public listed companies. Journal of Construction in Developing Countries, 26(2), 17-36.

Wong, C H, Nicholas, J and Holt, G D (2003) Using multivariate techniques for developing contractor classification models. Engineering, Construction and Architectural Management, 10(2), 99–116.

Xiang, D and Li, H (2006) Adopting leveraged buyout (LBO) mechanism for improving the competitiveness of the state-owned construction enterprises. International Journal of Construction Management, 6(2), 63-74.

Yuan, Z; Li, Z; Lei, Z; Yang, Y; Zhang, W; Lin, W; Cao, L (2025) Enhancing the production performance of prefabricated buildings through the integrated optimization of precast component layout and worker allocation. Journal of Construction Engineering and Management, 151(2).

Yue, H; Ye, G; Yang, J; Yan, Y; Chen, S; Yang, L; Chen, Y (2025) Cost–benefit analysis of four-party construction safety supervision. Journal of Construction Engineering and Management, 151(2).

Yusof, N, Mui, L Y, Meng, L L and Fern, T S (2007) Urban conservation as a development strategy to revitalize real estate market: An analysis of property transactions in georgetown penang. Journal of Construction in Developing Countries, 12(2), 43-61.

Zainuddin, F K and Mustapa, F D (2024) Transaction cost economics framework development for Malaysian housing development. Journal of Construction in Developing Countries, 29(2), 77–105.

Zainul-Abidin, N (2008) Achieving sustainability through value management: A passing opportunity?. International Journal of Construction Management, 8(2), 79-91.

Zhang, F; Liu, H; Wang, L; Chen, Z; Zhang, Q; Guo, L (2025) State awareness and collision risk assessment algorithm for tower crane based on bidirectional inverse perspective mapping and skeleton key points. Journal of Construction Engineering and Management, 151(2).

Zhang, H; Li, L; Demeulemeester, E; Bai, S; Zhang, J (2025) Heuristic methods for dynamic multiproject scheduling problems with stochastic transfer times. Journal of Construction Engineering and Management, 151(2).

Zou, P X W (2007) An overview of China's construction project tendering. International Journal of Construction Management, 7(2), 23-39.

Zou, P X W (2006) Strategies for minimizing corruption in the construction industry in China. Journal of Construction in Developing Countries, 11(2), 15-29.

Zuo, J and Zillante, G (2006) Project culture within construction projects: a pilot case study. International Journal of Construction Management, 6(2), 15-29.