Abdel-Razek, R H (1998) Quality Improvement in Egypt: Methodology and Implementation. Journal of Construction Engineering and Management, 124(05), 354–60.

Abdelgawad, M and Fayek, A R (2012) Comprehensive Hybrid Framework for Risk Analysis in the Construction Industry Using Combined Failure Mode and Effect Analysis, Fault Trees, Event Trees, and Fuzzy Logic. Journal of Construction Engineering and Management, 138(05), 642–51.

Abdelhamid, T S and Everett, J G (2002) Physiological Demands during Construction Work. Journal of Construction Engineering and Management, 128(05), 427–37.

Abraham, D M, Wirahadikusumah, R, Short, T J and Shahbahrami, S (1998) Optimization Modeling for Sewer Network Management. Journal of Construction Engineering and Management, 124(05), 402–10.

Ahmadian Fard Fini, A, Akbarnezhad, A, Rashidi, T H and Waller, S T (2017) Job Assignment Based on Brain Demands and Human Resource Strategies. Journal of Construction Engineering and Management, 143(05).

Ahmadian Fard Fini, A, Rashidi, T H, Akbarnezhad, A and Travis Waller, S (2016) Incorporating Multiskilling and Learning in the Optimization of Crew Composition. Journal of Construction Engineering and Management, 142(05).

Ahmed, K, Leung, M and Ojo, L D (2022) An Exploratory Study to Identify Key Stressors of Ethnic Minority Workers in the Construction Industry. Journal of Construction Engineering and Management, 148(05).

Ahn, S, Lee, S and Steel, R P (2014) Construction Workers’ Perceptions and Attitudes toward Social Norms as Predictors of Their Absence Behavior. Journal of Construction Engineering and Management, 140(05).

Ahuja, V, Yang, J and Shankar, R (2010) Benchmarking Framework to Measure Extent of ICT Adoption for Building Project Management. Journal of Construction Engineering and Management, 136(05), 538–45.

Akpan, E O P and Igwe, O (2001) Methodology for Determining Price Variation in Project Execution. Journal of Construction Engineering and Management, 127(05), 367–73.

Al Haj, R A and El-Sayegh, S M (2015) Time–Cost Optimization Model Considering Float-Consumption Impact. Journal of Construction Engineering and Management, 141(05).

Al-Bataineh, M, AbouRizk, S and Parkis, H (2013) Using Simulation to Plan Tunnel Construction. Journal of Construction Engineering and Management, 139(05), 564–71.

Al-Ghassani, A M, Kamara, J M, Anumba, C J and Carrillo, P M (2006) Prototype System for Knowledge Problem Definition. Journal of Construction Engineering and Management, 132(05), 516–24.

Al-Hussein, M, Alkass, S and Moselhi, O (2005) Optimization Algorithm for Selection and on Site Location of Mobile Cranes. Journal of Construction Engineering and Management, 131(05), 579–90.

Alnuaimi, A S, Taha, R A, Al Mohsin, M and Al-Harthi, A S (2010) Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman. Journal of Construction Engineering and Management, 136(05), 615–22.

Ammar, M, Zayed, T and Moselhi, O (2013) Fuzzy-Based Life-Cycle Cost Model for Decision Making under Subjectivity. Journal of Construction Engineering and Management, 139(05), 556–63.

Anderson, S D, Patil, S S, Gibson, G E and Sullivan, G R (2004) Owner–Contractor Work Structures: Process Approach. Journal of Construction Engineering and Management, 130(05), 680–90.

Anderson, S, Shane, J S and Schexnayder, C (2011) Strategies for Planned Project Acceleration. Journal of Construction Engineering and Management, 137(05), 372–81.

Anh Tuan, B L, Tesfamariam, M G, Chen, Y, Hwang, C, Lin, K and Young, M (2014) Production of Lightweight Aggregate from Sewage Sludge and Reservoir Sediment for High-Flowing Concrete. Journal of Construction Engineering and Management, 140(05).

Anjaneyappa, V, Amarnath, M S and Srinivasamurthy, B R (2014) Compacting Characteristics of Light Compacting Equipment. Journal of Construction Engineering and Management, 140(05).

Anwer, S, Li, H, Antwi-Afari, M F, Umer, W and Wong, A Y L (2021) Evaluation of Physiological Metrics as Real-Time Measurement of Physical Fatigue in Construction Workers: State-of-the-Art Review. Journal of Construction Engineering and Management, 147(05).

Aquere, A L, Dinis-Carvalho, J and Lima, R M (2013) Project Cell: Cellular Organization of the Building Design Process. Journal of Construction Engineering and Management, 139(05), 538–46.

Arditi, D and Yasamis, F (1998) Incentive/Disincentive Contracts: Perceptions of Owners and Contractors. Journal of Construction Engineering and Management, 124(05), 361–73.

Arnold, P and Javernick-Will, A (2013) Projectwide Access: Key to Effective Implementation of Construction Project Management Software Systems. Journal of Construction Engineering and Management, 139(05), 510–8.

Assaad, R and El-adaway, I H (2021) Determining Critical Combinations of Safety Fatality Causes Using Spectral Clustering and Computational Data Mining Algorithms. Journal of Construction Engineering and Management, 147(05).

Assaad, R, El-Adaway, I H and Abotaleb, I S (2020) Predicting Project Performance in the Construction Industry. Journal of Construction Engineering and Management, 146(05).

Atasoy, G, Ertaymaz, U, Dikmen, I and Talat Birgonul, M (2022) Empowering Risk Communication: Use of Visualizations to Describe Project Risks. Journal of Construction Engineering and Management, 148(05).

Avetisyan, H G, Miller-Hooks, E and Melanta, S (2012) Decision Models to Support Greenhouse Gas Emissions Reduction from Transportation Construction Projects. Journal of Construction Engineering and Management, 138(05), 631–41.

Babaeian Jelodar, M, Yiu, T W and Wilkinson, S (2022) Empirical Modeling for Conflict Causes and Contractual Relationships in Construction Projects. Journal of Construction Engineering and Management, 148(05).

Bamana, F, Lehoux, N and Cloutier, C (2019) Simulation of a Construction Project: Assessing Impact of Just-in-Time and Lean Principles. Journal of Construction Engineering and Management, 145(05).

Baradan, S and Usmen, M A (2006) Comparative Injury and Fatality Risk Analysis of Building Trades. Journal of Construction Engineering and Management, 132(05), 533–9.

Bernold, L E (2005) Paradigm Shift in Construction Education is Vital for the Future of Our Profession. Journal of Construction Engineering and Management, 131(05), 533–9.

Bernold, L E (2002) Spatial Integration in Construction. Journal of Construction Engineering and Management, 128(05), 400–8.

Besklubova, S, Skibniewski, M J and Zhang, X (2021) Factors Affecting 3D Printing Technology Adaptation in Construction. Journal of Construction Engineering and Management, 147(05).

Bijleveld, F R, Miller, S R and Dorée, A G (2015) Making Operational Strategies of Asphalt Teams Explicit to Reduce Process Variability. Journal of Construction Engineering and Management, 141(05).

Bing, L and Tiong, R L K (1999) Risk Management Model for International Construction Joint Ventures. Journal of Construction Engineering and Management, 125(05), 377–84.

Bröchner, J and Olofsson, T (2012) Construction Productivity Measures for Innovation Projects. Journal of Construction Engineering and Management, 138(05), 670–7.

Burke, R D, Parrish, K and El Asmar, M (2018) Environmental Product Declarations: Use in the Architectural and Engineering Design Process to Support Sustainable Construction. Journal of Construction Engineering and Management, 144(05).

Cai, J, Li, S and Cai, H (2019) Empirical Analysis of Capital Structure Determinants in Infrastructure Projects under Public–Private Partnerships. Journal of Construction Engineering and Management, 145(05).

Canales, A R, Arbelaez, M, Vasquez, E, Aveiga, F, Strong, K, Walters, R, Jaselskis, E J and Jahren, C T (2009) Exploring Training Needs and Development of Construction Language Courses for American Supervisors and Hispanic Craft Workers. Journal of Construction Engineering and Management, 135(05), 387–96.

Castelblanco, G, Guevara, J, Mesa, H and Sanchez, A (2021) Semantic Network Analysis of Literature on Public-Private Partnerships. Journal of Construction Engineering and Management, 147(05).

Chan, A P C, Chiang, Y, Wong, F K, Liang, S and Abidoye, F A (2020) Work–Life Balance for Construction Manual Workers. Journal of Construction Engineering and Management, 146(05).

Chan, A P C, Lam, P T I, Chan, D W M, Cheung, E and Ke, Y (2010) Critical Success Factors for PPPs in Infrastructure Developments: Chinese Perspective. Journal of Construction Engineering and Management, 136(05), 484–94.

Chan, D W M, Chan, A P C, Lam, P T I and Wong, J M W (2010) Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction. Journal of Construction Engineering and Management, 136(05), 495–507.

Chan, E H, Suen, H C and Chan, C K (2006) MAUT-Based Dispute Resolution Selection Model Prototype for International Construction Projects. Journal of Construction Engineering and Management, 132(05), 444–51.

Chang, L M, Georgy, M E and AbdelRazig, Y A (2000) Warranting Quality of Steel Bridge Coating. Journal of Construction Engineering and Management, 126(05), 374–80.

Che Ibrahim, C K I, Costello, S B and Wilkinson, S (2015) A Fuzzy Approach to Developing Scales for Performance Levels of Alliance Team Integration Assessment. Journal of Construction Engineering and Management, 141(05).

Chen, L and Manley, K (2014) Validation of an Instrument to Measure Governance and Performance on Collaborative Infrastructure Projects. Journal of Construction Engineering and Management, 140(05).

Chen, X, Zhang, Y, Zhao, B and Yang, S (2021) Investment Probabilistic Interval Estimation for Construction Project Using the Hybrid Model of SVR and GWO. Journal of Construction Engineering and Management, 147(05).

Cheung, S O, Yiu, T W and Chan, H W (2010) Exploring the Potential for Predicting Project Dispute Resolution Satisfaction Using Logistic Regression. Journal of Construction Engineering and Management, 136(05), 508–17.

Cheung, S, Suen, H C H and Lam, T (2002) Fundamentals of Alternative Dispute Resolution Processes in Construction. Journal of Construction Engineering and Management, 128(05), 409–17.

Chevallier, N J and Russell, A D (2001) Developing a Draft Schedule Using Templates and Rules. Journal of Construction Engineering and Management, 127(05), 391–8.

Chinowsky, P S and Diekmann, J E (2004) Construction Engineering Management Educators: History and Deteriorating Community. Journal of Construction Engineering and Management, 130(05), 751–8.

Choe, S and Leite, F (2017) Assessing Safety Risk among Different Construction Trades: Quantitative Approach. Journal of Construction Engineering and Management, 143(05).

Choi, B and Lee, S (2017) Role of Social Norms and Social Identifications in Safety Behavior of Construction Workers. II: Group Analyses for the Effects of Cultural Backgrounds and Organizational Structures on Social Influence Process. Journal of Construction Engineering and Management, 143(05).

Choi, B, Ahn, S and Lee, S (2017) Role of Social Norms and Social Identifications in Safety Behavior of Construction Workers. I: Theoretical Model of Safety Behavior under Social Influence. Journal of Construction Engineering and Management, 143(05).

Christodoulou, S E, Ellinas, G and Michaelidou-Kamenou, A (2010) Minimum Moment Method for Resource Leveling Using Entropy Maximization. Journal of Construction Engineering and Management, 136(05), 518–27.

Chua, D K H and Li, D (2000) Key Factors in Bid Reasoning Model. Journal of Construction Engineering and Management, 126(05), 349–57.

Conley, M A and Gregory, R A (1999) Partnering on Small Construction Projects. Journal of Construction Engineering and Management, 125(05), 320–4.

Creedy, G D, Skitmore, M and Wong, J K W (2010) Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects. Journal of Construction Engineering and Management, 136(05), 528–37.

Dadi, G B, Goodrum, P M, Taylor, T R B and Carswell, C M (2014) Cognitive Workload Demands Using 2D and 3D Spatial Engineering Information Formats. Journal of Construction Engineering and Management, 140(05).

Dai, J, Goodrum, P M, Maloney, W F and Srinivasan, C (2009) Latent Structures of the Factors Affecting Construction Labor Productivity. Journal of Construction Engineering and Management, 135(05), 397–406.

Dao, B, Kermanshachi, S, Shane, J, Anderson, S and Hare, E (2017) Exploring and Assessing Project Complexity. Journal of Construction Engineering and Management, 143(05).

Delgado, L, Shealy, T, Garvin, M and Pearce, A (2018) Framing Energy Efficiency with Payback Period: Empirical Study to Increase Energy Consideration during Facility Procurement Processes. Journal of Construction Engineering and Management, 144(05).

Doloi, H (2018) Community-Centric Model for Evaluating Social Value in Projects. Journal of Construction Engineering and Management, 144(05).

Dunston, P S, Gambatese, J A and McManus, J F (2005) Assessing State Transportation Agency Constructability Implementation. Journal of Construction Engineering and Management, 131(05), 569–78.

Dunston, P S, Sinfield, J V and Lee, T (2007) Technology Development Decision Economics for Real-Time Rolling Resistance Monitoring of Haul Roads. Journal of Construction Engineering and Management, 133(05), 393–402.

El-Diraby, T E and Kashif, K F (2005) Distributed Ontology Architecture for Knowledge Management in Highway Construction. Journal of Construction Engineering and Management, 131(05), 591–603.

El-Diraby, T E and O'Connor, J T (2001) Model for Evaluating Bridge Construction Plans. Journal of Construction Engineering and Management, 127(05), 399–405.

El-Mashaleh, M, O’Brien, W J and Minchin, R E (2006) Firm Performance and Information Technology Utilization in the Construction Industry. Journal of Construction Engineering and Management, 132(05), 499–507.

El-Sabek, L M and McCabe, B Y (2018) Framework for Managing Integration Challenges of Last Planner System in IMPs. Journal of Construction Engineering and Management, 144(05).

Elinwa, A U and Joshua, M (2001) Time-Overrun Factors in Nigerian Construction Industry. Journal of Construction Engineering and Management, 127(05), 419–25.

Elyamany, A and Abdelrahman, M (2010) Contractor Performance Evaluation for the Best Value of Superpave Projects. Journal of Construction Engineering and Management, 136(05), 606–14.

Ercan, T (2019) New Three-Part Model of Innovation Activity in Construction Companies. Journal of Construction Engineering and Management, 145(05).

Everett, J G and Kelly, D L (1998) Drywall Joint Finishing: Productivity and Ergonomics. Journal of Construction Engineering and Management, 124(05), 347–53.

Faniran, O O, Love, P E D and Li, H (1999) Optimal Allocation of Construction Planning Resources. Journal of Construction Engineering and Management, 125(05), 311–9.

Farshchian, M M and Heravi, G (2018) Probabilistic Assessment of Cost, Time, and Revenue in a Portfolio of Projects Using Stochastic Agent-Based Simulation. Journal of Construction Engineering and Management, 144(05).

Firouzi, A and Khayyati, M (2020) Bayesian Updating of Copula-Based Probabilistic Project-Duration Model. Journal of Construction Engineering and Management, 146(05).

Firouzi, A and Vahdatmanesh, M (2019) Applicability of Financial Derivatives for Hedging Material Price Risk in Highway Construction. Journal of Construction Engineering and Management, 145(05).

Fitch, G J, Odeh, I and William Ibbs, C (2015) Economic Sustainability of DBO Water Based on Wastewater Projects in the U.S.: Three Case Studies. Journal of Construction Engineering and Management, 141(05).

Gao, N and Touran, A (2020) Cost Overruns and Formal Risk Assessment Program in US Rail Transit Projects. Journal of Construction Engineering and Management, 146(05).

Garcia, C, Huebschman, R, Abraham, D M and Bullock, D M (2006) Using GPS to Measure the Impact of Construction Activities on Rural Interstates. Journal of Construction Engineering and Management, 132(05), 508–15.

Georgy, M E, Chang, L and Zhang, L (2005) Prediction of Engineering Performance: A Neurofuzzy Approach. Journal of Construction Engineering and Management, 131(05), 548–57.

Georgy, M E, Chang, L and Zhang, L (2005) Utility-Function Model for Engineering Performance Assessment. Journal of Construction Engineering and Management, 131(05), 558–68.

Goh, C S, Abdul-Rahman, H and Abdul Samad, Z (2013) Applying Risk Management Workshop for a Public Construction Project: Case Study. Journal of Construction Engineering and Management, 139(05), 572–80.

Guo, S, Tang, B, Liang, K, Zhou, X and Li, J (2021) Comparative Analysis of the Patterns of Unsafe Behaviors in Accidents between Building Construction and Urban Railway Construction. Journal of Construction Engineering and Management, 147(05).

Hacker, M E, Kaminsky, J, Faust, K M and Rauch, S (2020) Regulatory Enforcement Approaches for Mass Population Displacement. Journal of Construction Engineering and Management, 146(05).

Hajjar, D and AbouRizk, S M (1998) Modeling and Analysis of Aggregate Production Operations. Journal of Construction Engineering and Management, 124(05), 390–401.

Hammad, A W A, Akbarnezhad, A, Rey, D and Waller, S T (2016) A Computational Method for Estimating Travel Frequencies in Site Layout Planning. Journal of Construction Engineering and Management, 142(05).

Hancher, D E (1998) INNOVATIONS IN HIGHWAY CONSTRUCTION: TWELFTH PEURIFOY LECTURE, 1997. Journal of Construction Engineering and Management, 124(05), 343–6.

Hanna, A S and Gunduz, M (2004) Impact of Change Orders on Small Labor-Intensive Projects. Journal of Construction Engineering and Management, 130(05), 726–33.

Hasanzadeh, S, de la Garza, J M and Geller, E S (2020) Latent Effect of Safety Interventions. Journal of Construction Engineering and Management, 146(05).

Hassanein, A and Moselhi, O (2004) Planning and Scheduling Highway Construction. Journal of Construction Engineering and Management, 130(05), 638–46.

Hegab, M and Smith, G R (2009) Labor Performance Analysis for Microtunneling Projects. Journal of Construction Engineering and Management, 135(05), 432–5.

Hegazy, T and Zhang, K (2005) Daily Windows Delay Analysis. Journal of Construction Engineering and Management, 131(05), 505–12.

Hegazy, T, Elbeltagi, E and Zhang, K (2005) Keeping Better Site Records Using Intelligent Bar Charts. Journal of Construction Engineering and Management, 131(05), 513–21.

Henry, E and Brothers, H S (2001) Cost Analysis between SABER and Design Bid Build Contracting Methods. Journal of Construction Engineering and Management, 127(05), 359–66.

Heravi, G and Jafari, A (2014) Cost of Quality Evaluation in Mass-Housing Projects in Developing Countries. Journal of Construction Engineering and Management, 140(05).

Herbsman, Z J and Glagola, C R (1998) Lane Rental—Innovative Way to Reduce Road Construction Time. Journal of Construction Engineering and Management, 124(05), 411–7.

Hinze, J and Olbina, S (2009) Empirical Analysis of the Learning Curve Principle in Prestressed Concrete Piles. Journal of Construction Engineering and Management, 135(05), 425–31.

Hinze, J and Wilson, G (2000) Moving toward a Zero Injury Objective. Journal of Construction Engineering and Management, 126(05), 399–403.

Holland, N and Hinze, J (2000) Daylight Savings Time Changes and Construction Accidents. Journal of Construction Engineering and Management, 126(05), 404–6.

Holt, G D and Edwards, D J (2013) Analysis of United Kingdom Off-Highway Construction Machinery Market and Its Consumers Using New-Sales Data. Journal of Construction Engineering and Management, 139(05), 529–37.

Hon, C K H, Chan, A P C and Yam, M C H (2013) Determining Safety Climate Factors in the Repair, Maintenance, Minor Alteration, and Addition Sector of Hong Kong. Journal of Construction Engineering and Management, 139(05), 519–28.

Horta, I M, Camanho, A S and Da Costa, J M (2010) Performance Assessment of Construction Companies Integrating Key Performance Indicators and Data Envelopment Analysis. Journal of Construction Engineering and Management, 136(05), 581–94.

Hosseinian, S M, Younesi, S, Razini, S and Carmichael, D G (2022) Intelligent Stochastic Agent-Based Model for Predicting Truck Production in Construction Sites by Considering Learning Effect. Journal of Construction Engineering and Management, 148(05).

Hu, D and Mohamed, Y (2014) Simulation-Model-Structuring Methodology for Industrial Construction Fabrication Shops. Journal of Construction Engineering and Management, 140(05).

Hu, Q, Bai, Y, He, L, Cai, Q, Tang, S, Ma, G, Tan, J and Liang, B (2020) Intelligent Framework for Worker-Machine Safety Assessment. Journal of Construction Engineering and Management, 146(05).

Hua, Y, He, J, Gong, J and Zhao, J (2020) Hazardous Area Risk-Based Evacuation Simulation and Analysis of Building Construction Sites. Journal of Construction Engineering and Management, 146(05).

Huang, Y and Pi, C (2014) Real-Option Valuation of Build-Operate-Transfer Infrastructure Projects under Performance Bonding. Journal of Construction Engineering and Management, 140(05).

Hummer, J E, Arocho, I and Rasdorf, W (2017) Approach to Assessing Tradeoffs between Construction Equipment Fleet Emissions and Cost. Journal of Construction Engineering and Management, 143(05).

Hussain, S, FangWei, Z and Ali, Z (2019) Examining Influence of Construction Projects’ Quality Factors on Client Satisfaction Using Partial Least Squares Structural Equation Modeling. Journal of Construction Engineering and Management, 145(05).

Hwang, S (2009) Dynamic Regression Models for Prediction of Construction Costs. Journal of Construction Engineering and Management, 135(05), 360–7.

Hyari, K and El-Rayes, K (2006) Lighting Requirements for Nighttime Highway Construction. Journal of Construction Engineering and Management, 132(05), 435–43.

Ilbeigi, M, Ashuri, B and Shayegh, S (2016) Price Adjustment Clauses and Submitted Bid Prices for Major Asphalt Line Items in Highway Projects. Journal of Construction Engineering and Management, 142(05).

Ioannou, P G and Yang, I (2016) Repetitive Scheduling Method: Requirements, Modeling, and Implementation. Journal of Construction Engineering and Management, 142(05).

Jablonowski, C J (2015) Quantitative Method to Model the Underreporting of Safety Incidents. Journal of Construction Engineering and Management, 141(05).

Jafarzadeh, R, Ingham, J M, Walsh, K Q, Hassani, N and Ghodrati Amiri, G R (2015) Using Statistical Regression Analysis to Establish Construction Cost Models for Seismic Retrofit of Confined Masonry Buildings. Journal of Construction Engineering and Management, 141(05).

Jahren, C T, Ellsworth, B J and Bergeson, K (1999) Constructability Test for Cold In-Place Asphalt Recycling. Journal of Construction Engineering and Management, 125(05), 325–9.

Jang, W and Skibniewski, M J (2009) Cost-Benefit Analysis of Embedded Sensor System for Construction Materials Tracking. Journal of Construction Engineering and Management, 135(05), 378–86.

Jannadi, O A and Almishari, S (2003) Risk Assessment in Construction. Journal of Construction Engineering and Management, 129(05), 492–500.

Javernick-Will, A N and Scott, W R (2010) Who Needs to Know What? Institutional Knowledge and Global Projects. Journal of Construction Engineering and Management, 136(05), 546–57.

Jeelani, I, Albert, A and Gambatese, J A (2017) Why Do Construction Hazards Remain Unrecognized at the Work Interface?. Journal of Construction Engineering and Management, 143(05).

Jeelani, I, Albert, A, Azevedo, R and Jaselskis, E J (2017) Development and Testing of a Personalized Hazard-Recognition Training Intervention. Journal of Construction Engineering and Management, 143(05).

Johari, S and Neeraj Jha, K (2021) Framework for Identifying Competencies of Construction Workers. Journal of Construction Engineering and Management, 147(05).

Johnson, H M, Singh, A and Young, R H F (1998) Fall Protection Analysis for Workers on Residential Roofs. Journal of Construction Engineering and Management, 124(05), 418–28.

Johnson, T R, Feng, P, Sitzabee, W and Jernigan, M (2013) Federal Acquisition Regulation Applied to Alliancing Contract Practices. Journal of Construction Engineering and Management, 139(05), 480–7.

Jonasson, S, Dunston, P S, Ahmed, K and Hamilton, J (2002) Factors in Productivity and Unit Cost for Advanced Machine Guidance. Journal of Construction Engineering and Management, 128(05), 367–74.

Jung, Y and Woo, S (2004) Flexible Work Breakdown Structure for Integrated Cost and Schedule Control. Journal of Construction Engineering and Management, 130(05), 616–25.

Kaminsky, J A (2022) Improving Public–Private Partnerships for Renewable Electricity Infrastructure in Lower- and Middle-Income Countries. Journal of Construction Engineering and Management, 148(05).

Kandil, A and El-Rayes, K (2006) Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects. Journal of Construction Engineering and Management, 132(05), 491–8.

Kang, L S and Paulson, B C (1998) Information Management to Integrate Cost and Schedule for Civil Engineering Projects. Journal of Construction Engineering and Management, 124(05), 381–9.

Kang, L S, Park, I C and Lee, B H (2001) Optimal Schedule Planning for Multiple, Repetitive Construction Process. Journal of Construction Engineering and Management, 127(05), 382–90.

Kapelko, M and Abbott, M (2017) Productivity Growth and Business Cycles: Case Study of the Spanish Construction Industry. Journal of Construction Engineering and Management, 143(05).

Karam, K S, Karam, J S and Einstein, H H (2007) Decision Analysis Applied to Tunnel Exploration Planning. I: Principles and Case Study. Journal of Construction Engineering and Management, 133(05), 344–53.

Karam, K S, Karam, J S and Einstein, H H (2007) Decision Analysis Applied to Tunnel Exploration Planning. II: Consideration of Uncertainty. Journal of Construction Engineering and Management, 133(05), 354–63.

Karatai, T R, Kaluli, J W, Kabubo, C and Thiong’o, G (2017) Soil Stabilization Using Rice Husk Ash and Natural Lime as an Alternative to Cutting and Filling in Road Construction. Journal of Construction Engineering and Management, 143(05).

Karim, A and Adeli, H (1999) CONSCOM: An OO Construction Scheduling and Change Management System. Journal of Construction Engineering and Management, 125(05), 368–76.

Karim, A and Adeli, H (1999) OO Information Model for Construction Project Management. Journal of Construction Engineering and Management, 125(05), 361–7.

Karumanasseri, G and AbouRizk, S (2002) Decision Support System for Scheduling Steel Fabrication Projects. Journal of Construction Engineering and Management, 128(05), 392–9.

Kasapoğlu, E (2011) Leadership Behaviors in Project Design Offices. Journal of Construction Engineering and Management, 137(05), 356–63.

Keast, R and Hampson, K (2007) Building Constructive Innovation Networks: Role of Relationship Management. Journal of Construction Engineering and Management, 133(05), 364–73.

Keskin, B, Salman, B and Koseoglu, O (2022) Architecting a BIM-Based Digital Twin Platform for Airport Asset Management: A Model-Based System Engineering with SysML Approach. Journal of Construction Engineering and Management, 148(05).

Khamooshi, H and Cioffi, D F (2013) Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling. Journal of Construction Engineering and Management, 139(05), 488–97.

Kim, J and Philips, P (2012) Determinants of Quits and Dismissals on a Long-Lasting Unionized Industrial Construction Project. Journal of Construction Engineering and Management, 138(05), 661–9.

Kim, J, Greene, M and Kim, S (2014) Cost Comparative Analysis of a New Green Building Code for Residential Project Development. Journal of Construction Engineering and Management, 140(05).

Kim, K and de la Garza, J M (2005) Evaluation of the Resource-Constrained Critical Path Method Algorithms. Journal of Construction Engineering and Management, 131(05), 522–32.

Kim, K and de la Garza, J M (2003) Phantom Float. Journal of Construction Engineering and Management, 129(05), 507–17.

Kim, T W and Fischer, M (2014) Automated Generation of User Activity–Space Pairs in Space-Use Analysis. Journal of Construction Engineering and Management, 140(05).

Kishore, V, Abraham, D M and Sinfield, J V (2011) Portfolio Cash Assessment Using Fuzzy Systems Theory. Journal of Construction Engineering and Management, 137(05), 333–43.

Klotz, L and Horman, M (2010) Counterfactual Analysis of Sustainable Project Delivery Processes. Journal of Construction Engineering and Management, 136(05), 595–605.

Koehn, E & and Datta, N K (2003) Quality, Environmental, and Health and Safety Management Systems for Construction Engineering. Journal of Construction Engineering and Management, 129(05), 562–9.

Krechowicz, M (2020) Comprehensive Risk Management in Horizontal Directional Drilling Projects. Journal of Construction Engineering and Management, 146(05).

Kululanga, G K, Price, A D F and McCaffer, R (2002) Empirical Investigation of Construction Contractors' Organizational Learning. Journal of Construction Engineering and Management, 128(05), 385–91.

  • Type: Journal Article
  • Keywords: Contractors; Construction industry; Learning; Quantitative analysis; construction industry; contracts; learning systems; civil engineering;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2002)128:5(385)
  • Abstract:
    Conceptual frameworks dominate organizational learning literature with limited empirical assessments. This raises several questions about the validity and applicability of the various conceptual frameworks for how managers can build organizational learning capabilities. As such, lessons from the conceptual frameworks of organizational learning for addressing performance improvement that might have been used by construction contractors have been limited. This paper presents a quantitative analysis of organizational learning by construction contractors. The principles that underlie organizational learning and the factors that promote double-loop learning as a strategy for improving construction contractors’ business processes are presented. The paper has also established the learning orientations and focus of the surveyed construction contractors to determine their organizational learning dimensions as well as the factors that induced their double-loop learning, as rich lessons for organizations in the construction industry.

Lam, E W, Chan, A P and Chan, D W (2008) Determinants of Successful Design-Build Projects. Journal of Construction Engineering and Management, 134(05), 333–41.

Lan, A and Galy, B (2017) Evaluation of a Horizontal Lifeline System Used during Installation of Residential Roofs. Journal of Construction Engineering and Management, 143(05).

Lee, E, Lee, H and Harvey, J T (2006) Fast-Track Urban Freeway Rehabilitation with 55-H Weekend Closures: I-710 Long Beach Case Study. Journal of Construction Engineering and Management, 132(05), 465–72.

Lee, H and Yi, K J (1999) Application of Mathematical Matrix to Integrate Project Schedule and Cost. Journal of Construction Engineering and Management, 125(05), 339–46.

Lee, J, Park, M, Lee, H and Hyun, H (2019) Classification of Modular Building Construction Projects Based on Schedule-Driven Approach. Journal of Construction Engineering and Management, 145(05).

Lee, S, Peña-Mora, F and Park, M (2006) Reliability and Stability Buffering Approach: Focusing on the Issues of Errors and Changes in Concurrent Design and Construction Projects. Journal of Construction Engineering and Management, 132(05), 452–64.

Lestari, R I, Guo, B H W and Goh, Y M (2019) Causes, Solutions, and Adoption Barriers of Falls from Roofs in the Singapore Construction Industry. Journal of Construction Engineering and Management, 145(05).

Leung, M, Liang, Q and Chan, I Y S (2017) Development of a Stressors–Stress–Performance–Outcome Model for Expatriate Construction Professionals. Journal of Construction Engineering and Management, 143(05).

Lewis, P, Rasdorf, W, Frey, H C, Pang, S and Kim, K (2009) Requirements and Incentives for Reducing Construction Vehicle Emissions and Comparison of Nonroad Diesel Engine Emissions Data Sources. Journal of Construction Engineering and Management, 135(05), 341–51.

Li, H, Cao, J and Love, P E D (1999) Using Machine Learning and GA to Solve Time-Cost Trade-Off Problems. Journal of Construction Engineering and Management, 125(05), 347–53.

Li, K Y K and Chan, A T (2004) Management of Radon in Tunnel Drilling. Journal of Construction Engineering and Management, 130(05), 699–707.

Li, M, Chen, J, Xu, A, Xia, X and Wang, J (2014) Case Study of Innovative Top-Down Construction Method with Channel-Type Excavation. Journal of Construction Engineering and Management, 140(05).

Liang, Q, Leung, M and Cooper, C (2018) Focus Group Study to Explore Critical Factors for Managing Stress of Construction Workers. Journal of Construction Engineering and Management, 144(05).

Lim, J N, Schultmann, F and Ofori, G (2010) Tailoring Competitive Advantages Derived from Innovation to the Needs of Construction Firms. Journal of Construction Engineering and Management, 136(05), 568–80.

Lin, S (2015) An Analysis for Construction Engineering Networks. Journal of Construction Engineering and Management, 141(05).

Lines, B C and Ravi Kumar, G G (2018) Developing More Competitive Proposals: Relationship between Contractor Qualifications-Based Proposal Content and Owner Evaluation Scores. Journal of Construction Engineering and Management, 144(05).

Ling, Y Y (2002) Model for Predicting Performance of Architects and Engineers. Journal of Construction Engineering and Management, 128(05), 446–55.

Lingard, H, Pirzadeh, P and Oswald, D (2019) Talking Safety: Health and Safety Communication and Safety Climate in Subcontracted Construction Workgroups. Journal of Construction Engineering and Management, 145(05).

Liu, C, AbouRizk, S, Morley, D and Lei, Z (2020) Data-Driven Simulation-Based Analytics for Heavy Equipment Life-Cycle Cost. Journal of Construction Engineering and Management, 146(05).

Liu, C, Ji, W, AbouRizk, S M and Siu, M F (2019) Equipment Logistics Performance Measurement Using Data-Driven Social Network Analysis. Journal of Construction Engineering and Management, 145(05).

Liu, J and Lu, M (2020) Synchronized Optimization of Various Management-Function Schedules in a Multiproject Environment: Case Study of Planning Steel Girder Fabrication Projects in Bridge Construction. Journal of Construction Engineering and Management, 146(05).

Lopez, R and Love, P E D (2012) Design Error Costs in Construction Projects. Journal of Construction Engineering and Management, 138(05), 585–93.

Lopez, R, Chong, H, Wang, X and Graham, J (2016) Technical Review: Analysis and Appraisal of Four-Dimensional Building Information Modeling Usability in Construction and Engineering Projects. Journal of Construction Engineering and Management, 142(05).

Love, P E D, Niedzweicki, M, Bullen, P A and Edwards, D J (2012) Achieving the Green Building Council of Australia’s World Leadership Rating in an Office Building in Perth. Journal of Construction Engineering and Management, 138(05), 652–60.

Lu, M (2002) Enhancing Project Evaluation and Review Technique Simulation through Artificial Neural Network-based Input Modeling. Journal of Construction Engineering and Management, 128(05), 438–45.

Lu, M (2003) Simplified Discrete-Event Simulation Approach for Construction Simulation. Journal of Construction Engineering and Management, 129(05), 537–46.

Lu, M, Anson, M, Tang, S L and Ying, Y C (2003) {[}HKCONSIM{]}: A Practical Simulation Solution to Planning Concrete Plant Operations in Hong Kong. Journal of Construction Engineering and Management, 129(05), 547–54.

Lu, W, Xu, J and Söderlund, J (2020) Exploring the Effects of Building Information Modeling on Projects: Longitudinal Social Network Analysis. Journal of Construction Engineering and Management, 146(05).

Lucko, G and Peña Orozco, A A (2009) Float Types in Linear Schedule Analysis with Singularity Functions. Journal of Construction Engineering and Management, 135(05), 368–77.

Lucko, G, Araújo, L G and Cates, G R (2016) Slip Chart–Inspired Project Schedule Diagramming: Origins, Buffers, and Extension to Linear Schedules. Journal of Construction Engineering and Management, 142(05).

Lueke, J S and Ariaratnam, S T (2005) Surface Heave Mechanisms in Horizontal Directional Drilling. Journal of Construction Engineering and Management, 131(05), 540–7.

Luna, R and Wu, Y (2000) Simulation of Temperature and Stress Fields during RCC Dam Construction. Journal of Construction Engineering and Management, 126(05), 381–8.

Lv, J, Lin, M, Zhou, W and Xu, M (2021) How PPP Renegotiation Behaviors Evolve with Traffic Changes: Evolutionary Game Approach. Journal of Construction Engineering and Management, 147(05).

Mahpour, A and Mortaheb, M M (2018) Financial-Based Incentive Plan to Reduce Construction Waste. Journal of Construction Engineering and Management, 144(05).

Mao, X and Zhang, X (2008) Construction Process Reengineering by Integrating Lean Principles and Computer Simulation Techniques. Journal of Construction Engineering and Management, 134(05), 371–81.

Mao, X, Zhang, X and AbouRizk, S M (2009) Enhancing Value Engineering Process by Incorporating Inventive Problem-Solving Techniques. Journal of Construction Engineering and Management, 135(05), 416–24.

Marinelli, M and Lambropoulos, S (2013) Algorithmic Method for Scraper Load-Time Optimization. Journal of Construction Engineering and Management, 139(05), 459–65.

Martínez-Rocamora, A, García-Alvarado, R, Casanova-Medina, E, González-Böhme, L F and Auat-Cheein, F (2020) Parametric Programming of 3D Printed Curved Walls for Cost-Efficient Building Design. Journal of Construction Engineering and Management, 146(05).

Mattila, K G and Bowman, M R (2004) Accuracy of Highway Contractor’s Schedules. Journal of Construction Engineering and Management, 130(05), 647–55.

Mawdesley, M J, Al-jibouri, S H and Yang, H (2002) Genetic Algorithms for Construction Site Layout in Project Planning. Journal of Construction Engineering and Management, 128(05), 418–26.

Melanta, S, Miller-Hooks, E and Avetisyan, H G (2013) Carbon Footprint Estimation Tool for Transportation Construction Projects. Journal of Construction Engineering and Management, 139(05), 547–55.

Minchin, R E, Lewis, D W and McLeod, L (2011) Improving Productivity on a Troubled Bridge Project. Journal of Construction Engineering and Management, 137(05), 364–71.

Mitropoulos, P and Cupido, G (2009) Safety as an Emergent Property: Investigation into the Work Practices of High-Reliability Framing Crews. Journal of Construction Engineering and Management, 135(05), 407–15.

Mitropoulos, P and Memarian, B (2013) Task Demands in Masonry Work: Sources, Performance Implications, and Management Strategies. Journal of Construction Engineering and Management, 139(05), 581–90.

Mitropoulos, P and Tatum, C B (2000) Forces Driving Adoption of New Information Technologies. Journal of Construction Engineering and Management, 126(05), 340–8.

Mitropoulos, P and Tatum, C B (1999) Technology Adoption Decisions in Construction Organizations. Journal of Construction Engineering and Management, 125(05), 330–8.

Mohamed, S (2002) Safety Climate in Construction Site Environments. Journal of Construction Engineering and Management, 128(05), 375–84.

Moodi, F and Knapton, J (2003) Research into a Management System for Diagnosis, Maintenance, and Repair of Concrete Structures. Journal of Construction Engineering and Management, 129(05), 555–61.

Moon, S and Munira Chowdhury, A (2021) Utilization of Prior Information in Neural Network Training for Improving 28-Day Concrete Strength Prediction. Journal of Construction Engineering and Management, 147(05).

Moon, S, Zekavat, P R and Bernold, L E (2017) Dynamic Quality Control of Process Resource to Improve Concrete Supply Chain. Journal of Construction Engineering and Management, 143(05).

Mousaei, A, Taghaddos, H, Nekouvaght Tak, A, Behzadipour, S and Hermann, U (2021) Optimized Mobile Crane Path Planning in Discretized Polar Space. Journal of Construction Engineering and Management, 147(05).

Moynihan, G, Zhou, H and Cui, Q (2009) Stochastic Modeling for Pavement Warranty Cost Estimation. Journal of Construction Engineering and Management, 135(05), 352–9.

Mrazovic, N and Fischer, M (2022) Assessment Framework for Additive Manufacturing in the AEC Industry. Journal of Construction Engineering and Management, 148(05).

Nagashima, M, Tsuchiya, M and Asada, M (2011) Reducing the Economic Risk of LNG Tank Construction under Conditions of Fluctuating Resource Prices. Journal of Construction Engineering and Management, 137(05), 382–91.

Nasir, D, McCabe, B and Hartono, L (2003) Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model. Journal of Construction Engineering and Management, 129(05), 518–27.

Nasirian, A, Abbasi, B, Cheng, T C E and Arashpour, M (2022) Multiskilled Workforce Planning: A Case from the Construction Industry. Journal of Construction Engineering and Management, 148(05).

Navon, R (2020) The Last Lecture: The Need for Civil Engineering Education to Stimulate Thinking Instead of Only Teaching. Journal of Construction Engineering and Management, 146(05).

Navon, R, Shapira, A and Shechori, Y (2000) Automated Rebar Constructability Diagnosis. Journal of Construction Engineering and Management, 126(05), 389–97.

Nguyen, D A, Garvin, M J and Gonzalez, E E (2018) Risk Allocation in U.S. Public-Private Partnership Highway Project Contracts. Journal of Construction Engineering and Management, 144(05).

Nguyen, P H D, Tran, D and Lines, B C (2020) Fuzzy Set Theory Approach to Classify Highway Project Characteristics for Delivery Selection. Journal of Construction Engineering and Management, 146(05).

Nickdoost, N, Choi, J, AbdelRazig, Y and Sobanjo, J (2022) A Project Life-Cycle Approach to Managing Procrastination in Construction Projects: State-of-the-Art Review. Journal of Construction Engineering and Management, 148(05).

Niu, Y, Anumba, C and Lu, W (2019) Taxonomy and Deployment Framework for Emerging Pervasive Technologies in Construction Projects. Journal of Construction Engineering and Management, 145(05).

O'Brien, W J and Fischer, M A (2000) Importance of Capacity Constraints to Construction Cost and Schedule. Journal of Construction Engineering and Management, 126(05), 366–73.

Ogunlana, S O, Li, H and Sukhera, F A (2003) System Dynamics Approach to Exploring Performance Enhancement in a Construction Organization. Journal of Construction Engineering and Management, 129(05), 528–36.

Okonkwo, P N and Wium, J (2020) Health and Safety Management Systems within Construction Contractor Organizations: Case Study of South Africa. Journal of Construction Engineering and Management, 146(05).

Ozorhon, B, Arditi, D, Dikmen, I and Birgonul, M T (2008) Implications of Culture in the Performance of International Construction Joint Ventures. Journal of Construction Engineering and Management, 134(05), 361–70.

Palaneeswaran, E and Kumaraswamy, M M (2000) Contractor Selection for Design/Build Projects. Journal of Construction Engineering and Management, 126(05), 331–9.

Pan, M and Pan, W (2020) Understanding the Determinants of Construction Robot Adoption: Perspective of Building Contractors. Journal of Construction Engineering and Management, 146(05).

Park, H, Han, S H, Rojas, E M, Son, J and Jung, W (2011) Social Network Analysis of Collaborative Ventures for Overseas Construction Projects. Journal of Construction Engineering and Management, 137(05), 344–55.

Park, M and Peña-Mora, F (2004) Reliability Buffering for Construction Projects. Journal of Construction Engineering and Management, 130(05), 626–37.

Poon, C S, Yu, A T W, Wong, A and Yip, R (2013) Quantifying the Impact of Construction Waste Charging Scheme on Construction Waste Management in Hong Kong. Journal of Construction Engineering and Management, 139(05), 466–79.

Pradhananga, P, ElZomor, M and Santi Kasabdji, G (2021) Identifying the Challenges to Adopting Robotics in the US Construction Industry. Journal of Construction Engineering and Management, 147(05).

Prego, F J, Solla, M, Núñez-Nieto, X and Arias, P (2016) Assessing the Applicability of Ground-Penetrating Radar to Quality Control in Tunneling Construction. Journal of Construction Engineering and Management, 142(05).

Puddicombe, M S (2012) Novelty and Technical Complexity: Critical Constructs in Capital Projects. Journal of Construction Engineering and Management, 138(05), 613–20.

Rajan, T A, Gopinath, G and Behera, M (2014) PPPs and Project Overruns: Evidence from Road Projects in India. Journal of Construction Engineering and Management, 140(05).

Raoufi, M and Fayek, A R (2020) Fuzzy Monte Carlo Agent-Based Simulation of Construction Crew Performance. Journal of Construction Engineering and Management, 146(05).

Rezgui, Y and Miles, J (2010) Exploring the Potential of SME Alliances in the Construction Sector. Journal of Construction Engineering and Management, 136(05), 558–67.

Rocha, C G d, Anzanello, M J and Gerchman, M (2018) Method to Assess the Match between Clients’ Input and Decoupling Points in Customized Building Projects. Journal of Construction Engineering and Management, 144(05).

Rodríguez-Garzón, I, Lucas-Ruiz, V, Martínez-Fiestas, M and Delgado-Padial, A (2015) Association between Perceived Risk and Training in the Construction Industry. Journal of Construction Engineering and Management, 141(05).

Roofigari-Esfahan, N and Razavi, S (2017) Uncertainty-Aware Linear Schedule Optimization: A Space-Time Constraint-Satisfaction Approach. Journal of Construction Engineering and Management, 143(05).

Sacks, R and Goldin, M (2007) Lean Management Model for Construction of High-Rise Apartment Buildings. Journal of Construction Engineering and Management, 133(05), 374–84.

Sacks, R, Navon, R, Brodetskaia, I and Shapira, A (2005) Feasibility of Automated Monitoring of Lifting Equipment in Support of Project Control. Journal of Construction Engineering and Management, 131(05), 604–14.

Saleem, M, Al-Kutti, W A, Al-Akhras, N M and Haider, H (2016) Nondestructive Testing Procedure to Evaluate the Load-Carrying Capacity of Concrete Anchors. Journal of Construction Engineering and Management, 142(05).

Saleem, M, Elshami, M M and Najjar, M (2017) Development, Testing, and Implementation Strategy of a Translucent Concrete-Based Smart Lane Separator for Increased Traffic Safety. Journal of Construction Engineering and Management, 143(05).

Salehipour, A, Naeni, L M, Khanbabaei, R and Javaheri, A (2016) Lessons Learned from Applying the Individuals Control Charts to Monitoring Autocorrelated Project Performance Data. Journal of Construction Engineering and Management, 142(05).

Salhab, D, Møller, D E, Lindhard, S M, Hamzeh, F, Randrup, M and Pilgaard, A (2022) Accounting for Variability: Identifying Critical Activities as a Supplement to the Critical Path. Journal of Construction Engineering and Management, 148(05).

Salman, A, Moselhi, O and Zayed, T (2013) Scheduling Model for Rehabilitation of Distribution Networks Using MINLP. Journal of Construction Engineering and Management, 139(05), 498–509.

Schexnayder, C (2000) John F. Stevens—A Great Civil Engineer. Journal of Construction Engineering and Management, 126(05), 325–30.

Schuldt, S and El-Rayes, K (2018) Optimizing the Planning of Remote Construction Sites to Minimize Facility Destruction from Explosive Attacks. Journal of Construction Engineering and Management, 144(05).

Scott, S and Harris, R A (2004) United Kingdom Construction Claims: Views of Professionals. Journal of Construction Engineering and Management, 130(05), 734–41.

Senghore, O, Hastak, M, Abdelhamid, T S, AbuHammad, A and Syal, M G (2004) Production Process for Manufactured Housing. Journal of Construction Engineering and Management, 130(05), 708–18.

Seo, S and Hwang, Y (2001) . Journal of Construction Engineering and Management, 127(05), 414–8.

Shahtaheri, M, Nasir, H and Haas, C T (2015) Setting Baseline Rates for On-Site Work Categories in the Construction Industry. Journal of Construction Engineering and Management, 141(05).

Shan, Y, Imran, H, Lewis, P and Zhai, D (2017) Investigating the Latent Factors of Quality of Work-Life Affecting Construction Craft Worker Job Satisfaction. Journal of Construction Engineering and Management, 143(05).

Shapira, A, Rosenfeld, Y and Mizrahi, I (2008) Vision System for Tower Cranes. Journal of Construction Engineering and Management, 134(05), 320–32.

Shen, L Y, Bao, H J, Wu, Y Z and Lu, W S (2007) Using Bargaining-Game Theory for Negotiating Concession Period for BOT-Type Contract. Journal of Construction Engineering and Management, 133(05), 385–92.

Shen, Q and Liu, G (2003) Critical Success Factors for Value Management Studies in Construction. Journal of Construction Engineering and Management, 129(05), 485–91.

Shi, J J (1999) Activity-Based Construction (ABC) Modeling and Simulation Method. Journal of Construction Engineering and Management, 125(05), 354–60.

Shohet, I M and Frydman, S (2003) Communication Patterns in Construction at Construction Manager Level. Journal of Construction Engineering and Management, 129(05), 570–7.

Sierra, L A, Pellicer, E and Yepes, V (2016) Social Sustainability in the Lifecycle of Chilean Public Infrastructure. Journal of Construction Engineering and Management, 142(05).

Skitmore, M and Ng, S T (2002) Analytical and Approximate Variance of Total Project Cost. Journal of Construction Engineering and Management, 128(05), 456–60.

Soibelman, L, Liu, L Y, Kirby, J G, East, E W, Caldas, C H and Lin, K (2003) Design Review Checking System with Corporate Lessons Learned. Journal of Construction Engineering and Management, 129(05), 475–84.

Solheim-Kile, E and Wald, A (2019) Extending the Transactional View on Public–Private Partnership Projects: Role of Relational and Motivational Aspects in Goal Alignment. Journal of Construction Engineering and Management, 145(05).

Song, M H and Fischer, M (2020) Generating a Daily Bill of Materials at Level of Development 400 Using the Smallest Workface Boundary. Journal of Construction Engineering and Management, 146(05).

Song, M H, Fischer, M and Theis, P (2017) Field Study on the Connection between BIM and Daily Work Orders. Journal of Construction Engineering and Management, 143(05).

Sousa, V, Almeida, N M, Dias, L A and Branco, F A (2014) Risk-Informed Time-Cost Relationship Models for Sanitation Projects. Journal of Construction Engineering and Management, 140(05).

Sparkling, A E and Dogra, P (2021) Supervisors’ Reliance on Tacit Knowledge and Barriers to Knowledge Sharing in the Electrical Contracting Industry. Journal of Construction Engineering and Management, 147(05).

Sunindijo, R Y and Zou, P X W (2012) Political Skill for Developing Construction Safety Climate. Journal of Construction Engineering and Management, 138(05), 605–12.

Teizer, J, Venugopal, M, Teizer, W and Felkl, J (2012) Nanotechnology and Its Impact on Construction: Bridging the Gap between Researchers and Industry Professionals. Journal of Construction Engineering and Management, 138(05), 594–604.

Tembo-Silungwe, C K and Khatleli, N (2018) Identification of Enablers and Constraints of Risk Allocation Using Structuration Theory in the Construction Industry. Journal of Construction Engineering and Management, 144(05).

Thomas, H R and Sanvido, V E (2000) Role of the Fabricator in Labor Productivity. Journal of Construction Engineering and Management, 126(05), 358–65.

Thomas, H R and Završki, I (1999) Construction Baseline Productivity: Theory and Practice. Journal of Construction Engineering and Management, 125(05), 295–303.

Thorpe, T and Mead, S (2001) Project-Specific Web Sites: Friend or Foe?. Journal of Construction Engineering and Management, 127(05), 406–13.

Toh, Y Z, Goh, Y M and Guo, B H W (2017) Knowledge, Attitude, and Practice of Design for Safety: Multiple Stakeholders in the Singapore Construction Industry. Journal of Construction Engineering and Management, 143(05).

Tomczak, M and JaÅ›kowski, P (2020) New Approach to Improve General Contractor Crew’s Work Continuity in Repetitive Construction Projects. Journal of Construction Engineering and Management, 146(05).

Tommelein, I D, Riley, D R and Howell, G A (1999) Parade Game: Impact of Work Flow Variability on Trade Performance. Journal of Construction Engineering and Management, 125(05), 304–10.

Touran, A, Atgun, M and Bhurisith, I (2004) Analysis of the United States Department of Transportation Prompt Pay Provisions. Journal of Construction Engineering and Management, 130(05), 719–25.

Trigunarsyah, B (2004) Constructability Practices among Construction Contractors in Indonesia. Journal of Construction Engineering and Management, 130(05), 656–69.

Tserng, H P, Liao, H, Jaselskis, E J, Tsai, L K and Chen, P (2012) Predicting Construction Contractor Default with Barrier Option Model. Journal of Construction Engineering and Management, 138(05), 621–30.

Uma Maheswari, J, Varghese, K and Sridharan, T (2006) Application of Dependency Structure Matrix for Activity Sequencing in Concurrent Engineering Projects. Journal of Construction Engineering and Management, 132(05), 482–90.

Uwakweh, B O (2006) Motivational Climate of Construction Apprentice. Journal of Construction Engineering and Management, 132(05), 525–32.

Wang, Y, Zhu, S and Wong, A S T (2014) Cooling Time Estimation of Newly Placed Hot-Mix Asphalt Pavement in Different Weather Conditions. Journal of Construction Engineering and Management, 140(05).

Whang, S, Flanagan, R, Kim, S and Kim, S (2017) Contractor-Led Critical Design Management Factors in High-Rise Building Projects Involving Multinational Design Teams. Journal of Construction Engineering and Management, 143(05).

Winch, G M and North, S (2006) Critical Space Analysis. Journal of Construction Engineering and Management, 132(05), 473–81.

Wondimu, P A, Klakegg, O J, Lohne, J and Lædre, O (2020) Experiences with Best-Value Procurement in Norway and the Netherlands. Journal of Construction Engineering and Management, 146(05).

Wong, C H (2004) Contractor Performance Prediction Model for the United Kingdom Construction Contractor: Study of Logistic Regression Approach. Journal of Construction Engineering and Management, 130(05), 691–8.

Wong, F K, Chiang, Y, Abidoye, F A and Liang, S (2019) Interrelation between Human Factor–Related Accidents and Work Patterns in Construction Industry. Journal of Construction Engineering and Management, 145(05).

Xie, W, Zhao, T, Wang, H and Tang, J (2017) Construction Techniques Used to Automatically Pass Standard Box Girders through Special Passenger-Line Tunnels. Journal of Construction Engineering and Management, 143(05).

Xiong, W and Zhang, X (2014) Concession Renegotiation Models for Projects Developed through Public-Private Partnerships. Journal of Construction Engineering and Management, 140(05).

Xu, J and Song, X (2014) Suggestions for Temporary Construction Facilities’ Layout Problems in Large-Scale Construction Projects. Journal of Construction Engineering and Management, 140(05).

Yamín, R A and Harmelink, D J (2001) Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM). Journal of Construction Engineering and Management, 127(05), 374–81.

Yang, I (2008) Distribution-Free Monte Carlo Simulation: Premise and Refinement. Journal of Construction Engineering and Management, 134(05), 352–60.

Yang, L and Shi, J J (2010) Experimental Study on the Impact of Rainfall on RCC Construction. Journal of Construction Engineering and Management, 136(05), 477–83.

Yap, J B H, Abdul-Rahman, H and Wang, C (2018) Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach. Journal of Construction Engineering and Management, 144(05).

Yazdani, M, Abdi, M R, Kumar, N, Keshavarz-Ghorabaee, M and Chan, F T S (2019) Improved Decision Model for Evaluating Risks in Construction Projects. Journal of Construction Engineering and Management, 145(05).

Yeh, I (1998) Quantity Estimating of Building with Logarithm-Neuron Networks. Journal of Construction Engineering and Management, 124(05), 374–80.

Yiu, T W and Law, Y M (2011) Moderating Effect of Equity Sensitivity on Behavior-Outcome Relationships in Construction Dispute Negotiation. Journal of Construction Engineering and Management, 137(05), 322–32.

Yousefi, S, Hegazy, T, Capuruço, R A and Attalla, M (2008) System of Multiple ANNs for Online Planning of Numerous Building Improvements. Journal of Construction Engineering and Management, 134(05), 342–51.

Yu, T, Liang, X and Wang, Y (2020) Factors Affecting the Utilization of Big Data in Construction Projects. Journal of Construction Engineering and Management, 146(05).

Yu, Y, Yang, X, Li, H, Luo, X, Guo, H and Fang, Q (2019) Joint-Level Vision-Based Ergonomic Assessment Tool for Construction Workers. Journal of Construction Engineering and Management, 145(05).

Yuan, Z, Fang, Y, Hong, J, Zhang, Q, Zhang, Z and Ni, G (2022) Coupling Relationship between Capabilities and Benefits of Lean Construction for Precast Buildings from a Multivariable Moderation Perspective. Journal of Construction Engineering and Management, 148(05).

Zaalouk, A and Han, S (2021) Parameterized Design Optimization Framework for Worker-Friendly Workplaces in Modular Construction. Journal of Construction Engineering and Management, 147(05).

Zarghami, S A (2022) Forecasting Project Duration in the Face of Disruptive Events: A Resource-Based Approach. Journal of Construction Engineering and Management, 148(05).

Zhang, C, Zayed, T and Hammad, A (2008) Resource Management of Bridge Deck Rehabilitation: Jacques Cartier Bridge Case Study. Journal of Construction Engineering and Management, 134(05), 311–9.

Zhang, L, Wu, X and Liu, H (2016) Strategies to Reduce Ground Settlement from Shallow Tunnel Excavation: A Case Study in China. Journal of Construction Engineering and Management, 142(05).

Zhang, M, Cheng, W and Wang, Y (2018) Multiple-Fault Classification for Hot-Mix Asphalt Production by Machine Learning. Journal of Construction Engineering and Management, 144(05).

Zhang, N and Tiong, R (2003) Integrated Electronic Commerce Model for the Construction Industry. Journal of Construction Engineering and Management, 129(05), 578–85.

Zhang, P, Lingard, H, Blismas, N, Wakefield, R and Kleiner, B (2015) Work-Health and Safety-Risk Perceptions of Construction-Industry Stakeholders Using Photograph-Based Q Methodology. Journal of Construction Engineering and Management, 141(05).

Zhang, X (2004) Improving Concessionaire Selection Protocols in Public/Private Partnered Infrastructure Projects. Journal of Construction Engineering and Management, 130(05), 670–9.

Zhang, X Q and Kumaraswamy, M M (2001) Procurement Protocols for Public-Private Partnered Projects. Journal of Construction Engineering and Management, 127(05), 351–8.

Zhang, X, Li, Y and Wu, D (2020) Developing an Underground Utility Occupation Index for Efficient Urban Utilities Planning. Journal of Construction Engineering and Management, 146(05).

Zhao, Z, Guo, X and Chang, R (2019) Market Concentration and Competitive Intensity of the International Engineering Contracting Industry. Journal of Construction Engineering and Management, 145(05).

Zhong, D H and Zhang, J S (2003) New Method for Calculating Path Float in Program Evaluation and Review Technique (PERT). Journal of Construction Engineering and Management, 129(05), 501–6.

Zhong, D, Li, J, Zhu, H and Song, L (2004) Geographic Information System-Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes. Journal of Construction Engineering and Management, 130(05), 742–50.