Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 485 results ...

Çoker, G B (1985) Information System for Building Products. Journal of Construction Engineering and Management, 111(04), 411–25.

Abd El Halim, A E H O and Haas, R (2004) Process and Case Illustration of Construction Innovation. Journal of Construction Engineering and Management, 130(04), 570–5.

Abdelgawad, M and Fayek, A R (2011) Fuzzy Reliability Analyzer: Quantitative Assessment of Risk Events in the Construction Industry Using Fuzzy Fault-Tree Analysis. Journal of Construction Engineering and Management, 137(04), 294–302.

AbouRizk, S M and Halpin, D W (1990) Probabilistic Simulation Studies for Repetitive Construction Processes. Journal of Construction Engineering and Management, 116(04), 575–94.

AbouRizk, S M, Halpin, D W and Wilson, J R (1991) Visual Interactive Fitting of Beta Distributions. Journal of Construction Engineering and Management, 117(04), 589–605.

Abudayyeh, O Y and Rasdof, W J (1991) Design of Construction Industry Information Management Systems. Journal of Construction Engineering and Management, 117(04), 698–715.

Adeli, H and Karim, A (1997) Scheduling/Cost Optimization and Neural Dynamics Model for Construction. Journal of Construction Engineering and Management, 123(04), 450–8.

Ahmad, I (1990) Decision‐Support System for Modeling Bid/No‐Bid Decision Problem. Journal of Construction Engineering and Management, 116(04), 595–608.

Ahmed, S M, Sang, L P and Torbica, & M (2003) Use of Quality Function Deployment in Civil Engineering Capital Project Planning. Journal of Construction Engineering and Management, 129(04), 358–68.

Ahn, C R and Lee, S (2013) Importance of Operational Efficiency to Achieve Energy Efficiency and Exhaust Emission Reduction of Construction Operations. Journal of Construction Engineering and Management, 139(04), 404–13.

Ahuja, H N and Nandakumar, V (1985) Simulation Model to Forecast Project Completion Time. Journal of Construction Engineering and Management, 111(04), 325–42.

Akinci, B, Fischer, M and Kunz, J (2002) Automated Generation of Work Spaces Required by Construction Activities. Journal of Construction Engineering and Management, 128(04), 306–15.

Akinci, B, Fischer, M, Kunz, J and Levitt, R (2002) Representing Work Spaces Generically in Construction Method Models. Journal of Construction Engineering and Management, 128(04), 296–305.

Al Sarraj, Z M (1990) Formal Development of Line‐of‐Balance Technique. Journal of Construction Engineering and Management, 116(04), 689–704.

Al‐Harbi, K M, Johnston, D W and Fayadh, H (1994) Building Construction Detailed Estimating Practices in Saudi Arabia. Journal of Construction Engineering and Management, 120(04), 774–84.

Al‐Jarallah, M I (1983) Construction Industry in Saudi Arabia. Journal of Construction Engineering and Management, 109(04), 355–68.

Alavipour, S M R and Arditi, D (2018) Optimizing Financing Cost in Construction Projects with Fixed Project Duration. Journal of Construction Engineering and Management, 144(04).

Aleithawe, I, Sinno, R R and McAnally, W H (2012) Right-of-Way Acquisition Duration Prediction Model for Highway Construction Projects. Journal of Construction Engineering and Management, 138(04), 540–4.

Alhozaimy, A M and Al-Negheimish, A I (1999) Introducing and Managing Quality Scheme for RMC Industry in Saudi Arabia. Journal of Construction Engineering and Management, 125(04), 249–55.

Alhumaidi, H M (2015) Construction Contractors Ranking Method Using Multiple Decision-Makers and Multiattribute Fuzzy Weighted Average. Journal of Construction Engineering and Management, 141(04).

Allouche, E N, Ariaratnam, S T and MacLeod, C W (2003) Software for Planning and Cost Control in Directional Drilling Projects. Journal of Construction Engineering and Management, 129(04), 446–53.

Altayeb, S (1992) Efficacy of Drug Testing Programs Implemented by Contractors. Journal of Construction Engineering and Management, 118(04), 780–90.

Ansell, M, Holmes, M, Evans, R, Pasquire, C and Price, A (2009) Delivering Best Value in Highways Major Maintenance Schemes: Case Study. Journal of Construction Engineering and Management, 135(04), 235–45.

Anson, M and Siu, M F (2020) Augmented Balance Point Diagrams for Matching Site and Concrete-Supply Resources. Journal of Construction Engineering and Management, 146(04).

Antillon, E I, Molenaar, K R and Javernick-Will, A (2017) Evaluating the Effect of Contract Timing on Lifecycle-Design Innovation in Public–Private Partnerships: Comparative Case Study of Highway Projects. Journal of Construction Engineering and Management, 143(04).

Arditi, D and Pattanakitchamroon, T (2008) Analysis Methods in Time-Based Claims. Journal of Construction Engineering and Management, 134(04), 242–52.

Arditi, D, Kale, S and Tangkar, M (1997) Innovation in Construction Equipment and Its Flow into the Construction Industry. Journal of Construction Engineering and Management, 123(04), 371–8.

Arriagada D., R E and Alarcón C., L F (2014) Knowledge Management and Maturation Model in Construction Companies. Journal of Construction Engineering and Management, 140(04).

Arriagada D., R E and Alarcón C., L F (2014) Modelo de Gestión y Maduración de Conocimiento en Empresas Constructoras. Journal of Construction Engineering and Management, 140(04).

Arshad, M F, Thaheem, M J, Nasir, A R and Malik, M S A (2019) Contractual Risks of Building Information Modeling: Toward a Standardized Legal Framework for Design-Bid-Build Projects. Journal of Construction Engineering and Management, 145(04).

Ashuri, B, Kashani, H, Molenaar, K R, Lee, S and Lu, J (2012) Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options. Journal of Construction Engineering and Management, 138(04), 545–57.

Atalah, A (2008) Effect of Rock Trenching Vibrations on Nearby Structures. Journal of Construction Engineering and Management, 134(04), 234–41.

Atkin, B L and Gill, E M (1986) CAD and Management of Construction Projects. Journal of Construction Engineering and Management, 112(04), 557–65.

Attalla, M and Hegazy, T (2003) Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus Regression. Journal of Construction Engineering and Management, 129(04), 405–11.

Ayhan, M, Dikmen, I and Talat Birgonul, M (2021) Predicting the Occurrence of Construction Disputes Using Machine Learning Techniques. Journal of Construction Engineering and Management, 147(04).

Ayyub, B M and Haldar, A (1985) Decisions in Construction Operations. Journal of Construction Engineering and Management, 111(04), 343–57.

Back, W E and Bell, L C (1995) Quantifying Process Benefits of Electronic Data Management Technologies. Journal of Construction Engineering and Management, 121(04), 415–21.

Baek, M and Ashuri, B (2019) Analysis of the Variability of Submitted Unit Price Bids for Asphalt Line Items in Highway Projects. Journal of Construction Engineering and Management, 145(04).

Bai, Y (2007) Intelligent Painting Process Planner for Robotic Bridge Painting. Journal of Construction Engineering and Management, 133(04), 335–42.

Bai, Y, Burkett, W R and Nash, P T (2006) Lessons Learned from an Emergency Bridge Replacement Project. Journal of Construction Engineering and Management, 132(04), 338–44.

Barras, G C and Mayo, R E (1995) Minidirectional Drilling for Installation of Underground Electrical Conduit. Journal of Construction Engineering and Management, 121(04), 364–9.

Barraza, G A (2011) Probabilistic Estimation and Allocation of Project Time Contingency. Journal of Construction Engineering and Management, 137(04), 259–65.

Barry, W, Leite, F and O’Brien, W J (2015) Late Deliverable Risk Catalog: Evaluating the Impacts and Risks of Late Deliverables to Construction Sites. Journal of Construction Engineering and Management, 141(04).

Battikha, M G (2008) Reasoning Mechanism for Construction Nonconformance Root-Cause Analysis. Journal of Construction Engineering and Management, 134(04), 280–8.

Beheiry, S M, Chong, W K and Haas, C T (2006) Examining the Business Impact of Owner Commitment to Sustainability. Journal of Construction Engineering and Management, 132(04), 384–92.

Beliveau, Y J, Williams, J M, King, M G and Niles, A R (1995) Real-Time Position Measurement Integrated with CAD: Technologies and Their Protocols. Journal of Construction Engineering and Management, 121(04), 346–54.

Bernold, L E (1990) Testing Bar‐Code Technology in Construction Environment. Journal of Construction Engineering and Management, 116(04), 643–55.

Bernold, L E and Treseler, J F (1991) Vendor Analysis for Best Buy in Construction. Journal of Construction Engineering and Management, 117(04), 645–58.

Bertero, R D (2014) Great 2010 American Earthquakes: Lessons for Seismic Design and Construction. Journal of Construction Engineering and Management, 140(04).

Bertero, R D (2014) Los Grandes Terremotos Americanos del Año 2010: Enseñanzas para el Diseño y la Construcción Sísmica. Journal of Construction Engineering and Management, 140(04).

Bhandari, S, Hallowell, M R, Alruqi, W and Salas, R (2021) Modeling the Relationship between Personal Risk Tolerance, Work-Related Risk Tolerance, and Risk-Taking Behavior of Construction Workers. Journal of Construction Engineering and Management, 147(04).

Bhurisith, I and Touran, A (2002) Case Study of Obsolescence and Equipment Productivity. Journal of Construction Engineering and Management, 128(04), 357–61.

Bing, L, Tiong, R L, Fan, W W and Chew, D A (1999) Risk Management in International Construction Joint Ventures. Journal of Construction Engineering and Management, 125(04), 277–84.

Birgonul, M T, Dikmen, I and Bektas, S (2015) Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices. Journal of Construction Engineering and Management, 141(04).

Bofang, Z and Jianbo, C (1989) Finite Element Analysis of Effect of Pipe Cooling in Concrete Dams. Journal of Construction Engineering and Management, 115(04), 487–98.

Bowen, P, Edwards, P and Lingard, H (2013) Workplace Stress Experienced by Construction Professionals in South Africa. Journal of Construction Engineering and Management, 139(04), 393–403.

Bresnen, M J, Bryman, A E, Ford, J R, Keil, E T, Beardsworth, A D, Jepson, M A and Wray, K (1984) Effective Construction Site Management: A Review. Journal of Construction Engineering and Management, 110(04), 420–36.

Bubbers, G and Christian, J (1992) Hypertext and Claim Analysis. Journal of Construction Engineering and Management, 118(04), 716–30.

Bubshait, A A and Cunningham, M J (1998) Comparison of Delay Analysis Methodologies. Journal of Construction Engineering and Management, 124(04), 315–22.

Candaş, A B and Tokdemir, O B (2022) Automated Identification of Vagueness in the FIDIC Silver Book Conditions of Contract. Journal of Construction Engineering and Management, 148(04).

Cao, M, Cheng, M and Wu, Y (2015) Hybrid Computational Model for Forecasting Taiwan Construction Cost Index. Journal of Construction Engineering and Management, 141(04).

Carr, R I (1989) Cost‐Estimating Principles. Journal of Construction Engineering and Management, 115(04), 545–51.

Cavalcante, C A V, Alencar, M H and Lopes, R S (2017) Multicriteria Model to Support Maintenance Planning in Residential Complexes under Warranty. Journal of Construction Engineering and Management, 143(04).

Chan, A T S and Chan, E H W (2005) Impact of Perceived Leadership Styles on Work Outcomes: Case of Building Professionals. Journal of Construction Engineering and Management, 131(04), 413–22.

Chan, E H W and Chan, A T S (1999) Imposing ISO 9000 Quality Assurance System on Statutory Agents in Hong Kong. Journal of Construction Engineering and Management, 125(04), 285–91.

Chan, E H W and Tse, R Y C (2003) Cultural Considerations in International Construction Contracts. Journal of Construction Engineering and Management, 129(04), 375–81.

Chan, W and Lu, M (2008) Materials Handling System Simulation in Precast Viaduct Construction: Modeling, Analysis, and Implementation. Journal of Construction Engineering and Management, 134(04), 300–10.

Chang, A S and Tsai, Y (2003) Engineering Information Classification System. Journal of Construction Engineering and Management, 129(04), 454–60.

Chang, C, Hanna, A S, Lackney, J A and Sullivan, K T (2007) Quantifying the Impact of Schedule Compression on Labor Productivity for Mechanical and Sheet Metal Contractor. Journal of Construction Engineering and Management, 133(04), 287–96.

Chang, L (1986) Inferential Statistics for Craftsman Questionnaire. Journal of Construction Engineering and Management, 112(04), 492–9.

Chang, L and Borcherding, J D (1986) Craftsman Questionnaire Sampling. Journal of Construction Engineering and Management, 112(04), 543–56.

Chang, L and Borcherding, J D (1985) Evaluation of Craftsman Questionnaire. Journal of Construction Engineering and Management, 111(04), 426–37.

Chao, L and Liaw, S (2019) Fuzzy Logic Model for Determining Minimum Overheads-Cum-Markup Rate. Journal of Construction Engineering and Management, 145(04).

Chao, L and Skibniewski, M J (1998) Fuzzy Logic for Evaluating Alternative Construction Technology. Journal of Construction Engineering and Management, 124(04), 297–304.

Chau, K W, Anson, M and Zhang, J P (2004) Four-Dimensional Visualization of Construction Scheduling and Site Utilization. Journal of Construction Engineering and Management, 130(04), 598–606.

Chen, Q and Jin, R (2012) Safety4Site Commitment to Enhance Jobsite Safety Management and Performance. Journal of Construction Engineering and Management, 138(04), 509–19.

Chen, Z, Li, H and Wong, C T C (2000) Environmental Management of Urban Construction Projects in China. Journal of Construction Engineering and Management, 126(04), 320–4.

Cheng, E W L and Li, H (2005) Analytic Network Process Applied to Project Selection. Journal of Construction Engineering and Management, 131(04), 459–66.

Cheng, M and Ko, C (2003) Object-Oriented Evolutionary Fuzzy Neural Inference System for Construction Management. Journal of Construction Engineering and Management, 129(04), 461–9.

Cheng, M and Yang, S (2001) GIS-Based Cost Estimates Integrating with Material Layout Planning. Journal of Construction Engineering and Management, 127(04), 291–9.

Cheng, M Y and O'Connor, J T (1996) ArcSite: Enhanced GIS for Construction Site Layout. Journal of Construction Engineering and Management, 122(04), 329–36.

Chew, M Y L and De Silva, N (2004) Factorial Method for Performance Assessment of Building Facades. Journal of Construction Engineering and Management, 130(04), 525–33.

Chih, Y, Kiazad, K, Li, M, Capezio, A, Zhou, L and Restubog, S L D (2017) Broken Promises: Implications for the Job Insecurity and Job Performance of Chinese Construction Workers. Journal of Construction Engineering and Management, 143(04).

Chinowsky, P S, Diekmann, J and O’Brien, J (2010) Project Organizations as Social Networks. Journal of Construction Engineering and Management, 136(04), 452–8.

Chong, D, Wang, Y, Zhao, K, Wang, D and Oeser, M (2018) Asphalt Fume Exposures by Pavement Construction Workers: Current Status and Project Cases. Journal of Construction Engineering and Management, 144(04).

Christian, J and Mir, S U (1987) Use of Integrated Microcomputer Package for Formwork Design. Journal of Construction Engineering and Management, 113(04), 603–10.

Chrzanowski, E N and Johnston, D W (1986) Application of Linear Scheduling. Journal of Construction Engineering and Management, 112(04), 476–91.

Chua, D K H and Goh, Y M (2004) Incident Causation Model for Improving Feedback of Safety Knowledge. Journal of Construction Engineering and Management, 130(04), 542–51.

Chua, D K H and Yeoh, K W (2011) PDM++: Planning Framework from a Construction Requirements Perspective. Journal of Construction Engineering and Management, 137(04), 266–74.

CoÅŸkunoÄŸlu, O (1984) Optimal Probabilistic Compression of PERT Networks. Journal of Construction Engineering and Management, 110(04), 437–46.

Cole, L J R (1991) Construction Scheduling: Principles, Practices, and Six Case Studies. Journal of Construction Engineering and Management, 117(04), 579–88.

Crowley, L G (2000) Friedman and Gates—Another Look. Journal of Construction Engineering and Management, 126(04), 306–12.

De La Garza, J M and Melin, J W (1986) Prepayment Ability to Offset Inflation. Journal of Construction Engineering and Management, 112(04), 514–29.

De La Garza, J M and Mitropoulos, P (1991) . Journal of Construction Engineering and Management, 117(04), 736–55.

De La Garza, J M, Vorster, M C and Parvin, C M (1991) Total Float Traded as Commodity. Journal of Construction Engineering and Management, 117(04), 716–27.

de Neufville, R and King, D (1991) Risk and Need‐for‐Work Premiums in Contractor Bidding. Journal of Construction Engineering and Management, 117(04), 659–73.

de Neufville, R and Smith, J T (1994) Improving Contractors' Bids Using Preference Reversal Phenomenon. Journal of Construction Engineering and Management, 120(04), 706–19.

Del Solar, P, Del Río, M, Villoria, P and Nadal, A (2016) Analysis of Recurrent Defects in the Execution of Ceramic-Coatings Cladding in Building Construction. Journal of Construction Engineering and Management, 142(04).

Delgado-Hernandez, D J, Cruz-Cruz, C C and Vences-García, P Y (2017) Improvement Management Tools in the Construction Industry: Case Study of Mexico. Journal of Construction Engineering and Management, 143(04).

Deng, Y, Gan, V J L, Das, M, Cheng, J C P and Anumba, C (2019) Integrating 4D BIM and GIS for Construction Supply Chain Management. Journal of Construction Engineering and Management, 145(04).

Dharmapalan, V, Gambatese, J A, Fradella, J and Moghaddam Vahed, A (2015) Quantification and Assessment of Safety Risk in the Design of Multistory Buildings. Journal of Construction Engineering and Management, 141(04).

Dias, A and Ioannou, P G (1995) Debt Capacity and Optimal Capital Structure for Privately Financed Infrastructure Projects. Journal of Construction Engineering and Management, 121(04), 404–14.

Diekmann, J E and Girard, M J (1995) Are Contract Disputes Predictable?. Journal of Construction Engineering and Management, 121(04), 355–63.

Diekmann, J E and Kruppenbacher, T A (1984) Claims Analysis and Computer Reasoning. Journal of Construction Engineering and Management, 110(04), 391–408.

Dikmen, I, Birgonul, M T and Budayan, C (2009) Strategic Group Analysis in the Construction Industry. Journal of Construction Engineering and Management, 135(04), 288–97.

Dossick, C S and Neff, G (2010) Organizational Divisions in BIM-Enabled Commercial Construction. Journal of Construction Engineering and Management, 136(04), 459–67.

Dowding, C H (1994) Ground Motions and Air‐Blast Effects of Explosive Demolition of Structures. Journal of Construction Engineering and Management, 120(04), 838–56.

Drew, D S and Skitmore, M (2006) Testing Vickery’s Revenue Equivalence Theory in Construction Auctions. Journal of Construction Engineering and Management, 132(04), 425–8.

Drexler, J A and Larson, E W (2000) Partnering: Why Project Owner-Contractor Relationships Change. Journal of Construction Engineering and Management, 126(04), 293–7.

Du, J, El-Gafy, M and Zhao, D (2016) Optimization of Change Order Management Process with Object-Oriented Discrete Event Simulation: Case Study. Journal of Construction Engineering and Management, 142(04).

Dulaimi, M F and Langford, D (1999) Job Behavior of Construction Project Managers: Determinants and Assessment. Journal of Construction Engineering and Management, 125(04), 256–64.

Dunston, P S, Savage, B M and Mannering, F L (2000) Weekend Closure for Construction of Asphalt Overlay on Urban Highway. Journal of Construction Engineering and Management, 126(04), 313–9.

Durdyev, S, Ismail, S and Kandymov, N (2018) Structural Equation Model of the Factors Affecting Construction Labor Productivity. Journal of Construction Engineering and Management, 144(04).

Dyer, B, Goodrum, P M and Viele, K (2012) Effects of Omitted Variable Bias on Construction Real Output and Its Implications on Productivity Trends in the United States. Journal of Construction Engineering and Management, 138(04), 558–66.

Easa, S M (1988) Earthwork Allocations with Linear Unit Costs. Journal of Construction Engineering and Management, 114(04), 641–55.

Easa, S M and Can, E K (1985) Stochastic Priority Model for Aggregate Blending. Journal of Construction Engineering and Management, 111(04), 358–73.

Ekström, M A and Björnsson, H C (2005) Valuing Flexibility in Architecture, Engineering, and Construction Information Technology Investments. Journal of Construction Engineering and Management, 131(04), 431–8.

El-Anwar, O and Aziz, T A (2014) Integrated Urban-Construction Planning Framework for Slum Upgrading Projects. Journal of Construction Engineering and Management, 140(04).

El-Anwar, O and Aziz, T A (2014) Un Marco Integrado de Planificación Urbana y Construcción para Proyectos de Mejoramiento de Barrios Vulnerables. Journal of Construction Engineering and Management, 140(04).

El-Rayes, K (2001) Optimum Planning of Highway Construction under A + B Bidding Method. Journal of Construction Engineering and Management, 127(04), 261–9.

El-Rayes, K and Hyari, K (2005) {[}CONLIGHT:{]} Lighting Design Model for Nighttime Highway Construction. Journal of Construction Engineering and Management, 131(04), 467–76.

El-Rayes, K and Kandil, A (2005) Time-Cost-Quality Trade-Off Analysis for Highway Construction. Journal of Construction Engineering and Management, 131(04), 477–86.

El-Razek, M E A (1999) New Method for Construction of Diaphragm Walls. Journal of Construction Engineering and Management, 125(04), 233–41.

Elazouni, A M and Metwally, F G (2005) Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms. Journal of Construction Engineering and Management, 131(04), 400–12.

Elbeltagi, E, Hegazy, T and Eldosouky, A (2004) Dynamic Layout of Construction Temporary Facilities Considering Safety. Journal of Construction Engineering and Management, 130(04), 534–41.

Eldin, N N (1988) Constructability improvement of Project Designs. Journal of Construction Engineering and Management, 114(04), 631–40.

Elinwa, A U and Buba, S A (1993) Construction Cost Factors in Nigeria. Journal of Construction Engineering and Management, 119(04), 698–713.

Elsayegh, A and El-adaway, I H (2021) Holistic Study and Analysis of Factors Affecting Collaborative Planning in Construction. Journal of Construction Engineering and Management, 147(04).

Elzarka, H M and Bell, L C (1995) Object-Oriented Methodology for Materials-Management Systems. Journal of Construction Engineering and Management, 121(04), 438–45.

Fang, Y and Cho, Y K (2017) Effectiveness Analysis from a Cognitive Perspective for a Real-Time Safety Assistance System for Mobile Crane Lifting Operations. Journal of Construction Engineering and Management, 143(04).

Faniran, O O, Oluwoye, J O and Lenard, D J (1998) Interactions between Construction Planning and Influence Factors. Journal of Construction Engineering and Management, 124(04), 245–56.

Farid, F and Boyer, L T (1985) Fair and Reasonable Markup (FaRM) Pricing Model. Journal of Construction Engineering and Management, 111(04), 374–90.

Fernandez-Solis, J L, Porwal, V, Lavy, S, Shafaat, A, Rybkowski, Z K, Son, K and Lagoo, N (2013) Survey of Motivations, Benefits, and Implementation Challenges of Last Planner System Users. Journal of Construction Engineering and Management, 139(04), 354–60.

Ferrada, X and Serpell, A (2014) Selección de los Métodos de Construcción en Proyectos: Un Problema de Conocimiento. Journal of Construction Engineering and Management, 140(04).

Ferrada, X and Serpell, A (2014) Selection of Construction Methods for Construction Projects: A Knowledge Problem. Journal of Construction Engineering and Management, 140(04).

Fischer, M A and Aalami, F (1996) Scheduling with Computer-Interpretable Construction Method Models. Journal of Construction Engineering and Management, 122(04), 337–47.

Forcada, N, Macarulla, M and Love, P E D (2013) Assessment of Residential Defects at Post-Handover. Journal of Construction Engineering and Management, 139(04), 372–8.

Formoso, C T, Soibelman, L, De Cesare, C and Isatto, E L (2002) Material Waste in Building Industry: Main Causes and Prevention. Journal of Construction Engineering and Management, 128(04), 316–25.

Fortunato, B R, Hallowell, M R, Behm, M and Dewlaney, K (2012) Identification of Safety Risks for High-Performance Sustainable Construction Projects. Journal of Construction Engineering and Management, 138(04), 499–508.

Franco-Duran, D M and de la Garza, J M (2020) Performance of Resource-Constrained Scheduling Heuristics. Journal of Construction Engineering and Management, 146(04).

Fu, W K, Drew, D S and Lo, H P (2003) Competitiveness of Inexperienced and Experienced Contractors in Bidding. Journal of Construction Engineering and Management, 129(04), 388–95.

Gallardo, C A S, Granja, A D and Picchi, F A (2014) Mejorias en la Productividad de un Proceso de Prefabricados de Concreto con Flujo en Linea Despues de un Esfuerzo de Estabilidad Basica. Journal of Construction Engineering and Management, 140(04).

Gallardo, C A S, Granja, A D and Picchi, F A (2014) Productivity Gains in a Line Flow Precast Concrete Process after a Basic Stability Effort. Journal of Construction Engineering and Management, 140(04).

Gao, R, Chan, A P C, Utama, W P and Zahoor, H (2017) Workers’ Perceptions of Safety Climate in International Construction Projects: Effects of Nationality, Religious Belief, and Employment Mode. Journal of Construction Engineering and Management, 143(04).

Garcia, G, Golparvar-Fard, M, de la Garza, J M and Fischer, M (2021) Measuring Progress and Productivity in Model-Driven Engineering for Capital Project Delivery. Journal of Construction Engineering and Management, 147(04).

Garvin, M J (2010) Enabling Development of the Transportation Public-Private Partnership Market in the United States. Journal of Construction Engineering and Management, 136(04), 402–11.

Garza, J M d l, Hancher, D E and Decker, L (1998) Analysis of Safety Indicators in Construction. Journal of Construction Engineering and Management, 124(04), 312–4.

Gates, M and Scarpa, A (1984) Optimum Penetration of Friction Piles. Journal of Construction Engineering and Management, 110(04), 491–510.

Gelisen, G and Griffis, F H ( (2014) Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis. Journal of Construction Engineering and Management, 140(04).

Gelisen, G and Griffis, F H ( (2014) Productividad Automatizada Basada en el Itinerario Animado (APBSA): Una Simulacion Basada en un Enfoque del Analisis de Compensacion Tiempo-Costo. Journal of Construction Engineering and Management, 140(04).

Gerwick, B C (1990) Implementing Construction Research. Journal of Construction Engineering and Management, 116(04), 556–63.

Gibson, G E and Bell, L C (1990) Electronic Data Interchange in Construction. Journal of Construction Engineering and Management, 116(04), 727–37.

Gil, N, Tommelein, I D, Stout, A and Garrett, T (2005) Embodying Product and Process Flexibility to Cope with Challenging Project Deliveries. Journal of Construction Engineering and Management, 131(04), 439–48.

Goodrum, P M (2004) Hispanic and Non-Hispanic Wage Differentials: Implications for United States Construction Industry. Journal of Construction Engineering and Management, 130(04), 552–9.

Goodrum, P M, Zhai, D and Yasin, M F (2009) Relationship between Changes in Material Technology and Construction Productivity. Journal of Construction Engineering and Management, 135(04), 278–87.

Gould, C H (1988) Rolling Fours: Novel Work Schedule. Journal of Construction Engineering and Management, 114(04), 577–93.

Guevara, J, Herrera, L and Salazar, J (2022) Interorganizational Sponsor Networks in Road and Social Infrastructure PPP Equity Markets. Journal of Construction Engineering and Management, 148(04).

Guillermo, M A, Grau, D, Acevedo, S C and Rivera, T E (2014) How the Design and Assessment of Instruction/Learning Strategies Influence the Academic Performance of Civil Engineering Students at Universidad Industrial De Santander, Colombia. Journal of Construction Engineering and Management, 140(04).

Gunduz, M, Birgonul, M T and Ozdemir, M (2017) Fuzzy Structural Equation Model to Assess Construction Site Safety Performance. Journal of Construction Engineering and Management, 143(04).

Guo, S (2002) Identification and Resolution of Work Space Conflicts in Building Construction. Journal of Construction Engineering and Management, 128(04), 287–95.

Hacker, M E, Kaminsky, J and Faust, K M (2019) Legitimizing Involvement in Emergency Accommodations: Water and Wastewater Utility Perspectives. Journal of Construction Engineering and Management, 145(04).

Hadipriono, F C, Lim, C and Wong, K (1986) Event Tree Analysis to Prevent Failures in Temporary Structures. Journal of Construction Engineering and Management, 112(04), 500–13.

Haltenhoff, C E (1987) Construction Management Performance Under Dual Services Agreements. Journal of Construction Engineering and Management, 113(04), 640–7.

Hammad, M W, Abbasi, A and Ryan, M J (2018) Developing a Novel Framework to Manage Schedule Contingency Using Theory of Constraints and Earned Schedule Method. Journal of Construction Engineering and Management, 144(04).

Hampton, D, Jin, J S and Clark, E A (1990) Foundation Construction within Wastewater‐Treatment Plant. Journal of Construction Engineering and Management, 116(04), 564–73.

Han, S H and Diekmann, J E (2001) Approaches for Making Risk-Based Go/No-Go Decision for International Projects. Journal of Construction Engineering and Management, 127(04), 300–8.

Han, S, Jiang, Y and Bai, Y (2022) Fast-PGMED: Fast and Dense Elevation Determination for Earthwork Using Drone and Deep Learning. Journal of Construction Engineering and Management, 148(04).

Hanlon, E J and Sanvido, V E (1995) Constructability Information Classification Scheme. Journal of Construction Engineering and Management, 121(04), 337–45.

Hanna, A S, Peterson, P and Lee, M (2002) Benchmarking Productivity Indicators for Electrical/Mechanical Projects. Journal of Construction Engineering and Management, 128(04), 331–7.

Hanna, A S, Russell, J S, Nordheim, E V and Bruggink, M J (1999) Impact of Change Orders on Labor Efficiency for Electrical Construction. Journal of Construction Engineering and Management, 125(04), 224–32.

Harmelink, D J (2001) Linear Scheduling Model: Float Characteristics. Journal of Construction Engineering and Management, 127(04), 255–60.

Harmelink, D J and Rowings, J E (1998) Linear Scheduling Model: Development of Controlling Activity Path. Journal of Construction Engineering and Management, 124(04), 263–8.

Harris, R B and Ioannou, P G (1998) Scheduling Projects with Repeating Activities. Journal of Construction Engineering and Management, 124(04), 269–78.

Hartman, F, Snelgrove, P and Ashrafi, R (1997) Effective Wording to Improve Risk Allocation in Lump Sum Contracts. Journal of Construction Engineering and Management, 123(04), 379–87.

Harty, C and Whyte, J (2010) Emerging Hybrid Practices in Construction Design Work: Role of Mixed Media. Journal of Construction Engineering and Management, 136(04), 468–76.

Hasan, M and Lu, M (2021) Error Propagation Model for Analyzing Project Labor Cost Budget Risks in Industrial Construction. Journal of Construction Engineering and Management, 147(04).

Hassim, S, Kadir, M R A, Lew, Y and Sim, Y (2003) Estimation of Minimum Working Capital for Construction Projects in Malaysia. Journal of Construction Engineering and Management, 129(04), 369–74.

Hastak, M, Vanegas, J A and Puyana‐Camargo, M (1993) Time‐Based Competition: Competitive Advantage Tool for A/E/C Firms. Journal of Construction Engineering and Management, 119(04), 785–800.

Hegazy, T and Kamarah, E (2008) Efficient Repetitive Scheduling for High-Rise Construction. Journal of Construction Engineering and Management, 134(04), 253–64.

Hegazy, T and Petzold, K (2003) Genetic Optimization for Dynamic Project Control. Journal of Construction Engineering and Management, 129(04), 396–404.

Hegazy, T, Zaneldin, E and Grierson, D (2001) Improving Design Coordination for Building Projects. I: Information Model. Journal of Construction Engineering and Management, 127(04), 322–9.

Herbsman, Z (1983) Long‐Range Forecasting Highway Construction Costs. Journal of Construction Engineering and Management, 109(04), 423–34.

Herbsman, Z J (1995) A+B Bidding Method—Hidden Success Story for Highway Construction. Journal of Construction Engineering and Management, 121(04), 430–7.

Herrera, R F, Mourgues, C, Alarcón, L F and Pellicer, E (2021) Analyzing the Association between Lean Design Management Practices and BIM Uses in the Design of Construction Projects. Journal of Construction Engineering and Management, 147(04).

Hijazi, A M, AbouRizk, S M and Halpin, D W (1992) Modeling and Simulating Learning Development in Construction. Journal of Construction Engineering and Management, 118(04), 685–700.

Hinze, J (2005) Use of Trench Boxes for Worker Protection. Journal of Construction Engineering and Management, 131(04), 494–500.

Hinze, J and Brown, J (1994) Properties of Soundless Chemical Demolition Agents. Journal of Construction Engineering and Management, 120(04), 816–27.

Hinze, J and Roxo, J (1984) Is Injury Occurrence Related to Lunar Cycles?. Journal of Construction Engineering and Management, 110(04), 409–19.

Hinze, J and Wiegand, F (1992) Role of Designers in Construction Worker Safety. Journal of Construction Engineering and Management, 118(04), 677–84.

Hinze, J, Bren, D C and Piepho, N (1995) Experience Modification Rating As Measure of Safety Performance. Journal of Construction Engineering and Management, 121(04), 455–8.

Hiyassat, M A S (2000) Modification of Minimum Moment Approach in Resource Leveling. Journal of Construction Engineering and Management, 126(04), 278–84.

Horman, M J, Orosz, M P and Riley, D R (2006) Sequence Planning for Electrical Construction. Journal of Construction Engineering and Management, 132(04), 363–72.

Hosseinian, S M, Arjomand, A, Li, C Q and Zhang, G (2022) Developing a Model for Assessing Project Completion Time Reliability during Construction Using Time-Dependent Reliability Theory. Journal of Construction Engineering and Management, 148(04).

Howell, G, Laufer, A and Ballard, G (1993) Interaction between Subcycles: One Key to Improved Methods. Journal of Construction Engineering and Management, 119(04), 714–28.

Hwang, B and Ho, J W (2012) Front-End Planning Implementation in Singapore: Status, Importance, and Impact. Journal of Construction Engineering and Management, 138(04), 567–73.

Ibbs, C W, Kwak, Y H, Ng, T and Odabasi, A M (2003) Project Delivery Systems and Project Change: Quantitative Analysis. Journal of Construction Engineering and Management, 129(04), 382–7.

Idowu, O S and Lam, K C (2020) Conceptual Quantities Estimation Using Bootstrapped Support Vector Regression Models. Journal of Construction Engineering and Management, 146(04).

Ioannou, P G (1988) Geologic Exploration and Risk Reduction in Underground Construction. Journal of Construction Engineering and Management, 114(04), 532–47.

Ioannou, P G (1987) Geologic Prediction Model for Tunneling. Journal of Construction Engineering and Management, 113(04), 569–90.

Ioannou, P G (1988) Pilot Tunnels: Contractor's Position. Journal of Construction Engineering and Management, 114(04), 594–613.

Ioannou, P G and Carr, R I (1988) Advanced Building Technology Matrix System. Journal of Construction Engineering and Management, 114(04), 517–31.

Ivanoff, D J and Diekmann, J E (1989) Project‐Labor Agreements in Construction Industry. Journal of Construction Engineering and Management, 115(04), 567–84.

Jaafari, A (1997) Concurrent Construction and Life Cycle Project Management. Journal of Construction Engineering and Management, 123(04), 427–36.

Jaafari, A and Mateffy, V K (1986) Games People Play with Cost Control in Australia. Journal of Construction Engineering and Management, 112(04), 566–81.

Jaselskis, E J and Russell, J S (1992) Risk Analysis Approach to Selection of Contractor Evaluation Method. Journal of Construction Engineering and Management, 118(04), 814–21.

Javanmardi, A, Abbasian-Hosseini, S A, Liu, M and Hsiang, S M (2020) Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach. Journal of Construction Engineering and Management, 146(04).

Javernick-Will, A and Levitt, R E (2010) Mobilizing Institutional Knowledge for International Projects. Journal of Construction Engineering and Management, 136(04), 430–41.

Javid, M and Seneviratne, P N (2000) Investment Risk Analysis in Airport Parking Facility Development. Journal of Construction Engineering and Management, 126(04), 298–305.

Jeljeli, M N and Russell, J S (1995) Coping with Uncertainty in Environmental Construction: Decision-Analysis Approach. Journal of Construction Engineering and Management, 121(04), 370–80.

Jergeas, G and Put, J V d (2001) Benefits of Constructability on Construction Projects. Journal of Construction Engineering and Management, 127(04), 281–90.

Jia, B, Yang, Y, Xie, B and Yu, X (2021) Novel Geometric Control Technology for Precast Segmental Bridges. Journal of Construction Engineering and Management, 147(04).

Jin, R and Chen, Q (2019) Overview of Concrete Recycling Legislation and Practice in the United States. Journal of Construction Engineering and Management, 145(04).

Jordan Srour, F, Kiomjian, D and Srour, I M (2016) Learning Curves in Construction: A Critical Review and New Model. Journal of Construction Engineering and Management, 142(04).

Joseph Garcia, A and Mollaoglu, S (2020) Individuals’ Capacities to Apply Transferred Knowledge in AEC Project Teams. Journal of Construction Engineering and Management, 146(04).

Kagan, H A (1983) Evaluating Construction Failures. Journal of Construction Engineering and Management, 109(04), 460–72.

Kakoto, T and Skibniewski, M (1991) Engineering Decision Support of Automated Shield Tunneling. Journal of Construction Engineering and Management, 117(04), 674–90.

Kakoto, T, Skibniewski, M J and Hancher, D E (1989) Comparison of U.S. and Japanese Practices in Public Construction. Journal of Construction Engineering and Management, 115(04), 499–516.

Kalhor, E and Valentin, V (2018) Cost Estimation Framework for Optimal Retrofit Planning to Mitigate Residential Building Vulnerability to Wildfires. Journal of Construction Engineering and Management, 144(04).

Kang, L S and Paulson, B C (1997) Adaptability of Information Classification Systems for Civil Works. Journal of Construction Engineering and Management, 123(04), 419–26.

Kang, Y, O’Brien, W J, Dai, J, Mulva, S P, Thomas, S P, Chapman, R E and Butry, D (2013) Interaction Effects of Information Technologies and Best Practices on Construction Project Performance. Journal of Construction Engineering and Management, 139(04), 361–71.

Kangari, R (1995) Risk Management Perceptions and Trends of U.S. Construction. Journal of Construction Engineering and Management, 121(04), 422–9.

Kar, S, Kothari, C and Jha, K N (2021) Developing an Optimum Material Procurement Schedule by Integrating Construction Program and Budget Using NSGA-II. Journal of Construction Engineering and Management, 147(04).

Karakhan, A A, Gambatese, J and Simmons, D R (2020) Development of Assessment Tool for Workforce Sustainability. Journal of Construction Engineering and Management, 146(04).

Karlsson, M, Lakka, A, Sulankivi, K, Hanna, A S and Thompson, B P (2008) Best Practices for Integrating the Concurrent Engineering Environment into Multipartner Project Management. Journal of Construction Engineering and Management, 134(04), 289–99.

Kashiwagi, D and Byfield, R (2002) State of Utah Performance Information Procurement System Tests. Journal of Construction Engineering and Management, 128(04), 338–47.

Kereri, J O and Harper, C M (2019) Social Networks and Construction Teams: Literature Review. Journal of Construction Engineering and Management, 145(04).

Key, J M (1987) Earthmoving and Heavy Equipment. Journal of Construction Engineering and Management, 113(04), 611–22.

Khan, A, Do, J and Kim, D (2017) Experimental Optimization of High-Strength Self-Compacting Concrete Based on D-Optimal Design. Journal of Construction Engineering and Management, 143(04).

Kim, C, Kim, T, Lee, U, Cho, H and Kang, K (2016) Advanced Steel Beam Assembly Approach for Improving Safety of Structural Steel Workers. Journal of Construction Engineering and Management, 142(04).

Kim, H and Reinschmidt, K F (2011) Effects of Contractors’ Risk Attitude on Competition in Construction. Journal of Construction Engineering and Management, 137(04), 275–83.

Kim, J and Ibbs, C W (1995) Work-Package–Process Model for Piping Construction. Journal of Construction Engineering and Management, 121(04), 381–7.

Kim, J, Ham, Y, Chung, Y and Chi, S (2019) Systematic Camera Placement Framework for Operation-Level Visual Monitoring on Construction Jobsites. Journal of Construction Engineering and Management, 145(04).

Kineber, A F, Othman, I, Oke, A E, Chileshe, N and Buniya, M K (2021) Impact of Value Management on Building Projects Success: Structural Equation Modeling Approach. Journal of Construction Engineering and Management, 147(04).

Kleiner, B M, Smith-Jackson, T L, Mills, T H, O’Brien, M and Haro, E (2008) Design, Development, and Deployment of a Rapid Universal Safety and Health System for Construction. Journal of Construction Engineering and Management, 134(04), 273–9.

Ko, C and Cheng, M (2007) Dynamic Prediction of Project Success Using Artificial Intelligence. Journal of Construction Engineering and Management, 133(04), 316–24.

Koehn, E and Jones, M W (1983) Benefits and Costs of EEO Rules in Construction. Journal of Construction Engineering and Management, 109(04), 435–46.

Kog, Y C and Loh, P K (2012) Critical Success Factors for Different Components of Construction Projects. Journal of Construction Engineering and Management, 138(04), 520–8.

Koo, B and Fischer, M (2000) Feasibility Study of 4D CAD in Commercial Construction. Journal of Construction Engineering and Management, 126(04), 251–60.

Kraiem, Z M and Diekmann, J E (1987) Concurrent Delays in Construction Projects. Journal of Construction Engineering and Management, 113(04), 591–602.

Kula, B and Ergen, E (2021) Implementation of a BIM-FM Platform at an International Airport Project: Case Study. Journal of Construction Engineering and Management, 147(04).

Kululanga, G K, Kuotcha, W, McCaffer, R and Edum-Fotwe, F (2001) Construction Contractors' Claim Process Framework. Journal of Construction Engineering and Management, 127(04), 309–14.

Kululanga, G K, McCaffer, R, Price, A D F and Edum-Fotwe, F (1999) Learning Mechanisms Employed by Construction Contractors. Journal of Construction Engineering and Management, 125(04), 215–23.

López del Puerto, C and Shane, J S (2014) Claves del Éxito en la Gestión de Megaproyectos en México y los Estados Unidos: Un Estudio de Casos. Journal of Construction Engineering and Management, 140(04).

Lammie, J L and Shah, D P (1984) Construction Management: MARTA in Retrospect. Journal of Construction Engineering and Management, 110(04), 459–75.

Larsson, J, Lu, W, Krantz, J and Olofsson, T (2016) Discrete Event Simulation Analysis of Product and Process Platforms: A Bridge Construction Case Study. Journal of Construction Engineering and Management, 142(04).

Laryea, S and Hughes, W (2011) Risk and Price in the Bidding Process of Contractors. Journal of Construction Engineering and Management, 137(04), 248–58.

Laufer, A and Ledbetter, W B (1986) Assessment of Safety Performance Measures at Construction Sites. Journal of Construction Engineering and Management, 112(04), 530–42.

LeBlond, D, Owen, F, Gibson, G E, Haas, C T and Traver, A E (1998) Control Improvement for Advanced Construction Equipment. Journal of Construction Engineering and Management, 124(04), 289–96.

Lee, E and Ibbs, C W (2005) Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies. Journal of Construction Engineering and Management, 131(04), 449–58.

Lee, S and Halpin, D W (2003) Predictive Tool for Estimating Accident Risk. Journal of Construction Engineering and Management, 129(04), 431–6.

Lee, S, Thomas, S R and Tucker, R L (2004) Effective Practice Utilization Using Performance Prediction Software. Journal of Construction Engineering and Management, 130(04), 576–85.

Leu, S and Hwang, S (2001) Optimal Repetitive Scheduling Model with Shareable Resource Constraint. Journal of Construction Engineering and Management, 127(04), 270–80.

Li, H, Wang, M and Dong, X (2019) Resource Leveling in Projects with Stochastic Minimum Time Lags. Journal of Construction Engineering and Management, 145(04).

Li, S, Fan, M and Wu, X (2018) Effect of Social Capital between Construction Supervisors and Workers on Workers’ Safety Behavior. Journal of Construction Engineering and Management, 144(04).

Li, X and Chen, X (2012) Using Grouting of Shield Tunneling to Reduce Settlements of Overlying Tunnels: Case Study in Shenzhen Metro Construction. Journal of Construction Engineering and Management, 138(04), 574–84.

Li, Y, Li, G, Wang, T, Zhu, Y and Li, X (2019) Semicustomized Design Framework of Container Accommodation for Migrant Construction Workers. Journal of Construction Engineering and Management, 145(04).

Lin, K and Haas, C T (1996) Multiple Heavy Lifts Optimization. Journal of Construction Engineering and Management, 122(04), 354–62.

Ling, F Y Y, Hartmann, A, Kumaraswamy, M and Dulaimi, M (2007) Influences on Innovation Benefits during Implementation: Client’s Perspective. Journal of Construction Engineering and Management, 133(04), 306–15.

Lingard, H and Oswald, D (2020) Safety at the Front Line: Social Negotiation of Work and Safety at the Principal Contractor–Subcontractor Interface. Journal of Construction Engineering and Management, 146(04).

Liska, R W and Snell, B (1992) Financial Incentive Programs for Average‐Size Construction Firm. Journal of Construction Engineering and Management, 118(04), 667–76.

Liu, J and Rahbar, F (2004) Project Time-Cost Trade-Off Optimization by Maximal Flow Theory. Journal of Construction Engineering and Management, 130(04), 607–9.

Liu, J, Love, P E D, Sing, M C P, Carey, B and Matthews, J (2015) Modeling Australia’s Construction Workforce Demand: Empirical Study with a Global Economic Perspective. Journal of Construction Engineering and Management, 141(04).

Liu, L, Burns, S A and Feng, C (1995) Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method. Journal of Construction Engineering and Management, 121(04), 446–54.

Liu, M and Ling, Y Y (2005) Modeling a Contractor’s Markup Estimation. Journal of Construction Engineering and Management, 131(04), 391–9.

Liu, Q, Xu, N, Jiang, H, Wang, S, Wang, W and Wang, J (2020) Psychological Driving Mechanism of Safety Citizenship Behaviors of Construction Workers: Application of the Theory of Planned Behavior and Norm Activation Model. Journal of Construction Engineering and Management, 146(04).

Liu, Q, Ye, G, Yang, J, Xiang, Q and Liu, Q (2022) Construction Workers’ Representativeness Heuristic in Decision Making: The Impact of Demographic Factors. Journal of Construction Engineering and Management, 148(04).

Liu, R, Du, J, Issa, R R A and Giel, B (2017) BIM Cloud Score: Building Information Model and Modeling Performance Benchmarking. Journal of Construction Engineering and Management, 143(04).

Lopez del Puerto, C and Shane, J S (2014) Keys to Success in Megaproject Management in Mexico and the United States: Case Study. Journal of Construction Engineering and Management, 140(04).

Lorterapong, P and Moselhi, O (1996) Project-Network Analysis Using Fuzzy Sets Theory. Journal of Construction Engineering and Management, 122(04), 308–18.

Lorterapong, P and Ussavadilokrit, M (2013) Construction Scheduling Using the Constraint Satisfaction Problem Method. Journal of Construction Engineering and Management, 139(04), 414–22.

Love, P E D, Matthews, J and Fang, W (2021) Reflections on the Risk and Uncertainty of Rework in Construction. Journal of Construction Engineering and Management, 147(04).

Lowe, B D, Albers, J, Hayden, M, Lampl, M, Naber, S and Wurzelbacher, S (2020) Review of Construction Employer Case Studies of Safety and Health Equipment Interventions. Journal of Construction Engineering and Management, 146(04).

Lu, M and Li, H (2003) Resource-Activity Critical-Path Method for Construction Planning. Journal of Construction Engineering and Management, 129(04), 412–20.

Lu, W, Guo, W and Zhu, Q (2020) Effect of Justice on Contractor’s Relational Behavior: Moderating Role of Owner’s Asset Specificity. Journal of Construction Engineering and Management, 146(04).

Lucko, G (2009) Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions. Journal of Construction Engineering and Management, 135(04), 246–53.

Lucko, G and Kaminsky, J A (2016) Construction Engineering Conference and Workshop 2014: Setting an Industry–Academic Collaborative Research Agenda. Journal of Construction Engineering and Management, 142(04).

Lundberg, E J and Beliveau, Y J (1989) Automated Lay‐Down Yard Control System—ALYC. Journal of Construction Engineering and Management, 115(04), 535–44.

Lutz, J D, Halpin, D W and Wilson, J R (1994) Simulation of Learning Development in Repetitive Construction. Journal of Construction Engineering and Management, 120(04), 753–73.

Ma, L and Fu, H (2022) A Governance Framework for the Sustainable Delivery of Megaprojects: The Interaction of Megaproject Citizenship Behavior and Contracts. Journal of Construction Engineering and Management, 148(04).

Mahalingam, A (2010) PPP Experiences in Indian Cities: Barriers, Enablers, and the Way Forward. Journal of Construction Engineering and Management, 136(04), 419–29.

Maio, C, Schexnayder, C, Knutson, K and Weber, S (2000) Probability Distribution Functions for Construction Simulation. Journal of Construction Engineering and Management, 126(04), 285–92.

Makul, N (2021) Modified Cost-Benefit Analysis of the Production of Ready-Mixed Self-Consolidating Concrete Prepared with a Recycled Concrete Aggregate. Journal of Construction Engineering and Management, 147(04).

Maloney, W F (1988) Substance Abuse in Construction. Journal of Construction Engineering and Management, 114(04), 614–30.

Maloney, W F, Cameron, I and Hare, B (2007) Tradesmen Involvement in Health and Safety. Journal of Construction Engineering and Management, 133(04), 297–305.

Martin, H and Ramjarrie, K (2021) Cloud Contractor Selection Model for Design-Build Open Tender. Journal of Construction Engineering and Management, 147(04).

Martinez, J C and Ioannou, P G (1999) General-Purpose Systems for Effective Construction Simulation. Journal of Construction Engineering and Management, 125(04), 265–76.

McCabe, B Y, Alderman, E, Chen, Y, Hyatt, D E and Shahi, A (2017) Safety Performance in the Construction Industry: Quasi-Longitudinal Study. Journal of Construction Engineering and Management, 143(04).

McCullouch, B G and Lueprasert, K (1994) 2D Bar‐Code Applications in Construction. Journal of Construction Engineering and Management, 120(04), 739–52.

McQuillen, J L and Hicks, R G (1987) Construction of Rubber‐Modified Asphalt Pavements. Journal of Construction Engineering and Management, 113(04), 537–53.

Mejia A., G, Grau, D, Acevedo, S C and Rivera, T E (2014) Evaluación, Diseño, e Influencia de Estrategias de Instrucción-Aprendizaje en el Desempeño Académico de los Estudiantes de Ingenieria Civil en la Universidad Industrial de Santander, Colombia. Journal of Construction Engineering and Management, 140(04).

Migliaccio, G C, Bogus, S M and Cordova-Alvidrez, A A (2014) Continuous Quality Improvement Techniques for Data Collection in Asset Management Systems. Journal of Construction Engineering and Management, 140(04).

Migliaccio, G C, Bogus, S M and Cordova-Alvidrez, A A (2014) Tecnicas de Mejora Continua de la Calidad de la Recoleccion de Datos en Sistemas de Gerencia de Capital de Infraestructura. Journal of Construction Engineering and Management, 140(04).

Mirzadeh, I and Birgisson, B (2016) Evaluation of Highway Projects under Government Support Mechanisms Based on an Option-Pricing Framework. Journal of Construction Engineering and Management, 142(04).

Mitikie, B B and Lee, T S (2019) Experimental Investigation of Enzyme Stabilization and Its Effect on Clay Brick. Journal of Construction Engineering and Management, 145(04).

Molenaar, K, Washington, S and Diekmann, J (2000) Structural Equation Model of Construction Contract Dispute Potential. Journal of Construction Engineering and Management, 126(04), 268–77.

Moon, S and Bernold, L E (1998) Graphic-Based Human-Machine Interface for Construction Manipulator Control. Journal of Construction Engineering and Management, 124(04), 305–11.

Moselhi, O and El‐Rayes, K (1993) Scheduling of Repetitive Projects with Cost Optimization. Journal of Construction Engineering and Management, 119(04), 681–97.

Moselhi, O, Fazio, P and Hason, S (1992) Automation of Concrete Slab‐on‐Grade Construction. Journal of Construction Engineering and Management, 118(04), 731–48.

Moselhi, O, Hegazy, T and Fazio, P (1991) Neural Networks as Tools in Construction. Journal of Construction Engineering and Management, 117(04), 606–25.

Murguia, D, Demian, P and Soetanto, R (2021) Systemic BIM Adoption: A Multilevel Perspective. Journal of Construction Engineering and Management, 147(04).

Nam, C H and Tatum, C B (1989) Toward Understanding of Product Innovation Process in Construction. Journal of Construction Engineering and Management, 115(04), 517–34.

Namian, M, Albert, A and Feng, J (2018) Effect of Distraction on Hazard Recognition and Safety Risk Perception. Journal of Construction Engineering and Management, 144(04).

Naoum, S G (1994) Critical Analysis of Time and Cost of Management and Traditional Contracts. Journal of Construction Engineering and Management, 120(04), 687–705.

Nasirian, A, Arashpour, M, Abbasi, B and Akbarnezhad, A (2019) Optimal Work Assignment to Multiskilled Resources in Prefabricated Construction. Journal of Construction Engineering and Management, 145(04).

Navon, R and Goldschmidt, E (2003) Can Labor Inputs be Measured and Controlled Automatically?. Journal of Construction Engineering and Management, 129(04), 437–45.

Navon, R and Shpatnitsky, Y (2005) Field Experiments in Automated Monitoring of Road Construction. Journal of Construction Engineering and Management, 131(04), 487–93.

Navon, R, Kelly, P W and Johnston, D W (1993) Human Factors in Introducing On‐Site Construction Automation. Journal of Construction Engineering and Management, 119(04), 801–12.

Nguyen, L D and Tran, D Q (2021) Measurement of Fuzzy Membership Functions in Construction Risk Assessment. Journal of Construction Engineering and Management, 147(04).

Nima, M A, Abdul-Kadir, M R, Jaafar, M S and Alghulami, R G (2002) Constructability Concepts in West Port Highway in Malaysia. Journal of Construction Engineering and Management, 128(04), 348–56.

Nnaji, C, Gambatese, J, Karakhan, A and Osei-Kyei, R (2020) Development and Application of Safety Technology Adoption Decision-Making Tool. Journal of Construction Engineering and Management, 146(04).

Nnaji, C, Lee, H W, Karakhan, A and Gambatese, J (2018) Developing a Decision-Making Framework to Select Safety Technologies for Highway Construction. Journal of Construction Engineering and Management, 144(04).

Noorizadeh, A, Peltokorpi, A and Avkiran, N K (2019) Supplier Performance Evaluation in Construction Projects: Challenges and Possible Solutions. Journal of Construction Engineering and Management, 145(04).

O'Connor, J T (1985) Impacts of Constructability Improvement. Journal of Construction Engineering and Management, 111(04), 404–10.

O'Connor, J T and Caraway, P H (1993) Need for Specification Format that Accommodates Engineered Projects. Journal of Construction Engineering and Management, 119(04), 757–68.

O'Connor, J T and Davis, V S (1988) Constructability Improvement During Field Operations. Journal of Construction Engineering and Management, 114(04), 548–64.

O'Connor, J T, Larimore, M A and Tucker, R L (1986) Collecting Constructability Improvement Ideas. Journal of Construction Engineering and Management, 112(04), 463–75.

O’Connor, J T and Huh, Y (2006) Crew Production Rates for Contract Time Estimation: Beam Erection, Deck, and Rail of Highway Bridges. Journal of Construction Engineering and Management, 132(04), 408–15.

O’Connor, J T and Mock, B D (2019) Construction, Commissioning, and Startup Execution: Problematic Activities on Capital Projects. Journal of Construction Engineering and Management, 145(04).

Oberlender, G D (1984) Development of Construction Research. Journal of Construction Engineering and Management, 110(04), 486–90.

Ohura, T and Kato, M (1993) Erection and Field Test of Concrete Arch Bridge Applying Composite Tube. Journal of Construction Engineering and Management, 119(04), 666–80.

Orabi, W and El-Rayes, K (2012) Optimizing the Rehabilitation Efforts of Aging Transportation Networks. Journal of Construction Engineering and Management, 138(04), 529–39.

Orozco, F A, Serpell, A F, Molenaar, K R and Forcael, E (2014) Modelando los Factores e Índices de Competitividad para Constructoras: Hallazgos en Chile. Journal of Construction Engineering and Management, 140(04).

Orozco, F A, Serpell, A F, Molenaar, K R and Forcael, E (2014) Modeling Competitiveness Factors and Indexes for Construction Companies: Findings of Chile. Journal of Construction Engineering and Management, 140(04).

Oswald, D, Wade, F, Sherratt, F and Smith, S D (2019) Communicating Health and Safety on a Multinational Construction Project: Challenges and Strategies. Journal of Construction Engineering and Management, 145(04).

Ozorhon, B and Oral, K (2017) Drivers of Innovation in Construction Projects. Journal of Construction Engineering and Management, 143(04).

Paek, J H, Lee, Y W and Ock, J H (1993) Pricing Construction Risk: Fuzzy Set Application. Journal of Construction Engineering and Management, 119(04), 743–56.

Palacios, J L, Gonzalez, V and Alarcón, L F (2014) Selección de Formas de Relación con Terceros en la Construcción. Journal of Construction Engineering and Management, 140(04).

Palacios, J L, Gonzalez, V and Alarcón, L F (2014) Selection of Third-Party Relationships in Construction. Journal of Construction Engineering and Management, 140(04).

Palmer, A, Kelly, J and Male, S (1996) Holistic Appraisal of Value Engineering in Construction in United States. Journal of Construction Engineering and Management, 122(04), 324–8.

Parfitt, M K, Syal, M G, Khalvati, M and Bhatia, S (1993) Computer‐Integrated Design Drawings and Construction Project Plans. Journal of Construction Engineering and Management, 119(04), 729–42.

Paulson, B C and Fondahl, J W (1983) Craft Jurisdiction Impact on Construction. Journal of Construction Engineering and Management, 109(04), 369–86.

Pellicer, E, Yepes, V, Correa, C L and Alarcón, L F (2014) Model for Systematic Innovation in Construction Companies. Journal of Construction Engineering and Management, 140(04).

Pellicer, E, Yepes, V, Correa, C L and Alarcón, L F (2014) Modelo para la Innovación Sistemática en Empresas Constructoras. Journal of Construction Engineering and Management, 140(04).

Perkowski, J C (1988) Technical Trends in the E&C Business: The Next 10 Years. Journal of Construction Engineering and Management, 114(04), 565–76.

Phang, T C H, Chen, C and Tiong, R L K (2020) New Model for Identifying Critical Success Factors Influencing BIM Adoption from Precast Concrete Manufacturers’ View. Journal of Construction Engineering and Management, 146(04).

Pheng, L S and Hui, M S (2004) Implementing and Applying Six Sigma in Construction. Journal of Construction Engineering and Management, 130(04), 482–9.

Pocock, J B, Kuennen, S T, Gambatese, J and Rauschkolb, J (2006) Constructability State of Practice Report. Journal of Construction Engineering and Management, 132(04), 373–83.

Pocock, J B, Liu, L Y and Kim, M K (1997) Impact of Management Approach on Project Interaction and Performance. Journal of Construction Engineering and Management, 123(04), 411–8.

Popescu, C (1987) Construction Engineering Graduate Education Survey. Journal of Construction Engineering and Management, 113(04), 664–8.

Portas, J and AbouRizk, S (1997) Neural Network Model for Estimating Construction Productivity. Journal of Construction Engineering and Management, 123(04), 399–410.

Praticò, F G (2017) Metrics for Management of Asphalt Plant Sustainability. Journal of Construction Engineering and Management, 143(04).

Pregenzer, L J, Seppanen, P J, Kunz, J C and Paulson, B C (1999) Value-Added Assessment of Construction Plans. Journal of Construction Engineering and Management, 125(04), 242–8.

Pultar, M (1990) Progress‐Based Construction Scheduling. Journal of Construction Engineering and Management, 116(04), 670–88.

Radtke, M W and Russell, J S (1993) Project‐Level Model Process for Implementing Constructability. Journal of Construction Engineering and Management, 119(04), 813–31.

Rahman, M M and Kumaraswamy, M M (2012) Multicountry Perspectives of Relational Contracting and Integrated Project Teams. Journal of Construction Engineering and Management, 138(04), 469–80.

Ramaswamy, S D and Pertusier, E M (1986) Construction of Barrettes for High‐Rise Foundations. Journal of Construction Engineering and Management, 112(04), 455–62.

Ramsey, T S (1984) Quality Control “A Necessity Not an Option”. Journal of Construction Engineering and Management, 110(04), 513–7.

Rastegar, H, Arbab Shirani, B, Mirmohammadi, S H and Akhondi Bajegani, E (2021) Stochastic Programming Model for Bidding Price Decision in Construction Projects. Journal of Construction Engineering and Management, 147(04).

Rayburn, L M (1989) Productivity Database and Job Cost Control Using Microcomputers. Journal of Construction Engineering and Management, 115(04), 585–601.

Reinschmidt, K F, Griffis, F H ( and Bronner, P L (1991) Integration of Engineering, Design, and Construction. Journal of Construction Engineering and Management, 117(04), 756–72.

Rezvani, A, Ashkanasy, N and Khosravi, P (2020) Key Attitudes: Unlocking the Relationships between Emotional Intelligence and Performance in Construction Projects. Journal of Construction Engineering and Management, 146(04).

Riggs, L S and Hills, J W (1991) Implications for U.S. Construction Companies in 1992 European Community. Journal of Construction Engineering and Management, 117(04), 773–90.

Riley, D R and Sanvido, V E (1995) Patterns of Construction-Space Use in Multistory Buildings. Journal of Construction Engineering and Management, 121(04), 464–73.

Ringwald, R C (1988) Applications of Centrifugal Pumps. Journal of Construction Engineering and Management, 114(04), 659–63.

Ringwald, R C (1985) Formwork Design. Journal of Construction Engineering and Management, 111(04), 391–403.

Rivas, R A, Borcherding, J D, González, V and Alarcón, L F (2011) Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company. Journal of Construction Engineering and Management, 137(04), 312–20.

Rodriguez‐Ramos, W E and Francis, R L (1983) Single Crane Location Optimization. Journal of Construction Engineering and Management, 109(04), 387–97.

Rowings, J E (1991) Project‐Controls Systems Opportunities. Journal of Construction Engineering and Management, 117(04), 691–7.

Rowings, J E and Walker, R O (1984) Construction Energy Use. Journal of Construction Engineering and Management, 110(04), 447–58.

Ruff, C M, Dzombak, D A and Hendrickson, C T (1996) Owner-Contractor Relationships on Contaminated Site Remediation Projects. Journal of Construction Engineering and Management, 122(04), 348–53.

Russell, J S and Gugel, J G (1993) Comparison of Two Corporate Constructability Programs. Journal of Construction Engineering and Management, 119(04), 769–84.

Russell, J S and Jaselskis, E J (1992) Predicting Construction Contractor Failure Prior to Contract Award. Journal of Construction Engineering and Management, 118(04), 791–811.

Salas, R, Hallowell, M, Balaji, R and Bhandari, S (2020) Safety Risk Tolerance in the Construction Industry: Cross-Cultural Analysis. Journal of Construction Engineering and Management, 146(04).

Salim, M and Bernold, L E (1994) Effects of Design‐Integrated Process Planning on Productivity in Rebar Placement. Journal of Construction Engineering and Management, 120(04), 720–38.

Sanders, S R and Thomas, H R (1991) Factors Affecting Masonry‐Labor Productivity. Journal of Construction Engineering and Management, 117(04), 626–44.

Sankaran, B and O’Brien, W J (2018) Bayesian Second-Order Factor Model for Maturity Assessment of CIM Technologies and Practices at Highway Agencies. Journal of Construction Engineering and Management, 144(04).

  • Type: Journal Article
  • Keywords: Civil integrated management; Civil integrated management (CIM) maturity; Factor analysis; Digital workflow; Project delivery; Asset management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001460
  • Abstract:
    The work processes for highway infrastructure projects are undergoing significant transformations because of the advent of digital technologies for project delivery and asset management. Civil integrated management (CIM) encompasses the digital tools and practices that facilitate the collection, organization, and use of accurate project information throughout the facility lifecycle. With the increasing reliance on CIM technologies due to their proven benefits, there is a growing need to formalize a CIM maturity model that helps agencies gauge their CIM utilization activities. Through a survey of state transportation agencies and other CIM experts, this paper develops a quantitative approach to benchmark an agency’s CIM capability. A multistage Bayesian factor analysis technique was used in this study. The study jointly analyzes the information from the relevant literature and the collected data on relative importance and actual implementation levels of 16 attributes related to CIM utilization. Results suggest the existence of three latent factors that adequately indicate the measurements on these attributes related to technology, processes, and organization. Furthermore, results demonstrated an overall CIM maturity score exists at second-order and can adequately summarize the measurements along the first-order latent factors. The empirical validity of the second-order model was demonstrated by applying this framework to the usage data of six U.S. highway agencies to benchmark their CIM maturity. The mathematical framework of this study can help highway agencies develop customized applications for maturity assessment and support decisions for prioritizing CIM investments.

Sanvido, V E and Paulson, B C (1992) Site‐Level Construction Information System. Journal of Construction Engineering and Management, 118(04), 701–15.

Sawhney, A, Walsh, K D, Bashford, H H and Palaniappan, S (2009) Impact of Inspected Buffers on Production Parameters of Construction Processes. Journal of Construction Engineering and Management, 135(04), 319–29.

Schexnayder, C and Ohrn, L G (1997) Highway Specifications—Quality versus Pay. Journal of Construction Engineering and Management, 123(04), 437–43.

Schexnayder, C J and David, S A (2002) Past and Future of Construction Equipment—Part IV. Journal of Construction Engineering and Management, 128(04), 279–86.

Schexnayder, C J, Weber, S L and David, S A (2004) Transportation Agency Use of Owner-Controlled Insurance Programs. Journal of Construction Engineering and Management, 130(04), 517–24.

Schexnayder, C, Alarcón, L F, Antillo, E D, Morales, B C and López, M (2014) Observaciones de Desempeño de Puentesdurante el Terremoto de Chile en 2010. Journal of Construction Engineering and Management, 140(04).

Schexnayder, C, Alarcón, L F, Antillo, E D, Morales, B C and Lopez, M (2014) Observations on Bridge Performance during the Chilean Earthquake of 2010. Journal of Construction Engineering and Management, 140(04).

Schlick, H (1983) Temporary Heating in Construction Contracts. Journal of Construction Engineering and Management, 109(04), 447–59.

Selinger, S (1983) Economic Service Life of Building Construction Equipment. Journal of Construction Engineering and Management, 109(04), 398–405.

Semple, C, Hartman, F T and Jergeas, G (1994) Construction Claims and Disputes: Causes and Cost/Time Overruns. Journal of Construction Engineering and Management, 120(04), 785–95.

Senior, B A (1996) Electrical Construction Foreman Task Scheduling. Journal of Construction Engineering and Management, 122(04), 363–9.

Senior, B A (1995) Late-Time Computation for Task Chains Using Discrete-Event Simulation. Journal of Construction Engineering and Management, 121(04), 397–403.

Serugga, J, Kagioglou, M and Tzortzopoulos, P (2020) Value Generation in Front-End Design of Social Housing with QFD and Multiattribute Utility Theory. Journal of Construction Engineering and Management, 146(04).

Severson, G D, Jaselskis, E J and Russell, J S (1993) Trends in Construction Contractor Financial Data. Journal of Construction Engineering and Management, 119(04), 854–8.

Seydel, J and Olson, D L (1990) Bids Considering Multiple Criteria. Journal of Construction Engineering and Management, 116(04), 609–23.

Shah, D D, Jain, S K and Prybella, R W (1993) Performance of Remotely Controlled Fiberglass Pipe Jacking System. Journal of Construction Engineering and Management, 119(04), 832–51.

Shaheen, A A, Fayek, A R and AbouRizk, S M (2007) Fuzzy Numbers in Cost Range Estimating. Journal of Construction Engineering and Management, 133(04), 325–34.

Shang, L and Abdel Aziz, A M (2020) Stackelberg Game Theory-Based Optimization Model for Design of Payment Mechanism in Performance-Based PPPs. Journal of Construction Engineering and Management, 146(04).

Shapira, A and Glascock, J D (1996) Culture of Using Mobile Cranes for Building Construction. Journal of Construction Engineering and Management, 122(04), 298–307.

Shapira, A and Simcha, M (2009) AHP-Based Weighting of Factors Affecting Safety on Construction Sites with Tower Cranes. Journal of Construction Engineering and Management, 135(04), 307–18.

Shen, L Y, Li, H and Li, Q M (2002) Alternative Concession Model for Build Operate Transfer Contract Projects. Journal of Construction Engineering and Management, 128(04), 326–30.

Shen, L Y, Tam, V W Y, Tam, C M and Drew, D (2004) Mapping Approach for Examining Waste Management on Construction Sites. Journal of Construction Engineering and Management, 130(04), 472–81.

Shen, L, Lee, R K H and Zhang, Z (1996) Application of BOT System for Infrastructure Projects in China. Journal of Construction Engineering and Management, 122(04), 319–23.

Shen, L, Lu, W and Yam, M C (2006) Contractor Key Competitiveness Indicators: A China Study. Journal of Construction Engineering and Management, 132(04), 416–24.

Shen, X and Marks, E (2016) Near-Miss Information Visualization Tool in BIM for Construction Safety. Journal of Construction Engineering and Management, 142(04).

Sherman, R, Parrish, K and Lamanna, A (2021) Identifying and Categorizing Risks Incumbent in US Nuclear Power Plant Construction. Journal of Construction Engineering and Management, 147(04).

Shohet, I M (2006) Key Performance Indicators for Strategic Healthcare Facilities Maintenance. Journal of Construction Engineering and Management, 132(04), 345–52.

Shr, J, Ran, B and Sung, C W (2004) . Journal of Construction Engineering and Management, 130(04), 509–16.

Shrestha, A, Chan, T, Aibinu, A A, Chen, C and Martek, I (2018) Risk Allocation Inefficiencies in Chinese PPP Water Projects. Journal of Construction Engineering and Management, 144(04).

Sillars, D N and Kangari, R (2004) Predicting Organizational Success within a Project-Based Joint Venture Alliance. Journal of Construction Engineering and Management, 130(04), 500–8.

Smith, G R and Hancher, D E (1989) Estimating Precipitation Impacts for Scheduling. Journal of Construction Engineering and Management, 115(04), 552–66.

Smith, S D, Osborne, J R and Forde, M C (1995) Analysis of Earth-Moving Systems Using Discrete-Event Simulation. Journal of Construction Engineering and Management, 121(04), 388–96.

Sobeih, T, Salem, O, Genaidy, A, Abdelhamid, T and Shell, R (2009) Psychosocial Factors and Musculoskeletal Disorders in the Construction Industry. Journal of Construction Engineering and Management, 135(04), 267–77.

Solis, F, Sinfield, J V and Abraham, D M (2013) Hybrid Approach to the Study of Inter-Organization High Performance Teams. Journal of Construction Engineering and Management, 139(04), 379–92.

Somboonpisan, J and Limsawasd, C (2021) Environmental Weight for Bid Evaluation to Promote Sustainability in Highway Construction Projects. Journal of Construction Engineering and Management, 147(04).

Son, H and Kim, C (2013) Multiimaging Sensor Data Fusion-Based Enhancement for 3D Workspace Representation for Remote Machine Operation. Journal of Construction Engineering and Management, 139(04), 434–44.

Son, J, Khwaja, N and Milligan, D S (2019) Planning-Phase Estimation of Construction Time for a Large Portfolio of Highway Projects. Journal of Construction Engineering and Management, 145(04).

Song, Y and Chua, D K H (2007) Temporal Logic Representation Schema for Intermediate Function. Journal of Construction Engineering and Management, 133(04), 277–86.

Songer, A D, Ibbs, C W and Napier, T R (1994) Process Model for Public Sector Design‐Build Planning. Journal of Construction Engineering and Management, 120(04), 857–74.

Stenbeck, T (2008) Quantifying Effects of Incentives in a Rail Maintenance Performance-Based Contract. Journal of Construction Engineering and Management, 134(04), 265–72.

Stevens, J D and Murray, A L (1994) Modified Roof Erection System. Journal of Construction Engineering and Management, 120(04), 828–37.

Su, Y, Isaac, S and Lucko, G (2018) Integrated Temporal-Spatial Model for Construction Plans with Boolean Logic Operators. Journal of Construction Engineering and Management, 144(04).

Surahyo, M and El-Diraby, T E (2009) Schema for Interoperable Representation of Environmental and Social Costs in Highway Construction. Journal of Construction Engineering and Management, 135(04), 254–66.

Suraji, A, Duff, A R and Peckitt, S J (2001) Development of Causal Model of Construction Accident Causation. Journal of Construction Engineering and Management, 127(04), 337–44.

Syal, M G, Grobler, F, Willenbrock, J H and Parfitt, M K (1992) Construction Project Planning Process Model for Small‐Medium Builders. Journal of Construction Engineering and Management, 118(04), 651–66.

Szentes, H and Eriksson, P E (2016) Paradoxical Organizational Tensions between Control and Flexibility When Managing Large Infrastructure Projects. Journal of Construction Engineering and Management, 142(04).

Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS Approach for Automating Preconstruction Activities. Journal of Construction Engineering and Management, 124(04), 257–62.

Tam, C M, Tong, T K L and Chan, W K W (2001) Genetic Algorithm for Optimizing Supply Locations around Tower Crane. Journal of Construction Engineering and Management, 127(04), 315–21.

Tariq, S and Zhang, X (2021) Critical Analysis of the Private Sector Roles in Water PPP Failures. Journal of Construction Engineering and Management, 147(04).

Tatum, C B (1989) Organizing to Increase Innovation in Construction Firms. Journal of Construction Engineering and Management, 115(04), 602–17.

Tatum, C B (1987) Process of Innovation in Construction Firm. Journal of Construction Engineering and Management, 113(04), 648–63.

Taylor, J E, Dossick, C S and Garvin, M (2011) Meeting the Burden of Proof with Case-Study Research. Journal of Construction Engineering and Management, 137(04), 303–11.

Thabet, W Y and Beliveau, Y J (1994) HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects. Journal of Construction Engineering and Management, 120(04), 875–92.

Thomas, H R (2000) Schedule Acceleration, Work Flow, and Labor Productivity. Journal of Construction Engineering and Management, 126(04), 261–7.

Thomas, H R and Yiakoumis, I (1987) Factor Model of Construction Productivity. Journal of Construction Engineering and Management, 113(04), 623–39.

Thomas, H R, Maloney, W F, Horner, R M W, Smith, G R, Handa, V K and Sanders, S R (1990) Modeling Construction Labor Productivity. Journal of Construction Engineering and Management, 116(04), 705–26.

Thomas, H R, Sanders, S R and Bilal, S (1992) Comparison of Labor Productivity. Journal of Construction Engineering and Management, 118(04), 635–50.

Thomas, H R, Smith, G R and Cummings, D J (1995) Enforcement of Liquidated Damages. Journal of Construction Engineering and Management, 121(04), 459–63.

Thomas, H R, Smith, G R and Ponderlick, R M (1992) Resolving Contract Disputes Based on Differing‐Site‐Condition Clause. Journal of Construction Engineering and Management, 118(04), 767–79.

Thomas, H R, Smith, G R and Wright, D E (1990) Resolving Disputes over Contract Notice Requirements. Journal of Construction Engineering and Management, 116(04), 738–55.

Thomas, R, Keating, J M and Bluedorn, A C (1983) Authority Structures for Construction Project Management. Journal of Construction Engineering and Management, 109(04), 406–22.

Thomas, S R, Lee, S, Spencer, J D, Tucker, R L and Chapman, R E (2004) Impacts of Design/Information Technology on Project Outcomes. Journal of Construction Engineering and Management, 130(04), 586–97.

Tiruneh, G G and Fayek, A R (2022) Hybrid GA-MANFIS Model for Organizational Competencies and Performance in Construction. Journal of Construction Engineering and Management, 148(04).

Tommelein, I D (1998) Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique. Journal of Construction Engineering and Management, 124(04), 279–88.

Tommelein, I D, Carr, R I and Odeh, A M (1994) Assembly of Simulation Networks Using Designs, Plans, and Methods. Journal of Construction Engineering and Management, 120(04), 796–815.

Tommelein, I D, Levitt, R E and Hayes‐Roth, B (1992) SightPlan Model for Site Layout. Journal of Construction Engineering and Management, 118(04), 749–66.

Toole, T M (1998) Uncertainty and Home Builders' Adoption of Technological Innovations. Journal of Construction Engineering and Management, 124(04), 323–32.

Touran, A (1991) Modeling Uncertainty in Operations with Nonstationary Cycle Times. Journal of Construction Engineering and Management, 117(04), 728–35.

Touran, A (1997) Probabilistic Model for Tunneling Project Using Markov Chain. Journal of Construction Engineering and Management, 123(04), 444–9.

Touran, A and Asai, T (1987) Simulation of Tunneling Operations. Journal of Construction Engineering and Management, 113(04), 554–68.

Tserng, H P, Yin, S Y L and Li, S (2006) Developing a Resource Supply Chain Planning System for Construction Projects. Journal of Construction Engineering and Management, 132(04), 393–407.

Tuholski, S J, Gursel, A P, Tommelein, I D and Bomba, G (2009) “Lean” Comparison Using Process Charts of Complex Seismic Retrofit Projects. Journal of Construction Engineering and Management, 135(04), 330–9.

Turkan, Y, Bosché, F, Haas, C T and Haas, R (2013) Toward Automated Earned Value Tracking Using 3D Imaging Tools. Journal of Construction Engineering and Management, 139(04), 423–33.

Tyvand, J and Blachly, A T (1986) Foamed Plastic Absorbs Staged Post‐Tensioning Deflections. Journal of Construction Engineering and Management, 112(04), 582–7.

Ugural, M and Giritli, H (2021) Three-Way Interaction Model for Turnover Intention of Construction Professionals: Some Evidence from Turkey. Journal of Construction Engineering and Management, 147(04).

Umer, W, Li, H, Szeto, G P Y and Wong, A Y L (2018) Proactive Safety Measures: Quantifying the Upright Standing Stability after Sustained Rebar Tying Postures. Journal of Construction Engineering and Management, 144(04).

Unsal, H I and Taylor, J E (2011) Modeling Interfirm Dependency: Game Theoretic Simulation to Examine the Holdup Problem in Project Networks. Journal of Construction Engineering and Management, 137(04), 284–93.

Vaughan, J L, Leming, M L, Liu, M and Jaselskis, E (2013) Cost-Benefit Analysis of Construction Information Management System Implementation: Case Study. Journal of Construction Engineering and Management, 139(04), 445–55.

Vaziri, K, Carr, P G and Nozick, L K (2007) Project Planning for Construction under Uncertainty with Limited Resources. Journal of Construction Engineering and Management, 133(04), 268–76.

Venegas C., P and Alarcón C., L F (1997) Selecting Long-Term Strategies for Construction Firms. Journal of Construction Engineering and Management, 123(04), 388–98.

Vives, A, Benavides, J and Paris, A M (2010) Selecting Infrastructure Delivery Modalities: No Time for Ideology or Semantics. Journal of Construction Engineering and Management, 136(04), 412–8.

Vogl, B and Abdel-Wahab, M (2015) Measuring the Construction Industry’s Productivity Performance: Critique of International Productivity Comparisons at Industry Level. Journal of Construction Engineering and Management, 141(04).

Vorster, M C and De La Garza, J M (1990) Consequential Equipment Costs Associated with Lack of Availability and Downtime. Journal of Construction Engineering and Management, 116(04), 656–69.

Walsh, K D, Houston, W N and Houston, S L (1997) Field Implications of Current Compaction Specification Design Practices. Journal of Construction Engineering and Management, 123(04), 363–70.

Wambeke, B W, Liu, M and Hsiang, S M (2012) Using Last Planner and a Risk Assessment Matrix to Reduce Variation in Mechanical Related Construction Tasks. Journal of Construction Engineering and Management, 138(04), 491–8.

Wanberg, J, Javernick-Will, A, Chinowsky, P and Taylor, J E (2015) Spanning Cultural and Geographic Barriers with Knowledge Pipelines in Multinational Communities of Practice. Journal of Construction Engineering and Management, 141(04).

Wang, D, Arditi, D and Damci, A (2017) Construction Project Managers’ Motivators and Human Values. Journal of Construction Engineering and Management, 143(04).

Wang, P, Wang, K, Huang, Y, Fenn, P and Stewart, I (2022) Auditing Construction Cost from an In-Process Perspective Based on a Bayesian Predictive Model. Journal of Construction Engineering and Management, 148(04).

Wang, S Q, Tiong, R L K, Ting, S K, Chew, D and Ashley, D (1998) Evaluation and Competitive Tendering of BOT Power Plant Project in China. Journal of Construction Engineering and Management, 124(04), 333–41.

Wang, T, Tang, W, Qi, D, Shen, W and Huang, M (2016) Enhancing Design Management by Partnering in Delivery of International EPC Projects: Evidence from Chinese Construction Companies. Journal of Construction Engineering and Management, 142(04).

Wang, Z, Liu, Y, Hu, H and Dai, L (2021) Hybrid Rescheduling Optimization Model under Disruptions in Precast Production Considering Real-World Environment. Journal of Construction Engineering and Management, 147(04).

Warszawski, A (2003) Analysis of Costs and Benefits of Tall Buildings. Journal of Construction Engineering and Management, 129(04), 421–30.

Warszawski, A, Avraham, M and Carmel, D (1984) Utilization of Precast Concrete Elements in Building. Journal of Construction Engineering and Management, 110(04), 476–85.

Wauters, M and Vanhoucke, M (2015) Study of the Stability of Earned Value Management Forecasting. Journal of Construction Engineering and Management, 141(04).

Woldesenbet, A, Jeong, & H S and Oberlender, G D (2012) Daily Work Reports–Based Production Rate Estimation for Highway Projects. Journal of Construction Engineering and Management, 138(04), 481–90.

Wong, K, Unsal, H, Taylor, J E and Levitt, R E (2010) Global Dimension of Robust Project Network Design. Journal of Construction Engineering and Management, 136(04), 442–51.

Wu, L, Jia, G and Mackhaphonh, N (2019) Case Study on Improving the Effectiveness of Public Participation in Public Infrastructure Megaprojects. Journal of Construction Engineering and Management, 145(04).

Wu, M and Lo, H (2009) Optimal Strategy Modeling for Price-Time Biparameter Construction Bidding. Journal of Construction Engineering and Management, 135(04), 298–306.

Xia, N, Tang, Y, Li, D and Pan, A (2021) Safety Behavior among Construction Workers: Influences of Personality and Leadership. Journal of Construction Engineering and Management, 147(04).

Xie, H, Hong, Y and Brilakis, I (2022) Analysis of User Needs in Time-Related Risk Management for Holistic Project Understanding. Journal of Construction Engineering and Management, 148(04).

Xiong, B, Skitmore, M, Xia, P, Ballesteros-Pérez, P, Ye, K and Zhang, X (2019) Impact of Corporate Credit Scoring on Construction Contractors in China. Journal of Construction Engineering and Management, 145(04).

Xiong, W, Zhang, X and Chen, H (2016) Early-Termination Compensation in Public–Private Partnership Projects. Journal of Construction Engineering and Management, 142(04).

Xu, J, Jiang, L and Moon, S (2017) Determination of the Optimal Concession Period for BOT Contract Projects Based on a Discrete Stochastic Process Model. Journal of Construction Engineering and Management, 143(04).

Yates, J K (1990) Data‐Base Systems for Evaluating Construction Programs. Journal of Construction Engineering and Management, 116(04), 624–42.

Yates, J K (2014) Design and Construction for Sustainable Industrial Construction. Journal of Construction Engineering and Management, 140(04).

Yates, J K (2014) Diseño y Construccion para una Construccion Industrial Sustentable. Journal of Construction Engineering and Management, 140(04).

Yoon, S, Hastak, M and Lee, J (2018) Suitability of Intelligent Compaction for Asphalt Pavement Quality Control and Quality Assurance. Journal of Construction Engineering and Management, 144(04).

Yu, T, Shen, G Q and Shi, Q (2017) Comparing the Performance Quality of Design-Bid-Build and Design-Build Delivery Methods. Journal of Construction Engineering and Management, 143(04).

Zaneldin, E, Hegazy, T and Grierson, D (2001) Improving Design Coordination for Building Projects. II: A Collaborative System. Journal of Construction Engineering and Management, 127(04), 330–6.

Zayed, T M and Halpin, D W (2004) Process versus Data Oriented Techniques in Pile Construction Productivity Assessment. Journal of Construction Engineering and Management, 130(04), 490–9.

Zayed, T M and Minkarah, I (2004) Resource Allocation for Concrete Batch Plant Operation: Case Study. Journal of Construction Engineering and Management, 130(04), 560–9.

Zhang, J and El-Diraby, T E (2006) Constructability Analysis of the Bridge Superstructure Rotation Construction Method in China. Journal of Construction Engineering and Management, 132(04), 353–62.

Zhang, J, Eastham, D L and Bernold, L E (2005) Waste-Based Management in Residential Construction. Journal of Construction Engineering and Management, 131(04), 423–30.

Zhang, J, Xiang, P, Zhang, R, Chen, D and Ren, Y (2020) Mediating Effect of Risk Propensity between Personality Traits and Unsafe Behavioral Intention of Construction Workers. Journal of Construction Engineering and Management, 146(04).

Zhang, L and El-Gohary, N M (2016) Discovering Stakeholder Values for Axiology-Based Value Analysis of Building Projects. Journal of Construction Engineering and Management, 142(04).

Zhang, X and Liu, J (2022) Incentive Mechanism and Value-Added in PPP Projects Considering Financial Institutions’ Early Intervention. Journal of Construction Engineering and Management, 148(04).

Zheng, J, Zhang, Z, Wu, G, Yang, Y, Xia, N and Liu, B (2021) Daily Self-Efficacy, Work Engagement, and Deviance Behavior among Construction Professionals and Workers: Cross-Level Moderating Role of Job Control. Journal of Construction Engineering and Management, 147(04).

Zhong, B, Li, H, Luo, H, Zhou, J, Fang, W and Xing, X (2020) Ontology-Based Semantic Modeling of Knowledge in Construction: Classification and Identification of Hazards Implied in Images. Journal of Construction Engineering and Management, 146(04).

Zhu, H, Hwang, B, Ngo, J and Tan, J P S (2022) Applications of Smart Technologies in Construction Project Management. Journal of Construction Engineering and Management, 148(04).