Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 300 results ...

AbdelRazig, Y A and Chang, L (2000) Intelligent Model for Constructed Facilities Surface Assessment. Journal of Construction Engineering and Management, 126(06), 422–32.

Abdul-Aziz, A (2001) Unraveling of BOT Scheme: Malaysia's Indah Water Konsortium. Journal of Construction Engineering and Management, 127(06), 457–60.

Abeid, J and Arditi, D (2002) Time-Lapse Digital Photography Applied to Project Management. Journal of Construction Engineering and Management, 128(06), 530–5.

Abeysinghe, G and Urand, D (1999) Why Use Enactable Models of Construction Processes?. Journal of Construction Engineering and Management, 125(06), 437–47.

AbouRizk, S and Mather, K (2000) Simplifying Simulation Modeling through Integration with 3D CAD. Journal of Construction Engineering and Management, 126(06), 475–83.

AbouRizk, S, Knowles, P and Hermann, U R (2001) Estimating Labor Production Rates for Industrial Construction Activities. Journal of Construction Engineering and Management, 127(06), 502–11.

Al-Bayati, A J (2019) Satisfying the Need for Diversity Training for Hispanic Construction Workers and Their Supervisors at US Construction Workplaces: A Case Study. Journal of Construction Engineering and Management, 145(06).

Alarcón, L F, Rodríguez, A and Mourgues, C (2012) Impact of Machine-Failure Costs on Equipment Replacement Policies: Tunneling Company Case Study. Journal of Construction Engineering and Management, 138(06), 767–74.

Ali, G M, Kosa, J, Bouferguene, A and Al-Hussein, M (2021) Competitive Assessment of Ice and Frozen Silt Mat for Crane Ground Support Using Finite-Element Analysis. Journal of Construction Engineering and Management, 147(06).

Alkaissy, M, Arashpour, M, Zeynalian, M and Li, H (2022) Worksite Accident Impacts on Construction and Infrastructure: Nondeterministic Analysis of Subsectors and Organization Sizes. Journal of Construction Engineering and Management, 148(06).

Allouche, E N, Ariaratnam, S T and AbouRizk, S M (2001) Applications of Horizontal Characterization Techniques in Trenchless Construction. Journal of Construction Engineering and Management, 127(06), 476–84.

Alsharqawi, M, Abu Dabous, S, Zayed, T and Hamdan, S (2021) Budget Optimization of Concrete Bridge Decks under Performance-Based Contract Settings. Journal of Construction Engineering and Management, 147(06).

Alwasel, A, Abdel-Rahman, E M, Haas, C T and Lee, S (2017) Experience, Productivity, and Musculoskeletal Injury among Masonry Workers. Journal of Construction Engineering and Management, 143(06).

Anastasopoulos, P C, Haddock, J E and Peeta, S (2014) Cost Overrun in Public-Private Partnerships: Toward Sustainable Highway Maintenance and Rehabilitation. Journal of Construction Engineering and Management, 140(06).

Arditi, D, Tokdemir, O B and Suh, K (2002) Challenges in Line-of-Balance Scheduling. Journal of Construction Engineering and Management, 128(06), 545–56.

Ariaratnam, S T and MacLeod, C W (2002) Financial Outlay Modeling for a Local Sewer Rehabilitation Strategy. Journal of Construction Engineering and Management, 128(06), 486–95.

Aroke, O, Hasanzadeh, S, Esmaeili, B, Dodd, M D and Brock, R (2022) Using Worker Characteristics, Personality, and Attentional Distribution to Predict Hazard Identification Performance: A Moderated Mediation Analysis. Journal of Construction Engineering and Management, 148(06).

Assaad, R and El-adaway, I H (2020) Enhancing the Knowledge of Construction Business Failure: A Social Network Analysis Approach. Journal of Construction Engineering and Management, 146(06), 04020052.

Awad, A and Fayek, A R (2013) Adaptive Learning of Contractor Default Prediction Model for Surety Bonding. Journal of Construction Engineering and Management, 139(06), 694–704.

Badu, E, Owusu-Manu, D, Edwards, D J and Holt, G D (2013) Analysis of Strategic Issues Underpinning the Innovative Financing of Infrastructure within Developing Countries. Journal of Construction Engineering and Management, 139(06), 726–37.

Becker, T C, Jaselskis, E J and El-Gafy, M (2014) Improving Predictability of Construction Project Outcomes through Intentional Management of Indirect Construction Costs. Journal of Construction Engineering and Management, 140(06).

Bernold, L E (2005) Automatic As-Built Generation with Utility Trenchers. Journal of Construction Engineering and Management, 131(06), 740–7.

Bernold, L E (2003) Economic Model to Optimize Underground Utility Protection. Journal of Construction Engineering and Management, 129(06), 645–52.

Bingham, E, Gibson, G E and Asmar, M E (2018) Measuring User Perceptions of Popular Transportation Project Delivery Methods Using Least Significant Difference Intervals and Multiple Range Tests. Journal of Construction Engineering and Management, 144(06).

Bobick, T G (2004) Falls through Roof and Floor Openings and Surfaces, Including Skylights: 1992–2000. Journal of Construction Engineering and Management, 130(06), 895–907.

Bogenberger, C, Dell’Amico, M, Fuellerer, G, Hoefinger, G, Iori, M, Novellani, S and Panicucci, B (2015) Two-Phase Earthwork Optimization Model for Highway Construction. Journal of Construction Engineering and Management, 141(06).

Bohn, J S and Teizer, J (2010) Benefits and Barriers of Construction Project Monitoring Using High-Resolution Automated Cameras. Journal of Construction Engineering and Management, 136(06), 632–40.

Borges, W F and Mário, P d C (2017) Five Project-Duration Control Methods in Time Units: Case Study of a Linearly Distributed Planned Value. Journal of Construction Engineering and Management, 143(06).

Brodetskaia, I, Sacks, R and Shapira, A (2013) Stabilizing Production Flow of Interior and Finishing Works with Reentrant Flow in Building Construction. Journal of Construction Engineering and Management, 139(06), 665–74.

Burleson, R C, Haas, C T, Tucker, R L and Stanley, A (1998) Multiskilled Labor Utilization Strategies in Construction. Journal of Construction Engineering and Management, 124(06), 480–9.

Caldas, C H, Gibson, G E, Weerasooriya, R and Yohe, A M (2009) Identification of Effective Management Practices and Technologies for Lessons Learned Programs in the Construction Industry. Journal of Construction Engineering and Management, 135(06), 531–9.

Camfield, F E (1998) Guidelines for Quarrystone Armor Units. Journal of Construction Engineering and Management, 124(06), 465–6.

Candaş, A B and Tokdemir, O B (2022) Automating Coordination Efforts for Reviewing Construction Contracts with Multilabel Text Classification. Journal of Construction Engineering and Management, 148(06).

Cariaga, I and El-Diraby, T E (2013) Assessing the market potential for housing construction products in Mexico. Journal of Construction Engineering and Management, 139(06), 717–25.

Chan, S and Leung, N (2004) Prototype Web-Based Construction Project Management System. Journal of Construction Engineering and Management, 130(06), 935–43.

Chan, W T and Hu, H (2002) Constraint Programming Approach to Precast Production Scheduling. Journal of Construction Engineering and Management, 128(06), 513–21.

Chan, W T, Chen, C, Messner, J I and Chua, D K (2005) Interface Management for China’s Build–Operate–Transfer Projects. Journal of Construction Engineering and Management, 131(06), 645–55.

Chang, C and Qian, Y (2015) An Econometric Analysis of Holdup Problems in Construction Projects. Journal of Construction Engineering and Management, 141(06).

Chang, C and Yu, S (2018) Three-Variance Approach for Updating Earned Value Management. Journal of Construction Engineering and Management, 144(06).

Chang, R, Zuo, J, Soebarto, V, Zhao, Z, Zillante, G and Gan, X (2017) Discovering the Transition Pathways toward Sustainability for Construction Enterprises: Importance-Performance Analysis. Journal of Construction Engineering and Management, 143(06).

Chasey, A D and Merchant, S (2000) Issues for Construction of 300-mm Fab. Journal of Construction Engineering and Management, 126(06), 451–7.

Cheah, C Y J, Garvin, M J and Miller, J B (2004) Empirical Study of Strategic Performance of Global Construction Firms. Journal of Construction Engineering and Management, 130(06), 808–17.

Chen, G, Chen, J, Tang, Y, Li, Q and Luo, X (2022) Identifying Effective Collaborative Behaviors in Building Information Modeling–Enabled Construction Projects. Journal of Construction Engineering and Management, 148(06).

Chen, H, O’Brien, W J and Herbsman, Z J (2005) Assessing the Accuracy of Cash Flow Models: The Significance of Payment Conditions. Journal of Construction Engineering and Management, 131(06), 669–76.

Chen, P, Partington, D and Qiang, M (2009) Cross-Cultural Understanding of Construction Project Managers’ Conceptions of Their Work. Journal of Construction Engineering and Management, 135(06), 477–87.

Chen, Q, Jin, R and Soboyejo, A (2013) Understanding a Contractor’s Regional Variations in Safety Performance. Journal of Construction Engineering and Management, 139(06), 641–53.

Chen, Q, Reichard, G and Beliveau, Y (2008) Multiperspective Approach to Exploring Comprehensive Cause Factors for Interface Issues. Journal of Construction Engineering and Management, 134(06), 432–41.

Chen, Y Q, Zhang, Y B and Zhang, S J (2014) Impacts of Different Types of Owner-Contractor Conflict on Cost Performance in Construction Projects. Journal of Construction Engineering and Management, 140(06).

Cheng, E W L and Li, H (2004) Development of a Practical Model of Partnering for Construction Projects. Journal of Construction Engineering and Management, 130(06), 790–8.

Cheung, S O, Chow, P T and Yiu, T W (2009) Contingent Use of Negotiators’ Tactics in Construction Dispute Negotiation. Journal of Construction Engineering and Management, 135(06), 466–76.

Cheung, S O, Yiu, K T W and Suen, H (2004) Construction Negotiation Online. Journal of Construction Engineering and Management, 130(06), 844–52.

Chew, Y T E, Atay, E and Bayraktaroglu, S (2020) Female Engineers’ Happiness and Productivity in Organizations with Paternalistic Culture. Journal of Construction Engineering and Management, 146(06).

Chih, Y, Kiazad, K, Zhou, L, Capezio, A, Li, M and D. Restubog, S L (2016) Investigating Employee Turnover in the Construction Industry: A Psychological Contract Perspective. Journal of Construction Engineering and Management, 142(06).

Chin, K S and Choi, T W (2003) Construction in Hong Kong: Success Factors for ISO9000 Implementation. Journal of Construction Engineering and Management, 129(06), 599–609.

Cho, Y, Wang, C and Zhuang, Z (2013) Framework for Empirical Process to Improve Nonnuclear Gauge Performance in Hot-Mix Asphalt Pavement Construction. Journal of Construction Engineering and Management, 139(06), 601–10.

Chong, H Y, Zin, R M and Chong, S C (2013) Employing Data Warehousing for Contract Administration: e-Dispute Resolution Prototype. Journal of Construction Engineering and Management, 139(06), 611–9.

Chua, D K and Goh, Y M (2005) Poisson Model of Construction Incident Occurrence. Journal of Construction Engineering and Management, 131(06), 715–22.

Chua, D K H, Tyagi, A, Ling, S and Bok, S H (2003) Process-Parameter-Interface Model for Design Management. Journal of Construction Engineering and Management, 129(06), 653–63.

Chua, D K H, Yeoh, K W and Song, Y (2010) Quantification of Spatial Temporal Congestion in Four-Dimensional Computer-Aided Design. Journal of Construction Engineering and Management, 136(06), 641–9.

Chung, T H, Abraham, D M and Gokhale, S B (2004) Decision Support System for Microtunneling Applications. Journal of Construction Engineering and Management, 130(06), 835–43.

Dai, H, Cao, G and Su, H (2006) Management and Construction of the Three Gorges Project. Journal of Construction Engineering and Management, 132(06), 615–9.

de la Garza, J M and Pishdad-Bozorgi, P (2018) Workflow Process Model for Flash Track Projects. Journal of Construction Engineering and Management, 144(06).

del Caño, A and de la Cruz, M P (2002) Integrated Methodology for Project Risk Management. Journal of Construction Engineering and Management, 128(06), 473–85.

Deshpande, A S, Salem, O M and Miller, R A (2012) Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects. Journal of Construction Engineering and Management, 138(06), 716–24.

Dhal, M (2020) Labor Stand: Face of Precarious Migrant Construction Workers in India. Journal of Construction Engineering and Management, 146(06).

Diekmann, J E and Featherman, W D (1998) Assessing Cost Uncertainty: Lessons from Environmental Restoration Projects. Journal of Construction Engineering and Management, 124(06), 445–51.

Dinca, M S, Barbuta-Misu, N, Madaleno, M, Dinca, G and Deari, F (2017) Integrated Analysis of EU Construction Companies’ Financial Performances. Journal of Construction Engineering and Management, 143(06).

Dou, Y and Bo, Q (2022) Characteristics and Dynamics of BIM Adoption in China: Social Network Analysis. Journal of Construction Engineering and Management, 148(06).

Du, J, Kim, B and Zhao, D (2016) Cost Performance as a Stochastic Process: EAC Projection by Markov Chain Simulation. Journal of Construction Engineering and Management, 142(06).

Dzeng, R (2006) Identifying a Design Management Package to Support Concurrent Design in Building Wafer Fabrication Facilities. Journal of Construction Engineering and Management, 132(06), 606–14.

El-Abbasy, M S, Senouci, A, Zayed, T, Mirahadi, F and Parvizsedghy, L (2014) Condition Prediction Models for Oil and Gas Pipelines Using Regression Analysis. Journal of Construction Engineering and Management, 140(06).

El-adaway, I H, Abotaleb, I S, Eid, M S, May, S, Netherton, L and Vest, J (2018) Contract administration guidelines for public infrastructure projects in the United States and Saudi Arabia: comparative analysis approach. Journal of Construction Engineering and Management, 144(06), 04018031.

El-Tayeh, A and Gil, N (2007) Using Digital Socialization to Support Geographically Dispersed AEC Project Teams. Journal of Construction Engineering and Management, 133(06), 462–73.

Elbarkouky, M M G and Fayek, A R (2011) Fuzzy Similarity Consensus Model for Early Alignment of Construction Project Teams on the Extent of Their Roles and Responsibilities. Journal of Construction Engineering and Management, 137(06), 432–40.

Evia, C (2011) Localizing and Designing Computer-Based Safety Training Solutions for Hispanic Construction Workers. Journal of Construction Engineering and Management, 137(06), 452–9.

Ezeldin, A S and Sharara, L M (2006) Neural Networks for Estimating the Productivity of Concreting Activities. Journal of Construction Engineering and Management, 132(06), 650–6.

Fang, D, Chen, Y and Wong, L (2006) Safety Climate in Construction Industry: A Case Study in Hong Kong. Journal of Construction Engineering and Management, 132(06), 573–84.

Fang, D, Fong, P S and Li, M (2004) Risk Assessment Model of Tendering for Chinese Building Projects. Journal of Construction Engineering and Management, 130(06), 862–8.

Fang, D, Li, M, Fong, P S and Shen, L (2004) Risks in Chinese Construction Market—Contractors’ Perspective. Journal of Construction Engineering and Management, 130(06), 853–61.

Finke, M R (1998) A Better Way to Estimate and Mitigate Disruption. Journal of Construction Engineering and Management, 124(06), 490–7.

Geem, Z W (2010) Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search. Journal of Construction Engineering and Management, 136(06), 711–6.

Gerber, J K and Yacoubian, G S (2001) Evaluation of Drug Testing in the Workplace: Study of the Construction Industry. Journal of Construction Engineering and Management, 127(06), 438–44.

Goh, Y M and Binte Sa’adon, N F (2015) Cognitive Factors Influencing Safety Behavior at Height: A Multimethod Exploratory Study. Journal of Construction Engineering and Management, 141(06).

Goodrum, P M and Haas, C T (2002) Partial Factor Productivity and Equipment Technology Change at Activity Level in U.S. Construction Industry. Journal of Construction Engineering and Management, 128(06), 463–72.

Gransberg, D D, Lopez del Puerto, C and Humphrey, D (2007)  Relating Cost Growth from the Initial Estimate to Design Fee for Transportation Projects. Journal of Construction Engineering and Management, 133(06), 404–8.

Griffis, F H ( and Christodoulou, S (2000) Construction Risk Analysis Tool for Determining Liquidated Damages Insurance Premiums: Case Study. Journal of Construction Engineering and Management, 126(06), 407–13.

Guo, H, Yu, Y, Ding, Q and Skitmore, M (2018) Image-and-Skeleton-Based Parameterized Approach to Real-Time Identification of Construction Workers’ Unsafe Behaviors. Journal of Construction Engineering and Management, 144(06).

Guo, S, Ding, L, Zhang, Y, Skibniewski, M J and Liang, K (2019) Hybrid Recommendation Approach for Behavior Modification in the Chinese Construction Industry. Journal of Construction Engineering and Management, 145(06).

Hallowell, M and Toole, T M (2009) Contemporary Design-Bid-Build Model. Journal of Construction Engineering and Management, 135(06), 540–9.

Ham, N, Moon, S, Kim, J and Kim, J (2018) Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project. Journal of Construction Engineering and Management, 144(06).

Han, B and Leite, F (2021) Measuring the Impact of Immersive Virtual Reality on Construction Design Review Applications: Head-Mounted Display versus Desktop Monitor. Journal of Construction Engineering and Management, 147(06).

Han, S H, Kim, D Y and Kim, H (2007) Predicting Profit Performance for Selecting Candidate International Construction Projects. Journal of Construction Engineering and Management, 133(06), 425–36.

Han, Y, Li, Y, Taylor, J E and Zhong, J (2018) Characteristics and Evolution of Innovative Collaboration Networks in Architecture, Engineering, and Construction: Study of National Prize-Winning Projects in China. Journal of Construction Engineering and Management, 144(06).

Hanna, A S, Camlic, R, Peterson, P A and Lee, M (2004) Cumulative Effect of Project Changes for Electrical and Mechanical Construction. Journal of Construction Engineering and Management, 130(06), 762–71.

Hanna, A S, Taylor, C S and Sullivan, K T (2005) Impact of Extended Overtime on Construction Labor Productivity. Journal of Construction Engineering and Management, 131(06), 734–9.

Harmon, K M J (2003) Effectiveness of Dispute Review Boards. Journal of Construction Engineering and Management, 129(06), 674–9.

Harper, R S and Koehn, E (1998) Managing Industrial Construction Safety in Southeast Texas. Journal of Construction Engineering and Management, 124(06), 452–7.

Hassanein, A A and Hanna, R S (2008) Safety Performance in the Egyptian Construction Industry. Journal of Construction Engineering and Management, 134(06), 451–5.

Hastak, M, Gokhale, S, Goyani, K, Hong, T and Safi, B (2007) Project Manager’s Decision Aid for a Radical Project Cycle Reduction. Journal of Construction Engineering and Management, 133(06), 437–46.

Hawas, F and Cifuentes, A (2014) Valuation of Projects with Stochastic Cash Flows and Intertemporal Correlations: Practical Modeling Guidelines. Journal of Construction Engineering and Management, 140(06).

Hegab, M, Smith, G R and Salem, O M (2006) Soil Penetration Modeling in Microtunneling Projects. Journal of Construction Engineering and Management, 132(06), 598–605.

  • Type: Journal Article
  • Keywords: Microtunneling; Productivity; Construction equipment; Penetration; Contracts; Bids;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:6(598)
  • Abstract:
    As the need for utility service line replacement or repairs with minimum disruption to the surface have increased, so has the demand for trenchless excavation methods, in particular, microtunneling. Microtunneling is a trenchless technique that is used to install new pipelines. Microtunneling can be applied in gravity and pressure lines, permanent ducts for cables, and crossings under rails or roads. When bidding a microtunneling project, the main concern of microtunneling contractors is predicting the underground behavior of the machine. In other words, the productivity of microtunneling is the key to profit in microtunneling projects. Contractors generally predict approximate productivity based on experience, which risks cost estimation accuracy for microtunneling projects. Contractors lack a productivity model that helps them to predict driving time. This paper is a part of a series of papers covering the productivity of microtunneling projects. This paper focuses on predicting the penetration time of the microtunneling machine.

Hegazy, T and Ersahin, T (2001) Simplified Spreadsheet Solutions. I: Subcontractor Information System. Journal of Construction Engineering and Management, 127(06), 461–8.

Hegazy, T and Ersahin, T (2001) Simplified Spreadsheet Solutions. II: Overall Schedule Optimization. Journal of Construction Engineering and Management, 127(06), 469–75.

Hegazy, T and Kassab, M (2003) Resource Optimization Using Combined Simulation and Genetic Algorithms. Journal of Construction Engineering and Management, 129(06), 698–705.

Hegazy, T and Menesi, W (2012) Heuristic Method for Satisfying Both Deadlines and Resource Constraints. Journal of Construction Engineering and Management, 138(06), 688–96.

Hegazy, T, Shabeeb, A K, Elbeltagi, E and Cheema, T (2000) Algorithm for Scheduling with Multiskilled Constrained Resources. Journal of Construction Engineering and Management, 126(06), 414–21.

Herrera, R F, Mourgues, C, Alarcón, L F and Pellicer, E (2020) Understanding Interactions between Design Team Members of Construction Projects Using Social Network Analysis. Journal of Construction Engineering and Management, 146(06).

Ho, S P, Lin, Y, Chu, W and Wu, H (2009) Model for Organizational Governance Structure Choices in Construction Joint Ventures. Journal of Construction Engineering and Management, 135(06), 518–30.

Hong, T, Cho, K, Hyun, C and Han, S (2011) Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building. Journal of Construction Engineering and Management, 137(06), 393–402.

Hoseini, E, Bosch-Rekveldt, M and Hertogh, M (2020) Cost Contingency and Cost Evolvement of Construction Projects in the Preconstruction Phase. Journal of Construction Engineering and Management, 146(06).

Huang, R and Sun, K (2006) Non-Unit-Based Planning and Scheduling of Repetitive Construction Projects. Journal of Construction Engineering and Management, 132(06), 585–97.

Hussein, M, Darko, A, Eltoukhy, A E E and Zayed, T (2022) Sustainable Logistics Planning in Modular Integrated Construction Using Multimethod Simulation and Taguchi Approach. Journal of Construction Engineering and Management, 148(06).

Ipsilandis, P G (2007) Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects. Journal of Construction Engineering and Management, 133(06), 417–24.

Isidore, L J and Back, W E (2001) Probabilistic Optimal-Cost Scheduling. Journal of Construction Engineering and Management, 127(06), 431–7.

Jang, Y, Song, K, Park, M and Ahn, Y (2020) Classifying the Business Model Types of International Construction Contractors. Journal of Construction Engineering and Management, 146(06).

Jaselskis, E J and El-Misalami, T (2003) Implementing Radio Frequency Identification in the Construction Process. Journal of Construction Engineering and Management, 129(06), 680–8.

Jiang, S, Ma, G, Jia, J, Wu, M and Wu, Z (2022) Mobile ICT Overuse in the Construction Industry: Effects on Job Burnout of Project Managers. Journal of Construction Engineering and Management, 148(06).

Jin, Z and Gambatese, J (2020) Exploring the Potential of Technological Innovations for Temporary Structures: A Survey Study. Journal of Construction Engineering and Management, 146(06).

Jonsson, H and Rudberg, M (2015) Production System Classification Matrix: Matching Product Standardization and Production-System Design. Journal of Construction Engineering and Management, 141(06).

Jung, M, Park, M, Lee, H and Kim, H (2016) Weather-Delay Simulation Model Based on Vertical Weather Profile for High-Rise Building Construction. Journal of Construction Engineering and Management, 142(06).

Kale, S (2009) Fuzzy Intellectual Capital Index for Construction Firms. Journal of Construction Engineering and Management, 135(06), 508–17.

Kale, S and Arditi, D (1998) Business Failures: Liabilities of Newness, Adolescence, and Smallness. Journal of Construction Engineering and Management, 124(06), 458–64.

Kang, J H, Anderson, S D and Clayton, M J (2007) Empirical Study on the Merit of Web-Based 4D Visualization in Collaborative Construction Planning and Scheduling. Journal of Construction Engineering and Management, 133(06), 447–61.

Kartam, S (1999) Generic Methodology for Analyzing Delay Claims. Journal of Construction Engineering and Management, 125(06), 409–19.

Kashiwagi, D T and Byfield, R (2002) Testing of Minimization of Subjectivity in Best Value Procurement by Using Artificial Intelligence Systems in State of Utah Procurement. Journal of Construction Engineering and Management, 128(06), 496–502.

Khalafallah, A and El-Rayes, K (2006) Minimizing Construction-Related Hazards in Airport Expansion Projects. Journal of Construction Engineering and Management, 132(06), 562–72.

Kim, D Y, Han, S H and Kim, H (2008) Discriminant Analysis for Predicting Ranges of Cost Variance in International Construction Projects. Journal of Construction Engineering and Management, 134(06), 398–410.

Kim, Y A, Ryoo, B Y, Kim, Y and Huh, W C (2013) Major Accident Factors for Effective Safety Management of Highway Construction Projects. Journal of Construction Engineering and Management, 139(06), 628–40.

Knight, K and Robinson Fayek, A (2002) Use of Fuzzy Logic for Predicting Design Cost Overruns on Building Projects. Journal of Construction Engineering and Management, 128(06), 503–12.

Ko, C and Chung, N (2014) Lean Design Process. Journal of Construction Engineering and Management, 140(06).

Koc, K and Pelin Gurgun, A (2021) Assessment of Readability Risks in Contracts Causing Conflicts in Construction Projects. Journal of Construction Engineering and Management, 147(06).

Koksal, A and Arditi, D (2004) Predicting Construction Company Decline. Journal of Construction Engineering and Management, 130(06), 799–807.

Konchar, M and Sanvido, V (1998) Comparison of U.S. Project Delivery Systems. Journal of Construction Engineering and Management, 124(06), 435–44.

Koo, K and Park, S (2012) GA-Based Fuel-Efficient Transfer Path Selection Model for Delivering Construction Materials. Journal of Construction Engineering and Management, 138(06), 725–32.

Korman, T M, Fischer, M A and Tatum, C B (2003) Knowledge and Reasoning for MEP Coordination. Journal of Construction Engineering and Management, 129(06), 627–34.

Kosonen, H K and Kim, A A (2018) Mental Model Approach to Wastewater Treatment Plant Project Delivery during Emergency Response. Journal of Construction Engineering and Management, 144(06).

Kwon, N, Park, M, Lee, H, Ahn, J and Kim, S (2017) Construction Noise Prediction Model Based on Case-Based Reasoning in the Preconstruction Phase. Journal of Construction Engineering and Management, 143(06).

Kwon, N, Song, K, Lee, H, Kim, J and Park, M (2018) Construction Noise Risk Assessment Model Focusing on Construction Equipment. Journal of Construction Engineering and Management, 144(06).

Le, Y, Wang, Y, Luo, C and Peng, Y (2013) Integration of Financial and Contract Management on the Shanghai Expo Construction Program. Journal of Construction Engineering and Management, 139(06), 738–48.

Lee, D, Lee, S and Kim, S (2017) Composite Phase-Change Material Mold for Cost-Effective Production of Free-Form Concrete Panels. Journal of Construction Engineering and Management, 143(06).

Lee, H W, Choi, K and Gambatese, J A (2014) Real Options Valuation of Phased Investments in Commercial Energy Retrofits under Building Performance Risks. Journal of Construction Engineering and Management, 140(06).

Lee, H, Lee, J and Lee, J (1999) Nonshored Formwork System for Top-Down Construction. Journal of Construction Engineering and Management, 125(06), 392–9.

Lee, H, Yu, J and Kim, S (2004) Impact of Labor Factors on Workflow. Journal of Construction Engineering and Management, 130(06), 918–23.

Lee, S, Jeon, R, Kim, J and Kim, J (2011) Strategies for Developing Countries to Expand Their Shares in the Global Construction Market: Phase-Based SWOT and AAA Analyses of Korea. Journal of Construction Engineering and Management, 137(06), 460–70.

Leu, S and Yang, C (1999) GA-Based Multicriteria Optimal Model for Construction Scheduling. Journal of Construction Engineering and Management, 125(06), 420–7.

Leung, A W T and Tam, C M (1999) Models for Assessing Hoisting Times of Tower Cranes. Journal of Construction Engineering and Management, 125(06), 385–91.

Li, G, Zhang, G, Chen, C and Martek, I (2020) Empirical Bid or No Bid Decision Process in International Construction Projects: Structural Equation Modeling Framework. Journal of Construction Engineering and Management, 146(06).

Li, H, Kong, C W, Pang, Y C, Shi, W Z and Yu, L (2003) Internet-Based Geographical Information Systems System for E-Commerce Application in Construction Material Procurement. Journal of Construction Engineering and Management, 129(06), 689–97.

Li, R and Roberti, R (2017) Optimal Scheduling of Railway Track Possessions in Large-Scale Projects with Multiple Construction Works. Journal of Construction Engineering and Management, 143(06).

Li, S, Wu, X, Wang, X and Hu, S (2020) Relationship between Social Capital, Safety Competency, and Safety Behaviors of Construction Workers. Journal of Construction Engineering and Management, 146(06).

Liang, Y, Ashuri, B and Li, M (2021) Forecasting the Construction Expenditure Cash Flow for Transportation Design-Build Projects with a Case-Based Reasoning Model. Journal of Construction Engineering and Management, 147(06).

Liang, Y, Ashuri, B and Sun, W (2020) Analysis of the Variability of Project Cost and Schedule Performance in the Design-Build Environment. Journal of Construction Engineering and Management, 146(06).

Lippiatt, B C (1999) Selecting Cost-Effective Green Building Products: BEES Approach. Journal of Construction Engineering and Management, 125(06), 448–55.

Liu, D, Lu, W and Niu, Y (2018) Extended Technology-Acceptance Model to Make Smart Construction Systems Successful. Journal of Construction Engineering and Management, 144(06).

Liu, G, Huang, R, Li, K, Shrestha, A and Fu, X (2022) Greenhouse Gas Emissions Management in Prefabrication and Modular Construction Based on Earned Value Management. Journal of Construction Engineering and Management, 148(06).

Liu, H, Jazayeri, E and Dadi, G B (2017) Establishing the Influence of Owner Practices on Construction Safety in an Operational Excellence Model. Journal of Construction Engineering and Management, 143(06).

Liu, J, Xie, Q, Xia, B and Bridge, A J (2017) Impact of Design Risk on the Performance of Design-Build Projects. Journal of Construction Engineering and Management, 143(06).

Liu, J, Zhao, X and Yan, P (2016) Risk Paths in International Construction Projects: Case Study from Chinese Contractors. Journal of Construction Engineering and Management, 142(06).

Liu, K and El-Gohary, N (2022) Bridge Deterioration Knowledge Ontology for Supporting Bridge Document Analytics. Journal of Construction Engineering and Management, 148(06).

Liu, T, Chong, H, Zhang, W, Lee, C and Tang, X (2022) Effects of Contractual and Relational Governances on BIM Collaboration and Implementation for Project Performance Improvement. Journal of Construction Engineering and Management, 148(06).

Liu, X, Song, Y, Yi, W, Wang, X and Zhu, J (2018) Comparing the Random Forest with the Generalized Additive Model to Evaluate the Impacts of Outdoor Ambient Environmental Factors on Scaffolding Construction Productivity. Journal of Construction Engineering and Management, 144(06).

Liu, X, Wang, X, Zhao, Y and Xia, N (2020) Solving Workplace Deviant Behavior in Construction by Leader–Member Exchange and Leader–Member . Journal of Construction Engineering and Management, 146(06), 04020061.

Liu, Z, Wang, H and Li, H (2018) Model of Equipment Sharing between Contractors on Construction Projects. Journal of Construction Engineering and Management, 144(06).

Lo, T Y, Fung, I W and Tung, K C (2006) Construction Delays in Hong Kong Civil Engineering Projects. Journal of Construction Engineering and Management, 132(06), 636–49.

Lo, W and Yan, M (2009) Evaluating Qualification-Based Selection System: A Simulation Approach. Journal of Construction Engineering and Management, 135(06), 458–65.

Lo, W, Lin, C L and Yan, M R (2007) Contractor’s Opportunistic Bidding Behavior and Equilibrium Price Level in the Construction Market. Journal of Construction Engineering and Management, 133(06), 409–16.

Lohne, J, Kjesbu, N E, Engebø, A, Young, B and Lædre, O (2019) Scoping Literature Review of Crime in the AEC Industry. Journal of Construction Engineering and Management, 145(06).

Love, P E D, Edwards, D J and Irani, Z (2010) Work Stress, Support, and Mental Health in Construction. Journal of Construction Engineering and Management, 136(06), 650–8.

Love, P E D, Edwards, D J and Smith, J (2016) Rework Causation: Emergent Theoretical Insights and Implications for Research. Journal of Construction Engineering and Management, 142(06).

Lowe, D J and Skitmore, R M (2001) Human Effects in Construction Contract Price Forecasting: Experience and Experiential Learning Styles. Journal of Construction Engineering and Management, 127(06), 485–93.

Lu, H, Behbahani, S, Azimi, M, Matthews, J C, Han, S and Iseley, T (2020) Trenchless Construction Technologies for Oil and Gas Pipelines: State-of-the-Art Review. Journal of Construction Engineering and Management, 146(06).

Lu, M, Lau, S and Poon, C (2009) Simulation Approach to Evaluating Cost Efficiency of Selective Demolition Practices: Case of Hong Kong’s Kai Tak Airport Demolition. Journal of Construction Engineering and Management, 135(06), 448–57.

Lu, W, Zhang, L and Zhang, L (2016) Effect of Contract Completeness on Contractors’ Opportunistic Behavior and the Moderating Role of Interdependence. Journal of Construction Engineering and Management, 142(06).

Luo, X, Li, H, Dai, F, Cao, D, Yang, X and Guo, H (2017) Hierarchical Bayesian Model of Worker Response to Proximity Warnings of Construction Safety Hazards: Toward Constant Review of Safety Risk Control Measures. Journal of Construction Engineering and Management, 143(06).

Lv, L, Wang, Z, Li, H, Zhang, C and Qiao, R (2022) Tournament Incentive Mechanisms Design for Long-Distance Water Diversion Projects Incorporating Preference Heterogeneity. Journal of Construction Engineering and Management, 148(06).

Ma, G, Wu, M, Jia, J and Yang, W (2021) Two-Level Quality Decision Support System for Building Structural Damage Prediction and Maintenance Solution Recommendation in the Operation and Maintenance Phase. Journal of Construction Engineering and Management, 147(06).

Maberry, S (2000) Commercial Diving Operations in Construction. Journal of Construction Engineering and Management, 126(06), 433–9.

Maghrebi, M, Travis Waller, S and Sammut, C (2014) Assessing the Accuracy of Expert-Based Decisions in Dispatching Ready Mixed Concrete. Journal of Construction Engineering and Management, 140(06).

Maloney, W F (2002) Construction Product/Service and Customer Satisfaction. Journal of Construction Engineering and Management, 128(06), 522–9.

Marrana, T C, Silvestre, J D, de Brito, J and Gomes, R (2017) Lifecycle Cost Analysis of Flat Roofs of Buildings. Journal of Construction Engineering and Management, 143(06).

Marti, P, Trümpi, S and Heinzmann, D (2009) Hydraulic Joint for Pipe Jacking. Journal of Construction Engineering and Management, 135(06), 439–47.

Marzouk, M and Moselhi, O (2004) Fuzzy Clustering Model for Estimating Haulers’ Travel Time. Journal of Construction Engineering and Management, 130(06), 878–86.

Marzouk, M, Abdallah, M and El-Said, M (2010) Modeling Microtunneling Projects using Computer Simulation. Journal of Construction Engineering and Management, 136(06), 670–82.

Meier, J R and Russell, J S (2000) Model Process for Implementing Maintainability. Journal of Construction Engineering and Management, 126(06), 440–50.

Mohamed, M and Tran, D Q (2021) Risk-Based Inspection Model for Hot Mix Asphalt Pavement Construction Projects. Journal of Construction Engineering and Management, 147(06).

Mohamed, S (2003) Performance in International Construction Joint Ventures: Modeling Perspective. Journal of Construction Engineering and Management, 129(06), 619–26.

Mohammadi, A, Amador-Jimenez, L and Nasiri, F (2020) Reliable, Effective, and Sustainable Urban Railways: A Model for Optimal Planning and Asset Management. Journal of Construction Engineering and Management, 146(06).

Mohseni, H, Setunge, S, Zhang, G and Wakefield, R (2017) Markov Process for Deterioration Modeling and Asset Management of Community Buildings. Journal of Construction Engineering and Management, 143(06).

Molenaar, K R and Songer, A D (1998) Model for Public Sector Design-Build Project Selection. Journal of Construction Engineering and Management, 124(06), 467–79.

Molenaar, K R, Park, J and Washington, S (2009) Framework for Measuring Corporate Safety Culture and Its Impact on Construction Safety Performance. Journal of Construction Engineering and Management, 135(06), 488–96.

Moon, S, Zekavat, P R and Bernold, L E (2015) Dynamic Control of Construction Supply Chain to Improve Labor Performance. Journal of Construction Engineering and Management, 141(06).

Moselhi, O and Hassanein, A (2003) Optimized Scheduling of Linear Projects. Journal of Construction Engineering and Management, 129(06), 664–73.

Nasrallah, W F and Bou-Matar, R (2008) Exponential, Gamma, and Power Law Distributions in Information Flow on a Construction Site. Journal of Construction Engineering and Management, 134(06), 442–50.

Nassar, K M and Hegab, M Y (2006) Developing a Complexity Measure for Project Schedules. Journal of Construction Engineering and Management, 132(06), 554–61.

Navab-Kashani, R, Gay, L F and Bayat, A (2015) Productivity Improvement of Sewer CCTV Inspection through Time Study and Route Optimization. Journal of Construction Engineering and Management, 141(06).

Ndekugri, I (1999) Performance Bonds and Guarantees: Construction Owners and Professionals Beware. Journal of Construction Engineering and Management, 125(06), 428–36.

Nzabonimpa, J D and Hong, W (2018) Novel Precast Erection Method of Interlocking Mechanical Joints Using Couplers. Journal of Construction Engineering and Management, 144(06).

O’Connor, J T, O’Brien, W J and Choi, J O (2014) Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization. Journal of Construction Engineering and Management, 140(06).

Oates, D and Sullivan, K T (2012) Postoccupancy Energy Consumption Survey of Arizona’s LEED New Construction Population. Journal of Construction Engineering and Management, 138(06), 742–50.

Ozorhon, B, Arditi, D, Dikmen, I and Birgonul, M T (2011) Toward a Multidimensional Performance Measure for International Joint Ventures in Construction. Journal of Construction Engineering and Management, 137(06), 403–11.

Park, M, Lee, M, Lee, H and Hwang, S (2010) Boost, Control, or Both of Korean Housing Market: 831 Countermeasures. Journal of Construction Engineering and Management, 136(06), 693–701.

Park, T, Kim, B and Kim, H (2013) Real Option Approach to Sharing Privatization Risk in Underground Infrastructures. Journal of Construction Engineering and Management, 139(06), 685–93.

Pena-Mora, F and Park, M (2001) Dynamic Planning for Fast-Tracking Building Construction Projects. Journal of Construction Engineering and Management, 127(06), 445–56.

Peng, J (2002) Stability Analyses and Design Recommendations for Practical Shoring Systems during Construction. Journal of Construction Engineering and Management, 128(06), 536–44.

Pereira, E, Han, S, AbouRizk, S and Hermann, U (2017) Empirical Testing for Use of Safety Related Measures at the Organizational Level to Assess and Control the On-Site Risk Level. Journal of Construction Engineering and Management, 143(06).

Petroutsatou, K, Georgopoulos, E, Lambropoulos, S and Pantouvakis, J P (2012) Early Cost Estimating of Road Tunnel Construction Using Neural Networks. Journal of Construction Engineering and Management, 138(06), 679–87.

Pheng, L S and Chuan, C J (2001) Just-in-Time Management of Precast Concrete Components. Journal of Construction Engineering and Management, 127(06), 494–501.

Pirzadeh, P and Lingard, H (2021) Working from Home during the COVID-19 Pandemic: Health and Well-Being of Project-Based Construction Workers. Journal of Construction Engineering and Management, 147(06).

Priven, V and Sacks, R (2015) Effects of the Last Planner System on Social Networks among Construction Trade Crews. Journal of Construction Engineering and Management, 141(06).

Rahimi, Y, Tavakkoli-Moghaddam, R, Iranmanesh, S H and Vaez-Alaei, M (2018) Hybrid Approach to Construction Project Risk Management with Simultaneous FMEA/ISO 31000/Evolutionary Algorithms: Empirical Optimization Study. Journal of Construction Engineering and Management, 144(06).

Ranasinghe, U, Ruwanpura, J and Liu, X (2012) Streamlining the Construction Productivity Improvement Process with the Proposed Role of a Construction Productivity Improvement Officer. Journal of Construction Engineering and Management, 138(06), 697–706.

Raoufi, M and Fayek, A R (2018) Key Moderators of the Relationship between Construction Crew Motivation and Performance. Journal of Construction Engineering and Management, 144(06).

Rojas, E M and Kell, I (2008) Comparative Analysis of Project Delivery Systems Cost Performance in Pacific Northwest Public Schools. Journal of Construction Engineering and Management, 134(06), 387–97.

Rowe, G M, Meegoda, J N, Jumikis, A, Sharrock, M J, Bandara, N and Hettiarachchi, C H (2004) NJTxtr—A Computer Program Based on LASER to Monitor Asphalt Segregation. Journal of Construction Engineering and Management, 130(06), 924–34.

Russell, J S (2013) Shaping the Future of the Civil Engineering Profession. Journal of Construction Engineering and Management, 139(06), 654–64.

Russell, M M, Hsiang, S M, Liu, M and Wambeke, B (2014) Causes of Time Buffer and Duration Variation in Construction Project Tasks: Comparison of Perception to Reality. Journal of Construction Engineering and Management, 140(06).

Sacks, R and Partouche, R (2010) Empire State Building Project: Archetype of “Mass Construction”. Journal of Construction Engineering and Management, 136(06), 702–10.

Said, H and El-Rayes, K (2011) Optimizing Material Procurement and Storage on Construction Sites. Journal of Construction Engineering and Management, 137(06), 421–31.

San Cristóbal, J R (2012) Contractor Selection Using Multicriteria Decision-Making Methods. Journal of Construction Engineering and Management, 138(06), 751–8.

Sarkar, D and Dutta, G (2010) Design and Application of Risk Adjusted Cumulative Sum for Strength Monitoring of Ready Mixed Concrete. Journal of Construction Engineering and Management, 136(06), 623–31.

Senouci, A B and Eldin, N N (2004) Use of Genetic Algorithms in Resource Scheduling of Construction Projects. Journal of Construction Engineering and Management, 130(06), 869–77.

Shahbazi, B, Akbarnezhad, A, Rey, D, Ahmadian Fard Fini, A and Loosemore, M (2019) Optimization of Job Allocation in Construction Organizations to Maximize Workers’ Career Development Opportunities. Journal of Construction Engineering and Management, 145(06).

Shaofeng, L, Jincai, F, Pinghua, Z and Xiang, L (2018) Stability Analysis of Two Parallel Closely Spaced Tunnels Based on Convergence–Confinement Principle. Journal of Construction Engineering and Management, 144(06).

Sharafi, A, Sadegh Amalnick, M and Allah Taleizadeh, A (2021) Outcome of Financial Conflicts in the Operation Phase of Public–Private Partnership Contracts. Journal of Construction Engineering and Management, 147(06).

Shen, K, Li, X, Cao, X and Zhang, Z (2022) Prefabricated Construction Process Optimization Based on Rework Risk. Journal of Construction Engineering and Management, 148(06).

Shen, L, Wu, Y and Zhang, X (2011) Key Assessment Indicators for the Sustainability of Infrastructure Projects. Journal of Construction Engineering and Management, 137(06), 441–51.

Shen, X, Marks, E, Pradhananga, N and Cheng, T (2016) Hazardous Proximity Zone Design for Heavy Construction Excavation Equipment. Journal of Construction Engineering and Management, 142(06).

Sherafat, B, Ahn, C R, Akhavian, R, Behzadan, A H, Golparvar-Fard, M, Kim, H, Lee, Y, Rashidi, A and Azar, E R (2020) Automated Methods for Activity Recognition of Construction Workers and Equipment: State-of-the-Art Review. Journal of Construction Engineering and Management, 146(06).

Sherratt, F, Welfare, K, Hallowell, M and Hoque Tania, M (2018) Legalized Recreational Marijuana: Safety, Ethical, and Legal Perceptions of the Workforce. Journal of Construction Engineering and Management, 144(06).

Shoieb, K, Serror, M H and Marzouk, M (2020) Web-Based Tool for Interoperability among Structural Analysis Applications. Journal of Construction Engineering and Management, 146(06).

Sing, C, Love, P E D and Tam, C M (2012) Stock-Flow Model for Forecasting Labor Supply. Journal of Construction Engineering and Management, 138(06), 707–15.

Siu, M F, Lu, M, AbouRizk, S and Tidder, V (2016) Quantitative Assessment of Budget Sufficiency and Resource Utilization for Resource-Constrained Project Schedules. Journal of Construction Engineering and Management, 142(06).

Solla, M, González-Jorge, H, Varela, M and Lorenzo, H (2013) Ground-Penetrating Radar for Inspection of In-Road Structures and Data Interpretation by Numerical Modeling. Journal of Construction Engineering and Management, 139(06), 749–53.

Son, J and Mattila, K G (2004) Binary Resource Leveling Model: Activity Splitting Allowed. Journal of Construction Engineering and Management, 130(06), 887–94.

Song, J, Fagerlund, W R, Haas, C T, Tatum, C B and Vanegas, J A (2005) Considering Prework on Industrial Projects. Journal of Construction Engineering and Management, 131(06), 723–33.

Sonmez, R and Rowings, J E (1998) Construction Labor Productivity Modeling with Neural Networks. Journal of Construction Engineering and Management, 124(06), 498–504.

Sturts, C S and (Bud) Griffis, F H (2005) Addressing Pricing: Value Bidding for Engineers and Consultants. Journal of Construction Engineering and Management, 131(06), 621–30.

Sugimoto, M and Asanprakit, A (2010) Stack Pipe Model for Pipe Jacking Method. Journal of Construction Engineering and Management, 136(06), 683–92.

Sui Pheng, L and Hongbin, J (2003) Internationalization of Chinese Construction Enterprises. Journal of Construction Engineering and Management, 129(06), 589–98.

Sullivan, J, Asmar, M E, Chalhoub, J and Obeid, H (2017) Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality. Journal of Construction Engineering and Management, 143(06).

Tam, C M, Tong, T K L and Wong, Y W (2004) Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method. Journal of Construction Engineering and Management, 130(06), 827–34.

Tamate, S, Suemasa, N and Katada, T (2005) Analyses of Instability in Mobile Cranes due to Ground Penetration by Outriggers. Journal of Construction Engineering and Management, 131(06), 689–704.

Tatari, O and Kucukvar, M (2012) Eco-Efficiency of Construction Materials: Data Envelopment Analysis. Journal of Construction Engineering and Management, 138(06), 733–41.

Taylor, T R B and Ford, D N (2008) Managing Tipping Point Dynamics in Complex Construction Projects. Journal of Construction Engineering and Management, 134(06), 421–31.

Teo, P and Love, P E D (2017) Re-Examining the Association between Quality and Safety Performance in Construction: From Heterogeneous to Homogeneous Datasets. Journal of Construction Engineering and Management, 143(06).

Thomas, H R, Horman, M J and de Souza, U E L (2004) Symbiotic Crew Relationships and Labor Flow. Journal of Construction Engineering and Management, 130(06), 908–17.

Tommelein, I D (2015) Journey toward Lean Construction: Pursuing a Paradigm Shift in the AEC Industry. Journal of Construction Engineering and Management, 141(06).

Tsao, C C Y, Tommelein, I D, Swanlund, E S and Howell, G A (2004) Work Structuring to Achieve Integrated Product–Process Design. Journal of Construction Engineering and Management, 130(06), 780–9.

Tserng, H P, Liao, H, Tsai, L K and Chen, P (2011) Predicting Construction Contractor Default with Option-Based Credit Models—Models’ Performance and Comparison with Financial Ratio Models. Journal of Construction Engineering and Management, 137(06), 412–20.

Uddin, W (2008) Airborne Laser Terrain Mapping for Expediting Highway Projects: Evaluation of Accuracy and Cost. Journal of Construction Engineering and Management, 134(06), 411–20.

Vashani, H, Sullivan, J and El Asmar, M (2016) DB 2020: Analyzing and Forecasting Design-Build Market Trends. Journal of Construction Engineering and Management, 142(06).

Vaux, J S and Kirk, W M (2018) Relationship Conflict in Construction Management: Performance and Productivity Problem. Journal of Construction Engineering and Management, 144(06).

Walsh, K D, Hershauer, J C, Tommelein, I D and Walsh, T A (2004) Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain. Journal of Construction Engineering and Management, 130(06), 818–26.

Walters, J P, Kaminsky, J and Huepe, C (2018) Factors Influencing Household Solar Adoption in Santiago, Chile. Journal of Construction Engineering and Management, 144(06).

Wang, C, Liu, M, Hsiang, S M and Leming, M L (2012) Causes and Penalties of Variation: Case Study of a Precast Concrete Slab Production Facility. Journal of Construction Engineering and Management, 138(06), 775–85.

Wang, D, Dai, F and Ning, X (2015) Risk Assessment of Work-Related Musculoskeletal Disorders in Construction: State-of-the-Art Review. Journal of Construction Engineering and Management, 141(06).

Wang, S, Ni, Z, Qu, T, Wang, H and Pan, Q (2022) A Novel Index to Evaluate the Workability of Conditioned Coarse-Grained Soil for EPB Shield Tunnelling. Journal of Construction Engineering and Management, 148(06).

Wang, W and Demsetz, L A (2000) Application Example for Evaluating Networks Considering Correlation. Journal of Construction Engineering and Management, 126(06), 467–74.

Wang, W and Demsetz, L A (2000) Model for Evaluating Networks under Correlated Uncertainty—NETCOR. Journal of Construction Engineering and Management, 126(06), 458–66.

Wang, X, Ye, K and Arditi, D (2021) Embodied Cost of Collusive Bidding: Evidence from China’s Construction Industry. Journal of Construction Engineering and Management, 147(06).

Ward, M, Poleacovschi, C, Faust, K and Svec, J (2021) Modeling Public Support for Utility Expansions in Displacement Situations. Journal of Construction Engineering and Management, 147(06).

Weidman, J, Dickerson, D E and Koebel, C T (2015) Intervention to Improve Purchasing Decision-Maker Perceptions of Ventilated Tools. Journal of Construction Engineering and Management, 141(06).

West, J (2014) Collaborative Patterns and Power Imbalance in Strategic Alliance Networks. Journal of Construction Engineering and Management, 140(06).

Whalen, T M, Gopal, S and Abraham, D M (2004) Cost-Benefit Model for the Construction of Tornado Shelters. Journal of Construction Engineering and Management, 130(06), 772–9.

Wong, P S P, On Cheung, S and Hardcastle, C (2007) Embodying Learning Effect in Performance Prediction. Journal of Construction Engineering and Management, 133(06), 474–82.

Wong, P S, Cheung, S O and Fan, K L (2009) Examining the Relationship between Organizational Learning Styles and Project Performance. Journal of Construction Engineering and Management, 135(06), 497–507.

Xia, B, Molenaar, K, Chan, A, Skitmore, M and Zuo, J (2013) Determining Optimal Proportion of Design in Design-Build Request for Proposals. Journal of Construction Engineering and Management, 139(06), 620–7.

Xie, H, AbouRizk, S and Zou, J (2012) Quantitative Method for Updating Cost Contingency throughout Project Execution. Journal of Construction Engineering and Management, 138(06), 759–66.

Xue, J, Shen, G Q, Li, Y, Han, S and Chu, X (2021) Dynamic Analysis on Public Concerns in Hong Kong-Zhuhai-Macao Bridge: Integrated Topic and Sentiment Modeling Approach. Journal of Construction Engineering and Management, 147(06).

Yang, Y, Pan, M and Pan, W (2022) Integrated Offsite Logistics Scheduling Approach for High-Rise Modular Building Projects. Journal of Construction Engineering and Management, 148(06).

Yao, M, Wang, F, Chen, Z and Ye, H (2020) Optimal Incentive Contract with Asymmetric Cost Information. Journal of Construction Engineering and Management, 146(06).

Yates, J K and Battersby, L C (2003) Master Builder Project Delivery System and Designer Construction Knowledge. Journal of Construction Engineering and Management, 129(06), 635–44.

Ye, S and Tiong, R L K (2003) Effects of Tariff Design in Risk Management of Privately Financed Infrastructure Projects. Journal of Construction Engineering and Management, 129(06), 610–8.

Yeh, H, Hsieh, T and Chen, J (2017) Managing Complex Engineering Interfaces of Urban Mass Rapid Transit Projects. Journal of Construction Engineering and Management, 143(06).

Yeung, J F Y, Chan, A P C, Chan, D W M, Chiang, Y H and Yang, H (2013) Developing a Benchmarking Model for Construction Projects in Hong Kong. Journal of Construction Engineering and Management, 139(06), 705–16.

Yi, K and Langford, D (2006) Scheduling-Based Risk Estimation and Safety Planning for Construction Projects. Journal of Construction Engineering and Management, 132(06), 626–35.

Yoon, S, Kang, K, Yoon, Y, Hastak, M and Ji, R (2018) Systematic Decision-Making Process for Composite Pavement Maintenance. Journal of Construction Engineering and Management, 144(06).

Yu, J and Leung, M (2018) Structural Stakeholder Model in Public Engagement for Construction Development Projects. Journal of Construction Engineering and Management, 144(06).

Yu, W, Wang, K and Wang, M (2013) Pricing Strategy for Best Value Tender. Journal of Construction Engineering and Management, 139(06), 675–84.

Yuan, C, McClure, T, Cai, H and Dunston, P S (2017) Life-Cycle Approach to Collecting, Managing, and Sharing Transportation Infrastructure Asset Data. Journal of Construction Engineering and Management, 143(06).

Zahoor, H, Chan, A P C, Utama, W P, Gao, R and Memon, S A (2017) Determinants of Safety Climate for Building Projects: SEM-Based Cross-Validation Study. Journal of Construction Engineering and Management, 143(06).

Zayed, T M (2005) Productivity and Cost Assessment for Continuous Flight Auger Piles. Journal of Construction Engineering and Management, 131(06), 677–88.

Zayed, T M and Halpin, D W (2005) Pile Construction Productivity Assessment. Journal of Construction Engineering and Management, 131(06), 705–14.

Zhan, W, Pan, W and Hao, G (2022) Productivity Measurement and Improvement for Public Construction Projects. Journal of Construction Engineering and Management, 148(06).

Zhang, M, Cao, Z, Yang, Z and Zhao, X (2020) Utilizing Computer Vision and Fuzzy Inference to Evaluate Level of Collision Safety for Workers and Equipment in a Dynamic Environment. Journal of Construction Engineering and Management, 146(06).

Zhang, Q, Chen, Z, Li, J and Liu, S (2021) Pressure-Cast-In-Situ Pile with Spray-Expanded Frustum: Construction Equipment and Process. Journal of Construction Engineering and Management, 147(06).

Zhang, S, Migliaccio, G C, Zandbergen, P A and Guindani, M (2014) Empirical Assessment of Geographically Based Surface Interpolation Methods for Adjusting Construction Cost Estimates by Project Location. Journal of Construction Engineering and Management, 140(06).

Zhang, S, Shang, C, Wang, C, Song, R and Wang, X (2019) Real-Time Safety Risk Identification Model during Metro Construction Adjacent to Buildings. Journal of Construction Engineering and Management, 145(06).

Zhang, S, Zhang, S, Gao, Y and Ding, X (2016) Contractual Governance: Effects of Risk Allocation on Contractors’ Cooperative Behavior in Construction Projects. Journal of Construction Engineering and Management, 142(06).

Zhang, X (2005) Criteria for Selecting the Private-Sector Partner in Public–Private Partnerships. Journal of Construction Engineering and Management, 131(06), 631–44.

Zhang, X (2005) Financial Viability Analysis and Capital Structure Optimization in Privatized Public Infrastructure Projects. Journal of Construction Engineering and Management, 131(06), 656–68.

Zhang, X (2009) Win–Win Concession Period Determination Methodology. Journal of Construction Engineering and Management, 135(06), 550–8.

Zhang, X and Tariq, S (2020) Failure Mechanisms in International Water PPP Projects: A Public Sector Perspective. Journal of Construction Engineering and Management, 146(06).

Zhang, X, Le, Y, Liu, Y and Liu, M (2021) Fostering Ambidextrous Innovation in Infrastructure Projects: Differentiation and Integration Tactics of Cross-Functional Teams. Journal of Construction Engineering and Management, 147(06).

Zhao, T and Fu, C C (2006) Infrastructure Development and Expansion under Uncertainty: A Risk-Preference-Based Lattice Approach. Journal of Construction Engineering and Management, 132(06), 620–5.

Zhao, T, Liu, W, Zhang, L and Zhou, W (2018) Retracted: Cluster Analysis of Risk Factors from Near-Miss and Accident Reports in Tunneling Excavation. Journal of Construction Engineering and Management, 144(06).

Zhao, Z Y, Lv, Q L, Zuo, J and Zillante, G (2010) Prediction System for Change Management in Construction Project. Journal of Construction Engineering and Management, 136(06), 659–69.

Zhao, Z, Tang, C, Zhang, X and Skitmore, M (2017) Agglomeration and Competitive Position of Contractors in the International Construction Sector. Journal of Construction Engineering and Management, 143(06).

Zhong, S and Elzarka, H (2022) A Hybrid Grey System Theory–Based Subcontractor Selection Model for High-Stakes Construction Projects. Journal of Construction Engineering and Management, 148(06).

Zouein, P P and Tommelein, I D (1999) Dynamic Layout Planning Using a Hybrid Incremental Solution Method. Journal of Construction Engineering and Management, 125(06), 400–8.