Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 249 results ...

Abd Jamil, A H and Fathi, M S (2020) Enhancing BIM-Based Information Interoperability: Dispute Resolution from Legal and Contractual Perspectives. Journal of Construction Engineering and Management, 146(07).

Abdel-Monem, M and Hegazy, T (2013) Enhancing Construction As-Built Documentation Using Interactive Voice Response. Journal of Construction Engineering and Management, 139(07), 895–8.

Abdelmohsen, A Z and El-Rayes, K (2016) Optimal Trade-Offs between Construction Cost and Traffic Delay for Highway Work Zones. Journal of Construction Engineering and Management, 142(07).

Abdul Nabi, M and El-adaway, I H (2022) A Proactive Risk Assessment Framework to Maximize Schedule Benefits of Modularization in Construction Projects. Journal of Construction Engineering and Management, 148(07).

Abdul Nabi, M, El-adaway, I H, Fayek, S, Howell, C and Gambatese, J (2020) Contractual Guidelines for Construction Safety–Related Issues under Design–Build Standard Forms of Contract. Journal of Construction Engineering and Management, 146(07).

Afshar, A, Ziaraty, A K, Kaveh, A and Sharifi, F (2009) Nondominated Archiving Multicolony Ant Algorithm in Time–Cost Trade-Off Optimization. Journal of Construction Engineering and Management, 135(07), 668–74.

Ahiaga-Dagbui, D D, Love, P E D, Whyte, A and Boateng, P (2017) Costing and Technological Challenges of Offshore Oil and Gas Decommissioning in the U.K. North Sea. Journal of Construction Engineering and Management, 143(07).

Ahmad, R, Nauman, S and Malik, S Z (2022) Tyrannical Leader, Machiavellian Follower, Work Withdrawal, and Task Performance: Missing Links in Construction Projects. Journal of Construction Engineering and Management, 148(07).

Aibinu, A A and Odeyinka, H A (2006) Construction Delays and Their Causative Factors in Nigeria. Journal of Construction Engineering and Management, 132(07), 667–77.

Al-Bayati, A J, Al-Kasasbeh, M, Awolusi, I, Abudayyeh, O and Umar, T (2021) Trends of Occupational Fatal and Nonfatal Injuries in Electrical and Mechanical Specialty Contracting Sectors: Necessity for a Learning Investigation System. Journal of Construction Engineering and Management, 147(07).

Alashwal, A M and Fong, P S (2015) Empirical Study to Determine Fragmentation of Construction Projects. Journal of Construction Engineering and Management, 141(07).

Albert, A, Hallowell, M R, Kleiner, B, Chen, A and Golparvar-Fard, M (2014) Enhancing Construction Hazard Recognition with High-Fidelity Augmented Virtuality. Journal of Construction Engineering and Management, 140(07).

Albert, A, Hallowell, M R, Lingard, H and Kleiner, B M (2015) Multiple Baseline Testing: Experimental Method for Drawing Causal Inferences in Construction Engineering and Management Research. Journal of Construction Engineering and Management, 141(07).

Alex, D P, Al Hussein, M, Bouferguene, A and Fernando, S (2010) Artificial Neural Network Model for Cost Estimation: City of Edmonton’s Water and Sewer Installation Services. Journal of Construction Engineering and Management, 136(07), 745–56.

Alexander, D, Hallowell, M and Gambatese, J (2017) Precursors of Construction Fatalities. I: Iterative Experiment to Test the Predictive Validity of Human Judgment. Journal of Construction Engineering and Management, 143(07).

Alexander, D, Hallowell, M and Gambatese, J (2017) Precursors of Construction Fatalities. II: Predictive Modeling and Empirical Validation. Journal of Construction Engineering and Management, 143(07).

Ali, G M, Olearczyk, J, Bouferguene, A and Al-Hussein, M (2021) Implementation of Combined Loading to Calculate Ground Bearing Pressure under Crawler Crane Tracks. Journal of Construction Engineering and Management, 147(07).

Aljassmi, H and Han, S (2013) Analysis of Causes of Construction Defects Using Fault Trees and Risk Importance Measures. Journal of Construction Engineering and Management, 139(07), 870–80.

AlOtaibi, M, El-Rayes, K and Altuwaim, A (2021) Optimizing the Renovation Scheduling of Leased Residential Buildings to Minimize Total Project Cost. Journal of Construction Engineering and Management, 147(07).

Altuwaim, A and El-Rayes, K (2021) Multiobjective Optimization Model for Planning Repetitive Construction Projects. Journal of Construction Engineering and Management, 147(07).

Altuwaim, A and El-Rayes, K (2018) Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost. Journal of Construction Engineering and Management, 144(07).

Amer, F, Koh, H Y and Golparvar-Fard, M (2021) Automated Methods and Systems for Construction Planning and Scheduling: Critical Review of Three Decades of Research. Journal of Construction Engineering and Management, 147(07).

Ansari, R (2019) Dynamic Simulation Model for Project Change-Management Policies: Engineering Project Case. Journal of Construction Engineering and Management, 145(07).

Antwi-Afari, M F, Li, H, Umer, W, Yu, Y and Xing, X (2020) Construction Activity Recognition and Ergonomic Risk Assessment Using a Wearable Insole Pressure System. Journal of Construction Engineering and Management, 146(07).

Anvuur, A M and Kumaraswamy, M M (2012) Measurement and Antecedents of Cooperation in Construction. Journal of Construction Engineering and Management, 138(07), 797–810.

Araújo, L G and Lucko, G (2016) Slip Chart–Inspired Project Schedule Diagramming: Links, Extension to Network Schedules, and Unification. Journal of Construction Engineering and Management, 142(07).

Arditi, D and Alavipour, S M R (2019) Trends in Expectations about Duties and Responsibilities of Construction Managers. Journal of Construction Engineering and Management, 145(07).

Assaad, R H, El-adaway, I H, Hastak, M and LaScola Needy, K (2022) Quantification of the State of Practice of Offsite Construction and Related Technologies: Current Trends and Future Prospects. Journal of Construction Engineering and Management, 148(07).

Assaad, R H, El-adaway, I H, Hastak, M and LaScola Needy, K (2022) The Impact of Offsite Construction on the Workforce: Required Skillset and Prioritization of Training Needs. Journal of Construction Engineering and Management, 148(07).

Assefa Tsehayae, A and Robinson Fayek, A (2016) Developing and Optimizing Context-Specific Fuzzy Inference System-Based Construction Labor Productivity Models. Journal of Construction Engineering and Management, 142(07).

Azambuja, M M, Ponticelli, S and O’Brien, W J (2014) Strategic procurement practices for the industrial supply chain. Journal of Construction Engineering and Management, 140(07), 06014005.

Azeez, M, Gambatese, J and Hernandez, S (2019) What Do Construction Workers Really Want? A Study about Representation, Importance, and Perception of US Construction Occupational Rewards. Journal of Construction Engineering and Management, 145(07).

Ballesteros-Pérez, P, Skitmore, M, Das, R and del Campo-Hitschfeld, M L (2015) Quick Abnormal-Bid-Detection Method for Construction Contract Auctions. Journal of Construction Engineering and Management, 141(07).

Bashir, H A (2010) Removal of Redundant Relationships in an AON Project Network for Evaluating Schedule Complexity. Journal of Construction Engineering and Management, 136(07), 787–93.

Benachio, G L F, Freitas, M d C D and Tavares, S F (2021) Interactions between Lean Construction Principles and Circular Economy Practices for the Construction Industry. Journal of Construction Engineering and Management, 147(07).

Berg, R and Hinze, J (2005) Theft and Vandalism on Construction Sites. Journal of Construction Engineering and Management, 131(07), 826–33.

Bhih, M and Hegazy, T (2021) Enhanced But-For Method to Apportion Net Delays and Accelerations. Journal of Construction Engineering and Management, 147(07).

Boudet, H S, Jayasundera, D C and Davis, J (2011) Drivers of Conflict in Developing Country Infrastructure Projects: Experience from the Water and Pipeline Sectors. Journal of Construction Engineering and Management, 137(07), 498–511.

Bowen, P, Govender, R, Edwards, P, Cattell, K and Street, A (2015) Factors Determining South African Construction Workers’ Prejudice towards and Discrimination against HIV+ Persons. Journal of Construction Engineering and Management, 141(07).

Brandalise, F M P, Formoso, C T and Viana, D D (2022) Development of a Typology for Understanding Visual Management Concepts and Their Relationships. Journal of Construction Engineering and Management, 148(07).

Brilakis, I and Soibelman, L (2006) Multimodal Image Retrieval from Construction Databases and Model-Based Systems. Journal of Construction Engineering and Management, 132(07), 777–85.

Brito, D M d, Ferreira, E d A M and Costa, D B (2021) Framework for Building Information Modeling Adoption Based on Critical Success Factors from Brazilian Public Organizations. Journal of Construction Engineering and Management, 147(07).

Cai, J, Yang, L, Zhang, Y, Li, S and Cai, H (2021) Multitask Learning Method for Detecting the Visual Focus of Attention of Construction Workers. Journal of Construction Engineering and Management, 147(07).

Caldas, C H, Torrent, D G and Haas, C T (2006) Using Global Positioning System to Improve Materials-Locating Processes on Industrial Projects. Journal of Construction Engineering and Management, 132(07), 741–9.

Castañeda, J A, Tucker, R L and Haas, C T (2005) Workers’ Skills and Receptiveness to Operate Under the Tier II Construction Management Strategy. Journal of Construction Engineering and Management, 131(07), 799–807.

Cha, H S, Kim, J and Han, J (2009) Identifying and Assessing Influence Factors on Improving Waste Management Performance for Building Construction Projects. Journal of Construction Engineering and Management, 135(07), 647–56.

Chan, A P C, Wong, F K W, Chan, D W M, Yam, M C H, Kwok, A W K, Lam, E W M and Cheung, E (2008) Work at Height Fatalities in the Repair, Maintenance, Alteration, and Addition Works. Journal of Construction Engineering and Management, 134(07), 527–35.

Chen, K, Lu, W, Wang, H, Niu, Y and Huang, G G (2017) Naming Objects in BIM: A Convention and a Semiautomatic Approach. Journal of Construction Engineering and Management, 143(07).

Chen, L and Fong, P S W (2013) Visualizing Evolution of Knowledge Management Capability in Construction Firms. Journal of Construction Engineering and Management, 139(07), 839–51.

Chen, L, Zhang, J and Peng, W (2022) Research on the Hierarchical Discrete Time-Cost Trade-Off Problem for Program. Journal of Construction Engineering and Management, 148(07).

Chen, Q and Jin, R (2013) Multilevel Safety Culture and Climate Survey for Assessing New Safety Program. Journal of Construction Engineering and Management, 139(07), 805–17.

Cheng, G and Wilmot, C G (2009) Louisiana Highway Construction Cost Trend after Hurricanes Katrina and Rita. Journal of Construction Engineering and Management, 135(07), 594–600.

Chi, S, Han, S and Kim, D Y (2013) Relationship between Unsafe Working Conditions and Workers’ Behavior and Impact of Working Conditions on Injury Severity in U.S. Construction Industry. Journal of Construction Engineering and Management, 139(07), 826–38.

Chiang, Y H, Cheng, E W L and Lam, P T I (2010) Employing the Net Present Value-Consistent IRR Methods for PFI Contracts. Journal of Construction Engineering and Management, 136(07), 811–4.

Chong, H, Fan, S, Sutrisna, M, Hsieh, S and Tsai, C (2017) Preliminary Contractual Framework for BIM-Enabled Projects. Journal of Construction Engineering and Management, 143(07).

Choudhry, R M, Aslam, M A, Hinze, J W and Arain, F M (2014) Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines. Journal of Construction Engineering and Management, 140(07).

Chua, D K and Shen, L J (2005) Key Constraints Analysis with Integrated Production Scheduler. Journal of Construction Engineering and Management, 131(07), 753–64.

Dai, F and Lu, M (2013) Three-Dimensional Modeling of Site Elements by Analytically Processing Image Data Contained in Site Photos. Journal of Construction Engineering and Management, 139(07), 881–94.

Damnjanovic, I and Zhang, Z (2008) Risk-Based Model for Valuation of Performance-Specified Pavement Maintenance Contracts. Journal of Construction Engineering and Management, 134(07), 492–500.

Danforth, E M, Weidman, J E and Farnsworth, C B (2017) Strategies Employed and Lessons Learned by Commercial Construction Companies during Economic Recession and Recovery. Journal of Construction Engineering and Management, 143(07).

Davila Delgado, J M, Oyedele, L, Beach, T and Demian, P (2020) Augmented and Virtual Reality in Construction: Drivers and Limitations for Industry Adoption. Journal of Construction Engineering and Management, 146(07).

de la Fuente, A, Casanovas-Rubio, M d M, Pons, O and Armengou, J (2019) Sustainability of Column-Supported RC Slabs: Fiber Reinforcement as an Alternative. Journal of Construction Engineering and Management, 145(07).

Doloi, H (2014) Rationalizing the Implementation of Web-Based Project Management Systems in Construction Projects Using PLS-SEM. Journal of Construction Engineering and Management, 140(07).

Eastman, C M and Sacks, R (2008) Relative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities. Journal of Construction Engineering and Management, 134(07), 517–26.

Edwards, D J and Holt, G D (2014) Antecedents of Health and Safety Issues Relating to Plant Trailer Wheels. Journal of Construction Engineering and Management, 140(07).

Eissa, R, Eid, M S and Elbeltagi, E (2021) Current Applications of Game Theory in Construction Engineering and Management Research: A Social Network Analysis Approach. Journal of Construction Engineering and Management, 147(07).

El-Abbasy, M S, Zayed, T, Ahmed, M, Alzraiee, H and Abouhamad, M (2013) Contractor Selection Model for Highway Projects Using Integrated Simulation and Analytic Network Process. Journal of Construction Engineering and Management, 139(07), 755–67.

El-Anwar, O, El-Rayes, K and Elnashai, A S (2010) Maximizing the Sustainability of Integrated Housing Recovery Efforts. Journal of Construction Engineering and Management, 136(07), 794–802.

El-Diraby, T E (2013) Domain Ontology for Construction Knowledge. Journal of Construction Engineering and Management, 139(07), 768–84.

El-Gafy, M and Abdelhamid, T (2015) Impact of I/D Contracts Used for Expediting Michigan’s Road Construction. Journal of Construction Engineering and Management, 141(07).

El-Gohary, N M and El-Diraby, T E (2010) Domain Ontology for Processes in Infrastructure and Construction. Journal of Construction Engineering and Management, 136(07), 730–44.

Elbeltagi, E E, Hosny, O A, Elhakeem, A, Abdelrazek, M E and El-Abbasy, M S (2012) Fuzzy Logic Model for Selection of Vertical Formwork Systems. Journal of Construction Engineering and Management, 138(07), 832–40.

Elshaboury, N, Attia, T and Marzouk, M (2020) Application of Evolutionary Optimization Algorithms for Rehabilitation of Water Distribution Networks. Journal of Construction Engineering and Management, 146(07).

Fan, S, Yeh, I and Chi, W (2021) Improvement in Estimating Durations for Building Projects Using Artificial Neural Network and Sensitivity Analysis. Journal of Construction Engineering and Management, 147(07).

Fang, Y, Cho, Y K, Zhang, S and Perez, E (2016) Case Study of BIM and Cloud–Enabled Real-Time RFID Indoor Localization for Construction Management Applications. Journal of Construction Engineering and Management, 142(07).

Farshchian, M M, Heravi, G and AbouRizk, S (2017) Optimizing the Owner’s Scenarios for Budget Allocation in a Portfolio of Projects Using Agent-Based Simulation. Journal of Construction Engineering and Management, 143(07).

Fayek, A R (2020) Fuzzy Logic and Fuzzy Hybrid Techniques for Construction Engineering and Management. Journal of Construction Engineering and Management, 146(07).

Feng, Y (2015) Mathematical Models for Determining the Minimum Level of Voluntary Safety Investments for Building Projects. Journal of Construction Engineering and Management, 141(07).

Günhan, S and Arditi, D (2007) Budgeting Owner’s Construction Contingency. Journal of Construction Engineering and Management, 133(07), 492–7.

Gaikwad, S V, Calahorra-Jimenez, M, Molenaar, K R and Torres-Machi, C (2021) Challenges in Engineering Estimates for Best Value Design–Build Highway Projects. Journal of Construction Engineering and Management, 147(07).

Gallego, E, Fuentes, J M, Ramírez, A and Ayuga, F (2010) Design of Tall Formworks by a Finite-Element Model. Journal of Construction Engineering and Management, 136(07), 803–10.

Galloway, P D (2006) Comparative Study of University Courses on Critical-Path Method Scheduling. Journal of Construction Engineering and Management, 132(07), 712–22.

Galloway, P D (2006) Survey of the Construction Industry Relative to the Use of CPM Scheduling for Construction Projects. Journal of Construction Engineering and Management, 132(07), 697–711.

Gambatese, J A, Michael Toole, T and Abowitz, D A (2017) Owner Perceptions of Barriers to Prevention through Design Diffusion. Journal of Construction Engineering and Management, 143(07).

Garcia, A J and Mollaoglu, S (2020) Measuring Key Knowledge-Related Factors for Individuals in AEC Project Teams. Journal of Construction Engineering and Management, 146(07).

Ghannad, P and Lee, Y (2023) Optimizing Modularization of Residential Housing Designs for Rapid Postdisaster Mass Production of Housing. Journal of Construction Engineering and Management, 149(07).

Gharaibeh, N G, Liu, L and Wani, S S (2012) Skip-Lot Acceptance Sampling Plans for Highway Construction and Materials. Journal of Construction Engineering and Management, 138(07), 791–6.

Gholizadeh, P and Esmaeili, B (2020) Cost of Occupational Incidents for Electrical Contractors: Comparison Using Robust-Factorial Analysis of Variance. Journal of Construction Engineering and Management, 146(07).

Goedert, J D and Meadati, P (2008) Integrating Construction Process Documentation into Building Information Modeling. Journal of Construction Engineering and Management, 134(07), 509–16.

Goh, Y M and Wang, Q (2015) Investigating the Adequacy of Horizontal Lifeline System Design through Case Studies from Singapore. Journal of Construction Engineering and Management, 141(07).

Hale, D R, Shrestha, P P, Gibson, G E and Migliaccio, G C (2009) Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods. Journal of Construction Engineering and Management, 135(07), 579–87.

Han, Y, Li, J, Cao, X and Jin, R (2020) Structural Equation Modeling Approach to Studying the Relationships among Safety Investment, Construction Employees’ Safety Cognition, and Behavioral Performance. Journal of Construction Engineering and Management, 146(07).

Hare, B, Cameron, I, Real, K J and Maloney, W F (2013) Exploratory Case Study of Pictorial Aids for Communicating Health and Safety for Migrant Construction Workers. Journal of Construction Engineering and Management, 139(07), 818–25.

Hartmann, T and Levitt, R E (2010) Understanding and Managing Three-Dimensional/ Four-Dimensional Model Implementations at the Project Team Level. Journal of Construction Engineering and Management, 136(07), 757–67.

Hasanzadeh, S, Esmaeili, B and Dodd, M D (2018) Examining the Relationship between Construction Workers’ Visual Attention and Situation Awareness under Fall and Tripping Hazard Conditions: Using Mobile Eye Tracking. Journal of Construction Engineering and Management, 144(07).

Hermann, U H, Hasan, S, Al-Hussein, M and Bouferguene, A (2011) Innovative System for Off-the-Ground Rotation of Long Objects Using Mobile Cranes. Journal of Construction Engineering and Management, 137(07), 478–85.

Ho, S P (2006) Model for Financial Renegotiation in Public-Private Partnership Projects and Its Policy Implications: Game Theoretic View. Journal of Construction Engineering and Management, 132(07), 678–88.

Hon, C K H, Chan, A P C and Yam, M C H (2012) Empirical Study to Investigate the Difficulties of Implementing Safety Practices in the Repair and Maintenance Sector in Hong Kong. Journal of Construction Engineering and Management, 138(07), 877–84.

Horman, M J and Thomas, H R (2005) Role of Inventory Buffers in Construction Labor Performance. Journal of Construction Engineering and Management, 131(07), 834–43.

Hosseini, M R, Martek, I, Chileshe, N, Zavadskas, E K and Arashpour, M (2018) Assessing the Influence of Virtuality on the Effectiveness of Engineering Project Networks: “Big Five Theory” Perspective. Journal of Construction Engineering and Management, 144(07).

Hosseinian, S M, Farahpour, E and Carmichael, D G (2020) Optimum Outcome-Sharing Construction Contracts with Multiagent and Multioutcome Arrangements. Journal of Construction Engineering and Management, 146(07).

Hwang, S, Jebelli, H, Choi, B, Choi, M and Lee, S (2018) Measuring Workers’ Emotional State during Construction Tasks Using Wearable EEG. Journal of Construction Engineering and Management, 144(07).

Hyun, C, Cho, K, Koo, K, Hong, T and Moon, H (2008) Effect of Delivery Methods on Design Performance in Multifamily Housing Projects. Journal of Construction Engineering and Management, 134(07), 468–82.

Ikuma, L H, Nahmens, I and James, J (2011) Use of Safety and Lean Integrated Kaizen to Improve Performance in Modular Homebuilding. Journal of Construction Engineering and Management, 137(07), 551–60.

Imam, H (2021) Roles of Shared Leadership, Autonomy, and Knowledge Sharing in Construction Project Success. Journal of Construction Engineering and Management, 147(07).

Imran, S A, Commuri, S, Barman, M, Zaman, M and Beainy, F (2017) Modeling the Dynamics of Asphalt–Roller Interaction during Compaction. Journal of Construction Engineering and Management, 143(07).

Jarkas, A M and Bitar, C G (2012) Factors Affecting Construction Labor Productivity in Kuwait. Journal of Construction Engineering and Management, 138(07), 811–20.

Jayaraj, S, Doerfel, M L and Williams, T (2022) Clique to Win: Impact of Cliques, Competition, and Resources on Team Performance. Journal of Construction Engineering and Management, 148(07).

Jelodar, M B, Yiu, T W and Wilkinson, S (2016) Relationship-Quality Judgment Model for Construction Project Procurement: A Conjoint Measurement. Journal of Construction Engineering and Management, 142(07).

Jin, R, Han, S, Hyun, C and Kim, J (2014) Improving Accuracy of Early Stage Cost Estimation by Revising Categorical Variables in a Case-Based Reasoning Model. Journal of Construction Engineering and Management, 140(07).

Jordan Srour, F, Kiomjian, D and Srour, I M (2018) Automating the Use of Learning Curve Models in Construction Task Duration Estimates. Journal of Construction Engineering and Management, 144(07).

Kallantzis, A, Soldatos, J and Lambropoulos, S (2007) Linear versus Network Scheduling: A Critical Path Comparison. Journal of Construction Engineering and Management, 133(07), 483–91.

Kanit, R, Gunduz, M and Ozkan, O (2009) Investigating the Effectiveness of Certain Priority Rules on Resource Scheduling of Housing Estate Projects. Journal of Construction Engineering and Management, 135(07), 609–13.

Karakhan, A A and Gambatese, J A (2017) Identification, Quantification, and Classification of Potential Safety Risk for Sustainable Construction in the United States. Journal of Construction Engineering and Management, 143(07).

Karakhan, A A, Rajendran, S, Gambatese, J and Nnaji, C (2018) Measuring and Evaluating Safety Maturity of Construction Contractors: Multicriteria Decision-Making Approach. Journal of Construction Engineering and Management, 144(07).

Karimi, H and Taghaddos, H (2020) Impact of Age on the Strength of Experience and Education Role in Fatal Injuries Prevention in Iranian Construction Craft Workers. Journal of Construction Engineering and Management, 146(07).

Karimi, H, Taylor, T R B, Dadi, G B, Goodrum, P M and Srinivasan, C (2018) Impact of Skilled Labor Availability on Construction Project Cost Performance. Journal of Construction Engineering and Management, 144(07).

Khan, M, Khalid, R, Anjum, S, Tran, S V and Park, C (2022) Fall Prevention from Scaffolding Using Computer Vision and IoT-Based Monitoring. Journal of Construction Engineering and Management, 148(07).

Kifokeris, D (2021) Variants of Swedish lean construction practices reported in research: Systematic literature review and critical analysis. Journal of Construction Engineering and Management, 147(07), 05021005.

Kim, A and Arditi, D (2010) Performance of MBE/DBE/WBE Construction Firms in Transportation Projects. Journal of Construction Engineering and Management, 136(07), 768–77.

Kim, B and Kim, H (2014) Sensitivity of Earned Value Schedule Forecasting to S-Curve Patterns. Journal of Construction Engineering and Management, 140(07).

Kim, S, Hwang, S and Son, J (2022) Safety Management Guidelines for Precast Concrete Production Plants Using Importance-Performance Analysis. Journal of Construction Engineering and Management, 148(07).

Kiomjian, D, Srour, I and Srour, F J (2020) Knowledge Sharing and Productivity Improvement: An Agent-Based Modeling Approach. Journal of Construction Engineering and Management, 146(07).

Konstantinou, E and Brilakis, I (2018) Matching Construction Workers across Views for Automated 3D Vision Tracking On-Site. Journal of Construction Engineering and Management, 144(07).

Koulinas, G K and Anagnostopoulos, K P (2012) Construction Resource Allocation and Leveling Using a Threshold Accepting–Based Hyperheuristic Algorithm. Journal of Construction Engineering and Management, 138(07), 854–63.

Kwon, N, Park, M, Lee, H, Ahn, J and Shin, M (2016) Construction Noise Management Using Active Noise Control Techniques. Journal of Construction Engineering and Management, 142(07).

Lædre, O, Austeng, K, Haugen, T I and Klakegg, O J (2006) Procurement Routes in Public Building and Construction Projects. Journal of Construction Engineering and Management, 132(07), 689–96.

Laan, A, Voordijk, H, Noorderhaven, N and Dewulf, G (2012) Levels of Interorganizational Trust in Construction Projects: Empirical Evidence. Journal of Construction Engineering and Management, 138(07), 821–31.

Larsson, R and Rudberg, M (2019) Impact of Weather Conditions on In Situ Concrete Wall Operations Using a Simulation-Based Approach. Journal of Construction Engineering and Management, 145(07).

Lee, C and Chong, H (2021) Influence of Prior Ties on Trust and Contract Functions for BIM-Enabled EPC Megaproject Performance. Journal of Construction Engineering and Management, 147(07).

Lee, C Y, Chong, H and Wang, X (2018) Enhancing BIM Performance in EPC Projects through Integrative Trust-Based Functional Contracting Model. Journal of Construction Engineering and Management, 144(07).

Lee, C, Hong, T, Lee, G and Jeong, J (2012) . Journal of Construction Engineering and Management, 138(07), 897–904.

Lee, J (2021) Life Cycle Costing for Exterior Materials on Building Façade. Journal of Construction Engineering and Management, 147(07).

Lee, S, Tae, S, Jee, N and Shin, S (2015) LDA-Based Model for Measuring Impact of Change Orders in Apartment Projects and Its Application for Prerisk Assessment and Postevaluation. Journal of Construction Engineering and Management, 141(07).

Lee, S, Thomas, S R and Tucker, R L (2005) Web-Based Benchmarking System for the Construction Industry. Journal of Construction Engineering and Management, 131(07), 790–8.

Li, Y and Ning, Y (2022) Mitigating Opportunistic Behaviors in Consulting Projects: Evidence from the Outsourced Architectural and Engineering Design. Journal of Construction Engineering and Management, 148(07).

Li, Y, Soomro, M A, Khan, A N, Han, Y and Xue, R (2022) Impact of Ethical Leadership on Employee Turnover Intentions in the Construction Industry. Journal of Construction Engineering and Management, 148(07).

Li, Y, Wang, J, Cao, L, Wei, D and Wang, Y (2022) Three-Step Mathematical Model for Optimizing Rebar Cutting-Stock with Practical Application. Journal of Construction Engineering and Management, 148(07).

Lin, J J and Golparvar-Fard, M (2021) Visual and Virtual Production Management System for Proactive Project Controls. Journal of Construction Engineering and Management, 147(07).

Lin, P, Lee, W and Lee, M (2009) Exploring Problems and Undesired Effects in the Construction Development Process: The Case of a Small- to Medium-Sized Developer in Taiwan. Journal of Construction Engineering and Management, 135(07), 560–9.

Ling, F Y and Gui, Y (2009) Strengths, Weaknesses, Opportunities, and Threats: Case Study of Consulting Firms in Shenzhen, China. Journal of Construction Engineering and Management, 135(07), 628–36.

Liu, H, Kwigizile, V and Huang, W (2021) Holistic Framework for Highway Construction Cost Index Development Based on Inconsistent Pay Items. Journal of Construction Engineering and Management, 147(07).

Liu, J and Lu, M (2018) Constraint Programming Approach to Optimizing Project Schedules under Material Logistics and Crew Availability Constraints. Journal of Construction Engineering and Management, 144(07).

Liu, Y S, Zhao, X F and Liao, Y P (2013) Market Structure, Ownership Structure, and Performance of China’s Construction Industry. Journal of Construction Engineering and Management, 139(07), 852–7.

Lowe, D J, Emsley, M W and Harding, A (2006) Predicting Construction Cost Using Multiple Regression Techniques. Journal of Construction Engineering and Management, 132(07), 750–8.

Lucko, G (2011) Optimizing Cash Flows for Linear Schedules Modeled with Singularity Functions by Simulated Annealing. Journal of Construction Engineering and Management, 137(07), 523–35.

Lucko, G, Anderson-Cook, C M and Vorster, M C (2006) Statistical Considerations for Predicting Residual Value of Heavy Equipment. Journal of Construction Engineering and Management, 132(07), 723–32.

Luo, L, He, Q, Jaselskis, E J and Xie, J (2017) Construction Project Complexity: Research Trends and Implications. Journal of Construction Engineering and Management, 143(07).

Mahalingam, A and Levitt, R E (2007) Institutional Theory as a Framework for Analyzing Conflicts on Global Projects. Journal of Construction Engineering and Management, 133(07), 517–28.

Mahalingam, A and Levitt, R E (2007) Safety Issues on Global Projects. Journal of Construction Engineering and Management, 133(07), 506–16.

Mahalingam, A, Yadav, A K and Varaprasad, J (2015) Investigating the Role of Lean Practices in Enabling BIM Adoption: Evidence from Two Indian Cases. Journal of Construction Engineering and Management, 141(07).

Mahmoud, S, Hussein, M, Zayed, T and Fahmy, M (2022) Multiobjective Optimization Model for the Life Cycle Cost-Sustainability Trade-Off Problem of Building Upgrading Using a Generic Sustainability Assessment Tool. Journal of Construction Engineering and Management, 148(07).

Maravas, A and Pantouvakis, J (2011) Fuzzy Repetitive Scheduling Method for Projects with Repeating Activities. Journal of Construction Engineering and Management, 137(07), 561–4.

Martínez Fernández, P, Villalba Sanchís, I, Insa Franco, R and Yepes, V (2022) Slab Track Optimization Using Metamodels to Improve Rail Construction Sustainability. Journal of Construction Engineering and Management, 148(07).

Martinez, P, Livojevic, M, Jajal, P, Aldrich, D R, Al-Hussein, M and Ahmad, R (2020) Simulation-Driven Design of Wood Framing Support Systems for Off-Site Construction Machinery. Journal of Construction Engineering and Management, 146(07).

Masih-Tehrani, M and Ebrahimi-Nejad, S (2018) Hybrid Genetic Algorithm and Linear Programming for Bulldozer Emissions and Fuel-Consumption Management Using Continuously Variable Transmission. Journal of Construction Engineering and Management, 144(07).

Mathew, S A, Tran, D Q and Nguyen, P H D (2021) Evaluation of Cost Growth Factors in Design-Build Highway Projects Using Structural Equation Modeling. Journal of Construction Engineering and Management, 147(07).

Melhem, N N, Maher, R A and Sundermeier, M (2021) Waste-Based Management of Steel Reinforcement Cutting in Construction Projects. Journal of Construction Engineering and Management, 147(07).

Migliaccio, G C, Guindani, M, D’Incognito, M and Zhang, L (2013) Empirical Assessment of Spatial Prediction Methods for Location Cost-Adjustment Factors. Journal of Construction Engineering and Management, 139(07), 858–69.

Miller, L, Mannering, F and Abraham, D M (2009) Effectiveness of Speed Control Measures on Nighttime Construction and Maintenance Projects. Journal of Construction Engineering and Management, 135(07), 614–9.

Milošević, I, Kovačević, M and Petronijević, P (2021) Estimating Residual Value of Heavy Construction Equipment Using Ensemble Learning. Journal of Construction Engineering and Management, 147(07).

Minooei, F, Goodrum, P M and Taylor, T R B (2020) Young Talent Motivations to Pursue Craft Careers in Construction: The Theory of Planned Behavior. Journal of Construction Engineering and Management, 146(07).

Mirzaei, A, Nasirzadeh, F, Parchami Jalal, M and Zamani, Y (2018) 4D-BIM Dynamic Time–Space Conflict Detection and Quantification System for Building Construction Projects. Journal of Construction Engineering and Management, 144(07).

Mitropoulos, P, Abdelhamid, T S and Howell, G A (2005) Systems Model of Construction Accident Causation. Journal of Construction Engineering and Management, 131(07), 816–25.

Moon, S, Ha, C and Yang, J (2012) Structured Idea Creation for Improving the Value of Construction Design. Journal of Construction Engineering and Management, 138(07), 841–53.

Morgado, J, Flores-Colen, I, de Brito, J and Silva, A (2017) Maintenance Planning of Pitched Roofs in Current Buildings. Journal of Construction Engineering and Management, 143(07).

Mucheti, A S and Albuquerque, P J R d (2022) Influence of Execution Speed on Displacements of Soil-Nailed Structures with Vertical Face in Urban Areas. Journal of Construction Engineering and Management, 148(07).

Mullens, M A and Arif, M (2006) Structural Insulated Panels: Impact on the Residential Construction Process. Journal of Construction Engineering and Management, 132(07), 786–94.

Musenero, L, Baroudi, B and Gunawan, I (2021) Application of Dual Concern Theory in Elucidating Conflict Behavior in Infrastructure Public-Private Partnership Projects. Journal of Construction Engineering and Management, 147(07).

Navon, R and Kolton, O (2006) Model for Automated Monitoring of Fall Hazards in Building Construction. Journal of Construction Engineering and Management, 132(07), 733–40.

Nguyen, L D and Ibbs, W (2008) FLORA: New Forensic Schedule Analysis Technique. Journal of Construction Engineering and Management, 134(07), 483–91.

Nguyen, L D, Nguyen, T K N, Tran, D Q and Villiers, C (2014) Productivity in Daytime and Nighttime Construction of Urban Sewer Systems. Journal of Construction Engineering and Management, 140(07).

Noshadravan, A, Miller, T R and Gregory, J G (2017) A Lifecycle Cost Analysis of Residential Buildings Including Natural Hazard Risk. Journal of Construction Engineering and Management, 143(07).

O’Connor, J T, Torres, N and Woo, J (2016) Sustainability Actions during the Construction Phase. Journal of Construction Engineering and Management, 142(07).

Okpala, I, Nnaji, C, Awolusi, I and Akanmu, A (2021) Developing a Success Model for Assessing the Impact of Wearable Sensing Devices in the Construction Industry. Journal of Construction Engineering and Management, 147(07).

olde Scholtenhuis, L L, Hartmann, T and Dorée, A G (2016) Testing the Value of 4D Visualizations for Enhancing Mindfulness in Utility Reconstruction Works. Journal of Construction Engineering and Management, 142(07).

Oo, B, Drew, D S and Lo, H (2010) Modeling the Heterogeneity in Contractors’ Mark-Up Behavior. Journal of Construction Engineering and Management, 136(07), 720–9.

Osman, K K, Claveria, J B, Faust, K M and Hernandez, S (2019) Temporal Dynamics of Willingness to Pay for Alternatives That Increase the Reliability of Water and Wastewater Service. Journal of Construction Engineering and Management, 145(07).

Ospina-Alvarado, A, Castro-Lacouture, D and Roberts, J S (2016) Unified Framework for Construction Project Integration. Journal of Construction Engineering and Management, 142(07).

Park, H, Thomas, S R and Tucker, R L (2005) Benchmarking of Construction Productivity. Journal of Construction Engineering and Management, 131(07), 772–8.

Park, M, Yang, Y, Lee, H, Han, S and Ji, S (2012) Floor-Level Construction Material Layout Planning Model Considering Actual Travel Path. Journal of Construction Engineering and Management, 138(07), 905–15.

Perkins, R A (2009) Sources of Changes in Design–Build Contracts for a Governmental Owner. Journal of Construction Engineering and Management, 135(07), 588–93.

Priven, V and Sacks, R (2016) Impacts of the Social Subcontract and Last Planner System Interventions on the Trade-Crew Workflows of Multistory Residential Construction Projects. Journal of Construction Engineering and Management, 142(07).

Rausch, C, Sanchez, B and Haas, C (2021) . Journal of Construction Engineering and Management, 147(07).

Reinschmidt, K and Trejo, D (2006) Economic Value of Building Faster. Journal of Construction Engineering and Management, 132(07), 759–66.

Rezazadeh Azar, E, Dickinson, S and McCabe, B (2013) Server-Customer Interaction Tracker: Computer Vision–Based System to Estimate Dirt-Loading Cycles. Journal of Construction Engineering and Management, 139(07), 785–94.

Rezgui, Y and Zarli, A (2006) Paving the Way to the Vision of Digital Construction: A Strategic Roadmap. Journal of Construction Engineering and Management, 132(07), 767–76.

Sacks, R, Esquenazi, A and Goldin, M (2007) LEAPCON: Simulation of lean construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(07), 529–39.

Salem, O and Mohanty, S (2008) Project Management Practices and Information Technology Research. Journal of Construction Engineering and Management, 134(07), 501–8.

Sanad, H M, Ammar, M A and Ibrahim, M E (2008) Optimal Construction Site Layout Considering Safety and Environmental Aspects. Journal of Construction Engineering and Management, 134(07), 536–44.

Sankaran, B and O’Brien, W J (2018) Impact of CIM Technologies and Agency Policies on Performance for Highway Infrastructure Projects. Journal of Construction Engineering and Management, 144(07).

Serugga, J, Kagioglou, M and Tzortzopoulos, P (2021) Benefits Realization: Novel Conceptual Model for Front End–Design Decision-Making Using Dempster–Shafer Theory and Quality Function Deployment. Journal of Construction Engineering and Management, 147(07).

Shen, W, Tang, W, Wang, Y, Duffield, C F, Hui, F K P and Zhang, L (2021) Managing Interfaces in Large-Scale Projects: The Roles of Formal Governance and Partnering. Journal of Construction Engineering and Management, 147(07).

Shi, M, Wang, J, Li, Q, Cui, B, Guan, S and Zeng, T (2022) Accelerated Earth-Rockfill Dam Compaction by Collaborative Operation of Unmanned Roller Fleet. Journal of Construction Engineering and Management, 148(07).

Shi, Q, Chen, X, Xiao, C and Han, Y (2022) Network Perspective in Megaproject Management: A Systematic Review. Journal of Construction Engineering and Management, 148(07).

Shrestha, A, Chan, T, Aibinu, A A, Chen, C and Martek, I (2017) Risks in PPP Water Projects in China: Perspective of Local Governments. Journal of Construction Engineering and Management, 143(07).

Sing, C P, Love, P E D, Fung, I W H and Edwards, D J (2014) Personality and Occupational Accidents: Bar Benders in Guangdong Province, Shenzhen, China. Journal of Construction Engineering and Management, 140(07).

  • Type: Journal Article
  • Keywords: Occupational safety; Accidents; China; Construction industry; Case studies; Eysenck Personality Questionnaire; Occupational accidents; Personality; Unsafe behavior; Labor and personnel issues;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000858
  • Abstract:
    Limited research has been undertaken to explore how Chinese construction workers’ personality affects their safety behavior. Inappropriate behavior on-site can instigate serious accidents, injuries, or fatality as well as incur significant costs and loss of corporate reputation. To address this dearth within the extant literature, this paper uses Eysenck Personality Questionnaire to examine the complex relationship between the personality of Chinese construction workers (especially, bar benders) and occupational accidents. A significant relationship between personality, unsafe behaviors, and the extent of injury was identified. Using the results generated, a series of practical recommendations are proffered to reinforce behavioral safety training (and reduce accidents on-site), including suggestions for conducting training programs that can be tailored to construction workers with different personality traits.

Soman, R K and Whyte, J K (2020) Codification Challenges for Data Science in Construction. Journal of Construction Engineering and Management, 146(07).

Spearing, L A, Bakchan, A, Hamlet, L C, Stephens, K K, Kaminsky, J A and Faust, K M (2022) Comparing Qualitative Analysis Techniques for Construction Engineering and Management Research: The Case of Arctic Water Infrastructure. Journal of Construction Engineering and Management, 148(07).

Su, X and Cai, H (2014) Life Cycle Approach to Construction Workspace Modeling and Planning. Journal of Construction Engineering and Management, 140(07).

Suk, S, Hwang, B, Dai, J, Caldas, C H and Mulva, S P (2012) Performance Dashboard for a Pharmaceutical Project Benchmarking Program. Journal of Construction Engineering and Management, 138(07), 864–76.

Sun, C, Ahn, S and Ahn, C R (2020) Identifying Workers’ Safety Behavior–Related Personality by Sensing. Journal of Construction Engineering and Management, 146(07).

Swei, O (2018) Long-Run Construction Cost Trends: Baumol’s Cost Disease and a Disaggregate Look at Building Material Price Dynamics. Journal of Construction Engineering and Management, 144(07).

Tam, V W Y, Le, K N and Le, H N (2008) Using Gaussian and Hyperbolic Distributions for Quality Improvement in Construction: Case Study Approach. Journal of Construction Engineering and Management, 134(07), 555–61.

Tan, Y, Xue, B and Cheung, Y T (2017) Relationships between Main Contractors and Subcontractors and Their Impacts on Main Contractor Competitiveness: An Empirical Study in Hong Kong. Journal of Construction Engineering and Management, 143(07).

Tang, W, Qiang, M, Duffield, C F, Young, D M and Lu, Y (2008) Incentives in the Chinese Construction Industry. Journal of Construction Engineering and Management, 134(07), 457–67.

Tang, Y, Liu, R and Sun, Q (2014) Two-Stage Scheduling Model for Resource Leveling of Linear Projects. Journal of Construction Engineering and Management, 140(07).

Tao, L, Wu, C, Chiang, Y, Wong, F K and Liang, S (2017) Generational Perceptions of Freedom-Related Work Values: Hong Kong’s Implementation of a No-Saturday-Site-Work Policy in Construction. Journal of Construction Engineering and Management, 143(07).

Tavafzadeh Haghi, N, Ahmadian Nezhad Monfared, M, Hashemian, L and Bayat, A (2019) Capital Cost Comparison of Pavements Comprised of Insulation Layers: Case Study in Edmonton, Canada. Journal of Construction Engineering and Management, 145(07).

Thomas, H R, Riley, D R and Messner, J I (2005) Fundamental Principles of Site Material Management. Journal of Construction Engineering and Management, 131(07), 808–15.

Toland, M D, Bowen, P and Dueber, D M (2020) Multidimensional Item Response Theory Analysis of Work-Related, After-Hours Contact, and Psychosocial Measurement Scales for Construction Professionals. Journal of Construction Engineering and Management, 146(07).

Too, E G (2012) Capability Model to Improve Infrastructure Asset Performance. Journal of Construction Engineering and Management, 138(07), 885–96.

Trinh, M T, Feng, Y and Jin, X (2018) Conceptual Model for Developing Resilient Safety Culture in the Construction Environment. Journal of Construction Engineering and Management, 144(07).

Tsai, J and Chi, C S F (2015) Learning for Win-Win Collaboration. Journal of Construction Engineering and Management, 141(07).

Vereen, S C, Rasdorf, W and Hummer, J E (2016) Development and Comparative Analysis of Construction Industry Labor Productivity Metrics. Journal of Construction Engineering and Management, 142(07).

Wan, S K, Kumaraswamy, M M and Liu, D T (2009) Contributors to Construction Debris from Electrical and Mechanical Work in Hong Kong Infrastructure Projects. Journal of Construction Engineering and Management, 135(07), 637–46.

Wang, D, Dai, F, Ning, X, Dong, R G and Wu, J Z (2017) Assessing Work-Related Risk Factors on Low Back Disorders among Roofing Workers. Journal of Construction Engineering and Management, 143(07).

Wang, Q, Zuo, W, Guo, Z, Li, Q, Mei, T and Qiao, S (2020) BIM Voxelization Method Supporting Cell-Based Creation of a Path-Planning Environment. Journal of Construction Engineering and Management, 146(07).

Wang, S, Zhu, S and Yuen, P (2021) Assessment of Ground-Borne Vibration Impact on Nearby Underground Facilities Induced by Ground Surface Excavation. Journal of Construction Engineering and Management, 147(07).

Wang, X, Arditi, D and Ye, K (2022) Coupling Effects of Economic, Industrial, and Geographical Factors on Collusive Bidding Decisions. Journal of Construction Engineering and Management, 148(07).

Watkins, M, Mukherjee, A, Onder, N and Mattila, K (2009) Using Agent-Based Modeling to Study Construction Labor Productivity as an Emergent Property of Individual and Crew Interactions. Journal of Construction Engineering and Management, 135(07), 657–67.

Welfare, K, Sherratt, F and Hallowell, M (2021) Perceptions of Construction Work: Views to Consider to Improve Employee Recruitment and Retention. Journal of Construction Engineering and Management, 147(07).

Wen, Q, Qiang, M and An, N (2017) Collaborating with Construction Management Consultants in Project Execution: Responsibility Delegation and Capability Integration. Journal of Construction Engineering and Management, 143(07).

Wibowo, A and Kochendoerfer, B (2011) Selecting BOT/PPP Infrastructure Projects for Government Guarantee Portfolio under Conditions of Budget and Risk in the Indonesian Context. Journal of Construction Engineering and Management, 137(07), 512–22.

Wibowo, A and Sundermeier, M (2020) Developing a Fuzzy Value-for-Money Analysis Model for Annuity-Based Public-Private Partnership Infrastructure Projects under Consideration of Risk Mitigation Capability. Journal of Construction Engineering and Management, 146(07).

Wilmot, C G and Mei, B (2005) Neural Network Modeling of Highway Construction Costs. Journal of Construction Engineering and Management, 131(07), 765–71.

Wong, L, Wang, Y, Law, T and Lo, C T (2016) Association of Root Causes in Fatal Fall-from-Height Construction Accidents in Hong Kong. Journal of Construction Engineering and Management, 142(07).

Wong, P S P, Zwar, C and Gharaie, E (2017) Examining the Drivers and States of Organizational Change for Greater Use of Prefabrication in Construction Projects. Journal of Construction Engineering and Management, 143(07).

Wu, X and Xu, F (2021) Detection Model for Unbalanced Bidding in Railway Construction Projects: Considering the Risk of Quantity Variation. Journal of Construction Engineering and Management, 147(07).

Xiao, B, Wang, Y and Kang, S (2022) Deep Learning Image Captioning in Construction Management: A Feasibility Study. Journal of Construction Engineering and Management, 148(07).

Xu, J and Zeng, Z (2011) Applying Optimal Control Model to Dynamic Equipment Allocation Problem: Case Study of Concrete-Faced Rockfill Dam Construction Project. Journal of Construction Engineering and Management, 137(07), 536–50.

Xu, T, Tiong, R L, Chew, D A and Smith, N J (2005) Development Model for Competitive Construction Industry in the People’s Republic of China. Journal of Construction Engineering and Management, 131(07), 844–53.

Yang, I (2007) Using Elitist Particle Swarm Optimization to Facilitate Bicriterion Time-Cost Trade-Off Analysis. Journal of Construction Engineering and Management, 133(07), 498–505.

Yang, J and Yin, P (2009) Isolated Collapsed But-For Delay Analysis Methodology. Journal of Construction Engineering and Management, 135(07), 570–8.

Yang, J, Shen, G Q, Drew, D S and Ho, M (2010) Critical Success Factors for Stakeholder Management: Construction Practitioners’ Perspectives. Journal of Construction Engineering and Management, 136(07), 778–86.

Yang, X, Yu, M and Zhu, F (2020) Impact of Project Planning on Knowledge Integration in Construction Projects. Journal of Construction Engineering and Management, 146(07).

Yang, Z, Yuan, Y, Zhang, M, Zhao, X and Tian, B (2019) Assessment of Construction Workers’ Labor Intensity Based on Wearable Smartphone System. Journal of Construction Engineering and Management, 145(07).

Zayed, T M and Halpin, D W (2005) Productivity and Cost Regression Models for Pile Construction. Journal of Construction Engineering and Management, 131(07), 779–89.

Zetterlund, M, Norberg, T, Ericsson, L O and Rosén, L (2011) Framework for Value of Information Analysis in Rock Mass Characterization for Grouting Purposes. Journal of Construction Engineering and Management, 137(07), 486–97.

Zhang, H, Li, H and Lu, M (2008) Modeling Time-Constraints in Construction Operations through Simulation. Journal of Construction Engineering and Management, 134(07), 545–54.

Zhang, L, He, J and Zhou, S (2013) Sharing Tacit Knowledge for Integrated Project Team Flexibility: Case Study of Integrated Project Delivery. Journal of Construction Engineering and Management, 139(07), 795–804.

Zhang, L, Yuan, J, Xia, N, Bouferguene, A and Al-Hussein, M (2020) Improving Information Sharing in Major Construction Projects through OC and POC: RDT Perspective. Journal of Construction Engineering and Management, 146(07).

Zhang, M and Ge, S (2022) Vision and Trajectory–Based Dynamic Collision Prewarning Mechanism for Tower Cranes. Journal of Construction Engineering and Management, 148(07).

Zhang, P, Li, N, Fang, D and Wu, H (2017) Supervisor-Focused Behavior-Based Safety Method for the Construction Industry: Case Study in Hong Kong. Journal of Construction Engineering and Management, 143(07).

Zhang, X, Yu, Y, He, W and Chen, Y (2021) Bidding Decision-Support Model for Construction Projects Based on Projection Pursuit Learning Method. Journal of Construction Engineering and Management, 147(07).

Zhang, X, Zhang, W, Jiang, L and Zhao, T (2020) Identification of Critical Causes of Tower-Crane Accidents through System Thinking and Case Analysis. Journal of Construction Engineering and Management, 146(07).

Zhou, T, Zhu, Q, Shi, Y and Du, J (2022) Construction Robot Teleoperation Safeguard Based on Real-Time Human Hand Motion Prediction. Journal of Construction Engineering and Management, 148(07).

Zhu, Y, Ahmad, I and Wang, L (2009) Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects. Journal of Construction Engineering and Management, 135(07), 601–8.

Zou, P X and Zhang, G (2009) Comparative Study on the Perception of Construction Safety Risks in China and Australia. Journal of Construction Engineering and Management, 135(07), 620–7.