Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 972 results ...

Şevik, S, Koçer, A, İnce, H and Tombuş, F E (2022) Determination of optimum tilt angle of the solar collector and evaluation of the position of the existing buildings in terms of solar potential. Architectural Engineering and Design Management, 18(06), 812–28.

Özer, S and Jacoby, S (2022) Dwelling size and usability in London: a study of floor plan data using machine learning. Building Research & Information, 50(06), 694–708.

Çıdık, M S, Boyd, D and Thurairajah, N (2017) Ordering in disguise: Digital integration in built-environment practices. Building Research & Information, 45(06), 665-80.

Aalto, L, Sirola, P, Kalliomäki-Levanto, T, Lahtinen, M, Ruohomäki, V, Salonen, H and Reijula, K (2019) User-centric work environments in modular healthcare facilities. Engineering, Construction and Architectural Management, 26(06), 1047–62.

Abadou, Y, Ghrieb, A, Bustamante, R and Faid, H (2020) Optimization by mixture design approach. Journal of Engineering, Design and Technology , 18(06), 1731–47.

Abdel-Wahab, M and Vogl, B (2011) Trends of productivity growth in the construction industry across Europe, US and Japan. Construction Management and Economics, 29(06), 635–44.

AbdelRazig, Y A and Chang, L (2000) Intelligent Model for Constructed Facilities Surface Assessment. Journal of Construction Engineering and Management, 126(06), 422–32.

Abdirad, H and Nazari, A (2015) Barriers to effective implementation of quality management systems in public design projects in Iran. Architectural Engineering and Design Management, 11(06), 457-74.

Abdul Mujeebu, M and Ashraf, N (2020) Impact of location and deadband on energy performance of nano aerogel glazing for office building in Saudi Arabia. Building Research & Information, 48(06), 645–58.

Abdul-Aziz, A (2001) Unraveling of BOT Scheme: Malaysia's Indah Water Konsortium. Journal of Construction Engineering and Management, 127(06), 457–60.

Abdul-Aziz, A-R (1994) Global strategies: a comparison between Japanese and American construction firms. Construction Management and Economics, 12(06), 473-84.

Abdul-Rahman, H (1996) Some observations on the management of quality amongst construction professionals in the UK. Construction Management and Economics, 14(06), 485-96.

Abeid, J and Arditi, D (2002) Time-Lapse Digital Photography Applied to Project Management. Journal of Construction Engineering and Management, 128(06), 530–5.

Abeysinghe, G and Urand, D (1999) Why Use Enactable Models of Construction Processes?. Journal of Construction Engineering and Management, 125(06), 437–47.

AbouRizk, S and Mather, K (2000) Simplifying Simulation Modeling through Integration with 3D CAD. Journal of Construction Engineering and Management, 126(06), 475–83.

AbouRizk, S, Knowles, P and Hermann, U R (2001) Estimating Labor Production Rates for Industrial Construction Activities. Journal of Construction Engineering and Management, 127(06), 502–11.

Acharya, N K, Lee, Y D and Im, H M (2006) Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(06), 543–66.

Acharya, P, Sharma, K, Pokharel, G R and Adhikari, R (2022) Reviewing the progress of reconstruction five years after the 2015 Gorkha earthquake, Nepal. Building Research & Information, 50(06), 595–609.

Addy, M N, Akunyumu, S and Simons, B (2019) Key risk factors affecting renewable energy independent power producer (IPP) set-up projects in developing countries. Journal of Engineering, Design and Technology , 17(06), 1340–55.

Ade, R and Rehm, M (2022) A summertime thermal analysis of New Zealand Homestar certified apartments for older people. Building Research & Information, 50(06), 681–93.

Ade, R and Rehm, M (2020) Reaching for the stars: green construction cost premiums for Homestar certification. Construction Management and Economics, 38(06), 570–80.

Adebisi, E O, Alao, O O and Ojo, S O (2020) Assessment of early warning signs predisposing building projects to failure in Nigeria. Journal of Engineering, Design and Technology , 18(06), 1403–23.

Aghimien, D O, Aigbavboa, C O and Thwala, W D (2019) Microscoping the challenges of sustainable construction in developing countries. Journal of Engineering, Design and Technology , 17(06), 1110–28.

Agyefi-Mensah, S, Kpamma, Z E and Hagan, D E (2020) Residential adaptations as users' tacit means of communicating spatial needs in housing design. Journal of Engineering, Design and Technology , 18(06), 1593–613.

Agyekum, B, Kissi, E, Yamoah Agyemang, D and Badu, E (2018) Examining barriers for the utilization of non-traditional cost estimating models in developing countries. Journal of Engineering, Design and Technology, 16(06), 814–27.

Agyekum, K, Kissi, E, Danku, J C, Ampratwum, G and Amegatsey, G S (2020) Factors driving the career progression of construction project managers. Journal of Engineering, Design and Technology , 18(06), 1773–91.

Aivaliotis, V, Giannakopoulou, T, Gratsiou, M and Panagiotakopoulos, D (1991) Economies of scale and strategic planning for municipal waste treatment plants in Greece. Construction Management and Economics, 9(06), 553-64.

Akadiri, P O and Olomolaiye, P O (2012) Development of sustainable assessment criteria for building materials selection. Engineering, Construction and Architectural Management, 19(06), 666-87.

Akintoye, A and Chinyio, E (2005) Private Finance Initiative in the healthcare sector: trends and risk assessment. Engineering, Construction and Architectural Management, 12(06), 601–16.

Akintoye, A and Main, J (2007) Collaborative relationships in construction: the UK contractors' perception. Engineering, Construction and Architectural Management, 14(06), 597–617.

Aksenova, G, Kiviniemi, A, Kocaturk, T and Lejeune, A (2019) From Finnish AEC knowledge ecosystem to business ecosystem: lessons learned from the national deployment of BIM. Construction Management and Economics, 37(06), 317–35.

Al-Bayati, A J (2019) Satisfying the Need for Diversity Training for Hispanic Construction Workers and Their Supervisors at US Construction Workplaces: A Case Study. Journal of Construction Engineering and Management, 145(06).

Al-Hammad, A M, Assaf, S A and Al-Hazmi, T (1996) Assessment of the types of public building maintenance contracts in Saudi Arabia. Building Research & Information, 24(06), 358–62.

Al-Homoud, M S, Abdou, A A and Khan, M M (2004) Safety design practices in residential buildings in Saudi Arabia. Building Research & Information, 32(06), 538–43.

Alankarage, S, Chileshe, N, Samaraweera, A, Rameezdeen, R and Edwards, D J (2023) Organisational BIM maturity models and their applications: a systematic literature review. Architectural Engineering and Design Management, 19(06), 567–85.

Alarcón, L F, Rodríguez, A and Mourgues, C (2012) Impact of Machine-Failure Costs on Equipment Replacement Policies: Tunneling Company Case Study. Journal of Construction Engineering and Management, 138(06), 767–74.

Albayyaa, H, Hagare, D and Saha, S (2021) Energy conservation assessment of traditional and modern houses in Sydney. Building Research & Information, 49(06), 613–23.

Ali, G M, Kosa, J, Bouferguene, A and Al-Hussein, M (2021) Competitive Assessment of Ice and Frozen Silt Mat for Crane Ground Support Using Finite-Element Analysis. Journal of Construction Engineering and Management, 147(06).

Alkaissy, M, Arashpour, M, Zeynalian, M and Li, H (2022) Worksite Accident Impacts on Construction and Infrastructure: Nondeterministic Analysis of Subsectors and Organization Sizes. Journal of Construction Engineering and Management, 148(06).

AlKhaiat, H and Fereig, S M (1996) The role of precast concrete systems in Kuwaiti housing projects. Building Research & Information, 24(06), 374–8.

Allen, S and Hinks, J (1996) Note - How long should housing last? Some implications of the age and probable life of housing in England: a comment. Construction Management and Economics, 14(06), 529-34.

Allouche, E N, Ariaratnam, S T and AbouRizk, S M (2001) Applications of Horizontal Characterization Techniques in Trenchless Construction. Journal of Construction Engineering and Management, 127(06), 476–84.

Alsamadani, R, Hallowell, M and Javernick-Will, A N (2013) Measuring and modelling safety communication in small work crews in the US using social network analysis. Construction Management and Economics, 31(06), 568-79.

Alsharqawi, M, Abu Dabous, S, Zayed, T and Hamdan, S (2021) Budget Optimization of Concrete Bridge Decks under Performance-Based Contract Settings. Journal of Construction Engineering and Management, 147(06).

Alwasel, A, Abdel-Rahman, E M, Haas, C T and Lee, S (2017) Experience, Productivity, and Musculoskeletal Injury among Masonry Workers. Journal of Construction Engineering and Management, 143(06).

Amany, A, Taghizade, K and Noorzai, E (2020) Investigating conflicts of expert contractors using the last planner system in building information modeling process. Journal of Engineering, Design and Technology , 18(06), 1381–402.

Amuda-Yusuf, G and Mohamed, S F (2015) Essential features of a building services standard method of measurement in Malaysia. Engineering, Construction and Architectural Management, 22(06), 749-70.

Anastasopoulos, P C, Haddock, J E and Peeta, S (2014) Cost Overrun in Public-Private Partnerships: Toward Sustainable Highway Maintenance and Rehabilitation. Journal of Construction Engineering and Management, 140(06).

Andersen, M, Kleindienst, S, Yi, L, Lee, J, Bodart, M and Cutler, B (2008) An intuitive daylighting performance analysis and optimization approach. Building Research & Information, 36(06), 593–607.

Andersson, R and Buser, M (2022) From waste to resource management? Construction and demolition waste management through the lens of institutional work. Construction Management and Economics, 40(06), 477–96.

Aniekwu, A N (1995) The business environment of the construction industry in Nigeria. Construction Management and Economics, 13(06), 445-55.

Anikeeff, M A and Sriram, V (2008) Construction management strategy and developer performance. Engineering, Construction and Architectural Management, 15(06), 504–13.

Ankomah, E N, Ayarkwa, J and Agyekum, K (2020) Status of lean construction implementation among small and medium building contractors in Ghana. Journal of Engineering, Design and Technology, 18(06), 1691–709.

Ankrah, N A and Langford, D A (2005) Architects and contractors: a comparative study of organizational cultures. Construction Management and Economics, 23(06), 595-607.

Anumba, C E H, Dainty, A, Ison, S and Sergeant, A (2006) Understanding structural and cultural impediments to ICT system integration: A GIS-based case study. Engineering, Construction and Architectural Management, 13(06), 616–33.

Aouad, R and Amara, I (2018) Influence of the cutting condition on the wear and the surface roughness in the steel AISI 4140 with mixed ceramic and diamond tool. Journal of Engineering, Design and Technology, 16(06), 828–36.

Arashpour, M, Heidarpour, A, Akbar Nezhad, A, Hosseinifard, Z, Chileshe, N and Hosseini, R (2020) Performance-based control of variability and tolerance in off-site manufacture and assembly: optimization of penalty on poor production quality. Construction Management and Economics, 38(06), 502–14.

Arditi, D, Tokdemir, O B and Suh, K (2002) Challenges in Line-of-Balance Scheduling. Journal of Construction Engineering and Management, 128(06), 545–56.

Arefizadeh, H and Shahir, H (2020) Three-dimensional analysis of anchored wall with concrete bearing pads. Journal of Engineering, Design and Technology , 18(06), 1469–86.

Ariaratnam, S T and MacLeod, C W (2002) Financial Outlay Modeling for a Local Sewer Rehabilitation Strategy. Journal of Construction Engineering and Management, 128(06), 486–95.

Armitage, P, Godoy-Shimizu, D, Steemers, K and Chenvidyakarn, T (2015) Using Display Energy Certificates to quantify public sector office energy consumption. Building Research & Information, 43(06), 691-709.

Aroke, O, Hasanzadeh, S, Esmaeili, B, Dodd, M D and Brock, R (2022) Using Worker Characteristics, Personality, and Attentional Distribution to Predict Hazard Identification Performance: A Moderated Mediation Analysis. Journal of Construction Engineering and Management, 148(06).

Asa, E, Anna, A S and Baffoe-Twum, E (2019) An investigation of mechanical behavior of concrete containing crushed waste glass. Journal of Engineering, Design and Technology , 17(06), 1285–303.

Asa, E, Shrestha, M, Baffoe-Twum, E and Awuku, B (2020) Development of sustainable construction material from fly ash class C. Journal of Engineering, Design and Technology , 18(06), 1615–40.

Assaad, R and El-adaway, I H (2020) Enhancing the Knowledge of Construction Business Failure: A Social Network Analysis Approach. Journal of Construction Engineering and Management, 146(06), 04020052.

Attoh-Okine, N O (2003) Rule induction in productivity analysis: a rough set approach. Engineering, Construction and Architectural Management, 10(06), 413–7.

Aune, M (2012) Making energy visible in domestic property markets: the influence of advertisements. Building Research & Information, 40(06), 713-23.

Awad, A and Fayek, A R (2013) Adaptive Learning of Contractor Default Prediction Model for Surety Bonding. Journal of Construction Engineering and Management, 139(06), 694–704.

Ayers, G F, Culvenor, J F, Sillitoe, J and Else, D (2013) Meaningful and effective consultation and the construction industry of Victoria, Australia. Construction Management and Economics, 31(06), 542-67.

Babatunde, S O and Perera, S (2017) Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria. Engineering, Construction and Architectural Management, 24(06), 875-900.

Babatunde, S O, Ekundayo, D, Adekunle, A O and Bello, W (2020) Comparative analysis of drivers to BIM adoption among AEC firms in developing countries. Journal of Engineering, Design and Technology , 18(06), 1425–47.

Babatunde, S O, Perera, S, Zhou, L and Udeaja, C (2015) Barriers to public private partnership projects in developing countries: A case of Nigeria. Engineering, Construction and Architectural Management, 22(06), 669-91.

Badi, S and Diamantidou, D (2017) A social network perspective of building information modelling in Greek construction projects. Architectural Engineering and Design Management, 13(06), 406–22.

Badu, E, Owusu-Manu, D, Edwards, D J and Holt, G D (2013) Analysis of Strategic Issues Underpinning the Innovative Financing of Infrastructure within Developing Countries. Journal of Construction Engineering and Management, 139(06), 726–37.

Bae, S, Martin, C S and Asojo, A O (2021) Higher education students’ indoor environmental quality satisfaction benchmark. Building Research & Information, 49(06), 679–94.

Bakens, W (1997) International trends in research and technology development. Building Research & Information, 25(06), 335–7.

Bakry, I, Moselhi, O and Zayed, T (2016) Optimized scheduling and buffering of repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 23(06), 782-800.

Ballesteros-Pérez, P, del Campo-Hitschfeld, M L, González-Naranjo, M A and González-Cruz, M C (2015) Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(06), 596-621.

Barrett, P S, Sexton, M G and Green, L (1999) Integrated delivery systems for sustainable construction. Building Research & Information, 27(06), 398–405.

Barrett, P, Sharma, M and Zeisel, J (2019) Optimal spaces for those living with dementia: principles and evidence. Building Research & Information, 47(06), 734–46.

Battikha, M G and Davidson, C H (1996) Cause and effect 3-D model for measuring performance in construction acceleration: a decision support system. Building Research & Information, 24(06), 351–7.

Becker, T C, Jaselskis, E J and El-Gafy, M (2014) Improving Predictability of Construction Project Outcomes through Intentional Management of Indirect Construction Costs. Journal of Construction Engineering and Management, 140(06).

Behm, M and Schneller, A (2013) Application of the Loughborough Construction Accident Causation model: a framework for organizational learning. Construction Management and Economics, 31(06), 580-95.

Beitelmal, W, Molenaar, K R, Javernick-Will, A and Pellicer, E (2017) Challenges and barriers to establishing infrastructure asset management: A comparative study between Libya and the USA. Engineering, Construction and Architectural Management, 24(06), 1184-202.

Benabdellah, A C, Benghabrit, A and Bouhaddou, I (2020) Complexity drivers in engineering design. Journal of Engineering, Design and Technology , 18(06), 1663–90.

Bendak, S and Alhammadi, A A (2019) A multi-criteria decision-making approach to minimising fire risk in detached house designs. Journal of Engineering, Design and Technology , 17(06), 1146–60.

Berente, N, Baxter, R and Lyytinen, K (2010) Dynamics of inter-organizational knowledge creation and information technology use across object worlds: the case of an innovative construction project. Construction Management and Economics, 28(06), 569–88.

Berg, J B, Thuesen, C, Ernstsen, S K and Jensen, P A (2021) Reconfiguring the construction value chain: analysing key sources of friction in the business model archetypes of AEC companies in strategic partnerships. Construction Management and Economics, 39(06), 533–48.

Berggren, B (1999) Industry's contribution to sustainable development. Building Research & Information, 27(06), 432–6.

Bernold, L E (2005) Automatic As-Built Generation with Utility Trenchers. Journal of Construction Engineering and Management, 131(06), 740–7.

Bernold, L E (2003) Economic Model to Optimize Underground Utility Protection. Journal of Construction Engineering and Management, 129(06), 645–52.

Betts, M and Ofori, G (1992) Strategic planning for competitive advantage in construction. Construction Management and Economics, 10(06), 511-32.

Betts, M and Wood-Harper, T (1994) Re-engineering construction: a new management research agenda. Construction Management and Economics, 12(06), 551-6.

Betts, M, Cher, L, Mathur, K and Ofori, G (1991) Strategies for the construction sector in the information technology era. Construction Management and Economics, 9(06), 509-28.

Bhardwaj, A and Sharma, R K (2020) Effect of industrial wastes and lime on strength characteristics of clayey soil. Journal of Engineering, Design and Technology , 18(06), 1749–72.

Bhatnagar, S, Jacob, G, Devkar, G, Rybkowski, Z K, Arefazar, Y and Obulam, R (2023) A systematic review of lean simulation games in the construction industry. Architectural Engineering and Design Management, 19(06), 701–19.

Bhaurkar, V P and Thakur, A G (2019) Investigation of crack in beams using anti-resonance technique and FEA approach. Journal of Engineering, Design and Technology , 17(06), 1266–84.

Bick, P (1997) Statutory reform of aspects of construction law in Australia. Construction Management and Economics, 15(06), 549-58.

Billy, H and Iain, C (2011) Site manager safety training. Engineering, Construction and Architectural Management, 18(06), 2–.

Bingham, E, Gibson, G E and Asmar, M E (2018) Measuring User Perceptions of Popular Transportation Project Delivery Methods Using Least Significant Difference Intervals and Multiple Range Tests. Journal of Construction Engineering and Management, 144(06).

Blismas, N G and Dainty, A R J (2003) Computer-aided qualitative data analysis: panacea or paradox?. Building Research & Information, 31(06), 455–63.

Blomgren, S (2003) Changes to building research funding in Sweden. Building Research & Information, 31(06), 474–8.

  • Type: Journal Article
  • Keywords: construction industry; European Union; governance; innovation; public policy; R&D; research policy; Sweden
  • ISBN/ISSN: 0961-3218
  • URL: http://taylorandfrancis.metapress.com/link.asp?id=vp9kf3vdekxkpjnb
  • Abstract:
    Changes to the Swedish research landscape since 2001 are described including the re-organization of research councils, research programmes, the management and allocation of public funding research in Sweden, and the effects on built environment research. The reasons for these changes include the desire for increased integration with European Union research programmes, an increasing emphasis on inter- and multidisciplinary research, and the desire for research to contribute to economic well-being. Despite Sweden's high level of government investment in research, shifting priorities and an increasing number of applicants have resulted in reduced allocations for built environment research. This presents the challenging tasks to define and maintain core research capabilities within the built environment sector as well as to ensure adequate industry engagement with both the creation of the research agenda and the use of research outputs.

Bobick, T G (2004) Falls through Roof and Floor Openings and Surfaces, Including Skylights: 1992–2000. Journal of Construction Engineering and Management, 130(06), 895–907.

Bogenberger, C, Dell’Amico, M, Fuellerer, G, Hoefinger, G, Iori, M, Novellani, S and Panicucci, B (2015) Two-Phase Earthwork Optimization Model for Highway Construction. Journal of Construction Engineering and Management, 141(06).

Bohn, J S and Teizer, J (2010) Benefits and Barriers of Construction Project Monitoring Using High-Resolution Automated Cameras. Journal of Construction Engineering and Management, 136(06), 632–40.

Borges, W F and Mário, P d C (2017) Five Project-Duration Control Methods in Time Units: Case Study of a Linearly Distributed Planned Value. Journal of Construction Engineering and Management, 143(06).

Boukendour, S and Bah, R (2001) The guaranteed maximum price contract as call option. Construction Management and Economics, 19(06), 563-7.

Bourdeau, L (1999) Sustainable development and the future of construction: a comparison of visions from various countries. Building Research & Information, 27(06), 355–67.

Boussabaine, A H and Elhag, T M S (1999) Applying fuzzy techniques to cash flow analysis. Construction Management and Economics, 17(06), 745-55.

Bowen, P, Akintoye, A, Pearl, R and Edwards, P J (2007) Ethical behaviour in the South African construction industry. Construction Management and Economics, 25(06), 631–48.

Bowen, P, Edwards, P and Lingard, H (2013) Workplace stress among construction professionals in South Africa: The role of harassment and discrimination. Engineering, Construction and Architectural Management, 20(06), 620-35.

Bowen, P, Yakubu, K and Govender, R (2022) Predictors of moderate to high risk of alcohol harm among site-based South African construction workers. Construction Management and Economics, 40(06), 442–58.

Boyd, D and Bentley, D (2012) A critique of conceptions of design and management in construction projects. Construction Management and Economics, 30(06), 441-54.

Bråthen, K and Moum, A (2016) Bridging the gap: Bringing BIM to construction workers. Engineering, Construction and Architectural Management, 23(06), 751-64.

Brady, T, Davies, A and Gann, D (2005) Can integrated solutions business models work in construction?. Building Research & Information, 33(06), 571–9.

Brandon, P S (1999) Sustainability in management and organization: the key issues?. Building Research & Information, 27(06), 391–7.

Bresnen, M (2010) Keeping it real? Constituting partnering through boundary objects. Construction Management and Economics, 28(06), 615–28.

Bresnen, M, Goussevskaia, A and Swan, J (2005) Implementing change in construction project organizations: exploring the interplay between structure and agency. Building Research & Information, 33(06), 547–60.

Bröchner, J and Sjöström, C (2003) Quality and coordination: internationalizing Swedish building research. Building Research & Information, 31(06), 479–84.

Bröchner, J, Ang, G K I and Fredriksson, G (1999) Sustainability and the performance concept: encouraging innovative environmental technology in construction. Building Research & Information, 27(06), 367–78.

Bröchner, J, Josephson, P-E and Kadefors, A (2002) Swedish construction culture, quality management and collaborative practice. Building Research & Information, 30(06), 392–400.

Brodetskaia, I, Sacks, R and Shapira, A (2013) Stabilizing Production Flow of Interior and Finishing Works with Reentrant Flow in Building Construction. Journal of Construction Engineering and Management, 139(06), 665–74.

Brooker, P (1999) Survey of construction lawyers' attitudes and practicein the use of ADR in contractors' disputes. Construction Management and Economics, 17(06), 757-65.

Brooker, P and Lavers, A (1997) Perceptions of alternative dispute resolution as constraints upon its use in the UK construction industry. Construction Management and Economics, 15(06), 519-26.

Brooks, T, Spillane, J, Tansey, P and Hendron, C (2016) The impact of the recent economic recession on the operation of the NEC contract in Northern Ireland. Construction Management and Economics, 34(06), 393-417.

Bubshait, A A and Tahir, B M (1997) Effect of silica fume on the concrete-steel bond. Building Research & Information, 25(06), 365–9.

Bubshait, A A and Tahir, B M (1996) Planning and scheduling concrete repair work - a case study. Building Research & Information, 24(06), 363–8.

Bubshait, A A, Farooq, G, Jannadi, M O and Assaf, S A (1999) Quality practices in design organizations. Construction Management and Economics, 17(06), 799-809.

Buchmann-Slorup, R (2014) Applying critical chain buffer management theory in location-based management. Construction Management and Economics, 32(06), 506-19.

Burleson, R C, Haas, C T, Tucker, R L and Stanley, A (1998) Multiskilled Labor Utilization Strategies in Construction. Journal of Construction Engineering and Management, 124(06), 480–9.

Cai, J, Li, Z, Dou, Y and Li, T (2023) Investigating adoption of high prefabrication level technologies for enterprises: an integrated model. Building Research & Information, 51(06), 648–66.

Cai, S and Gou, Z (2023) Synchronization of water-energy consumption in residential and non-residential buildings during COVID-19. Building Research & Information, 51(06), 682–700.

Caldas, C and Gupta, A (2017) Critical factors impacting the performance of mega-projects. Engineering, Construction and Architectural Management, 24(06), 920-34.

Caldas, C H, Gibson, G E, Weerasooriya, R and Yohe, A M (2009) Identification of Effective Management Practices and Technologies for Lessons Learned Programs in the Construction Industry. Journal of Construction Engineering and Management, 135(06), 531–9.

Camfield, F E (1998) Guidelines for Quarrystone Armor Units. Journal of Construction Engineering and Management, 124(06), 465–6.

Camilleri, M, Jaques, R and Isaacs, N (2001) Impacts of climate change on building performance in New Zealand. Building Research & Information, 29(06), 430–50.

Candaş, A B and Tokdemir, O B (2022) Automating Coordination Efforts for Reviewing Construction Contracts with Multilabel Text Classification. Journal of Construction Engineering and Management, 148(06).

Canter, D (2008) Do we need a metatheory of the built environment?. Building Research & Information, 36(06), 663–7.

Cardellino, P, Araneda, C and García Alvarado, R (2018) Interventions in the classroom – the influence of spatial organisation on educational interaction in Uruguay. Architectural Engineering and Design Management, 14(06), 413–26.

Cariaga, I and El-Diraby, T E (2013) Assessing the market potential for housing construction products in Mexico. Journal of Construction Engineering and Management, 139(06), 717–25.

Carley, L A, Haas, C T, Borcherding, J D and Goodrum, P M (2003) Experiences with multiskilling among non-union craft workers in US industrial construction projects. Engineering, Construction and Architectural Management, 10(06), 374–81.

Carrillo, P (2004) Managing knowledge: lessons from the oil and gas sector. Construction Management and Economics, 22(06), 631-42.

Cass, N (2018) Energy-related standards and UK speculative office development. Building Research & Information, 46(06), 615–35.

Chan, A P C and Yeong, C M (1995) A comparison of strategies for reducing variations. Construction Management and Economics, 13(06), 467-73.

Chan, A P C, Wong, F K W, Hon, C K H, Ali, J A and Lyu, S (2017) Construction safety and health problems of ethnic minority workers in Hong Kong. Engineering, Construction and Architectural Management, 24(06), 901-19.

Chan, C T W (2007) Fuzzy procurement selection model for construction projects. Construction Management and Economics, 25(06), 611–8.

Chan, E H W (1997) Amicable dispute resolution in the People's Republic of China and its implications for foreign-related construction disputes. Construction Management and Economics, 15(06), 539-48.

Chan, S and Leung, N (2004) Prototype Web-Based Construction Project Management System. Journal of Construction Engineering and Management, 130(06), 935–43.

Chan, S L (2002) Responses of selected economic indicators to construction output shocks: the case of Singapore. Construction Management and Economics, 20(06), 523-33.

Chan, W T and Hu, H (2002) Constraint Programming Approach to Precast Production Scheduling. Journal of Construction Engineering and Management, 128(06), 513–21.

Chan, W T, Chen, C, Messner, J I and Chua, D K (2005) Interface Management for China’s Build–Operate–Transfer Projects. Journal of Construction Engineering and Management, 131(06), 645–55.

Chang, C and Qian, Y (2015) An Econometric Analysis of Holdup Problems in Construction Projects. Journal of Construction Engineering and Management, 141(06).

Chang, C and Yu, S (2018) Three-Variance Approach for Updating Earned Value Management. Journal of Construction Engineering and Management, 144(06).

Chang, C-Y, Chou, H-Y and Wang, M-T (2006) Characterizing the corporate governance of UK listed construction companies. Construction Management and Economics, 24(06), 647-56.

Chang, R, Zuo, J, Soebarto, V, Zhao, Z, Zillante, G and Gan, X (2017) Discovering the Transition Pathways toward Sustainability for Construction Enterprises: Importance-Performance Analysis. Journal of Construction Engineering and Management, 143(06).

Chapman, C and Ward, S (2008) Developing and implementing a balanced incentive and risk sharing contract. Construction Management and Economics, 26(06), 659–69.

Chasey, A D and Merchant, S (2000) Issues for Construction of 300-mm Fab. Journal of Construction Engineering and Management, 126(06), 451–7.

Cheah, C Y J, Chew, D A S and Huang, J (2006) Marketing foreign interior design services in China. Building Research & Information, 34(06), 584–95.

Cheah, C Y J, Garvin, M J and Miller, J B (2004) Empirical Study of Strategic Performance of Global Construction Firms. Journal of Construction Engineering and Management, 130(06), 808–17.

Chen, G, Chen, J, Tang, Y, Li, Q and Luo, X (2022) Identifying Effective Collaborative Behaviors in Building Information Modeling–Enabled Construction Projects. Journal of Construction Engineering and Management, 148(06).

Chen, H, O’Brien, W J and Herbsman, Z J (2005) Assessing the Accuracy of Cash Flow Models: The Significance of Payment Conditions. Journal of Construction Engineering and Management, 131(06), 669–76.

Chen, J J (1998) The characteristics and current status of China's construction industry. Construction Management and Economics, 16(06), 711-9.

Chen, P, Partington, D and Qiang, M (2009) Cross-Cultural Understanding of Construction Project Managers’ Conceptions of Their Work. Journal of Construction Engineering and Management, 135(06), 477–87.

Chen, Q, Jin, R and Soboyejo, A (2013) Understanding a Contractor’s Regional Variations in Safety Performance. Journal of Construction Engineering and Management, 139(06), 641–53.

Chen, Q, Reichard, G and Beliveau, Y (2008) Multiperspective Approach to Exploring Comprehensive Cause Factors for Interface Issues. Journal of Construction Engineering and Management, 134(06), 432–41.

Chen, Y and Yang, Z (2018) Validity and reliability of rating scales for subjective breathing resistance of wearing respirators. Journal of Engineering, Design and Technology, 16(06), 837–49.

Chen, Y Q, Zhang, Y B and Zhang, S J (2014) Impacts of Different Types of Owner-Contractor Conflict on Cost Performance in Construction Projects. Journal of Construction Engineering and Management, 140(06).

Cheng, E W L and Li, H (2004) Development of a Practical Model of Partnering for Construction Projects. Journal of Construction Engineering and Management, 130(06), 790–8.

Cheng, J, Proverbs, D G and Oduoza, C F (2006) The satisfaction levels of UK construction clients based on the performance of consultants: Results of a case study. Engineering, Construction and Architectural Management, 13(06), 567–83.

Cheng, Z, Ke, Y, Yang, Z, Cai, J and Wang, H (2020) Diversification or convergence. Engineering, Construction and Architectural Management, 27(06), 1315–35.

Cheung, S O, Chow, P T and Yiu, T W (2009) Contingent Use of Negotiators’ Tactics in Construction Dispute Negotiation. Journal of Construction Engineering and Management, 135(06), 466–76.

Cheung, S O, Yiu, K T W and Suen, H (2004) Construction Negotiation Online. Journal of Construction Engineering and Management, 130(06), 844–52.

Chew, M Y L, Silva, N D and Tan, S S (2004) A neural network approach to assessing building façade maintainability in the tropics. Construction Management and Economics, 22(06), 581-94.

Chew, Y T E, Atay, E and Bayraktaroglu, S (2020) Female Engineers’ Happiness and Productivity in Organizations with Paternalistic Culture. Journal of Construction Engineering and Management, 146(06).

Chi, C S F and Nicole Javernick‐Will, A (2011) Institutional effects on project arrangement: high‐speed rail projects in China and Taiwan. Construction Management and Economics, 29(06), 595–611.

Chih, Y, Kiazad, K, Zhou, L, Capezio, A, Li, M and D. Restubog, S L (2016) Investigating Employee Turnover in the Construction Industry: A Psychological Contract Perspective. Journal of Construction Engineering and Management, 142(06).

Chileshe, N, Edwards, D J, Kavishe, N and Haupt, T C (2020) Perception on challenges impacting bid decision of indigenous building contractors in Dar Es Salaam, Tanzania. Journal of Engineering, Design and Technology , 18(06), 1641–62.

Chin, K S and Choi, T W (2003) Construction in Hong Kong: Success Factors for ISO9000 Implementation. Journal of Construction Engineering and Management, 129(06), 599–609.

Chinazzo, G (2021) Investigating the indoor environmental quality of different workplaces through web-scraping and text-mining of Glassdoor reviews. Building Research & Information, 49(06), 695–713.

Chinyio, E and Akintoye, A (2008) Practical approaches for engaging stakeholders: findings from the UK. Construction Management and Economics, 26(06), 591–9.

Cho, Y, Wang, C and Zhuang, Z (2013) Framework for Empirical Process to Improve Nonnuclear Gauge Performance in Hot-Mix Asphalt Pavement Construction. Journal of Construction Engineering and Management, 139(06), 601–10.

Chong, H Y, Zin, R M and Chong, S C (2013) Employing Data Warehousing for Contract Administration: e-Dispute Resolution Prototype. Journal of Construction Engineering and Management, 139(06), 611–9.

Chua, D K and Goh, Y M (2005) Poisson Model of Construction Incident Occurrence. Journal of Construction Engineering and Management, 131(06), 715–22.

Chua, D K H, Tyagi, A, Ling, S and Bok, S H (2003) Process-Parameter-Interface Model for Design Management. Journal of Construction Engineering and Management, 129(06), 653–63.

Chua, D K H, Yeoh, K W and Song, Y (2010) Quantification of Spatial Temporal Congestion in Four-Dimensional Computer-Aided Design. Journal of Construction Engineering and Management, 136(06), 641–9.

Chuan, C and John, I M (2011) Characterizing entry modes for international construction markets: paving the way to a selection model. Engineering, Construction and Architectural Management, 18(06), 1–.

Chung, T H, Abraham, D M and Gokhale, S B (2004) Decision Support System for Microtunneling Applications. Journal of Construction Engineering and Management, 130(06), 835–43.

Cicmil, S and Marshall, D (2005) Insights into collaboration at the project level: complexity, social interaction and procurement mechanisms. Building Research & Information, 33(06), 523–35.

Clarke, L and Wall, C (2000) Craft versus industry: the division of labour in European housing construction. Construction Management and Economics, 18(06), 689-98.

Clarke, L, van der Meer, M, Bingham, C, Michielsens, E and Miller, S (2009) Enabling and disabling: disability in the British and Dutch construction sectors. Construction Management and Economics, 27(06), 555–66.

Cole, R J and Jose Valdebenito, M (2013) The importation of building environmental certification systems: international usages of BREEAM and LEED. Building Research & Information, 41(06), 662-76.

Coleman, M J, Irvine, K N, Lemon, M and Shao, L (2013) Promoting behaviour change through personalized energy feedback in offices. Building Research & Information, 41(06), 637-51.

Correia, J M, Sutrisna, M and Zaman, A U (2020) Factors influencing the implementation of off-site manufacturing in commercial projects in Western Australia. Journal of Engineering, Design and Technology , 18(06), 1449–68.

Cotton, A P, Sohail, M and Scott, R E (2005) Towards improved labour standards for construction of minor works in low income countries. Engineering, Construction and Architectural Management, 12(06), 617–32.

Courtney, R (1999) CIB Agenda 21 and the building research community. Building Research & Information, 27(06), 373–7.

Crawford, R H and Pullen, S (2011) Life cycle water analysis of a residential building and its occupants. Building Research & Information, 39(06), 589–602.

Cunha, L R M, Bastos, C D, Meijon, M N H and Araújo, D F (2016) Gamification technique for supporting transparency on construction sites: A case study. Engineering, Construction and Architectural Management, 23(06), 801-22.

Dada, J O (2017) An appraisal of paradigm shifts required of competence of the Nigerian quantity surveyors. Engineering, Construction and Architectural Management, 24(06), 1269-80.

Dai, H, Cao, G and Su, H (2006) Management and Construction of the Three Gorges Project. Journal of Construction Engineering and Management, 132(06), 615–9.

Dainty, A, Leiringer, R, Fernie, S and Harty, C (2017) BIM and the small construction firm: A critical perspective. Building Research & Information, 45(06), 696-709.

Damci, A, Arditi, D and Polat, G (2017) Civil engineers’ personal values/demographics linkage in project team building. Engineering, Construction and Architectural Management, 24(06), 1337-49.

Daniel, E I and Pasquire, C (2019) Creating social value within the delivery of construction projects: the role of lean approach. Engineering, Construction and Architectural Management, 26(06), 1105–28.

de la Garza, J M and Pishdad-Bozorgi, P (2018) Workflow Process Model for Flash Track Projects. Journal of Construction Engineering and Management, 144(06).

de Paula, N, Arditi, D and Melhado, S (2017) Managing sustainability efforts in building design, construction, consulting, and facility management firms. Engineering, Construction and Architectural Management, 24(06), 1040-50.

De Silva, N, Rathnayake, U and Kulasekera, K (2018) Under-reporting of construction accidents in Sri Lanka. Journal of Engineering, Design and Technology, 16(06), 850–68.

del Caño, A and de la Cruz, M P (2002) Integrated Methodology for Project Risk Management. Journal of Construction Engineering and Management, 128(06), 473–85.

Delgado-Hernandez, D J, Bampton, K E and Aspinwall, E (2007) Quality function deployment in construction. Construction Management and Economics, 25(06), 597–609.

Delghust, M, Roelens, W, Tanghe, T, De Weerdt, Y and Janssens, A (2015) Regulatory energy calculations versus real energy use in high-performance houses. Building Research & Information, 43(06), 675-90.

Deshpande, A S, Salem, O M and Miller, R A (2012) Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects. Journal of Construction Engineering and Management, 138(06), 716–24.

Dhal, M (2020) Labor Stand: Face of Precarious Migrant Construction Workers in India. Journal of Construction Engineering and Management, 146(06).

Diekmann, J E and Featherman, W D (1998) Assessing Cost Uncertainty: Lessons from Environmental Restoration Projects. Journal of Construction Engineering and Management, 124(06), 445–51.

Dinca, M S, Barbuta-Misu, N, Madaleno, M, Dinca, G and Deari, F (2017) Integrated Analysis of EU Construction Companies’ Financial Performances. Journal of Construction Engineering and Management, 143(06).

Ding, Z, Ng, F F and Wang, J (2013) The mediation role of trust in knowledge sharing: A cognitive perspective in Chinese architectural design teams. Engineering, Construction and Architectural Management, 20(06), 604-19.

Ding, Z, Zuo, J, Wu, J and Wang, J Y (2015) Key factors for the BIM adoption by architects: A China study. Engineering, Construction and Architectural Management, 22(06), 732-48.

Djafri, R, Mohamed Osman, M, Suzilawati Rabe, N and Shuid, S (2020) Investigating quality of life by residents of social housing in eastern Algeria: a structural equation modelling. Journal of Engineering, Design and Technology , 18(06), 1907–26.

Dou, Y and Bo, Q (2022) Characteristics and Dynamics of BIM Adoption in China: Social Network Analysis. Journal of Construction Engineering and Management, 148(06).

Druker, J and Croucher, R (2000) National collective bargaining and employment flexibility in the European building and civil engineering industries. Construction Management and Economics, 18(06), 699-709.

Du, J, Kim, B and Zhao, D (2016) Cost Performance as a Stochastic Process: EAC Projection by Markov Chain Simulation. Journal of Construction Engineering and Management, 142(06).

Du, J, Wang, Q and Shi, Q (2019) Description–experience gap under imperfect information. Engineering, Construction and Architectural Management, 26(06), 1151–70.

Dulaimi, M F (2007) Case studies on knowledge sharing across cultural boundaries. Engineering, Construction and Architectural Management, 14(06), 550–67.

Dulaimi, M F and Hwa, T F (2001) Developing world class construction companies in Singapore. Construction Management and Economics, 19(06), 591-9.

Dulaimi, M F, Nepal, M P and Park, M (2005) A hierarchical structural model of assessing innovation and project performance. Construction Management and Economics, 23(06), 565-77.

Duncan, K, Philips, P and Prus, M (2006) Prevailing wage legislation and public school construction efficiency: a stochastic frontier approach1. Construction Management and Economics, 24(06), 625-34.

Duodu, B, Melagoda, D G and Rowlinson, S (2024) Innovation ambidexterity in construction firms: external knowledge antecedents and performance consequences. Construction Management and Economics, 42(06), 503–26.

Dzeng, R (2006) Identifying a Design Management Package to Support Concurrent Design in Building Wafer Fabrication Facilities. Journal of Construction Engineering and Management, 132(06), 606–14.

Eberhardt, L C M, Birgisdóttir, H and Birkved, M (2019) Life cycle assessment of a Danish office building designed for disassembly. Building Research & Information, 47(06), 666–80.

Edirisinghe, R and Lingard, H (2016) Exploring the potential for the use of video to communicate safety information to construction workers: Case studies of organizational use. Construction Management and Economics, 34(06), 366-76.

Edirisinghe, R, London, K A, Kalutara, P and Aranda-Mena, G (2017) Building information modelling for facility management: Are we there yet?. Engineering, Construction and Architectural Management, 24(06), 1119-54.

Edwards, D J (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(06), 417–27.

Edwards, P and Bowen, P (2019) Language and communication issues in HIV/AIDS intervention management in the South African construction industry. Engineering, Construction and Architectural Management, 26(06), 962–88.

Edwards, P J and Edwards, M (1995) A price-rationalized approach to item separation in the measurement of concrete work. Construction Management and Economics, 13(06), 485-91.

Egbelakin, T, Wilkinson, S, Potangaroa, R and Ingham, J (2013) Improving regulatory frameworks for earthquake risk mitigation. Building Research & Information, 41(06), 677-89.

Egbu, C O (1997) Refurbishment management: challenges and opportunities. Building Research & Information, 25(06), 338–47.

Egbu, C O, Young, B A and Torrance, V B (1996) Refurbishment management practices in the shipping and construction industries - lessons to be learned. Building Research & Information, 24(06), 329–38.

El-Abbasy, M S, Senouci, A, Zayed, T, Mirahadi, F and Parvizsedghy, L (2014) Condition Prediction Models for Oil and Gas Pipelines Using Regression Analysis. Journal of Construction Engineering and Management, 140(06).

El-adaway, I H, Abotaleb, I S, Eid, M S, May, S, Netherton, L and Vest, J (2018) Contract administration guidelines for public infrastructure projects in the United States and Saudi Arabia: comparative analysis approach. Journal of Construction Engineering and Management, 144(06), 04018031.

El-Hamrawy, S A-K, Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(06), 988-1003.

El-Tayeh, A and Gil, N (2007) Using Digital Socialization to Support Geographically Dispersed AEC Project Teams. Journal of Construction Engineering and Management, 133(06), 462–73.

Elbarkouky, M M G and Fayek, A R (2011) Fuzzy Similarity Consensus Model for Early Alignment of Construction Project Teams on the Extent of Their Roles and Responsibilities. Journal of Construction Engineering and Management, 137(06), 432–40.

Eldin, N N (1999) Impact of employee, management, and process issues on constructability implementation. Construction Management and Economics, 17(06), 711-20.

Emmitt, S (2016) Editorial. Architectural Engineering and Design Management, 12(06), 407–8.

Emmitt, S (2017) Editorial. Architectural Engineering and Design Management, 13(06), 405.

Emsley, M W, Lowe, D J, Duff, A R, Harding, A and Hickson, A (2002) Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics, 20(06), 465-72.

Engebø, A, Klakegg, O J, Lohne, J, Bohne, R A, Fyhn, H and Lædre, O (2022) High-performance building projects: how to build trust in the team. Architectural Engineering and Design Management, 18(06), 774–90.

Enshassi, A (1997) Construction safety issues in Gaza Strip. Building Research & Information, 25(06), 370–3.

Entner, D, Prante, T, Vosgien, T, Zăvoianu, A, Saminger-Platz, S, Schwarz, M and Fink, K (2019) Potential identification and industrial evaluation of an integrated design automation workflow. Journal of Engineering, Design and Technology , 17(06), 1085–109.

Eriksson, P E, Atkin, B and Nilsson, T (2009) Overcoming barriers to partnering through cooperative procurement procedures. Engineering, Construction and Architectural Management, 16(06), 598–611.

Eriksson, P E, Nilsson, T, rn and Atkin, B (2008) Client perceptions of barriers to partnering. Engineering, Construction and Architectural Management, 15(06), 527–39.

Erkan, I (2020) A system proposal for rapid detecting of anthropometric data and affecting design strategies. Journal of Engineering, Design and Technology , 18(06), 1793–822.

Erman Surya, B, Muhd Zaimi Bin Abdul, M, Rosli Mohamad, Z and Bambang, T (2011) Constructability improvement in sea water intake structure. Engineering, Construction and Architectural Management, 18(06), 4–.

Erman, E (2002) Timber joint design: the geometric breakdown method. Building Research & Information, 30(06), 446–69.

Ershadi, M, Jefferies, M, Davis, P and Mojtahedi, M (2021) Project management offices in the construction industry: a literature review and qualitative synthesis of success variables. Construction Management and Economics, 39(06), 493–512.

Esmaeili, B and Hallowell, M (2013) Integration of safety risk data with highway construction schedules. Construction Management and Economics, 31(06), 528-41.

Essa, R and Fortune, C (2008) Pre-construction evaluation practices of sustainable housing projects in the UK. Engineering, Construction and Architectural Management, 15(06), 514–26.

Etemadi, R, Hon, C K H, Murphy, G and Manley, K (2020) The use of social media for work-related knowledge sharing by construction professionals. Architectural Engineering and Design Management, 16(06), 426-40.

Evia, C (2011) Localizing and Designing Computer-Based Safety Training Solutions for Hispanic Construction Workers. Journal of Construction Engineering and Management, 137(06), 452–9.

Ezeldin, A S and Sharara, L M (2006) Neural Networks for Estimating the Productivity of Concreting Activities. Journal of Construction Engineering and Management, 132(06), 650–6.

Fang, D, Chen, Y and Wong, L (2006) Safety Climate in Construction Industry: A Case Study in Hong Kong. Journal of Construction Engineering and Management, 132(06), 573–84.

Fang, D, Fong, P S and Li, M (2004) Risk Assessment Model of Tendering for Chinese Building Projects. Journal of Construction Engineering and Management, 130(06), 862–8.

Fang, D, Li, M, Fong, P S and Shen, L (2004) Risks in Chinese Construction Market—Contractors’ Perspective. Journal of Construction Engineering and Management, 130(06), 853–61.

Faniran, O O, Oluwoye, J O and Lenard, D (1994) Effective construction planning. Construction Management and Economics, 12(06), 485-99.

Fedoruk, L E, Cole, R J, Robinson, J B and Cayuela, A (2015) Learning from failure: Understanding the anticipated-achieved building energy performance gap. Building Research & Information, 43(06), 750-63.

Feldman, G, Shah, H, Chapman, C, Pärn, E A and Edwards, D J (2017) A systematic approach for enterprise systems upgrade decision-making: Outlining the decision processes. Journal of Engineering, Design and Technology, 15(06), 778-802.

Fenn, P, Lowe, D and Speck, C (1997) Conflict and dispute in construction. Construction Management and Economics, 15(06), 513-8.

Ferreira, C, Canhoto Neves, L, Silva, A and de Brito, J (2019) Stochastic Petri-net models to predict the degradation of ceramic claddings. Building Research & Information, 47(06), 697–715.

Finegan, E, Kelly, G and O’Sullivan, G (2020) Comparative analysis of Passivhaus simulated and measured overheating frequency in a typical dwelling in Ireland. Building Research & Information, 48(06), 681–99.

Finke, M R (1998) A Better Way to Estimate and Mitigate Disruption. Journal of Construction Engineering and Management, 124(06), 490–7.

Fiorineschi, L, Papini, S, Pugi, L, Rindi, A and Rotini, F (2020) Systematic design of a new gearbox for concrete mixers. Journal of Engineering, Design and Technology , 18(06), 2017–42.

Fitzgerald, E and Akintoye, A (1995) The accuracy and optimal linear correction of UK construction tender price index forecasts. Construction Management and Economics, 13(06), 493-500.

Florence Yean Yng, L and Asanga, G (2011) Strategies for potential owners in Singapore to own environmentally sustainable homes. Engineering, Construction and Architectural Management, 18(06), 3–.

Florence, L and Siew Huay, L (2010) Improving export performance of contractors from China. Engineering, Construction and Architectural Management, 17(06), 581–97.

Forman, M (2013) Inertia and change: lean construction and health and safety work on construction sites. Construction Management and Economics, 31(06), 647-60.

Forster, A M, Carter, K, Banfill, P F G and Kayan, B (2011) Green maintenance for historic masonry buildings: an emerging concept. Building Research & Information, 39(06), 654–64.

Forsythe, P J (2012) Profiling customer perceived service quality expectations in made-to-order housing construction in Australia. Engineering, Construction and Architectural Management, 19(06), 587-609.

Foulds, C, Powell, J and Seyfang, G (2013) Investigating the performance of everyday domestic practices using building monitoring. Building Research & Information, 41(06), 622-36.

Franz, B W and Olopade, J (2024) Exploring pathways to project success through project delivery team integration: a qualitative comparative analysis. Construction Management and Economics, 42(06), 564–81.

Fraser, C (1999) A non-results-based effectiveness index for construction site managers. Construction Management and Economics, 17(06), 789-98.

Fraser, C and Zhu, C (2008) Stakeholder perception of construction site managers' effectiveness. Construction Management and Economics, 26(06), 579–90.

Fu, W K, Drew, D S and Lo, H P (2004) Start-up and steady-state learning in recurrent bidding. Building Research & Information, 32(06), 484–96.

Gaddala, K and Raju, P S (2020) Optimal location of UPQC for power quality improvement: novel hybrid approach. Journal of Engineering, Design and Technology , 18(06), 1519–41.

Gajendran, T and Brewer, G (2007) Integration of information and communication technology: Influence of the cultural environment. Engineering, Construction and Architectural Management, 14(06), 532–49.

Galbraith, G H, McLean, R C and Kelly, D (1997) Moisture permeability measurements under varying barometric pressure. Building Research & Information, 25(06), 348–53.

Galbraith, G H, McLean, R C, Gillespie, I, Guo, J S and Kelly, D (1998) Non-isothermal moisture diffusion in porous building materials. Building Research & Information, 26(06), 330–9.

Galvin, R (2015) Integrating the rebound effect: Accurate predictors for upgrading domestic heating. Building Research & Information, 43(06), 710-22.

Gambatese, J A and Hallowell, M (2011) Enabling and measuring innovation in the construction industry. Construction Management and Economics, 29(06), 553–67.

Gangolells, M and Casals, M (2012) Resilience to increasing temperatures: residential building stock adaptation through codes and standards. Building Research & Information, 40(06), 645-64.

Gao, S, Low, S P and Nair, K (2018) Design for manufacturing and assembly (DfMA): a preliminary study of factors influencing its adoption in Singapore. Architectural Engineering and Design Management, 14(06), 440–56.

Gao, Y, Casasayas, O, Wang, J and Xu, X (2023) Factors affecting the blockchain application in construction management in China: an ANP-SWOT hybrid approach. Architectural Engineering and Design Management, 19(06), 665–80.

Gao, Y, Liu, X, Zhang, S, Zhang, J and Guo, Q (2022) BIM application and collaboration in construction projects: a perspective of the Chinese construction market. Construction Management and Economics, 40(06), 429–41.

Gardiner, P D and Simmons, J E L (1992) Analysis of conflict and change in construction projects. Construction Management and Economics, 10(06), 459-78.

Gatti, U C, Migliaccio, G C, Bogus, S M and Schneider, S (2014) An exploratory study of the relationship between construction workforce physical strain and task level productivity. Construction Management and Economics, 32(06), 548-64.

Geem, Z W (2010) Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search. Journal of Construction Engineering and Management, 136(06), 711–6.

Gerber, J K and Yacoubian, G S (2001) Evaluation of Drug Testing in the Workplace: Study of the Construction Industry. Journal of Construction Engineering and Management, 127(06), 438–44.

Gholipour, H F, Farzanegan, M R and Abu Al-Foul, M N (2024) House prices and labour productivity growth: Evidence from OECD countries. Construction Management and Economics, 42(06), 582–9.

Giddings, B, Sharma, M, Jones, P and Jensen, P (2013) An evaluation tool for design quality: PFI sheltered housing. Building Research & Information, 41(06), 690-705.

Gledson, B J and Greenwood, D (2017) The adoption of 4D BIM in the UK construction industry: An innovation diffusion approach. Engineering, Construction and Architectural Management, 24(06), 950-67.

Globa, A, Costin, G, Tokede, O, Wang, R, Khoo, C K and Moloney, J (2022) Hybrid kinetic facade: fabrication and feasibility evaluation of full-scale prototypes. Architectural Engineering and Design Management, 18(06), 791–811.

Godoy-Shimizu, D, Armitage, P, Steemers, K and Chenvidyakarn, T (2011) Using Display Energy Certificates to quantify schools' energy consumption. Building Research & Information, 39(06), 535–52.

Goh, Y M and Binte Sa’adon, N F (2015) Cognitive Factors Influencing Safety Behavior at Height: A Multimethod Exploratory Study. Journal of Construction Engineering and Management, 141(06).

Goncikowski, M (2022) The tactics of illumination of high-rise buildings in the cities skyline. Research by design on Skyreach tower skyscraper in Warsaw. Architectural Engineering and Design Management, 18(06), 870–93.

Goodier, C and Gibb, A (2007) Future opportunities for offsite in the UK. Construction Management and Economics, 25(06), 585–95.

Goodrum, P M and Haas, C T (2002) Partial Factor Productivity and Equipment Technology Change at Activity Level in U.S. Construction Industry. Journal of Construction Engineering and Management, 128(06), 463–72.

Goulding, J S and Al-Shawi, M (2002) Generic and specific IT training: a process protocol model for construction. Construction Management and Economics, 20(06), 493-505.

Gransberg, D D, Lopez del Puerto, C and Humphrey, D (2007)  Relating Cost Growth from the Initial Estimate to Design Fee for Transportation Projects. Journal of Construction Engineering and Management, 133(06), 404–8.

Green, S D and Liu, A M M (2007) Theory and practice in value management: a reply to Ellis et al. (2005). Construction Management and Economics, 25(06), 649–59.

Green, S D and May, S C (2005) Lean construction: arenas of enactment, models of diffusion and the meaning of 'leanness'. Building Research & Information, 33(06), 498–511.

Green, S D, Fernie, S and Weller, S (2005) Making sense of supply chain management: a comparative study of aerospace and construction. Construction Management and Economics, 23(06), 579-93.

Griffis, F H ( and Christodoulou, S (2000) Construction Risk Analysis Tool for Determining Liquidated Damages Insurance Premiums: Case Study. Journal of Construction Engineering and Management, 126(06), 407–13.

Griffith, A and Headley, J D (1998) Effective client management control of small works and minor maintenance. Construction Management and Economics, 16(06), 703-9.

Guffond, J-L and Leconte, G (2000) Developing construction logistics management: the French experience. Construction Management and Economics, 18(06), 679-87.

Gujar, S and Deshmukh, A (2023) Methodology for visual comfort analysis in intermediate open spaces of residential areas, case study: Nagpur, India. Architectural Engineering and Design Management, 19(06), 602–19.

Gunay, H B, O'Brien, W, Beausoleil-Morrison, I and Huchuk, B (2014) On adaptive occupant-learning window blind and lighting controls. Building Research & Information, 42(06), 739-56.

Gundes, S (2011) Input structure of the construction industry: a cross‐country analysis, 1968–90. Construction Management and Economics, 29(06), 613–21.

Gunduz, M and Elsherbeny, H A (2020) Critical assessment of construction contract administration using fuzzy structural equation modeling. Engineering, Construction and Architectural Management, 27(06), 1233–55.

Guo, H, Yu, Y, Ding, Q and Skitmore, M (2018) Image-and-Skeleton-Based Parameterized Approach to Real-Time Identification of Construction Workers’ Unsafe Behaviors. Journal of Construction Engineering and Management, 144(06).

Guo, S, Ding, L, Zhang, Y, Skibniewski, M J and Liang, K (2019) Hybrid Recommendation Approach for Behavior Modification in the Chinese Construction Industry. Journal of Construction Engineering and Management, 145(06).

Gurevich, U, Sacks, R and Shrestha, P (2017) BIM adoption by public facility agencies: Impacts on occupant value. Building Research & Information, 45(06), 610-30.

Gurgun, A P and Koc, K (2020) Contractor prequalification for green buildings—evidence from Turkey. Engineering, Construction and Architectural Management, 27(06), 1377–400.

Haas, C T, Rodriguez, A M, Glover, R and Goodrum, P M (2001) Implementing a multiskilled workforce. Construction Management and Economics, 19(06), 633-41.

Habibi, S (2019) Design concepts for the integration of bamboo in contemporary vernacular architecture. Architectural Engineering and Design Management, 15(06), 475–89.

Hallowell, M and Toole, T M (2009) Contemporary Design-Bid-Build Model. Journal of Construction Engineering and Management, 135(06), 540–9.

Ham, N, Moon, S, Kim, J and Kim, J (2018) Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project. Journal of Construction Engineering and Management, 144(06).

Hamilton, I G, Summerfield, A J, Steadman, J P, Stone, A and Davies, M (2010) Exploring energy integration between new and existing developments. Building Research & Information, 38(06), 609.

Hammad, A W, Grzybowska, H, Sutrisna, M, Akbarnezhad, A and Haddad, A (2020) A novel mathematical optimisation model for the scheduling of activities in modular construction factories. Construction Management and Economics, 38(06), 534–51.

Hamurcu, A, Timur, & and Rızvanoğlu, K (2020) An overview of virtual reality within industrial design education. Journal of Engineering, Design and Technology , 18(06), 1889–905.

Hamzeh, F, Abdul, G O, Saleh, B M B and Abbas, Y (2017) Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon. Engineering, Construction and Architectural Management, 24(06), 935-49.

Han, B and Leite, F (2021) Measuring the Impact of Immersive Virtual Reality on Construction Design Review Applications: Head-Mounted Display versus Desktop Monitor. Journal of Construction Engineering and Management, 147(06).

Han, S H, Kim, D Y and Kim, H (2007) Predicting Profit Performance for Selecting Candidate International Construction Projects. Journal of Construction Engineering and Management, 133(06), 425–36.

Han, Y, Li, Y, Taylor, J E and Zhong, J (2018) Characteristics and Evolution of Innovative Collaboration Networks in Architecture, Engineering, and Construction: Study of National Prize-Winning Projects in China. Journal of Construction Engineering and Management, 144(06).

Hanc, M, McAndrew, C and Ucci, M (2019) Conceptual approaches to wellbeing in buildings: a scoping review. Building Research & Information, 47(06), 767–83.

Hanna, A S, Camlic, R, Peterson, P A and Lee, M (2004) Cumulative Effect of Project Changes for Electrical and Mechanical Construction. Journal of Construction Engineering and Management, 130(06), 762–71.

Hanna, A S, Russell, J S and Vandenberg, P J (1999) The impact of change orders on mechanical construction labour efficiency. Construction Management and Economics, 17(06), 721-30.

Hanna, A S, Taylor, C S and Sullivan, K T (2005) Impact of Extended Overtime on Construction Labor Productivity. Journal of Construction Engineering and Management, 131(06), 734–9.

Hari, S, Egbu, C and Kumar, B (2005) A knowledge capture awareness tool: An empirical study on small and medium enterprises in the construction industry. Engineering, Construction and Architectural Management, 12(06), 533–67.

Harmon, K M J (2003) Effectiveness of Dispute Review Boards. Journal of Construction Engineering and Management, 129(06), 674–9.

Harper, R S and Koehn, E (1998) Managing Industrial Construction Safety in Southeast Texas. Journal of Construction Engineering and Management, 124(06), 452–7.

Harris, R, Romer, J, Kelly, O and Johnson, S (2003) Design and construction of the Downland Gridshell. Building Research & Information, 31(06), 427–54.

Hartmann, A (2006) The context of innovation management in construction firms. Construction Management and Economics, 24(06), 567-78.

Hartono, B and Yap, C M (2011) Understanding risky bidding: a prospect‐contingent perspective. Construction Management and Economics, 29(06), 579–93.

Harty, C (2005) Innovation in construction: a sociology of technology approach. Building Research & Information, 33(06), 512–22.

Hasanzade, M P, van Oel, C J and Pazhouhanfar, M (2023) Passengers’ preferences for architectural design characteristics in the design of airport terminals. Architectural Engineering and Design Management, 19(06), 586–601.

Hassan, A and El-Rayes, K (2020) Quantifying the interruption impact of activity delays in non-serial repetitive construction projects. Construction Management and Economics, 38(06), 515–33.

Hassanein, A A and Hanna, R S (2008) Safety Performance in the Egyptian Construction Industry. Journal of Construction Engineering and Management, 134(06), 451–5.

Hastak, M, Gokhale, S, Goyani, K, Hong, T and Safi, B (2007) Project Manager’s Decision Aid for a Radical Project Cycle Reduction. Journal of Construction Engineering and Management, 133(06), 437–46.

Hawas, F and Cifuentes, A (2014) Valuation of Projects with Stochastic Cash Flows and Intertemporal Correlations: Practical Modeling Guidelines. Journal of Construction Engineering and Management, 140(06).

Hay, R, Samuel, F, Watson, K J and Bradbury, S (2018) Post-occupancy evaluation in architecture: experiences and perspectives from UK practice. Building Research & Information, 46(06), 698–710.

Heath, T, Scott, D and Boyland, M (1994) A prototype computer-based design management tool. Construction Management and Economics, 12(06), 543-9.

Heerwagen, J H, Kampschroer, K, Powell, K M and Loftness, V (2004) Collaborative knowledge work environments. Building Research & Information, 32(06), 510–28.

Hegab, M, Smith, G R and Salem, O M (2006) Soil Penetration Modeling in Microtunneling Projects. Journal of Construction Engineering and Management, 132(06), 598–605.

Hegazy, T and Ersahin, T (2001) Simplified Spreadsheet Solutions. I: Subcontractor Information System. Journal of Construction Engineering and Management, 127(06), 461–8.

Hegazy, T and Ersahin, T (2001) Simplified Spreadsheet Solutions. II: Overall Schedule Optimization. Journal of Construction Engineering and Management, 127(06), 469–75.

Hegazy, T and Kassab, M (2003) Resource Optimization Using Combined Simulation and Genetic Algorithms. Journal of Construction Engineering and Management, 129(06), 698–705.

Hegazy, T and Menesi, W (2012) Heuristic Method for Satisfying Both Deadlines and Resource Constraints. Journal of Construction Engineering and Management, 138(06), 688–96.

Hegazy, T, Shabeeb, A K, Elbeltagi, E and Cheema, T (2000) Algorithm for Scheduling with Multiskilled Constrained Resources. Journal of Construction Engineering and Management, 126(06), 414–21.

Henry, E (2000) Quality management standardization in the French construction industry: singularities and internationalization prospects. Construction Management and Economics, 18(06), 667-77.

Hernandez, P and Kenny, P (2010) Integrating occupant preference and life cycle energy evaluation: a simplified method. Building Research & Information, 38(06), 37.

Herrera, R F, Mourgues, C, Alarcón, L F and Pellicer, E (2020) Understanding Interactions between Design Team Members of Construction Projects Using Social Network Analysis. Journal of Construction Engineering and Management, 146(06).

Hidalgo-Sánchez, F M, Torres-González, M, Mascort-Albea, E J, Canivell, J, Romero-Hernández, R and Martín-del-Río, J J (2023) NDT spatial data integration for monumental buildings: technical information management for the Royal Alcazar of Seville. Building Research & Information, 51(06), 625–47.

Ho, D C W, Chau, K W and Yau, Y (2008) Evaluating unauthorized appendages in private apartment buildings. Building Research & Information, 36(06), 568–79.

Ho, M-F, Drew, D, McGeorge, D and Loosemore, M (2004) Implementing corporate ethics management and its comparison with the safety management system: a case study in Hong Kong. Construction Management and Economics, 22(06), 595-606.

Ho, S P, Lin, Y, Chu, W and Wu, H (2009) Model for Organizational Governance Structure Choices in Construction Joint Ventures. Journal of Construction Engineering and Management, 135(06), 518–30.

Hoeber, H and Alsem, D (2016) Life-cycle information management using open-standard BIM. Engineering, Construction and Architectural Management, 23(06), 696-708.

Holt, G D (1997) Classifying construction contractors. Building Research & Information, 25(06), 374–82.

Holt, G D, Goulding, J and Akintoye, A (2014) Interrelationships between theory and research impact: Views from a survey of UK academics. Engineering, Construction and Architectural Management, 21(06), 674-96.

Hong, T, Cho, K, Hyun, C and Han, S (2011) Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building. Journal of Construction Engineering and Management, 137(06), 393–402.

Hong, W, Abdul-Rahman, H and Wang, C (2016) The application of Form School {[}Feng Shui{]} model in a sleep environment: human preferences and subjective sleep quality evaluation. Architectural Engineering and Design Management, 12(06), 442–59.

Hong, X and David, B (2010) Learning from cross-cultural problems in international projects: a Chinese case. Engineering, Construction and Architectural Management, 17(06), 549–62.

Hong, Z, Tam, C M and Shi, J J (2001) Resource allocation heuristic in construction simulation. Construction Management and Economics, 19(06), 643-51.

Hoseini, E, Bosch-Rekveldt, M and Hertogh, M (2020) Cost Contingency and Cost Evolvement of Construction Projects in the Preconstruction Phase. Journal of Construction Engineering and Management, 146(06).

Hossain, J B and Kusakabe, K (2005) Sex segregation in construction organizations in Bangladesh and Thailand. Construction Management and Economics, 23(06), 609-19.

Hu, D, Mohamed, Y, Taghaddos, H and Hermann, U ( (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(06), 328–47.

Hu, M (2020) Life-cycle environmental assessment of energy-retrofit strategies on a campus scale. Building Research & Information, 48(06), 659–80.

Hu, X and Liu, C (2018) Measuring efficiency, effectiveness and overall performance in the Chinese construction industry. Engineering, Construction and Architectural Management, 25(06), 780–97.

Hua, Y and Liu, A M M (2017) An investigation of person-culture fit and person-task fit on ICT adoption in the Hong Kong construction industry. Architectural Engineering and Design Management, 13(06), 423–38.

Huan, Y, Chan, A P C and Qiming, L (2010) Density dependence in the Chinese construction industry: focus on mortality of Jiangsu Province (1989-2007). Engineering, Construction and Architectural Management, 17(06), 563–80.

Huang, R and Sun, K (2006) Non-Unit-Based Planning and Scheduling of Repetitive Construction Projects. Journal of Construction Engineering and Management, 132(06), 585–97.

Huang, Y-L (2009) Prediction of contractor default probability using structural models of credit risk: an empirical investigation. Construction Management and Economics, 27(06), 581–96.

Huemer, L and Östergren, K (2000) Strategic change and organizational learning in two 'Swedish' construction firms. Construction Management and Economics, 18(06), 635-42.

Hussein, M, Darko, A, Eltoukhy, A E E and Zayed, T (2022) Sustainable Logistics Planning in Modular Integrated Construction Using Multimethod Simulation and Taguchi Approach. Journal of Construction Engineering and Management, 148(06).

Hyari, K and El-Rayes, K (2006) Field experiments to evaluate lighting performance in nighttime highway construction. Construction Management and Economics, 24(06), 591-601.

Ibrahim, A K M (2011) Risk matrix for factors affecting time delay in road construction projects: owners’ perspective. Engineering, Construction and Architectural Management, 18(06), 5–.

Idris, M M (1998) Assessment of the factors influencing the maintenance programme of large university buildings in Riyadh. Construction Management and Economics, 16(06), 673-9.

Ikediashi, D I and Ogunlana, S O (2015) Significant risk factors associated with facilities management outsourcing: A study on Nigeria’s public hospitals. Engineering, Construction and Architectural Management, 22(06), 771-96.

Ikediashi, D, Udo, G and Ofoegbu, M (2020) Post-occupancy evaluation of University of Uyo buildings. Journal of Engineering, Design and Technology , 18(06), 1711–30.

Imriyas, K, Pheng, L S and Teo, E A-L (2007) A framework for computing workers' compensation insurance premiums in construction. Construction Management and Economics, 25(06), 563–84.

Ipsilandis, P G (2007) Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects. Journal of Construction Engineering and Management, 133(06), 417–24.

Isaac, S and Navon, R (2014) Can project monitoring and control be fully automated?. Construction Management and Economics, 32(06), 495-505.

Isidore, L J and Back, W E (2001) Probabilistic Optimal-Cost Scheduling. Journal of Construction Engineering and Management, 127(06), 431–7.

Ison, S, Dainty, A and Wall, S (2004) The construction sector, congestion charging and exemptions. Engineering, Construction and Architectural Management, 11(06), 386–94.

Jaeger, M, Yu, G and Adair, D (2017) Organisational culture of Chinese construction organisations in Kuwait. Engineering, Construction and Architectural Management, 24(06), 1051-66.

Jaffal, I, Inard, C, Ghaddar, N and Ghali, K (2020) A metamodel for long-term thermal comfort in non-air-conditioned buildings. Architectural Engineering and Design Management, 16(06), 441-72.

Jahangiri, M, Haghani, A, Heidarian, S, Mostafaeipour, A, Raiesi, H A and Alidadi Shamsabadi, A (2020) Sensitivity analysis of using solar cells in regional electricity power supply of off-grid power systems in Iran. Journal of Engineering, Design and Technology , 18(06), 1849–66.

Jang, Y, Song, K, Park, M and Ahn, Y (2020) Classifying the Business Model Types of International Construction Contractors. Journal of Construction Engineering and Management, 146(06).

Janssen, J (2000) The European construction industry�s competitiveness: a construct of the European Commission. Construction Management and Economics, 18(06), 711-20.

Jaselskis, E J and El-Misalami, T (2003) Implementing Radio Frequency Identification in the Construction Process. Journal of Construction Engineering and Management, 129(06), 680–8.

Jay, I and Bowen, P (2011) What residents value in low-cost housing schemes: some South African concepts. Building Research & Information, 39(06), 574–88.

Jennings, P and Holt, G D (1998) Pre-qualification and multi-criteria selection: a measure of UK contractors' opinions. Construction Management and Economics, 16(06), 651-60.

Jennings, W (2012) Why costs overrun: risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games. Construction Management and Economics, 30(06), 455-62.

Jensen, J S, Gottlieb, S C and Thuesen, C L (2011) Construction sector development: frames and governance responses. Building Research & Information, 39(06), 665–77.

Jeschke, K N, Waldorff, S B, Dyreborg, J, Kines, P and Ajslev, J Z N (2021) Complaining about occupational safety and health: a barrier for collaboration between managers and workers on construction sites. Construction Management and Economics, 39(06), 459–74.

Jia, A Y, Rowlinson, S, Loosemore, M, Xu, M, Li, B and Gibb, A (2017) Institutions and institutional logics in construction safety management: The case of climatic heat stress. Construction Management and Economics, 35(06), 338-30.

Jiang, S, Ma, G, Jia, J, Wu, M and Wu, Z (2022) Mobile ICT Overuse in the Construction Industry: Effects on Job Burnout of Project Managers. Journal of Construction Engineering and Management, 148(06).

Jin, Z and Gambatese, J (2020) Exploring the Potential of Technological Innovations for Temporary Structures: A Survey Study. Journal of Construction Engineering and Management, 146(06).

Johnstone, I M (2004) Development of a model to estimate the benefit-cost ratio performance of housing. Construction Management and Economics, 22(06), 607-17.

Jonsson, H and Rudberg, M (2015) Production System Classification Matrix: Matching Product Standardization and Production-System Design. Journal of Construction Engineering and Management, 141(06).

Josephson, P-E and Björkman, L (2013) Why do work sampling studies in construction? The case of plumbing work in Scandinavia. Engineering, Construction and Architectural Management, 20(06), 589-603.

Jung, M, Park, M, Lee, H and Kim, H (2016) Weather-Delay Simulation Model Based on Vertical Weather Profile for High-Rise Building Construction. Journal of Construction Engineering and Management, 142(06).

Kajander, J-K, Sivunen, M, Vimpari, J, Pulkka, L and Junnila, S (2012) Market value of sustainability business innovations in the construction sector. Building Research & Information, 40(06), 665-78.

Kalantari, S, Shepley, M M, Rybkowski, Z K and Bryant, J (2017) Designing for operational efficiency: facility managers’ perspectives on how their knowledge can be better incorporated during design. Architectural Engineering and Design Management, 13(06), 457–78.

Kale, S (2009) Fuzzy Intellectual Capital Index for Construction Firms. Journal of Construction Engineering and Management, 135(06), 508–17.

Kale, S and Arditi, D (1998) Business Failures: Liabilities of Newness, Adolescence, and Smallness. Journal of Construction Engineering and Management, 124(06), 458–64.

Kang, J H, Anderson, S D and Clayton, M J (2007) Empirical Study on the Merit of Web-Based 4D Visualization in Collaborative Construction Planning and Scheduling. Journal of Construction Engineering and Management, 133(06), 447–61.

Karam, A H (2003) Marketing and architects in South Africa. Engineering, Construction and Architectural Management, 10(06), 402–12.

Karimi, H, Taylor, T R B and Goodrum, P M (2017) Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance. Construction Management and Economics, 35(06), 368-13.

Kartam, S (1999) Generic Methodology for Analyzing Delay Claims. Journal of Construction Engineering and Management, 125(06), 409–19.

Kashiwagi, D T and Byfield, R (2002) Testing of Minimization of Subjectivity in Best Value Procurement by Using Artificial Intelligence Systems in State of Utah Procurement. Journal of Construction Engineering and Management, 128(06), 496–502.

Katoch, V and Mohan, S (2019) Design and fabrication of a safety frame for workers carrying out head lifting at construction sites. Journal of Engineering, Design and Technology , 17(06), 1250–65.

Kehinde, J O and Mosaku, T O (2006) An empirical study of assets structure of building construction contractors in Nigeria. Engineering, Construction and Architectural Management, 13(06), 634–44.

Kennedy, P, Morrison, A and Milne, D O (1997) Resolution of disputes arising from set-off clauses between main contractors and sub-contractors. Construction Management and Economics, 15(06), 527-37.

Khabir, S and Vakilinezhad, R (2023) Energy and thermal analysis of DSF in the retrofit design of office buildings in hot climates. Architectural Engineering and Design Management, 19(06), 642–64.

Khalafallah, A and El-Rayes, K (2006) Minimizing Construction-Related Hazards in Airport Expansion Projects. Journal of Construction Engineering and Management, 132(06), 562–72.

Khalilzadeh, M, Balafshan, R and Hafezalkotob, A (2020) Multi-objective mathematical model based on fuzzy hybrid multi-criteria decision-making and FMEA approach for the risks of oil and gas projects. Journal of Engineering, Design and Technology , 18(06), 1997–2016.

Khanh, H D and Kim, S Y (2015) Development of waste occurrence level indicator in Vietnam construction industry. Engineering, Construction and Architectural Management, 22(06), 715-31.

Khosrowshahi, F and Arayici, Y (2012) Roadmap for implementation of BIM in the UK construction industry. Engineering, Construction and Architectural Management, 19(06), 610-35.

Kim, D Y, Han, S H and Kim, H (2008) Discriminant Analysis for Predicting Ranges of Cost Variance in International Construction Projects. Journal of Construction Engineering and Management, 134(06), 398–410.

Kim, Y A, Ryoo, B Y, Kim, Y and Huh, W C (2013) Major Accident Factors for Effective Safety Management of Highway Construction Projects. Journal of Construction Engineering and Management, 139(06), 628–40.

Kjellberg, H (2010) Struggling to perform a warehouse: buildings as symbols and tools. Construction Management and Economics, 28(06), 675–94.

Knight, K and Robinson Fayek, A (2002) Use of Fuzzy Logic for Predicting Design Cost Overruns on Building Projects. Journal of Construction Engineering and Management, 128(06), 503–12.

Knotten, V, Lædre, O and Hansen, G K (2017) Building design management – key success factors. Architectural Engineering and Design Management, 13(06), 479–93.

Ko, C and Chung, N (2014) Lean Design Process. Journal of Construction Engineering and Management, 140(06).

Koc, K and Pelin Gurgun, A (2021) Assessment of Readability Risks in Contracts Causing Conflicts in Construction Projects. Journal of Construction Engineering and Management, 147(06).

Koch, C (2013) From crew to country? Local and national construction safety cultures in Denmark. Construction Management and Economics, 31(06), 691-703.

Koch, C (2003) Knowledge management in consulting engineering - joining IT and human resources to support the production of knowledge. Engineering, Construction and Architectural Management, 10(06), 391–401.

Koch, C and Beemsterboer, S (2017) Making an engine: Performativities of building information standards. Building Research & Information, 45(06), 596-609.

Koch, C and Bendixen, M (2005) Multiple perspectives on organizing: projects between tyranny and perforation. Building Research & Information, 33(06), 536–46.

Kog, F and Yaman, H (2016) A multi-agent systems-based contractor pre-qualification model. Engineering, Construction and Architectural Management, 23(06), 709-26.

Koksal, A and Arditi, D (2004) Predicting Construction Company Decline. Journal of Construction Engineering and Management, 130(06), 799–807.

Konchar, M and Sanvido, V (1998) Comparison of U.S. Project Delivery Systems. Journal of Construction Engineering and Management, 124(06), 435–44.

Koo, K and Park, S (2012) GA-Based Fuel-Efficient Transfer Path Selection Model for Delivering Construction Materials. Journal of Construction Engineering and Management, 138(06), 725–32.

Koops, L, van Loenhout, C, Bosch-Rekveldt, M, Hertogh, M and Bakker, H (2017) Different perspectives of public project managers on project success. Engineering, Construction and Architectural Management, 24(06), 1294-318.

Kordi, N E, Belayutham, S and Che Ibrahim, C K I (2021) Mapping of social sustainability attributes to stakeholders’ involvement in construction project life cycle. Construction Management and Economics, 39(06), 513–32.

Korman, T M, Fischer, M A and Tatum, C B (2003) Knowledge and Reasoning for MEP Coordination. Journal of Construction Engineering and Management, 129(06), 627–34.

Kosonen, H K and Kim, A A (2018) Mental Model Approach to Wastewater Treatment Plant Project Delivery during Emergency Response. Journal of Construction Engineering and Management, 144(06).

Kowaltowski, D C C K, Muianga, E A D, Granja, A D, Moreira, D d C, Bernardini, S P and Castro, M R (2019) A critical analysis of research of a mass-housing programme. Building Research & Information, 47(06), 716–33.

Kramer, R, Schellen, L and Schellen, H (2018) Adaptive temperature limits for air-conditioned museums in temperate climates. Building Research & Information, 46(06), 686–97.

Kulkarni, S, Edwards, D J, Parn, E A, Chapman, C, Aigbavboa, C O and Cornish, R (2018) Evaluation of vehicle lightweighting to reduce greenhouse gas emissions with focus on magnesium substitution. Journal of Engineering, Design and Technology, 16(06), 869–88.

Kululanga, G K and Kuotcha, W S (2008) Measuring organisational learning through project reviews. Engineering, Construction and Architectural Management, 15(06), 580–95.

Kumaraswamy, M M, Ling, F Y Y, Anvuur, A M and Rahman, M M (2007) Targeting relationally integrated teams for sustainable PPPS. Engineering, Construction and Architectural Management, 14(06), 581–96.

Kwan, A Y and Ofori, G (2001) Chinese culture and successful implementation of partnering in Singapore's construction industry. Construction Management and Economics, 19(06), 619-32.

Kwofie, T E, Adinyira, E and Fugar, F (2017) Theoretical and practical implications for engendering project team communication effectiveness in mass housing project delivery in Ghana. Journal of Engineering, Design and Technology, 15(06), 826-44.

Kwon, N, Park, M, Lee, H, Ahn, J and Kim, S (2017) Construction Noise Prediction Model Based on Case-Based Reasoning in the Preconstruction Phase. Journal of Construction Engineering and Management, 143(06).

Kwon, N, Song, K, Lee, H, Kim, J and Park, M (2018) Construction Noise Risk Assessment Model Focusing on Construction Equipment. Journal of Construction Engineering and Management, 144(06).

Löwstedt, M and Sandberg, R (2020) Standardizing the free and independent professional. Engineering, Construction and Architectural Management, 27(06), 1337–55.

Lützkendorf, T and Lorenz, D (2007) Integrating sustainability into property risk assessments for market transformation. Building Research & Information, 35(06), 644–61.

Lacasse, M A (1999) Materials and technology for sustainable construction. Building Research & Information, 27(06), 406–9.

Lam, K C, Runesun, G, Ng, S T, Hu, T S, Cheung, S O and Deng, Z M (2001) Capital budget planning practices of building contractors in Hong Kong. Construction Management and Economics, 19(06), 569-76.

Lansley, P, McCreadie, C, Tinker, A, Flanagan, S, Goodacre, K and Turner-Smith, A (2004) Adapting the homes of older people: a case study of costs and savings. Building Research & Information, 32(06), 468–83.

Larsen, G D and Whyte, J (2013) Safe construction through design: perspectives from the site team. Construction Management and Economics, 31(06), 675-90.

Larsson, B, Sundqvist, J and Emmitt, S (2006) Component manufacturers' perceptions of managing innovation. Building Research & Information, 34(06), 552–64.

Laryea, S and Hughes, W (2009) Commercial reviews in the tender process of contractors. Engineering, Construction and Architectural Management, 16(06), 558–72.

Lau, E and Rowlinson, S (2009) Interpersonal trust and inter-firm trust in construction projects. Construction Management and Economics, 27(06), 539–54.

Layzell, J and Ledbetter, S (1998) FMEA applied to cladding systems: reducing the risk of failure. Building Research & Information, 26(06), 351–7.

Le, P T, Chileshe, N, Kirytopoulos, K and Rameezdeen, R (2020) Investigating the significance of risks in BOT transportation projects in Vietnam. Engineering, Construction and Architectural Management, 27(06), 1401–25.

Le, Y, Wang, Y, Luo, C and Peng, Y (2013) Integration of Financial and Contract Management on the Shanghai Expo Construction Program. Journal of Construction Engineering and Management, 139(06), 738–48.

Leaman, A and Bordass, B (2007) Are users more tolerant of 'green' buildings?. Building Research & Information, 35(06), 662–73.

Lee, D, Lee, S and Kim, S (2017) Composite Phase-Change Material Mold for Cost-Effective Production of Free-Form Concrete Panels. Journal of Construction Engineering and Management, 143(06).

Lee, H W, Choi, K and Gambatese, J A (2014) Real Options Valuation of Phased Investments in Commercial Energy Retrofits under Building Performance Risks. Journal of Construction Engineering and Management, 140(06).

Lee, H, Lee, J and Lee, J (1999) Nonshored Formwork System for Top-Down Construction. Journal of Construction Engineering and Management, 125(06), 392–9.

Lee, H, Yu, J and Kim, S (2004) Impact of Labor Factors on Workflow. Journal of Construction Engineering and Management, 130(06), 918–23.

Lee, S, Jeon, R, Kim, J and Kim, J (2011) Strategies for Developing Countries to Expand Their Shares in the Global Construction Market: Phase-Based SWOT and AAA Analyses of Korea. Journal of Construction Engineering and Management, 137(06), 460–70.

Lehtiranta, L, Kärnä, S, Junnonen, J-M and Julin, P (2012) The role of multi-firm satisfaction in construction project success. Construction Management and Economics, 30(06), 463-75.

Lema, N M and Price, A D F (1996) Construction process performance variability: focus on labor productivity. Building Research & Information, 24(06), 339–50.

Leu, S and Yang, C (1999) GA-Based Multicriteria Optimal Model for Construction Scheduling. Journal of Construction Engineering and Management, 125(06), 420–7.

Leu, S-S and Yang, C-H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(06), 767-76.

Leung, A W T and Tam, C M (1999) Models for Assessing Hoisting Times of Tower Cranes. Journal of Construction Engineering and Management, 125(06), 385–91.

Li, G, Zhang, G, Chen, C and Martek, I (2020) Empirical Bid or No Bid Decision Process in International Construction Projects: Structural Equation Modeling Framework. Journal of Construction Engineering and Management, 146(06).

Li, H (1996) Towards quantitatively measuring the performance of construction IT systems. Building Research & Information, 24(06), 379–82.

Li, H and Love, P E D (1998) Developing a theory of construction problem solving. Construction Management and Economics, 16(06), 721-7.

Li, H, Chan, G and Skitmore, M (2013) Integrating real time positioning systems to improve blind lifting and loading crane operations. Construction Management and Economics, 31(06), 596-605.

Li, H, Kong, C W, Pang, Y C, Shi, W Z and Yu, L (2003) Internet-Based Geographical Information Systems System for E-Commerce Application in Construction Material Procurement. Journal of Construction Engineering and Management, 129(06), 689–97.

Li, H, Li, V, Skitmore, M, Wong, J K W and Cheng, E W L (2009) Competitiveness factors: a study of the real estate market in China. Construction Management and Economics, 27(06), 567–79.

Li, H, Love, P E D and Ogunlana, S (1998) Genetic algorithm compared to non-linear optimization for labour and equipment assignment. Building Research & Information, 26(06), 322–9.

Li, J, Zuo, J, Jiang, W, Zhong, X, Li, J and Pan, Y (2020) Policy instrument choice for construction and demolition waste management: the case study of Shenzhen, China. Engineering, Construction and Architectural Management, 27(06), 1283–97.

Li, L, Li, Z, Li, X and Wu, G (2019) A review of global lean construction during the past two decades: analysis and visualization. Engineering, Construction and Architectural Management, 26(06), 1192–216.

Li, R and Roberti, R (2017) Optimal Scheduling of Railway Track Possessions in Large-Scale Projects with Multiple Construction Works. Journal of Construction Engineering and Management, 143(06).

Li, S, Wu, X, Wang, X and Hu, S (2020) Relationship between Social Capital, Safety Competency, and Safety Behaviors of Construction Workers. Journal of Construction Engineering and Management, 146(06).

Liang, Y, Ashuri, B and Li, M (2021) Forecasting the Construction Expenditure Cash Flow for Transportation Design-Build Projects with a Case-Based Reasoning Model. Journal of Construction Engineering and Management, 147(06).

Liang, Y, Ashuri, B and Sun, W (2020) Analysis of the Variability of Project Cost and Schedule Performance in the Design-Build Environment. Journal of Construction Engineering and Management, 146(06).

Linderoth, H C J (2017) From visions to practice: the role of sensemaking, institutional logic and pragmatic practice. Construction Management and Economics, 35(06), 324-14.

Ling, F Y Y (2003) Managing the implementation of construction innovations. Construction Management and Economics, 21(06), 635-49.

Ling, F Y Y and Ang, W T (2013) Using control systems to improve construction project outcomes. Engineering, Construction and Architectural Management, 20(06), 576-88.

Ling, F Y Y, Ang, A M H and Lim, S S Y (2007) Encounters between foreigners and Chinese: Perception and management of cultural differences. Engineering, Construction and Architectural Management, 14(06), 501–18.

Lingard, H (2001) The effect of first aid training on objective safety behaviour in Australian small business. Construction Management and Economics, 19(06), 611-8.

Lingard, H and Francis, V (2008) An exploration of the adaptive strategies of working families in the Australian construction industry. Engineering, Construction and Architectural Management, 15(06), 562–79.

Lingard, H and Rowlinson, S M (1994) Construction site safety in Hong Kong. Construction Management and Economics, 12(06), 501-10.

Lingard, H and Sublet, A (2002) The impact of job and organizational demands on marital or relationship satisfaction and conflict among Australia civil engineers. Construction Management and Economics, 20(06), 507-21.

Lingard, H, Francis, V and Turner, M (2012) Work time demands, work time control and supervisor support in the Australian construction industry: An analysis of work-family interaction. Engineering, Construction and Architectural Management, 19(06), 647-65.

Lingard, H, Zhang, R P and Oswald, D (2019) Effect of leadership and communication practices on the safety climate and behaviour of construction workgroups. Engineering, Construction and Architectural Management, 26(06), 886–906.

Lippiatt, B C (1999) Selecting Cost-Effective Green Building Products: BEES Approach. Journal of Construction Engineering and Management, 125(06), 448–55.

Lisø, K R, Hygen, H O, Kvande, T and Thue, J V (2006) Decay potential in wood structures using climate data. Building Research & Information, 34(06), 546–51.

Littlefair, P, Ortiz, J and Bhaumik, C D (2010) A simulation of solar shading control on UK office energy use. Building Research & Information, 38(06), 46.

Liu, A M M, Chiu, W M and Fellows, R (2007) Enhancing commitment through work empowerment. Engineering, Construction and Architectural Management, 14(06), 568–80.

Liu, A M M, Fellows, R and Ng, J (2004) Surveyors' perspectives on ethics in organisational culture. Engineering, Construction and Architectural Management, 11(06), 438–49.

Liu, D, Lu, W and Niu, Y (2018) Extended Technology-Acceptance Model to Make Smart Construction Systems Successful. Journal of Construction Engineering and Management, 144(06).

Liu, F, Chang-Richards, A, Wang, K I and Dirks, K N (2023) Critical indoor environmental factors affecting productivity: perspectives from university staff and postgraduate students. Building Research & Information, 51(06), 730–45.

Liu, G, Huang, R, Li, K, Shrestha, A and Fu, X (2022) Greenhouse Gas Emissions Management in Prefabrication and Modular Construction Based on Earned Value Management. Journal of Construction Engineering and Management, 148(06).

Liu, H, Jazayeri, E and Dadi, G B (2017) Establishing the Influence of Owner Practices on Construction Safety in an Operational Excellence Model. Journal of Construction Engineering and Management, 143(06).

Liu, J, Xie, Q, Xia, B and Bridge, A J (2017) Impact of Design Risk on the Performance of Design-Build Projects. Journal of Construction Engineering and Management, 143(06).

Liu, J, Zhao, X and Yan, P (2016) Risk Paths in International Construction Projects: Case Study from Chinese Contractors. Journal of Construction Engineering and Management, 142(06).

Liu, K and El-Gohary, N (2022) Bridge Deterioration Knowledge Ontology for Supporting Bridge Document Analytics. Journal of Construction Engineering and Management, 148(06).

Liu, K, Liu, Y, Kou, Y, Yang, X and Hu, G (2023) Formation mechanism for collaborative behaviour among stakeholders in megaprojects based on the theory of planned behaviour. Building Research & Information, 51(06), 667–81.

Liu, T, Chong, H, Zhang, W, Lee, C and Tang, X (2022) Effects of Contractual and Relational Governances on BIM Collaboration and Implementation for Project Performance Improvement. Journal of Construction Engineering and Management, 148(06).

Liu, X, Song, Y, Yi, W, Wang, X and Zhu, J (2018) Comparing the Random Forest with the Generalized Additive Model to Evaluate the Impacts of Outdoor Ambient Environmental Factors on Scaffolding Construction Productivity. Journal of Construction Engineering and Management, 144(06).

Liu, X, Wang, X, Zhao, Y and Xia, N (2020) Solving Workplace Deviant Behavior in Construction by Leader–Member Exchange and Leader–Member . Journal of Construction Engineering and Management, 146(06), 04020061.

Liu, Y, Messner, J I and Leicht, R M (2018) A process model for usability and maintainability design reviews. Architectural Engineering and Design Management, 14(06), 457–69.

Liu, Z, Wang, H and Li, H (2018) Model of Equipment Sharing between Contractors on Construction Projects. Journal of Construction Engineering and Management, 144(06).

Lo, T Y, Fung, I W and Tung, K C (2006) Construction Delays in Hong Kong Civil Engineering Projects. Journal of Construction Engineering and Management, 132(06), 636–49.

Lo, W and Yan, M (2009) Evaluating Qualification-Based Selection System: A Simulation Approach. Journal of Construction Engineering and Management, 135(06), 458–65.

Lo, W, Lin, C L and Yan, M R (2007) Contractor’s Opportunistic Bidding Behavior and Equilibrium Price Level in the Construction Market. Journal of Construction Engineering and Management, 133(06), 409–16.

Lohne, J, Kjesbu, N E, Engebø, A, Young, B and Lædre, O (2019) Scoping Literature Review of Crime in the AEC Industry. Journal of Construction Engineering and Management, 145(06).

Loosemore, M (1994) Problem behaviour. Construction Management and Economics, 12(06), 511-20.

Loosemore, M (1999) Responsibility, power and construction conflict. Construction Management and Economics, 17(06), 699-709.

Loosemore, M (1998) The influence of communication structure upon crisis management efficiency. Construction Management and Economics, 16(06), 661-71.

Loosemore, M, Alkilani, S and Mathenge, R (2020) The risks of and barriers to social procurement in construction: a supply chain perspective. Construction Management and Economics, 38(06), 552–69.

Lopes, J (1998) The construction industry and macroeconomy in Sub-Saharan Africa post 1970. Construction Management and Economics, 16(06), 637-49.

Love, P E D, Edwards, D J and Irani, Z (2010) Work Stress, Support, and Mental Health in Construction. Journal of Construction Engineering and Management, 136(06), 650–8.

Love, P E D, Edwards, D J and Smith, J (2016) Rework Causation: Emergent Theoretical Insights and Implications for Research. Journal of Construction Engineering and Management, 142(06).

Low, S P and Tan, S K L (1998) How 'just-in-time' wastages can be quantified: case study of a private condominium project. Construction Management and Economics, 16(06), 621-35.

Lowe, D J and Parvar, J (2004) A logistic regression approach to modelling the contractor's decision to bid. Construction Management and Economics, 22(06), 643-53.

Lowe, D J and Skitmore, R M (2001) Human Effects in Construction Contract Price Forecasting: Experience and Experiential Learning Styles. Journal of Construction Engineering and Management, 127(06), 485–93.

Lu, H, Behbahani, S, Azimi, M, Matthews, J C, Han, S and Iseley, T (2020) Trenchless Construction Technologies for Oil and Gas Pipelines: State-of-the-Art Review. Journal of Construction Engineering and Management, 146(06).

Lu, M, Lau, S and Poon, C (2009) Simulation Approach to Evaluating Cost Efficiency of Selective Demolition Practices: Case of Hong Kong’s Kai Tak Airport Demolition. Journal of Construction Engineering and Management, 135(06), 448–57.

Lu, W, Zhang, L and Zhang, L (2016) Effect of Contract Completeness on Contractors’ Opportunistic Behavior and the Moderating Role of Interdependence. Journal of Construction Engineering and Management, 142(06).

Luck, R (2010) Using objects to coordinate design activity in interaction. Construction Management and Economics, 28(06), 641–55.

Lucke, T and Beecham, S (2010) Aeration and gutter water levels in siphonic roof drainage systems. Building Research & Information, 38(06), 85.

Lucke, T and Beecham, S (2011) Field investigation of clogging in a permeable pavement system. Building Research & Information, 39(06), 603–15.

Lucko, G, Alves, T D C L and Angelim, V L (2014) Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. Construction Management and Economics, 32(06), 575-94.

Ludvig, K, Stenberg, A-C and Gluch, P (2013) The value of communicative skills for developing an energy strategy. Building Research & Information, 41(06), 611-21.

Lundgren, R, Kyrö, R and Olander, S (2024) The lifecycle impact and value capture of circular business models in the built environment. Construction Management and Economics, 42(06), 527–44.

Lundström, A, Savolainen, J and Kostiainen, E (2016) Case study: developing campus spaces through co-creation. Architectural Engineering and Design Management, 12(06), 409–26.

Luo, L-z, Mao, C, Shen, L-y and Li, Z-d (2015) Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system: A case study from China. Engineering, Construction and Architectural Management, 22(06), 622-43.

Luo, X, Li, H, Dai, F, Cao, D, Yang, X and Guo, H (2017) Hierarchical Bayesian Model of Worker Response to Proximity Warnings of Construction Safety Hazards: Toward Constant Review of Safety Risk Control Measures. Journal of Construction Engineering and Management, 143(06).

Lv, L, Wang, Z, Li, H, Zhang, C and Qiao, R (2022) Tournament Incentive Mechanisms Design for Long-Distance Water Diversion Projects Incorporating Preference Heterogeneity. Journal of Construction Engineering and Management, 148(06).

Ma, G, Wu, M, Jia, J and Yang, W (2021) Two-Level Quality Decision Support System for Building Structural Damage Prediction and Maintenance Solution Recommendation in the Operation and Maintenance Phase. Journal of Construction Engineering and Management, 147(06).

Ma, Q, Cheung, S O and Li, S (2023) Optimum risk/reward sharing framework to incentivize integrated project delivery adoption. Construction Management and Economics, 41(06), 519–35.

Maberry, S (2000) Commercial Diving Operations in Construction. Journal of Construction Engineering and Management, 126(06), 433–9.

Machline, E, Pearlmutter, D and Schwartz, M (2018) Parisian eco-districts: low energy and affordable housing?. Building Research & Information, 46(06), 636–52.

MacPherson, S J, Kelly, J E and Webb, R S (1993) How designs develop: insights from case studies in building engineering services. Construction Management and Economics, 11(06), 475-85.

Madson, K M, Franz, B, Molenaar, K R and Okudan Kremer, G (2020) Strategic development of flexible manufacturing facilities. Engineering, Construction and Architectural Management, 27(06), 1299–314.

Maghrebi, M, Travis Waller, S and Sammut, C (2014) Assessing the Accuracy of Expert-Based Decisions in Dispatching Ready Mixed Concrete. Journal of Construction Engineering and Management, 140(06).

Mahapatra, K and Gustavsson, L (2008) Multi-storey timber buildings: breaking industry path dependency. Building Research & Information, 36(06), 638–48.

Mahmoud-Jouini, S B (2000) Innovative supply-based strategies in the construction industry. Construction Management and Economics, 18(06), 643-50.

Mak, S W, Wong, J and Picken, D (1998) Note - The effect on contingency allowances of using risk analysis in capital cost estimating: a Hong Kong case study. Construction Management and Economics, 16(06), 615-9.

Maleki, B, Casanovas-Rubio, M d M and Fuente Antequera, A d l (2022) Sustainability assessment in residential high-rise building design: state of the art. Architectural Engineering and Design Management, 18(06), 927–40.

Malmberg, F (2007) Introduction of a new form of quote evaluation: a case study in southern Sweden. Construction Management and Economics, 25(06), 661–9.

Maloney, W F (2002) Construction Product/Service and Customer Satisfaction. Journal of Construction Engineering and Management, 128(06), 522–9.

Mangkuto, R A and Paramita, B (2022) Computation of the greenery-sky-view factor in daylit buildings. Architectural Engineering and Design Management, 18(06), 850–69.

Manrique Delgado, B, Cao, S, Hasan, A and Sirén, K (2018) Energy and exergy analysis of prosumers in hybrid energy grids. Building Research & Information, 46(06), 668–85.

Marks, E D and Teizer, J (2013) Method for testing proximity detection and alert technology for safe construction equipment operation. Construction Management and Economics, 31(06), 636-46.

Marrana, T C, Silvestre, J D, de Brito, J and Gomes, R (2017) Lifecycle Cost Analysis of Flat Roofs of Buildings. Journal of Construction Engineering and Management, 143(06).

Marteinsson, B (2003) Durability and the factor method of ISO 15686-1. Building Research & Information, 31(06), 416–26.

Marti, P, Trümpi, S and Heinzmann, D (2009) Hydraulic Joint for Pipe Jacking. Journal of Construction Engineering and Management, 135(06), 439–47.

Martinez-Soto, A and Jentsch, M F (2020) A transferable energy model for determining the future energy demand and its uncertainty in a country’s residential sector. Building Research & Information, 48(06), 587–612.

Mary, H and Graeme, N (2011) Factors influencing technical innovation in SME construction firms. Engineering, Construction and Architectural Management, 18(06), 6–.

Marzouk, M and Moselhi, O (2004) Fuzzy Clustering Model for Estimating Haulers’ Travel Time. Journal of Construction Engineering and Management, 130(06), 878–86.

Marzouk, M and Moselhi, O (2002) Simulation optimization for earthmoving operations using genetic algorithms. Construction Management and Economics, 20(06), 535-43.

Marzouk, M, Abdallah, M and El-Said, M (2010) Modeling Microtunneling Projects using Computer Simulation. Journal of Construction Engineering and Management, 136(06), 670–82.

Matarneh, S, Danso-Amoako, M, Al-Bizri, S, Gaterell, M and Matarneh, R (2019) BIM-based facilities information: streamlining the information exchange process. Journal of Engineering, Design and Technology , 17(06), 1304–22.

Mathur, V N, Price, A and Austin, S (2008) Conceptualizing stakeholder engagement in the context of sustainability and its assessment. Construction Management and Economics, 26(06), 601–9.

Meier, J R and Russell, J S (2000) Model Process for Implementing Maintainability. Journal of Construction Engineering and Management, 126(06), 440–50.

Meldrum, A, Hare, B and Cameron, I (2009) Road testing a health and safety worker engagement tool-kit in the construction industry. Engineering, Construction and Architectural Management, 16(06), 612–32.

Mellado Mascaraque, M &, Castilla Pacual, F J, Oteiza, I and Aparicio Secanellas, S (2020) Hygrothermal assessment of a traditional earthen wall in a dry Mediterranean climate. Building Research & Information, 48(06), 632–44.

Melzner, J, Zhang, S, Teizer, J and Bargstädt, H-J (2013) A case study on automated safety compliance checking to assist fall protection design and planning in building information models. Construction Management and Economics, 31(06), 661-74.

Memari, S, Kocaturk, T, Lozanovska, M, Andrews, F and Tucker, R (2023) Future proofing for hospital building design: from research to practice. Architectural Engineering and Design Management, 19(06), 681–700.

Meng, J, Xue, B, Liu, B and Fang, N (2015) Relationships between top managers’ leadership and infrastructure sustainability: A Chinese urbanization perspective. Engineering, Construction and Architectural Management, 22(06), 692-714.

Micelli, E (2000) Mobilizing the skills of specialist firms to reduce costs and enhance performance in the European construction industry: two case studies. Construction Management and Economics, 18(06), 651-6.

Michieka, N M, Razek, N H A and Gearhart, R S (2023) Modelling the impact of oil price changes and investment decisions on construction wages in the U.S.. Construction Management and Economics, 41(06), 500–18.

Miraj, P, Berawi, M A and Utami, S R (2021) Economic feasibility of green office building: combining life cycle cost analysis and cost–benefit evaluation. Building Research & Information, 49(06), 624–38.

Miskawi, Z (1993) A numerical analysis method for computing schedule and resource forecasting for industrial projects. Construction Management and Economics, 11(06), 411-20.

Modak, J P, Sohoni, V V and Aware, H V (1997) Manually powered manufacture of keyed bricks. Building Research & Information, 25(06), 354–64.

Mohamed, M and Tran, D Q (2021) Risk-Based Inspection Model for Hot Mix Asphalt Pavement Construction Projects. Journal of Construction Engineering and Management, 147(06).

Mohamed, S (2003) Performance in International Construction Joint Ventures: Modeling Perspective. Journal of Construction Engineering and Management, 129(06), 619–26.

Mohammadi, A, Amador-Jimenez, L and Nasiri, F (2020) Reliable, Effective, and Sustainable Urban Railways: A Model for Optimal Planning and Asset Management. Journal of Construction Engineering and Management, 146(06).

Mohammed, A and Charles, E (2010) Making a case for offsite construction in China. Engineering, Construction and Architectural Management, 17(06), 536–48.

Mohseni, H, Setunge, S, Zhang, G and Wakefield, R (2017) Markov Process for Deterioration Modeling and Asset Management of Community Buildings. Journal of Construction Engineering and Management, 143(06).

Molenaar, K R and Songer, A D (1998) Model for Public Sector Design-Build Project Selection. Journal of Construction Engineering and Management, 124(06), 467–79.

Molenaar, K R, Park, J and Washington, S (2009) Framework for Measuring Corporate Safety Culture and Its Impact on Construction Safety Performance. Journal of Construction Engineering and Management, 135(06), 488–96.

Moodley, K, Smith, N and Preece, C N (2008) Stakeholder matrix for ethical relationships in the construction industry. Construction Management and Economics, 26(06), 625–32.

Moon, S, Zekavat, P R and Bernold, L E (2015) Dynamic Control of Construction Supply Chain to Improve Labor Performance. Journal of Construction Engineering and Management, 141(06).

Moore, D R and Dainty, A R J (2001) Intra-team boundaries as inhibitors of performance improvement in UK design and build projects: a call for change. Construction Management and Economics, 19(06), 559-62.

Moore, S A, Gelfand, S and Whitsett, D (2015) Epistemological conflict: Modern and non-modern frameworks for sustainability. Building Research & Information, 43(06), 659-74.

Morgan, M and Cruickshank, H (2014) Quantifying the extent of space shortages: English dwellings. Building Research & Information, 42(06), 710-24.

Morosi, J A, Boldes, U and Colman, J (1996) Ornament and function. Building Research & Information, 24(06), 323–8.

Moselhi, O and Hassanein, A (2003) Optimized Scheduling of Linear Projects. Journal of Construction Engineering and Management, 129(06), 664–73.

Moses, T, Heesom, D and Oloke, D (2020) Implementing 5D BIM on construction projects: contractor perspectives from the UK construction sector. Journal of Engineering, Design and Technology , 18(06), 1867–88.

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(06), 1004-17.

Mukhopadhyay, J (2020) Observations of energy consumption and IEQ in a ‘Tiny House’. Building Research & Information, 48(06), 613–31.

Munir, M, Kiviniemi, A and Jones, S W (2019) Business value of integrated BIM-based asset management. Engineering, Construction and Architectural Management, 26(06), 1171–91.

Murray, B and Smyth, H (2011) Franchising in the US remodelling market: growth opportunities and barriers faced by general contractors. Construction Management and Economics, 29(06), 623–34.

Mushi, F V, Nguluma, H and Kihila, J (2022) A critical review of African green building research. Building Research & Information, 50(06), 610–27.

Mustaffa, N K, Abdul Kudus, S, Abdul Aziz, M F H and Anak Joseph, V R (2022) Strategies and way forward of low carbon construction in Malaysia. Building Research & Information, 50(06), 628–45.

Mustapha, F, Al-Abed, A and Wild, S (1995) A model for assessing the effectiveness of public housing in Sana'a (Republic of Yemen). Construction Management and Economics, 13(06), 457-65.

Nørkjaer Gade, P, Nørkjaer Gade, A, Otrel-Cass, K and Svidt, K (2019) A holistic analysis of a BIM-mediated building design process using activity theory. Construction Management and Economics, 37(06), 336–50.

Naim, M and Barlow, J (2003) An innovative supply chain strategy for customized housing. Construction Management and Economics, 21(06), 593-602.

Namo, F and Fellows, R F (1993) The role of advertising in marketing civil/structural engineering consultancy firms. Construction Management and Economics, 11(06), 431-41.

Nani, G, Mensah, I and Adjei-Kumi, T (2017) Duration estimation model for bridge construction projects in Ghana. Journal of Engineering, Design and Technology, 15(06), 754-77.

Nasir, H, Ahmed, H, Haas, C and Goodrum, P M (2014) An analysis of construction productivity differences between Canada and the United States. Construction Management and Economics, 32(06), 595-607.

Nasrallah, W F and Bou-Matar, R (2008) Exponential, Gamma, and Power Law Distributions in Information Flow on a Construction Site. Journal of Construction Engineering and Management, 134(06), 442–50.

Nassar, K M and Hegab, M Y (2006) Developing a Complexity Measure for Project Schedules. Journal of Construction Engineering and Management, 132(06), 554–61.

Navab-Kashani, R, Gay, L F and Bayat, A (2015) Productivity Improvement of Sewer CCTV Inspection through Time Study and Route Optimization. Journal of Construction Engineering and Management, 141(06).

Navon, R (1995) Resource-based model for automatic cash-flow forecasting. Construction Management and Economics, 13(06), 501-10.

Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(06), 635-46.

Nawfal, S and Ali, F (2018) The acceleration of 3D graphics transformations based on CUDA. Journal of Engineering, Design and Technology, 16(06), 925–37.

Ndekugri, I (1999) Performance Bonds and Guarantees: Construction Owners and Professionals Beware. Journal of Construction Engineering and Management, 125(06), 428–36.

Ndokwana, A and Fore, S (2018) Economic assessment of bioethanol production from maize in South Africa. Journal of Engineering, Design and Technology, 16(06), 973–94.

Newaz, M T, Davis, P R, Jefferies, M and Pillay, M (2018) Developing a safety climate factor model in construction research and practice. Engineering, Construction and Architectural Management, 25(06), 738–57.

Ng, S T (2005) Performance of engineering consultants in ISO 9000-based quality management systems implementation. Engineering, Construction and Architectural Management, 12(06), 519–32.

Ngai, S C, Drew, D S, Low, H P and Skitmore, M (2002) A theoretical framework for determining the minimum number of bidders in construction bidding competitions. Construction Management and Economics, 20(06), 473-82.

Ngowi, A B (1998) Is construction procurement a key to sustainable development?. Building Research & Information, 26(06), 340–50.

Nguyen, L D and Nguyen, H T (2013) Relationship between building floor and construction labor productivity: A case of structural work. Engineering, Construction and Architectural Management, 20(06), 563-75.

Nguyen, L D, Ogunlana, S O and Lan, D T X (2004) A study on project success factors in large construction projects in Vietnam. Engineering, Construction and Architectural Management, 11(06), 404–13.

Nibbelink, J, Sutrisna, M and Zaman, A U (2017) Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects – a Western Australian perspective. Architectural Engineering and Design Management, 13(06), 439–56.

Nicholson, M P and Naamani, Z (1992) Managing architectural design - a recent survey. Construction Management and Economics, 10(06), 479-87.

Nielsen, K J, Törner, M, Pousette, A and Grill, M (2023) National culture and occupational safety – a comparison of worker-level factors impacting safety for Danish and Swedish construction workers. Construction Management and Economics, 41(06), 445–56.

Nikmehr, B, Hosseini, M R, Rameezdeen, R, Chileshe, N, Ghoddousi, P and Arashpour, M (2017) An integrated model for factors affecting construction and demolition waste management in Iran. Engineering, Construction and Architectural Management, 24(06), 1246-68.

Nikoopayan Tak, M S, Bhattacharya, A, Metcalf, A R and Mousavi, E (2023) Cleanroom air quality: combined effects of ventilation rate and filtration schemes in a laboratory cleanroom. Building Research & Information, 51(06), 717–29.

Nkado, R N (1992) Construction time information system for the building industry. Construction Management and Economics, 10(06), 489-509.

Nnedinma, U (2016) Approaches, drivers and motivators of health and safety self-regulation in the Nigerian construction industry: a scoping study. Architectural Engineering and Design Management, 12(06), 460–75.

Nzabonimpa, J D and Hong, W (2018) Novel Precast Erection Method of Interlocking Mechanical Joints Using Couplers. Journal of Construction Engineering and Management, 144(06).

O'Brien, M J and Al-Soufi, A (1993) Electronic data interchange and the structure of the UK construction industry. Construction Management and Economics, 11(06), 443-53.

O’Connor, J T, O’Brien, W J and Choi, J O (2014) Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization. Journal of Construction Engineering and Management, 140(06).

Oates, D and Sullivan, K T (2012) Postoccupancy Energy Consumption Survey of Arizona’s LEED New Construction Population. Journal of Construction Engineering and Management, 138(06), 742–50.

Obi, L, Arif, M and Goulding, J (2020) Low-cost housing: a cost management model for process integration and evaluation. Architectural Engineering and Design Management, 16(06), 411-25.

Ochieng, E G and Price, A D (2009) Framework for managing multicultural project teams. Engineering, Construction and Architectural Management, 16(06), 527–43.

Ofori, G (2002) Singapore's construction: moving toward a knowledge-based industry. Building Research & Information, 30(06), 401–12.

Oke, A E (2018) Bonding capability of Nigerian contracting firms. Engineering, Construction and Architectural Management, 25(06), 707–20.

Oke, A E, Ibironke, O T and Bayegun, O A (2017) Appraisal of reward packages in construction firms: A case of quantity surveying firms in Nigeria. Journal of Engineering, Design and Technology, 15(06), 722-37.

Oke, A E, Ogunsemi, D R and Adeyelu, M (2019) Quadrant and gap analysis of required and exhibited quantity surveyors’ competencies. Journal of Engineering, Design and Technology , 17(06), 1161–73.

Olander, S and Landin, A (2008) A comparative study of factors affecting the external stakeholder management process. Construction Management and Economics, 26(06), 553–61.

Olawale, O A, Oyedele, L O and Owolabi, H A (2020) Construction practitioners’ perception of key drivers of reputation in mega-construction projects. Journal of Engineering, Design and Technology , 18(06), 1571–92.

Olawumi, T O and Chan, D W (2020) Key drivers for smart and sustainable practices in the built environment. Engineering, Construction and Architectural Management, 27(06), 1257–81.

Oney-Yazici, E, Giritli, H, Topcu-Oraz, G and Acar, E (2007) Organizational culture: the case of Turkish construction industry. Engineering, Construction and Architectural Management, 14(06), 519–31.

Osei-Kyei, R and Chan, A P C (2017) Empirical comparison of critical success factors for public-private partnerships in developing and developed countries: A case of Ghana and Hong Kong. Engineering, Construction and Architectural Management, 24(06), 1222-45.

Oteifa, S and Baldwin, A N (1991) Estimators' tasks and computer-aided estimating systems: a survey of FCEC member companies. Construction Management and Economics, 9(06), 543-52.

Othman, A A E and Hafez, M G (2019) A framework integrating corporate social responsibility for marketing architectural design firms in developing countries. Journal of Engineering, Design and Technology , 17(06), 1174–91.

Othman, A A, Rahman, S A, Sundram, V P K and Bhatti, M A (2015) Modelling marketing resources, procurement process coordination and firm performance in the Malaysian building construction industry. Engineering, Construction and Architectural Management, 22(06), 644-68.

Outcault, S, Alston-Stepnitz, E, Sanguinetti, A, DePew, A N and Magaña, C (2022) Building lower-carbon affordable housing: case studies from California. Building Research & Information, 50(06), 646–61.

Owusu-Manu, D, Edwards, D J, Kukah, A, Parn, E A, El-Gohary, H and Hosseini, M R (2018) An empirical examination of moral hazards and adverse selection on PPP projects. Journal of Engineering, Design and Technology, 16(06), 910–24.

Owusu-Manu, D, Edwards, D J, Mohammed, A, Thwala, W D and Birch, T (2019) Short run causal relationship between foreign direct investment (FDI) and infrastructure development. Journal of Engineering, Design and Technology , 17(06), 1202–21.

Owusu-Manu, D, Ghansah, F A, Darko, A, Asiedu, R O and Edwards, D J (2020) Insurable and non-insurable risks in complex project deals: case of the Ghanaian construction industry. Journal of Engineering, Design and Technology , 18(06), 1971–95.

Ozaki, R (2003) Customer-focused approaches to innovation in Housebuilding. Construction Management and Economics, 21(06), 557-64.

Ozorhon, B, Arditi, D, Dikmen, I and Birgonul, M T (2011) Toward a Multidimensional Performance Measure for International Joint Ventures in Construction. Journal of Construction Engineering and Management, 137(06), 403–11.

Palaneeswaran, E, Kumaraswamy, M M and Ng, S T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor. Engineering, Construction and Architectural Management, 10(06), 418–31.

Papadonikolaki, E and Wamelink, H (2017) Inter- and intra-organizational conditions for supply chain integration with BIM. Building Research & Information, 45(06), 649-64.

Papadonikolaki, E, Vrijhoef, R and Wamelink, H (2016) The interdependences of BIM and supply chain partnering: empirical explorations. Architectural Engineering and Design Management, 12(06), 476–94.

Park, H, Meacham, B J, Dembsey, N A and Goulthorpe, M (2014) Integration of fire safety and building design. Building Research & Information, 42(06), 696-709.

Park, J H and Lee, G (2017) Design coordination strategies in a 2D and BIM mixed-project environment: Social dynamics and productivity. Building Research & Information, 45(06), 631-48.

Park, M, Lee, M, Lee, H and Hwang, S (2010) Boost, Control, or Both of Korean Housing Market: 831 Countermeasures. Journal of Construction Engineering and Management, 136(06), 693–701.

Park, T, Kim, B and Kim, H (2013) Real Option Approach to Sharing Privatization Risk in Underground Infrastructures. Journal of Construction Engineering and Management, 139(06), 685–93.

Patermann, C (1999) The fifth EU framework programme and its consequences for the construction industry. Building Research & Information, 27(06), 413–9.

Pellicer, T M, Pellicer, E and Eaton, D (2009) A macroeconomic regression analysis of the European construction industry. Engineering, Construction and Architectural Management, 16(06), 573–97.

Pena-Mora, F and Park, M (2001) Dynamic Planning for Fast-Tracking Building Construction Projects. Journal of Construction Engineering and Management, 127(06), 445–56.

Peng, J (2002) Stability Analyses and Design Recommendations for Practical Shoring Systems during Construction. Journal of Construction Engineering and Management, 128(06), 536–44.

Pereira, E, Han, S, AbouRizk, S and Hermann, U (2017) Empirical Testing for Use of Safety Related Measures at the Organizational Level to Assess and Control the On-Site Risk Level. Journal of Construction Engineering and Management, 143(06).

Perez-Bella, J M, Dominguez-Hernandez, J, Cano-Suñen, E, Del Coz-Diaz, J J and Alvarez Rabanal, F P (2015) Improvement alternatives for determining the watertightness performance of building facades. Building Research & Information, 43(06), 723-36.

Pérez-Bella, J M, Domínguez-Hernández, J, Rodríguez-Soria, B, del Coz-Díaz, J J, Cano-Suñén, E and Navarro-Manso, A (2013) An extended method for comparing watertightness tests for facades. Building Research & Information, 41(06), 706-21.

Perng, Y-H and Chang, C-L (2004) How does Government Procurement Law affect bidding price competition in Taiwan?. Building Research & Information, 32(06), 497–509.

Petroutsatou, K, Georgopoulos, E, Lambropoulos, S and Pantouvakis, J P (2012) Early Cost Estimating of Road Tunnel Construction Using Neural Networks. Journal of Construction Engineering and Management, 138(06), 679–87.

Pewdum, W, Rujirayanyong, T and Sooksatra, V (2009) Forecasting final budget and duration of highway construction projects. Engineering, Construction and Architectural Management, 16(06), 544–57.

Pheng, L S and Chuan, C J (2001) Just-in-Time Management of Precast Concrete Components. Journal of Construction Engineering and Management, 127(06), 494–501.

Phua, F T T (2006) When is construction partnering likely to happen? An empirical examination of the role of institutional norms. Construction Management and Economics, 24(06), 615-24.

Pietroforte, R and Miller, J B (2002) Procurement methods for US infrastructure: historical perspectives and recent trends. Building Research & Information, 30(06), 425–35.

Pink, S, Tutt, D, Dainty, A and Gibb, A (2010) Ethnographic methodologies for construction research: knowing, practice and interventions. Building Research & Information, 38(06), 647-659.

Pirzadeh, P and Lingard, H (2021) Working from Home during the COVID-19 Pandemic: Health and Well-Being of Project-Based Construction Workers. Journal of Construction Engineering and Management, 147(06).

Pitts, A and Liao, H (2013) An assessment technique for the evaluation and promotion of sustainable Olympic design and urban development. Building Research & Information, 41(06), 722-34.

Plessis, C D (1999) Sustainable development demands dialogue between developed and developing worlds. Building Research & Information, 27(06), 319–90.

Poh, P S H and Chen, J (1998) The Singapore buildable design appraisal system: a preliminary review of the relationship between buildability, site productivity and costs. Construction Management and Economics, 16(06), 681-92.

Poirier, E A, Forgues, D and Staub-French, S (2017) Understanding the impact of BIM on collaboration: A Canadian case study. Building Research & Information, 45(06), 681-95.

Pollington, C (1999) Legal and procurement practices for sustainable development. Building Research & Information, 27(06), 410–2.

Poortinga, W, Jiang, S, Grey, C and Tweed, C (2018) Impacts of energy-efficiency investments on internal conditions in low-income households. Building Research & Information, 46(06), 653–67.

Porteous, C D A, Sharpe, T R, Menon, R A, Shearer, D, Musa, H, Baker, P H, Sanders, C H, Strachan, P A, Kelly, N J and Markopoulos, A (2012) Energy and environmental appraisal of domestic laundering appliances. Building Research & Information, 40(06), 679-99.

Pousette, A and Törner, M (2016) Effects of systematic work preparation meetings on safety climate and psychosocial conditions in the construction industry. Construction Management and Economics, 34(06), 355-65.

Prasertrungruang, T and Hadikusumo, B H W (2008) System dynamics modelling of machine downtime for small to medium highway contractors. Engineering, Construction and Architectural Management, 15(06), 540–61.

Pries, F and Dorée, A (2005) A century of innovation in the Dutch construction industry. Construction Management and Economics, 23(06), 561-4.

Priven, V and Sacks, R (2015) Effects of the Last Planner System on Social Networks among Construction Trade Crews. Journal of Construction Engineering and Management, 141(06).

Proverbs, D G and Holt, G D (2000) A theoretical model for optimum project (time) performance based on European best practice. Construction Management and Economics, 18(06), 657-65.

Pryke, S and Pearson, S (2006) Project governance: case studies on financial incentives. Building Research & Information, 34(06), 534–45.

Pryke, S D, Zagkli, G and Kougia, I (2011) Resource provision ego-networks in small Greek construction firms. Building Research & Information, 39(06), 616–36.

Raftery, J, Pasadilla, B, Chiang, Y H, Hui, E C M and Tang, B-S (1998) Globalization, comparative advantage and industrial policy: implications of recent developments in the construction sector in Asia. Construction Management and Economics, 16(06), 729-37.

Rahimi, Y, Tavakkoli-Moghaddam, R, Iranmanesh, S H and Vaez-Alaei, M (2018) Hybrid Approach to Construction Project Risk Management with Simultaneous FMEA/ISO 31000/Evolutionary Algorithms: Empirical Optimization Study. Journal of Construction Engineering and Management, 144(06).

Rajabion, L, Sataei Mokhtari, A, Khordehbinan, M W, Zare, M and Hassani, A (2019) The role of knowledge sharing in supply chain success. Journal of Engineering, Design and Technology , 17(06), 1222–49.

Ramdav, T and Harinarain, N (2020) A strategic framework for the survival of the quantity surveying profession. Journal of Engineering, Design and Technology , 18(06), 1487–518.

Ranasinghe, M (1996) Total project cost under inflation: a simplified model for decision makers. Construction Management and Economics, 14(06), 497-504.

Ranasinghe, U, Ruwanpura, J and Liu, X (2012) Streamlining the Construction Productivity Improvement Process with the Proposed Role of a Construction Productivity Improvement Officer. Journal of Construction Engineering and Management, 138(06), 697–706.

Raoufi, M and Fayek, A R (2018) Key Moderators of the Relationship between Construction Crew Motivation and Performance. Journal of Construction Engineering and Management, 144(06).

Rasmussen, G M G, Jensen, P L and Gottlieb, S C (2017) Frames, agency and institutional change: The case of benchmarking in Danish construction. Construction Management and Economics, 35(06), 305-19.

Raynsford, N (1999) The UK's approach to sustainable development in construction. Building Research & Information, 27(06), 420–4.

Reed, B (2007) Shifting from 'sustainability' to regeneration. Building Research & Information, 35(06), 674–80.

Rees, S W, Zhou, Z and Thomas, H R (2006) Multidimensional simulation of earth-contact heat transfer. Building Research & Information, 34(06), 565–72.

Reeves, K (2002) Construction business systems in Japan: general contractors and subcontractors. Building Research & Information, 30(06), 413–24.

Reichstein, T, Salter, A J and Gann, D M (2005) Last among equals: a comparison of innovation in construction, services and manufacturing in the UK. Construction Management and Economics, 23(06), 631-44.

Reymen, I M M J, Dewulf, G P M R and Blokpoel, S B (2008) Framework for managing uncertainty in property projects. Building Research & Information, 36(06), 580–92.

Rezaei, M, Mostafaeipour, A, Jafari, N, Naghdi-Khozani, N and Moftakharzadeh, A (2020) Wind and solar energy utilization for seawater desalination and hydrogen production in the coastal areas of southern Iran. Journal of Engineering, Design and Technology , 18(06), 1951–69.

Riaz, Z, Parn, E A, Edwards, D J, Arslan, M, Shen, C and Pena-Mora, F (2017) BIM and sensor-based data management system for construction safety monitoring. Journal of Engineering, Design and Technology, 15(06), 738-53.

Ritson, N H, Wilson, M M J and Cohen, D A (2017) Managing engineering contractors in the UK petrochemicals industry. Engineering, Construction and Architectural Management, 24(06), 1067-80.

Robson, A, Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(06), 418-31.

Rodrigues, L, Tubelo, R, Vega Pasos, A, Gonçalves, J C S, Wood, C and Gillott, M (2021) Quantifying airtightness in Brazilian residential buildings with focus on its contribution to thermal comfort. Building Research & Information, 49(06), 639–60.

Rojas, E M and Kell, I (2008) Comparative Analysis of Project Delivery Systems Cost Performance in Pacific Northwest Public Schools. Journal of Construction Engineering and Management, 134(06), 387–97.

Romanello, G (2018) Stability analysis of mobile cranes and determination of outriggers loading. Journal of Engineering, Design and Technology, 16(06), 938–58.

Rooke, C N, Rooke, J A, Koskela, L and Tzortzopoulos, P (2010) Using the physical properties of artefacts to manage through-life knowledge flows in the built environment: an initial exploration. Construction Management and Economics, 28(06), 601–13.

Rooke, J and Clark, L (2005) Learning, knowledge and authority on site: a case study of safety practice. Building Research & Information, 33(06), 561–70.

Rooke, J, Seymour, D and Fellows, R (2004) Planning for claims: an ethnography of industry culture. Construction Management and Economics, 22(06), 655-62.

Rosenfeld, Y (1994) Innovative construction methods. Construction Management and Economics, 12(06), 521-41.

Rovers, R (2014) New energy retrofit concept: ‘renovation trains’ for mass housing. Building Research & Information, 42(06), 757-67.

Rovira-Beleta, E, Cuerva, E, Pires de Souza, E, Planas, C and Alavedra, P (2015) Accessibility of emergency evacuation of persons with disabilities in public swimming pools in Barcelona, Spain: a review of literature and regulations. Architectural Engineering and Design Management, 11(06), 475-87.

Rowe, G M, Meegoda, J N, Jumikis, A, Sharrock, M J, Bandara, N and Hettiarachchi, C H (2004) NJTxtr—A Computer Program Based on LASER to Monitor Asphalt Segregation. Journal of Construction Engineering and Management, 130(06), 924–34.

Rowlinson, S and Cheung, Y K F (2008) Stakeholder management through empowerment: modelling project success. Construction Management and Economics, 26(06), 611–23.

Rowlinson, S M, Ho, T K K and Po-Hung, Y (1993) Leadership style of construction managers in Hong Kong. Construction Management and Economics, 11(06), 455-65.

Roy, R and Cochrane, S P (1999) Development of a customer focused strategy in speculative house building. Construction Management and Economics, 17(06), 777-87.

Russell, A D, Tran, N and Staub-French, S (2014) Searching for value: construction strategy exploration and linear planning. Construction Management and Economics, 32(06), 520-47.

Russell, J S (2013) Shaping the Future of the Civil Engineering Profession. Journal of Construction Engineering and Management, 139(06), 654–64.

Russell, M M, Hsiang, S M, Liu, M and Wambeke, B (2014) Causes of Time Buffer and Duration Variation in Construction Project Tasks: Comparison of Perception to Reality. Journal of Construction Engineering and Management, 140(06).

Rwelamila, P D (2002) Creating an effective construction industry strategy in South Africa. Building Research & Information, 30(06), 435–45.

Ryu, S-R, Rhee, K-N, Yeo, M-S and Kim, K-W (2008) Strategies for flow rate balancing in radiant floor heating systems. Building Research & Information, 36(06), 625–37.

Sacks, R and Partouche, R (2010) Empire State Building Project: Archetype of “Mass Construction”. Journal of Construction Engineering and Management, 136(06), 702–10.

Sadeghifar, M, Pazhouhanfar, M and Farrokhzad, M (2019) An exploration of the relationships between urban building façade visual elements and people’s preferences in the city of Gorgan, Iran. Architectural Engineering and Design Management, 15(06), 445–58.

Sadooghi, P and Kherani, N P (2022) Influence of metallo-dielectric optical properties on thermal resistance and solar heat gain coefficient of multi-pane glazing systems in hot and cold climates. Architectural Engineering and Design Management, 18(06), 894–910.

Sage, D J, Dainty, A R J and Brookes, N J (2010) Who reads the project file? Exploring the power effects of knowledge tools in construction project management. Construction Management and Economics, 28(06), 629–39.

Said, H and El-Rayes, K (2011) Optimizing Material Procurement and Storage on Construction Sites. Journal of Construction Engineering and Management, 137(06), 421–31.

Salter, A and Torbett, R (2003) Innovation and performance in engineering design. Construction Management and Economics, 21(06), 573-80.

Sameer, H and Bringezu, S (2021) Building information modelling application of material, water, and climate footprint analysis. Building Research & Information, 49(06), 593–612.

San Cristóbal, J R (2012) Contractor Selection Using Multicriteria Decision-Making Methods. Journal of Construction Engineering and Management, 138(06), 751–8.

Sanchez-Guevara, C, Fernandez, A S and Aja, A H (2015) Income, energy expenditure and housing in Madrid: Retrofitting policy implications. Building Research & Information, 43(06), 737-49.

Sánchez-Romero, M and Alavedra-Ribot, P (1996) Experimental study of the thermal behaviour of radiant floors. Building Research & Information, 24(06), 369–73.

Sanchez, B and Haas, C (2018) Capital project planning for a circular economy. Construction Management and Economics, 36(06), 303–12.

Sandhu, M and Helo, P (2006) A network approach to project business analysis. Engineering, Construction and Architectural Management, 13(06), 600–15.

Santoso, D S (2009) The construction site as a multicultural workplace: a perspective of minority migrant workers in Brunei. Construction Management and Economics, 27(06), 529–37.

Saram, D D D and Tang, S L (2005) Pain and suffering costs of persons in construction accidents: Hong Kong experience. Construction Management and Economics, 23(06), 645-58.

Sarkar, D and Dutta, G (2010) Design and Application of Risk Adjusted Cumulative Sum for Strength Monitoring of Ready Mixed Concrete. Journal of Construction Engineering and Management, 136(06), 623–31.

Sayce, S, Ellison, L and Parnell, P (2007) Understanding investment drivers for UK sustainable property. Building Research & Information, 35(06), 629–43.

Scheublin, F J M (2001) Project alliance contract in The Netherlands. Building Research & Information, 29(06), 451–5.

Schoenefeldt, H (2019) The House of Commons: a precedent for post-occupancy evaluation. Building Research & Information, 47(06), 635–65.

Schultmann, F and Sunke, N (2007) Energy-oriented deconstruction and recovery planning. Building Research & Information, 35(06), 15.

Schultz, C S, Jorgensen, K, Bonke, S and Rasmussen, G M G (2015) Building defects in Danish construction: project characteristics influencing the occurrence of defects at handover. Architectural Engineering and Design Management, 11(06), 423-39.

Schweber, L and Harty, C (2010) Actors and objects: a socio-technical networks approach to technology uptake in the construction sector. Construction Management and Economics, 28(06), 657–74.

Scott, D and Yang, J (1991) Setting the pace with PACES: a new concept of using an expert system for project analysis and control. Construction Management and Economics, 9(06), 529-41.

Seaden, G, Guolla, M, Doutriaux, J and Nash, J (2003) Strategic decisions and innovation in construction firms. Construction Management and Economics, 21(06), 603-12.

Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(06), 945–61.

Senaratne, S, Jin, X-H and Balasuriya, K (2017) Exploring the role of networks in disseminating construction project knowledge through case studies. Engineering, Construction and Architectural Management, 24(06), 1281-93.

Senaratne, S, Kagioglou, M, Amaratunga, D, Baldry, D, Aouad, G and Bowden, A (2005) Research knowledge transfer into teaching in the built environment. Engineering, Construction and Architectural Management, 12(06), 587–600.

Senaratne, S, Mirza, O, Lambrousis, G and Fernandez-Soncini, A (2018) Structural applicability of steel fibre-recycled aggregate concrete in construction. Journal of Engineering, Design and Technology, 16(06), 959–72.

Senouci, A B and Eldin, N N (2004) Use of Genetic Algorithms in Resource Scheduling of Construction Projects. Journal of Construction Engineering and Management, 130(06), 869–77.

Sepasgozar, S M E and Loosemore, M (2017) The role of customers and vendors in modern construction equipment technology diffusion. Engineering, Construction and Architectural Management, 24(06), 1203-21.

Seppänen, O, Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(06), 608-24.

Sexton, M and Barrett, P S (2003) A literature synthesis of innovation in small construction firms: insights, ambiguities and questions. Construction Management and Economics, 21(06), 613-22.

Sexton, M and Barrett, P S (2003) Appropriate innovation in small construction firms. Construction Management and Economics, 21(06), 623-33.

Sexton, M, Goulding, J, Zhang, X, Kagioglou, M, Aouad, G, Cooper, R and Barrett, P (2005) The role of the HyCon design-support tool in elevating hybrid concrete as a design option for structural frames. Engineering, Construction and Architectural Management, 12(06), 568–86.

Seymour, D E and Rooke, J D (1995) The culture of the industry and the culture of research. Construction Management and Economics, 13(06), 511-23.

Sezer, A A and Brochner, J (2014) The construction productivity debate and the measurement of service qualities. Construction Management and Economics, 32(06), 565-74.

Sha, K (2004) Construction business system in China: an institutional transformation perspective. Building Research & Information, 32(06), 529–37.

Sha, K and Jiang, Z (2003) Improving rural labourers' status in China's construction industry. Building Research & Information, 31(06), 464–73.

Sha, K, Song, T, Qi, X and Luo, N (2006) Rethinking China's urbanization: an institutional innovation perspective. Building Research & Information, 34(06), 573–83.

Shahbazi, B, Akbarnezhad, A, Rey, D, Ahmadian Fard Fini, A and Loosemore, M (2019) Optimization of Job Allocation in Construction Organizations to Maximize Workers’ Career Development Opportunities. Journal of Construction Engineering and Management, 145(06).

Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(06), 1004–23.

Shanbari, H, Blinn, N and Issa, R R A (2016) Using augmented reality video in enhancing masonry and roof component comprehension for construction management students. Engineering, Construction and Architectural Management, 23(06), 765-81.

Shaofeng, L, Jincai, F, Pinghua, Z and Xiang, L (2018) Stability Analysis of Two Parallel Closely Spaced Tunnels Based on Convergence–Confinement Principle. Journal of Construction Engineering and Management, 144(06).

Sharafi, A, Sadegh Amalnick, M and Allah Taleizadeh, A (2021) Outcome of Financial Conflicts in the Operation Phase of Public–Private Partnership Contracts. Journal of Construction Engineering and Management, 147(06).

Sharifi, S, Saman, W, Alemu, A and Boland, J (2021) A proposed long-term thermal comfort scale. Building Research & Information, 49(06), 661–78.

Shash, A A and Abdul-Hadi, N H (1993) The effect of contractor size on mark-up size decision in Saudi Arabia. Construction Management and Economics, 11(06), 421-9.

Shebob, A, Dawood, N, Shah, R K and Xu, Q (2012) Comparative study of delay factors in Libyan and the UK construction industry. Engineering, Construction and Architectural Management, 19(06), 688-712.

Shekhawat, P, Sharma, G and Singh, R M (2020) Durability analysis of eggshell powder–flyash geopolymer composite subjected to wetting–drying cycles. Journal of Engineering, Design and Technology , 18(06), 2043–60.

Shen, K, Li, X, Cao, X and Zhang, Z (2022) Prefabricated Construction Process Optimization Based on Rework Risk. Journal of Construction Engineering and Management, 148(06).

Shen, L, Wu, Y and Zhang, X (2011) Key Assessment Indicators for the Sustainability of Infrastructure Projects. Journal of Construction Engineering and Management, 137(06), 441–51.

Shen, Q, Lo, K-K and Wang, Q (1998) Priority setting in maintenance management of public buildings: a modified multi-attribute approach using AHP. Construction Management and Economics, 16(06), 693-702.

Shen, X, Marks, E, Pradhananga, N and Cheng, T (2016) Hazardous Proximity Zone Design for Heavy Construction Excavation Equipment. Journal of Construction Engineering and Management, 142(06).

Shepley, M M, Rybkowski, Z, Aliber, J and Lange, C (2012) Ambulatory infusion suite: pre- and post-occupancy evaluation. Building Research & Information, 40(06), 700-12.

Sherafat, B, Ahn, C R, Akhavian, R, Behzadan, A H, Golparvar-Fard, M, Kim, H, Lee, Y, Rashidi, A and Azar, E R (2020) Automated Methods for Activity Recognition of Construction Workers and Equipment: State-of-the-Art Review. Journal of Construction Engineering and Management, 146(06).

Sherratt, F, Farrell, P and Noble, R (2013) UK construction site safety: discourses of enforcement and engagement. Construction Management and Economics, 31(06), 623-35.

Sherratt, F, Welfare, K, Hallowell, M and Hoque Tania, M (2018) Legalized Recreational Marijuana: Safety, Ethical, and Legal Perceptions of the Workforce. Journal of Construction Engineering and Management, 144(06).

Shi, J J (2002) Three methods for verifying and validating the simulation of a construction operation. Construction Management and Economics, 20(06), 483-91.

Shi, Q, Zuo, J and Zillante, G (2012) Exploring the management of sustainable construction at the programme level: a Chinese case study. Construction Management and Economics, 30(06), 425-40.

Shohet, I M and Laufer, A (1991) What does the construction foreman do?. Construction Management and Economics, 9(06), 565-76.

Shoieb, K, Serror, M H and Marzouk, M (2020) Web-Based Tool for Interoperability among Structural Analysis Applications. Journal of Construction Engineering and Management, 146(06).

Short, C A, Noakes, C J, Gilkeson, C A and Fair, A (2014) Functional recovery of a resilient hospital type. Building Research & Information, 42(06), 657-84.

Shrestha, K, Shrestha, P P and Lidder, M (2019) Life-cycle cost comparison of chip seal and striping: in-house workers versus private contractors. Engineering, Construction and Architectural Management, 26(06), 927–44.

Shrestha, P P, Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(06), 1087–104.

Shurrab, J, Hussain, M and Khan, M (2019) Green and sustainable practices in the construction industry. Engineering, Construction and Architectural Management, 26(06), 1063–86.

Sia, M K, Yew, V W C and Siew, C L (2018) Influence of {[}Feng Shui{]} factors on house buying intention of Malaysian Chinese. Architectural Engineering and Design Management, 14(06), 427–39.

Signor, R, Love, P E D and Ballesteros-Pérez, P (2024) Detecting bid rigging in public auctions for procuring infrastructure projects: formulating the reference scenario for decision-making. Construction Management and Economics, 42(06), 545–63.

Sigrid Nordby, A (2011) Carbon reductions and building regulations: the case of Norwegian mountain cabins. Building Research & Information, 39(06), 553–65.

Silva, A, Dias, J L, Gaspar, P L and de Brito, J (2011) Service life prediction models for exterior stone cladding. Building Research & Information, 39(06), 637–53.

Simpeh, E K and Smallwood, J J (2020) An integrated model for predicting the probability of adoption of green building in South Africa. Journal of Engineering, Design and Technology , 18(06), 1927–50.

Simu, K and Lidelöw, H (2019) Middle managers’ perceptions of operations strategies at construction contractors . Construction Management and Economics, 37(06), 351–66.

Sing, C, Love, P E D and Tam, C M (2012) Stock-Flow Model for Forecasting Labor Supply. Journal of Construction Engineering and Management, 138(06), 707–15.

Singer, H and Özşahin, & (2022) Prioritization of laminate flooring selection criteria from experts’ perspectives: a spherical fuzzy AHP-based model. Architectural Engineering and Design Management, 18(06), 911–26.

Singh, A and Shoura, M M (1996) Optimizing bidding success and profitability in airport runway construction in French Polynesia. Construction Management and Economics, 14(06), 505-28.

Siu, M F, Lu, M, AbouRizk, S and Tidder, V (2016) Quantitative Assessment of Budget Sufficiency and Resource Utilization for Resource-Constrained Project Schedules. Journal of Construction Engineering and Management, 142(06).

Sjöström, C and Bakens, W (1999) CIB Agenda 21 for sustainable construction: why, how and what?. Building Research & Information, 27(06), 348–54.

Skitmore, M and Smyth, H (2007) Pricing construction work: a marketing viewpoint. Construction Management and Economics, 25(06), 619–30.

Smyth, H (2008) The credibility gap in stakeholder management: ethics and evidence of relationship management. Construction Management and Economics, 26(06), 633–43.

Snyder, J R, Dilaver, O, Stephenson, L C, Mackie, J E and Smith, S D (2018) Agent-based modelling and construction – reconstructing antiquity’s largest infrastructure project. Construction Management and Economics, 36(06), 313–27.

Soetanto, R, Dainty, A R J, Glass, J and Price, A D F (2004) Criteria for assessing the potential performance of hybrid concrete structural frames. Engineering, Construction and Architectural Management, 11(06), 414–25.

Soetanto, R, Dainty, A R J, Glass, J and Price, A D F (2006) Towards an explicit design decision process: the case of the structural frame. Construction Management and Economics, 24(06), 603-14.

Solla, M, González-Jorge, H, Varela, M and Lorenzo, H (2013) Ground-Penetrating Radar for Inspection of In-Road Structures and Data Interpretation by Numerical Modeling. Journal of Construction Engineering and Management, 139(06), 749–53.

Son, J and Mattila, K G (2004) Binary Resource Leveling Model: Activity Splitting Allowed. Journal of Construction Engineering and Management, 130(06), 887–94.

Song, J, Fagerlund, W R, Haas, C T, Tatum, C B and Vanegas, J A (2005) Considering Prework on Industrial Projects. Journal of Construction Engineering and Management, 131(06), 723–33.

Song, Y, Liu, C and Langston, C (2006) Linkage measures of the construction sector using the hypothetical extraction method. Construction Management and Economics, 24(06), 579-89.

Sonmez, R and Rowings, J E (1998) Construction Labor Productivity Modeling with Neural Networks. Journal of Construction Engineering and Management, 124(06), 498–504.

Spaeth, A B and Khali, R (2018) The place of VR technologies in UK architectural practice. Architectural Engineering and Design Management, 14(06), 470–87.

Srivastava, A, Srivastava, D K and Misra, A K (2019) Spatial variability modeling and reliability analysis of flexible pavement through mechanistic–empirical model. Journal of Engineering, Design and Technology , 17(06), 1129–45.

Stafford, A (2011) Long-term monitoring and performance of ground source heat pumps. Building Research & Information, 39(06), 566–73.

Staykova, G and Underwood, J (2017) Assessing collaborative performance on construction projects through knowledge exchange: A UK rail strategic alliance case study. Engineering, Construction and Architectural Management, 24(06), 968-87.

Steinhardt, D, Manley, K, Bildsten, L and Widen, K (2020) The structure of emergent prefabricated housing industries: a comparative case study of Australia and Sweden. Construction Management and Economics, 38(06), 483–501.

Stephan, A and Crawford, R H (2014) A comprehensive life cycle water analysis framework for residential buildings. Building Research & Information, 42(06), 685-95.

Stigson, B (1999) Sustainable development for industry and society. Building Research & Information, 27(06), 425–31.

Stipanowich, T J (1997) At the cutting edge: conflict avoidance and resolution in the US construction industry. Construction Management and Economics, 15(06), 505-12.

Stone, A, Shipworth, D, Biddulph, P and Oreszczyn, T (2014) Key factors determining the energy rating of existing English houses. Building Research & Information, 42(06), 725-38.

Ströbele, B and Lützkendorf, T (2019) Communicating environmental information: rethinking options for construction products. Building Research & Information, 47(06), 681–96.

Sturts, C S and (Bud) Griffis, F H (2005) Addressing Pricing: Value Bidding for Engineers and Consultants. Journal of Construction Engineering and Management, 131(06), 621–30.

Styhre, A and Gluch, P (2010) Managing knowledge in platforms: boundary objects and stocks and flows of knowledge. Construction Management and Economics, 28(06), 589–99.

Sugimoto, M and Asanprakit, A (2010) Stack Pipe Model for Pipe Jacking Method. Journal of Construction Engineering and Management, 136(06), 683–92.

Sui Pheng, L and Hongbin, J (2003) Internationalization of Chinese Construction Enterprises. Journal of Construction Engineering and Management, 129(06), 589–98.

Sullivan, J, Asmar, M E, Chalhoub, J and Obeid, H (2017) Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality. Journal of Construction Engineering and Management, 143(06).

Sunikka, M (2006) Energy efficiency and low-carbon technologies in urban renewal. Building Research & Information, 34(06), 521–33.

Swaffield, J A and Jack, L B (2004) Simulation and analysis of airborne cross-contamination routes due to the operation of building drainage and vent systems. Building Research & Information, 32(06), 451–67.

Szalay, Z (2008) Modelling building stock geometry for energy, emission and mass calculations. Building Research & Information, 36(06), 557–67.

Taleb, H, Elsebaei, M and El-Attar, M (2019) Enhancing the sustainability of shipping container homes in a hot arid region: A case study of Aswan in Egypt. Architectural Engineering and Design Management, 15(06), 459–74.

Tam, C M, Tong, T K L and Wong, Y W (2004) Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method. Journal of Construction Engineering and Management, 130(06), 827–34.

Tamate, S, Suemasa, N and Katada, T (2005) Analyses of Instability in Mobile Cranes due to Ground Penetration by Outriggers. Journal of Construction Engineering and Management, 131(06), 689–704.

Tan, W (1996) Note - The elasticity of capital-labour substitution in Singapore construction. Construction Management and Economics, 14(06), 535-40.

Taofeeq, M D, Adeleke, A and LEE, C (2020) Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies. Journal of Engineering, Design and Technology , 18(06), 1543–69.

Tatari, O and Kucukvar, M (2012) Eco-Efficiency of Construction Materials: Data Envelopment Analysis. Journal of Construction Engineering and Management, 138(06), 733–41.

Taylor, T R B and Ford, D N (2008) Managing Tipping Point Dynamics in Complex Construction Projects. Journal of Construction Engineering and Management, 134(06), 421–31.

Teerajetgul, W and Charoenngam, C (2006) Factors inducing knowledge creation: empirical evidence from Thai construction projects. Engineering, Construction and Architectural Management, 13(06), 584–99.

Tengan, C, Aigbavboa, C O, Guribie, F and Annor-Asubonteng, J (2019) Analysis of the outcome features of effective monitoring and evaluation in construction project delivery. Journal of Engineering, Design and Technology , 17(06), 1192–201.

Tenpierik, M J and Cauberg, J J M (2010) Encapsulated vacuum insulation panels: theoretical thermal optimization. Building Research & Information, 38(06), 9.

Teo, A L E, Ofori, G, Tjandra, I and Kim, H (2017) Framework for productivity and safety enhancement system using BIM in Singapore. Engineering, Construction and Architectural Management, 24(06), 1350-71.

Teo, P and Love, P E D (2017) Re-Examining the Association between Quality and Safety Performance in Construction: From Heterogeneous to Homogeneous Datasets. Journal of Construction Engineering and Management, 143(06).

Teshnehdel, S, Soflaei, F and Shokouhian, M (2020) Assessment of solar shading performance of courtyard houses in desert climate of Kashan, Iran. Architectural Engineering and Design Management, 16(06), 473-92.

Tezel, A and Koskela, L (2023) Off-site construction in highways projects: management, technical, and technology perspectives from the United Kingdom. Construction Management and Economics, 41(06), 475–99.

Thomas, H R, Horman, M J and de Souza, U E L (2004) Symbiotic Crew Relationships and Labor Flow. Journal of Construction Engineering and Management, 130(06), 908–17.

Thomas, L E (2010) Evaluating design strategies, performance and occupant satisfaction: a low carbon office refurbishment. Building Research & Information, 38(06), 24.

Tillson, A-A, Oreszczyn, T and Palmer, J (2013) Assessing impacts of summertime overheating: some adaptation strategies. Building Research & Information, 41(06), 652-61.

Titirla, M and Aretoulis, G (2019) Neural network models for actual duration of Greek highway projects. Journal of Engineering, Design and Technology , 17(06), 1323–39.

Tommelein, I D (2015) Journey toward Lean Construction: Pursuing a Paradigm Shift in the AEC Industry. Journal of Construction Engineering and Management, 141(06).

Tong, T K L, Tam, C M and Chan, A P C (2001) Genetic algorithm optimization in building portfolio management. Construction Management and Economics, 19(06), 601-9.

Towill, D R (2003) Construction and the time compression paradigm. Construction Management and Economics, 21(06), 581-91.

Tran, D Q and Molenaar, K R (2014) Exploring critical delivery selection risk factors for transportation design and construction projects. Engineering, Construction and Architectural Management, 21(06), 631-47.

Tran, D Q, Nguyen, L D and Faught, A (2017) Examination of communication processes in design-build project delivery in building construction. Engineering, Construction and Architectural Management, 24(06), 1319-36.

Tran, T X M, Malano, H M and Thompson, R G (2003) Application of the analytic hierarchy process to prioritise irrigation asset renewals: the case of the La Khe irrigation scheme, Vietnam. Engineering, Construction and Architectural Management, 10(06), 382–90.

Trigunarsyah, B (2004) A review of current practice in constructability improvement: case studies on construction projects in Indonesia. Construction Management and Economics, 22(06), 567–80-.

Trigunarsyah, B (2017) Organizational culture influence on client involvement. Engineering, Construction and Architectural Management, 24(06), 1155-69.

Trinh, T T P and Sharif, N (1996) Assessing construction technology by integrating constructed product and construction process complexities: a case study of embankment dams in Thailand. Construction Management and Economics, 14(06), 467-84.

Tripathi, K K and Jha, K N (2018) Application of fuzzy preference relation for evaluating success factors of construction organisations. Engineering, Construction and Architectural Management, 25(06), 758–79.

Tryggestad, K, Georg, S and Hernes, T (2010) Constructing buildings and design ambitions. Construction Management and Economics, 28(06), 695–705.

Tsao, C C Y, Tommelein, I D, Swanlund, E S and Howell, G A (2004) Work Structuring to Achieve Integrated Product–Process Design. Journal of Construction Engineering and Management, 130(06), 780–9.

Tserng, H P, Liao, H, Tsai, L K and Chen, P (2011) Predicting Construction Contractor Default with Option-Based Credit Models—Models’ Performance and Comparison with Financial Ratio Models. Journal of Construction Engineering and Management, 137(06), 412–20.

Tucker, R and Abbasi, N (2015) The architecture of teamwork: examining relationships between teaching, assessment, student learning and satisfaction with creative design outcomes. Architectural Engineering and Design Management, 11(06), 405-22.

Turner, M and Lingard, H (2016) Work-life fit: Identification of demand and resource typologies within a systems framework. Construction Management and Economics, 34(06), 377-92.

Tutt, D, Pink, S, Dainty, A R J and Gibb, A (2013) ‘In the air’ and below the horizon: migrant workers in UK construction and the practice-based nature of learning and communicating OHS. Construction Management and Economics, 31(06), 515-27.

Uddin, W (2008) Airborne Laser Terrain Mapping for Expediting Highway Projects: Evaluation of Accuracy and Cost. Journal of Construction Engineering and Management, 134(06), 411–20.

Uher, T E (1991) Risks in sub-contracting: sub-contract conditions. Construction Management and Economics, 9(06), 495-508.

Umeokafor, N (2018) An investigation into public and private clients’ attitudes, commitment and impact on construction health and safety in Nigeria. Engineering, Construction and Architectural Management, 25(06), 798–815.

Valitabar, M, GhaffarianHoseini, A, GhaffarianHoseini, A and Attia, S (2022) Advanced control strategy to maximize view and control discomforting glare: a complex adaptive façade. Architectural Engineering and Design Management, 18(06), 829–49.

Van der Vlist, A J, Vrolijk, M H and Dewulf, G P M R (2014) On information and communication technology and production cost in construction industry: evidence from the Netherlands. Construction Management and Economics, 32(06), 641-51.

Vashani, H, Sullivan, J and El Asmar, M (2016) DB 2020: Analyzing and Forecasting Design-Build Market Trends. Journal of Construction Engineering and Management, 142(06).

Vaux, J S and Kirk, W M (2018) Relationship Conflict in Construction Management: Performance and Productivity Problem. Journal of Construction Engineering and Management, 144(06).

Venselaar, M and Wamelink, H (2017) The nature of qualitative construction partnering research: Literature review. Engineering, Construction and Architectural Management, 24(06), 1092-118.

Vieira, R, Carreira, P, Domingues, P and Costa, A A (2020) Supporting building automation systems in BIM/IFC: reviewing the existing information gap. Engineering, Construction and Architectural Management, 27(06), 1357–75.

Vilasini, N, Neitzert, T and Rotimi, J (2014) Developing and evaluating a framework for process improvement in an alliance project: a New Zealand case study. Construction Management and Economics, 32(06), 625-40.

Vosman, L, Coenen, T B J, Volker, L and Visscher, K (2023) Collaboration and innovation beyond project boundaries: exploring the potential of an ecosystem perspective in the infrastructure sector. Construction Management and Economics, 41(06), 457–74.

Vu, H A, Cu, V H, Min, L X and Wang, J Q (2017) Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model. Engineering, Construction and Architectural Management, 24(06), 1018-39.

Walker, D and Jacobsson, M (2014) A rationale for alliancing within a public-private partnership. Engineering, Construction and Architectural Management, 21(06), 648-73.

Walker, D, Bourne, L M and Shelley, A (2008) Influence, stakeholder mapping and visualization. Construction Management and Economics, 26(06), 645–58.

Walraven, A and de Vries, B (2009) From demand driven contractor selection towards value driven contractor selection. Construction Management and Economics, 27(06), 597–604.

Walsh, K D, Hershauer, J C, Tommelein, I D and Walsh, T A (2004) Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain. Journal of Construction Engineering and Management, 130(06), 818–26.

Walters, J P, Kaminsky, J and Huepe, C (2018) Factors Influencing Household Solar Adoption in Santiago, Chile. Journal of Construction Engineering and Management, 144(06).

Wang, C, Li, B, Li, B and Baldwin, A (2017) Case study of “project controlling” on a large HOPSCA project in China. Engineering, Construction and Architectural Management, 24(06), 862-74.

Wang, C, Liu, M, Hsiang, S M and Leming, M L (2012) Causes and Penalties of Variation: Case Study of a Precast Concrete Slab Production Facility. Journal of Construction Engineering and Management, 138(06), 775–85.

Wang, D, Dai, F and Ning, X (2015) Risk Assessment of Work-Related Musculoskeletal Disorders in Construction: State-of-the-Art Review. Journal of Construction Engineering and Management, 141(06).

Wang, Q and Shi, Q (2019) The incentive mechanism of knowledge sharing in the industrial construction supply chain based on a supervisory mechanism. Engineering, Construction and Architectural Management, 26(06), 989–1003.

Wang, S, Ni, Z, Qu, T, Wang, H and Pan, Q (2022) A Novel Index to Evaluate the Workability of Conditioned Coarse-Grained Soil for EPB Shield Tunnelling. Journal of Construction Engineering and Management, 148(06).

Wang, W and Demsetz, L A (2000) Application Example for Evaluating Networks Considering Correlation. Journal of Construction Engineering and Management, 126(06), 467–74.

Wang, W and Demsetz, L A (2000) Model for Evaluating Networks under Correlated Uncertainty—NETCOR. Journal of Construction Engineering and Management, 126(06), 458–66.

Wang, X, Ye, K and Arditi, D (2021) Embodied Cost of Collusive Bidding: Evidence from China’s Construction Industry. Journal of Construction Engineering and Management, 147(06).

Wanigarathna, N, Sherratt, F, Price, A and Austin, S (2016) Healthcare designers’ use of prescriptive and performance-based approaches. Architectural Engineering and Design Management, 12(06), 427–41.

Ward, M, Poleacovschi, C, Faust, K and Svec, J (2021) Modeling Public Support for Utility Expansions in Displacement Situations. Journal of Construction Engineering and Management, 147(06).

Ward, S and Chapman, C (2008) Stakeholders and uncertainty management in projects. Construction Management and Economics, 26(06), 563–77.

Waters, B L, Dixit, M K and Pariafsai, F (2023) Architects’ ranking of professional design services. Architectural Engineering and Design Management, 19(06), 620–41.

Wei, L, Liu, G, Liu, W, Li, W and Yuan, Y (2023) Airborne infection risk in classrooms based on environment and occupant behavior measurement under COVID-19 epidemic. Building Research & Information, 51(06), 701–16.

Weidman, J, Dickerson, D E and Koebel, C T (2015) Intervention to Improve Purchasing Decision-Maker Perceptions of Ventilated Tools. Journal of Construction Engineering and Management, 141(06).

Weisheng, L, Liu, A M M, Hongdi, W and Zhongbing, W (2013) Procurement innovation for public construction projects: A study of agent-construction system and public-private partnership in China. Engineering, Construction and Architectural Management, 20(06), 543-62.

West, J (2014) Collaborative Patterns and Power Imbalance in Strategic Alliance Networks. Journal of Construction Engineering and Management, 140(06).

Westberg, K, Noren, J and Kus, H (2001) On using available environmental data in service life estimates. Building Research & Information, 29(06), 428–39.

Whalen, T M, Gopal, S and Abraham, D M (2004) Cost-Benefit Model for the Construction of Tornado Shelters. Journal of Construction Engineering and Management, 130(06), 772–9.

Wheeler, A and Malekzadeh, M (2015) Exploring the use of new school buildings through post-occupancy evaluation and participatory action research. Architectural Engineering and Design Management, 11(06), 440-56.

Whyte, J (2003) Innovation and users: virtual reality in the construction sector. Construction Management and Economics, 21(06), 565-72.

Whyte, J and Lobo, S (2010) Coordination and control in project-based work: digital objects and infrastructures for delivery. Construction Management and Economics, 28(06), 557–67.

Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(06), 621-30.

Wibowo, A (2004) Valuing guarantees in a BOT infrastructure project. Engineering, Construction and Architectural Management, 11(06), 395–403.

Winch, G and Carr, B (2001) Benchmarking on site productivity in France and the UK: a CALIBRE approach. Construction Management and Economics, 19(06), 577-90.

Winch, G and Schneider, E (1993) The strategic management of architectural practice. Construction Management and Economics, 11(06), 467-73.

Winch, G M (2003) How innovative is construction? Comparing aggregated data on construction innovation and other sectors - a case of apples and pears. Construction Management and Economics, 21(06), 651-4.

Witmer, A (2018) Contextual engineering assessment using an influence-identification tool. Journal of Engineering, Design and Technology, 16(06), 889–909.

Wong, E O W and Yip, R C P (2004) Promoting sustainable construction waste management in Hong Kong. Construction Management and Economics, 22(06), 563-6.

Wong, P S P, On Cheung, S and Hardcastle, C (2007) Embodying Learning Effect in Performance Prediction. Journal of Construction Engineering and Management, 133(06), 474–82.

Wong, P S, Cheung, S O and Fan, K L (2009) Examining the Relationship between Organizational Learning Styles and Project Performance. Journal of Construction Engineering and Management, 135(06), 497–507.

Worrall, H, Norman, G and Flanagan, R (1995) Intervention analysis and overseas trade in UK construction-related materials and components. Construction Management and Economics, 13(06), 475-84.

Xia, B, Molenaar, K, Chan, A, Skitmore, M and Zuo, J (2013) Determining Optimal Proportion of Design in Design-Build Request for Proposals. Journal of Construction Engineering and Management, 139(06), 620–7.

Xie, H, AbouRizk, S and Zou, J (2012) Quantitative Method for Updating Cost Contingency throughout Project Execution. Journal of Construction Engineering and Management, 138(06), 759–66.

Xue, J, Shen, G Q, Li, Y, Han, S and Chu, X (2021) Dynamic Analysis on Public Concerns in Hong Kong-Zhuhai-Macao Bridge: Integrated Topic and Sentiment Modeling Approach. Journal of Construction Engineering and Management, 147(06).

Yalcinkaya, M and Singh, V (2019) Exploring the use of Gestalt’s principles in improving the visualization, user experience and comprehension of COBie data extension. Engineering, Construction and Architectural Management, 26(06), 1024–46.

Yamaguchi, K, Matsufuji, Y and Koyama, T (2007) A new structural system: friction-resistant dry-masonry. Building Research & Information, 35(06), 616–28.

Yan, X and Kim, Y (2018) A conceptual framework of ITSMCA for a building collapse accident. Engineering, Construction and Architectural Management, 25(06), 721–37.

Yang, I-T and Ioannou, P G (2004) Scheduling system with focus on practical concerns in repetitive projects. Construction Management and Economics, 22(06), 619-30.

Yang, R J, Jayasuriya, S, Gunarathna, C, Arashpour, M, Xue, X and Zhang, G (2018) The evolution of stakeholder management practices in Australian mega construction projects. Engineering, Construction and Architectural Management, 25(06), 690–706.

Yang, Y, Pan, M and Pan, W (2022) Integrated Offsite Logistics Scheduling Approach for High-Rise Modular Building Projects. Journal of Construction Engineering and Management, 148(06).

Yao, M, Wang, F, Chen, Z and Ye, H (2020) Optimal Incentive Contract with Asymmetric Cost Information. Journal of Construction Engineering and Management, 146(06).

Yap, J B H and Lock, A (2017) Analysing the benefits, techniques, tools and challenges of knowledge management practices in the Malaysian construction SMEs. Journal of Engineering, Design and Technology, 15(06), 803-25.

Yap, J B H, Lee, K Y and Skitmore, M (2020) Analysing the causes of corruption in the Malaysian construction industry. Journal of Engineering, Design and Technology , 18(06), 1823–47.

Yates, J K and Battersby, L C (2003) Master Builder Project Delivery System and Designer Construction Knowledge. Journal of Construction Engineering and Management, 129(06), 635–44.

Ye, M, Lu, W, Flanagan, R and Ye, K (2018) Diversification in the international construction business. Construction Management and Economics, 36(06), 348–61.

Ye, S and Tiong, R L K (2003) Effects of Tariff Design in Risk Management of Privately Financed Infrastructure Projects. Journal of Construction Engineering and Management, 129(06), 610–8.

Yeh, H, Hsieh, T and Chen, J (2017) Managing Complex Engineering Interfaces of Urban Mass Rapid Transit Projects. Journal of Construction Engineering and Management, 143(06).

Yeung, J F Y, Chan, A P C, Chan, D W M, Chiang, Y H and Yang, H (2013) Developing a Benchmarking Model for Construction Projects in Hong Kong. Journal of Construction Engineering and Management, 139(06), 705–16.

Yi, K and Langford, D (2006) Scheduling-Based Risk Estimation and Safety Planning for Construction Projects. Journal of Construction Engineering and Management, 132(06), 626–35.

Yiu, T W and Chung, Y N (2014) Face-saving tactics as an aid to construction negotiation in Hong Kong. Engineering, Construction and Architectural Management, 21(06), 609-30.

Yogeswaran, K and Kumaraswamy, M M (1999) To instruct or not? The engineer's dilemma. Construction Management and Economics, 17(06), 731-43.

Yong Qiang, C, Huanqing, L, Wenxue, L and Ning, Z (2010) Analysis of project delivery systems in Chinese construction industry with data envelopment analysis (DEA). Engineering, Construction and Architectural Management, 17(06), 598–614.

Yoon, S, Kang, K, Yoon, Y, Hastak, M and Ji, R (2018) Systematic Decision-Making Process for Composite Pavement Maintenance. Journal of Construction Engineering and Management, 144(06).

Yu, A T W (2017) Using jigsaw method to enhance the learning of research and consultancy techniques for postgraduate students. Engineering, Construction and Architectural Management, 24(06), 1081-91.

Yu, J and Leung, M (2018) Structural Stakeholder Model in Public Engagement for Construction Development Projects. Journal of Construction Engineering and Management, 144(06).

Yu, J, Ma, G and Jiang, X (2017) Impact of the built environment and care services within rural nursing homes in China on quality of life for elderly residents. Engineering, Construction and Architectural Management, 24(06), 1170-83.

Yu, W, Wang, K and Wang, M (2013) Pricing Strategy for Best Value Tender. Journal of Construction Engineering and Management, 139(06), 675–84.

Yuan, C, McClure, T, Cai, H and Dunston, P S (2017) Life-Cycle Approach to Collecting, Managing, and Sharing Transportation Infrastructure Asset Data. Journal of Construction Engineering and Management, 143(06).

Yuan, X X (2012) Bayesian method for the correlated competitive bidding model. Construction Management and Economics, 30(06), 477-91.

Yun, G Y, Steemers, K and Baker, N (2008) Natural ventilation in practice: linking facade design, thermal performance, occupant perception and control. Building Research & Information, 36(06), 608–24.

Yung, P and Agyekum-Mensah, G (2012) Productivity losses in smoking breaks on construction sites: a case study. Engineering, Construction and Architectural Management, 19(06), 636-46.

Zahoor, H, Chan, A P C, Utama, W P, Gao, R and Memon, S A (2017) Determinants of Safety Climate for Building Projects: SEM-Based Cross-Validation Study. Journal of Construction Engineering and Management, 143(06).

Zami, M S (2022) Barriers hindering acceptance of earth construction in the urban context of the United Kingdom. Architectural Engineering and Design Management, 18(06), 941–58.

Zaryoun, M and Hosseini, M (2019) Lightweight fiber-reinforced clay as a sustainable material for disaster resilient architecture of future buildings. Architectural Engineering and Design Management, 15(06), 430–44.

Zayed, T M (2005) Productivity and Cost Assessment for Continuous Flight Auger Piles. Journal of Construction Engineering and Management, 131(06), 677–88.

Zayed, T M and Halpin, D W (2005) Pile Construction Productivity Assessment. Journal of Construction Engineering and Management, 131(06), 705–14.

Zemke, D M V and Pullman, M (2008) Assessing the value of good design in hotels. Building Research & Information, 36(06), 543–56.

Zhan, W, Pan, W and Hao, G (2022) Productivity Measurement and Improvement for Public Construction Projects. Journal of Construction Engineering and Management, 148(06).

Zhang, H, Li, H and Tam, C M (2004) Fuzzy discrete-event simulation for modeling uncertain activity duration. Engineering, Construction and Architectural Management, 11(06), 426–37.

Zhang, H, Xing, F and Liu, J (2011) Rehabilitation decision-making for buildings in the Wenchuan area. Construction Management and Economics, 29(06), 569–78.

Zhang, M, Cao, Z, Yang, Z and Zhao, X (2020) Utilizing Computer Vision and Fuzzy Inference to Evaluate Level of Collision Safety for Workers and Equipment in a Dynamic Environment. Journal of Construction Engineering and Management, 146(06).

Zhang, Q, Chen, Z, Li, J and Liu, S (2021) Pressure-Cast-In-Situ Pile with Spray-Expanded Frustum: Construction Equipment and Process. Journal of Construction Engineering and Management, 147(06).

Zhang, R P and Bowen, P (2021) Work-family role blurring and conflict among South African construction professionals. Construction Management and Economics, 39(06), 475–92.

Zhang, S, Migliaccio, G C, Zandbergen, P A and Guindani, M (2014) Empirical Assessment of Geographically Based Surface Interpolation Methods for Adjusting Construction Cost Estimates by Project Location. Journal of Construction Engineering and Management, 140(06).

Zhang, S, Shang, C, Wang, C, Song, R and Wang, X (2019) Real-Time Safety Risk Identification Model during Metro Construction Adjacent to Buildings. Journal of Construction Engineering and Management, 145(06).

Zhang, S, Zhang, S, Gao, Y and Ding, X (2016) Contractual Governance: Effects of Risk Allocation on Contractors’ Cooperative Behavior in Construction Projects. Journal of Construction Engineering and Management, 142(06).

Zhang, X (2005) Criteria for Selecting the Private-Sector Partner in Public–Private Partnerships. Journal of Construction Engineering and Management, 131(06), 631–44.

Zhang, X (2005) Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects. Journal of Construction Engineering and Management, 131(06), 656–68.

Zhang, X (2009) Win–Win Concession Period Determination Methodology. Journal of Construction Engineering and Management, 135(06), 550–8.

Zhang, X and Tariq, S (2020) Failure Mechanisms in International Water PPP Projects: A Public Sector Perspective. Journal of Construction Engineering and Management, 146(06).

Zhang, X, Le, Y, Liu, Y and Liu, M (2021) Fostering Ambidextrous Innovation in Infrastructure Projects: Differentiation and Integration Tactics of Cross-Functional Teams. Journal of Construction Engineering and Management, 147(06).

Zhang, Y, Tzortzopoulos, P and Kagioglou, M (2019) Healing built-environment effects on health outcomes: environment–occupant–health framework. Building Research & Information, 47(06), 747–66.

Zhang, Y, Wang, Z, Lin, W, Minchin, R E and Xue, X (2022) Understanding the slow diffusion of alternative delivery systems using interpretive structural modelling . Construction Management and Economics, 40(06), 459–76.

Zhao, T and Fu, C C (2006) Infrastructure Development and Expansion under Uncertainty: A Risk-Preference-Based Lattice Approach. Journal of Construction Engineering and Management, 132(06), 620–5.

Zhao, T, Liu, W, Zhang, L and Zhou, W (2018) Retracted: Cluster Analysis of Risk Factors from Near-Miss and Accident Reports in Tunneling Excavation. Journal of Construction Engineering and Management, 144(06).

Zhao, Z Y, Lv, Q L, Zuo, J and Zillante, G (2010) Prediction System for Change Management in Construction Project. Journal of Construction Engineering and Management, 136(06), 659–69.

Zhao, Z, Tang, C, Zhang, X and Skitmore, M (2017) Agglomeration and Competitive Position of Contractors in the International Construction Sector. Journal of Construction Engineering and Management, 143(06).

Zhong, S and Elzarka, H (2022) A Hybrid Grey System Theory–Based Subcontractor Selection Model for High-Stakes Construction Projects. Journal of Construction Engineering and Management, 148(06).

Zhou, Z, Irizarry, J and Li, Q (2013) Applying advanced technology to improve safety management in the construction industry: a literature review. Construction Management and Economics, 31(06), 606-22.

Zhu, F, Sun, M, Wang, L, Sun, X and Yu, M (2019) Value conflicts between local government and private sector in stock public-private partnership projects. Engineering, Construction and Architectural Management, 26(06), 907–26.

Zhuravchak, R, Nord, N and Brattebø, H (2022) The effect of building attributes on the energy performance at a scale: an inferential analysis. Building Research & Information, 50(06), 662–80.

Zimmerman, A and Kibert, C J (2007) Informing LEED's next generation with The Natural Step. Building Research & Information, 35(06), 681–9.

Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(06), 1129–50.

Zou, Y, Kiviniemi, A and Jones, S W (2016) Developing a tailored RBS linking to BIM for risk management of bridge projects. Engineering, Construction and Architectural Management, 23(06), 727-50.

Zouein, P P and Tommelein, I D (1999) Dynamic Layout Planning Using a Hybrid Incremental Solution Method. Journal of Construction Engineering and Management, 125(06), 400–8.