Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 45 results ...

Agyekum, K, Opoku, A, Oppon, A J and Opoku, D G J (2022) Obstacles to green building project financing: An empirical study in Ghana. International Journal of Construction Management, 22(15), 2922-30.

Ballesteros-Lintao, R and Ameer Ali, N A N (2023) Readability and comprehensibility of Malaysian construction contracts. International Journal of Construction Management, 23(15), 2649–57.

Bandara, S G D K, Abdeen, F N, Disaratna, V and Perera, B A K S (2022) Employee welfare and job satisfaction in the Sri Lankan hotel industry. International Journal of Construction Management, 22(15), 3045-54.

Bhavsar, V, Thomas Alex, S, Vaishnav, P K, Jose, A, Koshy, N G and Atiwadkar, S (2022) Investigation of critical factors influencing construction of airports: The case of India. International Journal of Construction Management, 22(15), 2905-13.

  • Type: Journal Article
  • Keywords: airport construction; airports in India; critical factors; factor analysis; relative importance index
  • ISBN/ISSN: 15623599
  • URL: https://doi.org/10.1080/15623599.2020.1831220
  • Abstract:
    Airport construction projects are distinctively unique and complex compared to other infrastructure and construction projects. Globally, construction of airports is often associated with large-scale cost and time overruns. However, studies that explicitly delineate the examination of critical factors affecting the airport construction are scant and highly unexplored. This study aims to bridge the knowledge gap by identifying the main factors affecting airport construction in India from clients' and contractors' perspectives using factor analysis. Based on a literature survey and expert interviews, questionnaires listing 21 attributes for clients, and 19 attributes for contractors were sent. Critical factors obtained from the analyses are as follows: a) Client-side–Pre-construction phase issues, Multi-organizational involvement issues and External issues; b) Contractor-side–Project implementation issues, Client related issues and Technical issues. The findings are intended to significantly help varied stakeholders to enhance the quality and success rate of future airport construction projects in developing countries.

Bui, T T P, MacGregor, C, Wilkinson, S and Domingo, N (2023) Towards zero carbon buildings: Issues and challenges in the New Zealand construction sector. International Journal of Construction Management, 23(15), 2709–16.

Cheng, B, Huang, J, Guo, Z, Li, J and Chen, H (2023) Towards sustainable construction through better construction and demolition waste management practices: A SWOT analysis of Suzhou, China. International Journal of Construction Management, 23(15), 2614–24.

Dodanwala, T C, Santoso, D S and Yukongdi, V (2023) Examining work role stressors, job satisfaction, job stress, and turnover intention of sri lanka's construction industry. International Journal of Construction Management, 23(15), 2583–92.

El-Kelesh, A M and Hassan, D A (2023) Impact of ground conditions and excavation depth on selection of excavation support system. International Journal of Construction Management, 23(15), 2539–50.

Faisal Shehzad, H M, Binti Ibrahim, R, Yusof, A F, Mohamed khaidzir, K A, Shawkat, S and Ahmad, S (2022) Recent developments of BIM adoption based on categorization, identification and factors: A systematic literature review. International Journal of Construction Management, 22(15), 3001-13.

Fazil, M W, Muhamad Tamyez, P F and Lee, C K (2024) Enhancing cost estimation performance through effective organizational control: The moderating role of project complexity in construction projects. International Journal of Construction Management, 24(15), 1630–42.

Ghanbaripour, A N, Golmoradi, M, Langston, C, Skulmoski, G and Arqoub, M A (2022) The effect of project manager's management style on project delivery success in construction projects. International Journal of Construction Management, 22(15), 2941-50.

Gowthami, N R, Sridhar, C N V and Venkata Ramana, N (2022) An empirical implementation model of total quality management in construction: Southern India. International Journal of Construction Management, 22(15), 3023-33.

Guo, B H W, Gonzalez, V A, Puolitaival, T, Enegbuma, W and Zou, Y (2023) Bridging the gap between building information modelling education and practice: A competency-based education perspective. International Journal of Construction Management, 23(15), 2558–69.

Hajarolasvadi, H and Shahhosseini, V (2022) Assignment of engineers to constructions project teams based on person-team fit. International Journal of Construction Management, 22(15), 2895-904.

Jaafar, K and El-Halawani, L I (2022) Simulation-based multi-objective optimization model for machinery allocation in shallow foundation. International Journal of Construction Management, 22(15), 2845-54.

Kiu, M S, Chia, F C and Wong, P F (2022) Exploring the potentials of blockchain application in construction industry: A systematic review. International Journal of Construction Management, 22(15), 2931-40.

Lello, D, Huang, Y, Emuze, F and Alananga, S (2024) Professional knowledge infusion and service performance within outbound consultant-supplier interfaces in Tanzania's construction industry: Can networking and stakeholder support play cards?. International Journal of Construction Management, 24(15), 1643–54.

Lindhard, S M (2024) Applying work measurements to identify productivity potentials: The case of prefabricated concrete elements. International Journal of Construction Management, 24(15), 1668–78.

Lu, W, Ghansah, F A and Xu, J (2023) A category and index hybrid (cih) approach to measuring the level of prefabrication. International Journal of Construction Management, 23(15), 2658–69.

Makoye, M, Mlinga, R S and Ndanshau, M O A (2023) Impact of macroeconomic factors on performance of construction industry in Tanzania. International Journal of Construction Management, 23(15), 2625–36.

Manege, S L and Kennedy, C J (2022) Investigating whole life costing awareness in Tanzania building construction industry. International Journal of Construction Management, 22(15), 2914-21.

Martins, S S, Evangelista, A C J, Hammad, A W A, Tam, V W Y and Haddad, A (2022) Evaluation of 4D BIM tools applicability in construction planning efficiency. International Journal of Construction Management, 22(15), 2987-3000.

Moda, H M, Ofodile, N, Zailani, B M, Abubakar, M and Ibrahim, Y M (2023) Management support as a critical success factor (CSF) for changing worker's safety attitude: A case of the Nigerian construction industry. International Journal of Construction Management, 23(15), 2551–7.

Mohajeri, M, Ardeshir, A, Banki, M T and Malekitabar, H (2022) Discovering causality patterns of unsafe behavior leading to fall hazards on construction sites. International Journal of Construction Management, 22(15), 3034-44.

Mohamed, M and Tran, D Q (2023) Examining critical factors and their combination effects on quality of roadway construction operations. International Journal of Construction Management, 23(15), 2637–48.

Nallaperuma-Arachchige, W, Hadiwattege, C and Hulathdoowage, N D (2023) Conflicts with external stakeholders in irrigation construction projects in Sri Lanka: A narrative analysis. International Journal of Construction Management, 23(15), 2570–82.

Nguyen, T A, Do, S T, Nguyen, V T, Khuc, T Q and Quach, Q T (2024) Essential strategies for embracing building information modeling (BIM) in public investment projects: A case study in Vietnam. International Journal of Construction Management, 24(15), 1708–18.

Niroshana, N, Siriwardana, C and Jayasekara, R (2023) The impact of COVID-19 on the construction industry and lessons learned: A case of Sri Lanka. International Journal of Construction Management, 23(15), 2521–38.

Nwaogu, J M, Chan, A P C and Akinyemi, T A (2023) Conceptualizing the dynamics of mental health among construction supervisors. International Journal of Construction Management, 23(15), 2593–613.

Oyeyipo, O, Adeyemi, B, Osuizugbo, I and Ojelabi, R (2022) Service quality of building services consultants in building project delivery; clients' perspectives. International Journal of Construction Management, 22(15), 2886-94.

Pakalapati, K, Khalafalla, M and Rueda-Benavides, J (2022) Using moving-window cross-validation algorithm to optimize bid-based cost estimating data usage. International Journal of Construction Management, 22(15), 2855-63.

Rezakhani, P (2022) Hybrid fuzzy-Bayesian decision support tool for dynamic project scheduling and control under uncertainty. International Journal of Construction Management, 22(15), 2864-76.

Savaş, S, Acar, E and Acar, D (2024) A project management model for architectural restoration projects. International Journal of Construction Management, 24(15), 1698–707.

Shrahily, R, Medjdoub, B, Klalib, H, Chalal, M and Alwetaishi, M (2022) Managing construction site communication using the responsibility assignment matrix (RAM) system. International Journal of Construction Management, 22(15), 2966-86.

Soliman, E, Al-Tabtabai, H, Almusalam, A and Hussein, M (2023) Impact of COVID-19 on labor's motivational factors and construction productivity. International Journal of Construction Management, 23(15), 2699–708.

Tajaddini, A, Pirooznezhad, L, Ravanshadnia, M and Coley, D (2024) Fuzzy inference decision model to quantify the effectiveness of incentives on delivering green buildings. International Journal of Construction Management, 24(15), 1599–616.

Taylor, M D (2022) A definition and valuation of the UK offsite construction sector: Ten years on. International Journal of Construction Management, 22(15), 2877-85.

Umuhoza, E and An, S H (2024) Ann model predicting quality performance for building construction projects in Rwanda. International Journal of Construction Management, 24(15), 1679–88.

Wasim, M, Vaz Serra, P and Ngo, T D (2022) Design for manufacturing and assembly for sustainable, quick and cost-effective prefabricated construction–a review. International Journal of Construction Management, 22(15), 3014-22.

Wassie, F A and Lakatos, L P (2024) Key audit matters disclosure: Do they reveal construction firm's risk of financial distress? Evidence from Ethiopia. International Journal of Construction Management, 24(15), 1689–97.

Yadollahi, M, Ebrahimi Saryazdi, S M, Shafaat, A and Hafezi, M (2023) Life cycle cost analysis of near zero energy buildings benefited from earth-sheltering. International Journal of Construction Management, 23(15), 2670–82.

Ye, Y X, Shan, M, Gao, X, Li, Q and Zhang, H (2024) Examining causes of disputes in subcontracting litigation cases using text mining and natural language processing techniques. International Journal of Construction Management, 24(15), 1617–29.

Yucel, B and Azhar, S (2024) Investigating critical success factors and risks of construction technology startups: A systematic literature review. International Journal of Construction Management, 24(15), 1655–67.

Zhang, C, Shen, W and Ye, Z (2022) Technical feasibility analysis on applying ultra-wide band technology in construction progress monitoring. International Journal of Construction Management, 22(15), 2951-65.

Zhang, N, Wang, J, Al-Hussein, M and Yin, X (2023) BIM-based automated design of drainage systems for panelized residential buildings. International Journal of Construction Management, 23(15), 2683–98.