Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 485 results ...
Çoker, G B (1985) Information System for Building Products. Journal of Construction Engineering and Management, 111(04), 411–25.
Abd El Halim, A E H O and Haas, R (2004) Process and Case Illustration of Construction Innovation. Journal of Construction Engineering and Management, 130(04), 570–5.
Abdelgawad, M and Fayek, A R (2011) Fuzzy Reliability Analyzer: Quantitative Assessment of Risk Events in the Construction Industry Using Fuzzy Fault-Tree Analysis. Journal of Construction Engineering and Management, 137(04), 294–302.
AbouRizk, S M and Halpin, D W (1990) Probabilistic Simulation Studies for Repetitive Construction Processes. Journal of Construction Engineering and Management, 116(04), 575–94.
AbouRizk, S M, Halpin, D W and Wilson, J R (1991) Visual Interactive Fitting of Beta Distributions. Journal of Construction Engineering and Management, 117(04), 589–605.
Abudayyeh, O Y and Rasdof, W J (1991) Design of Construction Industry Information Management Systems. Journal of Construction Engineering and Management, 117(04), 698–715.
Adeli, H and Karim, A (1997) Scheduling/Cost Optimization and Neural Dynamics Model for Construction. Journal of Construction Engineering and Management, 123(04), 450–8.
Ahmad, I (1990) Decision‐Support System for Modeling Bid/No‐Bid Decision Problem. Journal of Construction Engineering and Management, 116(04), 595–608.
Ahmed, S M, Sang, L P and Torbica, & M (2003) Use of Quality Function Deployment in Civil Engineering Capital Project Planning. Journal of Construction Engineering and Management, 129(04), 358–68.
Ahn, C R and Lee, S (2013) Importance of Operational Efficiency to Achieve Energy Efficiency and Exhaust Emission Reduction of Construction Operations. Journal of Construction Engineering and Management, 139(04), 404–13.
Ahuja, H N and Nandakumar, V (1985) Simulation Model to Forecast Project Completion Time. Journal of Construction Engineering and Management, 111(04), 325–42.
Akinci, B, Fischer, M and Kunz, J (2002) Automated Generation of Work Spaces Required by Construction Activities. Journal of Construction Engineering and Management, 128(04), 306–15.
Akinci, B, Fischer, M, Kunz, J and Levitt, R (2002) Representing Work Spaces Generically in Construction Method Models. Journal of Construction Engineering and Management, 128(04), 296–305.
Al Sarraj, Z M (1990) Formal Development of Line‐of‐Balance Technique. Journal of Construction Engineering and Management, 116(04), 689–704.
Al‐Harbi, K M, Johnston, D W and Fayadh, H (1994) Building Construction Detailed Estimating Practices in Saudi Arabia. Journal of Construction Engineering and Management, 120(04), 774–84.
Al‐Jarallah, M I (1983) Construction Industry in Saudi Arabia. Journal of Construction Engineering and Management, 109(04), 355–68.
Alavipour, S M R and Arditi, D (2018) Optimizing Financing Cost in Construction Projects with Fixed Project Duration. Journal of Construction Engineering and Management, 144(04).
Aleithawe, I, Sinno, R R and McAnally, W H (2012) Right-of-Way Acquisition Duration Prediction Model for Highway Construction Projects. Journal of Construction Engineering and Management, 138(04), 540–4.
Alhozaimy, A M and Al-Negheimish, A I (1999) Introducing and Managing Quality Scheme for RMC Industry in Saudi Arabia. Journal of Construction Engineering and Management, 125(04), 249–55.
Alhumaidi, H M (2015) Construction Contractors Ranking Method Using Multiple Decision-Makers and Multiattribute Fuzzy Weighted Average. Journal of Construction Engineering and Management, 141(04).
Allouche, E N, Ariaratnam, S T and MacLeod, C W (2003) Software for Planning and Cost Control in Directional Drilling Projects. Journal of Construction Engineering and Management, 129(04), 446–53.
Altayeb, S (1992) Efficacy of Drug Testing Programs Implemented by Contractors. Journal of Construction Engineering and Management, 118(04), 780–90.
Ansell, M, Holmes, M, Evans, R, Pasquire, C and Price, A (2009) Delivering Best Value in Highways Major Maintenance Schemes: Case Study. Journal of Construction Engineering and Management, 135(04), 235–45.
Anson, M and Siu, M F (2020) Augmented Balance Point Diagrams for Matching Site and Concrete-Supply Resources. Journal of Construction Engineering and Management, 146(04).
Antillon, E I, Molenaar, K R and Javernick-Will, A (2017) Evaluating the Effect of Contract Timing on Lifecycle-Design Innovation in Public–Private Partnerships: Comparative Case Study of Highway Projects. Journal of Construction Engineering and Management, 143(04).
Arditi, D and Pattanakitchamroon, T (2008) Analysis Methods in Time-Based Claims. Journal of Construction Engineering and Management, 134(04), 242–52.
Arditi, D, Kale, S and Tangkar, M (1997) Innovation in Construction Equipment and Its Flow into the Construction Industry. Journal of Construction Engineering and Management, 123(04), 371–8.
Arriagada D., R E and Alarcón C., L F (2014) Knowledge Management and Maturation Model in Construction Companies. Journal of Construction Engineering and Management, 140(04).
Arriagada D., R E and Alarcón C., L F (2014) Modelo de Gestión y Maduración de Conocimiento en Empresas Constructoras. Journal of Construction Engineering and Management, 140(04).
Arshad, M F, Thaheem, M J, Nasir, A R and Malik, M S A (2019) Contractual Risks of Building Information Modeling: Toward a Standardized Legal Framework for Design-Bid-Build Projects. Journal of Construction Engineering and Management, 145(04).
Ashuri, B, Kashani, H, Molenaar, K R, Lee, S and Lu, J (2012) Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options. Journal of Construction Engineering and Management, 138(04), 545–57.
Atalah, A (2008) Effect of Rock Trenching Vibrations on Nearby Structures. Journal of Construction Engineering and Management, 134(04), 234–41.
Atkin, B L and Gill, E M (1986) CAD and Management of Construction Projects. Journal of Construction Engineering and Management, 112(04), 557–65.
Attalla, M and Hegazy, T (2003) Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus Regression. Journal of Construction Engineering and Management, 129(04), 405–11.
Ayhan, M, Dikmen, I and Talat Birgonul, M (2021) Predicting the Occurrence of Construction Disputes Using Machine Learning Techniques. Journal of Construction Engineering and Management, 147(04).
Ayyub, B M and Haldar, A (1985) Decisions in Construction Operations. Journal of Construction Engineering and Management, 111(04), 343–57.
Back, W E and Bell, L C (1995) Quantifying Process Benefits of Electronic Data Management Technologies. Journal of Construction Engineering and Management, 121(04), 415–21.
Baek, M and Ashuri, B (2019) Analysis of the Variability of Submitted Unit Price Bids for Asphalt Line Items in Highway Projects. Journal of Construction Engineering and Management, 145(04).
Bai, Y (2007) Intelligent Painting Process Planner for Robotic Bridge Painting. Journal of Construction Engineering and Management, 133(04), 335–42.
Bai, Y, Burkett, W R and Nash, P T (2006) Lessons Learned from an Emergency Bridge Replacement Project. Journal of Construction Engineering and Management, 132(04), 338–44.
Barras, G C and Mayo, R E (1995) Minidirectional Drilling for Installation of Underground Electrical Conduit. Journal of Construction Engineering and Management, 121(04), 364–9.
Barraza, G A (2011) Probabilistic Estimation and Allocation of Project Time Contingency. Journal of Construction Engineering and Management, 137(04), 259–65.
Barry, W, Leite, F and O’Brien, W J (2015) Late Deliverable Risk Catalog: Evaluating the Impacts and Risks of Late Deliverables to Construction Sites. Journal of Construction Engineering and Management, 141(04).
Battikha, M G (2008) Reasoning Mechanism for Construction Nonconformance Root-Cause Analysis. Journal of Construction Engineering and Management, 134(04), 280–8.
Beheiry, S M, Chong, W K and Haas, C T (2006) Examining the Business Impact of Owner Commitment to Sustainability. Journal of Construction Engineering and Management, 132(04), 384–92.
Beliveau, Y J, Williams, J M, King, M G and Niles, A R (1995) Real-Time Position Measurement Integrated with CAD: Technologies and Their Protocols. Journal of Construction Engineering and Management, 121(04), 346–54.
Bernold, L E (1990) Testing Bar‐Code Technology in Construction Environment. Journal of Construction Engineering and Management, 116(04), 643–55.
Bernold, L E and Treseler, J F (1991) Vendor Analysis for Best Buy in Construction. Journal of Construction Engineering and Management, 117(04), 645–58.
Bertero, R D (2014) Great 2010 American Earthquakes: Lessons for Seismic Design and Construction. Journal of Construction Engineering and Management, 140(04).
Bertero, R D (2014) Los Grandes Terremotos Americanos del Año 2010: Enseñanzas para el Diseño y la Construcción Sísmica. Journal of Construction Engineering and Management, 140(04).
Bhandari, S, Hallowell, M R, Alruqi, W and Salas, R (2021) Modeling the Relationship between Personal Risk Tolerance, Work-Related Risk Tolerance, and Risk-Taking Behavior of Construction Workers. Journal of Construction Engineering and Management, 147(04).
Bhurisith, I and Touran, A (2002) Case Study of Obsolescence and Equipment Productivity. Journal of Construction Engineering and Management, 128(04), 357–61.
Bing, L, Tiong, R L, Fan, W W and Chew, D A (1999) Risk Management in International Construction Joint Ventures. Journal of Construction Engineering and Management, 125(04), 277–84.
Birgonul, M T, Dikmen, I and Bektas, S (2015) Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices. Journal of Construction Engineering and Management, 141(04).
Bofang, Z and Jianbo, C (1989) Finite Element Analysis of Effect of Pipe Cooling in Concrete Dams. Journal of Construction Engineering and Management, 115(04), 487–98.
Bowen, P, Edwards, P and Lingard, H (2013) Workplace Stress Experienced by Construction Professionals in South Africa. Journal of Construction Engineering and Management, 139(04), 393–403.
Bresnen, M J, Bryman, A E, Ford, J R, Keil, E T, Beardsworth, A D, Jepson, M A and Wray, K (1984) Effective Construction Site Management: A Review. Journal of Construction Engineering and Management, 110(04), 420–36.
Bubbers, G and Christian, J (1992) Hypertext and Claim Analysis. Journal of Construction Engineering and Management, 118(04), 716–30.
Bubshait, A A and Cunningham, M J (1998) Comparison of Delay Analysis Methodologies. Journal of Construction Engineering and Management, 124(04), 315–22.
Candaş, A B and Tokdemir, O B (2022) Automated Identification of Vagueness in the FIDIC Silver Book Conditions of Contract. Journal of Construction Engineering and Management, 148(04).
Cao, M, Cheng, M and Wu, Y (2015) Hybrid Computational Model for Forecasting Taiwan Construction Cost Index. Journal of Construction Engineering and Management, 141(04).
Carr, R I (1989) Cost‐Estimating Principles. Journal of Construction Engineering and Management, 115(04), 545–51.
Cavalcante, C A V, Alencar, M H and Lopes, R S (2017) Multicriteria Model to Support Maintenance Planning in Residential Complexes under Warranty. Journal of Construction Engineering and Management, 143(04).
Chan, A T S and Chan, E H W (2005) Impact of Perceived Leadership Styles on Work Outcomes: Case of Building Professionals. Journal of Construction Engineering and Management, 131(04), 413–22.
Chan, E H W and Chan, A T S (1999) Imposing ISO 9000 Quality Assurance System on Statutory Agents in Hong Kong. Journal of Construction Engineering and Management, 125(04), 285–91.
Chan, E H W and Tse, R Y C (2003) Cultural Considerations in International Construction Contracts. Journal of Construction Engineering and Management, 129(04), 375–81.
Chan, W and Lu, M (2008) Materials Handling System Simulation in Precast Viaduct Construction: Modeling, Analysis, and Implementation. Journal of Construction Engineering and Management, 134(04), 300–10.
Chang, A S and Tsai, Y (2003) Engineering Information Classification System. Journal of Construction Engineering and Management, 129(04), 454–60.
Chang, C, Hanna, A S, Lackney, J A and Sullivan, K T (2007) Quantifying the Impact of Schedule Compression on Labor Productivity for Mechanical and Sheet Metal Contractor. Journal of Construction Engineering and Management, 133(04), 287–96.
Chang, L (1986) Inferential Statistics for Craftsman Questionnaire. Journal of Construction Engineering and Management, 112(04), 492–9.
Chang, L and Borcherding, J D (1986) Craftsman Questionnaire Sampling. Journal of Construction Engineering and Management, 112(04), 543–56.
Chang, L and Borcherding, J D (1985) Evaluation of Craftsman Questionnaire. Journal of Construction Engineering and Management, 111(04), 426–37.
Chao, L and Liaw, S (2019) Fuzzy Logic Model for Determining Minimum Overheads-Cum-Markup Rate. Journal of Construction Engineering and Management, 145(04).
Chao, L and Skibniewski, M J (1998) Fuzzy Logic for Evaluating Alternative Construction Technology. Journal of Construction Engineering and Management, 124(04), 297–304.
Chau, K W, Anson, M and Zhang, J P (2004) Four-Dimensional Visualization of Construction Scheduling and Site Utilization. Journal of Construction Engineering and Management, 130(04), 598–606.
Chen, Q and Jin, R (2012) Safety4Site Commitment to Enhance Jobsite Safety Management and Performance. Journal of Construction Engineering and Management, 138(04), 509–19.
Chen, Z, Li, H and Wong, C T C (2000) Environmental Management of Urban Construction Projects in China. Journal of Construction Engineering and Management, 126(04), 320–4.
Cheng, E W L and Li, H (2005) Analytic Network Process Applied to Project Selection. Journal of Construction Engineering and Management, 131(04), 459–66.
Cheng, M and Ko, C (2003) Object-Oriented Evolutionary Fuzzy Neural Inference System for Construction Management. Journal of Construction Engineering and Management, 129(04), 461–9.
Cheng, M and Yang, S (2001) GIS-Based Cost Estimates Integrating with Material Layout Planning. Journal of Construction Engineering and Management, 127(04), 291–9.
Cheng, M Y and O'Connor, J T (1996) ArcSite: Enhanced GIS for Construction Site Layout. Journal of Construction Engineering and Management, 122(04), 329–36.
Chew, M Y L and De Silva, N (2004) Factorial Method for Performance Assessment of Building Facades. Journal of Construction Engineering and Management, 130(04), 525–33.
Chih, Y, Kiazad, K, Li, M, Capezio, A, Zhou, L and Restubog, S L D (2017) Broken Promises: Implications for the Job Insecurity and Job Performance of Chinese Construction Workers. Journal of Construction Engineering and Management, 143(04).
Chinowsky, P S, Diekmann, J and O’Brien, J (2010) Project Organizations as Social Networks. Journal of Construction Engineering and Management, 136(04), 452–8.
Chong, D, Wang, Y, Zhao, K, Wang, D and Oeser, M (2018) Asphalt Fume Exposures by Pavement Construction Workers: Current Status and Project Cases. Journal of Construction Engineering and Management, 144(04).
Christian, J and Mir, S U (1987) Use of Integrated Microcomputer Package for Formwork Design. Journal of Construction Engineering and Management, 113(04), 603–10.
Chrzanowski, E N and Johnston, D W (1986) Application of Linear Scheduling. Journal of Construction Engineering and Management, 112(04), 476–91.
Chua, D K H and Goh, Y M (2004) Incident Causation Model for Improving Feedback of Safety Knowledge. Journal of Construction Engineering and Management, 130(04), 542–51.
Chua, D K H and Yeoh, K W (2011) PDM++: Planning Framework from a Construction Requirements Perspective. Journal of Construction Engineering and Management, 137(04), 266–74.
CoÅŸkunoÄŸlu, O (1984) Optimal Probabilistic Compression of PERT Networks. Journal of Construction Engineering and Management, 110(04), 437–46.
Cole, L J R (1991) Construction Scheduling: Principles, Practices, and Six Case Studies. Journal of Construction Engineering and Management, 117(04), 579–88.
Crowley, L G (2000) Friedman and Gates—Another Look. Journal of Construction Engineering and Management, 126(04), 306–12.
De La Garza, J M and Melin, J W (1986) Prepayment Ability to Offset Inflation. Journal of Construction Engineering and Management, 112(04), 514–29.
De La Garza, J M and Mitropoulos, P (1991) . Journal of Construction Engineering and Management, 117(04), 736–55.
De La Garza, J M, Vorster, M C and Parvin, C M (1991) Total Float Traded as Commodity. Journal of Construction Engineering and Management, 117(04), 716–27.
de Neufville, R and King, D (1991) Risk and Need‐for‐Work Premiums in Contractor Bidding. Journal of Construction Engineering and Management, 117(04), 659–73.
de Neufville, R and Smith, J T (1994) Improving Contractors' Bids Using Preference Reversal Phenomenon. Journal of Construction Engineering and Management, 120(04), 706–19.
Del Solar, P, Del Río, M, Villoria, P and Nadal, A (2016) Analysis of Recurrent Defects in the Execution of Ceramic-Coatings Cladding in Building Construction. Journal of Construction Engineering and Management, 142(04).
Delgado-Hernandez, D J, Cruz-Cruz, C C and Vences-García, P Y (2017) Improvement Management Tools in the Construction Industry: Case Study of Mexico. Journal of Construction Engineering and Management, 143(04).
Deng, Y, Gan, V J L, Das, M, Cheng, J C P and Anumba, C (2019) Integrating 4D BIM and GIS for Construction Supply Chain Management. Journal of Construction Engineering and Management, 145(04).
Dharmapalan, V, Gambatese, J A, Fradella, J and Moghaddam Vahed, A (2015) Quantification and Assessment of Safety Risk in the Design of Multistory Buildings. Journal of Construction Engineering and Management, 141(04).
Dias, A and Ioannou, P G (1995) Debt Capacity and Optimal Capital Structure for Privately Financed Infrastructure Projects. Journal of Construction Engineering and Management, 121(04), 404–14.
Diekmann, J E and Girard, M J (1995) Are Contract Disputes Predictable?. Journal of Construction Engineering and Management, 121(04), 355–63.
Diekmann, J E and Kruppenbacher, T A (1984) Claims Analysis and Computer Reasoning. Journal of Construction Engineering and Management, 110(04), 391–408.
Dikmen, I, Birgonul, M T and Budayan, C (2009) Strategic Group Analysis in the Construction Industry. Journal of Construction Engineering and Management, 135(04), 288–97.
Dossick, C S and Neff, G (2010) Organizational Divisions in BIM-Enabled Commercial Construction. Journal of Construction Engineering and Management, 136(04), 459–67.
Dowding, C H (1994) Ground Motions and Air‐Blast Effects of Explosive Demolition of Structures. Journal of Construction Engineering and Management, 120(04), 838–56.
Drew, D S and Skitmore, M (2006) Testing Vickery’s Revenue Equivalence Theory in Construction Auctions. Journal of Construction Engineering and Management, 132(04), 425–8.
Drexler, J A and Larson, E W (2000) Partnering: Why Project Owner-Contractor Relationships Change. Journal of Construction Engineering and Management, 126(04), 293–7.
Du, J, El-Gafy, M and Zhao, D (2016) Optimization of Change Order Management Process with Object-Oriented Discrete Event Simulation: Case Study. Journal of Construction Engineering and Management, 142(04).
Dulaimi, M F and Langford, D (1999) Job Behavior of Construction Project Managers: Determinants and Assessment. Journal of Construction Engineering and Management, 125(04), 256–64.
Dunston, P S, Savage, B M and Mannering, F L (2000) Weekend Closure for Construction of Asphalt Overlay on Urban Highway. Journal of Construction Engineering and Management, 126(04), 313–9.
Durdyev, S, Ismail, S and Kandymov, N (2018) Structural Equation Model of the Factors Affecting Construction Labor Productivity. Journal of Construction Engineering and Management, 144(04).
Dyer, B, Goodrum, P M and Viele, K (2012) Effects of Omitted Variable Bias on Construction Real Output and Its Implications on Productivity Trends in the United States. Journal of Construction Engineering and Management, 138(04), 558–66.
Easa, S M (1988) Earthwork Allocations with Linear Unit Costs. Journal of Construction Engineering and Management, 114(04), 641–55.
Easa, S M and Can, E K (1985) Stochastic Priority Model for Aggregate Blending. Journal of Construction Engineering and Management, 111(04), 358–73.
Ekström, M A and Björnsson, H C (2005) Valuing Flexibility in Architecture, Engineering, and Construction Information Technology Investments. Journal of Construction Engineering and Management, 131(04), 431–8.
El-Anwar, O and Aziz, T A (2014) Integrated Urban-Construction Planning Framework for Slum Upgrading Projects. Journal of Construction Engineering and Management, 140(04).
El-Anwar, O and Aziz, T A (2014) Un Marco Integrado de Planificación Urbana y Construcción para Proyectos de Mejoramiento de Barrios Vulnerables. Journal of Construction Engineering and Management, 140(04).
El-Rayes, K (2001) Optimum Planning of Highway Construction under A + B Bidding Method. Journal of Construction Engineering and Management, 127(04), 261–9.
El-Rayes, K and Hyari, K (2005) {[}CONLIGHT:{]} Lighting Design Model for Nighttime Highway Construction. Journal of Construction Engineering and Management, 131(04), 467–76.
El-Rayes, K and Kandil, A (2005) Time-Cost-Quality Trade-Off Analysis for Highway Construction. Journal of Construction Engineering and Management, 131(04), 477–86.
El-Razek, M E A (1999) New Method for Construction of Diaphragm Walls. Journal of Construction Engineering and Management, 125(04), 233–41.
Elazouni, A M and Metwally, F G (2005) Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms. Journal of Construction Engineering and Management, 131(04), 400–12.
Elbeltagi, E, Hegazy, T and Eldosouky, A (2004) Dynamic Layout of Construction Temporary Facilities Considering Safety. Journal of Construction Engineering and Management, 130(04), 534–41.
Eldin, N N (1988) Constructability improvement of Project Designs. Journal of Construction Engineering and Management, 114(04), 631–40.
Elinwa, A U and Buba, S A (1993) Construction Cost Factors in Nigeria. Journal of Construction Engineering and Management, 119(04), 698–713.
Elsayegh, A and El-adaway, I H (2021) Holistic Study and Analysis of Factors Affecting Collaborative Planning in Construction. Journal of Construction Engineering and Management, 147(04).
Elzarka, H M and Bell, L C (1995) Object-Oriented Methodology for Materials-Management Systems. Journal of Construction Engineering and Management, 121(04), 438–45.
Fang, Y and Cho, Y K (2017) Effectiveness Analysis from a Cognitive Perspective for a Real-Time Safety Assistance System for Mobile Crane Lifting Operations. Journal of Construction Engineering and Management, 143(04).
Faniran, O O, Oluwoye, J O and Lenard, D J (1998) Interactions between Construction Planning and Influence Factors. Journal of Construction Engineering and Management, 124(04), 245–56.
Farid, F and Boyer, L T (1985) Fair and Reasonable Markup (FaRM) Pricing Model. Journal of Construction Engineering and Management, 111(04), 374–90.
Fernandez-Solis, J L, Porwal, V, Lavy, S, Shafaat, A, Rybkowski, Z K, Son, K and Lagoo, N (2013) Survey of Motivations, Benefits, and Implementation Challenges of Last Planner System Users. Journal of Construction Engineering and Management, 139(04), 354–60.
Ferrada, X and Serpell, A (2014) Selección de los Métodos de Construcción en Proyectos: Un Problema de Conocimiento. Journal of Construction Engineering and Management, 140(04).
Ferrada, X and Serpell, A (2014) Selection of Construction Methods for Construction Projects: A Knowledge Problem. Journal of Construction Engineering and Management, 140(04).
Fischer, M A and Aalami, F (1996) Scheduling with Computer-Interpretable Construction Method Models. Journal of Construction Engineering and Management, 122(04), 337–47.
Forcada, N, Macarulla, M and Love, P E D (2013) Assessment of Residential Defects at Post-Handover. Journal of Construction Engineering and Management, 139(04), 372–8.
Formoso, C T, Soibelman, L, De Cesare, C and Isatto, E L (2002) Material Waste in Building Industry: Main Causes and Prevention. Journal of Construction Engineering and Management, 128(04), 316–25.
Fortunato, B R, Hallowell, M R, Behm, M and Dewlaney, K (2012) Identification of Safety Risks for High-Performance Sustainable Construction Projects. Journal of Construction Engineering and Management, 138(04), 499–508.
Franco-Duran, D M and de la Garza, J M (2020) Performance of Resource-Constrained Scheduling Heuristics. Journal of Construction Engineering and Management, 146(04).
Fu, W K, Drew, D S and Lo, H P (2003) Competitiveness of Inexperienced and Experienced Contractors in Bidding. Journal of Construction Engineering and Management, 129(04), 388–95.
Gallardo, C A S, Granja, A D and Picchi, F A (2014) Mejorias en la Productividad de un Proceso de Prefabricados de Concreto con Flujo en Linea Despues de un Esfuerzo de Estabilidad Basica. Journal of Construction Engineering and Management, 140(04).
Gallardo, C A S, Granja, A D and Picchi, F A (2014) Productivity Gains in a Line Flow Precast Concrete Process after a Basic Stability Effort. Journal of Construction Engineering and Management, 140(04).
Gao, R, Chan, A P C, Utama, W P and Zahoor, H (2017) Workers’ Perceptions of Safety Climate in International Construction Projects: Effects of Nationality, Religious Belief, and Employment Mode. Journal of Construction Engineering and Management, 143(04).
Garcia, G, Golparvar-Fard, M, de la Garza, J M and Fischer, M (2021) Measuring Progress and Productivity in Model-Driven Engineering for Capital Project Delivery. Journal of Construction Engineering and Management, 147(04).
Garvin, M J (2010) Enabling Development of the Transportation Public-Private Partnership Market in the United States. Journal of Construction Engineering and Management, 136(04), 402–11.
Garza, J M d l, Hancher, D E and Decker, L (1998) Analysis of Safety Indicators in Construction. Journal of Construction Engineering and Management, 124(04), 312–4.
Gates, M and Scarpa, A (1984) Optimum Penetration of Friction Piles. Journal of Construction Engineering and Management, 110(04), 491–510.
Gelisen, G and Griffis, F H ( (2014) Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis. Journal of Construction Engineering and Management, 140(04).
Gelisen, G and Griffis, F H ( (2014) Productividad Automatizada Basada en el Itinerario Animado (APBSA): Una Simulacion Basada en un Enfoque del Analisis de Compensacion Tiempo-Costo. Journal of Construction Engineering and Management, 140(04).
Gerwick, B C (1990) Implementing Construction Research. Journal of Construction Engineering and Management, 116(04), 556–63.
Gibson, G E and Bell, L C (1990) Electronic Data Interchange in Construction. Journal of Construction Engineering and Management, 116(04), 727–37.
Gil, N, Tommelein, I D, Stout, A and Garrett, T (2005) Embodying Product and Process Flexibility to Cope with Challenging Project Deliveries. Journal of Construction Engineering and Management, 131(04), 439–48.
Goodrum, P M (2004) Hispanic and Non-Hispanic Wage Differentials: Implications for United States Construction Industry. Journal of Construction Engineering and Management, 130(04), 552–9.
Goodrum, P M, Zhai, D and Yasin, M F (2009) Relationship between Changes in Material Technology and Construction Productivity. Journal of Construction Engineering and Management, 135(04), 278–87.
Gould, C H (1988) Rolling Fours: Novel Work Schedule. Journal of Construction Engineering and Management, 114(04), 577–93.
Guevara, J, Herrera, L and Salazar, J (2022) Interorganizational Sponsor Networks in Road and Social Infrastructure PPP Equity Markets. Journal of Construction Engineering and Management, 148(04).
Guillermo, M A, Grau, D, Acevedo, S C and Rivera, T E (2014) How the Design and Assessment of Instruction/Learning Strategies Influence the Academic Performance of Civil Engineering Students at Universidad Industrial De Santander, Colombia. Journal of Construction Engineering and Management, 140(04).
Gunduz, M, Birgonul, M T and Ozdemir, M (2017) Fuzzy Structural Equation Model to Assess Construction Site Safety Performance. Journal of Construction Engineering and Management, 143(04).
Guo, S (2002) Identification and Resolution of Work Space Conflicts in Building Construction. Journal of Construction Engineering and Management, 128(04), 287–95.
Hacker, M E, Kaminsky, J and Faust, K M (2019) Legitimizing Involvement in Emergency Accommodations: Water and Wastewater Utility Perspectives. Journal of Construction Engineering and Management, 145(04).
Hadipriono, F C, Lim, C and Wong, K (1986) Event Tree Analysis to Prevent Failures in Temporary Structures. Journal of Construction Engineering and Management, 112(04), 500–13.
Haltenhoff, C E (1987) Construction Management Performance Under Dual Services Agreements. Journal of Construction Engineering and Management, 113(04), 640–7.
Hammad, M W, Abbasi, A and Ryan, M J (2018) Developing a Novel Framework to Manage Schedule Contingency Using Theory of Constraints and Earned Schedule Method. Journal of Construction Engineering and Management, 144(04).
Hampton, D, Jin, J S and Clark, E A (1990) Foundation Construction within Wastewater‐Treatment Plant. Journal of Construction Engineering and Management, 116(04), 564–73.
Han, S H and Diekmann, J E (2001) Approaches for Making Risk-Based Go/No-Go Decision for International Projects. Journal of Construction Engineering and Management, 127(04), 300–8.
Han, S, Jiang, Y and Bai, Y (2022) Fast-PGMED: Fast and Dense Elevation Determination for Earthwork Using Drone and Deep Learning. Journal of Construction Engineering and Management, 148(04).
Hanlon, E J and Sanvido, V E (1995) Constructability Information Classification Scheme. Journal of Construction Engineering and Management, 121(04), 337–45.
Hanna, A S, Peterson, P and Lee, M (2002) Benchmarking Productivity Indicators for Electrical/Mechanical Projects. Journal of Construction Engineering and Management, 128(04), 331–7.
Hanna, A S, Russell, J S, Nordheim, E V and Bruggink, M J (1999) Impact of Change Orders on Labor Efficiency for Electrical Construction. Journal of Construction Engineering and Management, 125(04), 224–32.
Harmelink, D J (2001) Linear Scheduling Model: Float Characteristics. Journal of Construction Engineering and Management, 127(04), 255–60.
Harmelink, D J and Rowings, J E (1998) Linear Scheduling Model: Development of Controlling Activity Path. Journal of Construction Engineering and Management, 124(04), 263–8.
Harris, R B and Ioannou, P G (1998) Scheduling Projects with Repeating Activities. Journal of Construction Engineering and Management, 124(04), 269–78.
Hartman, F, Snelgrove, P and Ashrafi, R (1997) Effective Wording to Improve Risk Allocation in Lump Sum Contracts. Journal of Construction Engineering and Management, 123(04), 379–87.
Harty, C and Whyte, J (2010) Emerging Hybrid Practices in Construction Design Work: Role of Mixed Media. Journal of Construction Engineering and Management, 136(04), 468–76.
Hasan, M and Lu, M (2021) Error Propagation Model for Analyzing Project Labor Cost Budget Risks in Industrial Construction. Journal of Construction Engineering and Management, 147(04).
Hassim, S, Kadir, M R A, Lew, Y and Sim, Y (2003) Estimation of Minimum Working Capital for Construction Projects in Malaysia. Journal of Construction Engineering and Management, 129(04), 369–74.
Hastak, M, Vanegas, J A and Puyana‐Camargo, M (1993) Time‐Based Competition: Competitive Advantage Tool for A/E/C Firms. Journal of Construction Engineering and Management, 119(04), 785–800.
Hegazy, T and Kamarah, E (2008) Efficient Repetitive Scheduling for High-Rise Construction. Journal of Construction Engineering and Management, 134(04), 253–64.
Hegazy, T and Petzold, K (2003) Genetic Optimization for Dynamic Project Control. Journal of Construction Engineering and Management, 129(04), 396–404.
Hegazy, T, Zaneldin, E and Grierson, D (2001) Improving Design Coordination for Building Projects. I: Information Model. Journal of Construction Engineering and Management, 127(04), 322–9.
Herbsman, Z (1983) Long‐Range Forecasting Highway Construction Costs. Journal of Construction Engineering and Management, 109(04), 423–34.
Herbsman, Z J (1995) A+B Bidding Method—Hidden Success Story for Highway Construction. Journal of Construction Engineering and Management, 121(04), 430–7.
Herrera, R F, Mourgues, C, Alarcón, L F and Pellicer, E (2021) Analyzing the Association between Lean Design Management Practices and BIM Uses in the Design of Construction Projects. Journal of Construction Engineering and Management, 147(04).
Hijazi, A M, AbouRizk, S M and Halpin, D W (1992) Modeling and Simulating Learning Development in Construction. Journal of Construction Engineering and Management, 118(04), 685–700.
Hinze, J (2005) Use of Trench Boxes for Worker Protection. Journal of Construction Engineering and Management, 131(04), 494–500.
Hinze, J and Brown, J (1994) Properties of Soundless Chemical Demolition Agents. Journal of Construction Engineering and Management, 120(04), 816–27.
Hinze, J and Roxo, J (1984) Is Injury Occurrence Related to Lunar Cycles?. Journal of Construction Engineering and Management, 110(04), 409–19.
Hinze, J and Wiegand, F (1992) Role of Designers in Construction Worker Safety. Journal of Construction Engineering and Management, 118(04), 677–84.
Hinze, J, Bren, D C and Piepho, N (1995) Experience Modification Rating As Measure of Safety Performance. Journal of Construction Engineering and Management, 121(04), 455–8.
Hiyassat, M A S (2000) Modification of Minimum Moment Approach in Resource Leveling. Journal of Construction Engineering and Management, 126(04), 278–84.
Horman, M J, Orosz, M P and Riley, D R (2006) Sequence Planning for Electrical Construction. Journal of Construction Engineering and Management, 132(04), 363–72.
Hosseinian, S M, Arjomand, A, Li, C Q and Zhang, G (2022) Developing a Model for Assessing Project Completion Time Reliability during Construction Using Time-Dependent Reliability Theory. Journal of Construction Engineering and Management, 148(04).
Howell, G, Laufer, A and Ballard, G (1993) Interaction between Subcycles: One Key to Improved Methods. Journal of Construction Engineering and Management, 119(04), 714–28.
Hwang, B and Ho, J W (2012) Front-End Planning Implementation in Singapore: Status, Importance, and Impact. Journal of Construction Engineering and Management, 138(04), 567–73.
Ibbs, C W, Kwak, Y H, Ng, T and Odabasi, A M (2003) Project Delivery Systems and Project Change: Quantitative Analysis. Journal of Construction Engineering and Management, 129(04), 382–7.
Idowu, O S and Lam, K C (2020) Conceptual Quantities Estimation Using Bootstrapped Support Vector Regression Models. Journal of Construction Engineering and Management, 146(04).
Ioannou, P G (1988) Geologic Exploration and Risk Reduction in Underground Construction. Journal of Construction Engineering and Management, 114(04), 532–47.
Ioannou, P G (1987) Geologic Prediction Model for Tunneling. Journal of Construction Engineering and Management, 113(04), 569–90.
Ioannou, P G (1988) Pilot Tunnels: Contractor's Position. Journal of Construction Engineering and Management, 114(04), 594–613.
Ioannou, P G and Carr, R I (1988) Advanced Building Technology Matrix System. Journal of Construction Engineering and Management, 114(04), 517–31.
Ivanoff, D J and Diekmann, J E (1989) Project‐Labor Agreements in Construction Industry. Journal of Construction Engineering and Management, 115(04), 567–84.
Jaafari, A (1997) Concurrent Construction and Life Cycle Project Management. Journal of Construction Engineering and Management, 123(04), 427–36.
Jaafari, A and Mateffy, V K (1986) Games People Play with Cost Control in Australia. Journal of Construction Engineering and Management, 112(04), 566–81.
Jaselskis, E J and Russell, J S (1992) Risk Analysis Approach to Selection of Contractor Evaluation Method. Journal of Construction Engineering and Management, 118(04), 814–21.
Javanmardi, A, Abbasian-Hosseini, S A, Liu, M and Hsiang, S M (2020) Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach. Journal of Construction Engineering and Management, 146(04).
Javernick-Will, A and Levitt, R E (2010) Mobilizing Institutional Knowledge for International Projects. Journal of Construction Engineering and Management, 136(04), 430–41.
Javid, M and Seneviratne, P N (2000) Investment Risk Analysis in Airport Parking Facility Development. Journal of Construction Engineering and Management, 126(04), 298–305.
Jeljeli, M N and Russell, J S (1995) Coping with Uncertainty in Environmental Construction: Decision-Analysis Approach. Journal of Construction Engineering and Management, 121(04), 370–80.
Jergeas, G and Put, J V d (2001) Benefits of Constructability on Construction Projects. Journal of Construction Engineering and Management, 127(04), 281–90.
Jia, B, Yang, Y, Xie, B and Yu, X (2021) Novel Geometric Control Technology for Precast Segmental Bridges. Journal of Construction Engineering and Management, 147(04).
Jin, R and Chen, Q (2019) Overview of Concrete Recycling Legislation and Practice in the United States. Journal of Construction Engineering and Management, 145(04).
Jordan Srour, F, Kiomjian, D and Srour, I M (2016) Learning Curves in Construction: A Critical Review and New Model. Journal of Construction Engineering and Management, 142(04).
Joseph Garcia, A and Mollaoglu, S (2020) Individuals’ Capacities to Apply Transferred Knowledge in AEC Project Teams. Journal of Construction Engineering and Management, 146(04).
Kagan, H A (1983) Evaluating Construction Failures. Journal of Construction Engineering and Management, 109(04), 460–72.
Kakoto, T and Skibniewski, M (1991) Engineering Decision Support of Automated Shield Tunneling. Journal of Construction Engineering and Management, 117(04), 674–90.
Kakoto, T, Skibniewski, M J and Hancher, D E (1989) Comparison of U.S. and Japanese Practices in Public Construction. Journal of Construction Engineering and Management, 115(04), 499–516.
Kalhor, E and Valentin, V (2018) Cost Estimation Framework for Optimal Retrofit Planning to Mitigate Residential Building Vulnerability to Wildfires. Journal of Construction Engineering and Management, 144(04).
Kang, L S and Paulson, B C (1997) Adaptability of Information Classification Systems for Civil Works. Journal of Construction Engineering and Management, 123(04), 419–26.
Kang, Y, O’Brien, W J, Dai, J, Mulva, S P, Thomas, S P, Chapman, R E and Butry, D (2013) Interaction Effects of Information Technologies and Best Practices on Construction Project Performance. Journal of Construction Engineering and Management, 139(04), 361–71.
Kangari, R (1995) Risk Management Perceptions and Trends of U.S. Construction. Journal of Construction Engineering and Management, 121(04), 422–9.
Kar, S, Kothari, C and Jha, K N (2021) Developing an Optimum Material Procurement Schedule by Integrating Construction Program and Budget Using NSGA-II. Journal of Construction Engineering and Management, 147(04).
Karakhan, A A, Gambatese, J and Simmons, D R (2020) Development of Assessment Tool for Workforce Sustainability. Journal of Construction Engineering and Management, 146(04).
Karlsson, M, Lakka, A, Sulankivi, K, Hanna, A S and Thompson, B P (2008) Best Practices for Integrating the Concurrent Engineering Environment into Multipartner Project Management. Journal of Construction Engineering and Management, 134(04), 289–99.
Kashiwagi, D and Byfield, R (2002) State of Utah Performance Information Procurement System Tests. Journal of Construction Engineering and Management, 128(04), 338–47.
Kereri, J O and Harper, C M (2019) Social Networks and Construction Teams: Literature Review. Journal of Construction Engineering and Management, 145(04).
Key, J M (1987) Earthmoving and Heavy Equipment. Journal of Construction Engineering and Management, 113(04), 611–22.
Khan, A, Do, J and Kim, D (2017) Experimental Optimization of High-Strength Self-Compacting Concrete Based on D-Optimal Design. Journal of Construction Engineering and Management, 143(04).
Kim, C, Kim, T, Lee, U, Cho, H and Kang, K (2016) Advanced Steel Beam Assembly Approach for Improving Safety of Structural Steel Workers. Journal of Construction Engineering and Management, 142(04).
Kim, H and Reinschmidt, K F (2011) Effects of Contractors’ Risk Attitude on Competition in Construction. Journal of Construction Engineering and Management, 137(04), 275–83.
Kim, J and Ibbs, C W (1995) Work-Package–Process Model for Piping Construction. Journal of Construction Engineering and Management, 121(04), 381–7.
Kim, J, Ham, Y, Chung, Y and Chi, S (2019) Systematic Camera Placement Framework for Operation-Level Visual Monitoring on Construction Jobsites. Journal of Construction Engineering and Management, 145(04).
Kineber, A F, Othman, I, Oke, A E, Chileshe, N and Buniya, M K (2021) Impact of Value Management on Building Projects Success: Structural Equation Modeling Approach. Journal of Construction Engineering and Management, 147(04).
Kleiner, B M, Smith-Jackson, T L, Mills, T H, O’Brien, M and Haro, E (2008) Design, Development, and Deployment of a Rapid Universal Safety and Health System for Construction. Journal of Construction Engineering and Management, 134(04), 273–9.
Ko, C and Cheng, M (2007) Dynamic Prediction of Project Success Using Artificial Intelligence. Journal of Construction Engineering and Management, 133(04), 316–24.
Koehn, E and Jones, M W (1983) Benefits and Costs of EEO Rules in Construction. Journal of Construction Engineering and Management, 109(04), 435–46.
Kog, Y C and Loh, P K (2012) Critical Success Factors for Different Components of Construction Projects. Journal of Construction Engineering and Management, 138(04), 520–8.
Koo, B and Fischer, M (2000) Feasibility Study of 4D CAD in Commercial Construction. Journal of Construction Engineering and Management, 126(04), 251–60.
Kraiem, Z M and Diekmann, J E (1987) Concurrent Delays in Construction Projects. Journal of Construction Engineering and Management, 113(04), 591–602.
Kula, B and Ergen, E (2021) Implementation of a BIM-FM Platform at an International Airport Project: Case Study. Journal of Construction Engineering and Management, 147(04).
Kululanga, G K, Kuotcha, W, McCaffer, R and Edum-Fotwe, F (2001) Construction Contractors' Claim Process Framework. Journal of Construction Engineering and Management, 127(04), 309–14.
Kululanga, G K, McCaffer, R, Price, A D F and Edum-Fotwe, F (1999) Learning Mechanisms Employed by Construction Contractors. Journal of Construction Engineering and Management, 125(04), 215–23.
López del Puerto, C and Shane, J S (2014) Claves del Éxito en la Gestión de Megaproyectos en México y los Estados Unidos: Un Estudio de Casos. Journal of Construction Engineering and Management, 140(04).
Lammie, J L and Shah, D P (1984) Construction Management: MARTA in Retrospect. Journal of Construction Engineering and Management, 110(04), 459–75.
Larsson, J, Lu, W, Krantz, J and Olofsson, T (2016) Discrete Event Simulation Analysis of Product and Process Platforms: A Bridge Construction Case Study. Journal of Construction Engineering and Management, 142(04).
Laryea, S and Hughes, W (2011) Risk and Price in the Bidding Process of Contractors. Journal of Construction Engineering and Management, 137(04), 248–58.
Laufer, A and Ledbetter, W B (1986) Assessment of Safety Performance Measures at Construction Sites. Journal of Construction Engineering and Management, 112(04), 530–42.
LeBlond, D, Owen, F, Gibson, G E, Haas, C T and Traver, A E (1998) Control Improvement for Advanced Construction Equipment. Journal of Construction Engineering and Management, 124(04), 289–96.
Lee, E and Ibbs, C W (2005) Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies. Journal of Construction Engineering and Management, 131(04), 449–58.
Lee, S and Halpin, D W (2003) Predictive Tool for Estimating Accident Risk. Journal of Construction Engineering and Management, 129(04), 431–6.
Lee, S, Thomas, S R and Tucker, R L (2004) Effective Practice Utilization Using Performance Prediction Software. Journal of Construction Engineering and Management, 130(04), 576–85.
Leu, S and Hwang, S (2001) Optimal Repetitive Scheduling Model with Shareable Resource Constraint. Journal of Construction Engineering and Management, 127(04), 270–80.
Li, H, Wang, M and Dong, X (2019) Resource Leveling in Projects with Stochastic Minimum Time Lags. Journal of Construction Engineering and Management, 145(04).
Li, S, Fan, M and Wu, X (2018) Effect of Social Capital between Construction Supervisors and Workers on Workers’ Safety Behavior. Journal of Construction Engineering and Management, 144(04).
Li, X and Chen, X (2012) Using Grouting of Shield Tunneling to Reduce Settlements of Overlying Tunnels: Case Study in Shenzhen Metro Construction. Journal of Construction Engineering and Management, 138(04), 574–84.
Li, Y, Li, G, Wang, T, Zhu, Y and Li, X (2019) Semicustomized Design Framework of Container Accommodation for Migrant Construction Workers. Journal of Construction Engineering and Management, 145(04).
Lin, K and Haas, C T (1996) Multiple Heavy Lifts Optimization. Journal of Construction Engineering and Management, 122(04), 354–62.
Ling, F Y Y, Hartmann, A, Kumaraswamy, M and Dulaimi, M (2007) Influences on Innovation Benefits during Implementation: Client’s Perspective. Journal of Construction Engineering and Management, 133(04), 306–15.
Lingard, H and Oswald, D (2020) Safety at the Front Line: Social Negotiation of Work and Safety at the Principal Contractor–Subcontractor Interface. Journal of Construction Engineering and Management, 146(04).
Liska, R W and Snell, B (1992) Financial Incentive Programs for Average‐Size Construction Firm. Journal of Construction Engineering and Management, 118(04), 667–76.
Liu, J and Rahbar, F (2004) Project Time-Cost Trade-Off Optimization by Maximal Flow Theory. Journal of Construction Engineering and Management, 130(04), 607–9.
Liu, J, Love, P E D, Sing, M C P, Carey, B and Matthews, J (2015) Modeling Australia’s Construction Workforce Demand: Empirical Study with a Global Economic Perspective. Journal of Construction Engineering and Management, 141(04).
Liu, L, Burns, S A and Feng, C (1995) Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method. Journal of Construction Engineering and Management, 121(04), 446–54.
Liu, M and Ling, Y Y (2005) Modeling a Contractor’s Markup Estimation. Journal of Construction Engineering and Management, 131(04), 391–9.
Liu, Q, Xu, N, Jiang, H, Wang, S, Wang, W and Wang, J (2020) Psychological Driving Mechanism of Safety Citizenship Behaviors of Construction Workers: Application of the Theory of Planned Behavior and Norm Activation Model. Journal of Construction Engineering and Management, 146(04).
Liu, Q, Ye, G, Yang, J, Xiang, Q and Liu, Q (2022) Construction Workers’ Representativeness Heuristic in Decision Making: The Impact of Demographic Factors. Journal of Construction Engineering and Management, 148(04).
Liu, R, Du, J, Issa, R R A and Giel, B (2017) BIM Cloud Score: Building Information Model and Modeling Performance Benchmarking. Journal of Construction Engineering and Management, 143(04).
Lopez del Puerto, C and Shane, J S (2014) Keys to Success in Megaproject Management in Mexico and the United States: Case Study. Journal of Construction Engineering and Management, 140(04).
Lorterapong, P and Moselhi, O (1996) Project-Network Analysis Using Fuzzy Sets Theory. Journal of Construction Engineering and Management, 122(04), 308–18.
Lorterapong, P and Ussavadilokrit, M (2013) Construction Scheduling Using the Constraint Satisfaction Problem Method. Journal of Construction Engineering and Management, 139(04), 414–22.
Love, P E D, Matthews, J and Fang, W (2021) Reflections on the Risk and Uncertainty of Rework in Construction. Journal of Construction Engineering and Management, 147(04).
Lowe, B D, Albers, J, Hayden, M, Lampl, M, Naber, S and Wurzelbacher, S (2020) Review of Construction Employer Case Studies of Safety and Health Equipment Interventions. Journal of Construction Engineering and Management, 146(04).
Lu, M and Li, H (2003) Resource-Activity Critical-Path Method for Construction Planning. Journal of Construction Engineering and Management, 129(04), 412–20.
Lu, W, Guo, W and Zhu, Q (2020) Effect of Justice on Contractor’s Relational Behavior: Moderating Role of Owner’s Asset Specificity. Journal of Construction Engineering and Management, 146(04).
Lucko, G (2009) Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions. Journal of Construction Engineering and Management, 135(04), 246–53.
Lucko, G and Kaminsky, J A (2016) Construction Engineering Conference and Workshop 2014: Setting an Industry–Academic Collaborative Research Agenda. Journal of Construction Engineering and Management, 142(04).
Lundberg, E J and Beliveau, Y J (1989) Automated Lay‐Down Yard Control System—ALYC. Journal of Construction Engineering and Management, 115(04), 535–44.
Lutz, J D, Halpin, D W and Wilson, J R (1994) Simulation of Learning Development in Repetitive Construction. Journal of Construction Engineering and Management, 120(04), 753–73.
Ma, L and Fu, H (2022) A Governance Framework for the Sustainable Delivery of Megaprojects: The Interaction of Megaproject Citizenship Behavior and Contracts. Journal of Construction Engineering and Management, 148(04).
Mahalingam, A (2010) PPP Experiences in Indian Cities: Barriers, Enablers, and the Way Forward. Journal of Construction Engineering and Management, 136(04), 419–29.
Maio, C, Schexnayder, C, Knutson, K and Weber, S (2000) Probability Distribution Functions for Construction Simulation. Journal of Construction Engineering and Management, 126(04), 285–92.
Makul, N (2021) Modified Cost-Benefit Analysis of the Production of Ready-Mixed Self-Consolidating Concrete Prepared with a Recycled Concrete Aggregate. Journal of Construction Engineering and Management, 147(04).
Maloney, W F (1988) Substance Abuse in Construction. Journal of Construction Engineering and Management, 114(04), 614–30.
Maloney, W F, Cameron, I and Hare, B (2007) Tradesmen Involvement in Health and Safety. Journal of Construction Engineering and Management, 133(04), 297–305.
Martin, H and Ramjarrie, K (2021) Cloud Contractor Selection Model for Design-Build Open Tender. Journal of Construction Engineering and Management, 147(04).
Martinez, J C and Ioannou, P G (1999) General-Purpose Systems for Effective Construction Simulation. Journal of Construction Engineering and Management, 125(04), 265–76.
McCabe, B Y, Alderman, E, Chen, Y, Hyatt, D E and Shahi, A (2017) Safety Performance in the Construction Industry: Quasi-Longitudinal Study. Journal of Construction Engineering and Management, 143(04).
McCullouch, B G and Lueprasert, K (1994) 2D Bar‐Code Applications in Construction. Journal of Construction Engineering and Management, 120(04), 739–52.
McQuillen, J L and Hicks, R G (1987) Construction of Rubber‐Modified Asphalt Pavements. Journal of Construction Engineering and Management, 113(04), 537–53.
Mejia A., G, Grau, D, Acevedo, S C and Rivera, T E (2014) Evaluación, Diseño, e Influencia de Estrategias de Instrucción-Aprendizaje en el Desempeño Académico de los Estudiantes de Ingenieria Civil en la Universidad Industrial de Santander, Colombia. Journal of Construction Engineering and Management, 140(04).
Migliaccio, G C, Bogus, S M and Cordova-Alvidrez, A A (2014) Continuous Quality Improvement Techniques for Data Collection in Asset Management Systems. Journal of Construction Engineering and Management, 140(04).
Migliaccio, G C, Bogus, S M and Cordova-Alvidrez, A A (2014) Tecnicas de Mejora Continua de la Calidad de la Recoleccion de Datos en Sistemas de Gerencia de Capital de Infraestructura. Journal of Construction Engineering and Management, 140(04).
Mirzadeh, I and Birgisson, B (2016) Evaluation of Highway Projects under Government Support Mechanisms Based on an Option-Pricing Framework. Journal of Construction Engineering and Management, 142(04).
Mitikie, B B and Lee, T S (2019) Experimental Investigation of Enzyme Stabilization and Its Effect on Clay Brick. Journal of Construction Engineering and Management, 145(04).
Molenaar, K, Washington, S and Diekmann, J (2000) Structural Equation Model of Construction Contract Dispute Potential. Journal of Construction Engineering and Management, 126(04), 268–77.
Moon, S and Bernold, L E (1998) Graphic-Based Human-Machine Interface for Construction Manipulator Control. Journal of Construction Engineering and Management, 124(04), 305–11.
Moselhi, O and El‐Rayes, K (1993) Scheduling of Repetitive Projects with Cost Optimization. Journal of Construction Engineering and Management, 119(04), 681–97.
Moselhi, O, Fazio, P and Hason, S (1992) Automation of Concrete Slab‐on‐Grade Construction. Journal of Construction Engineering and Management, 118(04), 731–48.
Moselhi, O, Hegazy, T and Fazio, P (1991) Neural Networks as Tools in Construction. Journal of Construction Engineering and Management, 117(04), 606–25.
Murguia, D, Demian, P and Soetanto, R (2021) Systemic BIM Adoption: A Multilevel Perspective. Journal of Construction Engineering and Management, 147(04).
Nam, C H and Tatum, C B (1989) Toward Understanding of Product Innovation Process in Construction. Journal of Construction Engineering and Management, 115(04), 517–34.
Namian, M, Albert, A and Feng, J (2018) Effect of Distraction on Hazard Recognition and Safety Risk Perception. Journal of Construction Engineering and Management, 144(04).
Naoum, S G (1994) Critical Analysis of Time and Cost of Management and Traditional Contracts. Journal of Construction Engineering and Management, 120(04), 687–705.
Nasirian, A, Arashpour, M, Abbasi, B and Akbarnezhad, A (2019) Optimal Work Assignment to Multiskilled Resources in Prefabricated Construction. Journal of Construction Engineering and Management, 145(04).
Navon, R and Goldschmidt, E (2003) Can Labor Inputs be Measured and Controlled Automatically?. Journal of Construction Engineering and Management, 129(04), 437–45.
Navon, R and Shpatnitsky, Y (2005) Field Experiments in Automated Monitoring of Road Construction. Journal of Construction Engineering and Management, 131(04), 487–93.
Navon, R, Kelly, P W and Johnston, D W (1993) Human Factors in Introducing On‐Site Construction Automation. Journal of Construction Engineering and Management, 119(04), 801–12.
Nguyen, L D and Tran, D Q (2021) Measurement of Fuzzy Membership Functions in Construction Risk Assessment. Journal of Construction Engineering and Management, 147(04).
Nima, M A, Abdul-Kadir, M R, Jaafar, M S and Alghulami, R G (2002) Constructability Concepts in West Port Highway in Malaysia. Journal of Construction Engineering and Management, 128(04), 348–56.
Nnaji, C, Gambatese, J, Karakhan, A and Osei-Kyei, R (2020) Development and Application of Safety Technology Adoption Decision-Making Tool. Journal of Construction Engineering and Management, 146(04).
Nnaji, C, Lee, H W, Karakhan, A and Gambatese, J (2018) Developing a Decision-Making Framework to Select Safety Technologies for Highway Construction. Journal of Construction Engineering and Management, 144(04).
Noorizadeh, A, Peltokorpi, A and Avkiran, N K (2019) Supplier Performance Evaluation in Construction Projects: Challenges and Possible Solutions. Journal of Construction Engineering and Management, 145(04).
O'Connor, J T (1985) Impacts of Constructability Improvement. Journal of Construction Engineering and Management, 111(04), 404–10.
O'Connor, J T and Caraway, P H (1993) Need for Specification Format that Accommodates Engineered Projects. Journal of Construction Engineering and Management, 119(04), 757–68.
O'Connor, J T and Davis, V S (1988) Constructability Improvement During Field Operations. Journal of Construction Engineering and Management, 114(04), 548–64.
O'Connor, J T, Larimore, M A and Tucker, R L (1986) Collecting Constructability Improvement Ideas. Journal of Construction Engineering and Management, 112(04), 463–75.
O’Connor, J T and Huh, Y (2006) Crew Production Rates for Contract Time Estimation: Beam Erection, Deck, and Rail of Highway Bridges. Journal of Construction Engineering and Management, 132(04), 408–15.
O’Connor, J T and Mock, B D (2019) Construction, Commissioning, and Startup Execution: Problematic Activities on Capital Projects. Journal of Construction Engineering and Management, 145(04).
Oberlender, G D (1984) Development of Construction Research. Journal of Construction Engineering and Management, 110(04), 486–90.
Ohura, T and Kato, M (1993) Erection and Field Test of Concrete Arch Bridge Applying Composite Tube. Journal of Construction Engineering and Management, 119(04), 666–80.
Orabi, W and El-Rayes, K (2012) Optimizing the Rehabilitation Efforts of Aging Transportation Networks. Journal of Construction Engineering and Management, 138(04), 529–39.
Orozco, F A, Serpell, A F, Molenaar, K R and Forcael, E (2014) Modelando los Factores e Índices de Competitividad para Constructoras: Hallazgos en Chile. Journal of Construction Engineering and Management, 140(04).
Orozco, F A, Serpell, A F, Molenaar, K R and Forcael, E (2014) Modeling Competitiveness Factors and Indexes for Construction Companies: Findings of Chile. Journal of Construction Engineering and Management, 140(04).
Oswald, D, Wade, F, Sherratt, F and Smith, S D (2019) Communicating Health and Safety on a Multinational Construction Project: Challenges and Strategies. Journal of Construction Engineering and Management, 145(04).
Ozorhon, B and Oral, K (2017) Drivers of Innovation in Construction Projects. Journal of Construction Engineering and Management, 143(04).
Paek, J H, Lee, Y W and Ock, J H (1993) Pricing Construction Risk: Fuzzy Set Application. Journal of Construction Engineering and Management, 119(04), 743–56.
Palacios, J L, Gonzalez, V and Alarcón, L F (2014) Selección de Formas de Relación con Terceros en la Construcción. Journal of Construction Engineering and Management, 140(04).
Palacios, J L, Gonzalez, V and Alarcón, L F (2014) Selection of Third-Party Relationships in Construction. Journal of Construction Engineering and Management, 140(04).
Palmer, A, Kelly, J and Male, S (1996) Holistic Appraisal of Value Engineering in Construction in United States. Journal of Construction Engineering and Management, 122(04), 324–8.
Parfitt, M K, Syal, M G, Khalvati, M and Bhatia, S (1993) Computer‐Integrated Design Drawings and Construction Project Plans. Journal of Construction Engineering and Management, 119(04), 729–42.
Paulson, B C and Fondahl, J W (1983) Craft Jurisdiction Impact on Construction. Journal of Construction Engineering and Management, 109(04), 369–86.
Pellicer, E, Yepes, V, Correa, C L and Alarcón, L F (2014) Model for Systematic Innovation in Construction Companies. Journal of Construction Engineering and Management, 140(04).
Pellicer, E, Yepes, V, Correa, C L and Alarcón, L F (2014) Modelo para la Innovación Sistemática en Empresas Constructoras. Journal of Construction Engineering and Management, 140(04).
Perkowski, J C (1988) Technical Trends in the E&C Business: The Next 10 Years. Journal of Construction Engineering and Management, 114(04), 565–76.
Phang, T C H, Chen, C and Tiong, R L K (2020) New Model for Identifying Critical Success Factors Influencing BIM Adoption from Precast Concrete Manufacturers’ View. Journal of Construction Engineering and Management, 146(04).
Pheng, L S and Hui, M S (2004) Implementing and Applying Six Sigma in Construction. Journal of Construction Engineering and Management, 130(04), 482–9.
Pocock, J B, Kuennen, S T, Gambatese, J and Rauschkolb, J (2006) Constructability State of Practice Report. Journal of Construction Engineering and Management, 132(04), 373–83.
Pocock, J B, Liu, L Y and Kim, M K (1997) Impact of Management Approach on Project Interaction and Performance. Journal of Construction Engineering and Management, 123(04), 411–8.
Popescu, C (1987) Construction Engineering Graduate Education Survey. Journal of Construction Engineering and Management, 113(04), 664–8.
Portas, J and AbouRizk, S (1997) Neural Network Model for Estimating Construction Productivity. Journal of Construction Engineering and Management, 123(04), 399–410.
Praticò, F G (2017) Metrics for Management of Asphalt Plant Sustainability. Journal of Construction Engineering and Management, 143(04).
Pregenzer, L J, Seppanen, P J, Kunz, J C and Paulson, B C (1999) Value-Added Assessment of Construction Plans. Journal of Construction Engineering and Management, 125(04), 242–8.
Pultar, M (1990) Progress‐Based Construction Scheduling. Journal of Construction Engineering and Management, 116(04), 670–88.
Radtke, M W and Russell, J S (1993) Project‐Level Model Process for Implementing Constructability. Journal of Construction Engineering and Management, 119(04), 813–31.
Rahman, M M and Kumaraswamy, M M (2012) Multicountry Perspectives of Relational Contracting and Integrated Project Teams. Journal of Construction Engineering and Management, 138(04), 469–80.
Ramaswamy, S D and Pertusier, E M (1986) Construction of Barrettes for High‐Rise Foundations. Journal of Construction Engineering and Management, 112(04), 455–62.
Ramsey, T S (1984) Quality Control “A Necessity Not an Option”. Journal of Construction Engineering and Management, 110(04), 513–7.
Rastegar, H, Arbab Shirani, B, Mirmohammadi, S H and Akhondi Bajegani, E (2021) Stochastic Programming Model for Bidding Price Decision in Construction Projects. Journal of Construction Engineering and Management, 147(04).
Rayburn, L M (1989) Productivity Database and Job Cost Control Using Microcomputers. Journal of Construction Engineering and Management, 115(04), 585–601.
Reinschmidt, K F, Griffis, F H ( and Bronner, P L (1991) Integration of Engineering, Design, and Construction. Journal of Construction Engineering and Management, 117(04), 756–72.
Rezvani, A, Ashkanasy, N and Khosravi, P (2020) Key Attitudes: Unlocking the Relationships between Emotional Intelligence and Performance in Construction Projects. Journal of Construction Engineering and Management, 146(04).
Riggs, L S and Hills, J W (1991) Implications for U.S. Construction Companies in 1992 European Community. Journal of Construction Engineering and Management, 117(04), 773–90.
Riley, D R and Sanvido, V E (1995) Patterns of Construction-Space Use in Multistory Buildings. Journal of Construction Engineering and Management, 121(04), 464–73.
Ringwald, R C (1988) Applications of Centrifugal Pumps. Journal of Construction Engineering and Management, 114(04), 659–63.
Ringwald, R C (1985) Formwork Design. Journal of Construction Engineering and Management, 111(04), 391–403.
Rivas, R A, Borcherding, J D, González, V and Alarcón, L F (2011) Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company. Journal of Construction Engineering and Management, 137(04), 312–20.
Rodriguez‐Ramos, W E and Francis, R L (1983) Single Crane Location Optimization. Journal of Construction Engineering and Management, 109(04), 387–97.
Rowings, J E (1991) Project‐Controls Systems Opportunities. Journal of Construction Engineering and Management, 117(04), 691–7.
Rowings, J E and Walker, R O (1984) Construction Energy Use. Journal of Construction Engineering and Management, 110(04), 447–58.
Ruff, C M, Dzombak, D A and Hendrickson, C T (1996) Owner-Contractor Relationships on Contaminated Site Remediation Projects. Journal of Construction Engineering and Management, 122(04), 348–53.
Russell, J S and Gugel, J G (1993) Comparison of Two Corporate Constructability Programs. Journal of Construction Engineering and Management, 119(04), 769–84.
Russell, J S and Jaselskis, E J (1992) Predicting Construction Contractor Failure Prior to Contract Award. Journal of Construction Engineering and Management, 118(04), 791–811.
Salas, R, Hallowell, M, Balaji, R and Bhandari, S (2020) Safety Risk Tolerance in the Construction Industry: Cross-Cultural Analysis. Journal of Construction Engineering and Management, 146(04).
Salim, M and Bernold, L E (1994) Effects of Design‐Integrated Process Planning on Productivity in Rebar Placement. Journal of Construction Engineering and Management, 120(04), 720–38.
Sanders, S R and Thomas, H R (1991) Factors Affecting Masonry‐Labor Productivity. Journal of Construction Engineering and Management, 117(04), 626–44.
Sankaran, B and O’Brien, W J (2018) Bayesian Second-Order Factor Model for Maturity Assessment of CIM Technologies and Practices at Highway Agencies. Journal of Construction Engineering and Management, 144(04).
Sanvido, V E and Paulson, B C (1992) Site‐Level Construction Information System. Journal of Construction Engineering and Management, 118(04), 701–15.
Sawhney, A, Walsh, K D, Bashford, H H and Palaniappan, S (2009) Impact of Inspected Buffers on Production Parameters of Construction Processes. Journal of Construction Engineering and Management, 135(04), 319–29.
Schexnayder, C and Ohrn, L G (1997) Highway Specifications—Quality versus Pay. Journal of Construction Engineering and Management, 123(04), 437–43.
Schexnayder, C J and David, S A (2002) Past and Future of Construction Equipment—Part IV. Journal of Construction Engineering and Management, 128(04), 279–86.
Schexnayder, C J, Weber, S L and David, S A (2004) Transportation Agency Use of Owner-Controlled Insurance Programs. Journal of Construction Engineering and Management, 130(04), 517–24.
Schexnayder, C, Alarcón, L F, Antillo, E D, Morales, B C and López, M (2014) Observaciones de Desempeño de Puentesdurante el Terremoto de Chile en 2010. Journal of Construction Engineering and Management, 140(04).
Schexnayder, C, Alarcón, L F, Antillo, E D, Morales, B C and Lopez, M (2014) Observations on Bridge Performance during the Chilean Earthquake of 2010. Journal of Construction Engineering and Management, 140(04).
Schlick, H (1983) Temporary Heating in Construction Contracts. Journal of Construction Engineering and Management, 109(04), 447–59.
Selinger, S (1983) Economic Service Life of Building Construction Equipment. Journal of Construction Engineering and Management, 109(04), 398–405.
Semple, C, Hartman, F T and Jergeas, G (1994) Construction Claims and Disputes: Causes and Cost/Time Overruns. Journal of Construction Engineering and Management, 120(04), 785–95.
Senior, B A (1996) Electrical Construction Foreman Task Scheduling. Journal of Construction Engineering and Management, 122(04), 363–9.
Senior, B A (1995) Late-Time Computation for Task Chains Using Discrete-Event Simulation. Journal of Construction Engineering and Management, 121(04), 397–403.
Serugga, J, Kagioglou, M and Tzortzopoulos, P (2020) Value Generation in Front-End Design of Social Housing with QFD and Multiattribute Utility Theory. Journal of Construction Engineering and Management, 146(04).
Severson, G D, Jaselskis, E J and Russell, J S (1993) Trends in Construction Contractor Financial Data. Journal of Construction Engineering and Management, 119(04), 854–8.
Seydel, J and Olson, D L (1990) Bids Considering Multiple Criteria. Journal of Construction Engineering and Management, 116(04), 609–23.
Shah, D D, Jain, S K and Prybella, R W (1993) Performance of Remotely Controlled Fiberglass Pipe Jacking System. Journal of Construction Engineering and Management, 119(04), 832–51.
Shaheen, A A, Fayek, A R and AbouRizk, S M (2007) Fuzzy Numbers in Cost Range Estimating. Journal of Construction Engineering and Management, 133(04), 325–34.
Shang, L and Abdel Aziz, A M (2020) Stackelberg Game Theory-Based Optimization Model for Design of Payment Mechanism in Performance-Based PPPs. Journal of Construction Engineering and Management, 146(04).
Shapira, A and Glascock, J D (1996) Culture of Using Mobile Cranes for Building Construction. Journal of Construction Engineering and Management, 122(04), 298–307.
Shapira, A and Simcha, M (2009) AHP-Based Weighting of Factors Affecting Safety on Construction Sites with Tower Cranes. Journal of Construction Engineering and Management, 135(04), 307–18.
Shen, L Y, Li, H and Li, Q M (2002) Alternative Concession Model for Build Operate Transfer Contract Projects. Journal of Construction Engineering and Management, 128(04), 326–30.
Shen, L Y, Tam, V W Y, Tam, C M and Drew, D (2004) Mapping Approach for Examining Waste Management on Construction Sites. Journal of Construction Engineering and Management, 130(04), 472–81.
Shen, L, Lee, R K H and Zhang, Z (1996) Application of BOT System for Infrastructure Projects in China. Journal of Construction Engineering and Management, 122(04), 319–23.
Shen, L, Lu, W and Yam, M C (2006) Contractor Key Competitiveness Indicators: A China Study. Journal of Construction Engineering and Management, 132(04), 416–24.
Shen, X and Marks, E (2016) Near-Miss Information Visualization Tool in BIM for Construction Safety. Journal of Construction Engineering and Management, 142(04).
Sherman, R, Parrish, K and Lamanna, A (2021) Identifying and Categorizing Risks Incumbent in US Nuclear Power Plant Construction. Journal of Construction Engineering and Management, 147(04).
Shohet, I M (2006) Key Performance Indicators for Strategic Healthcare Facilities Maintenance. Journal of Construction Engineering and Management, 132(04), 345–52.
Shr, J, Ran, B and Sung, C W (2004) . Journal of Construction Engineering and Management, 130(04), 509–16.
Shrestha, A, Chan, T, Aibinu, A A, Chen, C and Martek, I (2018) Risk Allocation Inefficiencies in Chinese PPP Water Projects. Journal of Construction Engineering and Management, 144(04).
Sillars, D N and Kangari, R (2004) Predicting Organizational Success within a Project-Based Joint Venture Alliance. Journal of Construction Engineering and Management, 130(04), 500–8.
Smith, G R and Hancher, D E (1989) Estimating Precipitation Impacts for Scheduling. Journal of Construction Engineering and Management, 115(04), 552–66.
Smith, S D, Osborne, J R and Forde, M C (1995) Analysis of Earth-Moving Systems Using Discrete-Event Simulation. Journal of Construction Engineering and Management, 121(04), 388–96.
Sobeih, T, Salem, O, Genaidy, A, Abdelhamid, T and Shell, R (2009) Psychosocial Factors and Musculoskeletal Disorders in the Construction Industry. Journal of Construction Engineering and Management, 135(04), 267–77.
Solis, F, Sinfield, J V and Abraham, D M (2013) Hybrid Approach to the Study of Inter-Organization High Performance Teams. Journal of Construction Engineering and Management, 139(04), 379–92.
Somboonpisan, J and Limsawasd, C (2021) Environmental Weight for Bid Evaluation to Promote Sustainability in Highway Construction Projects. Journal of Construction Engineering and Management, 147(04).
Son, H and Kim, C (2013) Multiimaging Sensor Data Fusion-Based Enhancement for 3D Workspace Representation for Remote Machine Operation. Journal of Construction Engineering and Management, 139(04), 434–44.
Son, J, Khwaja, N and Milligan, D S (2019) Planning-Phase Estimation of Construction Time for a Large Portfolio of Highway Projects. Journal of Construction Engineering and Management, 145(04).
Song, Y and Chua, D K H (2007) Temporal Logic Representation Schema for Intermediate Function. Journal of Construction Engineering and Management, 133(04), 277–86.
Songer, A D, Ibbs, C W and Napier, T R (1994) Process Model for Public Sector Design‐Build Planning. Journal of Construction Engineering and Management, 120(04), 857–74.
Stenbeck, T (2008) Quantifying Effects of Incentives in a Rail Maintenance Performance-Based Contract. Journal of Construction Engineering and Management, 134(04), 265–72.
Stevens, J D and Murray, A L (1994) Modified Roof Erection System. Journal of Construction Engineering and Management, 120(04), 828–37.
Su, Y, Isaac, S and Lucko, G (2018) Integrated Temporal-Spatial Model for Construction Plans with Boolean Logic Operators. Journal of Construction Engineering and Management, 144(04).
Surahyo, M and El-Diraby, T E (2009) Schema for Interoperable Representation of Environmental and Social Costs in Highway Construction. Journal of Construction Engineering and Management, 135(04), 254–66.
Suraji, A, Duff, A R and Peckitt, S J (2001) Development of Causal Model of Construction Accident Causation. Journal of Construction Engineering and Management, 127(04), 337–44.
Syal, M G, Grobler, F, Willenbrock, J H and Parfitt, M K (1992) Construction Project Planning Process Model for Small‐Medium Builders. Journal of Construction Engineering and Management, 118(04), 651–66.
Szentes, H and Eriksson, P E (2016) Paradoxical Organizational Tensions between Control and Flexibility When Managing Large Infrastructure Projects. Journal of Construction Engineering and Management, 142(04).
Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS Approach for Automating Preconstruction Activities. Journal of Construction Engineering and Management, 124(04), 257–62.
Tam, C M, Tong, T K L and Chan, W K W (2001) Genetic Algorithm for Optimizing Supply Locations around Tower Crane. Journal of Construction Engineering and Management, 127(04), 315–21.
Tariq, S and Zhang, X (2021) Critical Analysis of the Private Sector Roles in Water PPP Failures. Journal of Construction Engineering and Management, 147(04).
Tatum, C B (1989) Organizing to Increase Innovation in Construction Firms. Journal of Construction Engineering and Management, 115(04), 602–17.
Tatum, C B (1987) Process of Innovation in Construction Firm. Journal of Construction Engineering and Management, 113(04), 648–63.
Taylor, J E, Dossick, C S and Garvin, M (2011) Meeting the Burden of Proof with Case-Study Research. Journal of Construction Engineering and Management, 137(04), 303–11.
Thabet, W Y and Beliveau, Y J (1994) HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects. Journal of Construction Engineering and Management, 120(04), 875–92.
Thomas, H R (2000) Schedule Acceleration, Work Flow, and Labor Productivity. Journal of Construction Engineering and Management, 126(04), 261–7.
Thomas, H R and Yiakoumis, I (1987) Factor Model of Construction Productivity. Journal of Construction Engineering and Management, 113(04), 623–39.
Thomas, H R, Maloney, W F, Horner, R M W, Smith, G R, Handa, V K and Sanders, S R (1990) Modeling Construction Labor Productivity. Journal of Construction Engineering and Management, 116(04), 705–26.
Thomas, H R, Sanders, S R and Bilal, S (1992) Comparison of Labor Productivity. Journal of Construction Engineering and Management, 118(04), 635–50.
Thomas, H R, Smith, G R and Cummings, D J (1995) Enforcement of Liquidated Damages. Journal of Construction Engineering and Management, 121(04), 459–63.
Thomas, H R, Smith, G R and Ponderlick, R M (1992) Resolving Contract Disputes Based on Differing‐Site‐Condition Clause. Journal of Construction Engineering and Management, 118(04), 767–79.
Thomas, H R, Smith, G R and Wright, D E (1990) Resolving Disputes over Contract Notice Requirements. Journal of Construction Engineering and Management, 116(04), 738–55.
Thomas, R, Keating, J M and Bluedorn, A C (1983) Authority Structures for Construction Project Management. Journal of Construction Engineering and Management, 109(04), 406–22.
Thomas, S R, Lee, S, Spencer, J D, Tucker, R L and Chapman, R E (2004) Impacts of Design/Information Technology on Project Outcomes. Journal of Construction Engineering and Management, 130(04), 586–97.
Tiruneh, G G and Fayek, A R (2022) Hybrid GA-MANFIS Model for Organizational Competencies and Performance in Construction. Journal of Construction Engineering and Management, 148(04).
Tommelein, I D (1998) Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique. Journal of Construction Engineering and Management, 124(04), 279–88.
Tommelein, I D, Carr, R I and Odeh, A M (1994) Assembly of Simulation Networks Using Designs, Plans, and Methods. Journal of Construction Engineering and Management, 120(04), 796–815.
Tommelein, I D, Levitt, R E and Hayes‐Roth, B (1992) SightPlan Model for Site Layout. Journal of Construction Engineering and Management, 118(04), 749–66.
Toole, T M (1998) Uncertainty and Home Builders' Adoption of Technological Innovations. Journal of Construction Engineering and Management, 124(04), 323–32.
Touran, A (1991) Modeling Uncertainty in Operations with Nonstationary Cycle Times. Journal of Construction Engineering and Management, 117(04), 728–35.
Touran, A (1997) Probabilistic Model for Tunneling Project Using Markov Chain. Journal of Construction Engineering and Management, 123(04), 444–9.
Touran, A and Asai, T (1987) Simulation of Tunneling Operations. Journal of Construction Engineering and Management, 113(04), 554–68.
Tserng, H P, Yin, S Y L and Li, S (2006) Developing a Resource Supply Chain Planning System for Construction Projects. Journal of Construction Engineering and Management, 132(04), 393–407.
Tuholski, S J, Gursel, A P, Tommelein, I D and Bomba, G (2009) “Lean” Comparison Using Process Charts of Complex Seismic Retrofit Projects. Journal of Construction Engineering and Management, 135(04), 330–9.
Turkan, Y, Bosché, F, Haas, C T and Haas, R (2013) Toward Automated Earned Value Tracking Using 3D Imaging Tools. Journal of Construction Engineering and Management, 139(04), 423–33.
Tyvand, J and Blachly, A T (1986) Foamed Plastic Absorbs Staged Post‐Tensioning Deflections. Journal of Construction Engineering and Management, 112(04), 582–7.
Ugural, M and Giritli, H (2021) Three-Way Interaction Model for Turnover Intention of Construction Professionals: Some Evidence from Turkey. Journal of Construction Engineering and Management, 147(04).
Umer, W, Li, H, Szeto, G P Y and Wong, A Y L (2018) Proactive Safety Measures: Quantifying the Upright Standing Stability after Sustained Rebar Tying Postures. Journal of Construction Engineering and Management, 144(04).
Unsal, H I and Taylor, J E (2011) Modeling Interfirm Dependency: Game Theoretic Simulation to Examine the Holdup Problem in Project Networks. Journal of Construction Engineering and Management, 137(04), 284–93.
Vaughan, J L, Leming, M L, Liu, M and Jaselskis, E (2013) Cost-Benefit Analysis of Construction Information Management System Implementation: Case Study. Journal of Construction Engineering and Management, 139(04), 445–55.
Vaziri, K, Carr, P G and Nozick, L K (2007) Project Planning for Construction under Uncertainty with Limited Resources. Journal of Construction Engineering and Management, 133(04), 268–76.
Venegas C., P and Alarcón C., L F (1997) Selecting Long-Term Strategies for Construction Firms. Journal of Construction Engineering and Management, 123(04), 388–98.
Vives, A, Benavides, J and Paris, A M (2010) Selecting Infrastructure Delivery Modalities: No Time for Ideology or Semantics. Journal of Construction Engineering and Management, 136(04), 412–8.
Vogl, B and Abdel-Wahab, M (2015) Measuring the Construction Industry’s Productivity Performance: Critique of International Productivity Comparisons at Industry Level. Journal of Construction Engineering and Management, 141(04).
Vorster, M C and De La Garza, J M (1990) Consequential Equipment Costs Associated with Lack of Availability and Downtime. Journal of Construction Engineering and Management, 116(04), 656–69.
Walsh, K D, Houston, W N and Houston, S L (1997) Field Implications of Current Compaction Specification Design Practices. Journal of Construction Engineering and Management, 123(04), 363–70.
Wambeke, B W, Liu, M and Hsiang, S M (2012) Using Last Planner and a Risk Assessment Matrix to Reduce Variation in Mechanical Related Construction Tasks. Journal of Construction Engineering and Management, 138(04), 491–8.
Wanberg, J, Javernick-Will, A, Chinowsky, P and Taylor, J E (2015) Spanning Cultural and Geographic Barriers with Knowledge Pipelines in Multinational Communities of Practice. Journal of Construction Engineering and Management, 141(04).
Wang, D, Arditi, D and Damci, A (2017) Construction Project Managers’ Motivators and Human Values. Journal of Construction Engineering and Management, 143(04).
Wang, P, Wang, K, Huang, Y, Fenn, P and Stewart, I (2022) Auditing Construction Cost from an In-Process Perspective Based on a Bayesian Predictive Model. Journal of Construction Engineering and Management, 148(04).
Wang, S Q, Tiong, R L K, Ting, S K, Chew, D and Ashley, D (1998) Evaluation and Competitive Tendering of BOT Power Plant Project in China. Journal of Construction Engineering and Management, 124(04), 333–41.
Wang, T, Tang, W, Qi, D, Shen, W and Huang, M (2016) Enhancing Design Management by Partnering in Delivery of International EPC Projects: Evidence from Chinese Construction Companies. Journal of Construction Engineering and Management, 142(04).
Wang, Z, Liu, Y, Hu, H and Dai, L (2021) Hybrid Rescheduling Optimization Model under Disruptions in Precast Production Considering Real-World Environment. Journal of Construction Engineering and Management, 147(04).
Warszawski, A (2003) Analysis of Costs and Benefits of Tall Buildings. Journal of Construction Engineering and Management, 129(04), 421–30.
Warszawski, A, Avraham, M and Carmel, D (1984) Utilization of Precast Concrete Elements in Building. Journal of Construction Engineering and Management, 110(04), 476–85.
Wauters, M and Vanhoucke, M (2015) Study of the Stability of Earned Value Management Forecasting. Journal of Construction Engineering and Management, 141(04).
Woldesenbet, A, Jeong, & H S and Oberlender, G D (2012) Daily Work Reports–Based Production Rate Estimation for Highway Projects. Journal of Construction Engineering and Management, 138(04), 481–90.
Wong, K, Unsal, H, Taylor, J E and Levitt, R E (2010) Global Dimension of Robust Project Network Design. Journal of Construction Engineering and Management, 136(04), 442–51.
Wu, L, Jia, G and Mackhaphonh, N (2019) Case Study on Improving the Effectiveness of Public Participation in Public Infrastructure Megaprojects. Journal of Construction Engineering and Management, 145(04).
Wu, M and Lo, H (2009) Optimal Strategy Modeling for Price-Time Biparameter Construction Bidding. Journal of Construction Engineering and Management, 135(04), 298–306.
Xia, N, Tang, Y, Li, D and Pan, A (2021) Safety Behavior among Construction Workers: Influences of Personality and Leadership. Journal of Construction Engineering and Management, 147(04).
Xie, H, Hong, Y and Brilakis, I (2022) Analysis of User Needs in Time-Related Risk Management for Holistic Project Understanding. Journal of Construction Engineering and Management, 148(04).
Xiong, B, Skitmore, M, Xia, P, Ballesteros-Pérez, P, Ye, K and Zhang, X (2019) Impact of Corporate Credit Scoring on Construction Contractors in China. Journal of Construction Engineering and Management, 145(04).
Xiong, W, Zhang, X and Chen, H (2016) Early-Termination Compensation in Public–Private Partnership Projects. Journal of Construction Engineering and Management, 142(04).
Xu, J, Jiang, L and Moon, S (2017) Determination of the Optimal Concession Period for BOT Contract Projects Based on a Discrete Stochastic Process Model. Journal of Construction Engineering and Management, 143(04).
Yates, J K (1990) Data‐Base Systems for Evaluating Construction Programs. Journal of Construction Engineering and Management, 116(04), 624–42.
Yates, J K (2014) Design and Construction for Sustainable Industrial Construction. Journal of Construction Engineering and Management, 140(04).
Yates, J K (2014) Diseño y Construccion para una Construccion Industrial Sustentable. Journal of Construction Engineering and Management, 140(04).
Yoon, S, Hastak, M and Lee, J (2018) Suitability of Intelligent Compaction for Asphalt Pavement Quality Control and Quality Assurance. Journal of Construction Engineering and Management, 144(04).
Yu, T, Shen, G Q and Shi, Q (2017) Comparing the Performance Quality of Design-Bid-Build and Design-Build Delivery Methods. Journal of Construction Engineering and Management, 143(04).
Zaneldin, E, Hegazy, T and Grierson, D (2001) Improving Design Coordination for Building Projects. II: A Collaborative System. Journal of Construction Engineering and Management, 127(04), 330–6.
Zayed, T M and Halpin, D W (2004) Process versus Data Oriented Techniques in Pile Construction Productivity Assessment. Journal of Construction Engineering and Management, 130(04), 490–9.
Zayed, T M and Minkarah, I (2004) Resource Allocation for Concrete Batch Plant Operation: Case Study. Journal of Construction Engineering and Management, 130(04), 560–9.
Zhang, J and El-Diraby, T E (2006) Constructability Analysis of the Bridge Superstructure Rotation Construction Method in China. Journal of Construction Engineering and Management, 132(04), 353–62.
Zhang, J, Eastham, D L and Bernold, L E (2005) Waste-Based Management in Residential Construction. Journal of Construction Engineering and Management, 131(04), 423–30.
Zhang, J, Xiang, P, Zhang, R, Chen, D and Ren, Y (2020) Mediating Effect of Risk Propensity between Personality Traits and Unsafe Behavioral Intention of Construction Workers. Journal of Construction Engineering and Management, 146(04).
Zhang, L and El-Gohary, N M (2016) Discovering Stakeholder Values for Axiology-Based Value Analysis of Building Projects. Journal of Construction Engineering and Management, 142(04).
Zhang, X and Liu, J (2022) Incentive Mechanism and Value-Added in PPP Projects Considering Financial Institutions’ Early Intervention. Journal of Construction Engineering and Management, 148(04).
Zheng, J, Zhang, Z, Wu, G, Yang, Y, Xia, N and Liu, B (2021) Daily Self-Efficacy, Work Engagement, and Deviance Behavior among Construction Professionals and Workers: Cross-Level Moderating Role of Job Control. Journal of Construction Engineering and Management, 147(04).
Zhong, B, Li, H, Luo, H, Zhou, J, Fang, W and Xing, X (2020) Ontology-Based Semantic Modeling of Knowledge in Construction: Classification and Identification of Hazards Implied in Images. Journal of Construction Engineering and Management, 146(04).
Zhu, H, Hwang, B, Ngo, J and Tan, J P S (2022) Applications of Smart Technologies in Construction Project Management. Journal of Construction Engineering and Management, 148(04).