Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 177 results ...

Abdul-Aziz, A-R (1995) Examination of the eclectic paradigm as applied to international contracting: with emphasis on the internalization dimension. Engineering, Construction and Architectural Management, 2(02), 105–20.

Abdullah, A H, Yaman, S K, Mohammad, H and Hassan, P F (2018) Construction manager’s technical competencies in Malaysian construction projects. Engineering, Construction and Architectural Management, 25(02), 153–77.

Abidin, N Z and Pasquire, C L (2005) Delivering sustainability through value management: Concept and performance overview. Engineering, Construction and Architectural Management, 12(02), 168–80.

Abraham, D M and Yeh, M H J (1999) Breakwater construction: an effective method for industrial waste utilization. Engineering, Construction and Architectural Management, 6(02), 145–54.

Ahuja, V, Yang, J and Shankar, R (2010) IT-enhanced communication protocols for building project management. Engineering, Construction and Architectural Management, 17(02), 79.

Aibinu, A A, Dassanayake, D, Chan, T-K and Thangaraj, R (2015) Cost estimation for electric light and power elements during building design: A neural network approach. Engineering, Construction and Architectural Management, 22(02), 190-213.

Aje, I (2012) The impact of contractors' prequalification on construction project delivery in Nigeria. Engineering, Construction and Architectural Management, 19(02), 159-72.

Al-Momani, A H (2000) Structuring information on residential building: a model of preference. Engineering, Construction and Architectural Management, 7(02), 179–90.

Al-Tabtabai, H and Alex, A P (1999) Using genetic algorithms to solve optimization problems in construction. Engineering, Construction and Architectural Management, 6(02), 121–32.

Al-Tabtabai, H and Thomas, V P (2004) Negotiation and resolution of conflict using AHP: an application to project management. Engineering, Construction and Architectural Management, 11(02), 90–100.

Alaghbari, M W, Kadir, R A and Salim, E A (2007) The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(02), 192–206.

Alharbi, M, Emmitt, S and Demian, P (2015) What is architectural management? Towards a pragmatic definition. Engineering, Construction and Architectural Management, 22(02), 151-68.

Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: a comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(02), 159–73.

Alshawi, M and Hassan, Z (1999) Integrated models for construction planning: object flow and relationship. Engineering, Construction and Architectural Management, 6(02), 197–212.

Amadi, C, Carrillo, P and Tuuli, M (2019) PPP projects: improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(02), 544–60.

Ansell, M, Evans, R, Holmes, M, Price, A and Pasquire, C (2009) An application of the construction management framework in highways major maintenance. Engineering, Construction and Architectural Management, 16(02), 162–74.

Arayici, Y and Aouad, G (2005) Computer integrated construction: an approach to requirements engineering. Engineering, Construction and Architectural Management, 12(02), 194–215.

Arditi, D, Koksal, A and Kale, S (2000) Business failures in the construction industry. Engineering, Construction and Architectural Management, 7(02), 120–32.

Arditi, D, Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(02), 90–103.

Back, W E and Sanders, S R (1998) Industry expectations for engineering graduates. Engineering, Construction and Architectural Management, 5(02), 137–43.

Balatbat, M C A, Lin, C-Y and Carmichael, D G (2011) Management efficiency performance of construction businesses: Australian data. Engineering, Construction and Architectural Management, 18(02), 140–58.

Baldwin, A, Li, H, Huang, T, Kong, C W, Guo, H L, Chan, N and Wong, J (2009) Supporting pre-tender construction planning with virtual prototyping. Engineering, Construction and Architectural Management, 16(02), 150–61.

Barima, O and Rowlinson, S M (2010) Critical, manifest variables in virtual construction project value delivery. Engineering, Construction and Architectural Management, 17(02), 209.

Barrett, P and Barrett, L (2006) The 4Cs model of exemplary construction projects. Engineering, Construction and Architectural Management, 13(02), 201–15.

Besaiso, H, Fenn, P, Emsley, M and Wright, D (2018) A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine. Engineering, Construction and Architectural Management, 25(02), 241–56.

Bhokha, S and Ogunlana, S O (1999) Application of artificial neural network to forecast construction duration of buildings at the pre-design stage. Engineering, Construction and Architectural Management, 6(02), 133–44.

Blismas, N G, Sher, W D, Thorpe, A and Baldwin, A N (2004) Factors influencing project delivery within construction clients' multi-project environments. Engineering, Construction and Architectural Management, 11(02), 113–25.

Boussabaine, A H (2001) Neurofuzzy modelling of construction projects’ duration I: principles. Engineering, Construction and Architectural Management, 8(02), 104–13.

Boussabaine, A H (2001) Neurofuzzy modelling of construction projects’ duration II: application. Engineering, Construction and Architectural Management, 8(02), 114–29.

Bowen, P A, Pearl, R G and Edwards, P J (1999) Client briefing processes and procurement method selection: a South African study. Engineering, Construction and Architectural Management, 6(02), 91–104.

Bröchner, J (1994) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(02), 91–101.

Chalker, M and Loosemore, M (2016) Trust and productivity in Australian construction projects: A subcontractor perspective. Engineering, Construction and Architectural Management, 23(02), 192-210.

Chan, D W M, Lam, P T I, Chan, A P C and Wong, J M W (2011) Guaranteed maximum price (GMP) contracts in practice: a case study of a private office development project in Hong Kong. Engineering, Construction and Architectural Management, 18(02), 188–205.

Chan, I Y S, Leung, M-y and Yuan, T (2014) Structural relationships between cultural values and coping behaviors of professionals in the stressful construction industry. Engineering, Construction and Architectural Management, 21(02), 133-51.

Chan, J K W, Tam, C M and Cheung, R K C (2005) Construction firms at the crossroads in Hong Kong: Going insolvency or seeking opportunity. Engineering, Construction and Architectural Management, 12(02), 111–24.

Chang, S-h (2013) Evaluating essential liabilities on design professionals under earthquake’s impact: Taiwan experience. Engineering, Construction and Architectural Management, 20(02), 181-94.

Cheung, S O and Li, K (2019) Biases in construction project dispute resolution. Engineering, Construction and Architectural Management, 26(02), 321–48.

Chileshe, N, Rameezdeen, R and Hosseini, M R (2016) Drivers for adopting reverse logistics in the construction industry: A qualitative study. Engineering, Construction and Architectural Management, 23(02), 134-57.

Chinda, T and Mohamed, S (2008) Structural equation model of construction safety culture. Engineering, Construction and Architectural Management, 15(02), 114–31.

Cox, A and Townsend, M (1997) Latham as half-way house: a relational competence approach to better practice in construction procurement. Engineering, Construction and Architectural Management, 4(02), 143–58.

Dainty, A R J, Bagilhole, B M and Neale, R H (2000) The compatibility of construction companies’ human resource development policies with employee career expectations. Engineering, Construction and Architectural Management, 7(02), 169–78.

  • Type: Journal Article
  • Keywords: career development; human resource development; psychological contracts; staff retention
  • ISBN/ISSN: 0969-9988
  • URL: http://www.blackwell-synergy.com/links/doi/10.1046/j.1365-232X.2000.00150.x/abs
  • Abstract:
    In order to retain and motivate employees, organizations must respond to their expectations, both in terms of meeting formal aspects of their employment contracts and in addressing their less formal expectations of the employment relationship. Within the current human resources management (HRM) literature, these informal expectations are known as psychological contracts. This paper reports on research that explored psychological contracts within the construction industry. In-depth interviews were held with more than 80 construction managers and professional staff who worked for five large UK contracting organizations. The interviewees were asked to describe their career histories, and to discuss any tensions between the personnel policies of their organizations and their personal career aspirations and expectations. It emerged that responsibility for human resource development (HRD) had been largely devolved to divisional and operational management. This led to HRD becoming fragmented and unresponsive, and to employees becoming disillusioned by their employers’ failure to meet their expectations. It is argued that construction companies require a more sophisticated understanding of their employees’ expectations of the employment relationship if they are to be retained in the long term.

Dalal, J, Mohapatra, P K J and Mitra, G C (2010) Prioritization of rural roads: AHP in group decision. Engineering, Construction and Architectural Management, 17(02), 58.

Dawood, N (2010) Development of 4D-based performance indicators in construction industry. Engineering, Construction and Architectural Management, 17(02), 30.

Edirisinghe, R (2019) Digital skin of the construction site. Engineering, Construction and Architectural Management, 26(02), 184–223.

Emmitt, S (1999) Architectural management: an evolving field. Engineering, Construction and Architectural Management, 6(02), 188–96.

Ezulike, E L and Hoare, D J (1998) The need for education in alternative dispute resolution (ADR) in the construction industry. Engineering, Construction and Architectural Management, 5(02), 144–9.

Faniran, O O and Caban, G (1998) Minimizing waste on construction project sites. Engineering, Construction and Architectural Management, 5(02), 182–8.

Fergusson, H and Langford, D A (2006) Strategies for managing environmental issues in construction organizations. Engineering, Construction and Architectural Management, 13(02), 171–85.

Flanagan, R, Norman, G and Worrall, H (1995) Trade performance of the UK building materials and components industries. Engineering, Construction and Architectural Management, 2(02), 141–62.

Fortune, C and Setiawan, S (2005) Partnering practice and the delivery of construction projects for Housing Associations in the UK. Engineering, Construction and Architectural Management, 12(02), 181–93.

Gerrish, T, Ruikar, K, Cook, M, Johnson, M and Phillip, M (2017) Using BIM capabilities to improve existing building energy modelling practices. Engineering, Construction and Architectural Management, 24(02), 190-208.

Glass, J and Simmonds, M (2007) “Considerate construction”: case studies of current practice. Engineering, Construction and Architectural Management, 14(02), 131–49.

Gluch, P and Räisänen, C (2012) What tensions obstruct an alignment between project and environmental management practices?. Engineering, Construction and Architectural Management, 19(02), 127-40.

Goodrum, P M, Wan, Y and Fenouil, P C (2009) A decision-making system for accelerating roadway construction. Engineering, Construction and Architectural Management, 16(02), 116–35.

Gunarathna, C, Yang, R J and Fernando, N (2018) Conflicts and management styles in the Sri Lankan commercial building sector. Engineering, Construction and Architectural Management, 25(02), 178–201.

Hansen, K L, MGann, D and Groák, S (1998) Information technology decision support and business process change in the USA. Engineering, Construction and Architectural Management, 5(02), 115–26.

Hao, J L, Hill, M J and Shen, L Y (2008) Managing construction waste on-site through system dynamics modelling: the case of Hong Kong. Engineering, Construction and Architectural Management, 15(02), 103–13.

Hare, B and Cameron, I (2012) Health and safety gateways for construction project planning. Engineering, Construction and Architectural Management, 19(02), 192-204.

Hastheetham, A and Hadikusumo, B H W (2011) Theoretical framework of strategic behaviours in Thai contractors: An empirical case study. Engineering, Construction and Architectural Management, 18(02), 206–25.

Hejducki, Z and Mrozowicz, J (2001) Stream methods of construction work organization: an introduction to the problem. Engineering, Construction and Architectural Management, 8(02), 80–9.

Hindle, R D and Rwelamila, P D (1998) Resistance to change: architectural education in a turbulent environment. Engineering, Construction and Architectural Management, 5(02), 150–8.

Hong, Y, Hammad, A W, Sepasgozar, S and Akbarnezhad, A (2019) BIM adoption model for small and medium construction organisations in Australia. Engineering, Construction and Architectural Management, 26(02), 154–83.

Huo, X, Yu, A T W, Zezhou, W and Jayantha, W M (2019) Site planning and design of green residential building projects: case studies in China. Engineering, Construction and Architectural Management, 27(02), 525–43.

Hwang, B-G and Yang, S (2014) Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(02), 190-205.

Hwang, B-G, Tan, H F and Sathish, S (2013) Capital project performance measurement and benchmarking in Singapore. Engineering, Construction and Architectural Management, 20(02), 143-59.

Hwang, B-G, Zhao, X and Chin, E W Y (2017) International construction joint ventures between Singapore and developing countries: Risk assessment and allocation preferences. Engineering, Construction and Architectural Management, 24(02), 209-28.

Hyung, W, Kim, S and Jo, J (2019) Improved similarity measure in case-based reasoning: a case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(02), 561–78.

Isik, Z, Arditi, D, Dilmen, I and Birgonul, M T (2010) The role of exogenous factors in the strategic performance of construction companies. Engineering, Construction and Architectural Management, 17(02), 34.

Jaafar, M, Ramayah, T, Abdul-Aziz, A-R and Saad, B (2007) Technology readiness among managers of Malaysian construction firms. Engineering, Construction and Architectural Management, 14(02), 180–91.

Jiang, W and Lu, Y (2017) Influence of initial trust on control from client perspective: Construction industry in China. Engineering, Construction and Architectural Management, 24(02), 326-45.

Johari, S and Jha, K N (2019) Challenges of attracting construction workers to skill development and training programmes. Engineering, Construction and Architectural Management, 27(02), 321–40.

Junnonen, J M (1998) Strategy formation in construction firms. Engineering, Construction and Architectural Management, 5(02), 107–14.

Kagioglou, M, Cooper, R, Aouad, G F and Sexton, M (2000) Rethinking construction: the generic design and construction process protocol. Engineering, Construction and Architectural Management, 7(02), 141–53.

Kaplanogu, S B and Arditi, D (2009) Pre-project peer reviews in GMP/lump sum contracts. Engineering, Construction and Architectural Management, 16(02), 175–85.

Kavishe, N, Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects. Engineering, Construction and Architectural Management, 25(02), 202–40.

Kikwasi, G J (2011) An evaluation of construction skills in Tanzania. Engineering, Construction and Architectural Management, 18(02), 127–39.

Koushki, P A and Kartam, N (2004) Impact of construction materials on project time and cost in Kuwait. Engineering, Construction and Architectural Management, 11(02), 126–32.

Kpamma, Z E, Adjei-Kumi, T, Ayarkwa, J and Adinyira, E (2017) Participatory design, wicked problems, choosing by advantages. Engineering, Construction and Architectural Management, 24(02), 289-307.

Kumaraswamy, M M (1997) Conflicts, claims and disputes in construction. Engineering, Construction and Architectural Management, 4(02), 95–111.

Kumaraswamy, M M, Ng, S T, Ugwu, O O, Palaneeswaran, E and Rahman, M M (2004) Empowering collaborative decisions in complex construction project scenarios. Engineering, Construction and Architectural Management, 11(02), 133–42.

Lam, K C, Hu, T, Cheung, S O, Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(02), 130–44.

Langford, D, Rowlinson, S M and Sawacha, E (2000) Safety behaviour and safety management: its influence on the attitudes of workers in the UK construction industry. Engineering, Construction and Architectural Management, 7(02), 133–40.

Lê, M A T and Brønn, C (2007) Linking experience and learning: application to multi-project building environments. Engineering, Construction and Architectural Management, 14(02), 150–63.

Lee, J, Blumenstein, M, Guan, H and Loo, Y-C (2013) Minimising uncertainty in long-term prediction of bridge element. Engineering, Construction and Architectural Management, 20(02), 127-42.

Leung, M-y, Liu, A M M and Ng, S T (2005) Is there a relationship between construction conflicts and participants' satisfaction?. Engineering, Construction and Architectural Management, 12(02), 149–67.

Li, B, Akintoye, A, Edwards, P J and Hardcastle, C (2005) PFI procurement for construction projects in the UK: Findings from a questionnaire survey. Engineering, Construction and Architectural Management, 12(02), 125–48.

Li, H, Jin, Z, Li, V, Liu, G and Skitmore, R M (2013) An entry mode decision-making model for the international expansion of construction enterprises. Engineering, Construction and Architectural Management, 20(02), 160-80.

Li, X, Wang, X and Lei, L (2019) The application of an ANP-Fuzzy comprehensive evaluation model to assess lean construction management performance. Engineering, Construction and Architectural Management, 27(02), 356–84.

Liang, L Y, Thompson, R G and Young, D M (2004) Optimizing the design of sewer networks using genetic algorithms and tabu search. Engineering, Construction and Architectural Management, 11(02), 101–12.

Limsila, K and Ogunlana, S O (2008) Performance and leadership outcome correlates of leadership styles and subordinate commitment. Engineering, Construction and Architectural Management, 15(02), 164–84.

Ling, F Y Y and Lee, S Y (2012) Careers development in construction firms: application of Sun Tzu's Art of War principles. Engineering, Construction and Architectural Management, 19(02), 173-91.

Ling, F Y Y, Tan, P C, Ning, Y, Teo, A and Gunawansa, A (2015) Effect of adoption of relational contracting practices on relationship quality in public projects in Singapore. Engineering, Construction and Architectural Management, 22(02), 169-89.

Lingard, H, Cooke, T and Blismas, N (2011) Coworkers' response to occupational health and safety: an overlooked dimension of group-level safety climate in the construction industry?. Engineering, Construction and Architectural Management, 18(02), 159–75.

Liu, A M-M (1999) A research model of project complexity and goal commitment effects on project outcome. Engineering, Construction and Architectural Management, 6(02), 105–11.

Liu, J, Lin, S and Feng, Y (2018) Understanding why Chinese contractors are not willing to purchase construction insurance. Engineering, Construction and Architectural Management, 25(02), 257–72.

Liu, T and Wilkinson, S (2014) Using public-private partnerships for the building and management of school assets and services. Engineering, Construction and Architectural Management, 21(02), 206-23.

Lombardi, P (1997) Decision making in urban regeneration plans. Engineering, Construction and Architectural Management, 4(02), 127–42.

Loosemore, M (1994) Dealing with unexpected problems-do contracts help? A comparison of the NEC and JCT 80 forms. Engineering, Construction and Architectural Management, 1(02), 115–37.

Loosemore, M and Hughes, K (1998) Emergency systems in construction contracts. Engineering, Construction and Architectural Management, 5(02), 189–98.

Loudoun, R and Townsend, K (2017) Implementing health promotion programs in the Australian construction industry: Levers and agents for change. Engineering, Construction and Architectural Management, 24(02), 260-74.

Love, P E D, Smith, J, Treloar, G J and Li, H (2000) Some empirical observations of service quality in construction. Engineering, Construction and Architectural Management, 7(02), 191–201.

Lu, X and Davis, S (2018) Priming effects on safety decisions in a virtual construction simulator. Engineering, Construction and Architectural Management, 25(02), 273–94.

Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(02), 127–36.

Mawdesley, M J, Askew, W H and Al-Jibouri, S H (2004) Site layout for earthworks in road projects. Engineering, Construction and Architectural Management, 11(02), 83–9.

Meiling, J, Backlund, F and Johnsson, H (2012) Managing for continuous improvement in off-site construction: Evaluation of lean management principles. Engineering, Construction and Architectural Management, 19(02), 141-58.

Mellado, F, Lou, E C and Becerra, C L C (2019) Synthesising performance in the construction industry. Engineering, Construction and Architectural Management, 27(02), 579–608.

Molad, C and Back, W E (1995) EDI's role as an enabler for electronic commerce and information integration. Engineering, Construction and Architectural Management, 2(02), 93–104.

Mpofu, B, Ochieng, E G, Moobela, C and Pretorius, A (2017) Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction and Architectural Management, 24(02), 346-76.

Ndekugri, I and McDonnell, B (1999) Differing site conditions risks: a FIDIC/engineering and construction contract comparison. Engineering, Construction and Architectural Management, 6(02), 177–87.

Ng, S T and Wong, Y M W (2006) Adopting non-privately funded public-private partnerships in maintenance projects: A case study in Hong Kong. Engineering, Construction and Architectural Management, 13(02), 186–200.

Ng, S T, Skitmore, M R and Smith, N J (1999) Decision-makers' perceptions in the formulation of pre-qualification criteria. Engineering, Construction and Architectural Management, 6(02), 155–65.

Nwaogu, J M, Chan, A P, Hon, C K and Darko, A (2019) Review of global mental health research in the construction industry. Engineering, Construction and Architectural Management, 27(02), 385–410.

O'Reilly, M P and Mawdesley, M J (1994) The evaluation of construction disputes: a risk approach. Engineering, Construction and Architectural Management, 1(02), 103–14.

Ofori, G and Gang, G (2001) ISO 9000 certification of Singapore construction enterprises: its costs and benefits and its role in the development of the industry. Engineering, Construction and Architectural Management, 8(02), 145–57.

Oyedele, L O (2010) Sustaining architects' and engineers' motivation in design firms: An investigation of critical success factors. Engineering, Construction and Architectural Management, 17(02), 96.

Parn, E A and Edwards, D (2019) Cyber threats confronting the digital built environment. Engineering, Construction and Architectural Management, 26(02), 245–66.

Perry, J G and Barnes, M (2000) Target cost contracts: an analysis of the interplay between fee, target, share and price. Engineering, Construction and Architectural Management, 7(02), 202–8.

Plantinga, H, Voordijk, H and Doree, A (2019) The reasoning behind infrastructure manager’s choice of procurement instruments. Engineering, Construction and Architectural Management, 26(02), 303–20.

Poh, P S H and Horner, R M W (1995) Cost-significant modelling: potential for use in South-East Asia. Engineering, Construction and Architectural Management, 2(02), 121–39.

Poon, C S, Yu, A T W and Ng, L H (2003) Comparison of low-waste building technologies adopted in public and private housing projects in Hong Kong. Engineering, Construction and Architectural Management, 10(02), 88–98.

Poortman, E R and Bons, H N M (1994) Information for the management of the building-materials flow. Engineering, Construction and Architectural Management, 1(02), 139–46.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(02), 174–81.

Rahman, M M and Kumaraswamy, M M (2002) Risk management trends in the construction industry: moving towards joint risk management. Engineering, Construction and Architectural Management, 9(02), 131–51.

Rajeh, M, Tookey, J E and Rotimi, J O B (2015) Estimating transaction costs in the New Zealand construction procurement: A structural equation modelling methodology. Engineering, Construction and Architectural Management, 22(02), 242-67.

Rowlinson, S and Croker, N (2006) IT sophistication, performance and progress towards formal electronic communication in the Hong Kong construction industry. Engineering, Construction and Architectural Management, 13(02), 154–70.

Salah, A and Moselhi, O (2015) Contingency modelling for construction projects using fuzzy-set theory. Engineering, Construction and Architectural Management, 22(02), 214-41.

Salvado, F, Almeida, N and Vale e Azevedo, A (2019) Aligning financial and functional equivalent depreciations rates of building assets. Engineering, Construction and Architectural Management, 27(02), 441–57.

Sambasivan, M, Deepak, T J, Salim, A N and Ponniah, V (2017) Analysis of delays in Tanzanian construction industry: Transaction cost economics and structural equation modeling approach. Engineering, Construction and Architectural Management, 24(02), 308-25.

Sandrk, N I and Huemann, M (2016) Organizational culture of the Croatian construction industry. Engineering, Construction and Architectural Management, 23(02), 237-60.

Sarshar, M, Tanyer, A M, Aouad, G and Underwood, J (2002) A vision for construction IT 2005–2010: two case studies. Engineering, Construction and Architectural Management, 9(02), 152–60.

Schröpfer, V L M, Tah, J and Kurul, E (2017) Mapping the knowledge flow in sustainable construction project teams using social network analysis. Engineering, Construction and Architectural Management, 24(02), 229-59.

Scott, R (1995) Invited paper: Competitive advantage through alliancing. Engineering, Construction and Architectural Management, 2(02), 83–92.

Sebastian, R (2011) Changing roles of the clients, architects and contractors through BIM. Engineering, Construction and Architectural Management, 18(02), 176–87.

Senaratne, S and Sexton, M G (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management, 16(02), 186–200.

Seneviratne, K, Amaratunga, D and Haigh, R (2017) Managing housing needs of post conflict housing reconstruction: Sri Lankan perspective. Engineering, Construction and Architectural Management, 24(02), 275-88.

Sepasgozar, S M E, Loosemore, M and Davis, S R (2016) Conceptualising information and equipment technology adoption in construction: A critical review of existing research. Engineering, Construction and Architectural Management, 23(02), 158-76.

Shehab, T and Farooq, M (2013) Neural network cost estimating model for utility rehabilitation projects. Engineering, Construction and Architectural Management, 20(02), 118-26.

Shelton, J, Martek, I and Chen, C (2016) Implementation of innovative technologies in small-scale construction firms: Five Australian case studies. Engineering, Construction and Architectural Management, 23(02), 177-91.

Simister, S J and Green, S D (1997) Recurring themes in value management practice. Engineering, Construction and Architectural Management, 4(02), 113–25.

Singh, A (2002) Behavioural perceptions of design and construction engineers. Engineering, Construction and Architectural Management, 9(02), 66–80.

Singh, V and Holmström, J (2015) Needs and technology adoption: Observation from BIM experience. Engineering, Construction and Architectural Management, 22(02), 128-50.

Skitmore, M R and Lo, H P (2002) A method of identifying high outliers in construction contract auctions. Engineering, Construction and Architectural Management, 9(02), 90–130.

Stumpf, I (2000) Competitive pressures on middle-market contractors in the UK. Engineering, Construction and Architectural Management, 7(02), 159–68.

Sutrisna, M and Barrett, P (2007) Applying rich picture diagrams to model case studies of construction projects. Engineering, Construction and Architectural Management, 14(02), 164–79.

Sutrisna, M and Goulding, J (2019) Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, Construction and Architectural Management, 26(02), 267–84.

Swaffield, L M and McDonald, A M (2008) The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(02), 132–48.

Swan, W and Khalfan, M M A (2007) Mutual objective setting for partnering projects in the public sector. Engineering, Construction and Architectural Management, 14(02), 119–30.

Tah, J H M and Carr, V (2000) Information modelling for a construction project risk management system. Engineering, Construction and Architectural Management, 7(02), 107–19.

Tai, S, Wang, Y and Anumba, C J (2009) A survey on communications in large-scale construction projects in China. Engineering, Construction and Architectural Management, 16(02), 136–49.

Tan, W (2003) Building competitive advantage: construction education in Japan. Engineering, Construction and Architectural Management, 10(02), 78–87.

Tan, W (2000) Total factor productivity in Singapore construction. Engineering, Construction and Architectural Management, 7(02), 154–8.

Tas, E, Yaman, H and Tanacan, L (2008) A building material evaluation and selection model for the Turkish construction sector. Engineering, Construction and Architectural Management, 15(02), 149–63.

Tiong, R L K and Alum, J (1997) Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(02), 83–94.

Tong, T K L (2003) Fuzzy optimisation of labour allocation by generic algorithms. Engineering, Construction and Architectural Management, 10(02), 146–55.

Underwood, J and Watson, A (2003) An XML metadata approach to seamless project information exchange between heterogeneous platforms.. Engineering, Construction and Architectural Management, 10(02), 128–45.

Ungureanu, L C, Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules’ quality. Engineering, Construction and Architectural Management, 26(02), 224–44.

Utama, W P, Chan, A P, Zahoor, H, Gao, R and Jumas, D Y (2019) Making decision toward overseas construction projects. Engineering, Construction and Architectural Management, 26(02), 285–302.

Vee, C and Skitmore, M R (2003) Professional ethics in the construction industry. Engineering, Construction and Architectural Management, 10(02), 117–27.

Walker, A and Wing, C K (1999) The relationship between construction project management theory and transaction cost economics. Engineering, Construction and Architectural Management, 6(02), 166–76.

Wall, J and Ahmed, V (2008) Lessons learned from a case study in deploying blended learning continuing professional development. Engineering, Construction and Architectural Management, 15(02), 185–202.

Walsh, K D, Sawhney, A and Vachris, M A (2006) Improving inter-spatial comparison of construction costs. Engineering, Construction and Architectural Management, 13(02), 123–35.

Wang, X, Shi, L, Wang, B and Kan, M (2019) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(02), 483–501.

Wantanakorn, D, Mawdesley, M J and Askew, W H (1999) Management errors in construction. Engineering, Construction and Architectural Management, 6(02), 112–20.

Wesz, J G B, Formoso, C T and Tzortzopoulos, P (2018) Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(02), 134–52.

White, D and Fortune, J (2012) Using systems thinking to evaluate a major project: The case of the Gateshead Millennium Bridge. Engineering, Construction and Architectural Management, 19(02), 205-28.

Willar, D, Trigunarsyah, B and Coffey, V (2016) Organisational culture and quality management system implementation in Indonesian construction companies. Engineering, Construction and Architectural Management, 23(02), 114-33.

Wu, S, Clements-Croome, D, Fairey, V, Albany, B, Sidhu, J, Desmond, D and Neale, K (2006) Reliability in the whole life cycle of building systems. Engineering, Construction and Architectural Management, 13(02), 136–53.

Xiao, H and Proverbs, D (2002) Construction time performance: an evaluation of contractors from Japan, the UK and the US. Engineering, Construction and Architectural Management, 9(02), 81–9.

Xie, L-l, Yang, Y, Hu, Y and Chan, A P C (2014) Understanding project stakeholders’ perceptions of public participation in China's infrastructure and construction projects: Social effects, benefits, forms, and barriers. Engineering, Construction and Architectural Management, 21(02), 224-40.

Ye, K, Shen, L and Lu, W (2014) A discriminant model for measuring competition intensity of construction market. Engineering, Construction and Architectural Management, 21(02), 152-69.

Yevu, S K and Yu, A T W (2019) The ecosystem of drivers for electronic procurement adoption for construction project procurement. Engineering, Construction and Architectural Management, 27(02), 411–40.

Zarghami, S A and Gunawan, I (2019) A domain-specific measure of centrality for water distribution networks. Engineering, Construction and Architectural Management, 27(02), 341–55.

Zayed, T and Liu, Y (2014) Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(02), 170-89.

Zhang, L and Fan, W (2013) Improving performance of construction projects: A project manager's emotional intelligence approach. Engineering, Construction and Architectural Management, 20(02), 195-207.

Zhou, S, Ng, S T, Lee, S H, Xu, F J and Yang, Y (2019) A domain knowledge incorporated text mining approach for capturing user needs on BIM applications. Engineering, Construction and Architectural Management, 27(02), 458–82.

Zohrehvandi, S, Vanhoucke, M, Soltani, R and Javadi, M (2019) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(02), 502–24.

Zuppa, D, Olbina, S and Issa, R (2016) Perceptions of trust in the US construction industry. Engineering, Construction and Architectural Management, 23(02), 211-36.