Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 2205 results ...

Ibem, E, O, Onyemaechi, P, C.E and yo-Vaughan, K. N. (2018) Project Selection and Transparency Factors in Housing Public-Private Partnerships in Nigeria . Construction Economics and Building, 18(02), 15-40.

Paz, J, C, Rozenboim, D, Cuadros, Cano, A, S. Escobar P, J, Juan Camilo Paz, David Rozenboim, Álvaro Cuadros, Sandra Cano, John Escobar (2018) A Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential Impacts of Delay Risks . Construction Economics and Building, 18(02), 41-69.

Peel, J, Ahmed, V and Saboor, S (2020) An investigation of barriers and enablers to energy efficiency retrofitting of social housing in London. Construction Economics and Building, 20(02), 127-149.

Öz, Ö (2001) Sources of competitive advantage of Turkish construction companies in international markets. Construction Management and Economics, 19(02), 135-44.

Štaube, T, Leemeijer, B, Geipele, S, Kauškale, L, Geipele, I and Jansen, J (2016) Economic and financial rationale for age-friendly housing. Journal of Financial Management of Property and Construction, 21(02), 99-121.

Abdalazeem, M E, Hassan, H, Asawa, T and Mahmoud, H (2024) Green roofs and thermal comfort: a comparative study of soil layers’ seasonal thermal performance integrated with ventilation in hot climate. Architectural Engineering and Design Management, 20(02), 358–89.

Abdallah, M, El-Rayes, K and Liu, L (2016) Minimizing Upgrade Cost to Achieve LEED Certification for Existing Buildings. Journal of Construction Engineering and Management, 142(02).

Abdelhamid, T S and Everett, J G (1999) Time Series Analysis for Construction Productivity Experiments. Journal of Construction Engineering and Management, 125(02), 87–95.

Abdessalem, J, Fakhreddine, D, Said, A and Mohamed, H (2014) Shape optimization for a hyperelastic axisymmetric structure. Journal of Engineering, Design and Technology, 12(02), 177-94.

Abdirad, H, Dossick, C S, Johnson, B R and Migliaccio, G (2021) Disruptive information exchange requirements in construction projects: perception and response patterns. Building Research & Information, 49(02), 161–78.

Abdul-Aziz, A-R (1995) Examination of the eclectic paradigm as applied to international contracting: with emphasis on the internalization dimension. Engineering, Construction and Architectural Management, 2(02), 105–20.

Abdul-Aziz, A-R and Hussin, A-A (2003) Construction Safety in Malaysia: A Review of Industry Performance and Outlook for the Future. Journal of Construction Research, 4(02), 141–53.

Abdul-Aziz, A-R and Wong, S S (2010) Competitive assets of Malaysian international contractors. Journal of Financial Management of Property and Construction, 15(02), 176–89.

Abdul-Aziz, A-R, Yi, H S and Jaafar, M (2007) Impact of firm characteristics on the value of resources for Malaysian private housing developers. Journal of Financial Management of Property and Construction, 12(02), 95–106.

Abdul-Rahman, H, Berawi, M A, Berawi, A R, Mohamed, O, Othman, M and Yahya, I A (2006) Delay Mitigation in the Malaysian Construction Industry. Journal of Construction Engineering and Management, 132(02), 125–33.

Abdullah, A H, Yaman, S K, Mohammad, H and Hassan, P F (2018) Construction manager’s technical competencies in Malaysian construction projects. Engineering, Construction and Architectural Management, 25(02), 153–77.

Abejide, O S (1997) Solid soilcrete blocks for low-cost buildings: a Nigerian case study. Building Research & Information, 25(02), 115–9.

Abidin, N Z and Pasquire, C L (2005) Delivering sustainability through value management: Concept and performance overview. Engineering, Construction and Architectural Management, 12(02), 168–80.

AbouRizk, S and Shi, J (1994) Automated Construction‐Simulation Optimization. Journal of Construction Engineering and Management, 120(02), 374–85.

AbouRizk, S M and Dozzi, S P (1993) Application of Computer Simulation in Resolving Construction Disputes. Journal of Construction Engineering and Management, 119(02), 355–73.

AbouRizk, S M, Halpin, D W and Wilson, J R (1994) Fitting Beta Distributions Based on Sample Data. Journal of Construction Engineering and Management, 120(02), 288–305.

Abraham, D M and Dickinson, R J (1998) Disposal Costs for Environmentally Regulated Facilities: LCC Approach. Journal of Construction Engineering and Management, 124(02), 146–54.

Abraham, D M and Yeh, M H J (1999) Breakwater construction: an effective method for industrial waste utilization. Engineering, Construction and Architectural Management, 6(02), 145–54.

Abu Hanipah, A F F and Tahar, K N (2018) Development of the 3D dome model based on a terrestrial laser scanner. International Journal of Building Pathology and Adaptation, 36(02), 122–36.

Abudayyeh, O, Federicks, T, Palmquist, M and Torres, H N (2003) Analysis of Occupational Injuries and Fatalities in Electrical Contracting Industry. Journal of Construction Engineering and Management, 129(02), 152–8.

Acar, E and Yalçın, N (2019) Task-related pro-environmental behaviours of architectural designers: LEED-based evidence from Turkey. Architectural Engineering and Design Management, 15(02), 121–40.

Adafin, J, Rotimi, J O B and Wilkinson, S (2015) Why do the design stage elemental cost plan and final tender sum differ in New Zealand?. Journal of Financial Management of Property and Construction, 20(02), 116-31.

Adams, J D and Brown, A W (2002) Project management in public sector construction projects: assessing value for money. Journal of Construction Procurement, 8(02), 84–100.

Addy, M, Adinyira, E and Ayarkwa, J (2018) Antecedents of building information modelling adoption among quantity surveyors in Ghana. Journal of Engineering, Design and Technology, 16(02), 313–26.

Adebisi, E O, Ojo, S O and Alao, O O (2018) Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria. International Journal of Building Pathology and Adaptation, 36(02), 210–31.

Adedeji, J A, Fadamiro, J A and Odeyale, T O (2019) Design toolkits for campus open spaces from post-occupancy evaluations of federal universities in South-west Nigeria. Built Environment Project and Asset Management, 10(02), 296–311.

Adenuga, O and Ibiyemi, A (2009) An assessment of the state of maintenance of public hospital buildings in southwest Nigeria. Construction Economics and Building, 9(02), 51-60.

Adey, B T, Lethanh, N, Hartmann, A and Viti, F (2014) Evaluation of intervention strategies for a road link in the Netherlands. Built Environment Project and Asset Management, 4(02), 180-98.

Adinyira, E, Agyekum, K, Baiden, B K, Ebohon, O J and Ampratwum, G (2020) Regeneration of Sub-Saharan Africa's open marketplaces: a case for guileless stakeholder participation. Construction Economics and Building, 20(02), 165-180.

Adriaanse, A, Voordijk, H and Dewulf, G (2010) The use of interorganisational ICT in construction projects: a critical perspective. Construction Innovation, 10(02), 223–37.

Agapiou, A and Dainty, A R J (2003) Client-led approaches to increasing participation of women, ethnic minorities and disabled people in the construction workforce: a framework for change. Journal of Construction Procurement, 9(02), 4–16.

Agapiou, A, Clausen, L E, Flanagan, R, Norman, G and Notman, D (1998) The role of logistics in the materials flow control process: experiences from abroad. Construction Management and Economics, 16(02), 131-7.

Agapiou, A, Price, A D F and McCaffer, R (1995) Planning future construction skill requirements: understanding labour resource issues1. Construction Management and Economics, 13(02), 149-61.

Aghimien, D, Aigbavboa, C, Oke, A and Aghimien, L (2022) Latent Institutional Environment Factors Influencing Construction Digitalization in South Africa. International Journal of Construction Education and Research, 18(02), 142–58.

Aguado, A, Caño, A d, de la Cruz, M P, Gómez, D and Josa, A (2012) Sustainability Assessment of Concrete Structures within the Spanish Structural Concrete Code. Journal of Construction Engineering and Management, 138(02), 268–76.

Agyefi-Mensah, S, Post, J, van Egmond, E, Badu, E and Mohammadi, M (2015) The need for post-occupancy evaluation of public apartment buildings in Ghana. Journal of Engineering, Design and Technology, 13(02), 315-33.

Ahmad, I U, Russell, J S and Abou-Zeid, A (1995) Information technology (IT) and integration in the construction industry. Construction Management and Economics, 13(02), 163-71.

Ahmadian Fard Fini, A, Akbarnezhad, A, Rashidi, T H and Waller, S T (2018) Dynamic Programming Approach toward Optimization of Workforce Planning Decisions. Journal of Construction Engineering and Management, 144(02).

Ahmed, I (2011) An overview of post-disaster permanent housing reconstruction in developing countries. International Journal of Disaster Resilience in the Built Environment, 2(02), 148-64.

Ahmed, M O, El-adaway, I H, Coatney, K T and Eid, M S (2016) Construction Bidding and the Winner’s Curse: Game Theory Approach. Journal of Construction Engineering and Management, 142(02).

Ahmed, S and Sobuz, M H R (2019) Challenges of implementing lean construction in the construction industry in Bangladesh. Smart and Sustainable Built Environment, 9(02), 174–207.

Ahuja, V, Yang, J and Shankar, R (2010) IT-enhanced communication protocols for building project management. Engineering, Construction and Architectural Management, 17(02), 79.

Ahuja, V, Yang, J, Skitmore, M and Shankar, R (2010) An empirical test of causal relationships of factors affecting ICT adoption for building project management: An Indian SME case study. Construction Innovation, 10(02), 164–80.

Aibinu, A A, Dassanayake, D, Chan, T-K and Thangaraj, R (2015) Cost estimation for electric light and power elements during building design: A neural network approach. Engineering, Construction and Architectural Management, 22(02), 190-213.

Aje, I (2012) The impact of contractors' prequalification on construction project delivery in Nigeria. Engineering, Construction and Architectural Management, 19(02), 159-72.

Aje, O I, Odusami, K T and Ogunsemi, D R (2009) The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. Journal of Financial Management of Property and Construction, 14(02), 171–87.

Akampurira, E and Windapo, A (2019) Key quality attributes of design documentation: South African perspective. Journal of Engineering, Design and Technology, 17(02), 362–82.

Akintoye, A (1994) Design and build: a survey of construction contractors' views. Construction Management and Economics, 12(02), 155-63.

Akintoye, A (1995) Just-in-time application and implementation for building material management. Construction Management and Economics, 13(02), 105-13.

Akintoye, A and Fitzgerald, E (2000) A survey of current cost estimating practices in the UK. Construction Management and Economics, 18(02), 161-72.

Akintoye, A, Ajewolfe, O and Olomolaiye, P O (1992) Construction cost information management in Nigeria. Construction Management and Economics, 10(02), 107-16.

Akintoye, A, Bowen, P A and Hardcastle, C (1998) Macro-economic leading indicators of construction contract prices. Construction Management and Economics, 16(02), 159-75.

Akintoye, A, Renukappa, S and Lal, H (2012) The abolition of the "contracts in writing" rule in the 2009 Construction Act: Potential implications for UK adjudication. International Journal of Law in the Built Environment, 4(02), 140-56.

Akotia, J, Manu, E, Opoku, A and Sackey, E (2020) The role of built environment practitioners in driving the socio-economic sustainability aspects of sustainable regeneration. Construction Economics and Building, 20(02), 89-108.

Akotia, J, Opoku, A, Egbu, C and Fortune, C (2016) Exploring the knowledge ‘base’ of practitioners in the delivery of sustainable regeneration projects . Construction Economics and Building, 16(02), 14-26.

Al Yahya, M, Skitmore, M, Bridge, A, Nepal, M and Cattell, D (2018) e-Tendering readiness in construction: the posterior model. Construction Innovation, 18(02), 0.

Al-Gahtani, K S (2009) Float Allocation Using the Total Risk Approach. Journal of Construction Engineering and Management, 135(02), 88–95.

Al-Hussein, M, Alkass, S and Moselhi, O (2001) An algorithm for mobile crane selection and location on construction sites. Construction Innovation, 1(02), 91–105.

Al-Kaisy, A and Nassar, K (2009) Developing a Decision Support Tool for Nighttime Construction in Highway Projects. Journal of Construction Engineering and Management, 135(02), 119–25.

Al-Meshekeh, H S (2001) The effect of conflict management upon project effectiveness. Journal of Construction Procurement, 7(02), 15–30.

Al-Momani, A H (2000) Structuring information on residential building: a model of preference. Engineering, Construction and Architectural Management, 7(02), 179–90.

Al-Muyeed, A and Afrin, R (2005) Effect of masonry infill for reducing the sway of rc frame using finite element modeling. Journal of Construction Research, 6(02), 293–306.

Al-Qawasmi, J (2019) Examining indicators coverage in a sample of sustainable building assessment systems. Architectural Engineering and Design Management, 15(02), 101–20.

Al-Qawasmi, J (2016) Vernacular as a renewable resource: toward region-specific architecture in Saudi Arabia, a case from KFUPM. Architectural Engineering and Design Management, 12(02), 81–96.

Al-Sudairi, A A and Al-Motairi, M S (2010) Multi objective land use allocation model using priority-based goal programming technique. Construction Management and Economics, 28(02), 61.

Al-Tabtabai, H (2002) Construction procurement strategy selection using analytical hierarchy process. Journal of Construction Procurement, 8(02), 117–32.

Al-Tabtabai, H and Alex, A P (1999) Using genetic algorithms to solve optimization problems in construction. Engineering, Construction and Architectural Management, 6(02), 121–32.

Al-Tabtabai, H and Thomas, V P (2004) Negotiation and resolution of conflict using AHP: an application to project management. Engineering, Construction and Architectural Management, 11(02), 90–100.

Alaghbari, M W, Kadir, R A and Salim, E A (2007) The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(02), 192–206.

Alam, A, Bhat, M S, Farooq, H, Ahmad, B, Ahmad, S and Sheikh, A H (2018) Flood risk assessment of Srinagar city in Jammu and Kashmir, India. International Journal of Disaster Resilience in the Built Environment, 9(02), 114–29.

Alani, A M, Petersen, A K, Chapman, K G and Khosrowshahi, F (2004) A proposed quantitative model for building repair and maintenance -theory, model development and application. Journal of Construction Research, 5(02), 193–210.

Alao, O O, Jagboro, G O and Opawole, A (2018) Cost and time implications of abandoned project resuscitation. Journal of Financial Management of Property and Construction, 23(02), 185–201.

Alashwal, A, M, Fareed, N, F and Al-obaidi, K, M (2017) Determining Success Criteria and Success Factors for International Construction Projects for Malaysian Contractors . Construction Economics and Building, 17(02), 62-80.

Albadra, D, Elamin, Z, Adeyeye, K, Polychronaki, E, Coley, D A, Holley, J and Copping, A (2021) Participatory design in refugee camps: comparison of different methods and visualization tools. Building Research & Information, 49(02), 248–64.

Albert, A, Hallowell, M R and Kleiner, B M (2014) Enhancing Construction Hazard Recognition and Communication with Energy-Based Cognitive Mnemonics and Safety Meeting Maturity Model: Multiple Baseline Study. Journal of Construction Engineering and Management, 140(02).

Aldossari, K M, Lines, B C, Smithwick, J B, Hurtado, K C and Sullivan, K T (2023) Alternative Project Delivery Method Adoption in the AEC Industry: An Organizational Change Perspective. International Journal of Construction Education and Research, 19(02), 150–65.

Alharbi, M, Emmitt, S and Demian, P (2015) What is architectural management? Towards a pragmatic definition. Engineering, Construction and Architectural Management, 22(02), 151-68.

Ali, F, Chowdary, B V and Gonzales, L (2013) An integrated design approach for rapid product development: A case study through application of reverse engineering, re-engineering and fast prototyping tools. Journal of Engineering, Design and Technology, 11(02), 178-89.

Aljassmi, H, Han, S and Davis, S (2016) Analysis of the Complex Mechanisms of Defect Generation in Construction Projects. Journal of Construction Engineering and Management, 142(02).

Alkass, S, Mazerolle, M and Harris, F C (1998) Note - Rigour in research and peer-review: a reply. Construction Management and Economics, 16(02), 139-40.

Alkoc, E and Erbatur, F (1997) Productivity improvement in concreting operations through simulation models. Building Research & Information, 25(02), 82–91.

Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: a comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(02), 159–73.

Allam, S I G (1988) Multi-project scheduling: a new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6(02), 93-115.

Allan, P and Bryant, M (2014) The attributes of resilience: A tool in the evaluation and design of earthquake-prone cities. International Journal of Disaster Resilience in the Built Environment, 5(02), 109-29.

Allen, P M (2008) The importance of complexity for the research agenda in the built environment. Architectural Engineering and Design Management, 4(02), 5–14.

Allmon, E, Haas, C T, Borcherding, J D and Goodrum, P M (2000) U.S. Construction Labor Productivity Trends, 1970–1998. Journal of Construction Engineering and Management, 126(02), 97–104.

Allotey, N K, Arku, G and Amponsah, P E (2010) Earthquake-disaster preparedness: the case of Accra. International Journal of Disaster Resilience in the Built Environment, 1(02), 140–56.

Alluqmani, A E (2014) Design and behaviour of R.C. beams to ACI318-and-SBC304; and EC2 codes when subjected to asymmetric loading. Journal of Engineering, Design and Technology, 12(02), 158-76.

AlMaian, R Y, Needy, K L, Walsh, K D and Alves, T d C L (2016) A qualitative data analysis for supplier quality-management practices for engineer-procure-construct projects. Journal of Construction Engineering and Management, 142(02), 04015061.

Almazrouei, M, Khalid, K, Abdallah, S and Davidson, R (2019) Assessing the health, safety, and environment culture in the United Arab Emirates oil and gas industry. Journal of Engineering, Design and Technology , 18(02), 495–512.

Almeida, N, Sousa, V, Alves Dias, L and Branco, F (2010) A framework for combining risk-management and performance-based building approaches. Building Research & Information, 38(02), 74.

Alshawi, M and Hassan, Z (1999) Integrated models for construction planning: object flow and relationship. Engineering, Construction and Architectural Management, 6(02), 197–212.

Altay, B and Salcı, E (2024) Exploring designers’ finishing materials selection for residential interior spaces. Architectural Engineering and Design Management, 20(02), 269–86.

Altomonte, S (2005) CH2 - Lighting and physiology. Construction Economics and Building, 5(02), 40-46.

Alwan, Z, Greenwood, D and Gledson, B (2015) Rapid LEED evaluation performed with BIM-based sustainability analysis on a virtual construction project. Construction Innovation, 15(02), 134-50.

Amadi, C, Carrillo, P and Tuuli, M (2019) PPP projects: improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(02), 544–60.

Ambrose, M D and Tucker, S N (2000) Procurement system evaluation for the construction industry. Journal of Construction Procurement, 6(02).

Ameen, J R M, Neale, R H and Abrahamson, M (2003) An application of regression analysis to quality a claim for increased costs. Construction Management and Economics, 21(02), 156-65.

Amirkhanian, S N and Baker, N J (1992) Expert System for Equipment Selection for Earth‐Moving Operations. Journal of Construction Engineering and Management, 118(02), 318–31.

Ammar, A, Hanna, A S, Nordheim, E V and Russell, J S (2003) Indicator Variables Model of Firm’s Size-Profitability Relationship of Electrical Contractors Using Financial and Economic Data. Journal of Construction Engineering and Management, 129(02), 192–7.

Amoatey, C and Hayibor, M V K (2017) Critical success factors for local government project stakeholder management. Built Environment Project and Asset Management, 7(02), 143-56.

Amos, D, Musa, Z N and Au-Yong, C P (2020) Performance measurement of facilities management services in Ghana’s public hospitals. Building Research & Information, 48(02), 218–38.

Anagnostopoulos, K P and Koulinas, G K (2010) A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(02), 75.

Anderies, J M (2014) Embedding built environments in social-ecological systems: resilience-based design principles. Building Research & Information, 42(02), 130-42.

Andersen, M T and Findsen, A (2019) Exploring the benefits of structured information with the use of virtual design and construction principles in a BIM life-cycle approach. Architectural Engineering and Design Management, 15(02), 83–100.

Anderson, S D, Fisher, D J and Rahman, S P (2000) Integrating Constructability into Project Development: A Process Approach. Journal of Construction Engineering and Management, 126(02), 81–88.

Andi and Minato, T (2004) Representing causal mechanism of defective designs: exploration through case studies. Construction Management and Economics, 22(02), 183-92.

Andrew, A and Bryan, C (2011) Scottish construction lawyers and mediation: an investigation into attitudes and experiences. International Journal of Law in the Built Environment, 3(02), 159–81.

Ang, G, Groosman, M and Scholten, N P M (2005) Dutch performance-based approach to building regulations and public procurement. Building Research & Information, 33(02), 107–19.

Aniekwu, A N and Okpala, D C (1988) The effect of systemic factors on contract services in Nigeria. Construction Management and Economics, 6(02), 171-82.

Ansell, M, Evans, R, Holmes, M, Price, A and Pasquire, C (2009) An application of the construction management framework in highways major maintenance. Engineering, Construction and Architectural Management, 16(02), 162–74.

Anson, M and Wang, S Q (1998) Performance of Concrete Placing in Hong Kong Buildings. Journal of Construction Engineering and Management, 124(02), 116–24.

Antwi-Afari, M F, Li, H, Edwards, D J, Pärn, E A, Owusu-Manu, D, Seo, J and Wong, A Y L (2018) Identification of potential biomechanical risk factors for low back disorders during repetitive rebar lifting. Construction Innovation, 18(02), 0.

Antwi, A and Deakin, M (1996) Discounting, obsolescence, depreciation and their effects on the environment of cities. Journal of Financial Management of Property and Construction, 1(02), 39–56.

Anumba, C J, Abdullah, A and Ruikar, K (2008) An integrated system for demolition techniques selection. Architectural Engineering and Design Management, 4(02), 130–48.

Aoieong, R T, Tang, S L and Ahmed, S M (2002) A process approach in measuring quality costs of construction projects: model development. Construction Management and Economics, 20(02), 179-92.

Aouad, G F and Price, A D F (1994) Construction planning and information technology in the UK and USA construction industries: a comparative study. Construction Management and Economics, 12(02), 97-106.

Aouad, G F, Hinks, J, Cooper, R, Sheath, D M, Kagioglou, M and Sexton, M (1998) An information technology (IT) map for a generic design and construction process protocol. Journal of Construction Procurement, 4(02), 132–51.

Aouad, G F, Kawooya, A A O and Price, A D F (1996) Construction planning models: a review of history, capabilities and limitations. Journal of Construction Procurement, 2(02), 19–37.

Aranda-Mena, G, Sher, W, Gameson, R and Ward, P (2005) Evolving trends in nD modelling: the 'construction planning workbench'. Architectural Engineering and Design Management, 1(02), 111–26.

Arantes, A and Ferreira, L M D (2020) Underlying causes and mitigation measures of delays in construction projects. Journal of Financial Management of Property and Construction , 25(02), 165–81.

Arashpour, M, Wakefield, R, Blismas, N and Lee E W M (2013) A new approach for modelling variability in residential construction projects. Construction Economics and Building, 13(02), 83-92.

Arashpour, M, Wakefield, R, Blismas, N and Lee, E W M (2014) Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects. Journal of Construction Engineering and Management, 140(02).

Araujo, L G, Piña, A B S, Aidar, L A G, Coelho, G O and Carvalho, M T M (2019) Recommendations and guidelines for implementing PPP projects. Built Environment Project and Asset Management, 9(02), 262–76.

Arayici, Y and Aouad, G (2005) Computer integrated construction: an approach to requirements engineering. Engineering, Construction and Architectural Management, 12(02), 194–215.

Arboleda, C A and Abraham, D M (2004) Fatalities in Trenching Operations—Analysis Using Models of Accident Causation. Journal of Construction Engineering and Management, 130(02), 273–80.

Arbon, P, Steenkamp, M, Cornell, V, Cusack, L and Gebbie, K (2016) Measuring disaster resilience in communities and households: Pragmatic tools developed in Australia. International Journal of Disaster Resilience in the Built Environment, 7(02), 201-15.

Arbulu, R J, Tommelein, I D, Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(02), 161–71.

Arditi, D and Lee, D-E (2003) Assessing the corporate service quality performance of design build contractors using quality function deployment. Construction Management and Economics, 21(02), 175-85.

Arditi, D and Lee, D-E (2004) Note - Service quality performance of design/build contractors using quality function deployment. Construction Management and Economics, 22(02), 123-7.

Arditi, D, Akan, G T and Gurdamar, S (1985) Reasons for delays in public projects in Turkey. Construction Management and Economics, 3(02), 171-81.

Arditi, D, Elhassan, A and Toklu, Y C (2002) Constructability Analysis in the Design Firm. Journal of Construction Engineering and Management, 128(02), 117–26.

Arditi, D, Koksal, A and Kale, S (2000) Business failures in the construction industry. Engineering, Construction and Architectural Management, 7(02), 120–32.

Arditi, D, Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(02), 90–103.

Arensman, D B and Ozbek, M E (2012) Building Information Modeling and Potential Legal Issues. International Journal of Construction Education and Research, 8(02), 146-56.

Ariaratnam, S T, Lueke, J S and Allouche, E N (1999) Utilization of Trenchless Construction Methods by Canadian Municipalities. Journal of Construction Engineering and Management, 125(02), 76–86.

Arif, A A and Karam, A H (2005) Architectural practices and IT: local vs international. Journal of Engineering, Design and Technology, 3(02), 155–63.

Arif, M, Bendi, D, Toma-Sabbagh, T and Sutrisna, M (2012) Construction waste management in India: an exploratory study. Construction Innovation, 12(02), 133-55.

Arif, M, Egbu, C, Haleem, A, Kulonda, D and Khalfan, M (2009) State of green construction in India: drivers and challenges. Journal of Engineering, Design and Technology, 7(02), 223–34.

Arif, M, Khalfan, M, Barnard, J and Heller, N (2012) Assessing knowledge retention in construction organisations: cases from the UAE. Construction Economics and Building, 12(02), 55-71.

Arlain, A G and Rakhra, A S (1988) Building code assessment framework. Construction Management and Economics, 6(02), 117-31.

Arroyo, P, Tommelein, I D and Ballard, G (2016) Selecting Globally Sustainable Materials: A Case Study Using Choosing by Advantages. Journal of Construction Engineering and Management, 142(02).

Art Chaovalitwongse, W, Wang, W, Williams, T P and Chaovalitwongse, P (2012) Data Mining Framework to Optimize the Bid Selection Policy for Competitively Bid Highway Construction Projects. Journal of Construction Engineering and Management, 138(02), 277–86.

Artmann, N, Gyalistras, D, Manz, H and Heiselberg, P (2008) Impact of climate warming on passive night cooling potential. Building Research & Information, 36(02), 28.

Arumala, J O (2006) Mold and the construction industry. International Journal of Construction Education and Research, 2(02), 75-89.

Asad, S and Dainty, A R J (2005) Job motivational factors for disparate occupational groups within the UK construction sector: a comparative analysis. Journal of Construction Research, 6(02), 223–36.

Asao, K, Miyamoto, T, Kato, H and Diaz, C E D (2013) Comparison of revenue guarantee programs in build-operation-transfer projects. Built Environment Project and Asset Management, 3(02), 214-27.

Ascione, F, Bellia, L, Mazzei, P and Minichiello, F (2010) Solar gain and building envelope: the surface factor. Building Research & Information, 38(02), 205.

Ashcroft, D, Egbelakin, T, Jing, J and Rasheed, E O (2019) Cost comparison of seismic damage resisting systems for modules in multi-storey buildings. Journal of Engineering, Design and Technology, 17(02), 330–46.

Ashley, D B, Uehara, K and Robinson, B E (1983) Critical Decision Making During Construction. Journal of Construction Engineering and Management, 109(02), 146–62.

Aslay, S E and Dede, T (2024) Reduce the construction cost of a 7-story RC public building with metaheuristic algorithms. Architectural Engineering and Design Management, 20(02), 214–29.

Assaf, S A (1987) Feasibility assessment of large-scale housing development in Saudi Arabia: a case study. Construction Management and Economics, 5(02), 157-68.

Atkin, B (1993) Stereotypes and themes in building designs: insights for model builders. Construction Management and Economics, 11(02), 119-30.

Atkin, B and Bildsten, L (2017) A future for facility management. Construction Innovation, 17(02), 116-24.

Atta, A, Ali, N, Taman, M and Etman, E (2018) Improvement the structural behavior of recycled RC elements using CdO nanoparticles. Construction Innovation, 18(02), 134–51.

Attia, D A, Maarouf, I, Taha, D and Nassar, D (2020) Detecting failures in conservation practice in relation to cultural significance: the case of heritage buildings in Khartoum. Building Research & Information, 48(02), 124–39.

Au, T and Hendrickson, C (1986) Profit Measures for Construction Projects. Journal of Construction Engineering and Management, 112(02), 273–86.

Augenbroe, G and Park, C-S (2005) Quantification methods of technical building performance. Building Research & Information, 33(02), 159–72.

Austin, C O (2011) A contingent valuation model for assessing electricity demand. Journal of Financial Management of Property and Construction, 16(02), 126–46.

Austin, R B, Pishdad-Bozorgi, P and de la Garza, J M (2016) Identifying and Prioritizing Best Practices to Achieve Flash Track Projects. Journal of Construction Engineering and Management, 142(02).

Austin, S A, Baldwin, A N, Baizhan, L and Waskett, P (2000) Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process. Construction Management and Economics, 18(02), 173-82.

Avila, J, Rapp, R, Dunbar, S and Jackson, A T (2021) Burnout and Worklife in Disaster Restoration: Maslach Burnout Inventory and Areas of Worklife Survey. Journal of Construction Engineering and Management, 147(02).

Awodele, O A, Aghimien, D O, Akinkunmi, O G and Aigbavboa, C O (2019) Labour-only procurement. Journal of Engineering, Design and Technology, 17(02), 347–61.

Ayadi, A, Nasraoui, H, Driss, Z, Bouabidi, A and Abid, M S (2018) Unsteady state of a solar chimney power plant accoupled with a turbine: case study. Journal of Engineering, Design and Technology, 16(02), 244–55.

Aye, L and Fuller, R (2005) An evaluation of a proposed ventilation system for Melbourne's CH2 building. Construction Economics and Building, 5(02), 47-57.

Aye, L and Fuller, R (2005) The proposed heating and cooling system in the CH2 building and its impact on occupant productivity. Construction Economics and Building, 5(02), 32-39.

Ayinla, K O, Cheung, F and Tawil, A (2019) Demystifying the concept of offsite manufacturing method. Construction Innovation , 20(02), 223–46.

Ayodele, O A, Chang-Richards, A and González, V (2020) Factors Affecting Workforce Turnover in the Construction Sector: A Systematic Review. Journal of Construction Engineering and Management, 146(02).

Ayyub, B M and Haldar, A (1984) Project Scheduling Using Fuzzy Set Concepts. Journal of Construction Engineering and Management, 110(02), 189–204.

Azman, M A, Hon, C K H, Skitmore, M, Lee, B L and Xia, B (2019) A Meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: evidence from Malaysia. Construction Management and Economics, 37(02), 72–88.

Baba, K (1990) Principal Nature of Management in Japanese Construction Industry. Journal of Construction Engineering and Management, 116(02), 351–64.

Babaei, M, Rashidi-baqhi, A and Rashidi, M (2022) Estimating Project Cost under Uncertainty Using Universal Generating Function Method. Journal of Construction Engineering and Management, 148(02).

Babatunde, S O, Awodele, O A and Adeniyi, O (2018) Opportunities and challenges of foreign direct investment utilisation and its impact on construction sector in developing countries. Journal of Financial Management of Property and Construction, 23(02), 239–56.

Back, W E and Sanders, S R (1998) Industry expectations for engineering graduates. Engineering, Construction and Architectural Management, 5(02), 137–43.

Badasyan, N (2018) Project feasibility analysis economic model for private investments in the renewable energy sector. Built Environment Project and Asset Management, 8(02), 215–30.

Badger, W W and Smith, J C (2006) Ranking construction programs: the academic debate ebgins. International Journal of Construction Education and Research, 2(02), 127-42.

Badger, W, Sullivan, K, Wiezel, A and Bopp, P H (2009) Profiling the leadership of project managers. International Journal of Construction Education and Research, 5(02), 121-46.

Badu, E, Owusu-Manu, D-G, Edwards, D J, Adesi, M and Lichtenstein, S (2013) Rural infrastructure development in the Volta region of Ghana: barriers and interventions. Journal of Financial Management of Property and Construction, 18(02), 142-59.

Bai, S, Li, M, Lu, Q, Tian, H and Qin, L (2022) Global Time Optimization Method for Dredging Construction Cycles of Trailing Suction Hopper Dredger Based on Grey System Model. Journal of Construction Engineering and Management, 148(02).

Bai, Y and Amirkhanian, S N (1994) Knowledge‐Based Expert System for Concrete Mix Design. Journal of Construction Engineering and Management, 120(02), 357–73.

Bai, Y and Bernold, L E (2001) Quality Control Parameters for Robotic Bridge Painting. Journal of Construction Engineering and Management, 127(02), 142–8.

Bakens, W (1997) International Trends in Building and Construction Research . Journal of Construction Engineering and Management, 123(02), 102–4.

Baker, F (2013) Housing and planning regulation – England and Ireland. International Journal of Law in the Built Environment, 5(02), 118-36.

Baker, S, Ponniah, D and Smith, S (1999) Risk response techniques employed currently for major projects. Construction Management and Economics, 17(02), 205-13.

Balali, V, Zalavadia, A and Heydarian, A (2020) Real-Time Interaction and Cost Estimating within Immersive Virtual Environments. Journal of Construction Engineering and Management, 146(02).

Balatbat, M C A, Lin, C-Y and Carmichael, D G (2011) Management efficiency performance of construction businesses: Australian data. Engineering, Construction and Architectural Management, 18(02), 140–58.

Baldwin, A N, Austin, S A, Hassan, T M and Thorpe, A (1999) Modelling information flow during the conceptual and schematic stages of building design. Construction Management and Economics, 17(02), 155-67.

Baldwin, A, Li, H, Huang, T, Kong, C W, Guo, H L, Chan, N and Wong, J (2009) Supporting pre-tender construction planning with virtual prototyping. Engineering, Construction and Architectural Management, 16(02), 150–61.

Ballard, G (2003) Lean project management. Building Research & Information, 31(02), 119–33.

Ballesteros-Pérez, P, Phua, F T T and Mora-Melià, D (2019) Human Resource Allocation to Multiple Projects Based on Members’ Expertise, Group Heterogeneity, and Social Cohesion. Journal of Construction Engineering and Management, 145(02).

Balsas, C J L (2017) The right to walk in cities, a comparative review of Macau, Lisbon and Las Vegas. International Journal of Law in the Built Environment, 9(02), 123-42.

Bamgbade, J A, Fung, E S, Moshood, T D, Kamaruddeen, A M and Liew, S (2023) The dynamics of ecological sustainability in housing delivery: developers’ perspectives. Architectural Engineering and Design Management, 19(02), 183–99.

Banik, G C (2001) Construction productivity improvement: current US perspective. Journal of Construction Procurement, 7(02), 60–71.

Bansal, S, Biswas, S and Singh, S (2018) Fuzzy TOPSIS based holistic assessment of regions: context of India. Smart and Sustainable Built Environment, 7(02), 166–81.

Baqerin, M H, Shafahi, Y and Kashani, H (2016) Application of Weibull Analysis to Evaluate and Forecast Schedule Performance in Repetitive Projects. Journal of Construction Engineering and Management, 142(02).

Barari, A, Ganjavi, B, Jeloudar, M G and Domairry, G (2010) Assessment of two analytical methods in solving the linear and nonlinear elastic beam deformation problems. Journal of Engineering, Design and Technology, 8(02), 127–45.

Barbosa, J A, Araújo, C, Mateus, R and Bragança, L (2016) Smart interior design of buildings and its relationship to land use. Architectural Engineering and Design Management, 12(02), 97–106.

Barima, O and Rowlinson, S M (2010) Critical, manifest variables in virtual construction project value delivery. Engineering, Construction and Architectural Management, 17(02), 209.

Barker, R, Childerhouse, P, Naim, M, Masat, J and Wilson, D (2004) Potential of Total Cycle Time Compression in Construction: Focus on Program Development and Design. Journal of Construction Engineering and Management, 130(02), 177–87.

Barlow, J, Childerhouse, P, Gann, D, Hong-Minh, S, Naim, M and Ozaki, R (2003) Choice and delivery in housebuilding: lessons from Japan for UK housebuilders. Building Research & Information, 31(02), 134–45.

Barnes, W C (1993) Microcomputers in Management of Construction Operations. Journal of Construction Engineering and Management, 119(02), 403–12.

Barot, B (2002) Growth and business cycles for the Swedish economy. Journal of Construction Research, 3(02), 217–53.

Baroudi, B and Metcalfe, M (2011) A human perspective of contractor prequalification. Construction Economics and Building, 11(02), 60-70.

Baroudi, B and Rapp, R R (2014) Stakeholder management in disaster restoration projects. International Journal of Disaster Resilience in the Built Environment, 5(02), 182-93.

Barraza, G A, Back, W E and Mata, F (2000) Probabilistic Monitoring of Project Performance Using SS-Curves. Journal of Construction Engineering and Management, 126(02), 142–8.

Barrett, P and Barrett, L (2006) The 4Cs model of exemplary construction projects. Engineering, Construction and Architectural Management, 13(02), 201–15.

Barton, R T (2000) Soft value management methodology for use in project initiation: a learning journey. Journal of Construction Research, 1(02), 109–22.

Bashouri, J and William, D G (2014) A model for sharing knowledge in architectural firms. Construction Innovation, 14(02), 168-85.

Bassindale, J (2020) Learning through Successful Feedback: Digital Opportunities for Effective Feedback in Project-Based Architectural Education. International Journal of Construction Education and Research, 16(02), 84–101.

Bastos, M F, Ribeiro, F L and Teixeira, J C (2005) Estimating of capital cost of underground car parking projects. Journal of Financial Management of Property and Construction, 10(02), 125–32.

Battikha, M G (2002) QUALICON: Computer-Based System for Construction Quality Management. Journal of Construction Engineering and Management, 128(02), 164–73.

Bayat, M, Khanzadi, M and Nasirzadeh, F (2020) Bargaining Game Model to Determine Concessionary Items in Build-Operate-Transfer Contracts. Journal of Construction Engineering and Management, 146(02).

Bazen, E (2014) Effect of the Building Act 2011 on compliance costs in Western Australia. Construction Economics and Building, 14(02), 41-56.

Beainy, F, Commuri, S and Zaman, M (2012) Quality Assurance of Hot Mix Asphalt Pavements Using the Intelligent Asphalt Compaction Analyzer. Journal of Construction Engineering and Management, 138(02), 178–87.

Becerra, J, Ortiz, P, Zaderenko, A P and Karapanagiotis, I (2020) Assessment of nanoparticles/nanocomposites to inhibit micro-algal fouling on limestone façades. Building Research & Information, 48(02), 180–90.

Behm, M and Hock, P C (2012) Safe design of skyrise greenery in Singapore. Smart and Sustainable Built Environment, 1(02), 186-205.

Belabed, Y, Kerboua, B and Tarfaoui, M (2019) New design for reducing interfacial stresses of reinforced structures with FRP plates. International Journal of Building Pathology and Adaptation, 37(02), 196–207.

Belayutham, S, Che Ibrahim, C K I, Zulkifli, A R and Ibrahim, N (2019) A dual-functional social innovation process model for low-cost houses through university-enabled initiative. Construction Innovation , 19(02), 126–48.

Bell, L C and McCullouch, B G (1988) Bar Code Applications in Construction. Journal of Construction Engineering and Management, 114(02), 263–78.

Bell, L C and McCullouch, B G (1983) Microcomputer Spreadsheet Applications. Journal of Construction Engineering and Management, 109(02), 214–23.

Bell, L C and Stukhart, G (1987) Costs and Benefits of Materials Management Systems. Journal of Construction Engineering and Management, 113(02), 222–34.

Beltrão, L M P and Carvalho, M T M (2019) Prioritizing Construction Risks Using Fuzzy AHP in Brazilian Public Enterprises. Journal of Construction Engineering and Management, 145(02).

Ben-Haim, Y and Laufer, A (1998) Robust Reliability of Projects with Activity-Duration Uncertainty. Journal of Construction Engineering and Management, 124(02), 125–32.

Bencze, O C, Dasmohapatra, S and Tilotta, D C (2012) A concept for a performance-based rating system for home resilience: ReScU. International Journal of Disaster Resilience in the Built Environment, 3(02), 148-65.

Bennett, W G and Karunarathna, H (2019) Coastal flood alleviation through management interventions under changing climate conditions. International Journal of Disaster Resilience in the Built Environment, 11(02), 187–203.

Bensalah, M, Elouadi, A and Mharzi, H (2019) Overview: the opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(02), 103–16.

Bentivegna, V, Curwell, S, Deakin, M, Lombardi, P, Mitchell, G and Nijkamp, P (2002) A vision and methodology for integrated sustainable urban development: BEQUEST. Building Research & Information, 30(02), 83–94.

Beran, V, Dlask, P, Eaton, D, Hromada, E and Zindulka, O (2011) Mapping of synchronous activities through virtual management momentum simulation. Construction Innovation, 11(02), 190–211.

Bernold, L E (2007) Teaching Evaluations for Construction Engineering and Management: Opportunity to Move Us Forward. Journal of Construction Engineering and Management, 133(02), 146–56.

Bernold, L E and Chang, P (1992) Potential Gains through Welded‐Wire Fabric Reinforcement. Journal of Construction Engineering and Management, 118(02), 244–57.

Bernold, L E and Salim, M (1993) Placement‐Oriented Design and Delivery of Concrete Reinforcement. Journal of Construction Engineering and Management, 119(02), 323–35.

Besaiso, H, Fenn, P, Emsley, M and Wright, D (2018) A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine. Engineering, Construction and Architectural Management, 25(02), 241–56.

Best, R (2009) A refined basket of goods approach for comparing construction costs between countries. Construction Economics and Building, 9(02), 29-38.

Betts, M and Liow, S R (1993) The relationship between teaching methods and educational objectives in building education. Construction Management and Economics, 11(02), 131-41.

Bevan, W J (2020) How to Improve the Student Feedback Process: A Case Study within the Built Environment. International Journal of Construction Education and Research, 16(02), 117–31.

Bhandari, S, Hallowell, M R, Boven, L V, Welker, K M, Golparvar-Fard, M and Gruber, J (2020) Using Augmented Virtuality to Examine How Emotions Influence Construction-Hazard Identification, Risk Assessment, and Safety Decisions. Journal of Construction Engineering and Management, 146(02).

Bhokha, S and Ogunlana, S O (1999) Application of artificial neural network to forecast construction duration of buildings at the pre-design stage. Engineering, Construction and Architectural Management, 6(02), 133–44.

Bi, L, Ren, B, Zhong, D and Hu, L (2015) Real-Time Construction Schedule Analysis of Long-Distance Diversion Tunnels Based on Lithological Predictions Using a Markov Process. Journal of Construction Engineering and Management, 141(02).

Bichard, E and Thurairajah, N (2013) Behaviour change strategies for energy efficiency in owner-occupied housing. Construction Innovation, 13(02), 165-85.

Bichard, E and Thurairajah, N (2014) Trialling behaviour change strategies to motivate interest in property level flood protection. International Journal of Disaster Resilience in the Built Environment, 5(02), 130-43.

Bidanset, P, McCord, M, Davis, P and Sunderman, M (2019) An exploratory approach for enhancing vertical and horizontal equity tests for {[}ad valorem{]} property tax valuations using geographically weighted regression. Journal of Financial Management of Property and Construction , 24(02), 231–50.

Birnie, J and Yates, A (1991) Cost prediction using decision/risk analysis methodologies. Construction Management and Economics, 9(02), 171-86.

Bitarafan, M, Hosseini, S B, Abazarlou, S and Mahmoudzadeh, A (2015) Selecting the optimal composition of architectural forms from the perspective of civil defense using AHP and IHWP methods. Architectural Engineering and Design Management, 11(02), 137-48.

Bjork, B-C (2012) A comparison of subscription and open access journals in construction management and related fields. Construction Economics and Building, 12(02), 27-42.

Björnfot, A and Jongeling, R (2007) Application of line-of-balance and 4D CAD for lean planning. Construction Innovation, 7(02), 200–11.

Blackmon, R B and Gramopadhye, A K (1995) Improving Construction Safety by Providing Positive Feedback on Backup Alarms. Journal of Construction Engineering and Management, 121(02), 166–71.

Blismas, N G, Sher, W D, Thorpe, A and Baldwin, A N (2004) Factors influencing project delivery within construction clients' multi-project environments. Engineering, Construction and Architectural Management, 11(02), 113–25.

Blismas, N, Pasquire, C and Gibb, A (2006) Benefit evaluation for off-site production in construction. Construction Management and Economics, 24(02), 121-30.

Blyth, K, Lewis, J and Kaka, A (2004) Predicting project and activity duration for buildings in the UK. Journal of Construction Research, 5(02), 329–47.

Bollo, C S and Cole, R J (2019) Decoupling climate-policy objectives and mechanisms to reduce fragmentation. Building Research & Information, 47(02), 219–33.

Bologna, R and Nord, R D (2000) Effects of the law reforming public works contracts on the Italian building process. Building Research & Information, 28(02), 109–18.

Bon, R (1988) Replacement simulation model: a framework for building portfolio decisions. Construction Management and Economics, 6(02), 149-59.

Bon, R (1996) Whither global construction? Some results of the ECERU opinion survey, 1993–95. Building Research & Information, 24(02), 81–5.

Bon, R and Pietroforte, R (1993) New construction versus maintenance and repair construction technology in the US since World War II. Construction Management and Economics, 11(02), 151-62.

Bond, S and Dermisi, S (2017) Using GIS to measure the impact of the Canterbury earthquakes on house prices in Christchurch, NZ. International Journal of Disaster Resilience in the Built Environment, 8(02), 123-38.

Bordass, B, Cohen, R, Standeven, M and Leaman, A (2001) Assessing building performance in use 2: technical performance of the Probe buildings. Building Research & Information, 29(02), 103–13.

Bordass, B, Cohen, R, Standeven, M and Leaman, A (2001) Assessing building performance in use 3: technical performance of the Probe buildings. Building Research & Information, 29(02), 114–28.

Bordass, B, Leaman, A and Ruyssevelt, P (2001) Assessing building performance in use 5: technical performance of the Probe buildings. Building Research & Information, 29(02), 144–57.

Borgeson, S and Brager, G (2011) Comfort standards and variations in exceedance for mixed-mode buildings. Building Research & Information, 39(02), 33.

Bortolini, R and Forcada, N (2020) Analysis of building maintenance requests using a text mining approach: building services evaluation. Building Research & Information, 48(02), 207–17.

Bosher, L, Dainty, A, Carrillo, P, Glass, J and Price, A (2007) Integrating disaster risk management into construction: a UK perspective. Building Research & Information, 35(02), 163–77.

Bouchlaghem, N M (1996) A computer model for the design of window shading devices. Building Research & Information, 24(02), 104–7.

Bouraoui, D and Lizarralde, G (2013) Centralized decision making, users' participation and satisfaction in post-disaster reconstruction: The case of Tunisia. International Journal of Disaster Resilience in the Built Environment, 4(02), 145-67.

Bourikas, L, Costanza, E, Gauthier, S, James, P A B, Kittley-Davies, J, Ornaghi, C, Rogers, A, Saadatian, E and Huang, Y (2018) Camera-based window-opening estimation in a naturally ventilated office. Building Research & Information, 46(02), 148–63.

Boussabaine, A H (2001) Neurofuzzy modelling of construction projects’ duration I: principles. Engineering, Construction and Architectural Management, 8(02), 104–13.

Boussabaine, A H (2001) Neurofuzzy modelling of construction projects’ duration II: application. Engineering, Construction and Architectural Management, 8(02), 114–29.

Boutfskis, V and Fellows, R F (1997) Appraising the performance of long span sportshalls and swimming pools in Greece. Journal of Financial Management of Property and Construction, 2(02), 39–58.

Bowen, P A, Pearl, R G and Edwards, P J (1999) Client briefing processes and procurement method selection: a South African study. Engineering, Construction and Architectural Management, 6(02), 91–104.

Bowen, P, Cattel, K, Hall, K, Edwards, P and Pearl, R (2002) Perceptions of time, cost and quality management on building projects. Construction Economics and Building, 2(02), 48-56.

Bowen, P, Cattell, K, Michell, K and Edwards, P (2008) Job satisfaction of South Africa quantity surveyors: Are employers happier than employees?. Journal of Engineering, Design and Technology, 6(02), 124–44.

Bowen, P, Jay, I, Cattell, K and Edwards, P (2010) Value management awareness and practice by South African architects: an empirical study. Construction Innovation, 10(02), 203–22.

Bowen, P, Pearl, R and Akintoye, A (2007) Professional ethics in the South African construction industry. Building Research & Information, 35(02), 189–205.

Bower, D J, Hinks, J, Wright, H, Hardcastle, C and Cuckow, H (2001) ICTs, videoconferencing and the construction industry: opportunity or threat?. Construction Innovation, 1(02), 129–44.

Bowlby, W and Cohn, L F (1983) Prediction of Highway Construction Noise Levels. Journal of Construction Engineering and Management, 109(02), 163–80.

Boyle, F and Thomson, C (2016) Establishing an evidence base for adapting social housing for an ageing population. Journal of Financial Management of Property and Construction, 21(02), 137-59.

Boyle, L and Michell, K (2020) Key ingredients for a collaborative urban regeneration strategy in the Global South. Construction Economics and Building, 20(02), 150-164.

Boz, M A and El-adaway, I H (2015) Creating a Holistic Systems Framework for Sustainability Assessment of Civil Infrastructure Projects. Journal of Construction Engineering and Management, 141(02).

Bröchner, J (1990) Impacts of information technology on the structure of construction. Construction Management and Economics, 8(02), 205-18.

Bröchner, J (1994) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(02), 91–101.

Bröchner, J and Silfwerbrand, J (2019) Performance of performance specifications in design-build highway projects . Construction Economics and Building, 19(02), 111-125.

Bradley, P E (2019) Methodology for the sequence analysis of building stocks. Building Research & Information, 47(02), 141–55.

Brahme, R and Mahdavi, A (2003) Complex early design inquiries via generative design agents. Construction Innovation, 3(02), 81–95.

Brandon, P S (1984) Cost versus quality: a zero sum game?. Construction Management and Economics, 2(02), 111-26.

Bremer, W and Kok, K (2000) The Dutch construction industry: a combination of competition and corporatism. Building Research & Information, 28(02), 98–108.

Bresnen, M and Marshall, N (2000) Partnering in construction: a critical review of issues, problems and dilemmas. Construction Management and Economics, 18(02), 229-37.

Brett-Jones, A T (1983) Barchester low-rise: a case study of a management contract for remedial work to a large housing scheme. Construction Management and Economics, 1(02), 91-117.

Brewer, G and Gajendran, T (2012) Attitudes, behaviours and the transmission of cultural traits: Impacts on ICT/BIM use in a project team. Construction Innovation, 12(02), 198-215.

Briscoe, G H, Dainty, A R J, Millett, S J and Neale, R H (2004) Client-led strategies for construction supply chain improvement. Construction Management and Economics, 22(02), 193-201.

Brockman, J L (2014) Interpersonal Conflict in Construction: Cost, Cause, and Consequence. Journal of Construction Engineering and Management, 140(02).

Broft, R, Badi, S M and Pryke, S (2016) Towards supply chain maturity in construction. Built Environment Project and Asset Management, 6(02), 187-204.

Brown, C and Gorgolewski, M (2015) Understanding the role of inhabitants in innovative mechanical ventilation strategies. Building Research & Information, 43(02), 210-21.

Brown, C, Milke, M and Seville, E (2010) Waste management as a “Lifeline”? A New Zealand case study analysis. International Journal of Disaster Resilience in the Built Environment, 1(02), 192–206.

Brown, D C (2003) Novel Method of Excavation. Journal of Construction Engineering and Management, 129(02), 222–5.

Brownlie, S M and Harris, F C (1987) A review of finance for large-scale construction. Construction Management and Economics, 5(02), 115-21.

Brunso, T P and Siddiqi, K M (2003) Using Benchmarks and Metrics to Evaluate Project Delivery of Environmental Restoration Programs. Journal of Construction Engineering and Management, 129(02), 119–30.

Bu, S, Shen, G, Anumba, C J, Wong, A K D and Liang, X (2015) Literature review of green retrofit design for commercial buildings with BIM implication. Smart and Sustainable Built Environment, 4(02), 188-214.

Buckman, A H, Mayfield, M and Beck, S B M (2014) What is a Smart Building?. Smart and Sustainable Built Environment, 3(02), 92-109.

Bulsara, M A, Hingu, A D and Vaghasiya, P S (2016) Energy loss due to unbalance in rotor–shaft system. Journal of Engineering, Design and Technology, 14(02), 277-85.

Burati, J L, Matthews, M F and Kalidindi, S N (1991) Quality Management in Construction Industry. Journal of Construction Engineering and Management, 117(02), 341–59.

Burchett, J F and Tummala, V M R (1998) An application of the risk management process (RMP) in capital investment decisions for an EHV transmission line construction project. Construction Management and Economics, 16(02), 235-44.

Burford, N K and Smith, F W (1999) Developing a new military shelter system: a technical study in advanced materials and structures. Building Research & Information, 27(02), 64–83.

Burr, K L and Jones, C B (2010) The role of the architect: changes of the past, practices of the present, and indications of the future. International Journal of Construction Education and Research, 6(02), 122–38.

Burrus, R T, Dumas, C F and Graham, J E (2011) Hurricane risk and coastal property owner choices. International Journal of Disaster Resilience in the Built Environment, 2(02), 118-38.

Burton, R, Dickson, M and Harris, R (1998) The use of roundwood thinnings in buildings: a case study. Building Research & Information, 26(02), 76–93.

Bygballe, L E, Håkansson, H and Jahre, M (2013) A critical discussion of models for conceptualizing the economic logic of construction. Construction Management and Economics, 31(02), 104-18.

Cabahug, R R, Edwards, D J and Nicholas, J (2004) Classifying plant operator maintenance proficiency: examining personal variables. Building Research & Information, 32(02), 119–27.

Caixeta, M C B F and Fabricio, M M (2013) A conceptual model for the design process of interventions in healthcare buildings: a method to improve design. Architectural Engineering and Design Management, 9(02), 95-109.

Cammarano, S, Pellegrino, A, Lo Verso, V R M and Aghemo, C (2015) Assessment of daylight in rooms with different architectural features. Building Research & Information, 43(02), 222-37.

Campagnac, E (2000) The contracting system in the French construction industry: actors and institutions. Building Research & Information, 28(02), 131–40.

Candido, C, Kim, J, de Dear, R and Thomas, L (2016) Bossa: A multidimensional post-occupancy evaluation tool. Building Research & Information, 44(02), 214-28.

Cândido, C, Lamberts, R, de Dear, R, Bittencourt, L and de Vecchi, R (2011) Towards a Brazilian standard for naturally ventilated buildings: guidelines for thermal and air movement acceptability. Building Research & Information, 39(02), 145–53.

Capitanio, M (2018) More green space in Japanese shopping streets. Smart and Sustainable Built Environment, 7(02), 212–22.

Carbonara, N and Pellegrino, R (2020) The role of public private partnerships in fostering innovation. Construction Management and Economics, 38(02), 140–56.

Cardellicchio, L (2020) Self-cleaning and colour-preserving efficiency of photocatalytic concrete: case study of the Jubilee Church in Rome. Building Research & Information, 48(02), 160–79.

Carmichael, D G (1986) Shovel-truck queues: a reconciliation of theory and practice. Construction Management and Economics, 4(02), 161-77.

Carmichael, D G and Balatbat, M C A (2010) A contractor's analysis of the likelihood of payment of claims. Journal of Financial Management of Property and Construction, 15(02), 102–17.

Carmichael, D G and Karantonis, J P (2015) Construction contracts with conversion capability: a way forward. Journal of Financial Management of Property and Construction, 20(02), 132-46.

Carmichael, D G and Mustaffa, N K (2018) Emissions and production penalties/bonuses associated with non-standard earthmoving loading policies. Construction Innovation, 18(02), 0.

Carmichael, D G, Nguyen, T A and Shen, X (2019) Single Treatment of PPP Road Project Options. Journal of Construction Engineering and Management, 145(02).

Carr, R I (2000) . Journal of Construction Engineering and Management, 126(02), 105–13.

Carr, R I (2000) . Journal of Construction Engineering and Management, 126(02), 114–21.

Carr, R I (1993) Cost, Schedule, and Time Variances and Integration. Journal of Construction Engineering and Management, 119(02), 245–65.

Carr, R I and Maloney, W F (1983) Basic Research Needs in Construction Engineering. Journal of Construction Engineering and Management, 109(02), 181–9.

Carrasco, S, Ochiai, C and Okazaki, K (2017) Residential satisfaction and housing modifications: A study in disaster-induced resettlement sites in Cagayan de Oro, Philippines. International Journal of Disaster Resilience in the Built Environment, 8(02), 175-89.

Carter, G and Smith, S D (2006) Safety Hazard Identification on Construction Projects. Journal of Construction Engineering and Management, 132(02), 197–205.

Casamayor, J, Su, D and Sarshar, M (2015) Extending the lifespan of LED-lighting products. Architectural Engineering and Design Management, 11(02), 105-22.

Cattaneo, S and Mola, F (2012) Assessing the Quality Control of Self-Consolidating Concrete Properties. Journal of Construction Engineering and Management, 138(02), 197–205.

Celik, B G, Ozbek, M E, Attaran, S and Jalili, M (2014) Comparison of Environmental Responsibility of Construction Management Students Based on Exposure to Sustainability in Curricula and on Campus. International Journal of Construction Education and Research, 10(02), 96-110.

Cennamo, C and Fiore, M D (2013) Best practice of structural retrofit: the SS. Rosario Church in Gesualdo, Italy. International Journal of Disaster Resilience in the Built Environment, 4(02), 215-35.

Ceno, J S d (2012) Selective licensing and resident satisfaction in social housing: a UK case study. International Journal of Law in the Built Environment, 4(02), 126-39.

Cha, H S and O’Connor, J T (2005) Optimizing Implementation of Value Management Processes for Capital Projects. Journal of Construction Engineering and Management, 131(02), 239–51.

Cha, H S, Kim, K H and Kim, C K (2012) Case Study on Selective Demolition Method for Refurbishing Deteriorated Residential Apartments. Journal of Construction Engineering and Management, 138(02), 294–303.

Chalker, M and Loosemore, M (2016) Trust and productivity in Australian construction projects: A subcontractor perspective. Engineering, Construction and Architectural Management, 23(02), 192-210.

Chalkey, K and Green, M (2016) In the context of mediation, is safeguarding mediator neutrality and party autonomy more important than ensuring a fair settlement?. International Journal of Law in the Built Environment, 8(02), 161-75.

Chan, A P C (1999) Modelling building durations in Hong Kong. Construction Management and Economics, 17(02), 189-96.

Chan, A P C (1995) Towards an expert system on project procurement. Journal of Construction Procurement, 1(02), 111–23.

Chan, A P C, Chan, D W M, Chiang, Y H, Tang, B S, Chan, E H W and Ho, K S K (2004) Exploring Critical Success Factors for Partnering in Construction Projects. Journal of Construction Engineering and Management, 130(02), 188–98.

Chan, A P C, Ho, D C K and Tam, C M (2001) Design and Build Project Success Factors: Multivariate Analysis. Journal of Construction Engineering and Management, 127(02), 93–100.

Chan, A P C, Wong, F K W and Yang, Y (2016) From innovation to application of personal cooling vest. Smart and Sustainable Built Environment, 5(02), 111-24.

Chan, A P C, Wong, J M W and Chiang, Y H (2003) Modelling Labour Demand at Project Level — An Empirical Study in Hong Kong. Journal of Engineering, Design and Technology, 1(02), 135–50.

Chan, D W M, Lam, P T I, Chan, A P C and Wong, J M W (2011) Guaranteed maximum price (GMP) contracts in practice: a case study of a private office development project in Hong Kong. Engineering, Construction and Architectural Management, 18(02), 188–205.

Chan, E H W and Chan, A T S (2002) Development of professional system in the construction industry of China. Journal of Construction Research, 3(02), 271–84.

Chan, E H W, Suen, H C H and Chan, S-L (2005) An integrated project extranet design prototype: E-AEC for architects, engineers and contractors in Hong Kong and Mainland China. Journal of Construction Research, 6(02), 253–71.

Chan, I Y S, Leung, M-y and Yuan, T (2014) Structural relationships between cultural values and coping behaviors of professionals in the stressful construction industry. Engineering, Construction and Architectural Management, 21(02), 133-51.

Chan, J K W, Tam, C M and Cheung, R K C (2005) Construction firms at the crossroads in Hong Kong: Going insolvency or seeking opportunity. Engineering, Construction and Architectural Management, 12(02), 111–24.

Chan, T K and Abdul-Aziz, A-R (2017) Financial performance and operating strategies of Malaysian property development companies during the global financial crisis. Journal of Financial Management of Property and Construction, 22(02), 174-91.

Chan, W, Chua, D K H and Kannan, G (1996) Construction Resource Scheduling with Genetic Algorithms . Journal of Construction Engineering and Management, 122(02), 125–32.

Chancellor, W, Abbott, M and Carson, C (2015) Factors promoting innovation and efficiency in the construction industry: a comparative study of New Zealand and Australia. Construction Economics and Building, 15(02), 63-80.

Chandrasekara, C M K N K, Weerasinghe, K, Pathirana, S and Piyadasa, R U (2018) Stresses over surface water sources in a human dominated environment. International Journal of Disaster Resilience in the Built Environment, 9(02), 184–97.

Chang, A S (2001) Work-Time Model for Engineers. Journal of Construction Engineering and Management, 127(02), 163–72.

Chang, A S and Tien, C-C (2006) Quantifying uncertainty and equivocality in engineering projects. Construction Management and Economics, 24(02), 171-84.

Chang, C-Y (2013) A critical review of the application of TCE in the interpretation of risk allocation in PPP contracts. Construction Management and Economics, 31(02), 99-103.

Chang, L and Hsie, M (1995) Developing Acceptance-Sampling Methods for Quality Construction. Journal of Construction Engineering and Management, 121(02), 246–53.

Chang, S-h (2013) Evaluating essential liabilities on design professionals under earthquake’s impact: Taiwan experience. Engineering, Construction and Architectural Management, 20(02), 181-94.

Chang, T C, Ibbs, C W and Crandall, K C (1990) Network Resource Allocation with Support of a Fuzzy Expert System. Journal of Construction Engineering and Management, 116(02), 239–60.

Chang, Y H and Tang, B (2005) Trust, partnership and power in construction: theory and applications in Hong Kong. Journal of Construction Procurement, 11(02), 94-111.

Chantawit, D, Hadikusumo, B H W, Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: visualizing project scheduling and safety planning. Construction Innovation, 5(02), 99–114.

Chao, L and Kuo, C (2018) Neural-Network-Centered Approach to Determining Lower Limit of Combined Rate of Overheads and Markup. Journal of Construction Engineering and Management, 144(02).

Charles, S, Vidyaratne, H and Melagoda, D G (2019) Prospects and restraints of green roofs for high-rise buildings in Sri Lanka. Built Environment Project and Asset Management, 10(02), 246–60.

Charlesworth, E and Fien, J (2014) Breaching the urban contract: Lessons from post disaster reconstruction from research on five divided cities. International Journal of Disaster Resilience in the Built Environment, 5(02), 194-201.

Chau, K W and Lai, L W C (1994) A comparison between growth in labour productivity in the construction industry and the economy. Construction Management and Economics, 12(02), 183-5.

Chau, K W and So, A T P (1995) A fuzzy expert system for contract decision making. Construction Management and Economics, 13(02), 95-103.

Chau, K W, Poon, S W, Wang, Y S and Lu, L L (2005) Technological progress and the productive efficiency of construction firms in Hong Kong, 1981-2001. Journal of Construction Research, 6(02), 195–207.

Che Ibrahim, C K I and Belayutham, S (2020) A knowledge, attitude and practices (KAP) study on prevention through design: a dynamic insight into civil and structural engineers in Malaysia. Architectural Engineering and Design Management, 16(02), 131–49.

Che Ibrahim, C K I, Belayutham, S, Mohammad, M Z and Ismail, S (2022) Development of a Conceptual Designer’s Knowledge, Skills, and Experience Index for Prevention through Design Practice in Construction. Journal of Construction Engineering and Management, 148(02).

Chehayeb, N N and AbouRizk, S M (1998) Simulation-Based Scheduling with Continuous Activity Relationships. Journal of Construction Engineering and Management, 124(02), 107–15.

Chen, G, Zhang, G, Xie, Y-M and Jin, X-H (2012) Overview of alliancing research and practice in the construction industry. Architectural Engineering and Design Management, 8(02), 103-19.

Chen, H, Feng, Z, Liu, Y, Chen, B, Deng, T, Qin, Y and Xu, W (2023) Multiobjective Optimization of a 3D Laser Scanning Scheme for Engineering Structures Based on RF-NSGA-II. Journal of Construction Engineering and Management, 149(02).

Chen, J J (1996) The impact of public construction investment upon special economic zones: the Chinese experience. Construction Management and Economics, 14(02), 175-82.

Chen, L and Mohamed, S (2010) The strategic importance of tacit knowledge management activities in construction. Construction Innovation, 10(02), 138–63.

Chen, Q, Jin, Z, Xia, B, Wu, P and Skitmore, M (2016) Time and Cost Performance of Design–Build Projects. Journal of Construction Engineering and Management, 142(02).

Chen, Q, Reichard, G and Beliveau, Y (2010) Object Model Framework for Interface Modeling and IT-Oriented Interface Management. Journal of Construction Engineering and Management, 136(02), 187–98.

Chen, S, Tian, Y, Jin, L and Xiang, L (2021) Estimating the Frequency of Exposure to Uncertain Hazards: Impact of Wind Conditions on Concrete Dam Construction. Journal of Construction Engineering and Management, 147(02).

Chen, Y, Dib, H and Cox, R F (2014) A measurement model of building information modelling maturity. Construction Innovation, 14(02), 186-209.

Chen, Z, Abdullah, A B, Anumba, C J and Li, H (2014) ANP Experiment for Demolition Plan Evaluation. Journal of Construction Engineering and Management, 140(02).

Cheng, E W L, Li, H and Yu, L (2005) The analytic network process (ANP) approach to location selection: a shopping mall illustration. Construction Innovation, 5(02), 83–97.

Cheng, J C P, Chen, K and Chen, W (2020) State-of-the-Art Review on Mixed Reality Applications in the AECO Industry. Journal of Construction Engineering and Management, 146(02).

Cheng, J C P, Chen, K, Wong, P K, Chen, W and Li, C T (2021) Graph-based network generation and CCTV processing techniques for fire evacuation. Building Research & Information, 49(02), 179–96.

Cherns, A B and Bryant, D T (1984) Studying the client's role in construction management. Construction Management and Economics, 2(02), 177-84.

Cheung, C (2005) CH2 energy harvesting systems: economic use and efficiency. Construction Economics and Building, 5(02), 20-31.

Cheung, F Y K, Rowlinson, S, Jefferies, M and Lau, E (2005) Relationship contracting in Australia. Journal of Construction Procurement, 11(02).

Cheung, S O and Li, K (2019) Biases in construction project dispute resolution. Engineering, Construction and Architectural Management, 26(02), 321–48.

Cheung, S O, Wong, P S P, Fung, A Y S and Coffey, W V (2008) Examining the use of bid information in predicting the contractor's performance. Journal of Financial Management of Property and Construction, 13(02), 111–22.

Cheung, S-O, Ng, S T, Lam, K-C and Sin, W-S (2001) A fuzzy sets model for construction dispute evaluation. Construction Innovation, 1(02), 117–27.

Cheung, S, Lam, K, Wong, S S and Wong S K (2001) The fee sensitive risk exposures of project authorized person in Hong Kong. Construction Economics and Building, 1(02), 65-72.

Cheung, S. O, Levina, B and Niu, Y (2017) Concentration Analysis of New Private Residential Units Market in Hong Kong . Construction Economics and Building, 17(02), 1-23.

Chew, M Y, Conejos, S and Law, J S L (2017) Green maintainability design criteria for nanostructured titanium dioxide (TiO2) façade coatings. International Journal of Building Pathology and Adaptation, 35(02), 139–58.

Chiang, Y H, Li, V J, Zhou, L, Wong, F and Lam, P (2016) Evaluating Sustainable Building-Maintenance Projects: Balancing Economic, Social, and Environmental Impacts in the Case of Hong Kong. Journal of Construction Engineering and Management, 142(02).

Chiang, Y-H and So, J C K (2006) Devising a conducive regulatory framework for Hong Kong real estate investment trusts. Journal of Financial Management of Property and Construction, 11(02), 91–104.

Chiang, Y-H, Tang, B-S and Wong, F K W (2008) Volume building as competitive strategy. Construction Management and Economics, 26(02), 161–76.

Chileshe, N and Dzisi, E (2012) Benefits and barriers of construction health and safety management (HSM): Perceptions of practitioners within design organisations. Journal of Engineering, Design and Technology, 10(02), 276-98.

Chileshe, N and Haupt, T C (2010) An empirical analysis of factors impacting career decisions in South African construction industry: Male and female high school students' perspectives. Journal of Engineering, Design and Technology, 8(02), 221–39.

Chileshe, N and Haupt, T C (2005) Modelling critical success factors of construction project management (CPM). Journal of Engineering, Design and Technology, 3(02), 140–54.

Chileshe, N, Rameezdeen, R and Hosseini, M R (2016) Drivers for adopting reverse logistics in the construction industry: A qualitative study. Engineering, Construction and Architectural Management, 23(02), 134-57.

Chinda, T and Mohamed, S (2008) Structural equation model of construction safety culture. Engineering, Construction and Architectural Management, 15(02), 114–31.

Cho, Y K, Bode, T, Song, J and Jeong, J (2012) Thermography-Driven Distress Prediction from Hot Mix Asphalt Road Paving Construction. Journal of Construction Engineering and Management, 138(02), 206–14.

Choi, B and Lee, S (2018) An Empirically Based Agent-Based Model of the Sociocognitive Process of Construction Workers’ Safety Behavior. Journal of Construction Engineering and Management, 144(02).

Choi, C, Ryu, K R and Shahandashti, M (2021) Predicting City-Level Construction Cost Index Using Linear Forecasting Models. Journal of Construction Engineering and Management, 147(02).

Choi, H, Cho, H and Seo, J W (2004) Risk Assessment Methodology for Underground Construction Projects. Journal of Construction Engineering and Management, 130(02), 258–72.

Choi, K, Lee, H W, Mao, Z, Lavy, S and Ryoo, B Y (2016) Environmental, Economic, and Social Implications of Highway Concrete Rehabilitation Alternatives. Journal of Construction Engineering and Management, 142(02).

Chong, D, Wang, Y, Guo, H and Lu, Y (2014) Volatile Organic Compounds Generated in Asphalt Pavement Construction and Their Health Effects on Workers. Journal of Construction Engineering and Management, 140(02).

Choudhari, S and Tindwani, A (2017) Logistics optimisation in road construction project. Construction Innovation, 17(02), 158-79.

Chow, W K and Chan, L Y (2011) Possibility of using water mist fire suppression system in Hong Kong. Journal of Engineering, Design and Technology, 9(02), 157–63.

Chowdhooree, I and Islam, I (2018) Factors and actors for enhancing community flood resilience. International Journal of Disaster Resilience in the Built Environment, 9(02), 153–69.

Christermaller, F, Ibrahim, C K I C, Manu, P, Belayutham, S, Mahamadu, A-M and Yunusa-Kaltungo, A (2022) Implementation of design for safety (DFS) in construction in developing countries: A study of designers in Malaysia. Construction Economics and Building, 22(02), 1-26.

Chua, D K H, Wang, Y and Tan, W T (2003) Impacts of Obstacles in East Asian Cross-Border Construction. Journal of Construction Engineering and Management, 129(02), 131–41.

Chua, S J L, Zubbir, N B, Ali, A S and Au-Yong, C P (2018) Maintenance of high-rise residential buildings. International Journal of Building Pathology and Adaptation, 36(02), 137–51.

Ciesielski, C A (2006) OSHA cards and instruction in construction safety. International Journal of Construction Education and Research, 2(02), 113-26.

Cioffi, J, Wilkes, L and O'Brien, J (2002) Outdoor workers and sun protection: knowledge and behaviour. Construction Economics and Building, 2(02), 10-14.

City of Melbourne (2005) Preamble to special issue. Construction Economics and Building, 5(02), 1-7.

Clarke, N J, Kuipers, M C and Roos, J (2019) Cultural resilience and the Smart and Sustainable City. Smart and Sustainable Built Environment, 9(02), 144–55.

Clements-Croome, D J (1996) Future horizons in building environmental engineering. Building Research & Information, 24(02), 86–96.

Clevenger, C, Glick, S and del Puerto, C L (2012) Interoperable Learning Leveraging Building Information Modeling (BIM) in Construction Education. International Journal of Construction Education and Research, 8(02), 101-18.

Coggins, J (2011) From disparity to harmonisation of construction industry payment legislation in Australia: a proposal for a dual process of adjudication based upon size of progress payment claim. Construction Economics and Building, 11(02), 34-59.

Coggins, J K and Donohoe, S (2012) The validity of adjudicators' determinations containing errors of law: A comparison of the judicial approach in England and New South Wales. International Journal of Law in the Built Environment, 4(02), 116-25.

Cohen, R, Standeven, M, Bordass, B and Leaman, A (2001) Assessing building performance in use 1: the Probe process. Building Research & Information, 29(02), 85–102.

Cole, R J (2004) Changing context for environmental knowledge. Building Research & Information, 32(02), 91–109.

Collier, C A and Jacques, D E (1984) Optimum Equipment Life by Minimum Life‐Cycle Costs. Journal of Construction Engineering and Management, 110(02), 248–65.

Collinge, W H (2017) Client requirement representations and transformations in construction project design. Journal of Engineering, Design and Technology, 15(02), 222-41.

Collins, A and Baccarini, D (2004) Project success -a survey. Journal of Construction Research, 5(02), 211–31.

Collins, W and Redden, L (2021) Improving Student’s Estimating Abilities through Experiential Learning. International Journal of Construction Education and Research, 17(02), 117–32.

Connaughton, J, Meikle, J and Teerikangas, S (2015) Mergers, acquisitions and the evolution of construction professional services firms. Construction Management and Economics, 33(02), 146-59.

Conradie, D, van Reenen, T and Bole, S (2018) Degree-day building energy reference map for South Africa. Building Research & Information, 46(02), 191–206.

Consoli, G (2006) The architect's dilemma: a self reflection in understanding prison design and construction in private prison projects. Construction Economics and Building, 6(02), 1-10.

Cooper, I (2001) Post-occupancy evaluation - where are you?. Building Research & Information, 29(02), 158–63.

Cooper, I (2002) Transgressing discipline boundaries: is BEQUEST an example of 'the new production of knowledge'?. Building Research & Information, 30(02), 116–29.

Cornick, T and Osbon, K (1994) A study of the contractor's quantity surveying practice during the construction process. Construction Management and Economics, 12(02), 107-11.

Correia, J M F, de Oliveira Neto, G C, Leite, R R and da Silva, D (2021) Plan to Overcome Barriers to Reverse Logistics in Construction and Demolition Waste: Survey of the Construction Industry. Journal of Construction Engineering and Management, 147(02).

Costa, D B and Formoso, C T (2004) A set of evaluation criteria for performance measurement systems in the construction industry. Journal of Financial Management of Property and Construction, 9(02), 91–102.

Costa, S, Carvalho, M S, Pimentel, C and Duarte, C (2023) A Systematic Literature Review and Conceptual Framework of Construction Industrialization. Journal of Construction Engineering and Management, 149(02).

Cote, B, Robinson, B, Gabr, M A and Borden, R H (2013) Performance-Cost Analysis of Stabilized Undercut Subgrades. Journal of Construction Engineering and Management, 139(02), 121–7.

Cottrell, D S (2006) Contractor Process Improvement for Enhancing Construction Productivity. Journal of Construction Engineering and Management, 132(02), 189–96.

Courtney, R and Winch, G M (2003) Re-engineering construction: the role of research and implementation. Building Research & Information, 31(02), 172–8.

Cowie, G F (1987) Enough Scope Yields Better Estimates. Journal of Construction Engineering and Management, 113(02), 315–20.

Cox, A and Furlong, P (1995) European procurement rules and national preference: explaining the local sourcing of public works contracts in the EU in 1993. Journal of Construction Procurement, 1(02), 87–99.

Cox, A and Townsend, M (1997) Latham as half-way house: a relational competence approach to better practice in construction procurement. Engineering, Construction and Architectural Management, 4(02), 143–58.

Cox, R F, Issa, R R A and Ahrens, D (2003) Management’s Perception of Key Performance Indicators for Construction. Journal of Construction Engineering and Management, 129(02), 142–51.

Cox, R F, Issa, R R and Frey, A (2006) Proposed Subcontractor-Based Employee Motivational Model. Journal of Construction Engineering and Management, 132(02), 152–63.

Crook, D (1997) Empirical enquiry or metaphysics? Re-specifying the methodological debate. Journal of Construction Procurement, 3(02), 56–71.

Crowley, L G and Hancher, D E (1995) Evaluation of Competitive Bids. Journal of Construction Engineering and Management, 121(02), 238–45.

Crowley, L G and Hancher, D E (1995) Risk Assessment of Competitive Procurement. Journal of Construction Engineering and Management, 121(02), 230–7.

Crowley, L G, Lutz, J D and Burleson, R C (1997) Functional Illiteracy in Construction Industry . Journal of Construction Engineering and Management, 123(02), 162–70.

Cuervo, J C and Low, S P (2005) Significance of internalization factors for Singapore transnational construction corporations. Construction Management and Economics, 23(02), 147-62.

Cusack, M M (1985) The use of integer linear programming for modelling project control information. Construction Management and Economics, 3(02), 91-104.

d'Amato, M and Kauko, T (2012) Sustainability and risk premium estimation in property valuation and assessment of worth. Building Research & Information, 40(02), 174-85.

D'Incognito, M, Costantino, N and Migliaccio, G C (2015) Actors and barriers to the adoption of LCC and LCA techniques in the built environment. Built Environment Project and Asset Management, 5(02), 202-16.

Dabarera, G, Perera, B and Rodrigo, M (2019) Suitability of public-private-partnership procurement method for road projects in Sri Lanka. Built Environment Project and Asset Management, 9(02), 199–213.

Daddow, T and Skitmore, M (2004) Value management in practice: an interview survey. Construction Economics and Building, 4(02), 11-18.

Dai, F and Lu, M (2010) Assessing the Accuracy of Applying Photogrammetry to Take Geometric Measurements on Building Products. Journal of Construction Engineering and Management, 136(02), 242–50.

Dainty, A R J, Bagilhole, B M and Neale, R H (2000) A grounded theory of women's career under-achievement in large UK construction companies. Construction Management and Economics, 18(02), 239-50.

Dainty, A R J, Bagilhole, B M and Neale, R H (2000) The compatibility of construction companies’ human resource development policies with employee career expectations. Engineering, Construction and Architectural Management, 7(02), 169–78.

Dainty, A R J, Cheng, M-I and Moore, D R (2003) Redefining performance measures for construction project managers: an empirical evaluation. Construction Management and Economics, 21(02), 209-18.

Dakhli, Z and Lafhaj, Z (2017) Experimental and numerical prototyping of a complex cement column formwork for construction. Architectural Engineering and Design Management, 13(02), 147–65.

Dalal, J, Mohapatra, P K J and Mitra, G C (2010) Prioritization of rural roads: AHP in group decision. Engineering, Construction and Architectural Management, 17(02), 58.

Dale, A, Gonzales, C and Himangshu, P (2003) Financing of private infrastructure investments in the emerging markets of southeast Asia. Journal of Financial Management of Property and Construction, 8(02), 61–78.

Dale, J M and Dulaimi, M F (2016) Cultural competence: a success factor in NGO projects?. Built Environment Project and Asset Management, 6(02), 232-46.

Dang, C N, Le-Hoai, L and Peansupap, V (2021) Effect of encouragement-based management mechanism on construction firms’ manpower development: An empirical study from Vietnam. Construction Economics and Building, 21(02), 58-80.

Dang, T and Bargstädt, H (2016) 4D Relationships: The Missing Link in 4D Scheduling. Journal of Construction Engineering and Management, 142(02).

Daniel, E I, Oshodi, O S and Odediran, S (2024) An Exploration of Construction Craftspeople Apprentice Training: Evidence from the UK. International Journal of Construction Education and Research, 20(02), 218–40.

Danso, H, Martinson, B, Ali, M and Mant, C (2015) Performance characteristics of enhanced soil blocks: a quantitative review. Building Research & Information, 43(02), 253-62.

Dansoh, A (2005) Strategic planning practice of construction firms in Ghana. Construction Management and Economics, 23(02), 163-–8.

Dansoh, A, Frimpong, S and Oppong, G D (2020) Exploring the dimensions of traditional authority influencing stakeholder management at the pre-construction stage of infrastructure projects. Construction Management and Economics, 38(02), 189–206.

Daoud, A O, Othman, A A E, Ebohon, O J and Bayyati, A (2022) Overcoming the limitations of the green pyramid rating system in the Egyptian construction industry: a critical analysis. Architectural Engineering and Design Management, 18(02), 114–27.

Dar, J (2019) Solar splitting day-lighting system “SolsDays”: the first beam splitting day-lighting system. Smart and Sustainable Built Environment, 9(02), 130–43.

Darren Graham, L, Smith, S D and Dunlop, P (2005) Lognormal Distribution Provides an Optimum Representation of the Concrete Delivery and Placement Process. Journal of Construction Engineering and Management, 131(02), 230–8.

Das, D K (2020) Perspectives of smart cities in South Africa through applied systems analysis approach: a case of Bloemfontein. Construction Economics and Building, 20(02), 65-88.

Davey, C L, McDonald, J, Lowe, D, Duff, R, Powell, J A and Powell, J E (2006) Defects liability management by design. Building Research & Information, 34(02), 145–53.

Davis, P (2007) Maintaining relationship based procurement. Construction Economics and Building, 7(02), 37-44.

Dawood, N (2010) Development of 4D-based performance indicators in construction industry. Engineering, Construction and Architectural Management, 17(02), 30.

Dawood, N N (1996) A strategy for a computer-based materials management system for the building industry. Journal of Financial Management of Property and Construction, 1(02), 17–28.

Dawood, N N (1995) An integrated bidding management expert system for the make-to-order precast industry. Construction Management and Economics, 13(02), 115-25.

Dawood, N N and Neale, R H (1993) Forecasting the sales of pre-cast concrete building products. Construction Management and Economics, 11(02), 81-98.

Dawson, S and Osborne, A (2020) Re-shaping Built Environment Higher Education: The Impact of Degree Apprenticeships in England. International Journal of Construction Education and Research, 16(02), 102–16.

de Azevedo, R C, de Oliveira Lacerda, R T, Ensslin, L, Jungles, A E and Ensslin, S R (2013) Performance Measurement to Aid Decision Making in the Budgeting Process for Apartment-Building Construction: Case Study Using MCDA-C. Journal of Construction Engineering and Management, 139(02), 225–35.

de Bem, D H, Lima, D P B and Medeiros-Junior, R A (2018) Effect of chemical admixtures on concrete’s electrical resistivity. International Journal of Building Pathology and Adaptation, 36(02), 174–87.

de Casas Castro Marins, K R (2014) A method for energy efficiency assessment during urban energy planning. Smart and Sustainable Built Environment, 3(02), 132-52.

de Dear, R (2011) Revisiting an old hypothesis of human thermal perception: alliesthesia. Building Research & Information, 39(02), 108–17.

de Kock, P M and Carta, S (2020) Trojans of ambiguity vs resilient regeneration: visual meaning in cities. Construction Economics and Building, 20(02), 1-24.

de Kock, P M and Carta, S (2020) Trojans of ambiguity vs resilient regeneration: visual meaning in cities. Construction Economics and Building, 20(02), 1-24.

De Marco, A, Rafele, C and Thaheem, M J (2016) Dynamic Management of Risk Contingency in Complex Design-Build Projects. Journal of Construction Engineering and Management, 142(02).

de Melo, R S S, Do, D, Tillmann, P, Ballard, G and Granja, A D (2016) Target value design in the public sector: evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(02), 125–37.

De Silva, N, Darmicka, R and Fernando, E (2014) Impact of foreign workforce on productivity in foreign-funded infrastructure projects. Journal of Financial Management of Property and Construction, 19(02), 168-83.

De Silva, N, Weerasinghe, N, Madhusanka, H and Kumaraswamy, M (2018) Enablers of relational integrated value networks (RIVANS) for total facilities management (TFM). Journal of Financial Management of Property and Construction, 23(02), 170–84.

de Valence, G and Runeson, G (2015) Graham Ive and the methodology of construction economics. Construction Management and Economics, 33(02), 126-33.

Deacon, C and Smallwood, J (2003) Health Promotion in South African Construction. Journal of Construction Research, 4(02), 129–40.

Deakin, M (1997) The development of computer-based information systems for local authority property management 2 : the application. Journal of Financial Management of Property and Construction, 2(02), 59–84.

Deakin, M, Huovila, P, Rao, S, Sunikka, M and Vreeker, R (2002) The assessment of sustainable urban development. Building Research & Information, 30(02), 95–108.

Debs, L and Shaurette, M (2021) An Exploration of Telephone and E-Mail Communications for Design-Related Construction Problems. International Journal of Construction Education and Research, 17(02), 154–77.

Deepak, M and Mahesh, G (2024) Developing an Assessment Framework for Evaluating Knowledge-Based Safety Culture in Construction Organizations. International Journal of Construction Education and Research, 20(02), 177–96.

Dehghan, R and Ruwnapura, J Y (2014) Model of Trade-Off between Overlapping and Rework of Design Activities. Journal of Construction Engineering and Management, 140(02).

Delaney, F T and Wamuziri, S C (2002) Corporate profitability in construction and allied industries. Journal of Financial Management of Property and Construction, 7(02), 107–16.

Delhi, V S K, Mahalingam, A and Palukuri, S (2012) Governance issues in BOT based PPP infrastructure projects in India. Built Environment Project and Asset Management, 2(02), 234-49.

Deng, F and Smyth, H (2014) Nature of Firm Performance in Construction. Journal of Construction Engineering and Management, 140(02).

Deshmukh, A, Oh, E H and Hastak, M (2011) Impact of flood damaged critical infrastructure on communities and industries. Built Environment Project and Asset Management, 1(02), 156-75.

Devapriya, K A K and Pretorius, F (2002) The economic implication of project finance arrangements for BOO/BOT power projects in Asia. Journal of Construction Research, 3(02), 285–309.

Dewlaney, K S and Hallowell, M (2012) Prevention through design and construction safety management strategies for high performance sustainable building construction. Construction Management and Economics, 30(02), 165-77.

Dhar, T K, Hossain, M S M and Rahaman, K R (2013) How does flexible design promote resource efficiency for housing? A study of Khulna, Bangladesh. Smart and Sustainable Built Environment, 2(02), 140-57.

Dickinson, H and Swaffield, L (2004) Implementing a segregation-based waste management system on site - does it reduce site waste disposal costs?. Journal of Financial Management of Property and Construction, 9(02), 75–90.

Diekmann, J E and Kim, M P (1992) SuperChange: Expert System for Analysis of Changes Claims. Journal of Construction Engineering and Management, 118(02), 399–411.

Dikmen, I, Birgonul, M T and Kiziltas, S (2005) Prediction of Organizational Effectiveness in Construction Companies. Journal of Construction Engineering and Management, 131(02), 252–61.

Dilger, W H, Tadros, G S and Giannelia, P (1992) Method Proposed for Construction of Multispan Cable‐Stayed Bridges. Journal of Construction Engineering and Management, 118(02), 273–82.

Dinesh, C P, Bari, A U, Dissanayake, R P G and Tamura, M (2013) Detecting and assessment of tsunami building damage using high-resolution satellite images with GIS data. International Journal of Disaster Resilience in the Built Environment, 4(02), 132-44.

Ding, G (2013) Demolish or refurbish – environmental benefits of housing conservation. Construction Economics and Building, 13(02), 18-34.

Ding, Z and Ng, F (2010) Personal Construct-Based Factors Affecting Interpersonal Trust in a Project Design Team. Journal of Construction Engineering and Management, 136(02), 227–34.

Ding, Z, Ng, F and Wang, J (2014) Testing trust scale measurement invariance in project teams. Journal of Engineering, Design and Technology, 12(02), 209-22.

Distefano, M J and O’Brien, W J (2009) Comparative Analysis of Infrastructure Assessment Methodologies at the Small Unit Level. Journal of Construction Engineering and Management, 135(02), 96–107.

Djalante, R and Thomalla, F (2012) Disaster risk reduction and climate change adaptation in Indonesia: Institutional challenges and opportunities for integration. International Journal of Disaster Resilience in the Built Environment, 3(02), 166-80.

Doğan, S Z, Arditi, D and Murat Günaydin, H (2008) Using Decision Trees for Determining Attribute Weights in a Case-Based Model of Early Cost Prediction. Journal of Construction Engineering and Management, 134(02), 146–52.

Donn, M, Selkowitz, S and Bordass, B (2012) The building performance sketch. Building Research & Information, 40(02), 186-208.

Dorée, A G (2004) Collusion in the Dutch construction industry: an industrial organization perspective. Building Research & Information, 32(02), 146–56.

Dow, I, Sertyesilisik, B and Ross, A D (2009) An investigation on the cost implications of methodology of sub-contract work pricing. Journal of Financial Management of Property and Construction, 14(02), 98–125.

Dowsett, R, Green, M, Sexton, M and Harty, C (2019) Projecting at the project level: MMC supply chain integration roadmap for small housebuilders. Construction Innovation, 19(02), 193–211.

Dozzi, S P, AbouRizk, S M and Schroeder, S L (1996) Utility-Theory Model for Bid Markup Decisions . Journal of Construction Engineering and Management, 122(02), 119–24.

Drew, D S, Lai, P Y, Li, H and Lo, H P (2002) Correcting the fee-technical score variability imbalance in two-envelope fee tendering. Construction Management and Economics, 20(02), 157-66.

Drew, D, Kwong, C, Zou, P and Shen, L Y (2002) Determining the optimal fee-technical proposal combination in two envelope fee bidding. Construction Economics and Building, 2(02), 1-9.

Drew, D, Li, H and Shen, L Y (2000) Feedback in Competitive Fee Tendering. Journal of Construction Procurement, 6(02).

Du, J, Liu, C and Picken, D (2007) A preliminary study on human resources management in international construction. Construction Economics and Building, 7(02), 1-11.

Du, J, Shi, Y, Zou, Z and Zhao, D (2018) CoVR: Cloud-Based Multiuser Virtual Reality Headset System for Project Communication of Remote Users. Journal of Construction Engineering and Management, 144(02).

Duncan, J (2005) Performance-based building: lessons from implementation in New Zealand. Building Research & Information, 33(02), 120–7.

Duncan, K, Philips, P and Prus, M (2009) The effects of prevailing wage regulations on construction efficiency in British Columbia. International Journal of Construction Education and Research, 5(02), 63-78.

Dunston, P S and Bernold, L E (2000) Adaptive Control for Safe and Quality Rebar Fabrication. Journal of Construction Engineering and Management, 126(02), 122–9.

Durham, J and White, R (2015) Collective resilience following mine clearance in Kurdish Iraq. International Journal of Disaster Resilience in the Built Environment, 6(02), 156-67.

Dutta, R and Basnayake, S (2018) Gap assessment towards strengthening early warning systems. International Journal of Disaster Resilience in the Built Environment, 9(02), 198–215.

Duyne Barenstein, J E (2015) Continuity and change in housing and settlement patterns in post-earthquake Gujarat, India. International Journal of Disaster Resilience in the Built Environment, 6(02), 140-55.

Eadie, R, Perera, S and Heaney, G (2012) Capturing maturity of ICT applications in construction processes. Journal of Financial Management of Property and Construction, 17(02), 176-94.

Easa, S M (1989) Resource Leveling in Construction by Optimization. Journal of Construction Engineering and Management, 115(02), 302–16.

East, E W and Kim, S (1993) Standardizing Scheduling Data Exchange. Journal of Construction Engineering and Management, 119(02), 215–25.

Eaton, D, Akbiyikli, R and Dickinson, M (2006) An evaluation of the stimulants and impediments to innovation within PFI/PPP projects. Construction Innovation, 6(02), 63–7.

Eberhardt, L C M, Birkved, M and Birgisdottir, H (2022) Building design and construction strategies for a circular economy. Architectural Engineering and Design Management, 18(02), 93–113.

Echeverria-Valiente, E, Garcia-Alvarado, R, Celis-D’Amico, F and Saelzer-Fuica, G (2019) Integrated design experiences for energy-efficient housing in Chile. Construction Innovation , 19(02), 236–55.

Edirisinghe, R (2019) Digital skin of the construction site. Engineering, Construction and Architectural Management, 26(02), 184–223.

  • Type: Journal Article
  • Keywords: Information systems; Innovation; Technology; Construction; Information and communication technology (ICT) applications; Novel method;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-04-2017-0066
  • Abstract:
    The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of the future smart construction site. Design/methodology/approach The paper provides a systematic and hierarchical classification of 114 articles from both industry and academia on the digital skin concept and evaluates them. The hierarchical classification is based on application areas relevant to construction, such as augmented reality, building information model-based visualisation, labour tracking, supply chain tracking, safety management, mobile equipment tracking and schedule and progress monitoring. Evaluations of the research papers were conducted based on three pillars: validation of technological feasibility, onsite application and user acceptance testing. Findings Technologies learned about in the literature review enabled the envisaging of the pervasive construction site of the future. The paper presents scenarios for the future context-aware construction site, including the construction worker, construction procurement management and future real-time safety management systems. Originality/value Based on the gaps identified by the review in the body of knowledge and on a broader analysis of technology diffusion, the paper highlights the research challenges to be overcome in the advent of digital skin. The paper recommends that researchers follow a coherent process for smart technology design, development and implementation in order to achieve this vision for the construction industry.

Edum-Fotwe, F T, Thorpe, A and McCaffer, R (2000) Assessing potential of on-line transaction for information as a resource in the construction process. Journal of Construction Procurement, 6(02).

Edwards, B and Eckblad, J (1984) Motivating the British construction industry. Construction Management and Economics, 2(02), 145-56.

Edwards, D J (2003) Accident trends involving construction plant: an exploratory analysis. Journal of Construction Research, 4(02), 161–73.

Edwards, D J and Holt, G D (2009) Construction plant and equipment management research: thematic review. Journal of Engineering, Design and Technology, 7(02), 186–206.

Edwards, D J and Holt, G D (2010) Cost-effective risk assessment of hand-arm vibration exposure. Journal of Financial Management of Property and Construction, 15(02), 158–75.

Edwards, D J and Holt, G D (2006) Hand-arm vibration exposure from construction tools: results of a field study. Construction Management and Economics, 24(02), 209-17.

Edwards, D J and Holt, G D (2008) Protecting capital investment in plant and equipment: case study observations of post-theft recovery. Journal of Financial Management of Property and Construction, 13(02), 96–110.

Edwards, D J and Nicholas, J (2001) Telescopic handler machine park prediction using sales trends. Journal of Financial Management of Property and Construction, 6(02), 109–18.

Edwards, D J, Cabahug, R R and Nicholas, J (2003) The Impact of Training and Education Characteristics Upon Plant Operator Maintenance Proficiency. Journal of Engineering, Design and Technology, 1(02), 119–34.

Edwards, D J, Harris, P T and Holt, G D (1996) The greenhouse effect: impact upon and the role to be played by construction. Building Research & Information, 24(02), 97–103.

Edwards, D J, Holt, G D and Harris, F C (1998) Financial management of construction plant: conceptualising cost prediction. Journal of Financial Management of Property and Construction, 3(02), 59–74.

Edwards, D J, Yang, J, Wright, B C and Love, P E D (2007) Establishing the link between plant operator performance and personal motivation. Journal of Engineering, Design and Technology, 5(02), 173–87.

Edwards, P J and Bowen, P A (1998) Risk and risk management in construction: towards more appropriate research techniques. Journal of Construction Procurement, 4(02), 103–15.

Eiris Pereira, R and Gheisari, M (2019) Site Visit Application in Construction Education: A Descriptive Study of Faculty Members. International Journal of Construction Education and Research, 15(02), 83–99.

Ekström, M A and Bjornsson, H C (2002) Trust building tools supporting electronic bidding in construction. Journal of Construction Procurement, 8(02), 133–47.

Ekstrom, M A, Bjornsson, H C and Nass, C I (2003) Accounting for rater credibility when evaluating AEC subcontractors. Construction Management and Economics, 21(02), 197-208.

Ekundayo, D, Babatunde, S.O, Ekundayo, A, Perera, S and Udeaja, C (2019) Life cycle carbon emissions and comparative evaluation of selected open source UK embodied carbon counting tools. Construction Economics and Building, 19(02), 220-242.

El Debs, L C, Brunese, P S and Shaurette, M (2018) Use of concept maps to illustrate barriers to construction industry inter-organizational communication: A comparative view from students and professionals. International Journal of Construction Education and Research, 14(02), 77-94.

El Meouche, R, Abunemeh, M, Hijaze, I, Mebarki, A and Shahrour, I (2018) Developing Optimal Paths for Evacuating Risky Construction Sites. Journal of Construction Engineering and Management, 144(02).

El-Anwar, O and Chen, L (2013) Computing a Displacement Distance Equivalent to Optimize Plans for Postdisaster Temporary Housing Projects. Journal of Construction Engineering and Management, 139(02), 174–84.

El-Gafy, M A (2007) Construction time-cost trade-off analysis using ant system. International Journal of Construction Education and Research, 3(02), 99-108.

El-Ghandour, W and Al-Hussein, M (2004) Survey of information technology applications in construction. Construction Innovation, 4(02), 83–98.

EL-Mahdy, D and Ali, M (2024) Assessing the solar radiation performance of self-shaded 3D-printed clay-based façades. Architectural Engineering and Design Management, 20(02), 249–68.

El-Medany, W M (2014) A cost-effective programmable SoC for network security using Xilinx Spartan 3AN FPGA. Journal of Engineering, Design and Technology, 12(02), 280-91.

El-Rasas, T and Marzouk, M (2020) Fuzzy model for assessing delays in Egyptian residential projects. Journal of Financial Management of Property and Construction , 25(02), 225–46.

El-Rayes, K and Moselhi, O (2001) Impact of Rainfall on the Productivity of Highway Construction. Journal of Construction Engineering and Management, 127(02), 125–31.

El-Sabek, L M and McCabe, B Y (2018) Coordination challenges of production planning in the construction of international mega-projects in the Middle East. International Journal of Construction Education and Research, 14(02), 118-40.

Elazouni, A (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(02), 199–211.

Elazouni, A M and Basha, I M (1996) Evaluating the Performance of Construction Equipment Operators in Egypt . Journal of Construction Engineering and Management, 122(02), 109–14.

Elazouni, A M and El-Razek, M E A (2000) Adapting Lift-Slab Technology to Construct Submerged Pile Caps. Journal of Construction Engineering and Management, 126(02), 149–57.

Eley, J (2001) How do post-occupancy evaluation and the facilities manager meet?. Building Research & Information, 29(02), 164–7.

Elhakeem, A and Hegazy, T (2005) Graphical Approach for Manpower Planning in Infrastructure Networks. Journal of Construction Engineering and Management, 131(02), 168–75.

Elhami, K N and Garlock, M E M (2017) Overview of fire following earthquake: historical events and community responses. International Journal of Disaster Resilience in the Built Environment, 8(02), 158-74.

Elliot, C and Palmer, A (1996) Life cycle energy analysis of the building resource. Journal of Financial Management of Property and Construction, 1(02), 5–16.

Elliott, J W, Glick, S and Valdes-Vasquez, R (2019) Student perceptions of model-based estimating. International Journal of Construction Education and Research, 15(02), 118–35.

Elliott, M E and Heymsfield, E (2003) Inspection of Luling Bridge Cable Stays: Case Study. Journal of Construction Engineering and Management, 129(02), 226–30.

Ellsworth-Krebs, K, Reid, L and Hunter, C J (2019) Integrated framework of home comfort: relaxation, companionship and control. Building Research & Information, 47(02), 202–18.

Elmasry, M, Zayed, T and Hawari, A (2019) Multi-Objective Optimization Model for Inspection Scheduling of Sewer Pipelines. Journal of Construction Engineering and Management, 145(02).

Emmitt, S (1999) Architectural management: an evolving field. Engineering, Construction and Architectural Management, 6(02), 188–96.

Emmitt, S (2016) Editorial. Architectural Engineering and Design Management, 12(02), 79–80.

Emmitt, S (2017) Editorial. Architectural Engineering and Design Management, 13(02), 79.

Emmitt, S (2005) Integrating teaching and research in an architectural technology undergraduate model. Journal of Engineering, Design and Technology, 3(02), 164–79.

Emmitt, S (2016) The construction design manager – a rapidly evolving innovation. Architectural Engineering and Design Management, 12(02), 138–48.

Emuze, F, Smallwood, J and Han, S (2014) Factors contributing to non-value adding activities in South African construction. Journal of Engineering, Design and Technology, 12(02), 223-43.

English, J (2002) The communication problems experienced by workforce on site, and their possible solutions. Journal of Construction Research, 3(02), 311–21.

Enshassi, A (1997) Construction projects and the environment in Palestine. Building Research & Information, 25(02), 111–4.

Enshassi, A, Al-Najjar, J and Kumaraswamy, M (2009) Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(02), 126–51.

Enshassi, A, El-Rayyes, Y and Alkilani, S (2015) Job stress, job burnout and safety performance in the Palestinian construction industry. Journal of Financial Management of Property and Construction, 20(02), 170-87.

Enshassi, A, Elzebdeh, S and Mohamed, S (2017) Drivers affecting household residents’ water and related energy consumption in residential buildings. International Journal of Building Pathology and Adaptation, 35(02), 159–75.

Enshassi, A, Mohamed, S and Karriri, A a E (2010) Factors affecting the bid/no bid decision in the Palestinian construction industry. Journal of Financial Management of Property and Construction, 15(02), 118–42.

Enshassi, A, Mohamed, S and Madi, I (2005) Factors affecting accuracy of cost estimation of building contracts in the Gaza Strip. Journal of Financial Management of Property and Construction, 10(02), 115–24.

Enshassi, M S A, Walbridge, S, West, J S and Haas, C T (2020) Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory. Journal of Construction Engineering and Management, 146(02).

Ergen, E and Akinci, B (2008) Formalization of the Flow of Component-Related Information in Precast Concrete Supply Chains. Journal of Construction Engineering and Management, 134(02), 112–21.

Eriksson, P E (2008) Procurement Effects on Coopetition in Client-Contractor Relationships. Journal of Construction Engineering and Management, 134(02), 103–11.

Eriksson, P E (2017) Procurement strategies for enhancing exploration and exploitation in construction projects. Journal of Financial Management of Property and Construction, 22(02), 211-30.

Eriksson, P, Milić, V and Brostrom, T (2019) Balancing preservation and energy efficiency in building stocks. International Journal of Building Pathology and Adaptation, 38(02), 356–73.

Escamilla, E, Ostadalimakhmalbaf, M and Bigelow, B F (2016) Factors impacting hispanic high school students and how to best reach them for the careers in the construction industry. International Journal of Construction Education and Research, 12(02), 82-98.

Essah, E A, Sanders, C H, Baker, P and Kalagasidis, A S (2009) Condensation and moisture transport in cold roofs: effects of roof underlay. Building Research & Information, 37(02), 117–28.

Evans, S, Liddiard, R and Steadman, P (2019) Modelling a whole building stock: domestic, non-domestic and mixed use. Building Research & Information, 47(02), 156–72.

Everett, J G (1999) Overexertion Injuries in Construction. Journal of Construction Engineering and Management, 125(02), 109–14.

Everett, J G and Frank, P B (1996) Costs of Accidents and Injuries to the Construction Industry . Journal of Construction Engineering and Management, 122(02), 158–64.

Everett, J G and Saito, H (1996) Construction Automation: Demands and Satisfiers in the United States and Japan . Journal of Construction Engineering and Management, 122(02), 147–51.

Everett, J G and Slocum, A H (1994) Automation and Robotics Opportunities: Construction versus Manufacturing. Journal of Construction Engineering and Management, 120(02), 443–52.

Ewin, N A, Oxley, R and Poole, F (1990) Advanced applications software for speculative housing companies. Construction Management and Economics, 8(02), 109-33.

Ezulike, E L and Hoare, D J (1998) The need for education in alternative dispute resolution (ADR) in the construction industry. Engineering, Construction and Architectural Management, 5(02), 144–9.

Fadiya, O O, Georgakis, P, Chinyio, E and Akadiri, P (2013) Analysing the perceptions of UK building contractors on the contributors to the cost of construction plant theft. Journal of Financial Management of Property and Construction, 18(02), 128-41.

Fadiya, O, Georgakis, P, Chinyio, E and Nwagboso, C (2015) Decision-making framework for selecting ICT-based construction logistics systems. Journal of Engineering, Design and Technology, 13(02), 260-81.

Famakin, I O, Aje, I O and Ogunsemi, D R (2012) Assessment of success factors for joint venture construction projects in Nigeria. Journal of Financial Management of Property and Construction, 17(02), 153-65.

Famiyeh, S, Amoatey, C T, Adaku, E and Agbenohevi, C S (2017) Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana. Journal of Engineering, Design and Technology, 15(02), 181-98.

Fan, C (2024) Using convolutional neural networks to identify illegal roofs from unmanned aerial vehicle images. Architectural Engineering and Design Management, 20(02), 390–410.

Fan, S (2012) Modified Time Impact Analysis Method. Journal of Construction Engineering and Management, 138(02), 227–33.

Faniran, O O and Caban, G (1998) Minimizing waste on construction project sites. Engineering, Construction and Architectural Management, 5(02), 182–8.

Farid, F (1990) Pricing Construction Contracts under Tax Reform Act of 1986. Journal of Construction Engineering and Management, 116(02), 300–15.

Farid, F and Koning, T L (1994) Simulation Verifies Queuing Program for Selecting Loader‐Truck Fleets. Journal of Construction Engineering and Management, 120(02), 386–404.

Farmer, I W (1996) Performance of Chain Trenchers in Mixed Ground . Journal of Construction Engineering and Management, 122(02), 115–8.

Farnsworth, C B, Smith, J P and Bingham, E D (2022) A Cross-Sectional Study Exploring IJCER Impact in Construction Scholarship. International Journal of Construction Education and Research, 18(02), 179–98.

Farrell, L M (2001) Financial agency issues in mortgage underwriting and real estate valuation. Journal of Financial Management of Property and Construction, 6(02), 119–37.

Farrell, M L (1999) The evolution of value theory and the practice of real estate valuation. Journal of Financial Management of Property and Construction, 4(02), 5–32.

Farrow, C B, Liu, J and Tatum, M C (2011) Curriculum Delivery and Assessment for Net Generation Construction Students. International Journal of Construction Education and Research, 7(02), 109–25.

Fasakin, J O and Ogunsemi, D R (2003) Modelling the selling prices of residential buildings in Nigeria. Journal of Financial Management of Property and Construction, 8(02), 111–4.

Fasna, M and Gunatilake, S (2019) Overcoming barriers for building energy efficiency retrofits: insights from hotel retrofits in Sri Lanka. Built Environment Project and Asset Management, 10(02), 277–95.

Faulkner, A C, Sargent, J H and Wearne, S H (1989) Civil engineers' managerial roles and needs: report of survey. Construction Management and Economics, 7(02), 155-74.

Februandari, A (2019) Authenticity in cultural built heritage: learning from Chinese Indonesians’ houses. International Journal of Building Pathology and Adaptation, 38(02), 262–78.

Federle, M O and Maloney, W F (1992) Substitutes for Leadership and Unionized Construction Carpenters. Journal of Construction Engineering and Management, 118(02), 332–48.

Fehan, H and Aigbogun, O (2021) Influence of internal organizational factors and institutional pressures on construction firms' performance. Construction Economics and Building, 21(02), 81-99.

Fellows, M F, Phua, F T T and Tutt, D E (2023) Building bridges: the bilingual language work of migrant construction workers. Construction Management and Economics, 41(02), 153–71.

Fellows, R F (1991) Escalation management: forecasting the effects of inflation on building projects. Construction Management and Economics, 9(02), 187-204.

Fenn, J E, Hutchings, D M and Burr, K L (2008) The purposes for state residential general contractor licensing in the United States. International Journal of Construction Education and Research, 4(02), 67-81.

Fergusson, H and Langford, D A (2006) Strategies for managing environmental issues in construction organizations. Engineering, Construction and Architectural Management, 13(02), 171–85.

Fernie, S, Leiringer, R and Thorpe, T (2006) Change in construction: a critical perspective. Building Research & Information, 34(02), 91–103.

Ferreira, M, Almeida, M, Rodrigues, A and Silva, S M (2016) Comparing cost-optimal and net-zero energy targets in building retrofit. Building Research & Information, 44(02), 188-201.

Finch, E F, Flanagan, R and Marsh, L (1996) Auto-ID application in construction. Construction Management and Economics, 14(02), 121-9.

Finke, M R (1999) Window Analyses of Compensable Delays. Journal of Construction Engineering and Management, 125(02), 96–100.

Finne, C (2006) Publishing building product information: a value net perspective. Construction Innovation, 6(02), 79–96.

Finnemore, M, Sarshar, M, Haigh, R, Goulding, J, Barrett, P and Aouad, G F (2000) Can process capability be used to manage the construction supply chain?. Journal of Construction Procurement, 6(02).

Fisher, D J, Anderson, S D and Rahman, S P (2000) Integrating Constructability Tools into Constructability Review Process. Journal of Construction Engineering and Management, 126(02), 89–96.

Fjeldstad, O, Ali, M and Katera, L (2019) Policy implementation under stress. Journal of Financial Management of Property and Construction, 24(02), 129–47.

Flanagan, R and Norman, G (1985) Sealed bid auctions: an application to the building industry. Construction Management and Economics, 3(02), 145-61.

Flanagan, R and Norman, G (1983) The accuracy and monitoring of quantity surveyors' price forecasting for building work. Construction Management and Economics, 1(02), 157-80.

Flanagan, R, Norman, G and Worrall, H (1995) Trade performance of the UK building materials and components industries. Engineering, Construction and Architectural Management, 2(02), 141–62.

Florez, L, Castro, D and Irizarry, J (2013) Measuring sustainability perceptions of construction materials. Construction Innovation, 13(02), 217-34.

Fo, P and Skitmore, x (2007) Factors facilitating construction industry development. Building Research & Information, 35(02), 178–88.

Foliente, G and Seo, S (2012) Modelling building stock energy use and carbon emission scenarios. Smart and Sustainable Built Environment, 1(02), 118-38.

Fong, P S and Lung, B W (2007) Interorganizational Teamwork in the Construction Industry. Journal of Construction Engineering and Management, 133(02), 157–68.

Fong, P S-W (2000) Facilitated team learning in value management teams. Journal of Construction Research, 1(02), 99–107.

Forde, B and Stiemer, S F (1985) Steel Construction Evaluation by MLR‐Strategies. Journal of Construction Engineering and Management, 111(02), 149–56.

Foroughi Sabzevar, M, Gheisari, M and Lo, L J (2021) Improving Access to Design Information of Paper-Based Floor Plans Using Augmented Reality. International Journal of Construction Education and Research, 17(02), 178–98.

Forsythe, P J (2007) A conceptual framework for studying customer satisfaction in residential construction. Construction Management and Economics, 25(02), 171–82.

Fortune, C and Hinks, J (1999) Quality issues in building project price forecasting: factors affecting model selection. Journal of Construction Procurement, 5(02), 129–40.

Fortune, C and Lees, M (2001) Systematic errors of judgement and the formulation of strategic cost advice for construction clients. Journal of Financial Management of Property and Construction, 6(02), 81–93.

Fortune, C and Setiawan, S (2005) Partnering practice and the delivery of construction projects for Housing Associations in the UK. Engineering, Construction and Architectural Management, 12(02), 181–93.

Fouchal, F, Ellis, K, Hassan, T and Firth, S (2013) ICT-enabled energy efficiency – a lens onto practices of other sectors. Smart and Sustainable Built Environment, 2(02), 158-78.

Fox, S (2003) A matrix to indicate the utility of technologies. Construction Management and Economics, 21(02), 187-96.

Franz, F, Patrick, M, Jorn van de, W and Peter, W (2011) Measuring the financial performance of green buildings in the UK commercial property market: Addressing the data issues. Journal of Financial Management of Property and Construction, 16(02), 163–85.

Fredericks, T, Abudayyeh, O, Palmquist, M and Torres, H N (2002) Mechanical Contracting Safety Issues. Journal of Construction Engineering and Management, 128(02), 186–93.

Frimpong, Y and Oluwoye, J (2003) Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana. Journal of Construction Research, 4(02), 175–87.

Fu, E, Newell, D, Becker, A, Schwegler, B and Fischer, M (2013) Is adaptation sustainable? A method to estimate climate-critical construction resource capacity. Construction Innovation, 13(02), 202-16.

Fuller, J, Brown, C J and Crowley, R (2018) Performance-Based Maintenance Contracting in Florida: Evaluation by Surveys, Statistics, and Content Analysis. Journal of Construction Engineering and Management, 144(02).

Fuller, R J (2004) Operating experiences with an advanced fabric energy storage system. Construction Economics and Building, 4(02), 1-10.

Furusaka, S and Gray, C (1984) A model for the selection of the optimum crane for construction sites. Construction Management and Economics, 2(02), 157-76.

Furuya, N, Yamaoka, R and Paulson, B C (1994) Construction of Akashi‐Kaikyo Bridge West Anchorage. Journal of Construction Engineering and Management, 120(02), 337–56.

Gabe, J (2016) Successful greenhouse gas mitigation in existing Australian office buildings. Building Research & Information, 44(02), 160-74.

Gajendran, T and Brewer, G (2012) Cultural consciousness and the effective implementation of information and communication technology. Construction Innovation, 12(02), 179-97.

Gajendran, T, Brewer, G and Marimuthu, M (2013) Internationalisation of construction business and e-commerce: Innovation, integration and dynamic capabilities. Construction Economics and Building, 13(02), 1-17.

Gajendran, T, Brewer, G, Dainty, A amd Runeson, G (2012) A conceptual approach to studying the organisational culture of construction projects. Construction Economics and Building, 12(02), 1-26.

Gajendran, T, Brewer, G, Runeson, G and Dainty, A (2011) Investigating informality in construction: philosophy, paradigm and practice. Construction Economics and Building, 11(02), 84-98.

Gajjar, D, Lucas, J and Davis, D (2023) Understanding Employee Perception to Promote Management Level Workforce Development for Roofing Contractors. International Journal of Construction Education and Research, 19(02), 221–38.

Galasiu, A D and Reinhart, C F (2008) Current daylighting design practice: a survey. Building Research & Information, 36(02), 74.

Galea, N, Powell, A and Salignac, F (2023) The role of homosociality in maintaining men’s powerfulness in construction companies. Construction Management and Economics, 41(02), 172–82.

Gambatese, J A and Rajendran, S (2012) Flagger Illumination during Nighttime Construction and Maintenance Operations. Journal of Construction Engineering and Management, 138(02), 250–7.

Ganah, A A (2003) The Use of Computer Visualisation in Communicating Constructability Information in UK. Journal of Engineering, Design and Technology, 1(02), 151–67.

Gangolells, M, Casals, M, Forcada, N, Fuertes, A and Roca, X (2013) Model for Enhancing Integrated Identification, Assessment, and Operational Control of On-Site Environmental Impacts and Health and Safety Risks in Construction Firms. Journal of Construction Engineering and Management, 139(02), 138–47.

Gannon, M J and Smith, N J (2011) An effective outline business case to facilitate successful decision-making. Construction Management and Economics, 29(02), 185–97.

Gao, S, Song, X and Ding, R (2020) Promoting Information Transfer in Collaborative Projects through Network Structure Adjustment. Journal of Construction Engineering and Management, 146(02).

Gao, X, Pishdad-Bozorgi, P, Shelden, D R and Tang, S (2021) Internet of Things Enabled Data Acquisition Framework for Smart Building Applications. Journal of Construction Engineering and Management, 147(02).

García-León, R A, Quintero-Quintero, W and Rodriguez-Castilla, M (2019) Thermal analysis of three motorcycle disc brakes. Smart and Sustainable Built Environment, 9(02), 208–26.

Gavieta, R C (1997) Socio-economic and spatial indicators for household energy for a tropical urban community in urban Manila. Building Research & Information, 25(02), 124–8.

Gavieta, R C and Onate, C E (1997) Building regulations and disaster mitigation: the Philippines. Building Research & Information, 25(02), 120–3.

Gbadegesin, J T and Aluko, B T (2014) Public private partnerships/private finance initiatives for financing infrastructure in public tertiary institutions in Nigeria. Built Environment Project and Asset Management, 4(02), 199-215.

Gerassis, S, Martín, J E, García, J T, Saavedra, A and Taboada, J (2017) Bayesian Decision Tool for the Analysis of Occupational Accidents in the Construction of Embankments. Journal of Construction Engineering and Management, 143(02).

Gerrish, T, Ruikar, K, Cook, M, Johnson, M and Phillip, M (2017) Using BIM capabilities to improve existing building energy modelling practices. Engineering, Construction and Architectural Management, 24(02), 190-208.

Gerth, R, Boqvist, A, Bjelkemyr, M and Lindberg, B (2013) Design for construction: utilizing production experiences in development. Construction Management and Economics, 31(02), 135-50.

Ghafoori, M and Abdallah, M (2022) Simulation-Based Optimization Model to Minimize Equivalent Annual Cost of Existing Buildings. Journal of Construction Engineering and Management, 148(02).

Gharaie, E, Lingard, H and Cooke, T (2015) Causes of fatal accidents involving cranes in the Australian construction industry. Construction Economics and Building, 15(02), 1-12.

Ghiasi, V, Ghiasi, S and Prasad, A (2012) Evaluation of tunnels under squeezing rock condition. Journal of Engineering, Design and Technology, 10(02), 168-79.

Ghodoosi, F, Abu-Samra, S, Zeynalian, M and Zayed, T (2018) Maintenance Cost Optimization for Bridge Structures Using System Reliability Analysis and Genetic Algorithms. Journal of Construction Engineering and Management, 144(02).

Ghosh, A, Parrish, K and Chasey, A D (2015) Implementing a vertically-integrated BIM curriculum in an undergraduate construction management program. International Journal of Construction Education and Research, 11(02), 121-39.

Ghosh, S and Burghart, J (2021) Lean construction: Experience of US contractors. International Journal of Construction Education and Research, 17(02), 133–53.

Ghosh, S and Lee, S K ( (2023) Using Social Network Analysis to Explore Communication among Members of an Integrated Project Delivery Team. International Journal of Construction Education and Research, 19(02), 132–49.

Ghosh, S, Dickerson, D E and Mills, T (2019) Effect of the Last Planner System® on Social Interactions among Project Participants. International Journal of Construction Education and Research, 15(02), 100–17.

Ghosh, S, Nourihamedani, M, Reyes, M and Snyder, L (2024) Association Between Leading Indicators of Safety Performance in Construction Projects. International Journal of Construction Education and Research, 20(02), 121–35.

Giahchy, S, Hosseini, S A, Akhbari, M, Safa, E and Akbarpour, A (2023) A novel mathematical multi-criteria decision-making model for optimizing life cycle energy and cost in construction projects planning. Architectural Engineering and Design Management, 19(02), 200–13.

Gibb, A G F and Isack, F (2003) Re-engineering through pre-assembly: client expectations and drivers. Building Research & Information, 31(02), 146–60.

Gidado, K and Barter, G (1996) The constraints to effective information flow in the construction management procurement system. Journal of Construction Procurement, 2(02), 52–68.

Giti, D M, K'Akumu, O A and Ondieki, E O (2020) Enhanced role of private sector through public private partnerships in low income urban housing in Kenya. Journal of Financial Management of Property and Construction , 25(02), 293–312.

Glagola, C R and Sheedy, W M (2002) Partnering on Defense Contracts. Journal of Construction Engineering and Management, 128(02), 127–38.

Glass, J (2005) A best practice process model for hybrid concrete construction. Construction Management and Economics, 23(02), 169-84.

Glass, J and Simmonds, M (2007) “Considerate construction”: case studies of current practice. Engineering, Construction and Architectural Management, 14(02), 131–49.

Gledson, B J (2016) Hybrid project delivery processes observed in constructor BIM innovation adoption. Construction Innovation, 16(02), 229-46.

Gledson, B J and Phoenix, C (2017) Exploring organisational attributes affecting the innovativeness of UK SMEs. Construction Innovation, 17(02), 224-43.

Gluch, P and Räisänen, C (2012) What tensions obstruct an alignment between project and environmental management practices?. Engineering, Construction and Architectural Management, 19(02), 127-40.

Gluch, P and Räisänen, C (2009) Interactional perspective on environmental communication in construction projects. Building Research & Information, 37(02), 164–75.

Gluch, P and Stenberg, A-c (2006) How do trade media influence green building practice?. Building Research & Information, 34(02), 104–17.

Goh, B H (2016) Designing a whole-life building cost index in Singapore. Built Environment Project and Asset Management, 6(02), 159-73.

Goh, B-H (1999) An evaluation of the accuracy of the multiple regression approach in forecasting sectoral construction demand in Singapore. Construction Management and Economics, 17(02), 231-41.

Goh, B-H (2000) Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: the case of the Singapore residential sector. Construction Management and Economics, 18(02), 209-17.

Goh, Y M and Chua, D K H (2010) Case-Based Reasoning Approach to Construction Safety Hazard Identification: Adaptation and Utilization. Journal of Construction Engineering and Management, 136(02), 170–8.

Gokyigit Arpaci, E Y, Eksi Akbulut, D and Yildiz, O (2024) Enhancing water resistance of earthen buildings by using admixture materials. Architectural Engineering and Design Management, 20(02), 320–36.

Golizadeh, H, Hosseini, M R, Edwards, D J, Abrishami, S, Taghavi, N and Banihashemi, S (2019) Barriers to adoption of RPAs on construction projects: a task–technology fit perspective. Construction Innovation, 19(02), 149–69.

Gomar, J E, Haas, C T and Morton, D P (2002) Assignment and Allocation Optimization of Partially Multiskilled Workforce. Journal of Construction Engineering and Management, 128(02), 103–9.

Goodhew, S, Bird, P and Paterson, I (1997) The financial implications of using natural ventilation to reduce the levels of radon gas within an existing 'period' dwelling. Journal of Financial Management of Property and Construction, 2(02), 85–104.

Goodhew, S, Fitzgerald, D and Southcombe, C (1999) Water efficient dwellings :- do UK house builders recognise a need?. Journal of Financial Management of Property and Construction, 4(02), 49–62.

Goodrum, P M, Wan, Y and Fenouil, P C (2009) A decision-making system for accelerating roadway construction. Engineering, Construction and Architectural Management, 16(02), 116–35.

Gorgolewski, M (2008) Designing with reused building components: some challenges. Building Research & Information, 36(02), 88.

Gormley, M and Campbell, D P (2006) Modelling water reduction effects: method and implications for horizontal drainage. Building Research & Information, 34(02), 131–44.

Gotthelf, H, Ozbek, M E and Guggemos, A (2013) Potential Efficiency Gains from Early Involvement of Steel Fabricators and Erectors: Lessons Learned from the NREL Research Support Facility Project. International Journal of Construction Education and Research, 9(02), 147-60.

Gottlieb, S C and Haugbølle, K (2013) Contradictions and collaboration: partnering in-between systems of production, values and interests. Construction Management and Economics, 31(02), 119-34.

Goyal, S, Routroy, S and Singhal, A (2019) Analyzing environment sustainability enablers using fuzzy DEMATEL for an Indian steel manufacturing company. Journal of Engineering, Design and Technology, 17(02), 300–29.

Graafland, J and Nijhof, A (2007) Transparency, market operation and trust in the Dutch construction industry: an exploratory study. Construction Management and Economics, 25(02), 195–205.

Gram-Hanssen, K (2010) Residential heat comfort practices: understanding users. Building Research & Information, 38(02), 86.

Gransberg, D D and Molenaar, K (2003) A synthesis of design-builder selection methods for public infrastructure projects. Journal of Construction Procurement, 9(02), 40–51.

Grant, A and Ries, R (2013) Impact of building service life models on life cycle assessment. Building Research & Information, 41(02), 168-86.

Grant, E (2013) “Pack 'em, rack 'em and stack 'em”: the appropriateness of the use and reuse of shipping containers for prison accommodation. Construction Economics and Building, 13(02), 35-44.

Gray, C (1986) 'Intelligent' construction time and cost analysis. Construction Management and Economics, 4(02), 135-50.

Gray, C and Flanagan, R (1984) US productivity and fast tracking starts on the drawing board. Construction Management and Economics, 2(02), 133-44.

Gray, C and Little, J (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(02), 121-44.

Grecksch, K and Holzhausen, J (2017) Property rights revisited: are narratives the way forward?. International Journal of Law in the Built Environment, 9(02), 94-107.

Green, S D (1996) A metaphorical analysis of client organizations and the briefing process. Construction Management and Economics, 14(02), 155-64.

Green, S D (1999) Partnering: the propaganda of corporatism?. Journal of Construction Procurement, 5(02), 177–86.

Green, S D (1999) The missing arguments of lean construction. Construction Management and Economics, 17(02), 133--7.

Green, S D and May, S (2003) Re-engineering construction: going against the grain. Building Research & Information, 31(02), 97–106.

Greenwood, D, Hogg, K and Kan, S (2005) Subcontractors' liability for project delays. Journal of Financial Management of Property and Construction, 10(02), 107–14.

Greenwood, D, Horne, M, Thompson, E M, Allwood, C M, Wernemyr, C and Westerdahl, B (2008) Strategic perspectives on the use of virtual reality within the building industries of four countries. Architectural Engineering and Design Management, 4(02), 85–98.

Gregori, T and Pietroforte, R (2015) An input-output analysis of the construction sector in emerging markets. Construction Management and Economics, 33(02), 134-45.

Gregory-Stevens, J, Frame, I and Henjewele, C (2016) Mediation in construction disputes in England. International Journal of Law in the Built Environment, 8(02), 123-36.

Griffin, B and Yang, J (2013) Design and analysis of a novel earpiece-less eyeglass frame. Journal of Engineering, Design and Technology, 11(02), 158-77.

Grimm, C T (1984) Facade Topography in Masonry Failure Investigation. Journal of Construction Engineering and Management, 110(02), 145–51.

Grover, R, Walacik, M, Buzu, O, Gunes, T, Raskovic, M and Yildiz, U (2019) Barriers to the use of property taxation in municipal finance. Journal of Financial Management of Property and Construction , 24(02), 166–83.

Gruneberg, S and Hughes, W (2004) Analysing the types of procurement used in the UK: a comparison of two data sets. Journal of Financial Management of Property and Construction, 9(02), –74.

Gruneberg, S and Hughes, W (2005) UK construction orders and output: A comparison of government and commercially available data 1995-2001. Journal of Financial Management of Property and Construction, 10(02), 83–94.

Gunarathna, C, Yang, R J and Fernando, N (2018) Conflicts and management styles in the Sri Lankan commercial building sector. Engineering, Construction and Architectural Management, 25(02), 178–201.

Gunduz, M and Elsherbeny, H A (2021) Critical Assessment of Contract Administration Using Multidimensional Fuzzy Logic Approach. Journal of Construction Engineering and Management, 147(02).

Guo, B H W, Yiu, T W, González, V A and Goh, Y M (2017) Using a Pressure-State-Practice Model to Develop Safety Leading Indicators for Construction Projects. Journal of Construction Engineering and Management, 143(02).

Guo, K, Zhang, L and Wang, T (2021) Concession period optimisation in complex projects under uncertainty: a public–private partnership perspective. Construction Management and Economics, 39(02), 156–72.

Guo, S, Shen, G, Yang, J, Sun, B and Xue, F (2015) Embodied energy of service trading in Hong Kong. Smart and Sustainable Built Environment, 4(02), 234-48.

Gurmu, A T (2019) Tools for Measuring Construction Materials Management Practices and Predicting Labor Productivity in Multistory Building Projects. Journal of Construction Engineering and Management, 145(02).

Gyi, D E, Gibb, A G F and Haslam, R A (1999) The quality of accident and health data in the construction industry: interviews with senior managers. Construction Management and Economics, 17(02), 197-204.

Hübner, F, Volk, R, Kühlen, A and Schultmann, F (2017) Review of project planning methods for deconstruction projects of buildings. Built Environment Project and Asset Management, 7(02), 212-26.

Haan, J D, Voordijk, H and Joosten, G-J (2002) Market strategies and core capabilities in the building industry. Construction Management and Economics, 20(02), 109-18.

Habets, T, Voordijk, H and Sijde, P v d (2011) The adoption of innovative asphalt equipment in road construction. Construction Innovation, 11(02), 229–45.

Habibeh Valizadeh, A and Husaini b, O (2011) Overview of remote sensing techniques in earthquake prediction. Journal of Engineering, Design and Technology, 9(02), 164–77.

Haddad, S, Osmond, P and King, S (2019) Application of adaptive thermal comfort methods for Iranian schoolchildren. Building Research & Information, 47(02), 173–89.

Hadidi, L, Assaf, S, Aluwfi, K and Akrawi, H (2017) The effect of ISO 9001 implementation on the customer satisfaction of the engineering design services. International Journal of Building Pathology and Adaptation, 35(02), 176–90.

Hadikusumo, B H W and Rowlinson, S (2004) Capturing Safety Knowledge Using Design-for-Safety-Process Tool. Journal of Construction Engineering and Management, 130(02), 281–9.

Hague, D J (1985) Incentives and motivation in the construction industry: a critique. Construction Management and Economics, 3(02), 163-70.

Haigh, R, Sakalasuriya, M M, Amaratunga, D, Basnayake, S, Hettige, S, Premalal, S and Jayasinghe Arachchi, A (2020) The upstream-downstream interface of Sri Lanka’s tsunami early warning system. International Journal of Disaster Resilience in the Built Environment, 11(02), 219–40.

Hajjar, D and AbouRizk, S M (2002) Unified Modeling Methodology for Construction Simulation. Journal of Construction Engineering and Management, 128(02), 174–85.

Halligan, D W, Hester, W T and Thomas, H R (1987) Managing Unforeseen Site Conditions. Journal of Construction Engineering and Management, 113(02), 273–87.

Haltenhoff, C E (1986) Educating Professional Construction Managers. Journal of Construction Engineering and Management, 112(02), 153–62.

Hamidavi, T, Abrishami, S, Ponterosso, P, Begg, D and Nanos, N (2020) OSD. Construction Innovation , 20(02), 149–69.

Hamilton, A, Mitchell, G and Yli-Karjanmaa, S (2002) The BEQUEST toolkit: a decision support system for urban sustainability. Building Research & Information, 30(02), 109–15.

Hammad, A, Akbarnezhad, A, Grzybowska, H, Wu, P and Wang, X (2019) Mathematical optimisation of location and design of windows by considering energy performance, lighting and privacy of buildings. Smart and Sustainable Built Environment, 8(02), 117–37.

Hammond, D, Dempsey, J J, Szigeti, F and Davis, G (2005) Integrating a performance-based approach into practice: a case study. Building Research & Information, 33(02), 128–41.

Hampson, K and Tatum, C B (1997) Technology Strategy and Competitive Performance in Bridge Construction . Journal of Construction Engineering and Management, 123(02), 153–61.

Hamza, M and Månsson, P (2019) The human dimension of early warning – a viewpoint. International Journal of Disaster Resilience in the Built Environment, 11(02), 263–74.

Hamzeh, F R, Faek, F and AlHussein, H (2019) Understanding improvisation in construction through antecedents, behaviours and consequences. Construction Management and Economics, 37(02), 61–71.

Han, K, Degol, J and Golparvar-Fard, M (2018) Geometry- and Appearance-Based Reasoning of Construction Progress Monitoring. Journal of Construction Engineering and Management, 144(02).

Han, S H and Diekmann, J (2004) Judgment-based cross-impact method for predicting cost variance for highly uncertain projects. Journal of Construction Research, 5(02), 171–92.

Han, S S and Ofori, G (2001) Construction industry in China's regional economy, 1990-1998. Construction Management and Economics, 19(02), 189-205.

Handa, V K and Barcia, R M (1986) Construction Production Planning. Journal of Construction Engineering and Management, 112(02), 163–77.

Handa, V K and Rivers, D (1983) Downgrading Construction Incidents. Journal of Construction Engineering and Management, 109(02), 190–205.

Hanggara, D and Wijeyewickrema, A C (2019) Vulnerability assessment of reinforced concrete buildings in Indonesia subjected to tsunami inundation forces. International Journal of Disaster Resilience in the Built Environment, 11(02), 204–18.

Hanna, A S and Senouci, A B (1995) Design Optimization of Concrete-Slab Forms. Journal of Construction Engineering and Management, 121(02), 215–21.

Hanna, A S and Skiffington, M A (2010) Effect of Preconstruction Planning Effort on Sheet Metal Project Performance. Journal of Construction Engineering and Management, 136(02), 235–41.

Hanna, A S, Iskandar, K A and Lotfallah, W (2019) Benchmarking project performance: a guideline for assessing vulnerability of mechanical and electrical projects to productivity loss . Construction Management and Economics, 37(02), 101–11.

Hanna, A S, Mikhail, G and Iskandar, K A (2017) State of Prefab Practice in the Electrical Construction Industry: Qualitative Assessment. Journal of Construction Engineering and Management, 143(02).

Hansen, G K and Olsson, N O E (2011) Layered project-layered process: lean thinking and flexible solutions. Architectural Engineering and Design Management, 7(02), 70–84.

Hansen, K L, MGann, D and Groák, S (1998) Information technology decision support and business process change in the USA. Engineering, Construction and Architectural Management, 5(02), 115–26.

Hao, J L, Hill, M J and Shen, L Y (2008) Managing construction waste on-site through system dynamics modelling: the case of Hong Kong. Engineering, Construction and Architectural Management, 15(02), 103–13.

Harada, S (2015) Bidding for private finance initiative projects: an analysis. Journal of Financial Management of Property and Construction, 20(02), 188-202.

Haraguchi, M and Kim, S (2016) Critical infrastructure interdependence in New York City during Hurricane Sandy. International Journal of Disaster Resilience in the Built Environment, 7(02), 133-43.

Haran, M, McCord, M, Hutchison, N, McGreal, S, Adair, A, Berry, J and Kashyap, A (2013) Financial structure of PPPs deals post-GFC: an international perspective. Journal of Financial Management of Property and Construction, 18(02), 184-203.

Hardie, M, Allen, J and Newell, G (2013) Environmentally driven technical innovation by Australian construction SMEs. Smart and Sustainable Built Environment, 2(02), 179-91.

Hardie, M, Khan, S, O'Donnell, A and Miller, G (2007) The efficacy of waste management plans in Australian commercial construction refurbishment projects. Construction Economics and Building, 7(02), 26-36.

Hare, B and Cameron, I (2012) Health and safety gateways for construction project planning. Engineering, Construction and Architectural Management, 19(02), 192-204.

Harris, R B (1990) Packing Method for Resource Leveling (Pack). Journal of Construction Engineering and Management, 116(02), 331–50.

Hartwell, J C, Upadhyay, Y and Sourani, A (2019) Influential factors of life cycle management in education PFI projects. Built Environment Project and Asset Management, 9(02), 302–14.

Hartwig, J and Kockat, J (2016) Macroeconomic effects of energetic building retrofit: Input-output sensitivity analyses. Construction Management and Economics, 34(02), 79-97.

Hasan, A and Jha, K N (2016) Acceptance of the Incentive/Disincentive Contracting Strategy in Developing Construction Markets: Empirical Study from India. Journal of Construction Engineering and Management, 142(02).

Hasan, S, Al-Hussein, M, Hermann, U H and Safouhi, H (2010) Interactive and Dynamic Integrated Module for Mobile Cranes Supporting System Design. Journal of Construction Engineering and Management, 136(02), 179–86.

Hassan, A, Purnomo, M R A and Anugerah, A R (2019) Fuzzy-analytical-hierarchy process in failure mode and effect analysis (FMEA) to identify process failure in the warehouse of a cement industry. Journal of Engineering, Design and Technology , 18(02), 378–88.

Hassan, O A B and Anderstedt, R (2017) Estimation of drying time of fresh concrete slabs: a comparative study. Journal of Engineering, Design and Technology, 15(02), 134-48.

Hassanain, M A, Alamoudi, A, Al-Hammad, A and Abdallah, A (2020) Barriers to the implementation of POE practices in the Saudi Arabian building industry. Architectural Engineering and Design Management, 16(02), 150–65.

Hassanain, M A, Bin-Mohanna, A, Al-Hammad, A-M and Sanni-Anibire, M O (2017) Challenges to the implementation of building management systems in Saudi Arabia. Built Environment Project and Asset Management, 7(02), 130-42.

Hassanain, M A, Sanni-Anibire, M O, Mahmoud, A S and Hamida, M B (2020) Design guidelines for the functional efficiency of laboratory facilities. Architectural Engineering and Design Management, 16(02), 115–30.

Hassler, U and Kohler, N (2014) The ideal of resilient systems and questions of continuity. Building Research & Information, 42(02), 158-67.

Hastheetham, A and Hadikusumo, B H W (2011) Theoretical framework of strategic behaviours in Thai contractors: An empirical case study. Engineering, Construction and Architectural Management, 18(02), 206–25.

Hatush, Z and Skitmore, M R (1997) Evaluating contractor prequalification data: selection criteria and project success factors. Construction Management and Economics, 15(02), 129-47.

Haupt, T C and Pillay, K (2016) Investigating the true costs of construction accidents. Journal of Engineering, Design and Technology, 14(02), 373-419.

Haupt, T C and Smallwood, J (2004) HIV and AIDS in SA construction: attitudes and perceptions of workers. Journal of Construction Research, 5(02), 311–27.

Hayles, C S, Dean, M, Lappin, S A and McCullough, J E (2013) Climate change adaptation: A decision support framework to encourage environmentally responsible behaviour. Smart and Sustainable Built Environment, 2(02), 192-214.

Haynes, N S and Love, P E D (2004) Psychological adjustment and coping among construction project managers. Construction Management and Economics, 22(02), 129-40.

He, Q, Wang, T, Chan, A P C and Xu, J (2021) Developing a List of Key Performance Indictors for Benchmarking the Success of Construction Megaprojects. Journal of Construction Engineering and Management, 147(02).

He, Q, Wu, Z, Li, S, Li, H and Wang, Y (2023) Two decades of the evolution of China’s green building policy: insights from text mining. Building Research & Information, 51(02), 158–78.

He, W, Tang, W, Wei, Y, Duffield, C F and Lei, Z (2016) Evaluation of Cooperation during Project Delivery: Empirical Study on the Hydropower Industry in Southwest China. Journal of Construction Engineering and Management, 142(02).

He, X, Liu, R and Anumba, C J (2021) Data-Driven Insights on the Knowledge Gaps of Conceptual Cost Estimation Modeling. Journal of Construction Engineering and Management, 147(02).

Hearne, R (2013) Realising the “right to the city”: Developing a human rights based framework for regeneration of areas of urban disadvantage. International Journal of Law in the Built Environment, 5(02), 172-87.

Hedborg, S and Rosander, L (2024) Self-organizing in urban development: developers coordinating between construction projects. Construction Management and Economics, 42(02), 114–28.

Heesom, D and Mahdjoubi, L (2004) Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(02), 171-82.

Hegab, M Y and Smith, G R (2007) Delay Time Analysis in Microtunneling Projects. Journal of Construction Engineering and Management, 133(02), 191–5.

Hegarty, T, Wright, S, Wordsworth, R and Lord, B (2023) Deferential Tailoring: a grounded theory of how women respond and adapt to social conditions and gender-related challenges in the New Zealand construction industry. Construction Management and Economics, 41(02), 138–52.

Hegazy, T, Elhakeem, A and Elbeltagi, E (2004) Distributed Scheduling Model for Infrastructure Networks. Journal of Construction Engineering and Management, 130(02), 160–7.

Hein, M F and Houck, K D (2008) Construction challenges of adaptive reuse of historical buildings in Europe. International Journal of Construction Education and Research, 4(02), 115-131.

Hein, M F, Dougherty, M and Hobbs, T (2013) Cleaning Methods for Pervious Concrete Pavements. International Journal of Construction Education and Research, 9(02), 102-16.

Hejducki, Z and Mrozowicz, J (2001) Stream methods of construction work organization: an introduction to the problem. Engineering, Construction and Architectural Management, 8(02), 80–9.

Hemström, K, Mahapatra, K and Gustavsson, L (2017) Architects’ perception of the innovativeness of the Swedish construction industry. Construction Innovation, 17(02), 244-60.

Hendrickse, C and Thurner, T W (2019) Design intervention at major technological installations. Journal of Engineering, Design and Technology, 17(02), 402–13.

Hendrickson, C, Martinelli, D and Rehak, D (1987) Hierarchical Rule‐Based Activity Duration Estimation. Journal of Construction Engineering and Management, 113(02), 288–301.

Hes, D, Morrison, A and Bates, M (2005) Assessment and selection of materials for Melbourne City Council House 2. Construction Economics and Building, 5(02), 8-19.

Hewitt, E L, Andrews, C J, Senick, J A, Wener, R E, Krogmann, U and Sorensen Allacci, M (2016) Distinguishing between green building occupants' reasoned and unplanned behaviours. Building Research & Information, 44(02), 119-34.

Hilal, M, Maqsood, T and Abdekhodaee, A (2019) A scientometric analysis of BIM studies in facilities management. International Journal of Building Pathology and Adaptation, 37(02), 122–39.

Hildreth, J C and Vorster, M C (2010) Learning construction performance improvement through planning. International Journal of Construction Education and Research, 6(02), 139–51.

Hindle, R D and Rwelamila, P D (1998) Resistance to change: architectural education in a turbulent environment. Engineering, Construction and Architectural Management, 5(02), 150–8.

Hinze, J and Bren, D (1996) Analysis of Fatalities and Injuries Due to Powerline Contacts . Journal of Construction Engineering and Management, 122(02), 177–82.

Hinze, J and Couey, J (1989) Weather in Construction Contracts. Journal of Construction Engineering and Management, 115(02), 270–83.

Hinze, J and Gambatese, J (2003) Factors That Influence Safety Performance of Specialty Contractors. Journal of Construction Engineering and Management, 129(02), 159–64.

Hinze, J and Hinze, M M (1986) Problems Associated with Removal of Asbestos. Journal of Construction Engineering and Management, 112(02), 211–9.

Hinze, J and Nelson, A (1996) Enhancing Performance of Soundless Chemical Demolition Agents . Journal of Construction Engineering and Management, 122(02), 193–5.

Hinze, J and Parker, R (1988) Productivity Study on Extruded Concrete Curbing Operations. Journal of Construction Engineering and Management, 114(02), 256–62.

Hinze, J and Raboud, P (1988) Safety on Large Building Construction Projects. Journal of Construction Engineering and Management, 114(02), 286–93.

Hinze, J and Russell, D B (1995) Analysis of Fatalities Recorded by OSHA. Journal of Construction Engineering and Management, 121(02), 209–14.

Hinze, J and Tracey, A (1994) The Contractor‐Subcontractor Relationship: The Subcontractor's View. Journal of Construction Engineering and Management, 120(02), 274–87.

Hinze, J, Huang, X and Terry, L (2005) The Nature of Struck-by Accidents. Journal of Construction Engineering and Management, 131(02), 262–8.

Hlaing, N N, Singh, D, Tiong, R L K and Ehrlich, M (2008) Perceptions of Singapore construction contractors on construction risk identification. Journal of Financial Management of Property and Construction, 13(02), 85–95.

Ho, C M F (2013) Communication Makes a Corporate Code of Ethics Effective: Lessons from Hong Kong. Journal of Construction Engineering and Management, 139(02), 128–37.

Ho, S P and Liu, L Y (2002) An option pricing-based model for evaluating the financial viability of privatised infrastructure projects. Construction Management and Economics, 20(02), 143-56.

Holley, P W and Dagg, C (2006) Development of expanded multidisciplinary collaborative experiences across construction and design curricula. International Journal of Construction Education and Research, 2(02), 91-111.

Holmes, S H and Reinhart, C F (2013) Assessing future climate change and energy price scenarios: institutional building investment. Building Research & Information, 41(02), 209-22.

Holt, G D (1997) Construction research questionnaires and attitude measurement: relative index or mean?. Journal of Construction Procurement, 3(02), 88–96.

Holt, G D (2014) Industrial innovation: case study of the Claerwen dam. Built Environment Project and Asset Management, 4(02), 146-65.

Holt, G D and Faniran, O (2000) Construction management research: a blend of rationalist and interpretative paradigms. Journal of Construction Research, 1(02), 177–82.

Holt, G D and Goulding, J S (2014) Conceptualisation of ambiguous-mixed-methods within building and construction research. Journal of Engineering, Design and Technology, 12(02), 244-62.

Holt, G D, Akintoye, A and Davis, P T (2015) Editorial: Analysis of papers published in the Journal of Financial Management of Property and Construction 2010-2015. Journal of Financial Management of Property and Construction, 20(02), 106-15.

Hong, X and Proverbs, D (2003) Contractor relationships: a comparison in Japan, the UK and the US. Journal of Construction Procurement, 9(02), 52–64.

Hong, Y, Hammad, A W, Sepasgozar, S and Akbarnezhad, A (2019) BIM adoption model for small and medium construction organisations in Australia. Engineering, Construction and Architectural Management, 26(02), 154–83.

Hong, Y, Hammad, A, Zhong, X, Wang, B and Akbarnezhad, A (2020) Comparative Modeling Approach to Capture the Differences in BIM Adoption Decision-Making Process in Australia and China. Journal of Construction Engineering and Management, 146(02).

Hopkin, T, Lu, S, Rogers, P and Sexton, M (2017) Key stakeholders’ perspectives towards UK new-build housing defects. International Journal of Building Pathology and Adaptation, 35(02), 110–23.

Horne, M, Hill, R and Giddings, R (1999) Visualization of photovoltaic clad buildings. Building Research & Information, 27(02), 96–108.

Hosein, R and Lewis, T M (2005) Quantifying the relationship between aggregate GDP and construction value added in a small petroleum rich economy � a case study of Trinidad and Tobago. Construction Management and Economics, 23(02), 185-97.

Hossein Hashemi Doulabi, S, Seifi, A and Shariat, S Y (2011) Efficient Hybrid Genetic Algorithm for Resource Leveling via Activity Splitting. Journal of Construction Engineering and Management, 137(02), 137–46.

Hosseini, M R, Chileshe, N, Zuo, J and Baroudi, B (2015) Adopting global virtual engineering teams in AEC projects: A qualitative meta-analysis of innovation diffusion studies. Construction Innovation, 15(02), 151-79.

Hou, X, Zeng, Y and Xue, J (2020) Detecting Structural Components of Building Engineering Based on Deep-Learning Method. Journal of Construction Engineering and Management, 146(02).

Hsieh, T (1998) Impact of Subcontracting on Site Productivity: Lessons Learned in Taiwan. Journal of Construction Engineering and Management, 124(02), 91–100.

hu, E, Zou, L and Langston, C (2004) A new interlink decision making index for making multi-criteria decisions. Construction Economics and Building, 4(02), 33-42.

Hu, M (2023) An evaluation of the retrofit net zero building performances: life cycle energy, emissions and cost. Building Research & Information, 51(02), 179–91.

Hu, Z, Chen, S and Zhang, X (2014) Value for money and its influential factors: an empirical study of PPP projects in Japan. Built Environment Project and Asset Management, 4(02), 166-79.

Hua, G B (2007) Applying the strategic alignment model to business and ICT strategies of Singapore's small and medium-sized architecture, engineering and construction enterprises. Construction Management and Economics, 25(02), 157–69.

Huang, J-Y and Siao, S-T (2016) Development of an integrated bionic design system. Journal of Engineering, Design and Technology, 14(02), 310-27.

Huang, R and Halpin, D W (1995) Graphical-Based Method for Transient Evaluation of Construction Operations. Journal of Construction Engineering and Management, 121(02), 222–9.

Huang, W, Xu, J, Zhu, D, Liu, C, Lu, J and Lu, K (2016) Multi-objective optimization of composite two-stage vibration isolation system for sensitive equipment. Journal of Engineering, Design and Technology, 14(02), 343-61.

Huang, X and Hinze, J (2006) Owner’s Role in Construction Safety. Journal of Construction Engineering and Management, 132(02), 164–73.

Huang, X and Hinze, J (2006) Owner’s Role in Construction Safety: Guidance Model. Journal of Construction Engineering and Management, 132(02), 174–81.

Huat, T P and Pheng, L S (1994) The fuzzy industry maturity grid (FIMG) and its application to the Singapore construction industry. Construction Management and Economics, 12(02), 125-38.

Hubbard, B J and Middaugh, B (2013) Leveraging Bluetooth Consumer Electronics as Proximity Sensors to Construction Health Hazards. International Journal of Construction Education and Research, 9(02), 117-31.

Huebner, G M, McMichael, M, Shipworth, D, Shipworth, M, Durand-Daubin, M and Summerfield, A J (2015) The shape of warmth: temperature profiles in living rooms. Building Research & Information, 43(02), 185-96.

Hughes, M, Palmer, J, Cheng, V and Shipworth, D (2013) Sensitivity and uncertainty analysis of England's housing energy model. Building Research & Information, 41(02), 156-67.

Hughes, R and Thorpe, D (2014) A review of enabling factors in construction industry productivity in an Australian environment. Construction Innovation, 14(02), 210-28.

Hui, E C M (2006) Intra-urban residential mobility and property markets: theory and evidence. Journal of Financial Management of Property and Construction, 11(02), 117–30.

Hui, E C-M, Lo, T K K, Chen, J and Wang, Z (2012) Housing and consumer markets in urban China. Construction Management and Economics, 30(02), 117-31.

Hulme, T W and Burchell, A J (1992) Bored Tunneling for Singapore Metro. Journal of Construction Engineering and Management, 118(02), 363–84.

Hulshizer, A J and Desai, A J (1984) Shock Vibration Effects on Freshly Placed Concrete. Journal of Construction Engineering and Management, 110(02), 266–85.

Hung, Y-H, Smith-Jackson, T and Winchester, W (2011) Use of attitude congruence to identify safety interventions for small residential builders. Construction Management and Economics, 29(02), 113–30.

Huo, X, Yu, A T W, Zezhou, W and Jayantha, W M (2019) Site planning and design of green residential building projects: case studies in China. Engineering, Construction and Architectural Management, 27(02), 525–43.

Hussain, R S, Ruikar, K, Enoch, M P, Brien, N and Gartside, D (2017) Process mapping for road works planning and coordination. Built Environment Project and Asset Management, 7(02), 157-72.

Hutchings, M and Christofferson, J (2005) Factors leading to construction company success: perceptions of small-volume residential contractors. International Journal of Construction Education and Research, 1(02), 102–11.

Hwang, B and Lim, E J (2013) Critical Success Factors for Key Project Players and Objectives: Case Study of Singapore. Journal of Construction Engineering and Management, 139(02), 204–15.

Hwang, B-G and Yang, S (2014) Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(02), 190-205.

Hwang, B-G, Tan, H F and Sathish, S (2013) Capital project performance measurement and benchmarking in Singapore. Engineering, Construction and Architectural Management, 20(02), 143-59.

Hwang, B-G, Thomas, S R, Degezelle, D and Caldas, C H (2008) Development of a benchmarking framework for pharmaceutical capital projects. Construction Management and Economics, 26(02), 177–95.

Hwang, B-G, Zhao, X and Chin, E W Y (2017) International construction joint ventures between Singapore and developing countries: Risk assessment and allocation preferences. Engineering, Construction and Architectural Management, 24(02), 209-28.

Hwang, B, Zhao, X and Yang, K W (2019) Effect of BIM on Rework in Construction Projects in Singapore: Status Quo, Magnitude, Impact, and Strategies. Journal of Construction Engineering and Management, 145(02).

Hwang, S, Park, M, Lee, H, Lee, S and Kim, H (2013) Dynamic Feasibility Analysis of the Housing Supply Strategies in a Recession: Korean Housing Market. Journal of Construction Engineering and Management, 139(02), 148–60.

Hyari, K H (2016) Handling Unbalanced Bidding in Construction Projects: Prevention Rather Than Detection. Journal of Construction Engineering and Management, 142(02).

Hyung, W, Kim, S and Jo, J (2019) Improved similarity measure in case-based reasoning: a case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(02), 561–78.

Ianakiev, A and Greenwood, J (2013) Design and analysis of rotomoulded panels for a self-erecting low-cost flood barrier. Architectural Engineering and Design Management, 9(02), 110-20.

Ibbs, C W (1985) Product Specification Practices and Problems. Journal of Construction Engineering and Management, 111(02), 157–72.

Ibbs, C W, Bates, L C and Echeverry, D (1987) Owner‐Furnished Equipment (OFE) Contract Practices. Journal of Construction Engineering and Management, 113(02), 249–63.

Ibbs, W and Nguyen, L D (2007) Schedule Analysis under the Effect of Resource Allocation. Journal of Construction Engineering and Management, 133(02), 131–8.

Ibbs, W C (1991) Innovative contract incentive features for construction. Construction Management and Economics, 9(02), 157-69.

Ibbs, W, Nguyen, L D and Simonian, L (2011) Concurrent Delays and Apportionment of Damages. Journal of Construction Engineering and Management, 137(02), 119–26.

Ibem, E O, Aduwo, E B and Uwakonye, O (2012) Adequacy of incremental construction strategy for housing low-income urban residents in Ogun State, Nigeria. Built Environment Project and Asset Management, 2(02), 182-94.

Ibrahim, K, Adebowale, O J, Dodo, M, Zailani, B M, Lukman, O and Kajimo-Shakantu, K (2024) Challenges and Coping Strategies of Built Environment Students During Students Industrial Work Experience Scheme (SIWES): Perspective from Nigeria. International Journal of Construction Education and Research, 20(02), 157–76.

Ibrahim, Y M and Kaka, A P (2007) The impact of diversification on the performance of UK construction firms. Journal of Financial Management of Property and Construction, 12(02), 73–86.

Ibrahim, Y M, Ibrahim, A M and Kabir, B (2009) Geographic diversification, performance, and the risk profile of UK construction firms. Journal of Engineering, Design and Technology, 7(02), 171–85.

Ibrahim, Y M, Kaka, A P, Aouad, G and Kagioglou, M (2008) As-built documentation of construction sequence by integrating virtual reality with time-lapse movies. Architectural Engineering and Design Management, 4(02), 73–84.

Idoro, G (2009) Evaluating levels of project planning and their effects on performance in the Nigerian construction industry. Construction Economics and Building, 9(02), 39-50.

Igo, T and Skitmore, M (2006) Diagnosing the organizational culture of an Australian engineering consultancy using the competing values framework. Construction Innovation, 6(02), 121–39.

Ikediashi, D I and Ogwueleka, A C (2016) Assessing the use of ICT systems and their impact on construction project performance in the Nigerian construction industry. Journal of Engineering, Design and Technology, 14(02), 252-76.

Ilter, D and Dikbas, A (2009) An analysis of the key challenges to the widespread use of mediation in the Turkish construction industry. International Journal of Law in the Built Environment, 1(02), 143-55.

Ilter, D, Cakmak, P I, Ustuner, Y A and Tas, E (2016) Toward a research roadmap for construction mediation. International Journal of Law in the Built Environment, 8(02), 176-90.

Imbert, I D C (1990) Human issues affecting construction in developing countries. Construction Management and Economics, 8(02), 219-28.

Inzulza Contardo, J, Boano, C and Wirsching, C (2018) Gentrification in (re)construction: Talca’s neighbourhoods post 2010 earthquake. International Journal of Disaster Resilience in the Built Environment, 9(02), 170–83.

Ioannou, P G (1988) Bidding Models—Symmetry and State of Information. Journal of Construction Engineering and Management, 114(02), 214–32.

Ioannou, P G (1989) Dynamic Probabilistic Decision Processes. Journal of Construction Engineering and Management, 115(02), 237–57.

Ioannou, P G and Liu, L Y (1993) Advanced Construction Technology System—ACTS. Journal of Construction Engineering and Management, 119(02), 288–306.

Irani, Z (2008) Information systems evaluation: what does it mean?. Construction Innovation, 8(02), 88–91.

Irfan, M, Jalil, A, Khan, M and Khan, S (2024) Effects of Welfare Facilities (Amenities for Well-Being) on the Satisfaction of Civil Engineers in Construction Industry. International Journal of Construction Education and Research, 20(02), 197–217.

Irizarry, J, Gheisari, M, Zolfagharian, S and Meadati, P (2013) Human Computer Interaction Modes for Construction Education Applications: Experimenting with Small Format Interactive Displays. International Journal of Construction Education and Research, 9(02), 83-101.

Irizarry, J, Meadati, P, Barham, W S and Akhnoukh, A (2012) Exploring Applications of Building Information Modeling for Enhancing Visualization and Information Access in Engineering and Construction Education Environments. International Journal of Construction Education and Research, 8(02), 119-45.

Isa, R, Emuze, F, Das, D and Awuzie, B O (2018) Modeling a transformational route to infrastructure sustainability in South Africa. Built Environment Project and Asset Management, 8(02), 147–59.

Isaac, S and Navon, R (2008) Feasibility Study of an Automated Tool for Identifying the Implications of Changes in Construction Projects. Journal of Construction Engineering and Management, 134(02), 139–45.

Isik, Z, Arditi, D, Dilmen, I and Birgonul, M T (2010) The role of exogenous factors in the strategic performance of construction companies. Engineering, Construction and Architectural Management, 17(02), 34.

Isikdag, U, Underwood, J, Aouad, G and Trodd, N (2007) Investigating the role of building information models as a part of an integrated data layer: a fire response management case. Architectural Engineering and Design Management, 3(02), 124–42.

Islam, M D M and Faniran, O O (2005) Structural equation model of project planning effectiveness. Construction Management and Economics, 23(02), 215-23.

Islam, M S, Nepal, M P and Skitmore, M (2019) Modified Fuzzy Group Decision-Making Approach to Cost Overrun Risk Assessment of Power Plant Projects. Journal of Construction Engineering and Management, 145(02).

Ismaila, S O and Samuel, T M (2014) Human-centered engineering: the challenges of Nigerian engineer. Journal of Engineering, Design and Technology, 12(02), 195-208.

Iyer, K C and Sagheer, M (2010) Hierarchical Structuring of PPP Risks Using Interpretative Structural Modeling. Journal of Construction Engineering and Management, 136(02), 151–9.

Jaafar, M and Aziz, A R A (2008) Entrepreneurship education in developing country: Exploration on its necessity in the construction programme. Journal of Engineering, Design and Technology, 6(02), 178–89.

Jaafar, M, Nuruddin, A and Abu Bakar, S P (2014) Business success and psychological traits of housing developers. Construction Economics and Building, 14(02), 57-72.

Jaafar, M, Ramayah, T, Abdul-Aziz, A-R and Saad, B (2007) Technology readiness among managers of Malaysian construction firms. Engineering, Construction and Architectural Management, 14(02), 180–91.

Jaafari, A (1984) Criticism of CPM for Project Planning Analysis. Journal of Construction Engineering and Management, 110(02), 222–33.

Jackson, B (2005) The perceptions of experienced construction practitioners regarding ethical transgressions in the construction industry. International Journal of Construction Education and Research, 1(02), 112–28.

Jackson, B J (2005) Design-build education at associated schools of construction undergraduate programs. International Journal of Construction Education and Research, 1(02), 75–88.

Jacomit, A M and Granja, A D (2011) An investigation into the adoption of target costing on Brazilian public social housing projects. Architectural Engineering and Design Management, 7(02), 113–27.

Jafari, A, Valentin, V and Bogus, S M (2019) Identification of Social Sustainability Criteria in Building Energy Retrofit Projects. Journal of Construction Engineering and Management, 145(02).

Jafarzadeh, R, Ingham, J M, Wilkinson, S, González, V and Aghakouchak, A A (2014) Application of Artificial Neural Network Methodology for Predicting Seismic Retrofit Construction Costs. Journal of Construction Engineering and Management, 140(02).

Jane, B (2010) Using banks: the effect of national attitudes to public intervention in mortgage lending and eviction in French and English law. International Journal of Law in the Built Environment, 2(02), 118–37.

Jannadi, M O (1997) An effective safety programme for a concrete product manufacturing plant. Building Research & Information, 25(02), 92–100.

Jannadi, M O (1996) Factors affecting the safety of the construction industry. Building Research & Information, 24(02), 108–12.

Jansson, G, Lundkvist, R and Olofsson, T (2015) The role of experience feedback channels in the continuous development of house-building platforms. Construction Innovation, 15(02), 236-55.

Jarkas, A M (2016) Effect of Buildability on Labor Productivity: A Practical Quantification Approach. Journal of Construction Engineering and Management, 142(02).

Jarkas, A M (2012) Influence of Buildability Factors on Rebar Installation Labor Productivity of Columns. Journal of Construction Engineering and Management, 138(02), 258–67.

Jaselskis, E J and Ashley, D B (1991) Optimal Allocation of Project Management Resources for Achieving Success. Journal of Construction Engineering and Management, 117(02), 321–40.

Jaselskis, E J, Anderson, M R, Jahren, C T, Rodriguez, Y and Njos, S (1995) Radio-Frequency Identification Applications in Construction Industry. Journal of Construction Engineering and Management, 121(02), 189–96.

Javed, N, Thaheem, M J, Bakhtawar, B, Nasir, A R, Khan, K I A and Gabriel, H F (2019) Managing risk in green building projects: toward a dedicated framework. Smart and Sustainable Built Environment, 9(02), 156–73.

Jayaram, S (2010) Design of template to fabricate magnetic torquer coils for nano and picosatellite missions. Journal of Engineering, Design and Technology, 8(02), 158–67.

Jayasena, N S, Mallawaarachchi, H and De Silva, L (2019) Environmental sustainability of facilities management. Built Environment Project and Asset Management, 10(02), 261–76.

Jayasuriya, S, Zhang, G and Jing Yang, R (2019) Challenges in public private partnerships in construction industry. Built Environment Project and Asset Management, 9(02), 172–85.

Jeary, A and Jeary, I (2001) The influence of flooding risk on infrastructure development in western Sydney. Construction Economics and Building, 1(02), 57-64.

Jeffries, M, Gameson, R, Chen, S E and Elliott, T (2001) The Justification and Implementation of Project Alliances - Reflections From the Wandoo B Development. Journal of Construction Procurement, 7(02), 31–41.

Jenny, R J (1983) Compressed Air Use in Soft Ground Tunneling. Journal of Construction Engineering and Management, 109(02), 206–13.

Jens, K and Gregg, J S (2022) Building performances in open and enclosed spaces: a method for balancing operational costs and space utilization with a focus on user needs and satisfaction. Architectural Engineering and Design Management, 18(02), 149–64.

Jensen, D A and Patterson, J E (2011) Janus Head of Liquidated Damages: Does Public Policy Influence United States Courts Regarding Enforceability of a Liquidating Damages Clause?. International Journal of Construction Education and Research, 7(02), 143–56.

Jensen, J O and Gram-Hanssen, K (2008) Ecological modernization of sustainable buildings: a Danish perspective. Building Research & Information, 36(02), 58.

Jensen, W and Fischer, B (2006) Student perspectives on the qualities/behaviors of faculty that contribute most significantly to student learning. International Journal of Construction Education and Research, 2(02), 67-73.

Jensen, W, Fischer, B and Wentz, T (2007) Post-design LEED certification for commercial and residential structures. International Journal of Construction Education and Research, 3(02), 109-21.

Jeong, H S, Abraham, D M and Lew, J J (2004) Evaluation of an Emerging Market in Subsurface Utility Engineering. Journal of Construction Engineering and Management, 130(02), 225–34.

Jergeas, G F and Revay, S O (1993) Quantifying construction claims using the differential cost method. Construction Management and Economics, 11(02), 163-6.

Jia, F, Xiang, P and Chen, D (2022) Prioritizing the Operation and Maintenance Complexity of Mega Transportation Projects Based on Systems Thinking. Journal of Construction Engineering and Management, 148(02).

Jiang, H and Liu, C (2014) Spatial linkages among Australian construction markets. Construction Economics and Building, 14(02), 18-30.

Jiang, H, Lin, P and Qiang, M (2016) Public-Opinion Sentiment Analysis for Large Hydro Projects. Journal of Construction Engineering and Management, 142(02).

Jiang, W and Lu, Y (2017) Influence of initial trust on control from client perspective: Construction industry in China. Engineering, Construction and Architectural Management, 24(02), 326-45.

Jiang, Y and Wu, H (2007) Production rates of highway construction activities. International Journal of Construction Education and Research, 3(02), 81-98.

Jimoh, R and Van Wyk, J (2013) Ideological leaning and praxis of housing co-operatives in South Africa: matters arising. Construction Economics and Building, 13(02), 54-66.

Jin, R, Han, S, Hyun, C and Cha, Y (2016) Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects. Journal of Construction Engineering and Management, 142(02).

Jin, X (2010) Determinants of Efficient Risk Allocation in Privately Financed Public Infrastructure Projects in Australia. Journal of Construction Engineering and Management, 136(02), 138–50.

Jingmond, M and Ågren, R (2015) Unravelling causes of defects in construction. Construction Innovation, 15(02), 198-218.

Joannides, M M, Olbina, S and Issa, R R A (2012) Implementation of Building Information Modeling into Accredited Programs in Architecture and Construction Education. International Journal of Construction Education and Research, 8(02), 83-100.

Johari, S and Jha, K N (2019) Challenges of attracting construction workers to skill development and training programmes. Engineering, Construction and Architectural Management, 27(02), 321–40.

John, S T, Roy, B K, Sarkar, P and Davis, R (2020) IoT Enabled Real-Time Monitoring System for Early-Age Compressive Strength of Concrete. Journal of Construction Engineering and Management, 146(02).

Johnston, D, Farmer, D, Brooke-Peat, M and Miles-Shenton, D (2016) Bridging the domestic building fabric performance gap. Building Research & Information, 44(02), 147-59.

Jolly Cyril, E and Singla, H K (2020) Comparative analysis of profitability of real estate, industrial construction and infrastructure firms: evidence from India. Journal of Financial Management of Property and Construction , 25(02), 273–91.

Joseph, A and Hamilton, D K (2008) The Pebble Projects: coordinated evidence-based case studies. Building Research & Information, 36(02), 45.

Jørgensen, B and Emmitt, S (2009) Investigating the integration of design and construction from a “lean” perspective. Construction Innovation, 9(02), 225–40.

Jr, A C L and Melhado, S B (2014) Scope of design for production of wall partitions. Journal of Engineering, Design and Technology, 12(02), 263-79.

Jukic, D and Carmichael, D G (2016) Emission and cost effects of training for construction equipment operators: A field study. Smart and Sustainable Built Environment, 5(02), 96-110.

Juli, P (2010) Housing discrimination and minorities in European cities: the Catalan Right to Housing Act 2007. International Journal of Law in the Built Environment, 2(02), 138–56.

Julian Sidoli del, C (2011) An investigation into lawyer attitudes towards the use of mediation in commercial property disputes in England and Wales. International Journal of Law in the Built Environment, 3(02), 182–98.

Jumat, A R, Coffey, V and Skitmore, M (2012) Stakeholder service delivery expectations of military facilities management. Built Environment Project and Asset Management, 2(02), 146-66.

Junnonen, J M (1998) Strategy formation in construction firms. Engineering, Construction and Architectural Management, 5(02), 107–14.

Kähkönen, K E E (2015) Role and nature of systemic innovations in construction and real estate sector. Construction Innovation, 15(02), 130-3.

Kaboli, A S and Carmichael, D G (2014) Truck dispatching and minimum emissions earthmoving. Smart and Sustainable Built Environment, 3(02), 170-86.

Kadefors, A (2005) Trust in construction: cognitive traps as obstacles to collaborative contracting strategies. Journal of Construction Procurement, 11(02).

Kadry, M, Osman, H and Georgy, M (2017) Causes of Construction Delays in Countries with High Geopolitical Risks. Journal of Construction Engineering and Management, 143(02).

Kaewsri, N and Tonghong, T (2011) An investigation of women engineers in non-traditional occupations in the Thai construction industry. Construction Economics and Building, 11(02), 1-21.

Kagioglou, M, Cooper, R, Aouad, G F and Sexton, M (2000) Rethinking construction: the generic design and construction process protocol. Engineering, Construction and Architectural Management, 7(02), 141–53.

Kajewski, S L (2005) Multilevel Formwork Load Distribution with Posttensioned Slabs. Journal of Construction Engineering and Management, 131(02), 203–10.

Kaka, A P (1994) Contractors' financial budgeting using computer simulation. Construction Management and Economics, 12(02), 113-24.

Kaka, A P and Boussabaine, A H (1999) Updating techniques for cumulative cost forecasting on construction projects. Journal of Construction Procurement, 5(02), 141–58.

Kakitahi, J M, Alinaitwe, H M, Landin, A and Mone, S J (2016) Impact of construction-related rework on selected Ugandan public projects. Journal of Engineering, Design and Technology, 14(02), 238-51.

Kamal, E M and Flanagan, R (2012) Understanding absorptive capacity in Malaysian small and medium sized (SME) construction companies. Journal of Engineering, Design and Technology, 10(02), 180-98.

Kamardeen, I (2014) Adaptive e-Tutorial for Enhancing Student Learning in Construction Education. International Journal of Construction Education and Research, 10(02), 79-95.

Kaminsky, J (2019) The global influence of national cultural values on construction permitting. Construction Management and Economics, 37(02), 89–100.

Kaminsky, J (2021) Who Are We Talking To? Situating Construction Engineering and Management Knowledge. Journal of Construction Engineering and Management, 147(02).

Kaminsky, J A (2018) National Culture Shapes Private Investment in Transportation Infrastructure Projects around the Globe. Journal of Construction Engineering and Management, 144(02).

Kaminsky, J and Javernick-Will, A (2015) Theorizing the Internal Social Sustainability of Sanitation Organizations. Journal of Construction Engineering and Management, 141(02).

Kang, L S and Paulson, B C (2000) Information Classification for Civil Engineering Projects by Uniclass. Journal of Construction Engineering and Management, 126(02), 158–67.

Kang, S and Seo, J (2013) GIS Method for Haul Road Layout Planning in Large Earthmoving Projects: Framework and Analysis. Journal of Construction Engineering and Management, 139(02), 236–46.

Kangari, R (1988) Business Failure in Construction Industry. Journal of Construction Engineering and Management, 114(02), 172–90.

Kangari, R (1995) Construction Documentation in Arbitration. Journal of Construction Engineering and Management, 121(02), 201–8.

Kangari, R and Riggs, L S (1988) Portfolio management in construction. Construction Management and Economics, 6(02), 161-9.

Kangari, R and Yoshida, T (1989) Prototype Robotics in Construction Industry. Journal of Construction Engineering and Management, 115(02), 284–301.

Kangari, R, Farid, F and Elgharib, H M (1992) Financial Performance Analysis for Construction Industry. Journal of Construction Engineering and Management, 118(02), 349–61.

Kaplanogu, S B and Arditi, D (2009) Pre-project peer reviews in GMP/lump sum contracts. Engineering, Construction and Architectural Management, 16(02), 175–85.

Karan, E, Irizarry, J and Haymaker, J (2015) Generating IFC models from heterogeneous data using semantic web. Construction Innovation, 15(02), 219-35.

Karimi, H, Danesh Ashtiani, H A and Aghanajafi, C (2019) Study of mixed materials heat exchanger using optimization techniques. Journal of Engineering, Design and Technology, 17(02), 414–33.

Karrbom Gustavsson, T, Hallin, A and Dobers, P (2024) Stakeholder involvement in distributed projects: a performative approach to large scale urban sustainable development projects and the case of Stockholm Royal Seaport. Construction Management and Economics, 42(02), 146–61.

Karshenas, S (1989) Truck Capacity Selection for Earthmoving. Journal of Construction Engineering and Management, 115(02), 212–27.

Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(02), 135-46.

Kartam, N A (1997) Integrating Safety and Health Performance into Construction CPM . Journal of Construction Engineering and Management, 123(02), 121–6.

Karunasena, G and Rameezdeen, R (2010) Post-disaster housing reconstruction: Comparative study of donor vs owner-driven approaches. International Journal of Disaster Resilience in the Built Environment, 1(02), 173–91.

Karunasena, G, Rathnayake, R M N U and Senarathne, D (2016) Integrating sustainability concepts and value planning for sustainable construction. Built Environment Project and Asset Management, 6(02), 125-38.

Kasai, S, Li, N and Fang, D (2015) A system-of-systems approach to understanding urbanization – state of the art and prospect. Smart and Sustainable Built Environment, 4(02), 154-71.

Kasapoğlu, E (2014) Leadership Styles in Architectural Design Offices in Turkey. Journal of Construction Engineering and Management, 140(02).

Kashani, H, Ashuri, B, Shahandashti, S M and Lu, J (2015) Investment Valuation Model for Renewable Energy Systems in Buildings. Journal of Construction Engineering and Management, 141(02).

Kashiwagi, D T and Byfield, R (2002) Project MA Case study of potential impact of subjective decision making on construction performance. Journal of Construction Procurement, 8(02), 101–16.

Kashiwagi, D T and Massner, S (2005) Solving the construction craftperson skill shortage problem through construction undergraduate and graduate education. International Journal of Construction Education and Research, 1(02), 89–101.

Kashiwagi, D T and Mayo, R E (2001) Best Value Procurement in Construction Using Artificial Intelligence. Journal of Construction Procurement, 7(02), 42–59.

Kavishe, N, Chileshe, N and Jefferson, I (2019) Public–private partnerships in Tanzanian affordable housing schemes. Built Environment Project and Asset Management, 9(02), 233–47.

Kavishe, N, Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects. Engineering, Construction and Architectural Management, 25(02), 202–40.

Kayan, B A, Forster, A M and Banfill, P F G (2016) Green Maintenance for historic masonry buildings: an option appraisal approach. Smart and Sustainable Built Environment, 5(02), 143-64.

Kazaz, A and Birgonul, M T (2005) Determination of Quality Level in Mass Housing Projects in Turkey. Journal of Construction Engineering and Management, 131(02), 195–202.

Kazmierczak, A and Bichard, E (2010) Investigating homeowners' interest in property-level flood protection. International Journal of Disaster Resilience in the Built Environment, 1(02), 157–72.

Ke, Y, Zhao, X, Wang, Y and Wang, S (2009) SWOT analysis of domestic private enterprises in developing infrastructure projects in China. Journal of Financial Management of Property and Construction, 14(02), 152–70.

Keenan, J M (2018) Seeking an interoperability of disaster resilience and transformative adaptation in humanitarian design. International Journal of Disaster Resilience in the Built Environment, 9(02), 145–52.

Kenley, R (2019) CME Forum: a response to “Construction flow index: a metric of production flow quality in construction”. Construction Management and Economics, 37(02), 112–9.

Kennedy, R and Sidwell, A C (2001) Re-engineering the construction delivery process: The Museum of Tropical Queensland, Townsville – A Case Study. Construction Innovation, 1(02), 77–89.

Kerali, A G and Thomas, T H (2004) Simple durability test for cement stabilized blocks. Building Research & Information, 32(02), 140–5.

Kern, A P and Formoso, C T (2006) A model for integrating cost management and production planning and control in construction firms. Journal of Financial Management of Property and Construction, 11(02), 75–90.

Kestle, L, Potangaroa, R and Storey, B (2011) Integration of lean design and design management and its influence on the development of a multidisciplinary design management model for remote site projects. Architectural Engineering and Design Management, 7(02), 139–53.

Khalaf, A B, Hamam, Y, Alayli, Y and Djouani, K (2013) The effect of maintenance on the survival of medical equipment. Journal of Engineering, Design and Technology, 11(02), 142-57.

Khalili, A and Chua, D K (2014) Integrated Prefabrication Configuration and Component Grouping for Resource Optimization of Precast Production. Journal of Construction Engineering and Management, 140(02).

Khan, M W and Ali, Y (2020) Sustainable construction. Construction Innovation , 20(02), 191–207.

Khanyile, N.S.M, Musonda,I and Agumba, J.N (2019) Evaluating the relationship between communication management practices and project outcomes: a case study of Eswatini (Swaziland) construction industry. Construction Economics and Building, 19(02), 197-219.

Khanzadi, M, Nasirzadeh, F and Dashti, M S (2018) Fuzzy Cognitive Map Approach to Analyze Causes of Change Orders in Construction Projects. Journal of Construction Engineering and Management, 144(02).

Khatib, J M, Chileshe, N and Sloan, S (2007) Antecedents and benefits of 3D and 4D modelling for construction planners. Journal of Engineering, Design and Technology, 5(02), 159–72.

Khorshid, E, Alfadli, A and Falah, A (2018) Application of constraint infeasibility detection methods in engineering design problems. Journal of Engineering, Design and Technology, 16(02), 285–312.

Khosrowshahi, F (1991) Simulation of expenditure patterns of construction projects. Construction Management and Economics, 9(02), 113-32.

Kiatake, M and Petreche, J R D (2012) A case study on the application of the theory of inventive problem solving in architecture. Architectural Engineering and Design Management, 8(02), 90-102.

Kikwasi, G J (2011) An evaluation of construction skills in Tanzania. Engineering, Construction and Architectural Management, 18(02), 127–39.

Kim, C, Kim, H, Ryu, J and Kim, C (2011) Ubiquitous Sensor Network for Construction Material Monitoring. Journal of Construction Engineering and Management, 137(02), 158–65.

Kim, H, Ahn, C R and Yang, K (2017) Identifying Safety Hazards Using Collective Bodily Responses of Workers. Journal of Construction Engineering and Management, 143(02).

Kim, J and Ellis, R D (2010) Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm. Journal of Construction Engineering and Management, 136(02), 160–9.

Kim, J and Irizarry, J (2021) Evaluating the Use of Augmented Reality Technology to Improve Construction Management Student’s Spatial Skills. International Journal of Construction Education and Research, 17(02), 99–116.

Kim, T, Lee, H W and Hong, S (2016) Value Engineering for Roadway Expansion Project over Deep Thick Soft Soils. Journal of Construction Engineering and Management, 142(02).

Kim, W-S, Tam, N M and Jung, D-H (2005) Experimental study on strength of cement stabilized clay. Journal of Engineering, Design and Technology, 3(02), 116–26.

Kim, Y-W and Kim, S-C (2011) Cost analysis of information technology-assisted quality inspection using activity-based costing. Construction Management and Economics, 29(02), 163–72.

King, D, Gurtner, Y, Firdaus, A, Harwood, S and Cottrell, A (2016) Land use planning for disaster risk reduction and climate change adaptation: Operationalizing policy and legislation at local levels. International Journal of Disaster Resilience in the Built Environment, 7(02), 158-72.

Kishk, M, Al-Hajj, A, Pollock, R and Aouad, G F (2003) Effective feedback of whole-life data to the design process. Journal of Financial Management of Property and Construction, 8(02), 89–98.

Kisilewicz, T (2007) Computer simulation in solar architecture design. Architectural Engineering and Design Management, 3(02), 106–23.

Kitschker, A D and Swaffield, L M (2003) Examination of relationships between Egan's key drivers of change and mechanical and electrical contractors' profits. Journal of Financial Management of Property and Construction, 8(02), 99–110.

Kleindienst, S and Andersen, M (2012) Comprehensive annual daylight design through a goal-based approach. Building Research & Information, 40(02), 154-73.

Kocaturk, T (2007) An investigation of the emerging knowledge in digital design from a multidisciplinary perspective. Architectural Engineering and Design Management, 3(02), 93–105.

Koehn, E and Brown, G (1985) Climatic Effects on Construction. Journal of Construction Engineering and Management, 111(02), 129–37.

Koehn, E and Brown, G (1986) International Labor Productivity Factors. Journal of Construction Engineering and Management, 112(02), 299–302.

Koehn, E and Caplan, S B (1987) Work Improvement Data for Small and Medium Size Contractors. Journal of Construction Engineering and Management, 113(02), 327–39.

Koehn, E and Espaillat, C A (1984) Costs and Benefits of MBE Rules in Construction. Journal of Construction Engineering and Management, 110(02), 235–47.

Koehn, E and Musser, K (1983) OSHA Regulations Effects on Construction. Journal of Construction Engineering and Management, 109(02), 233–44.

Kohler, N (2002) The relevance of BEQUEST: an observer's perspective. Building Research & Information, 30(02), 130–8.

Kokkonen, A and Vaagaasar, A L (2018) Managing collaborative space in multi-partner projects. Construction Management and Economics, 36(02), 83-95.

Komendantova, N, Scolobig, A, Garcia-Aristizabal, A, Monfort, D and Fleming, K (2016) Multi-risk approach and urban resilience. International Journal of Disaster Resilience in the Built Environment, 7(02), 114-32.

Kometa, S T, Olomolaiye, P O and Harris, F C (1995) Quantifying client-generated risk by project consultants. Construction Management and Economics, 13(02), 137-47.

Kometa, S T, Olomolaiye, P O and Harris, F C (1996) Validation of the model for evaluating client-generated risk by project consultants. Construction Management and Economics, 14(02), 131-45.

Komolafe, M O, Oyewole, M O and Gbadegesin, J T (2019) Stakeholders’ relevance in sustainable residential property development. Smart and Sustainable Built Environment, 9(02), 112–29.

Kong, F and Dou, D (2021) Resource-Constrained Project Scheduling Problem under Multiple Time Constraints. Journal of Construction Engineering and Management, 147(02).

Konno, Y (2014) An empirical analysis of the exit of SMEs tendering for public works in the Japanese construction industry. Journal of Financial Management of Property and Construction, 19(02), 101-16.

Konno, Y and Itoh, Y (2018) Why do listed companies delist themselves voluntarily?. Journal of Financial Management of Property and Construction, 23(02), 152–69.

Kornakova, M and March, A (2017) The role of citizens in DRR planning exercises: when to inform or consult. International Journal of Disaster Resilience in the Built Environment, 8(02), 209-22.

Korstanje, M (2010) Commentaries on our new ways of perceiving disasters. International Journal of Disaster Resilience in the Built Environment, 1(02), 241–8.

Korstanje, M E (2011) Reconnecting with poverty: new challenges of disaster management. International Journal of Disaster Resilience in the Built Environment, 2(02), 165-77.

Koskela, L and Ballard, G (2006) Should project management be based on theories of economics or production?. Building Research & Information, 34(02), 154–63.

Koskela, L, Ferrantelli, A, Niiranen, J, Pikas, E and Dave, B (2019) Epistemological explanation of lean construction. Journal of Construction Engineering and Management, 145(02), 04018131 .

Koushki, P A and Kartam, N (2004) Impact of construction materials on project time and cost in Kuwait. Engineering, Construction and Architectural Management, 11(02), 126–32.

Kpamma, E Z and Adjei-Kumi, T (2011) Management of waste in the building design process: the Ghanaian consultants' perspective. Architectural Engineering and Design Management, 7(02), 102–12.

Kpamma, Z E, Adjei-Kumi, T, Ayarkwa, J and Adinyira, E (2017) Participatory design, wicked problems, choosing by advantages. Engineering, Construction and Architectural Management, 24(02), 289-307.

Kramer, S W and Dillard, C (2009) Why do American construction professionals choose to work abroad on US embassy projects?. International Journal of Construction Education and Research, 5(02), 95-107.

Kuitert, L, Willems, J and Volker, L (2024) Value integration in multi-functional urban projects: a value driven perspective on sustainability transitions. Construction Management and Economics, 42(02), 182–98.

Kulkarni, S S, Chapman, C, Shah, H and Edwards, D J (2018) A computational design method for bio-mimicked horizontal axis tidal turbines. International Journal of Building Pathology and Adaptation, 36(02), 188–209.

Kumamoto, T, Kameda, H, Hoshiya, M and Ishii, K (1990) Construction of Difficult Dry Dock in Yokohama, Japan. Journal of Construction Engineering and Management, 116(02), 201–20.

Kumaraswamy, M M (1997) Conflicts, claims and disputes in construction. Engineering, Construction and Architectural Management, 4(02), 95–111.

Kumaraswamy, M M and Chan, D W M (1999) Factors facilitating faster construction. Journal of Construction Procurement, 5(02), 88–98.

Kumaraswamy, M M and Dissanayaka, S M (1996) Procurement by objectives. Journal of Construction Procurement, 2(02), 38–51.

Kumaraswamy, M M and Morris, D A (2002) Build-Operate-Transfer-Type Procurement in Asian Megaprojects. Journal of Construction Engineering and Management, 128(02), 93–102.

Kumaraswamy, M M, Ng, S T, Ugwu, O O, Palaneeswaran, E and Rahman, M M (2004) Empowering collaborative decisions in complex construction project scenarios. Engineering, Construction and Architectural Management, 11(02), 133–42.

Kurul, E (2015) Influences of social capital on knowledge creation: An exploration in the UK built environment sector. Architectural Engineering and Design Management, 11(02), 83-104.

Kwak, Y H (2002) Analyzing Asian Infrastructure Development Privatization Market. Journal of Construction Engineering and Management, 128(02), 110–6.

Kwofie, T E, Aigbavboa, C O and Thwala, W D (2019) Measures to improve the adoption of life cycle assessment in the South African construction industry. Journal of Engineering, Design and Technology , 18(02), 480–94.

Kwon, A H C, Then, D and Skitmore, M R (2000) Risk management in Singapore construction joint ventures. Journal of Construction Research, 1(02), 139–49.

Lützkendorf, T and Speer, T M (2005) Alleviating asymmetric information in property markets: building performance and product quality as signals for consumers. Building Research & Information, 33(02), 182–95.

Labib, Y N, Lotfallah, W B, Hanna, A S and Boulos, N W (2021) Development and Application of Performance Index for Comparative Assessment of Public Capital Projects. Journal of Construction Engineering and Management, 147(02).

Lahdenperä, P (1999) Restructuring the building industry for improved performance. Journal of Construction Procurement, 5(02), 118–28.

Lahdenperä, P (2017) Towards a Coherent Theory of Project Alliancing: Discovering the System’s Complex Mechanisms Yielding Value for Money. Construction Economics and Building, 17(02), 41-61.

Lai, C-m and Chiang, C-m (2006) How phase change materials affect thermal performance: hollow bricks. Building Research & Information, 34(02), 118–30.

Laitos, J G and Abel, T M (2013) Sites suitable for mixed use development in Britain and America. International Journal of Law in the Built Environment, 5(02), 137-55.

Lam, K C and Chow, W S (1999) The significance of financial risks in BOT procurement. Building Research & Information, 27(02), 84–95.

Lam, K C, Hu, T, Cheung, S O, Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(02), 130–44.

Lam, K C, Hu, T, Ng, S T, Skitmore, M R and Cheung, S O (2001) A fuzzy neural network approach for contractor prequalification. Construction Management and Economics, 19(02), 175-88.

Lam, K C, Tang, C M and Lee, W C (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23(02), 127-45.

Lam, P T I (2004) An investigation into the use of specifications in procuring construction works. Journal of Construction Procurement, 10(02).

Lam, P T I, Wong, F K W and Wong, F W H (2007) Building features and site-specific factors affecting buildability in Hong Kong. Journal of Engineering, Design and Technology, 5(02), 129–47.

Lam, P T I, Wong, F W H, Chan, A P C, Shea, W C Y and Lau, J W S (2012) A scheme design buildability assessment model for building projects. Construction Innovation, 12(02), 216-38.

Lam, Y T, Alum, J and Neale, R H (1994) Design and development of a KBES for planning and scheduling ready-mixed concrete supply. Construction Management and Economics, 12(02), 165-70.

Lambropoulos, J, Manolopoulos, N and Pantouvakis, J P (1996) SEMANTIC: smart earth moving analysis and estimation of cost. Construction Management and Economics, 14(02), 79-92.

Langdon, R R and Sawang, S (2018) Construction Workers’ Well-Being: What Leads to Depression, Anxiety, and Stress?. Journal of Construction Engineering and Management, 144(02).

Langford, D, Rowlinson, S M and Sawacha, E (2000) Safety behaviour and safety management: its influence on the attitudes of workers in the UK construction industry. Engineering, Construction and Architectural Management, 7(02), 133–40.

Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: an analysis of 30 Melbourne case studies. Construction Management and Economics, 26(02), 147–60.

Lansley, P R (1983) A practical approach to auditing organizational flexibility. Construction Management and Economics, 1(02), 145-56.

Lansley, P R (1987) Corporate strategy and survival in the UK construction industry. Construction Management and Economics, 5(02), 141-55.

Lansley, P R and Quince, T (1981) Organizational responses to a major recession. Construction Papers, 1(02), 5–16.

Larsen, J, K, Lindhard, S, M, Brunoe, T. D and Jensen, KN (2018) The Relation between Pre-planning, Commissioning and Enhanced Project Performance. Construction Economics and Building, 18(02), 1-14.

Larsson, J, Eriksson, P E, Lingegård, S and Järvenpää, A (2022) Innovation outcomes and processes in infrastructure projects – a comparative study of Design-Build and Design-Build-Maintenance contracts. Construction Management and Economics, 40(02), 142–56.

Larsson, N K (2001) iiSBE: the international initiative for sustainable built environment. Building Research & Information, 29(02), 175–7.

Lavy, S and Nixon, J L (2017) Applications, enrolment, attendance, and student performance in rebuilt school facilities: A case study. International Journal of Construction Education and Research, 13(02), 125-41.

Lê, M A T and Brønn, C (2007) Linking experience and learning: application to multi-project building environments. Engineering, Construction and Architectural Management, 14(02), 150–63.

Le, P L, Jarroudi, I, Dao, T and Chaabane, A (2021) Integrated construction supply chain: an optimal decision-making model with third-party logistics partnership. Construction Management and Economics, 39(02), 133–55.

Leaman, A and Bordass, B (2001) Assessing building performance in use 4: technical performance of the Probe buildings. Building Research & Information, 29(02), 129–43.

Leather, P and Rolfe, S (1997) Fit for the task: the future of the small scale domestic repair and maintenance industry in the UK. Construction Management and Economics, 15(02), 201-12.

Lee, A, Kagioglou, M, Cooper, R and Aouad, G F (2000) Production Management: The Process Protocol Approach. Journal of Construction Procurement, 6(02).

Lee, E and Thomas, D K (2007) State-of-Practice Technologies on Accelerated Urban Highway Rehabilitation: I-15 California Experience. Journal of Construction Engineering and Management, 133(02), 105–13.

Lee, J, Blumenstein, M, Guan, H and Loo, Y-C (2013) Minimising uncertainty in long-term prediction of bridge element. Engineering, Construction and Architectural Management, 20(02), 127-42.

Lee, S (2015) Determination of Priority Weights under Multiattribute Decision-Making Situations: AHP versus Fuzzy AHP. Journal of Construction Engineering and Management, 141(02).

Lees, E and Shepherd, E (2015) Incoherence and incompatibility in planning law. International Journal of Law in the Built Environment, 7(02), 111-26.

Lehtiranta, L and Junnonen, J-M (2014) Stretching risk management standards: multi-organizational perspectives. Built Environment Project and Asset Management, 4(02), 128-45.

Lei, Z, Han, S, Bouferguène, A, Taghaddos, H, Hermann, U and Al-Hussein, M (2015) Algorithm for Mobile Crane Walking Path Planning in Congested Industrial Plants. Journal of Construction Engineering and Management, 141(02).

Leiringer, R and Schweber, L (2010) Managing multiple markets: big firms and PFI. Building Research & Information, 38(02), 43.

Leiringer, R, Gottlieb, S C, Fang, Y and Mo, X (2022) In search of sustainable construction: the role of building environmental assessment methods as policies enforcing green building. Construction Management and Economics, 40(02), 104–22.

Leishman, C and Warren, F (2006) Private housing design customization through house type substitution. Construction Management and Economics, 24(02), 149-58.

Lemna, G J, Borcherding, J D and Tucker, R L (1986) Productive Foremen in Industrial Construction. Journal of Construction Engineering and Management, 112(02), 192–210.

Lenard, D (1999) Future challenges in construction management: creating a symbiotic learning environment. Journal of Construction Procurement, 5(02), 197–210.

Lenard, D, Raftery, J and McGeorge, D (1997) Designing a research methodology. Journal of Construction Procurement, 3(02), 19–33.

Lenderink, B, Halman, J I, Boes, H and Voordijk, H (2020) A method to encourage and assess innovations in public tenders for infrastructure and construction projects. Construction Innovation , 20(02), 171–89.

Leopold, E and Bishop, D (1983) Design philosophy and practice in speculative housebuilding: Part 1. Construction Management and Economics, 1(02), 119-44.

Lerche, J, Enevoldsen, P and Seppänen, O (2022) Application of Takt and Kanban to Modular Wind Turbine Construction. Journal of Construction Engineering and Management, 148(02).

Leshinsky, R (2012) Use of planning agreements to support sustainability and environmental preservation: A case study from Victoria, Australia. International Journal of Law in the Built Environment, 4(02), 157-72.

Lessing, J and Brege, S (2018) Industrialized Building Companies’ Business Models: Multiple Case Study of Swedish and North American Companies. Journal of Construction Engineering and Management, 144(02).

Leu, S-S and Hung, T-H (2002) A genetic algorithm-based optimal resource-constrained schedule simulation model. Construction Management and Economics, 20(02), 131-41.

Leung, M-K and Shing, G T-y (1999) The growing mortgage market in China. Journal of Financial Management of Property and Construction, 4(02), 33–48.

Leung, M-Y and Chan, H K L (2007) Antecedents of commitment in construction management. Construction Management and Economics, 25(02), 113–27.

Leung, M-y, Liang, Q and Yu, J (2016) Development of a mindfulness-stress-performance model for construction workers. Construction Management and Economics, 34(02), 110-28.

Leung, M-y, Liu, A M M and Ng, S T (2005) Is there a relationship between construction conflicts and participants' satisfaction?. Engineering, Construction and Architectural Management, 12(02), 149–67.

Leung, M, Bowen, P, Liang, Q and Famakin, I (2015) Development of a Job-Stress Model for Construction Professionals in South Africa and Hong Kong. Journal of Construction Engineering and Management, 141(02).

Leung, M, Chan, Y and Yu, J (2009) Integrated Model for the Stressors and Stresses of Construction Project Managers in Hong Kong. Journal of Construction Engineering and Management, 135(02), 126–34.

Leung, M, Yu, J and Chong, M L A (2016) Effects of Stress and Commitment on the Performance of Construction Estimation Participants in Hong Kong. Journal of Construction Engineering and Management, 142(02).

Leung, M, Zhang, H and Skitmore, M (2008) Effects of Organizational Supports on the Stress of Construction Estimation Participants. Journal of Construction Engineering and Management, 134(02), 84–93.

Leviäkangas, P, Wigan, M and Haapasalo, H (2013) Financial anatomy of E4 Helsinki-Lahti shadow toll PPP-project. Built Environment Project and Asset Management, 3(02), 165-80.

Li, B, Akintoye, A, Edwards, P J and Hardcastle, C (2005) PFI procurement for construction projects in the UK: Findings from a questionnaire survey. Engineering, Construction and Architectural Management, 12(02), 125–48.

Li, F G N, Smith, A Z P, Biddulph, P, Hamilton, I G, Lowe, R, Mavrogianni, A, Oikonomou, E, Raslan, R, Stamp, S, Stone, A, Summerfield, A J, Veitch, D, Gori, V and Oreszczyn, T (2015) Solid-wall U-values: heat flux measurements compared with standard assumptions. Building Research & Information, 43(02), 238-52.

Li, G, Chen, C, Martek, I, Ao, Y and Dai, J (2021) Bid or No-Bid Decision Model for International Construction Projects: Evidential Reasoning Approach. Journal of Construction Engineering and Management, 147(02).

Li, H (1997) Determinants of knowledge-based expert system success in construction engineering. Building Research & Information, 25(02), 101–6.

Li, H (1996) The role of IT manager in construction process re-engineering. Building Research & Information, 24(02), 124–7.

Li, H and Love, P E D (1999) Combining rule-based expert systems and artificial neural networks for mark-up estimation. Construction Management and Economics, 17(02), 169-76.

Li, H, Arditi, D and Wang, Z (2012) Transaction-related issues and construction project performance. Construction Management and Economics, 30(02), 151-64.

Li, H, Chen, Z, Wong, C T C and Love, P E D (2002) A quantitative approach to construction pollution control based on resource levelling. Construction Innovation, 2(02), 71–81.

Li, H, Jin, Z, Li, V, Liu, G and Skitmore, R M (2013) An entry mode decision-making model for the international expansion of construction enterprises. Engineering, Construction and Architectural Management, 20(02), 160-80.

Li, H, Xu, Z and Demeulemeester, E (2015) Scheduling Policies for the Stochastic Resource Leveling Problem. Journal of Construction Engineering and Management, 141(02).

Li, P, Wang, Q, Guo, Z, Mei, T, Li, Q, Qiao, S and Zuo, W (2022) Identifying Falling-from-Height Hazards in Building Information Models: A Voxelization-Based Method. Journal of Construction Engineering and Management, 148(02).

Li, X, Lu, W, Xue, F, Wu, L, Zhao, R, Lou, J and Xu, J (2022) Blockchain-Enabled IoT-BIM Platform for Supply Chain Management in Modular Construction. Journal of Construction Engineering and Management, 148(02).

Li, X, Wang, X and Lei, L (2019) The application of an ANP-Fuzzy comprehensive evaluation model to assess lean construction management performance. Engineering, Construction and Architectural Management, 27(02), 356–84.

Lian, J K and Ling, F Y (2018) The influence of personal characteristics on quantity surveyors’ job satisfaction. Built Environment Project and Asset Management, 8(02), 183–93.

Liang, L Y, Thompson, R G and Young, D M (2004) Optimizing the design of sewer networks using genetic algorithms and tabu search. Engineering, Construction and Architectural Management, 11(02), 101–12.

Liang, R, Zhang, J, Wu, C, Sheng, Z and Wang, X (2019) Joint-Venture Contractor Selection Using Competitive and Collaborative Criteria with Uncertainty. Journal of Construction Engineering and Management, 145(02).

Liao, C (2015) Optimal Inspection Strategies for Labor Inspection in the Construction Industry. Journal of Construction Engineering and Management, 141(02).

Liberatore, M J, Pollack-Johnson, B and Smith, C A (2001) Project Management in Construction: Software Use and Research Directions. Journal of Construction Engineering and Management, 127(02), 101–7.

Lim, T (2009) Essence of time in construction contracts. Construction Economics and Building, 9(02), 1-6.

Lim, T, Park, S, Lee, H and Lee, D (2016) Artificial Neural Network–Based Slip-Trip Classifier Using Smart Sensor for Construction Workplace. Journal of Construction Engineering and Management, 142(02).

Limsila, K and Ogunlana, S O (2008) Performance and leadership outcome correlates of leadership styles and subordinate commitment. Engineering, Construction and Architectural Management, 15(02), 164–84.

Lin, C, Chiang, W, Weng, Y and Wu, H (2023) Assessing the anthropogenic carbon emission of wooden construction: an LCA study. Building Research & Information, 51(02), 138–57.

Lin, Y-H, Lee, P-C and Chang, T-P (2008) Integrating grey number and Minkowski distance function into grey relational analysis technique to improve the decision quality under uncertain information. Construction Management and Economics, 26(02), 115–23.

Lindqvist, S (2012) The concept of transparency in the European Union's residential housing market: A theoretical framework. International Journal of Law in the Built Environment, 4(02), 99-115.

Lines, B C and Smithwick, J B (2019) Best practices for organizational change management within electrical contractors. International Journal of Construction Education and Research, 15(02), 136–59.

Lines, B C, Perrenoud, A, Sullivan, K T and Smithwick, J (2015) Implementing new project delivery strategies: Development of a web-based multimedia tool to support owner project team training. International Journal of Construction Education and Research, 11(02), 140-60.

Lines, B C, Sullivan, K T and Wiezel, A (2016) Support for Organizational Change: Change-Readiness Outcomes among AEC Project Teams. Journal of Construction Engineering and Management, 142(02).

Ling, F Y Y (2004) Key determinants of performance of design-bid-build projects in Singapore. Building Research & Information, 32(02), 128–39.

Ling, F Y Y and Hien, M B T (2014) Boosting project outcomes through goal alignment: a case study of Vietnam. Construction Economics and Building, 14(02), 73-86.

Ling, F Y Y and Lee, S Y (2012) Careers development in construction firms: application of Sun Tzu's Art of War principles. Engineering, Construction and Architectural Management, 19(02), 173-91.

Ling, F Y Y and Ng, W T (2011) Boosting performance of road infrastructure: A case study based on motorist satisfaction in Singapore. Built Environment Project and Asset Management, 1(02), 211-25.

Ling, F Y Y, Tan, P C, Ning, Y, Teo, A and Gunawansa, A (2015) Effect of adoption of relational contracting practices on relationship quality in public projects in Singapore. Engineering, Construction and Architectural Management, 22(02), 169-89.

Ling, F Y, Ibbs, C W and Hoo, W Y (2006) Determinants of International Architectural, Engineering, and Construction Firms’ Project Success in China. Journal of Construction Engineering and Management, 132(02), 206–14.

Ling, Y Y (2000) A theoretical framework for selection of consultants by design-build contractors. Journal of Construction Procurement, 6(02).

Ling, Y Y, Khee, H Y and Lim, K S G (2000) The reasons why clients prefer to procure more projects based on design-bid-build than design-and-build. Journal of Construction Procurement, 6(02).

Lingard, H (2004) Work and Family Sources of Burnout in the Australian Engineering Profession: Comparison of Respondents in Dual- and Single-Earner Couples, Parents, and Nonparents. Journal of Construction Engineering and Management, 130(02), 290–8.

Lingard, H and Francis, V (2006) Does a supportive work environment moderate the relationship between work-family conflict and burnout among construction professionals?. Construction Management and Economics, 24(02), 185-96.

Lingard, H and Holmes, N (2001) Understandings of occupational health and safety risk control in small business construction firms: barriers to implementing technological controls. Construction Management and Economics, 19(02), 217-26.

Lingard, H and Lin, J (2003) Managing motherhood in the Australian construction industry: work-family balance, parental leave and part-time work. Construction Economics and Building, 3(02), 15-24.

Lingard, H, Cooke, T and Blismas, N (2011) Coworkers' response to occupational health and safety: an overlooked dimension of group-level safety climate in the construction industry?. Engineering, Construction and Architectural Management, 18(02), 159–75.

Lingard, H, Cooke, T and Blismas, N (2012) Do Perceptions of Supervisors’ Safety Responses Mediate the Relationship between Perceptions of the Organizational Safety Climate and Incident Rates in the Construction Supply Chain?. Journal of Construction Engineering and Management, 138(02), 234–41.

Lingard, H, Hughes, W and Chinyio, E (1998) The impact of contractor selection method on transaction costs: a review. Journal of Construction Procurement, 4(02), 89–102.

Linner, T and Bock, T (2012) Evolution of large-scale industrialisation and service innovation in Japanese prefabrication industry. Construction Innovation, 12(02), 156-78.

Liow, K H (1999) Corporate real estate in financial statements: evidence from Singapore hotel corporations. Journal of Financial Management of Property and Construction, 4(02), 63–80.

Liow, K H (2002) Corporate real estate in financial statements: The accounting perspective. Journal of Financial Management of Property and Construction, 7(02), 91–6.

Liow, K H, Leong, J O T, Ebrahim, M S and Brown, G R (2001) Performance measurement in corporate real estate: issues, evidence and research agenda. Journal of Financial Management of Property and Construction, 6(02), 71–9.

Liu, A M M, Fellows, R and Tuuli, M M (2011) The role of corporate citizenship values in promoting corporate social performance: towards a conceptual model and a research agenda. Construction Management and Economics, 29(02), 173–83.

Liu, A M-M (1999) A research model of project complexity and goal commitment effects on project outcome. Engineering, Construction and Architectural Management, 6(02), 105–11.

Liu, A M-M (2003) The quest for quality in public housing projects: a behaviour to outcome paradigm. Construction Management and Economics, 21(02), 147-58.

Liu, A M-M and Walker, A (1998) Evaluation of project outcomes. Construction Management and Economics, 16(02), 209-19.

Liu, A, Hodgson, G and Lord, W (2010) Innovation in construction education: the role of culture in e-learning. Architectural Engineering and Design Management, 6(02), 91–102.

Liu, C and Song, Y (2005) Multifactor productivity measures of construction sectors using oecd input-output database. Journal of Construction Research, 6(02), 209–22.

Liu, C, Lyle, B and Langston, C (2003) Estimating demolition costs for single residential buildings. Construction Economics and Building, 3(02), 33-42.

Liu, J, Lin, S and Feng, Y (2018) Understanding why Chinese contractors are not willing to purchase construction insurance. Engineering, Construction and Architectural Management, 25(02), 257–72.

Liu, J, Olsen, D A and Hein, M F (2011) Enhancing Construction Education Using an Online Multimedia Collection. International Journal of Construction Education and Research, 7(02), 85–108.

Liu, K, Su, Y, Pollack, J, Liang, H and Zhang, S (2022) Explaining the Formation Mechanism of Intrateam Knowledge Exchange Network in Offsite Construction Projects: A Social Cognitive Perspective. Journal of Construction Engineering and Management, 148(02).

Liu, Q, Feng, Y, London, K and Zhang, P (2023) Influence of personal characteristics and environmental stressors on mental health for multicultural construction workplaces in Australia. Construction Management and Economics, 41(02), 116–37.

Liu, T and Wilkinson, S (2013) Can the pilot public-private partnerships project be applied in future urban rail development?: A case study of Beijing Metro Line 4 project. Built Environment Project and Asset Management, 3(02), 250-63.

Liu, T and Wilkinson, S (2014) Using public-private partnerships for the building and management of school assets and services. Engineering, Construction and Architectural Management, 21(02), 206-23.

Liu, X, Chen, W and Bowman, M D (1986) Shore‐Slab Interaction in Concrete Buildings. Journal of Construction Engineering and Management, 112(02), 227–44.

Liu, Y and Yeh, I (2016) Building Valuation Model of Enterprise Values for Construction Enterprise with Quantile Neural Networks. Journal of Construction Engineering and Management, 142(02).

Liu, Y, Zhao, J, Dimitrov, V, Irish, A, Jones, C, Kirk, S, Thomas, J and Welter, D (2010) An entertaining robot prototype for pets. Journal of Engineering, Design and Technology, 8(02), 189–205.

Lizarralde, G and Root, D (2008) The informal construction sector and the inefficiency of low cost housing markets. Construction Management and Economics, 26(02), 103–13.

Lobo, Y and Wilkinson, S (2006) The effects of occupational licensing on skills needs in the building industry: evidence from New Zealand. Construction Economics and Building, 6(02), 55-63.

Loffler, M (1997) Foamglass as spacer in multiple-glazing. Building Research & Information, 25(02), 107–10.

Logcher, R D, Wang, M and Chen, F H (1989) Knowledge Processing for Construction Management Data Base. Journal of Construction Engineering and Management, 115(02), 196–211.

Lombardi, P (1997) Decision making in urban regeneration plans. Engineering, Construction and Architectural Management, 4(02), 127–42.

London, K (2010) Multi-market industrial organizational economic models for the internationalization process by small and medium enterprise construction design service firms. Architectural Engineering and Design Management, 6(02), 132–52.

Loosemore, M (1999) Bargaining tactics in construction disputes. Construction Management and Economics, 17(02), 177-88.

Loosemore, M (1994) Dealing with unexpected problems-do contracts help? A comparison of the NEC and JCT 80 forms. Engineering, Construction and Architectural Management, 1(02), 115–37.

Loosemore, M (2003) Impediments to reform in the Australian building and construction industry. Construction Economics and Building, 3(02), 1-8.

Loosemore, M and Galea, N (2008) Genderlect and conflict in the Australian construction industry. Construction Management and Economics, 26(02), 125–35.

Loosemore, M and Hughes, K (1998) Emergency systems in construction contracts. Engineering, Construction and Architectural Management, 5(02), 189–98.

Loosemore, M and Lim, B T H (2018) Mapping corporate social responsibility strategies in the construction and engineering industry. Construction Management and Economics, 36(02), 67-82.

Loosemore, M and Teo, M (2002) The crisis management practices of Australian construction companies. Construction Economics and Building, 2(02), 15-26.

Loosemore, M, Phua, F, Dunn, K and Ozguc, U (2010) Operatives’ experiences of cultural diversity on Australian construction sites. Construction Management and Economics, 28(02), 88.

Lopez del Puerto, C, Clevenger, C M, Boremann, K and Gilkey, D P (2014) Exploratory Study to Identify Perceptions of Safety and Risk among Residential Latino Construction Workers as Distinct from Commercial and Heavy Civil Construction Workers. Journal of Construction Engineering and Management, 140(02).

Loudoun, R and Townsend, K (2017) Implementing health promotion programs in the Australian construction industry: Levers and agents for change. Engineering, Construction and Architectural Management, 24(02), 260-74.

Love, P E D and Li, H (2000) Overcoming the problems associated with quality certification. Construction Management and Economics, 18(02), 139-49.

Love, P E D, Davis, P R, Chevis, R and Edwards, D J (2011) Risk/Reward Compensation Model for Civil Engineering Infrastructure Alliance Projects. Journal of Construction Engineering and Management, 137(02), 127–36.

Love, P E D, Huang, J C, Edwards, D J and Irani, Z (2004) Nurturing a learning organization in construction: a focus on strategic shift, organizational transformation, customer orientation and quality centered learning. Construction Innovation, 4(02), 113–26.

Love, P E D, Skitmore, M R and Earl, G (1998) Selecting a suitable procurement method for a building project. Construction Management and Economics, 16(02), 221-33.

Love, P E D, Smith, J, Treloar, G J and Li, H (2000) Some empirical observations of service quality in construction. Engineering, Construction and Architectural Management, 7(02), 191–201.

Love, P E D, Teo, P and Morrison, J (2018) Revisiting Quality Failure Costs in Construction. Journal of Construction Engineering and Management, 144(02).

Love, P E D, Tse, R Y C and Edwards, D J (2005) Time–Cost Relationships in Australian Building Construction Projects. Journal of Construction Engineering and Management, 131(02), 187–94.

Love, P E D, Tse, R Y C, Holt, G D and Proverbs, D G (2002) Transaction Costs, Learning, and Alliances. Journal of Construction Research, 3(02), 193–207.

Love, P E D, Veli, S, Davis, P, Teo, P and Morrison, J (2017) {[}See the Difference{]} in a Precast Facility: Changing Mindsets with an Experiential Safety Program. Journal of Construction Engineering and Management, 143(02).

Low S P (1994) Balancing construction and marketing in world economic development: the four global scenarios. Construction Management and Economics, 12(02), 171-82.

Lowe, D (2003) The development of early stage design cost estimating expertise: effective feedback and systematic reflection for quantity surveyors. Journal of Financial Management of Property and Construction, 8(02), 79–88.

Lowe, J G (1983) Control of direct labour: a critical review. Construction Papers, 2(02), 53–60.

Lowe, J G (1996) Technological change and construction. Journal of Financial Management of Property and Construction, 1(02), 65–94.

Lowe, J G (1987) The measurement of productivity in the construction industry. Construction Management and Economics, 5(02), 101-13.

Lu, M and Anson, M (2004) Establish Concrete Placing Rates Using Quality Control Records from Hong Kong Building Construction Projects. Journal of Construction Engineering and Management, 130(02), 216–24.

Lu, S-L and Sexton, M (2010) Career journeys and turning points of senior female managers in small construction firms. Construction Management and Economics, 28(02), 39.

Lu, W, Peng, Y, Shen, Q and Li, H (2013) Generic Model for Measuring Benefits of BIM as a Learning Tool in Construction Tasks. Journal of Construction Engineering and Management, 139(02), 195–203.

Lu, W, Ye, K, Flanagan, R and Jewell, C (2014) Nexus between Contracting and Construction Professional Service Businesses: Empirical Evidence from International Market. Journal of Construction Engineering and Management, 140(02).

Lu, W, Zhang, L and Li, Z (2015) Influence of Negotiation Risk Attitude and Power on Behaviors and Outcomes When Negotiating Construction Claims. Journal of Construction Engineering and Management, 141(02).

Lu, X and Davis, S (2018) Priming effects on safety decisions in a virtual construction simulator. Engineering, Construction and Architectural Management, 25(02), 273–94.

Luck, R (2015) Organising design in the wild: locating multidisciplinarity as a way of working. Architectural Engineering and Design Management, 11(02), 149-62.

Lucke, T and Beecham, S (2010) Capacity loss in siphonic roof drainage systems due to aeration. Building Research & Information, 38(02), 17.

Luiten, G T & and Tolman, F P (1997) Automating Communication in Civil Engineering . Journal of Construction Engineering and Management, 123(02), 113–20.

Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(02), 127–36.

Luke, B (2011) Judges, child trespassers and occupiers' liability. International Journal of Law in the Built Environment, 3(02), 126–45.

Lukhele, T, Botha, B and Mbanga, S (2021) Exploring project complexity relations to scope changes in construction projects: A case study of NEC projects in South Africa. Construction Economics and Building, 21(02), 18-33.

Lukito, J A, Susilawati, C and Goonetilleke, A (2019) Climate change adaptation in the management of public buildings: an Indonesian context. International Journal of Building Pathology and Adaptation, 37(02), 140–62.

Lundgren, M S (2016) Energy and architectural consequences of Swedish building code. Smart and Sustainable Built Environment, 5(02), 125-42.

Lutz, J D and Hijazi, A (1993) Planning repetitive construction: current practice. Construction Management and Economics, 11(02), 99-110.

Lutz, J D, Chang, L and Napier, T R (1990) Evaluation of New Building Technology. Journal of Construction Engineering and Management, 116(02), 281–99.

Luu, D and Sher, W (2006) Construction tender subcontract selection using case-based reasoning. Construction Economics and Building, 6(02), 32-43.

Mándoki, R and Orr, J (2023) The social acceptance of mass produced residential buildings among Hungarian young adults. Architectural Engineering and Design Management, 19(02), 148–62.

Ma, H, Zeng, S, Lin, H and Zeng, R (2020) Impact of Public Sector on Sustainability of Public–Private Partnership Projects. Journal of Construction Engineering and Management, 146(02).

Ma, X, Chan, A P C, Li, Y, Zhang, B and Xiong, F (2020) Critical Strategies for Enhancing BIM Implementation in AEC Projects: Perspectives from Chinese Practitioners. Journal of Construction Engineering and Management, 146(02).

MacDonald, J and Mills, J (2013) An IPD approach to construction education. Construction Economics and Building, 13(02), 93-103.

Machika, P (2007) Access to success: The value of bridging programmes in engineering at the University of Johannesburg. Journal of Engineering, Design and Technology, 5(02), 120–8.

MacKee, J, Askland, H H and Askew, L (2014) Recovering cultural built heritage after natural disasters: A resilience perspective. International Journal of Disaster Resilience in the Built Environment, 5(02), 202-12.

MacSporran, C and Tucker, S N (1996) Target budget levels for building operating costs. Construction Management and Economics, 14(02), 103-19.

Madhlopa, A (2016) Effect of controlling airflow in a solar chimney on thermal load in a built environment. Journal of Engineering, Design and Technology, 14(02), 286-309.

Madritsch, T and Ebinger, M (2011) A management framework for the built environment: BEM2/BEM3. Built Environment Project and Asset Management, 1(02), 111-21.

Maghrebi, M, Shamsoddini, A and Waller, S T (2016) Fusion-based learning approach for predicting concrete pouring productivity based on construction and supply parameters. Construction Innovation, 16(02), 185-202.

Mah, D, Manrique, J D, Yu, H, Al-Hussein, M and Nasseri, R (2011) House construction CO2 footprint quantification: a BIM approach. Construction Innovation, 11(02), 161–78.

Mahadkar, S, Mills, G and Price, A D F (2012) Stakeholder consultation practices within healthcare infrastructure planning: A conceptual approach to strategic asset management. Built Environment Project and Asset Management, 2(02), 127-45.

Mahamadu, A, Mahdjoubi, L, Booth, C, Manu, P and Manu, E (2019) Building information modelling (BIM) capability and delivery success on construction projects. Construction Innovation, 19(02), 170–92.

Mahamid, I (2017) Analysis of schedule deviations in road construction projects and the effects of project physical characteristics. Journal of Financial Management of Property and Construction, 22(02), 192-210.

Mahamid, I (2013) Common risks affecting time overrun in road construction projects in Palestine: contractors’ perspective. Construction Economics and Building, 13(02), 45-53.

Mahato, B K and Ogunlana, S O (2011) Conflict dynamics in a dam construction project: a case study. Built Environment Project and Asset Management, 1(02), 176-94.

Mahdavinejad, M, Bemanian, M, Abolvardi, G and Elhamian, S M (2012) Analysing the state of seismic consideration of architectural non-structural components (ANSCs) in design process (based on IBC). International Journal of Disaster Resilience in the Built Environment, 3(02), 133-47.

Mahmoud, A S, Sanni-Anibire, M O and Hassanain, M A (2017) Performance-based fire safety evacuation of an auditorium facility using a theoretical calculation method. International Journal of Building Pathology and Adaptation, 35(02), 124–38.

Mahmoud, A S, Sanni-Anibire, M O, Hassanain, M A and Ahmed, W (2019) Key performance indicators for the evaluation of academic and research laboratory facilities. International Journal of Building Pathology and Adaptation, 37(02), 208–30.

Mak, S and Picken, D (2000) Using Risk Analysis to Determine Construction Project Contingencies. Journal of Construction Engineering and Management, 126(02), 130–6.

Mak, S W K, Choy, L H T and Ho, W K O (2008) Hedonic models, internet-based technologies, and the provision of online property appraisal. Construction Innovation, 8(02), 92–105.

Male, S (1990) Professional authority, power and emerging forms of 'profession' in quantity surveying. Construction Management and Economics, 8(02), 191-204.

Malla, V and Delhi, V S K (2022) Determining interconnectedness of barriers to interface management in large construction projects. Construction Economics and Building, 22(02), 69-101.

Maloney, W F (2003) Labor-Management Cooperation and Customer Satisfaction. Journal of Construction Engineering and Management, 129(02), 165–72.

Maloney, W F and Jones, T W (1984) Labor‐Management Cooperation: Operation MOST. Journal of Construction Engineering and Management, 110(02), 205–21.

Maloney, W F and McFillen, J M (1987) Motivational Impact of Work Crews. Journal of Construction Engineering and Management, 113(02), 208–21.

Maloney, W F and McFillen, J M (1983) Research Needs in Construction Worker Performance. Journal of Construction Engineering and Management, 109(02), 245–54.

Manda Putra, R, Muhammad Tang, U, Ikhwan Siregar, Y and Thamrin (2018) Sustainability analysis of the management of Lake Baru in Buluh Cina Village, Indonesia. Smart and Sustainable Built Environment, 7(02), 182–211.

Mandal, S (2017) An empirical competence-capability model of supply chain resilience. International Journal of Disaster Resilience in the Built Environment, 8(02), 190-208.

Mañelele, I and Muya, M (2008) Risk identification on community-based construction projects in Zambia. Journal of Engineering, Design and Technology, 6(02), 145–61.

Manewa, A, Siriwardena, M, Ross, A and Madanayake, U (2016) Adaptable buildings for sustainable built environment. Built Environment Project and Asset Management, 6(02), 139-58.

Mangioni, V (2019) Value capture taxation: alternate sources of revenue for Sub-Central government in Australia. Journal of Financial Management of Property and Construction , 24(02), 200–16.

Manivannan, J, Loganathan, S, J, K T and Kalidindi, S N (2022) Investigating the relationship between occupational stress and work-life balance among Indian construction professionals. Construction Economics and Building, 22(02), 27-51.

Mannakkara, S and Wilkinson, S J (2015) Supporting post-disaster social recovery to build back better. International Journal of Disaster Resilience in the Built Environment, 6(02), 126-39.

Manoliadis, O, Tsolas, I and Nakou, A (2006) Sustainable construction and drivers of change in Greece: a Delphi study. Construction Management and Economics, 24(02), 113-20.

Manthe, M and Smallwood, J (2007) The appropriateness of built environment tertiary education: Perspectives of academics and postgraduate students. Journal of Engineering, Design and Technology, 5(02), 102–19.

Maqsoom, A and Charoenngam, C (2014) Motives and competitive assets of Pakistani international construction contracting firms: Impact of size and international experience. Journal of Financial Management of Property and Construction, 19(02), 138-51.

Marasini, R and Dawood, N (2006) Innovative managerial control system (IMCS): an application in precast concrete building products industry. Construction Innovation, 6(02), 97–120.

Maree, C (2011) Comparative analysis of some aspects of assessment of damages for contractual breaches in England and Wales, Australia and New Zealand. International Journal of Law in the Built Environment, 3(02), 113–25.

Marinelli, M (2019) Evaluation of PPP road projects in Greece. Built Environment Project and Asset Management, 9(02), 186–98.

Marinelli, M and Salopek, M (2019) Joint risk management and collaborative ethos. Journal of Engineering, Design and Technology , 18(02), 343–61.

Marsh, R (2017) Building lifespan: effect on the environmental impact of building components in a Danish perspective. Architectural Engineering and Design Management, 13(02), 80–100.

Marshall, H E (1985) A graphical approach to discount payback. Construction Management and Economics, 3(02), 105-20.

Martínez-Carricondo, P, Carvajal-Ramírez, F, Yero-Paneque, L and Agüera-Vega, F (2020) Combination of nadiral and oblique UAV photogrammetry and HBIM for the virtual reconstruction of cultural heritage. Case study of Cortijo del Fraile in Níjar, Almería (Spain). Building Research & Information, 48(02), 140–59.

Martin, H and Lewis, T M (2014) Pinpointing Safety Leadership Factors for Safe Construction Sites in Trinidad and Tobago. Journal of Construction Engineering and Management, 140(02).

Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(02), 133–48.

Marzouk, M and Moselhi, O (2003) A decision support tool for construction bidding. Construction Innovation, 3(02), 111–24.

Marzouk, M and Moselhi, O (2003) Object-oriented Simulation Model for Earthmoving Operations. Journal of Construction Engineering and Management, 129(02), 173–81.

Mastrandrea, F (1986) The liability of the construction project manager. Construction Management and Economics, 4(02), 105-34.

Masurier, J L, Blockley, D and Wood, D M (2000) Management of value and uncertainty in construction projects. Journal of Construction Research, 1(02), 123–9.

Mathews, M (2013) BIM collaboration in student architectural technologist learning. Journal of Engineering, Design and Technology, 11(02), 190-206.

Matzenberger, J, Hargreaves, N, Raha, D and Dias, P (2015) A novel approach to assess resilience of energy systems. International Journal of Disaster Resilience in the Built Environment, 6(02), 168-81.

Mawdesley, M J, Askew, W H and Al-Jibouri, S H (2004) Site layout for earthworks in road projects. Engineering, Construction and Architectural Management, 11(02), 83–9.

Maxwell, D A, Back, W E and Toon, J (1998) Optimization of Crew Configurations Using Activity-Based Costing. Journal of Construction Engineering and Management, 124(02), 162–8.

Mayer, Z and Kazakidis, V (2007) Decision Making in Flexible Mine Production System Design Using Real Options. Journal of Construction Engineering and Management, 133(02), 169–80.

McCabe, S (1997) Using suitable tools for researching what quality managers in construction organizations actually do. Journal of Construction Procurement, 3(02), 72–87.

McCandless, D W, Bruce, R D and Gebken, R J (2010) Retention of construction teachers in secondary education. International Journal of Construction Education and Research, 6(02), 104–21.

McCarthy, S F (2012) Developing an Australian code of construction ethics. Construction Economics and Building, 12(02), 87-100.

McCluskey, W J, Zulkarnain, D D and Kamarudin, N (2014) Boosted regression trees: An application for the mass appraisal of residential property in Malaysia. Journal of Financial Management of Property and Construction, 19(02), 152-67.

McCord, J, McCord, M, McCluskey, W, Davis, P T, McIlhatton, D and Haran, M (2014) Effect of public green space on residential property values in Belfast metropolitan area. Journal of Financial Management of Property and Construction, 19(02), 117-37.

McCord, M (2020) An exploratory investigation into the relationship between energy performance certificates and sales price: a polytomous universal model approach. Journal of Financial Management of Property and Construction , 25(02), 247–71.

McCord, P J and Gunderson, D E (2014) Factors that Most Affect Relationships with General Contractors on Commercial Construction Projects: Pacific Northwest Subcontractor Perspectives. International Journal of Construction Education and Research, 10(02), 126-39.

McCormack, M, Treloar, G J, Palmowski, L and Crawford, R (2007) Modelling direct and indirect water requirements of construction. Building Research & Information, 35(02), 156–62.

McCowan, A and Mohamed, S (2002) A classification of decision support systems (DSSs) for the Analysis and evaluation of concession project investments (CPIs). Journal of Financial Management of Property and Construction, 7(02), 127–37.

McCowan, A K and Mohamed, S (2007) Decision Support System to Evaluate and Compare Concession Options. Journal of Construction Engineering and Management, 133(02), 114–23.

McCoy, A P, Thabet, W and Badinelli, R (2008) Towards establishing a domain specific commercialization model for innovation in residential construction. Construction Innovation, 8(02), 137–55.

McCullouch, B G and Gunn, P (1993) Construction Field Data Acquisition with Pen‐Based Computers. Journal of Construction Engineering and Management, 119(02), 374–84.

McDermott, P and Khalfan, M (2006) Achieving supply chain integration within construction industry. Construction Economics and Building, 6(02), 44-54.

McDermott, P and Quinn, B (1995) Latham causes conflict: institutional development in the UK construction industry. Journal of Construction Procurement, 1(02), 150–64.

Mcdougall, J A and Swaffield, J A (2007) Transport of deformable solids within building drainage networks. Building Research & Information, 35(02), 220–32.

McFarland, A E (2010) An end user approach to teaching specifications. International Journal of Construction Education and Research, 6(02), 83–103.

McGee, S, Frittman, J, Ahn, S J and Murray, S (2016) Implications of cascading effects for the Hyogo Framework. International Journal of Disaster Resilience in the Built Environment, 7(02), 144-57.

McGuffin, A A and Obonyo, E (2010) Enhancing performance: a case study of the effects of employee coaching in construction practice. Construction Management and Economics, 28(02), 9.

McKim, R, Hegazy, T and Attalla, M (2000) Project Performance Control in Reconstruction Projects. Journal of Construction Engineering and Management, 126(02), 137–41.

McLaughlin, P (2003) Peer assessment for construction management and quantity surveying students. Construction Economics and Building, 3(02), 43-49.

Meacham, B, Bowen, R, Traw, J and Moore, A (2005) Performance-based building regulation: current situation and future needs. Building Research & Information, 33(02), 91–106.

Medjdoub, B and Chenini, M B (2015) A constraint-based parametric model to support building services design exploration. Architectural Engineering and Design Management, 11(02), 123-36.

Megahed, N A (2017) Understanding kinetic architecture: typology, classification, and design strategy. Architectural Engineering and Design Management, 13(02), 130–46.

Meijer, F and Visscher, H (2017) Quality control of constructions: European trends and developments. International Journal of Law in the Built Environment, 9(02), 143-61.

Meiling, J, Backlund, F and Johnsson, H (2012) Managing for continuous improvement in off-site construction: Evaluation of lean management principles. Engineering, Construction and Architectural Management, 19(02), 141-58.

Meistad, T (2014) How energy efficient office buildings challenge and contribute to usability. Smart and Sustainable Built Environment, 3(02), 110-31.

Mellado, F, Lou, E C and Becerra, C L C (2019) Synthesising performance in the construction industry. Engineering, Construction and Architectural Management, 27(02), 579–608.

Mellado, F, Wong, P F, Amano, K, Johnson, C and Lou, E C W (2020) Digitisation of existing buildings to support building assessment schemes: viability of automated sustainability-led design scan-to-BIM process. Architectural Engineering and Design Management, 16(02), 84–99.

Mellal, L and Djebabra, M (2015) Contribution of cost-benefit analysis to optimization of eco-design plants. Journal of Engineering, Design and Technology, 13(02), 334-46.

Memarian, B, Brooks, S B and Le, J C (2023) Obstacles and Solutions to Implementing Job Hazard Analysis in Construction: A Case Study. International Journal of Construction Education and Research, 19(02), 187–98.

Memon, Z A, Abd.Majid, M Z and Mustaffar, M (2007) A systematic procedure for developing the 3D model to evaluate the construction project progress. Construction Innovation, 7(02), 187–99.

Menches, C L and Chen, J (2013) Using ecological momentary assessment to understand a construction worker's daily disruptions and decisions. Construction Management and Economics, 31(02), 180-94.

Mezher, T (2011) Building future sustainable cities: the need for a new mindset. Construction Innovation, 11(02), 136–41.

Mezher, T, Abdul-Malak, M A, Arnaout, S and Bassil, Z (2004) Public Project Programming System (3PS): a decision support system for public sector investment. Construction Innovation, 4(02), 99–111.

Michail, S and David, J L (2011) Elemental cost estimating: current UK practice and procedure. Journal of Financial Management of Property and Construction, 16(02), 147–62.

Milberg, C T and Tommelein, I D (2020) Methods for Managing Tolerance Compatibility: Windows in Cast-in-Place Concrete. Journal of Construction Engineering and Management, 146(02).

Miller, A, Radcliffe, D and Isokangas, E (2009) A perception-influence model for the management of technology implementation in construction. Construction Innovation, 9(02), 168–83.

Miller, C, Packham, G and Thomas, B (2003) Inter-organisational relationships and their effect upon small construction enterprises in South Wales: co-operation at a cost. Journal of Construction Procurement, 9(02), 17–28.

Miller, K R, Hutchings, D M and Newitt, J S (2006) Study of top 500 Design firms' plans to adopt MasterFormat(TM) 2004. International Journal of Construction Education and Research, 2(02), 143-50.

Miller, M L and Bernold, L E (1991) Sensor‐Integrated Nailing for Building Construction. Journal of Construction Engineering and Management, 117(02), 213–25.

Miller, S, Haupt, T C and Chileshe, N (2005) Student perceptions of the first year civil engineering course content. Journal of Engineering, Design and Technology, 3(02), 180–9.

Mills, A (2003) Property and construction professions: the views of industry leaders. Construction Economics and Building, 3(02), 9-14.

Mills, A, Smith, J and Love, P (2002) Barriers to the development of SME's in the Australian construction industry. Construction Economics and Building, 2(02), 71-79.

Mintah, K, Higgins, D and Callanan, J (2018) A real option approach for the valuation of switching output flexibility in residential property investment. Journal of Financial Management of Property and Construction, 23(02), 133–51.

Miskawi, Z (1989) An S-curve equation for project control. Construction Management and Economics, 7(02), 115-24.

Mitropoulos, P and Guillama, V (2010) Analysis of Residential Framing Accidents, Activities, and Task Demands. Journal of Construction Engineering and Management, 136(02), 260–9.

Miyatake, Y and Kangari, R (1993) Experiencing Computer Integrated Construction. Journal of Construction Engineering and Management, 119(02), 307–22.

Mladenovic, G, Vajdic, N, Wündsch, B and Temeljotov-Salaj, A (2013) Use of key performance indicators for PPP transport projects to meet stakeholders’ performance objectives. Built Environment Project and Asset Management, 3(02), 228-49.

Mlecnik, E (2016) Activating the adoption of innovation: Lessons from a passive house network. Built Environment Project and Asset Management, 6(02), 205-17.

Mock, B and O’Connor, J T (2019) Owner and contractor solution strategies for industrial commissioning. Construction Innovation , 19(02), 256–79.

Moezzi, M and Goins, J (2011) Text mining for occupant perspectives on the physical workplace. Building Research & Information, 39(02), 169–82.

Mohamad Karimi, S, Jamshid Mousavi, S, Kaveh, A and Afshar, A (2007) Fuzzy Optimization Model for Earthwork Allocations with Imprecise Parameters. Journal of Construction Engineering and Management, 133(02), 181–90.

Mohammed, A A and Abdul-Rahman, H (2014) Aspects of project learning in construction: A socio-technical model. Construction Innovation, 14(02), 229-44.

Mohanta, A and Das, S (2023) Decision support system for the early stage of green building envelope design considering energy and maintainability. Architectural Engineering and Design Management, 19(02), 163–82.

Mok, C K, Tummala, V M R and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(02), 161-75.

Molad, C and Back, W E (1995) EDI's role as an enabler for electronic commerce and information integration. Engineering, Construction and Architectural Management, 2(02), 93–104.

Montemanni, R, Toklu, N E, Toklu, & & and Toklu, Y C (2012) Aggregate Blending via Robust Linear Programming. Journal of Construction Engineering and Management, 138(02), 188–96.

Moon, S, Xu, S, Hou, L, Wu, C, Wang, X and Tam, V W Y (2018) RFID-Aided Tracking System to Improve Work Efficiency of Scaffold Supplier: Stock Management in Australasian Supply Chain. Journal of Construction Engineering and Management, 144(02).

Moore, J D and Gloeckner, G W (2007) A theory of women's career choice in Construction Management: recommendations for academia. International Journal of Construction Education and Research, 3(02), 123-39.

Moore, J D and Plugge, P W (2008) Perceptions and expectations: implications for construction management internships. International Journal of Construction Education and Research, 4(02), 82-96.

Moore, J E, Kuprenas, J, Lee, J-J, Gordon, P, Richardson, H and Pan, Q (2004) Cost analysis methodology for advanced treatment of stormwater: the Los Angeles case. Journal of Construction Research, 5(02), 149–70.

Mootanah, D P (1998) The effective management of risk in concession projects. Journal of Financial Management of Property and Construction, 3(02), 27–40.

Mootanah, D P (2000) Theory meets practice: proposal for a dynamic value and risk methodology for project management. Journal of Construction Research, 1(02), 131–8.

Morgenstern, P, Lowe, R and Chiu, L F (2015) Heat metering: socio-technical challenges in district-heated social housing. Building Research & Information, 43(02), 197-209.

Morledge, R and Adnan, H (2005) The importance of trust to the success of joint venture projects. Journal of Construction Procurement, 11(02).

Moselhi, O and Nicholas, M J (1990) Hybrid Expert System for Construction Planning and Scheduling. Journal of Construction Engineering and Management, 116(02), 221–38.

Mostafa, M A and El-Gohary, N M (2015) Semantic System for Stakeholder-Conscious Infrastructure Project Planning and Design. Journal of Construction Engineering and Management, 141(02).

Mostafaeipour, A, Qolipour, M, Rezaei, M and Goudarzi, H (2019) Techno-economic assessment of using wind power system for tribal region of Gachsaran in Iran. Journal of Engineering, Design and Technology , 18(02), 293–307.

Mostafavi, A, Abraham, D M and Lee, J (2012) System-of-systems approach for assessment of financial innovations in infrastructure. Built Environment Project and Asset Management, 2(02), 250-65.

Motawa, I and Kaka, A (2008) Payment mechanisms for integrated teams in construction. Construction Economics and Building, 8(02), 1-10.

Motawa, I, Kaka, A and Wong, C H (2008) Development of transparent payment systems. Journal of Financial Management of Property and Construction, 13(02), 143–56.

Moussourakis, J and Haksever, C (2010) Project Compression with Nonlinear Cost Functions. Journal of Construction Engineering and Management, 136(02), 251–9.

Mpofu, B, Ochieng, E G, Moobela, C and Pretorius, A (2017) Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction and Architectural Management, 24(02), 346-76.

Munir, M, Kiviniemi, A, Jones, S and Finnegan, S (2020) BIM-based operational information requirements for asset owners. Architectural Engineering and Design Management, 16(02), 100–14.

Murnane, R, Simpson, A and Jongman, B (2016) Understanding risk: what makes a risk assessment successful?. International Journal of Disaster Resilience in the Built Environment, 7(02), 186-200.

Murphy, M E, Perera, R S and Heaney, S G (2008) Building design innovation: Expansion of classification linkages through case study analysis. Journal of Engineering, Design and Technology, 6(02), 99–111.

Murphy, M E, Perera, R S and Heaney, S G (2008) Building design innovation: Expansion of classification linkages through case study analysis. Journal of Engineering, Design and Technology, 6(02), 99–111.

Murphy, R (2013) Strategic planning in construction professional service firms: a study of Irish QS practices. Construction Management and Economics, 31(02), 151-66.

Muya, M, Price, A D F and Edum-Fotwe, F T (2006) Overview of funding for construction craft skills training in Sub-Saharan Africa: a case study of Zambia. Construction Management and Economics, 24(02), 197-208.

Muya, M, Price, A D F, Thorpe, A and Edum-Fotwe, F (1999) Application of analytic hierarchy process to the evaluation of logistics factors and their contribution to improvements in construction materials supply. Journal of Construction Procurement, 5(02), 99–117.

Myers, D (2003) The future of construction economics as an academic discipline. Construction Management and Economics, 21(02), 103-6.

Nadhim, E, A, Hon, C, K, H , Xia, B, Stewart, I and Fang, D (2018) Investigating the Relationships between Safety Climate and Safety Performance Indicators in Retrofitting Works . Construction Economics and Building, 18(02), 110-129.

Nadim, W and Goulding, J S (2010) Offsite production in the UK: the way forward? A UK construction industry perspective. Construction Innovation, 10(02), 181–202.

Nahmens, I and Reichel, C (2013) Adoption of high performance building systems in hot-humid climates – lessons learned. Construction Innovation, 13(02), 186-201.

Naismith, N, Price, A D F, Dainty, A R J, Bryman, A, Greasley, K and Soetanto, R (2005) Engendering trust in the construction supply chain. Journal of Construction Procurement, 11(02).

Naja, M and Baytiyeh, H (2015) Stopping the tragedy before it occurs: Protecting Lebanese public schools from upcoming earthquake disasters. International Journal of Disaster Resilience in the Built Environment, 6(02), 182-92.

Naji, K K (2005) Virtual environments for improving construction site safety. Architectural Engineering and Design Management, 1(02), 93–102.

Najjir, G, Love, P and Runeson, G (2001) Issues for the global construction market. Construction Economics and Building, 1(02), 73-81.

Nam, C H and Tatum, C B (1988) Major characteristics of constructed products and resulting limitations of construction technology. Construction Management and Economics, 6(02), 133-48.

Nam, C H and Tatum, C B (1992) Noncontractual Methods of Integration on Construction Projects. Journal of Construction Engineering and Management, 118(02), 385–98.

Nam, C H, Gasiorowski, J G and Tatum, C B (1991) Microlevel Study of Integration in High‐Strength Concrete Innovation. Journal of Construction Engineering and Management, 117(02), 294–309.

Nani, G, Edwards, P, Adjei-Kumi, T, Badu, E and Amoah, P (2008) Customisation and desirable characteristics of a standard method of measurement for building works in Ghana. Construction Economics and Building, 8(02), 30-40.

Narbaev, T, De Marco, A and Orazalin, N (2020) A multi-disciplinary meta-review of the public–private partnerships research. Construction Management and Economics, 38(02), 109–25.

Nasarre-Aznar, S (2015) “Robinhoodian” courts’ decisions on mortgage law in Spain. International Journal of Law in the Built Environment, 7(02), 127-47.

Nasarre-Aznar, S and Molina-Roig, E (2017) A legal perspective of current challenges of the Spanish residential rental market. International Journal of Law in the Built Environment, 9(02), 108-22.

Navarro-Astor, E, Román-Onsalo, M and Infante-Perea, M (2017) Women’s career development in the construction industry across 15 years: main barriers. Journal of Engineering, Design and Technology, 15(02), 199-221.

Navon, R and Maor, D (1995) Equipment replacement and optimal size of a civil engineering fleet. Construction Management and Economics, 13(02), 173-83.

Navon, R, Rubinovitz, Y and Coffler, M (1996) Fully Automated Rebar CAD/CAM System: Economic Evaluation and Field Implementation . Journal of Construction Engineering and Management, 122(02), 101–8.

Nazeer, S F and De Silva, N (2016) TBPE scoring framework for tropical buildings. Built Environment Project and Asset Management, 6(02), 174-86.

Ndekugri, I and McDonnell, B (1999) Differing site conditions risks: a FIDIC/engineering and construction contract comparison. Engineering, Construction and Architectural Management, 6(02), 177–87.

Ndekugri, I and Turner, A (1994) Building Procurement by Design and Build Approach. Journal of Construction Engineering and Management, 120(02), 243–56.

Neely, E S and Neathammer, R (1991) Life‐Cycle Maintenance Costs by Facility Use. Journal of Construction Engineering and Management, 117(02), 310–20.

Nepal, M P, Park, M and Son, B (2006) Effects of Schedule Pressure on Construction Performance. Journal of Construction Engineering and Management, 132(02), 182–8.

New, K, Tyler, A, Friday, A, Hazas, M and Gormally, A (2023) Space temperature policy towards net-zero: recommendations from a systematic review of UK HEI heating policies. Building Research & Information, 51(02), 223–39.

Newaz, M T, Ershadi, M, Jefferies, M, Pillay, M and Davis, P (2023) A systematic review of contemporary safety management research: a multi-level approach to identifying trending domains in the construction industry. Construction Management and Economics, 41(02), 97–115.

Newcombe, R (2000) An Investigation into Simulating the Procurement Process in the United Kingdom Construction Industry. Journal of Construction Procurement, 6(02).

Newcombe, R (1999) Procurement as a learning process. Journal of Construction Procurement, 5(02), 211–20.

Newman, P W (2015) Transport infrastructure and sustainability: a new planning and assessment framework. Smart and Sustainable Built Environment, 4(02), 140-53.

Newsham, G, Brand, J, Donnelly, C, Veitch, J, Aries, M and Charles, K (2009) Linking indoor environment conditions to job satisfaction: a field study. Building Research & Information, 37(02), 129–47.

Newton, S (1991) An agenda for cost modelling research. Construction Management and Economics, 9(02), 97-112.

Newton, S (2009) New directions in leadership. Construction Innovation, 9(02), 129–32.

Ng, A W Y and Chan, A H S (2017) Mental Models of Construction Workers for Safety-Sign Representation. Journal of Construction Engineering and Management, 143(02).

Ng, F P, Björnsson, H C and Chiu, S S (2004) Valuing a price cap contract for material procurement as a real option. Construction Management and Economics, 22(02), 141-50.

Ng, S T and Wong, Y M W (2006) Adopting non-privately funded public-private partnerships in maintenance projects: A case study in Hong Kong. Engineering, Construction and Architectural Management, 13(02), 186–200.

Ng, S T and Xie, J (2008) A simulation model for evaluating the tariff stability of concession-based PPP proposals. Construction Innovation, 8(02), 106–19.

Ng, S T, Fan, R Y C, Wong, J M W, Chan, A P C, Chiang, Y H, Lam, P T I and Kumaraswamy, M (2009) Coping with structural change in construction: experiences gained from advanced economies. Construction Management and Economics, 27(02), 165–80.

Ng, S T, Mak, M M Y, Skitmore, M R, Lam, K C and Varnam, M (2001) The predictive ability of Bromilow's time-cost model. Construction Management and Economics, 19(02), 165-73.

Ng, S T, Skitmore, M R and Smith, N J (1999) Decision-makers' perceptions in the formulation of pre-qualification criteria. Engineering, Construction and Architectural Management, 6(02), 155–65.

Ng, T, Palaneeswaran, E and Kumaraswamy, M (2008) Costs and benefits of ISO9000-based quality management systems to construction contractors. Construction Economics and Building, 8(02), 23-29.

Nguyen, T H, McIntyre, C and Diab, M (2006) Assessing learning and teaching performance of a construction capstone course. International Journal of Construction Education and Research, 2(02), 151-66.

Nicholas, J, Holt, G D and Harris, P T (2000) An Investigation into Predicting Materials Suppliers' Profits. Journal of Construction Procurement, 6(02).

Nicholas, J, Holt, G D and Mihsein, M (2000) Predicting materials suppliers' bad debt. Journal of Construction Research, 1(02), 159–67.

Nicholls, R (1992) Construction of Grout‐Impregnated Fabric‐Reinforced Pipes. Journal of Construction Engineering and Management, 118(02), 283–302.

Nicolini, D (2002) In search of 'project chemistry'. Construction Management and Economics, 20(02), 167-77.

Nieto-Morote, A and Ruz-Vila, F (2012) Last Planner Control System Applied to a Chemical Plant Construction. Journal of Construction Engineering and Management, 138(02), 287–93.

Nikolaidis, N and Roumboutsos, A (2013) A PPP renegotiation framework: a road concession in Greece. Built Environment Project and Asset Management, 3(02), 264-78.

Nimcharoenwon, P and Miller, G (2001) Combating the 'sick building syndrome' by improving indoor air quality. Construction Economics and Building, 1(02), 82-89.

Nirupama, N (2012) Risk and vulnerability assessment: a comprehensive approach. International Journal of Disaster Resilience in the Built Environment, 3(02), 103-14.

Nishigaki, S, Vavrin, J, Kano, N, Haga, T, Kunz, J C and Law, K (1994) Humanware, Human Error, and Hiyari‐Hat: A Template of Unsafe Symptoms. Journal of Construction Engineering and Management, 120(02), 421–42.

Nobe, M C and Greenwell, C (2016) Moving operations and maintenance practices of existing buildings beyond sustainability: A case study of the lenses framework during post occupancy. International Journal of Construction Education and Research, 12(02), 122-41.

Noktehdan, M, Shahbazpour, M, Zare, M R and Wilkinson, S (2019) Innovation Management and Construction Phases in Infrastructure Projects. Journal of Construction Engineering and Management, 145(02).

Nomura, Y, Hoshina, H, Shiomi, H and Umezu, T (1985) Pipe Jacking Method for Long Curve Construction. Journal of Construction Engineering and Management, 111(02), 138–48.

Noorzai, E, Gharouni Jafari, K and Moslemi Naeni, L (2022) Lessons Learned on Selecting the Best Mass Housing Method Based on Performance Evaluation Criteria in Iran. International Journal of Construction Education and Research, 18(02), 123–41.

Noyce, D A and Hanna, A S (1997) Planned Schedule Compression Concept File For Electrical Contractors . Journal of Construction Engineering and Management, 123(02), 189–97.

Nwaogu, J M, Chan, A P, Hon, C K and Darko, A (2019) Review of global mental health research in the construction industry. Engineering, Construction and Architectural Management, 27(02), 385–410.

Nyabwengi, L M and K’Akumu, O A (2019) An evaluation of property tax base in Nairobi city. Journal of Financial Management of Property and Construction , 24(02), 184–99.

Nzekwe-Excel, C, Nwagboso, C, Georgakis, P and Proverbs, D (2010) Integrated framework for satisfaction assessment in construction sector. Journal of Engineering, Design and Technology, 8(02), 168–88.

O'Brien, J J, Kreitzberg, F C and Mikes, W F (1985) Network Scheduling Variations for Repetitive Work. Journal of Construction Engineering and Management, 111(02), 105–16.

O'Connor, J T, Hugo, F and Stamm, E M (1991) Improving Highway Specifications for Constructibility. Journal of Construction Engineering and Management, 117(02), 242–58.

O'Connor, J T, Rusch, S E and Schulz, M J (1987) Constructability Concepts for Engineering and Procurement. Journal of Construction Engineering and Management, 113(02), 235–48.

O'Reilly, M P and Mawdesley, M J (1994) The evaluation of construction disputes: a risk approach. Engineering, Construction and Architectural Management, 1(02), 103–14.

O'Mahony, L F (2013) The meaning of home: from theory to practice. International Journal of Law in the Built Environment, 5(02), 156-71.

O’Connor, J T and Koo, H J (2021) Proactive Design Quality Assessment Tool for Building Projects. Journal of Construction Engineering and Management, 147(02).

Obi, L I, Arif, M and Kulonda, D J (2017) Prioritizing cost management system considerations for Nigerian housing projects. Journal of Financial Management of Property and Construction, 22(02), 135-53.

Obonyo, E A (2011) An agent-based intelligent virtual learning environment for construction management. Construction Innovation, 11(02), 142–60.

Odoemena, A T and Horita, M (2018) A strategic analysis of contract termination in public-private partnerships: Implications from cases in Sub-Saharan Africa. Construction Management and Economics, 36(02), 96-108.

Oduori, M and Mbuya, T (2009) Wire rope selection for manual winch application. Journal of Engineering, Design and Technology, 7(02), 207–22.

Oduori, M F, Mutuli, S M and Munyasi, D M (2015) Analysis of the single toggle jaw crusher kinematics. Journal of Engineering, Design and Technology, 13(02), 213-39.

Odusote, O O and Fellows, R F (1992) An examination of the importance of resource considerations when contractors make project selection decisions. Construction Management and Economics, 10(02), 137-51.

Ofori, G (1989) Housing in Singapore: determinants of success and lessons for the developing countries. Construction Management and Economics, 7(02), 137-53.

Ofori, G (1984) Improving the construction industry in declining developing economies. Construction Management and Economics, 2(02), 127-32.

Ofori, G (2003) Preparing Singapore's construction industry for the knowledge-based economy: practices, procedures and performance. Construction Management and Economics, 21(02), 113-25.

Ofori, G (1998) Sustainable construction: comment. Construction Management and Economics, 16(02), 141-5.

Ofori, G and Gang, G (2001) ISO 9000 certification of Singapore construction enterprises: its costs and benefits and its role in the development of the industry. Engineering, Construction and Architectural Management, 8(02), 145–57.

Ofori, G and Lean, C S (2001) Factors influencing development of construction enterprises in Singapore. Construction Management and Economics, 19(02), 145-54.

Ofori, G and Toor, S-U-R (2009) Research on cross-cultural leadership and management in construction: a review and directions for future research. Construction Management and Economics, 27(02), 119–33.

Ofori, G, Dulaimi, M F and Ling, F Y Y (2004) Improving performance of construction industry in Singapore: motivators, enablers and lessons for developing countries. Journal of Construction Research, 5(02), 267–89.

Ogbu, C P and Adindu, C C (2019) Direct risk factors and cost performance of road projects in developing countries. Journal of Engineering, Design and Technology , 18(02), 326–42.

Ogunlana, S O (1991) Learning from experience in design cost estimating. Construction Management and Economics, 9(02), 133-50.

Ogunlana, S O (1999) Procurement lessons from Solomon's temple project. Journal of Construction Procurement, 5(02), 187–96.

Ogunyanda, K, Fritz, W and van Zyl, R (2015) PSIM simulations of a DC SQUID magnetometer. Journal of Engineering, Design and Technology, 13(02), 298-314.

Oh, E H, Naderpajouh, N, Hastak, M and Gokhale, S (2016) Integration of the Construction Knowledge and Expertise in Front-End Planning. Journal of Construction Engineering and Management, 142(02).

Ohueri, C C, Enegbuma, W I and Habil, H (2019) MyCREST embedded framework for enhancing the adoption of green office building development in Sarawak. Built Environment Project and Asset Management, 10(02), 215–30.

Ohueri, C C, Enegbuma, W I and Kenley, R (2018) Energy efficiency practices for Malaysian green office building occupants. Built Environment Project and Asset Management, 8(02), 134–46.

Ojolo, S J, Damisa, O, Orisaleye, J I and Ogbonnaya, C (2010) Design and development of cashew nut shelling machine. Journal of Engineering, Design and Technology, 8(02), 146–57.

Okafor, C C, Ani, U S and Ugwu, O (2022) Evaluation of Supply Chain Management Lapses in Nigeria’s Construction Industry. International Journal of Construction Education and Research, 18(02), 103–22.

Oke, A E and Aghimien, D O (2018) Drivers of value management in the Nigerian construction industry. Journal of Engineering, Design and Technology, 16(02), 270–84.

Oke, A E, Aghimien, D O, Aigbavboa, C O and Akinradewo, O I (2020) Appraisal of the drivers of smart city development in South Africa. Construction Economics and Building, 20(02), 109-126.

Oke, A, Atofarati, J and Bello, S (2022) Awareness of 3D printing for sustainable construction in an emerging economy. Construction Economics and Building, 22(02), 52-68.

Oke,A.E, Aghimien,D.O, Akinradewo,O.I and Aigbavboa, C.O (2020) Improving resilience of cities through smart city drivers. Construction Economics and Building, 20(02), 45-64.

Ökmen, Ö and Öztaş, A (2010) Construction cost analysis under uncertainty with correlated cost risk analysis model. Construction Management and Economics, 28(02), 12.

Okoro, C.S, Musonda, I and Agumba, J.N (2019) Validity and reliability of a transportation infrastructure sustainable performance framework: a study of transport projects in South Africa. Construction Economics and Building, 19(02), 126-143.

Okoye, P, U (2018) Occupational Health and Safety Risk Levels of Building Construction Trades in Nigeria . Construction Economics and Building, 18(02), 92-109.

Okpala, D C and Aniekwu, A N (1988) Causes of High Costs of Construction in Nigeria. Journal of Construction Engineering and Management, 114(02), 233–44.

Olabanji, O M and Mpofu, K (2019) Adopting hybridized multicriteria decision model as a decision tool in engineering design. Journal of Engineering, Design and Technology , 18(02), 451–79.

Olanipekun, A O, Oshodi, O S, Darko, A and Omotayo, T (2019) The state of corporate social responsibility practice in the construction sector. Smart and Sustainable Built Environment, 9(02), 91–111.

Olanipekun, A.O and Saka, N (2019) Response of the Nigerian construction sector to economic shocks. Construction Economics and Building, 19(02), 160-180.

Olaniran, O J, Love, P E D, Edwards, D J, Olatunji, O and Matthews, J (2017) Chaos Theory: Implications for Cost Overrun Research in Hydrocarbon Megaprojects. Journal of Construction Engineering and Management, 143(02).

Olanrewaju, A A L (2012) Quantitative analysis of defects in university buildings: user perspective. Built Environment Project and Asset Management, 2(02), 167-81.

Olbina, S and Beliveau, Y (2009) Developing a transparent shading device as a daylighting system. Building Research & Information, 37(02), 148–63.

Oliveros-Romero, J and Aibinu, A A (2019) Ex post impact evaluation of PPP projects: an exploratory research. Built Environment Project and Asset Management, 9(02), 315–30.

Olivieri, H, Seppänen, O and Denis Granja, A (2018) Improving workflow and resource usage in construction schedules through location-based management system. Construction Management and Economics, 36(02), 109-24.

Oloke, D A, Edwards, D J and Thorpe, T A (2003) Predicting Construction Plant Breakdown Time Using Time Series Modelling. Journal of Engineering, Design and Technology, 1(02), 202–21.

Olomolaiye, P O and Ogunlana, S O (1989) A system for monitoring and improving construction operative productivity in Nigeria. Construction Management and Economics, 7(02), 175-86.

Oluseye, O, Oyeyemi, O A, Ehis, O G and Aigbavboa, C (2024) Effects of Building contractors’ Value Systems on Corruption Manifestations in Nigeria’s Construction Sector. International Journal of Construction Education and Research, 20(02), 136–56.

Omar, E A A and Mangin, J-C (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(02), 83–101.

Omar, I and Mncwango, S (2005) Sanitary landfill energy harnessing and applications. Journal of Engineering, Design and Technology, 3(02), 127–39.

Omopariola, E D, Windapo, A, Edwards, D J and Thwala, W D (2019) Contractors’ perceptions of the effects of cash flow on construction projects. Journal of Engineering, Design and Technology , 18(02), 308–25.

Onitiri, M A and Adedayo, S M (2015) Compressive behaviour of polypropylene filled with iron ore tailings. Journal of Engineering, Design and Technology, 13(02), 198-212.

Onukwube, H and Iyagba, R (2011) Construction professionals job performance and characteristics: a comparison of indigenous and expatriate construction companies in Nigeria. Construction Economics and Building, 11(02), 71-83.

Onukwube, H N (2012) Correlates of job satisfaction amongst quantity surveyors in consulting firms in Lagos, Nigeria. Construction Economics and Building, 12(02), 43-54.

Oo, B L and Lim, B T H (2021) Changes in job situations for women workforce in construction during the covid-19 pandemic. Construction Economics and Building, 21(02), 34-57.

Ophiyandri, T, Amaratunga, D, Pathirage, C and Keraminiyage, K (2013) Critical success factors for community-based post-disaster housing reconstruction projects in the pre-construction stage in Indonesia. International Journal of Disaster Resilience in the Built Environment, 4(02), 236-49.

Opoku, A and Mills, S A (2019) Exploring the use of standardised design in addressing the shortage of primary school places in the UK. Journal of Engineering, Design and Technology, 17(02), 383–401.

Opoku, A, Ahmed, V and Cruickshank, H (2015) Leadership style of sustainability professionals in the UK construction industry. Built Environment Project and Asset Management, 5(02), 184-201.

Opoku, A, Cruickshank, H and Ahmed, V (2015) Organizational leadership role in the delivery of sustainable construction projects in UK. Built Environment Project and Asset Management, 5(02), 154-69.

Organ, S (2019) The opportunities and challenges of improving the condition and sustainability of a historic building at an international tourist attraction in the UK. International Journal of Building Pathology and Adaptation, 38(02), 329–55.

Ormerod, M G and Newton, R A (2005) Moving beyond accessibility: the principles of universal (inclusive) design as a dimension in nD modelling of the built environment. Architectural Engineering and Design Management, 1(02), 103–10.

Ortlepp, R, Gruhler, K and Schiller, G (2018) Materials in Germany’s domestic building stock: calculation model and uncertainties. Building Research & Information, 46(02), 164–78.

Osei-Kyei, R and Chan, A P C (2017) Risk assessment in public-private partnership infrastructure projects: Empirical comparison between Ghana and Hong Kong. Construction Innovation, 17(02), 204-23.

Osei-Kyei, R, Chan, A P, Dansoh, A, Ofori-Kuragu, J K and Owusu, E K (2018) Motivations for adopting unsolicited proposals for public-private partnership project implementation. Journal of Financial Management of Property and Construction, 23(02), 221–38.

Oshodi, O S, Thwala, W D, Odubiyi, T B, Abidoye, R B and Aigbavboa, C O (2019) Using neural network model to estimate the rental price of residential properties. Journal of Financial Management of Property and Construction , 24(02), 217–30.

Othman, A A E and Abdelrahim, S M (2019) Achieving sustainability through reducing construction waste during the design process. Journal of Engineering, Design and Technology, 18(02), 362–77.

Otter, A d and Emmitt, S (2008) Design team communication and design task complexity: the preference for dialogues. Architectural Engineering and Design Management, 4(02), 121–9.

Owusu-Manu, D-G, Edwards, D J, Kutin-Mensah, E K, Kilby, A, Parn, E and Love, P E (2017) The impact of socio-political and economic environments on private sector participation in energy infrastructure delivery in Ghana. Journal of Engineering, Design and Technology, 15(02), 166-80.

Owusu-Manu, D, John Edwards, D, Pärn, E A, Antwi-Afari, M F and Aigbavboa, C (2018) The knowledge enablers of knowledge transfer: a study in the construction industries in Ghana. Journal of Engineering, Design and Technology, 16(02), 194–210.

Oyedele, J B, McGreal, S, Adair, A and Ogedengbe, P (2013) Performance and role of European listed infrastructure in a mixed-asset portfolio. Journal of Financial Management of Property and Construction, 18(02), 160-83.

Oyedele, L O (2010) Sustaining architects' and engineers' motivation in design firms: An investigation of critical success factors. Engineering, Construction and Architectural Management, 17(02), 96.

Oyedele, L O, Tham, K W, Jaiyeoba, B E and Fadeyi, M O (2003) Model for Predicting Architect's Performance in Building Delivery Process. Journal of Engineering, Design and Technology, 1(02), 168–86.

Oyegoke, A S and Kiiras, J (2004) Two generic perspectives of CM contracting systems: a case of the US, the UK and Finland. Journal of Construction Procurement, 10(02).

Oyewobi, L O, Abiola-Falemu, O and Ibironke, O T (2016) The impact of rework and organisational culture on project delivery. Journal of Engineering, Design and Technology, 14(02), 214-37.

Oyewobi, L O, Windapo, A O and Cattell, K S (2013) Impact of business diversification on South African construction companies' corporate performance. Journal of Financial Management of Property and Construction, 18(02), 110-27.

Oyodele, L, Jaiyeoba, B and Fadeyi, M (2003) Design factors influencing quality of building projects in Nigeria: consultants' perception. Construction Economics and Building, 3(02), 25-32.

Pérez-Valcárcel, J, Aragón, J, Muñiz, S, Freire-Tellado, M and Mosquera, E (2024) Transportable temporary homes with folding roof. Architectural Engineering and Design Management, 20(02), 337–57.

Padilla, E M and Carr, R I (1991) Resource Strategies for Dynamic Project Management. Journal of Construction Engineering and Management, 117(02), 279–93.

Padraic, K (2010) Can housing rights be applied to modern housing systems?. International Journal of Law in the Built Environment, 2(02), 103–17.

Paek, J H and Ock, J H (1996) Innovative Building Construction Technique: Modified Up/Down Method . Journal of Construction Engineering and Management, 122(02), 141–6.

Paek, J H, Lee, Y W and Napier, T R (1992) Selection of Design/Build Proposal Using Fuzzy‐Logic System. Journal of Construction Engineering and Management, 118(02), 303–17.

Palaneeswaran, E and Kumaraswamy, M M (2003) Knowledge Mining of Information Sources for Research in Construction Management. Journal of Construction Engineering and Management, 129(02), 182–91.

Palaneeswaran, E, Kumaraswamy, M M and Ng, S T (2003) Formulating a Framework for Relationally Integrated Construction Supply Chains. Journal of Construction Research, 4(02), 189–205.

Pan, W, Gibb, A G F and Dainty, A R J (2007) Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(02), 183–94.

Pandithawatta, T, Zainudeen, N and Perera, C (2019) An integrated approach of Lean-Green construction: Sri Lankan perspective. Built Environment Project and Asset Management, 10(02), 200–14.

Panthi, K, Ahmed, S M and Ogunlana, S O (2009) Contingency estimation for construction projects through risk analysis. International Journal of Construction Education and Research, 5(02), 79-94.

Panthi, K, Das, K and Abdel-Salam, T (2017) Sustainability and cost assessment of coastal vacation homes for energy retrofits. Built Environment Project and Asset Management, 7(02), 185-98.

Pantzartzis, E, Price, A D F and Pascale, F (2016) A built environment response to the rising costs of dementia. Journal of Financial Management of Property and Construction, 21(02), 160-87.

Panwar, A and Jha, K N (2021) Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model. Journal of Construction Engineering and Management, 147(02).

Park, J and Cho, Y K (2022) Point Cloud Information Modeling: Deep Learning–Based Automated Information Modeling Framework for Point Cloud Data. Journal of Construction Engineering and Management, 148(02).

Park, J, Kim, K and Cho, Y K (2017) Framework of Automated Construction-Safety Monitoring Using Cloud-Enabled BIM and BLE Mobile Tracking Sensors. Journal of Construction Engineering and Management, 143(02).

Park, Y-I and Papadopoulou, T C (2012) Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size. Built Environment Project and Asset Management, 2(02), 195-216.

Park, Y, Gwak, H and Lee, D (2017) Dozer Workability Estimation Method for Economic Dozing. Journal of Construction Engineering and Management, 143(02).

Parn, E A and Edwards, D (2019) Cyber threats confronting the digital built environment. Engineering, Construction and Architectural Management, 26(02), 245–66.

Pasquire, C and Salvatierra-Garrido, J (2011) Introducing the concept of first and last value to aid lean design: learning from social housing projects in Chile. Architectural Engineering and Design Management, 7(02), 128–38.

Pathania, A K, Goyal, B and Saini, J R (2017) Diffusion of adoption of solar energy – a structural model analysis. Smart and Sustainable Built Environment, 6(02), 66-83.

Patlakas, P, Musso, M and Larkham, P (2022) A digital curation model for post-occupancy evaluation data. Architectural Engineering and Design Management, 18(02), 128–48.

Patricia, N (2011) The use of mediation in preventing homelessness in England. International Journal of Law in the Built Environment, 3(02), 146–58.

Patterson, D A, Farnsworth, C B, Hutchings, D M, Eggett, D L and Weidman, J E (2023) Comparing Cost, Schedule, and Quality of CM/GC and DBB Project Delivery for Repetitive Commercial Construction. International Journal of Construction Education and Research, 19(02), 166–86.

Paul, C A, Aghimien, D O, Ibrahim, A D and Ibrahim, Y M (2021) Measures for curbing unethical practices among construction industry professionals: Quantity surveyors’ perspective. Construction Economics and Building, 21(02), 1-17.

Paulson, B C (1995) Computers and Construction—Midcareer Reflections. Journal of Construction Engineering and Management, 121(02), 197–200.

Paulson, B C (2003) Design and Construction for the Rest of Us. Journal of Construction Research, 4(02), 115–27.

Paulson, B C, Chan, W T and Koo, C C (1987) Construction Operations Simulation by Microcomputer. Journal of Construction Engineering and Management, 113(02), 302–14.

Pearlmutter, D, Freidin, C and Huberman, N (2007) Alternative materials for desert buildings: a comparative life cycle energy analysis. Building Research & Information, 35(02), 144–55.

Pearson, A L, Barnard, L T, Pearce, J, Kingham, S and Howden-Chapman, P (2014) Housing quality and resilience in New Zealand. Building Research & Information, 42(02), 182-90.

Pedro, J B, Meijer, F and Visscher, H (2009) The Portuguese building regulation system: a critical review. International Journal of Law in the Built Environment, 1(02), 156-71.

Peer, S (1986) An improved systematic activity sampling technique for work study. Construction Management and Economics, 4(02), 151-9.

Pekuri, A, Pekuri, L and Haapasalo, H (2015) Business models and project selection in construction companies. Construction Innovation, 15(02), 180-97.

Pelé-Peltier, A, Charef, R and Morel, J (2023) Factors affecting the use of earth material in mainstream construction: a critical review. Building Research & Information, 51(02), 119–37.

Pellegrino, R, Carbonara, N and Costantino, N (2019) Public guarantees for mitigating interest rate risk in PPP projects. Built Environment Project and Asset Management, 9(02), 248–61.

Pellegrino, R, Costantino, N, Pietroforte, R and Sancilio, S (2012) Construction of multi-storey concrete structures in Italy: patterns of productivity and learning curves. Construction Management and Economics, 30(02), 103-15.

Pellegrino, R, Vajdic, N and Carbonara, N (2013) Real option theory for risk mitigation in transport PPPs. Built Environment Project and Asset Management, 3(02), 199-213.

Pelsmakers, S, Croxford, B and Elwell, C (2019) Suspended timber ground floors: measured heat loss compared with models. Building Research & Information, 47(02), 127–40.

Peltola, T and Mansikkamaki, P (2007) Formable multilayer PCB structure: design and technology demonstrator. Journal of Engineering, Design and Technology, 5(02), 148–58.

Peng, J L, Yen, T, Lin, Y, Wu, K L and Chen, W F (1997) Performance of Scaffold Frame Shoring under Pattern Loads and Load Paths . Journal of Construction Engineering and Management, 123(02), 138–45.

Perera, A A D A J and Imriyas, K (2004) An integrated construction project cost information system using MS Access� and MS Project�. Construction Management and Economics, 22(02), 203-11.

Perrin, R and Price, A D F (2004) Developing teams and the allocation of rewards within a team environment. Journal of Construction Procurement, 10(02).

Perry, J G and Barnes, M (2000) Target cost contracts: an analysis of the interplay between fee, target, share and price. Engineering, Construction and Architectural Management, 7(02), 202–8.

Petrovic-Lazarevic, S (2008) The development of corporate social responsibility in the Australian construction industry. Construction Management and Economics, 26(02), 93–101.

Pheng, L S and Tan, S K L (1997) The measurement of just in time wastage for a public housing project in Singapore. Building Research & Information, 25(02), 67–81.

Phillips, S, Martin, J, Dainty, A and Price, A (2007) Uncertainty in best value decision making. Journal of Financial Management of Property and Construction, 12(02), 72.

Phua, F T T (2013) Construction management research at the individual level of analysis: current status, gaps and future directions. Construction Management and Economics, 31(02), 167-79.

Picken, D H and Ilozor, B D (2003) Height and construction costs of building in Hong Kong. Construction Management and Economics, 21(02), 107-11.

Pickett, S T A, McGrath, B, Cadenasso, M L and Felson, A J (2014) Ecological resilience and resilient cities. Building Research & Information, 42(02), 143-57.

Pietroforte, R, Bon, R and Gregori, T (2000) Regional development and construction in Italy: an input-output analysis, 1959-1992. Construction Management and Economics, 18(02), 151-9.

Pilgrim, M, Bouchlaghem, D, Loveday, D and Holmes, M (2002) Towards best practice in building analysis data representation. Construction Innovation, 2(02), 117–30.

Pin, T H and Scott, W F (1994) Bidding Model for Refurbishment Work. Journal of Construction Engineering and Management, 120(02), 257–73.

Ping Ho, S (2005) Bid Compensation Decision Model for Projects with Costly Bid Preparation. Journal of Construction Engineering and Management, 131(02), 151–9.

Pishdad-Bozorgi, P (2017) Case studies on the role of integrated project delivery approach on the establishment and promotion of trust. International Journal of Construction Education and Research, 13(02), 102-23.

Pishdad-Bozorgi, P and Beliveau, Y J (2016) A schema of trust building attributes and their corresponding integrated project delivery traits. International Journal of Construction Education and Research, 12(02), 142-60.

Pitt, M, Tucker, M, Riley, M and Longden, J (2009) Towards sustainable construction: promotion and best practices. Construction Innovation, 9(02), 201–24.

Plantinga, H, Voordijk, H and Doree, A (2019) The reasoning behind infrastructure manager’s choice of procurement instruments. Engineering, Construction and Architectural Management, 26(02), 303–20.

Plat, H T (1996) Property values and implications of refurbishment costs. Journal of Financial Management of Property and Construction, 1(02), 57–64.

Pocock, J B, Hyun, C T, Liu, L Y and Kim, M K (1996) Relationship between Project Interaction and Performance Indicators . Journal of Construction Engineering and Management, 122(02), 165–76.

Poh, P S H and Horner, R M W (1995) Cost-significant modelling: potential for use in South-East Asia. Engineering, Construction and Architectural Management, 2(02), 121–39.

Poleacovschi, C, Javernick-Will, A, Tong, T and Wanberg, J (2019) Engineers Seeking Knowledge: Effect of Control Systems on Accessibility of Tacit and Codified Knowledge. Journal of Construction Engineering and Management, 145(02).

Poon, C S, Yu, A T W and Ng, L H (2003) Comparison of low-waste building technologies adopted in public and private housing projects in Hong Kong. Engineering, Construction and Architectural Management, 10(02), 88–98.

Poon, J (2017) Relationships between demographic factors and employment prospects of architecture, construction and urban planning graduates. International Journal of Construction Education and Research, 13(02), 83-19.

Poon, J and Brownlow, M (2016) A study of the impacts of variable factors on built environment graduates’ prospects. International Journal of Construction Education and Research, 12(02), 99-121.

Poortman, E R and Bons, H N M (1994) Information for the management of the building-materials flow. Engineering, Construction and Architectural Management, 1(02), 139–46.

Powell, C (1989) Workload fluctuations and aspects of building quality. Construction Management and Economics, 7(02), 125-36.

Praticò, F G and Giunta, M (2018) Proposal of a Key Performance Indicator for Railway Track Based on LCC and RAMS Analyses. Journal of Construction Engineering and Management, 144(02).

Praticò, F G, Casciano, A and Tramontana, D (2011) Pavement Life-Cycle Cost and Asphalt Binder Quality: Theoretical and Experimental Investigation. Journal of Construction Engineering and Management, 137(02), 99–107.

Pratt, N (2015) The “by right” defence in village green registration. International Journal of Law in the Built Environment, 7(02), 96-110.

Pretorius, F I H and Taylor, R G (1986) Conflict and individual coping behaviour in informal matrix organizations with the construction industry. Construction Management and Economics, 4(02), 87-104.

Prieto, A J and Silva, A (2020) Service life prediction and environmental exposure conditions of timber claddings in South Chile. Building Research & Information, 48(02), 191–206.

Prieto, A J, Silva, A, de Brito, J and Macias-Bernal, J M (2018) Serviceability of facade claddings. Building Research & Information, 46(02), 179–90.

Prince, M W (1992) Implications of perception and strategy for engineers in construction management. Construction Management and Economics, 10(02), 93-105.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(02), 174–81.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1999) European construction contractors: a productivity appraisal of in situ concrete operations. Construction Management and Economics, 17(02), 221-30.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1999) Factors in formwork selection: a comparative investigation. Building Research & Information, 27(02), 109–19.

Pu, W, Xu, F, Chen, R and Marques, R C (2020) PPP project procurement model selection in China: does it matter?. Construction Management and Economics, 38(02), 126–39.

Puddicombe, M S and Johnson, B (2011) Research and Theory Building in Construction Management. International Journal of Construction Education and Research, 7(02), 126–42.

Pulkka, L, Ristimäki, M, Rajakallio, K and Junnila, S (2016) Applicability and benefits of the ecosystem concept in the construction industry. Construction Management and Economics, 34(02), 129-16.

Pusceddu, C, Blumberg, G, Salvalai, G and Imperadori, M (2017) The use of building technology to support disaster resilience: the case study of air shelter house. International Journal of Disaster Resilience in the Built Environment, 8(02), 139-57.

Qian, L Z, Chen, T H, Anumba, C and Choy, C F (2017) Development of a web-based system for managing suppliers’ performance and knowledge sharing in construction projects. Built Environment Project and Asset Management, 7(02), 117-29.

Que, B C (2002) Incorporating Practicability into Genetic Algorithm-Based Time-Cost Optimization. Journal of Construction Engineering and Management, 128(02), 139–43.

Rabie, M and El-Sayegh, S (2017) Modelling of tri-parameter bidding integrating cost, time and risk: a stochastic approach. Journal of Financial Management of Property and Construction, 22(02), 117-34.

Rachelle, A (2011) Guest editorial: comparative research at the frontier of planning law: The case of compensation rights for land use regulations. International Journal of Law in the Built Environment, 3(02), 100–12.

Radosavljevic, M and Horner, M (2007) Process planning methodology: dynamic short-term planning for off-site construction in Slovenia. Construction Management and Economics, 25(02), 143–56.

Radvan, M (2019) Municipal charges on communal waste: do they compete with the immovable property tax?. Journal of Financial Management of Property and Construction, 24(02), 148–65.

Radzi, A R, Rahman, R A, Doh, S I and Esa, M (2022) Construction Readiness for Highway Projects: Key Decision Criteria. Journal of Construction Engineering and Management, 148(02).

Rafiei, M H and Adeli, H (2016) A Novel Machine Learning Model for Estimation of Sale Prices of Real Estate Units. Journal of Construction Engineering and Management, 142(02).

Raftery, J, Csete, J and Hui, S K-F (2001) Are risk attitudes robust? Qualitative evidence before and after a business cycle inflection. Construction Management and Economics, 19(02), 155-64.

Rahayu, H P, Comfort, L K, Haigh, R, Amaratunga, D and Khoirunnisa, D (2020) A study of people-centered early warning system in the face of near-field tsunami risk for Indonesian coastal cities. International Journal of Disaster Resilience in the Built Environment, 11(02), 241–62.

Rahman, M and Alhassan, A (2012) A contractor's perception on early contractor involvement. Built Environment Project and Asset Management, 2(02), 217-33.

Rahman, M M and Kumaraswamy, M M (2002) Risk management trends in the construction industry: moving towards joint risk management. Engineering, Construction and Architectural Management, 9(02), 131–51.

Rahmani, F, Khalfan, M, M, A and Maqsood, T (2016) Lessons learnt from the use of relationship-based procurement methods in Australia: clients’ perspectives . Construction Economics and Building, 16(02), 1-13.

Rajeh, M, Tookey, J E and Rotimi, J O B (2015) Estimating transaction costs in the New Zealand construction procurement: A structural equation modelling methodology. Engineering, Construction and Architectural Management, 22(02), 242-67.

Ramachandra, T and Rotimi, J (2011) The nature of payment problems in the New Zealand construction industry. Construction Economics and Building, 11(02), 22-33.

Ramachandra, T and Rotimi, J O B (2012) Liquidation and its effects on construction trade creditors in New Zealand. Journal of Financial Management of Property and Construction, 17(02), 166-75.

Rameezdeen, R and Rodrigo, A (2014) Modifications to standard forms of contract: the impact on readability. Construction Economics and Building, 14(02), 31-40.

Ramsay-Dawber, P A (1995) A critique of the business performance measures of UK construction companies. Journal of Construction Procurement, 1(02), 100–10.

Ranasinghe, M (1996) Mine restoration bond for clay mining and its impact on the prices of building materials in Sri Lanka. Construction Management and Economics, 14(02), 165-74.

Randeree, K and Ahmed, N (2019) The social imperative in sustainable urban development. Smart and Sustainable Built Environment, 8(02), 138–49.

Randil, C, Siriwardana, C and Hewawasam, K (2019) Framework to analyze Sri Lanka disaster management mechanism. International Journal of Disaster Resilience in the Built Environment, 11(02), 289–307.

Rani, S P J V and Prabha, K A (2010) Stochastic logic computation based RBFNN with adaptive hidden layer structure. Journal of Engineering, Design and Technology, 8(02), 206–20.

Raphael, B (2011) Multi-criteria decision making for collaborative design optimization of buildings. Built Environment Project and Asset Management, 1(02), 122-36.

Rasdorf, W J and Herbert, M J (1990) Bar Coding in Construction Engineering. Journal of Construction Engineering and Management, 116(02), 261–80.

Rasdorf, W, Grasso, B and Bridgers, M (2010) Public versus Private Perceptions on Hiring an External Program Manager. Journal of Construction Engineering and Management, 136(02), 219–26.

Rasheed, E O, Yu, J, Hale, S and Booth, N (2022) The Impact of External and Internal Sources of Motivation on Young Women’s Interest in Construction-Related Careers: An Exploratory Study. International Journal of Construction Education and Research, 18(02), 159–78.

Rashid, K B A (2002) An assessment on the systems of registration of contracting firms in Malaysia. Journal of Construction Procurement, 8(02), 148–59.

Rashid, K M and Behzadan, A H (2018) Risk Behavior-Based Trajectory Prediction for Construction Site Safety Monitoring. Journal of Construction Engineering and Management, 144(02).

Rathnayake, D K, Kularatne, D, Abeysinghe, S, Shehara, I, Fonseka, T, Edirisinghe Mudiyanselage, S D J, Kamalrathne, W G C T, Siriwardana, C, Alagiyawanna Mohotti Appuhamilage, C S B and Dissanayake, R (2020) Barriers and enablers of coastal disaster resilience – lessons learned from tsunami in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 11(02), 275–88.

Ray, R S, Hornibrook, J, Skitmore, M R and Zarkada-Fraser, A (1999) Ethics in tendering: a survey of Australian opinion and practice. Construction Management and Economics, 17(02), 139-53.

Razavi, S N, Montaser, A and Moselhi, O (2012) RFID deployment protocols for indoor construction. Construction Innovation, 12(02), 239-58.

Reda, R M (1990) RPM: Repetitive Project Modeling. Journal of Construction Engineering and Management, 116(02), 316–30.

Reda, R, Saad, M, Ahmed, M Z and Abd-Elkader, H (2018) Monitoring joint quality: Taguchi approach and structure investigation. Journal of Engineering, Design and Technology, 16(02), 211–32.

Reeve, A C, Desha, C, Hargreaves, D and Hargroves, K (2015) Biophilic urbanism: contributions to holistic urban greening for urban renewal. Smart and Sustainable Built Environment, 4(02), 215-33.

Rehm, M and Ade, R (2013) Construction costs comparison between ‘green’ and conventional office buildings. Building Research & Information, 41(02), 198-208.

Reinoso, E, Jaimes, M A and Torres, M A (2016) Evaluation of building code compliance in Mexico city: Mid-rise dwellings. Building Research & Information, 44(02), 202-13.

Rekola, M, M (2012) The role of design management in the sustainable building process. Architectural Engineering and Design Management, 8(02), 78-89.

Remold, L E (1989) Simulation of Nonsteady Construction Processes. Journal of Construction Engineering and Management, 115(02), 163–78.

Ren, S, Qiang, G, Tang, S, Zhang, C, Seo, H and Wu, K (2024) An automatic design-feedback process for structural prefabricated components quantity take-off calculation using BIM. Architectural Engineering and Design Management, 20(02), 287–302.

Ren, Z, Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(02), 153-71.

Reposa, J H (2009) Comparison of USGBC LEED for homes and the NAHB national green building program. International Journal of Construction Education and Research, 5(02), 108-20.

Reszka, M and Edwards, P J (1997) Joint ventures: a construction project case study. Journal of Financial Management of Property and Construction, 2(02), 5–20.

Rethinam, A, Shivakumar, V D, Harish, L, Abhishek, M B, Ramana, G V, Madhusudana, R, Sah, R and Manjini, S (2015) Grain refinement of C-Mn steel through thermo-mechanical processing. Journal of Engineering, Design and Technology, 13(02), 282-97.

Ribeiro, F L (2001) BOT model: the Portuguese case. Journal of Construction Procurement, 7(02), 72–86.

Ribeiro, F L (1998) Delivering large scale building projects: a case study. Journal of Construction Procurement, 4(02), 77–88.

Ribeiro, F L and Henriques, P G (2002) The housing property markets in Portugal: analysis and future trends. Journal of Financial Management of Property and Construction, 7(02), 97–106.

Riggs, L S (1988) Educating Construction Managers. Journal of Construction Engineering and Management, 114(02), 279–85.

Rilett, L R (1998) Effect of Variability on End Product Specifications. Journal of Construction Engineering and Management, 124(02), 139–45.

Rilett, L R (1998) Identifying Component Variability of End Product Specification Tests. Journal of Construction Engineering and Management, 124(02), 133–8.

Riley, D R and Sanvido, V E (1997) Space Planning Method for Multistory Building Construction . Journal of Construction Engineering and Management, 123(02), 171–80.

Ringwald, R C (1987) Bunching Theory Applied to Minimize Cost. Journal of Construction Engineering and Management, 113(02), 321–6.

Roberts, C J, Pärn, E A, Edwards, D J and Aigbavboa, C (2018) Digitalising asset management: concomitant benefits and persistent challenges. International Journal of Building Pathology and Adaptation, 36(02), 152–73.

Roberts, C, Bobrova, Y and Marjanovic-Halburd, L (2019) Impacts of energy legislation on organizational motivation: a case study. Building Research & Information, 47(02), 234–44.

Roberts, C, Edwards, D J, Sing, M C P and Aigbavboa, C (2023) Post-occupancy evaluation: process delineation and implementation trends in the UK higher education sector. Architectural Engineering and Design Management, 19(02), 125–47.

Roberts, J (1987) The business round-table construction industry cost effectiveness task force. Construction Management and Economics, 5(02), 95-100.

Robin, C (2011) Today's pupils, tomorrow's engineers! Pedagogy and policy: a UK perspective. Journal of Engineering, Design and Technology, 9(02), 227–41.

Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(02), 181–97.

Robinson, J and Cole, R J (2015) Theoretical underpinnings of regenerative sustainability. Building Research & Information, 43(02), 133-43.

Rogage, K (2018) Virtual training environments for major incident response planning in UK gas infrastructure. International Journal of Disaster Resilience in the Built Environment, 9(02), 130–44.

Rogerson, R J, Giddings, B and Jefferies, M (2024) Constructing the future of the city centre: realizing visions. Construction Management and Economics, 42(02), 129–45.

Rogge, D F (1984) Delay Reporting Within Cost Accounting System. Journal of Construction Engineering and Management, 110(02), 289–92.

Rooke, J D (1997) Developing a more empirical approach to culture, attitude and motivation in construction management research: a critique and a proposal. Journal of Construction Procurement, 3(02), 45–55.

Rooke, J D, Seymour, D E and Fellows, R F (2003) The claims culture: a taxonomy of attitudes in the industry. Construction Management and Economics, 21(02), 167-74.

Roosli, R and O'Keefe, P (2013) Post-disaster housing and management in Malaysia: a literature review. International Journal of Disaster Resilience in the Built Environment, 4(02), 168-81.

Root, D S, Thorpe, A, Thomson, D S, Austin, S A and Hammond, J W (2003) Design chains: introducing supply chain management into the construction design process. Journal of Construction Procurement, 9(02), 29–39.

Root, D, Fellows, R F and Hancock, M (1997) Quantitative versus qualitative or positivism and interactionism: a reflection of ideology in the current methodological debate?. Journal of Construction Procurement, 3(02), 34–44.

Rose, T and Manley, K (2010) Motivational misalignment on an iconic infrastructure project. Building Research & Information, 38(02), 56.

Rose, T, Manley, K and Widen, K (2019) Do firm-level barriers to construction product innovation adoption vary according to position in the supply chain?. Construction Innovation , 19(02), 212–35.

Rosenbaum, S, Toledo, M and González, V (2014) Improving Environmental and Production Performance in Construction Projects Using Value-Stream Mapping: Case Study. Journal of Construction Engineering and Management, 140(02).

Rosenfeld, Y (2009) Cost of quality versus cost of non-quality in construction: the crucial balance. Construction Management and Economics, 27(02), 107–17.

Rosowsky, D V (2011) Recovery: rebuilding a resilient housing stock. International Journal of Disaster Resilience in the Built Environment, 2(02), 139-47.

Ross, A D, Scullion, J S and Goulding, J S (2006) A decision support approach to procurement arrangement design. Journal of Construction Procurement, 12(02).

Rotimi, J and Ramanayaka, C (2015) Analysis of the influence of a strategy-led planning approach on successful construction project implementation. Construction Economics and Building, 15(02), 13-30.

Roumboutsos, A and Macário, R M R (2013) Public private partnerships in transport: theory and practice. Built Environment Project and Asset Management, 3(02), 160-4.

Rounds, J L and Chi, N (1985) Total Quality Management for Construction. Journal of Construction Engineering and Management, 111(02), 117–28.

Rounds, J L and Warning, G (1987) Impact of Computerizing Midsized Construction Companies. Journal of Construction Engineering and Management, 113(02), 183–90.

Rowings, J E and Kaspar, S L (1991) Constructability of Cable‐Stayed Bridges. Journal of Construction Engineering and Management, 117(02), 259–78.

Rowlinson, S and Croker, N (2006) IT sophistication, performance and progress towards formal electronic communication in the Hong Kong construction industry. Engineering, Construction and Architectural Management, 13(02), 154–70.

Rowlinson, S, Matthews, J, Phua, F, McDermott, P and Chapman, T (2000) Emerging issues in procurement systems. Journal of Construction Procurement, 6(02).

Roy, R, Brown, J and Gaze, C (2003) Re-engineering the construction process in the speculative house building sector. Construction Management and Economics, 21(02), 137-46.

Royer, K (1986) The Federal Government and the Critical Path. Journal of Construction Engineering and Management, 112(02), 220–5.

Ruchinskaya, T (1996) The contribution of the Scottish architect Adam Menelaws to Moscow architecture in the early 19th century. Building Research & Information, 24(02), 75–80.

Ruchinskaya, T (1996) The introduction of the architectural scheme of York Gate (1825, Regent's Park, London) in Moscow at the beginning of the 19th century. Building Research & Information, 24(02), 69–74.

Ruddock, L and Ruddock, S (2016) The financial and economic challenges of housing provision for an ageing society. Journal of Financial Management of Property and Construction, 21(02), 85-98.

Runeson, G (2011) The demise of the journal ranking: a victory for common sense. Construction Economics and Building, 11(02), 99-100.

Runeson, G (1997) The methodology of building economics research. Journal of Construction Procurement, 3(02), 3–18.

Runeson, G and Bennett, J (1983) Tendering and the price level in the New Zealand building industry. Construction Papers, 2(02), 29–35.

Runeson, G and de Valence, G (2015) A critique of the methodology of building economics: trust the theories. Construction Management and Economics, 33(02), 117-25.

Runeson, G and Raftery, J (1998) Neo-classical micro-economics as an analytical tool for construction price determination. Journal of Construction Procurement, 4(02), 116–31.

Russell, A D (1993) Computerized Daily Site Reporting. Journal of Construction Engineering and Management, 119(02), 385–402.

Russell, A D and Wong, W C M (1993) New Generation of Planning Structures. Journal of Construction Engineering and Management, 119(02), 196–214.

Russell, J S and Zhai, H (1996) Predicting Contractor Failure Using Stochastic Dynamics of Economic and Financial Variables . Journal of Construction Engineering and Management, 122(02), 183–91.

Russell, J S, Hancher, D E and Skibniewski, M J (1992) Contractor pre-qualification data for construction owners. Construction Management and Economics, 10(02), 117-35.

Russell, M M, Liu, M, Howell, G and Hsiang, S M (2015) Case Studies of the Allocation and Reduction of Time Buffer through Use of the Last Planner System. Journal of Construction Engineering and Management, 141(02).

Russo, J G (1981) Construction marketing in the USA: a viable system for success and control. Construction Papers, 1(02), 29–35.

Rustom, R (2006) Formulation of generic simulation models for analyzing construction claims. Construction Economics and Building, 6(02), 11-19.

Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(02), 167–86.

Ryan, R C (2008) Use of an e-text as a primary course resource. International Journal of Construction Education and Research, 4(02), 97-114.

Ryu, J, Diraneyya, M M, Haas, C T and Abdel-Rahman, E (2021) Analysis of the Limits of Automated Rule-Based Ergonomic Assessment in Bricklaying. Journal of Construction Engineering and Management, 147(02).

Sørensen, N L, Rasmussen, F N, Øien, T B and Frandsen, A K (2020) Holistic sustainability: advancing interdisciplinary building design through tools and data in Denmark. Construction Economics and Building, 20(02), 25-44.

Sözen, Z and Kayahan, O (2001) Correlates of the length of the relationship between main and specialist trade contractors in the construction industry. Construction Management and Economics, 19(02), 131-3.

Sa'eed, A, Gambo, N, Inuwa, I I and Musonda, I (2020) Effects of financial management practices on technical performance of building contractors in northeast Nigeria. Journal of Financial Management of Property and Construction , 25(02), 201–23.

Sachs, T, Tiong, R and Wagner, D (2007) Political risk quantification using fuzzy set approach. Journal of Financial Management of Property and Construction, 12(02), 107–26.

Sacks, A, Nisbet, A, Ross, J and Harinarain, N (2012) Life cycle cost analysis: a case study of Lincoln on the Lake. Journal of Engineering, Design and Technology, 10(02), 228-54.

Sacks, R, Eastman, C M and Lee, G (2004) Process Model Perspectives on Management and Engineering Procedures in the Precast/Prestressed Concrete Industry. Journal of Construction Engineering and Management, 130(02), 206–15.

Sadeghpour, F, Moselhi, O and Alkass, S T (2006) Computer-Aided Site Layout Planning. Journal of Construction Engineering and Management, 132(02), 143–51.

Saeed, A M, Duffield, C and Hui, F K P (2018) An enhanced framework for assessing the operational performance of public-private partnership school projects. Built Environment Project and Asset Management, 8(02), 194–214.

Sage, D, Dainty, A and Brookes, N (2012) A 'Strategy-as-Practice' exploration of lean construction strategizing. Building Research & Information, 40(02), 221-30.

Saha, S, greville, C and Mullins, T (2001) Optimisation of construction process inspection rates using a learning approach. Construction Economics and Building, 1(02), 1-13.

Said, H (2016) Modeling and Likelihood Prediction of Prefabrication Feasibility for Electrical Construction Firms. Journal of Construction Engineering and Management, 142(02).

Said, H M and Bartusiak, J (2018) Regional Competition Analysis of Industrialized Homebuilding Industry. Journal of Construction Engineering and Management, 144(02).

Said, H M and Kandimalla, P (2018) Performance Measurement of Building Sheet-Metal Ductwork Prefabrication under Batch Production Settings. Journal of Construction Engineering and Management, 144(02).

Sajjadian, S M (2016) Dynamic modelling of solar storage system: a case study of leisure centre. Smart and Sustainable Built Environment, 5(02), 165-75.

Saka, A B and Chan, D W (2020) Profound barriers to building information modelling (BIM) adoption in construction small and medium-sized enterprises (SMEs). Construction Innovation , 20(02), 261–84.

Sakhakarmi, S, Park, J and Cho, C (2019) Enhanced Machine Learning Classification Accuracy for Scaffolding Safety Using Increased Features. Journal of Construction Engineering and Management, 145(02).

Sakka, Z I and El-Sayegh, S M (2007) Float Consumption Impact on Cost and Schedule in the Construction Industry. Journal of Construction Engineering and Management, 133(02), 124–30.

Salah, A and Moselhi, O (2015) Contingency modelling for construction projects using fuzzy-set theory. Engineering, Construction and Architectural Management, 22(02), 214-41.

Salarian, A A, Etemadfard, H, Rahimzadegan, A and Ghalehnovi, M (2023) Investigating the Role of Clustering in Construction-Accident Severity Prediction Using a Heterogeneous and Imbalanced Data Set. Journal of Construction Engineering and Management, 149(02).

Salvado, F, Almeida, N and Vale e Azevedo, A (2019) Aligning financial and functional equivalent depreciations rates of building assets. Engineering, Construction and Architectural Management, 27(02), 441–57.

Salvado, F, Almeida, N M d and Vale e Azevedo, A (2018) Toward improved LCC-informed decisions in building management. Built Environment Project and Asset Management, 8(02), 114–33.

Sambasivan, M, Deepak, T J, Salim, A N and Ponniah, V (2017) Analysis of delays in Tanzanian construction industry: Transaction cost economics and structural equation modeling approach. Engineering, Construction and Architectural Management, 24(02), 308-25.

Sanboskani, H and Srour, I (2022) Using Advanced Statistical Methods to Identify the Drivers of Knowledge Sharing Intention among Construction Workers. Journal of Construction Engineering and Management, 148(02).

Sanchez, A, X, Lehtiranta, L, Hampson, K D and Kenley, R (2014) Evaluation framework for green procurement in road construction. Smart and Sustainable Built Environment, 3(02), 153-69.

Sandberg, N H and Brattebø, H (2012) Analysis of energy and carbon flows in the future Norwegian dwelling stock. Building Research & Information, 40(02), 123-39.

Sanderford, A R, McCoy, A P and Keefe, M J (2018) Adoption of Energy Star certifications: theory and evidence compared. Building Research & Information, 46(02), 207–19.

Sandrk, N I and Huemann, M (2016) Organizational culture of the Croatian construction industry. Engineering, Construction and Architectural Management, 23(02), 237-60.

Sangiorgio, V, Uva, G and Fatiguso, F (2018) Optimized AHP to Overcome Limits in Weight Calculation: Building Performance Application. Journal of Construction Engineering and Management, 144(02).

Sanni, A, O (2016) Factors determining the success of public private partnership projects in Nigeria . Construction Economics and Building, 16(02), 42-55.

Sanvido, V E (1988) Conceptual Construction Process Model. Journal of Construction Engineering and Management, 114(02), 294–310.

Sanvido, V E and Medeiros, D J (1990) Applying Computer‐Integrated Manufacturing Concepts to Construction. Journal of Construction Engineering and Management, 116(02), 365–79.

Sanvido, V E and Paulson, B C (1991) Site Analysis Using Controller‐Function Charts. Journal of Construction Engineering and Management, 117(02), 226–41.

Sargent, K, Hyland, P and Sawang, S (2012) Factors influencing the adoption of information technology in a construction business. Construction Economics and Building, 12(02), 72-86.

Sarhan, J, Xia, B, Fawzia, S, Karim, A and Olanipekun, A (2018) Barriers to implementing lean construction practices in the Kingdom of Saudi Arabia (KSA) construction industry. Construction Innovation, 18(02), 246–72.

Sariola, R (2018) Utilizing the innovation potential of suppliers in construction projects. Construction Innovation, 18(02), 0.

Sarshar, M, Haigh, R and Amaratunga, D (2004) Improving project processes: best practice case study. Construction Innovation, 4(02), 69–82.

Sarshar, M, Tanyer, A M, Aouad, G and Underwood, J (2002) A vision for construction IT 2005–2010: two case studies. Engineering, Construction and Architectural Management, 9(02), 152–60.

Sastry, M K S and Seekumar, L (2012) Automation of real time monitoring and controlling of a marine loading arm. Journal of Engineering, Design and Technology, 10(02), 217-27.

Satwiko, P, Prasetya, A and Suhedi, F (2019) Noise-reducing vents for windows in warm, humid, tropical countries. Architectural Engineering and Design Management, 15(02), 141–58.

Saurin, T A, Formoso, C T and Guimarães, L B M (2004) Safety and production: an integrated planning and control model. Construction Management and Economics, 22(02), 159-69.

Sawhney, A and Mund, A (2001) IntelliCranes: an integrated crane type and model selection system. Construction Management and Economics, 19(02), 227-37.

Scharpff, J, Schraven, D, Volker, L, Spaan, M T J and de Weerdt, M M (2021) Can multiple contractors self-regulate their joint service delivery? A serious gaming experiment on road maintenance planning. Construction Management and Economics, 39(02), 99–116.

Schaufelberger, J E and Wipadapisut, I (2003) Alternate Financing Strategies for Build-Operate-Transfer Projects. Journal of Construction Engineering and Management, 129(02), 205–13.

Schexnayder, C, Knutson, K and Fente, J (2005) Describing a Beta Probability Distribution Function for Construction Simulation. Journal of Construction Engineering and Management, 131(02), 221–9.

Schipper, E L F, Thomalla, F, Vulturius, G, Davis, M and Johnson, K (2016) Linking disaster risk reduction, climate change and development. International Journal of Disaster Resilience in the Built Environment, 7(02), 216-28.

Schlegel, M, Trutnevyte, E and Scholz, R W (2012) Patterns of residential heat demand in rural Switzerland. Building Research & Information, 40(02), 140-53.

Schröpfer, V L M, Tah, J and Kurul, E (2017) Mapping the knowledge flow in sustainable construction project teams using social network analysis. Engineering, Construction and Architectural Management, 24(02), 229-59.

Schweber, L (2013) The effect of BREEAM on clients and construction professionals. Building Research & Information, 41(02), 129-45.

Scott, D (1987) Multi-objective economic evaluation of minor roading projects. Construction Management and Economics, 5(02), 169-81.

Scott, D and Kagiri, M (1992) Choosing the most appropriate method of construction with computer assistance. Construction Management and Economics, 10(02), 153-77.

Scott, R (1995) Invited paper: Competitive advantage through alliancing. Engineering, Construction and Architectural Management, 2(02), 83–92.

Scott, S (1995) Checking the project plan. Construction Management and Economics, 13(02), 127-36.

Scrase, J I (2001) Curbing the growth in UK commercial energy consumption. Building Research & Information, 29(02), 51–61.

Sebastian, R (2011) Changing roles of the clients, architects and contractors through BIM. Engineering, Construction and Architectural Management, 18(02), 176–87.

Sebastian, R (2004) Critical appraisal of design management in architecture. Journal of Construction Research, 5(02), 255–66.

Sebastian, R (2010) Integrated design and engineering using building information modelling: a pilot project of small-scale housing development in The Netherlands. Architectural Engineering and Design Management, 6(02), 103–10.

Senarath, J R and Fernando, N G (2017) Developing labour productivity norms for aluminium system formwork in Sri Lanka. Built Environment Project and Asset Management, 7(02), 199-211.

Senaratne, S and Hewamanage, P R (2015) The role of team leadership in achieving leed certification in a green building project. Built Environment Project and Asset Management, 5(02), 170-83.

Senaratne, S and Sexton, M G (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management, 16(02), 186–200.

Seneviratne, K, Amaratunga, D and Haigh, R (2017) Managing housing needs of post conflict housing reconstruction: Sri Lankan perspective. Engineering, Construction and Architectural Management, 24(02), 275-88.

Seni, D A (2000) From scientific management to process engineering: the spontaneous theory of technological value in the design of work in organizations. Journal of Construction Research, 1(02), 91–8.

Seo, Y C and Hyan, C T (2004) Procurement system selection model reflecting past performance. Journal of Construction Procurement, 10(02).

Sepasgozar, S M E, Loosemore, M and Davis, S R (2016) Conceptualising information and equipment technology adoption in construction: A critical review of existing research. Engineering, Construction and Architectural Management, 23(02), 158-76.

Sergeeva, N and Liu, N (2019) Social construction of innovation and the role of innovation brokers in the construction sector. Construction Innovation , 20(02), 247–59.

Serpell, A F (2004) Towards a knowledge-based assessment of conceptual cost estimates. Building Research & Information, 32(02), 157–64.

Severson, G D, Russell, J S and Jaselskis, E J (1994) Predicting Contract Surety Bond Claims Using Contractor Financial Data. Journal of Construction Engineering and Management, 120(02), 405–20.

Sexton, M and Barrett, P (2005) Performance-based building and innovation: balancing client and industry needs. Building Research & Information, 33(02), 142–8.

Seyis, S, Ergen, E and Pizzi, E (2016) Identification of Waste Types and Their Root Causes in Green-Building Project Delivery Process. Journal of Construction Engineering and Management, 142(02).

Sezer, A A (2015) Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(02), 141-53.

Sfakianakis, E and Laar, M v d (2013) Fiscal effects and public risk in public-private partnerships. Built Environment Project and Asset Management, 3(02), 181-98.

Shafabakhsh, G A, Kashi, E and Akbari, A (2016) A comparison effect of aircraft main gear configuration on runway damages by LED and FE method. Journal of Engineering, Design and Technology, 14(02), 362-72.

Shafabakhsh, G, Kashi, E and Tahani, M (2018) Analysis of runway pavement response under aircraft moving load by FEM. Journal of Engineering, Design and Technology, 16(02), 233–43.

Shahandashti, M, Ashuri, B and Mostaan, K (2018) Automatic fault detection for Building Integrated Photovoltaic (BIPV) systems using time series methods. Built Environment Project and Asset Management, 8(02), 160–70.

Shakantu, W, Muya, M, Tookey, J and Bowen, P (2008) Evaluating truck empty running in construction: a case study from Cape Town, South Africa. Construction Economics and Building, 8(02), 41-49.

Shaked, O and Warszawski, A (1995) Knowledge-Based System for Construction Planning of High-Rise Buildings. Journal of Construction Engineering and Management, 121(02), 172–82.

Shammas-Toma, M, Seymour, D E and Clark, L (1998) Obstacles to implementing total quality management in the UK construction industry. Construction Management and Economics, 16(02), 177-92.

Shapira, A (1999) Contemporary Trends in Formwork Standards—A Case Study. Journal of Construction Engineering and Management, 125(02), 69–75.

Shapira, A, Shahar, Y and Raz, Y (2001) Design and Construction of High Multitier Shoring Towers: Case Study. Journal of Construction Engineering and Management, 127(02), 108–15.

Sharafi, A, Amalnick, M S and Taleizadeh, A A (2022) Optimal readjustment of contract variables and the financial outcome of PPP projects in the operation period. Construction Management and Economics, 40(02), 87–103.

Sharma, M and Lee, A (2019) Dementia-friendly heritage settings: a research review. International Journal of Building Pathology and Adaptation, 38(02), 279–310.

Sharma, V, Caldas, C H and Mulva, S P (2020) Identification and Prioritization of Factors Affecting the Overall Project Cost of Healthcare Facilities. Journal of Construction Engineering and Management, 146(02).

Sharp, M (2010) Simple solutions to complex issues in the built environment. Construction Innovation, 10(02), 121–5.

Shash, A A (1993) Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11(02), 111-8.

Shash, A A (1998) Subcontractors' Bidding Decisions. Journal of Construction Engineering and Management, 124(02), 101–6.

Shash, A A and Ahcom, J (2005) Organizational aspects of safety management subsystem. Journal of Construction Research, 6(02), 237–52.

Shash, A A and Al-Amir, M (1997) Information technology in contractors' firms in Saudi Arabia. Construction Management and Economics, 15(02), 187-200.

Shehab, T and Farooq, M (2013) Neural network cost estimating model for utility rehabilitation projects. Engineering, Construction and Architectural Management, 20(02), 118-26.

Shehadeh, A, Alshboul, O and Hamedat, O (2022) Risk Assessment Model for Optimal Gain–Pain Share Ratio in Target Cost Contract for Construction Projects. Journal of Construction Engineering and Management, 148(02).

Shelton, J, Martek, I and Chen, C (2016) Implementation of innovative technologies in small-scale construction firms: Five Australian case studies. Engineering, Construction and Architectural Management, 23(02), 177-91.

Shen, L and Song, W (1998) Competitive Tendering Practice in Chinese Construction. Journal of Construction Engineering and Management, 124(02), 155–61.

Shen, L Y and Wu, Y Z (2005) Risk Concession Model for Build/Operate/Transfer Contract Projects. Journal of Construction Engineering and Management, 131(02), 211–20.

Shen, L-Y, Wu, M and Wang, J Y (2002) A model for assessing the feasibility of construction project in contributing to the attainment of sustainable development. Journal of Construction Research, 3(02), 255–69.

Shen, Q, Li, H, Chung, J and Hui, P-Y (2004) A framework for identification and representation of client requirements in the briefing process. Construction Management and Economics, 22(02), 213-21.

Sher, W, Williams, A and Northcote, M (2015) The lived experience of online educators: insights from construction management. Construction Economics and Building, 15(02), 49-62.

Sherratt, F and Leicht, R (2020) Unpacking Ontological Perspectives in CEM Research: Everything Is Biased. Journal of Construction Engineering and Management, 146(02).

Sherrin, C, McAllister, P and Nanda, A (2015) The persistence of distance: A macro-level perspective on European cross-border real estate development flows. Journal of Financial Management of Property and Construction, 20(02), 147-69.

Sherry, C (2009) The New South Wales strata and Community Titles Acts: A case study of legislatively created high rise and master planned communities. International Journal of Law in the Built Environment, 1(02), 130-42.

Shi, J J and Halpin, D W (2003) Enterprise Resource Planning for Construction Business Management. Journal of Construction Engineering and Management, 129(02), 214–21.

Shields, T J, Silcock, G W and Donegan, H A (1990) Towards the development of a fire safety systems evaluation for public assembly buildings. Construction Management and Economics, 8(02), 147-58.

Shih, N and Huang, S (2006) 3D Scan Information Management System for Construction Management. Journal of Construction Engineering and Management, 132(02), 134–42.

Shim, E and Kim, B-C (2014) Batch-Size Based Repetitive Scheduling Method (BRSM). International Journal of Construction Education and Research, 10(02), 140-56.

Shoesmith, D R (1996) A study of the management and procurement of building services work. Construction Management and Economics, 14(02), 93-101.

Shohet, I M and Paciuk, M (2006) Service life prediction of exterior cladding components under failure conditions. Construction Management and Economics, 24(02), 131-48.

Shohet, I M and Perelstein, E (2004) Decision Support Model for the Allocation of Resources in Rehabilitation Projects. Journal of Construction Engineering and Management, 130(02), 249–57.

Shohet, I M and Puterman, M (2004) Flat roofing systems: towards integrated techno-economic analysis. Building Research & Information, 32(02), 165–73.

Shohet, I M, Lavy-Leibovich, S and Bar-On, D (2003) Integrated maintenance monitoring of hospital buildings. Construction Management and Economics, 21(02), 219-29.

Shojaei, A, Wang, J and Fenner, A (2019) Exploring the feasibility of blockchain technology as an infrastructure for improving built asset sustainability. Built Environment Project and Asset Management, 10(02), 184–99.

Shokri-Ghasabeh, M and Chileshe, N (2016) Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 16(02), 127-57.

Shokri, S, Ahn, S, Lee, S, Haas, C T and Haas, R C G (2016) Current Status of Interface Management in Construction: Drivers and Effects of Systematic Interface Management. Journal of Construction Engineering and Management, 142(02).

Shokri, S, Haas, C T, G. Haas, R C and Lee, S H (2016) Interface-Management Process for Managing Risks in Complex Capital Projects. Journal of Construction Engineering and Management, 142(02).

Short, A C (2008) What is 'architectural design research'?. Building Research & Information, 36(02), 195–9.

Short, C A and Lomas, K J (2007) Exploiting a hybrid environmental design strategy in a US continental climate. Building Research & Information, 35(02), 119–43.

Shuler, S, Schmidt, C and Goldbaum, J (2010) Life-cycle economic performance for hot mix asphalt pavement rehabilitation strategies. International Journal of Construction Education and Research, 6(02), 152–62.

Sibilla, M and Kurul, E (2021) Exploring transformative pedagogies for built environment disciplines: the case of interdisciplinarity in low carbon transition. Building Research & Information, 49(02), 234–47.

Sidoli del Ceno, J, George, H and Vols, M (2015) Adjudication in tenancy deposit scheme disputes: agents’ perspectives. International Journal of Law in the Built Environment, 7(02), 162-72.

Sidwell, A C (1990) Project management: dynamics and performance. Construction Management and Economics, 8(02), 159-79.

Sidwell, A C, Budiawan, D and Ma, T (2001) The significance of the tendering contract on the opportunities for clients to encourage contractorled innovation. Construction Innovation, 1(02), 107–16.

Siew, R Y J (2015) Alternative framework for assessing sustainable building funds: Green Building Fund. Building Research & Information, 43(02), 160-9.

Siew, R Y J (2016) Assessing the readiness of sustainability reporting tools (SRTs) for an age-friendly built environment. Journal of Financial Management of Property and Construction, 21(02), 122-36.

Siew, R Y J (2014) Human resource management in the construction industry – Sustainability competencies. Construction Economics and Building, 14(02), 87-103.

Siew, R Y J, Balatbat, M C A and Carmichael, D G (2013) A review of building/infrastructure sustainability reporting tools (SRTs). Smart and Sustainable Built Environment, 2(02), 106-39.

Sillars, D N and Kangari, R (1997) Japanese Construction Alliances . Journal of Construction Engineering and Management, 123(02), 146–52.

Simister, S J and Green, S D (1997) Recurring themes in value management practice. Engineering, Construction and Architectural Management, 4(02), 113–25.

Simons, A E, Redden, L and Collins, W (2023) Sitework Knowledge for Entry-Level Construction Professionals: Academic and Industry Perceptions. International Journal of Construction Education and Research, 19(02), 199–220.

Simpson, K B and Sam, A (2019) Strategies for health and safety management in Ghana. Journal of Engineering, Design and Technology , 18(02), 431–50.

Sing, T-F (2002) Time to build options in construction processes. Construction Management and Economics, 20(02), 119-30.

Singh, A (2011) Bayesian analysis for causes of failure at a water utility. Built Environment Project and Asset Management, 1(02), 195-210.

Singh, A (2002) Behavioural perceptions of design and construction engineers. Engineering, Construction and Architectural Management, 9(02), 66–80.

Singh, A (2012) Engineering mixes with politics. Construction Innovation, 12(02), 128-32.

Singh, K K and Sinha, M K (2017) Optimization of design parameters in a cylindrical heat sink with branched fins under natural convection. Journal of Engineering, Design and Technology, 15(02), 242-53.

Singh, S (1991) Cost estimation of prestressed concrete beam and reinforced concrete slab construction. Construction Management and Economics, 9(02), 205-15.

Singh, V and Holmström, J (2015) Needs and technology adoption: Observation from BIM experience. Engineering, Construction and Architectural Management, 22(02), 128-50.

Sivunen, M, Pulkka, L, Heinonen, J, Kajander, J-K and Junnila, S (2013) Service-dominant innovation in the built environment. Construction Innovation, 13(02), 146-64.

Skaik, S (2017) Operational problems and solutions of statutory complex adjudication: stakeholders’ perspectives. International Journal of Law in the Built Environment, 9(02), 162-75.

Skitmore, M R and Lo, H P (2002) A method of identifying high outliers in construction contract auctions. Engineering, Construction and Architectural Management, 9(02), 90–130.

Skitmore, M R and Wilcock, J (1994) Estimating processes of smaller builders. Construction Management and Economics, 12(02), 139-54.

Skitmore, M R, Stradling, S G and Tuohy, A P (1989) Project management under uncertainty. Construction Management and Economics, 7(02), 103-13.

Skitmore, M, Drew, D and Ngai, S (2001) Bid-Spread. Journal of Construction Engineering and Management, 127(02), 149–53.

Slattery, K T and Slattery, D K (2013) Modeling Earth Surfaces for Highway Earthwork Computation Using Terrestrial Laser Scanning. International Journal of Construction Education and Research, 9(02), 132-46.

Smallwood, J and Venter, D (2001) The role of the media in South African construction health and safety. Construction Economics and Building, 1(02), 37-46.

Smith, B W (2008) Temporary construction lighting of buildings: an evaluation of four techniques, both qualitative and quantitative. International Journal of Construction Education and Research, 4(02), 132-149.

Smith, G and Ceranic, B (2008) Spatial layout planning in sub-surface rail station design for effective fire evacuation. Architectural Engineering and Design Management, 4(02), 99–120.

Smith, G R and Bohn, C M (1999) Small to Medium Contractor Contingency and Assumption of Risk. Journal of Construction Engineering and Management, 125(02), 101–8.

Smith, G R and Roth, R D (1991) Safety Programs and The Construction Manager. Journal of Construction Engineering and Management, 117(02), 360–71.

Smith, J (2005) An approach to developing a performance brief at the project inception stage. Architectural Engineering and Design Management, 1(02), 3–20.

Smith, S D, Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(02), 219-28.

Smits, M W M (2019) A quasi-experimental method for testing rural design support within a DRM framework. Smart and Sustainable Built Environment, 8(02), 150–87.

Smyth, H J and Thompson, N J (2005) Developing conditions of trust within a framework of trust. Journal of Construction Procurement, 11(02).

So, C (2017) Intuitive design: framing a software test system as a status reporting tool for business. Journal of Engineering, Design and Technology, 15(02), 149-65.

Sobotka, A (2000) Simulation modelling for logistics re-engineering in the construction company. Construction Management and Economics, 18(02), 183-95.

Soetanto, R and Proverbs, D G (2004) Intelligent models for predicting levels of client satisfaction. Journal of Construction Research, 5(02), 233–53.

Soetanto, R, Glass, J, Dainty, A R J and Price, A D F (2007) Structural frame selection: case studies of hybrid concrete frames. Building Research & Information, 35(02), 206–19.

Sohani, H, Hosseini Nourzad, S H and Saghatforoush, E (2024) The optimized form of building made from the reused elements. Architectural Engineering and Design Management, 20(02), 191–213.

Sole, T and Wagner, C (2018) Understanding domestic fuel use practices in an urban township. Building Research & Information, 46(02), 220–30.

Soliman-Junior, J, Tzortzopoulos, P and Kagioglou, M (2022) Designers’ perspective on the use of automation to support regulatory compliance in healthcare building projects. Construction Management and Economics, 40(02), 123–41.

Somerville, P (2013) Property and power in the English countryside: the case of housing. International Journal of Law in the Built Environment, 5(02), 100-17.

Sommerville, J (1996) An analysis of recruitment sources and employee turnover in Scottish construction organizations. Construction Management and Economics, 14(02), 147-54.

Son, J and Rojas, E M (2011) Impact of Optimism Bias Regarding Organizational Dynamics on Project Planning and Control. Journal of Construction Engineering and Management, 137(02), 147–57.

Songer, A D, Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(02), 69–82.

Sozen, Z and Kucuk, M A (1999) Secondary subcontracting in the Turkish construction industry. Construction Management and Economics, 17(02), 215-20.

Sridarran, P, Keraminiyage, K and Herszon, L (2017) Improving the cost estimates of complex projects in the project-based industries. Built Environment Project and Asset Management, 7(02), 173-84.

Srijaroen, C, Hoy, M, Horpibulsuk, S, Rachan, R and Arulrajah, A (2021) Soil–Cement Screw Pile: Alternative Pile for Low- and Medium-Rise Buildings in Soft Bangkok Clay. Journal of Construction Engineering and Management, 147(02).

Srinath, P, Carolyn, S H and Stephen, K (2011) An analysis of value management in practice: the case of Northern Ireland's construction industry. Journal of Financial Management of Property and Construction, 16(02), 94–110.

Srinivasan, R and Harris, F C (1991) Lane rental contracting. Construction Management and Economics, 9(02), 151-5.

Stamatiadis, N, Goodrum, P, Shocklee, E and Wang, C (2014) Quantitative Analysis of State Transportation Agency’s Experience with Constructability Reviews. Journal of Construction Engineering and Management, 140(02).

Stanford, M S and Molenaar, K R (2018) Influence of Simplified Procurement Methods on Competition for Public Sector Construction. Journal of Construction Engineering and Management, 144(02).

Stanley, F and Thabani, M (2011) Application of RCM for a chipping and sawing mill. Journal of Engineering, Design and Technology, 9(02), 204–26.

Stansfield, F R (1995) Work in the IT industry on usability provides an agenda for improvement of construction procurement methods. Journal of Construction Procurement, 1(02), 124–49.

Steele, A and Sodhi, D (2004) Black and minority ethnic contractors and consultants and UK housing associations' contracting power. Construction Management and Economics, 22(02), 151-7.

Steemers, K, Baker, N, Crowther, D, Dubiel, J and Nikolopoulou, M (1998) Radiation absorption and urban texture. Building Research & Information, 26(02), 103–12.

Steinhardt, D, A and Manley, K (2016) Exploring the beliefs of Australian prefabricated house builders . Construction Economics and Building, 16(02), 27-41.

Stewart, J, Minchin, R E, Jaselskis, E J, Dayal, V and Smith, G (2004) Potential Construction Applications for Thermoset Composite Scrap Material. Journal of Construction Engineering and Management, 130(02), 199–205.

Stewart, P (2001) The role of e-commerce systems for the construction industry. Construction Economics and Building, 1(02), 24-36.

Stewart, P, Robinson, J and Low, S (2005) The business case for sustainable design - the City of Melbourne CH2 project. Construction Economics and Building, 5(02), 58-70.

Stopforth, R, Proctor-Parker, C and Davrajh, S (2019) Analysis of a low-cost anthropomorphic sensory platform for the world first minibus test. Journal of Engineering, Design and Technology, 17(02), 434–55.

Stoy, C and Schalcher, H (2007) Residential Building Projects: Building Cost Indicators and Drivers. Journal of Construction Engineering and Management, 133(02), 139–45.

Strahorn, S, Galendran, T and Brewer, G (2015) The influence of trust in traditional contracting: investigating the "lived experience" of stakeholders. Construction Economics and Building, 15(02), 81-101.

Straub, A (2011) Maintenance contractors acting as service innovators. Construction Innovation, 11(02), 179–89.

Strengers, Y and Maller, C (2011) Integrating health, housing and energy policies: social practices of cooling. Building Research & Information, 39(02), 154–68.

Stringfellow, P (2014) Construction contractors’ involvement in disaster management planning. Construction Economics and Building, 14(02), 120-132.

Stumpf, I (2000) Competitive pressures on middle-market contractors in the UK. Engineering, Construction and Architectural Management, 7(02), 159–68.

Styhre, A (2011) In the circuit of credibility: construction workers and the norms of "a good job". Construction Management and Economics, 29(02), 199–209.

Styhre, A (2019) The invention of the shopping mall. Journal of Engineering, Design and Technology, 17(02), 283–99.

Styhre, A, Wikmalm, L, Ollila, S and Roth, J (2012) Sociomaterial practices in engineering work: The backtalk of materials and the tinkering of resources. Journal of Engineering, Design and Technology, 10(02), 151-67.

Su, Y-S (2017) Rebuild, retreat or resilience: urban flood vulnerability analysis and simulation in Taipei. International Journal of Disaster Resilience in the Built Environment, 8(02), 110-22.

Succar, B, Sher, W and Williams, A (2012) Measuring BIM performance: Five metrics. Architectural Engineering and Design Management, 8(02), 120-42.

Suchocki, C, Błaszczak-Bąk, W, Janicka, J and Dumalski, A (2021) Detection of defects in building walls using modified OptD method for down-sampling of point clouds. Building Research & Information, 49(02), 197–215.

Sun, Y and Goh, B H (2015) Contribution index based on green building certification systems. Construction Economics and Building, 15(02), 31-48.

Sun, Y and Zhang, L (2015) Balancing Public and Private Stakeholder Interests in BOT Concessions: Minimum Revenue Guarantee and Royalty Scheme Applied to a Water Treatment Project in China. Journal of Construction Engineering and Management, 141(02).

Sunday, J O, Olatunde, D and Oluwatoyin, I (2011) Investigation into the effects of solid lubricant on the surface characteristics of some metals during orthogonal machining. Journal of Engineering, Design and Technology, 9(02), 130–42.

Sunding, L and Ekholm, A (2014) Problems and problem attention in the construction sector – understanding the influence of human factors. Construction Economics and Building, 14(02), 1-17.

Sundquist, J, Larsson, B and Lindahl, G (2007) Cooperation in the building sector between building material manufacturers and contractors to develop products. Construction Economics and Building, 7(02), 45-53.

Sundqvist, J (2008) From focus on price to the pyramid of innovation, information, cooperation, value and trust: a success story of five Swedish building material manufacturers. Construction Economics and Building, 8(02), 11-2.

Suresh, N, Kumar, M and Arul Daniel, S (2019) Multi-agent strategy for low voltage DC supply for a smart home. Smart and Sustainable Built Environment, 9(02), 73–90.

Sutrisna, M and Barrett, P (2007) Applying rich picture diagrams to model case studies of construction projects. Engineering, Construction and Architectural Management, 14(02), 164–79.

Sutrisna, M and Goulding, J (2019) Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, Construction and Architectural Management, 26(02), 267–84.

Sutton, K, Williams, A, Tremain, D and Kilgour, P (2016) University entry score: Is it a consideration for spatial performance in architecture design students?. Journal of Engineering, Design and Technology, 14(02), 328-42.

Swaffield, L M and McDonald, A M (2008) The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(02), 132–48.

Swallow, M and Zulu, S (2019) Students’ awareness and perception of the value of BIM and 4D for site health and safety management. Journal of Engineering, Design and Technology , 18(02), 414–30.

Swan, W and Khalfan, M M A (2007) Mutual objective setting for partnering projects in the public sector. Engineering, Construction and Architectural Management, 14(02), 119–30.

Swei, O (2020) Forecasting Infidelity: Why Current Methods for Predicting Costs Miss the Mark. Journal of Construction Engineering and Management, 146(02).

Sweis, R J, Al Sharef, R, Jandali, D, Obeidat, B Y and Andrawes, N (2018) The relationship between project team members' effectiveness and acknowledgment of talent: Team members' perspective. International Journal of Construction Education and Research, 14(02), 141-60.

Syben, G (2000) Contractors take command: from a demand-based towards a producer oriented model in German construction. Building Research & Information, 28(02), 119–30.

Syed, A and Routray, J K (2014) Vulnerability assessment of earthquake prone communities in Baluchistan. International Journal of Disaster Resilience in the Built Environment, 5(02), 144-62.

Syed, A and Sonparote, R S (2020) Development and Early-Age Performance of an Innovative Prestressed Precast Concrete Pavement. Journal of Construction Engineering and Management, 146(02).

Sylvie, J R, Thomas, S R, Lee, S, Chapman, R E and Smith, R T (2013) Development and Interpretation of the Security Rating Index. Journal of Construction Engineering and Management, 139(02), 185–94.

Tah, J H M and Carr, V (2000) Information modelling for a construction project risk management system. Engineering, Construction and Architectural Management, 7(02), 107–19.

Tai, S, Wang, Y and Anumba, C J (2009) A survey on communications in large-scale construction projects in China. Engineering, Construction and Architectural Management, 16(02), 136–49.

Tainter, J A and Taylor, T G (2014) Complexity, problem-solving, sustainability and resilience. Building Research & Information, 42(02), 168-81.

Tait, P and Loosemore, M (2009) The corporate governance of Australian listed construction companies. Construction Economics and Building, 9(02), 7-16.

Talley, K G and Torres, A S (2018) Measuring the impact of using daily objectives to provide rapid feedback in construction courses. International Journal of Construction Education and Research, 14(02), 95-117.

Tam, C M and Tong, T K L (2005) Multiple GMDH models for estimating resource requirements. Construction Innovation, 5(02), 115–31.

Tam, C M, Tam, V W Y and Zeng, S X (2004) Environmental performance assessment in China and Hong Kong. Building Research & Information, 32(02), 110–8.

Tam, C M, Tong, T K L, Cheung, S O and Chan, A P C (2001) Genetic algorithm model in optimizing the use of labour. Construction Management and Economics, 19(02), 207-15.

Tam, C-M and Tong, T K L (2008) Locating large-scale harbour-front project developments using SIR method with grey aggregation approach. Construction Innovation, 8(02), 120–36.

Tam, V W Y and Le, K N (2008) On using the Gaussian and hyperbolic distributions to improve quality in construction. Journal of Engineering, Design and Technology, 6(02), 112–23.

Tam, V W Y, Shen, L Y, Fung, I W H and Wang, J Y (2007) Controlling construction waste by implementing governmental ordinances in Hong Kong. Construction Innovation, 7(02), 149–66.

Tan, W (2003) Building competitive advantage: construction education in Japan. Engineering, Construction and Architectural Management, 10(02), 78–87.

Tan, W (1999) Construction cost and building height. Construction Management and Economics, 17(02), 129-32.

Tan, W (2003) The Development of Construction Education in Singapore. Journal of Construction Research, 4(02), 207–22.

Tan, W (2000) Total factor productivity in Singapore construction. Engineering, Construction and Architectural Management, 7(02), 154–8.

Tan, W and Elias, Y (2000) Learning-by-doing in Singapore construction. Journal of Construction Research, 1(02), 151–8.

Tang, S L, Lee, H K and Wong, K (1997) Safety cost optimization of building projects in Hong Kong. Construction Management and Economics, 15(02), 177-86.

Tang, Y H and Ogunlana, S O (2003) Modelling the dynamic performance of a construction organization. Construction Management and Economics, 21(02), 127-36.

Tangwe, S l and Simon, M (2019) Quantification of the viability of residential air source heat pump water heaters as potential replacement for geysers in South Africa. Journal of Engineering, Design and Technology, 17(02), 456–70.

Tas, E, Yaman, H and Tanacan, L (2008) A building material evaluation and selection model for the Turkish construction sector. Engineering, Construction and Architectural Management, 15(02), 149–63.

Tatum, C B (1987) Balancing Engineering and Management in Construction Education. Journal of Construction Engineering and Management, 113(02), 264–72.

Tatum, C B (1986) Designing Project Organizations: An Expanded Process. Journal of Construction Engineering and Management, 112(02), 259–72.

Tatum, C B (1987) Improving Constructibility during Conceptual Planning. Journal of Construction Engineering and Management, 113(02), 191–207.

Tatum, C B (1983) Innovations in Nuclear Concrete Construction. Journal of Construction Engineering and Management, 109(02), 131–45.

Tatum, C B (1986) Potential Mechanisms for Construction Innovation. Journal of Construction Engineering and Management, 112(02), 178–91.

Tatum, C B and Cottrell, T E (1983) Resident Engineering in Power Plant Construction. Journal of Construction Engineering and Management, 109(02), 224–32.

Tatum, C B, Bauer, M F and Meade, A W (1989) Process of Innovation for Up/Down Construction at Rowes Wharf. Journal of Construction Engineering and Management, 115(02), 179–95.

Tauber, G (2015) Architects and rural post-disaster housing: lessons from South India. International Journal of Disaster Resilience in the Built Environment, 6(02), 206-24.

Tavakoli, A and Kakalia, A (1993) MMS: a materials management system. Construction Management and Economics, 11(02), 143-9.

Tavakoli, A, Taye, E D and Erktin, M (1989) Equipment Policy of Top 400 Contractors: A Survey. Journal of Construction Engineering and Management, 115(02), 317–29.

Tavakoli, N and Hosseini Nourzad, S H (2020) Win-win pricing method for BOT projects using a simulation-based evolutionary optimization. Construction Management and Economics, 38(02), 157–71.

Tavares, d A C, Rocha, L J and Monetti, E (2017) São Paulo’s office market: scenario for the next years. Journal of Financial Management of Property and Construction, 22(02), 154-73.

Tawalare, A, G and Laishram, B (2018) Relational Contracting Conceptual Model for Public Sector Construction Organisations: An Indian Context . Construction Economics and Building, 18(02), 70-91.

Taylor, M D and Wamuziri, S C (2002) Strategic construction mechatronics valuation: a real option-pricing approach. Journal of Financial Management of Property and Construction, 7(02), 75–90.

Tazilan, A (2012) Identifying microarchitecture for sustainable design in Malaysia. Smart and Sustainable Built Environment, 1(02), 172-85.

Telem, D, Shapira, A, Goren, Y D and Schexnayder, C J (2006) Moving a Reinforced-Concrete Building: Case Study. Journal of Construction Engineering and Management, 132(02), 115–24.

Tennant, S and Fernie, S (2012) The commercial currency of construction framework agreements. Building Research & Information, 40(02), 209-20.

Teo, A and Runeson, G (2001) Aspects of market differentiation in the building industry. Construction Economics and Building, 1(02), 14-23.

Teo, M M and Loosemore, M (2011) Community-based protest against construction projects: a case study of movement continuity. Construction Management and Economics, 29(02), 131–44.

Teriö, O, Sorri, J, Kähkönen, K and Hämäläinen, J (2014) Environmental index for Finnish construction sites. Construction Innovation, 14(02), 245-62.

Teriö, O, Sorri, J, Kähkönen, K and Hämäläinen, J (2014) Environmental index for Finnish construction sites. Construction Innovation, 14(02), 245-62.

Terry, N and Palmer, J (2016) Trends in home computing and energy demand. Building Research & Information, 44(02), 175-87.

Tezel, A and Aziz, Z (2017) Benefits of visual management in construction: Cases from the transportation sector in England. Construction Innovation, 17(02), 125-57.

Thomas, A M (2011) Evaluating development and community benefits of shopping malls: A case study using input/output analysis. Journal of Financial Management of Property and Construction, 16(02), 111–25.

Thomas, H R and Raynar, K A (1997) Scheduled Overtime and Labor Productivity: Quantitative Analysis . Journal of Construction Engineering and Management, 123(02), 181–8.

Thomas, H R and Willenbrock, J H (1988) Managing Construction Research at Universities. Journal of Construction Engineering and Management, 114(02), 245–55.

Thomas, H R, Guevara, J M and Gustenhoven, C T (1984) Improving Productivity Estimates by Work Sampling. Journal of Construction Engineering and Management, 110(02), 178–88.

Thomas, H R, Heuer, D W and Filippelli, R L (1984) Settlement of Construction Jurisdictional Disputes. Journal of Construction Engineering and Management, 110(02), 165–77.

Thomas, H R, Horman, M J, de Souza, U E L and ZavÅ™ski, I (2002) Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(02), 144–54.

Thomas, H R, Mathews, C T and Ward, J G (1986) Learning Curve Models of Construction Productivity. Journal of Construction Engineering and Management, 112(02), 245–58.

Thomas, H R, Smith, G R and Mellott, R E (1994) Interpretation of Construction Contracts. Journal of Construction Engineering and Management, 120(02), 321–36.

Thomas, T (1998) Domestic water supply using rainwater harvesting. Building Research & Information, 26(02), 94–101.

Thorpe, D (2003) Online Remote Construction Management trials in Queensland Department of Main Roads: a participant’s perspective. Construction Innovation, 3(02), 65–79.

Thorpe, D, Ryan, N and Charles, M B (2009) Innovation and small residential builders: an Australian study. Construction Innovation, 9(02), 184–200.

Tiong, R L K (1995) Risks and Guarantees in BOT Tender. Journal of Construction Engineering and Management, 121(02), 183–8.

Tiong, R L K (1992) Strategies in Risk Management of On‐Demand Guarantees. Journal of Construction Engineering and Management, 118(02), 229–43.

Tiong, R L K and Alum, J (1997) Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(02), 83–94.

Tiong, R L K, Yeo, K and McCarthy, S C (1992) Critical Success Factors in Winning BOT Contracts. Journal of Construction Engineering and Management, 118(02), 217–28.

Titus, S and Bröchner, J (2005) Managing information flow in construction supply chains. Construction Innovation, 5(02), 71–82.

Tokdemir, O B, Erol, H and Dikmen, I (2019) Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation. Journal of Construction Engineering and Management, 145(02).

Toller, S, Carlsson, A, Wadeskog, A, Miliutenko, S and Finnveden, G (2013) Indicators for environmental monitoring of the Swedish building and real estate management sector. Building Research & Information, 41(02), 146-55.

Tommelein, I D and Zouein, P P (1993) Interactive Dynamic Layout Planning. Journal of Construction Engineering and Management, 119(02), 266–87.

Tong, T K L (2003) Fuzzy optimisation of labour allocation by generic algorithms. Engineering, Construction and Architectural Management, 10(02), 146–55.

Toor, S-u-R and Ogunlana, S O (2009) Construction professionals' perception of critical success factors for large-scale construction projects. Construction Innovation, 9(02), 149–67.

Touran, A and Wiser, E P (1992) Monte Carlo Technique with Correlated Random Variables. Journal of Construction Engineering and Management, 118(02), 258–72.

Towner, M and Baccarini, D (2007) Risk pricing in construction tenders - how, who, what. Construction Economics and Building, 7(02), 12-25.

Tran, D Q, Diraviam, G and Minchin, R E (2018) Performance of Highway Design-Bid-Build and Design-Build Projects by Work Types. Journal of Construction Engineering and Management, 144(02).

Tran, Dand Skitmore, M (2002) The impact of culture on international management: a survey of project communications in Singapore. Construction Economics and Building, 2(02), 36-47.

Tran, H and Carmichael, D G (2012) The likelihood of subcontractor payment: Downstream progression via the owner and contractor. Journal of Financial Management of Property and Construction, 17(02), 135-52.

Traylor, C, Zhao, W and Tao, Y X (2019) Utilizing modulating-temperature setpoints to save energy and maintain alliesthesia-based comfort. Building Research & Information, 47(02), 190–201.

Trethewy, R W (2005) The effect of feedback on risk taking in the Australian construction industry. Journal of Engineering, Design and Technology, 3(02), 109–15.

Trethewy, R W and Atkinson, M (2003) Enhanced Safety, Health and Environment Outcomes Through Improved Design. Journal of Engineering, Design and Technology, 1(02), 187–201.

Tribelsky, E and Sacks, R (2011) An empirical study of information flows in multidisciplinary civil engineering design teams using lean measure. Architectural Engineering and Design Management, 7(02), 85–101.

Trigunarsyah, B (2007) Project designers' role in improving constructability of Indonesian construction projects. Construction Management and Economics, 25(02), 207–15.

Trinh, M T and Feng, Y (2020) Impact of Project Complexity on Construction Safety Performance: Moderating Role of Resilient Safety Culture. Journal of Construction Engineering and Management, 146(02).

Trinh, M T, Feng, Y and Mohamed, S (2019) Framework for Measuring Resilient Safety Culture in Vietnam’s Construction Environment. Journal of Construction Engineering and Management, 145(02).

Trinius, W and Sjöström, C (2005) Service life planning and performance requirements. Building Research & Information, 33(02), 173–81.

Trost, S M and Oberlender, G D (2003) Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression. Journal of Construction Engineering and Management, 129(02), 198–204.

Trushell, I, Clark, B and Agapiou, A (2016) Construction mediation in Scotland: An investigation into attitudes and experiences of mediation practitioners. International Journal of Law in the Built Environment, 8(02), 101-22.

Tse, R Y C and Love, P E D (2003) An Economic Analysis of the Effect of Delays on Project Costs. Journal of Construction Research, 4(02), 155–60.

Tse, R Y C, Ganesan, S and So, H M (1998) Property cycles in Hong Kong: causes and impacts. Journal of Financial Management of Property and Construction, 3(02), 2–26.

Tsehayae, A A and Fayek, A R (2016) System model for analysing construction labour productivity. Construction Innovation, 16(02), 203-28.

Tseng, A A, Tanaka, M, Leeladharan, B and Choi, J G (2003) Rotating laser-based system for full profile measurement. Construction Innovation, 3(02), 97–110.

Tserng, H P, Russell, J S, Hsu, C and Lin, C (2012) Analyzing the Role of National PPP Units in Promoting PPPs: Using New Institutional Economics and a Case Study. Journal of Construction Engineering and Management, 138(02), 242–9.

Tserng, H P, Yin, S Y L, Skibniewski, M J and Lee, M H (2010) Developing an ARIS-House-Based Method from Existing Information Systems to Project-Based Enterprise Resource Planning for General Contractor. Journal of Construction Engineering and Management, 136(02), 199–209.

Tucker, R L (1988) Perfection of the Buggy Whip. Journal of Construction Engineering and Management, 114(02), 157–71.

Tucker, S, Gamage, A and Wijeyesekera, C (2014) Some design aspects of sustainable post-disaster housing. International Journal of Disaster Resilience in the Built Environment, 5(02), 163-81.

Tunefalk, M, Legner, M and Leijonhufvud, G (2019) Long-term effects of additional insulation of building façades in Sweden. International Journal of Building Pathology and Adaptation, 38(02), 374–85.

Turkan, Y, Bosché, F, Haas, C T and Haas, R (2014) Tracking of secondary and temporary objects in structural concrete work. Construction Innovation, 14(02), 145-67.

Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Dynamics of control in construction project teams. Construction Management and Economics, 28(02), 202.

Tyler, J and Singh, A (2011) Enhancing post-earthquake disaster resilience. International Journal of Disaster Resilience in the Built Environment, 2(02), 103-17.

Tymvios, N and Gambatese, J A (2016) Perceptions about Design for Construction Worker Safety: Viewpoints from Contractors, Designers, and University Facility Owners. Journal of Construction Engineering and Management, 142(02).

Uddin, M, Mahboub, K C and Goodrum, P M (2011) Effects of Nonnormal Distributions on Highway Construction Acceptance Pay Factor Calculation. Journal of Construction Engineering and Management, 137(02), 108–18.

Ueki, M, Haas, C T and Seo, J (1999) Decision Tool for Microtunneling Method Selection. Journal of Construction Engineering and Management, 125(02), 123–31.

Uher, T E (1999) Partnering performance in Australia. Journal of Construction Procurement, 5(02), 163–76.

UlutaÅŸ, D D, Giritli, H and McDermott, P (2016) Corporate social responsibility in construction industry: A comparative study between UK and Turkey. Built Environment Project and Asset Management, 6(02), 218-31.

Umar, A A, Zawawi, N A W A and Abdul-Aziz, A (2019) Exploratory factor analysis of skills requirement for PPP contract governance. Built Environment Project and Asset Management, 9(02), 277–90.

Underwood, J and Watson, A (2003) An XML metadata approach to seamless project information exchange between heterogeneous platforms.. Engineering, Construction and Architectural Management, 10(02), 128–45.

Ungureanu, L C, Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules’ quality. Engineering, Construction and Architectural Management, 26(02), 224–44.

Unuigbe, M, Zulu, S L and Johnston, D (2020) Renewable energy sources and technologies in commercial buildings. Built Environment Project and Asset Management, 10(02), 231–45.

Utama, W P, Chan, A P, Zahoor, H, Gao, R and Jumas, D Y (2019) Making decision toward overseas construction projects. Engineering, Construction and Architectural Management, 26(02), 285–302.

Utomo, C and Rahmawati, Y (2020) Agreement options for negotiation on material location decision of housing development. Construction Innovation , 20(02), 209–22.

Vakhitova, T V (2015) Rethinking conservation: Managing cultural heritage as an inhabited cultural landscape. Built Environment Project and Asset Management, 5(02), 217-28.

Vakili-Ardebili, A and Boussabaine, A H (2007) Creating value through sustainable building design. Architectural Engineering and Design Management, 3(02), 83–92.

Vakili-Ardebili, A and Boussabaine, A H (2010) Ecological building design determinants. Architectural Engineering and Design Management, 6(02), 111–31.

Valdes-Vasquez, R and Clevenger, C M (2015) Piloting collaborative learning activities in a sustainable construction class. International Journal of Construction Education and Research, 11(02), 79-96.

Valente, C P, Brandalise, F M P and Formoso, C T (2019) Model for Devising Visual Management Systems on Construction Sites. Journal of Construction Engineering and Management, 145(02).

Valizadeh, R and Elmi, M (2010) Feasibility studies for optimum establishment of rural occupancy in mountainous regions. International Journal of Disaster Resilience in the Built Environment, 1(02), 221–40.

van Amstel, F M C, Zerjav, V, Hartmann, T, van der Voort, M C and Dewulf, G P M R (2015) Expanding the representation of user activities. Building Research & Information, 43(02), 144-59.

van den Bosch, C C K (2016) Tree agency and urban forest governance. Smart and Sustainable Built Environment, 5(02), 176-88.

van der Bent, H S, van den Brom, P I, Visscher, H J, Meijer, A and Mouter, N (2023) The energy performance of dwellings with heat pumps of Dutch non-profit housing associations. Building Research & Information, 51(02), 192–202.

van der Heijden, J (2015) Voluntary programmes for building retrofits: opportunities, performance and challenges. Building Research & Information, 43(02), 170-84.

van der Meer, J, Hartmann, A, van der Horst, A and Dewulf, G (2020) Multi-criteria decision analysis and quality of design decisions in infrastructure tenders: a contractor’s perspective. Construction Management and Economics, 38(02), 172–88.

Van Der Meulen, G J R and Money, A H (1984) The Bidding Game. Journal of Construction Engineering and Management, 110(02), 153–64.

Van Hove, M Y C, Deurinck, M, Lameire, W, Laverge, J, Janssens, A and Delghust, M (2023) Large-scale statistical analysis and modelling of real and regulatory total energy use in existing single-family houses in Flanders. Building Research & Information, 51(02), 203–22.

van Mossel, H-J and Straub, A (2009) The need for customizing maintenance services in social housing. Construction Management and Economics, 27(02), 135–51.

Van Oorschot, J A, Halman, J I and Hofman, E (2020) Getting innovations adopted in the housing sector. Construction Innovation , 20(02), 285–318.

Vanegas, J A, Bravo, E B and Halpin, D W (1993) Simulation Technologies for Planning Heavy Construction Processes. Journal of Construction Engineering and Management, 119(02), 336–54.

Vee, C and Skitmore, M R (2003) Professional ethics in the construction industry. Engineering, Construction and Architectural Management, 10(02), 117–27.

Vennström, A and Eriksson, P E (2010) Client perceived barriers to change of the construction process. Construction Innovation, 10(02), 126–37.

Venselaar, M and Gruis, V (2016) Studying intra-organizational dynamics in implementing supply chain partnering: A case study about work floor experiences in a Dutch housing association. Construction Management and Economics, 34(02), 98-109.

Verwey, I (2008) Women helping women: outcomes of a South African pilot project. Journal of Engineering, Design and Technology, 6(02), 162–77.

Vidalakis, C, Tookey, J E and Sommerville, J (2011) Logistics simulation modelling across construction supply chains. Construction Innovation, 11(02), 212–28.

Vigren, O (2024) Ecosystems in construction management and urban development: a comprehensive review of conceptualizations and contributions. Construction Management and Economics, 42(02), 162–81.

Vilventhan, A and Kalidindi, S N (2018) Utility relocation management in highway projects. Built Environment Project and Asset Management, 8(02), 171–82.

Vinodh, S and Aravindraj, S (2012) Axiomatic modeling of lean manufacturing system. Journal of Engineering, Design and Technology, 10(02), 199-216.

Vinodh, S and Ravikumar, R (2012) Application of probabilistic finite element analysis for crane hook design. Journal of Engineering, Design and Technology, 10(02), 255-75.

Vinodh, S, Arvind, K R and Rajanayagam, D (2011) Development of digital product catalogue for enabling agility in a manufacturing organisation. Journal of Engineering, Design and Technology, 9(02), 143–56.

Vinodh, S, Somanaathan, M and Arvind, K R (2013) Development of value stream map for achieving leanness in a manufacturing organization. Journal of Engineering, Design and Technology, 11(02), 129-41.

Vinodh, S, Sundararaj, G, Devadasan, S R, Kuttalingam, D, Jayaprakasam, J and Rajanayagam, D (2009) Agility through the interfacing of CAD and CAM. Journal of Engineering, Design and Technology, 7(02), 143–70.

Vogel, J.A, Lind, H, and Holm, C (2019) Incentivising innovation in the construction sector: the role of consulting contracts. Construction Economics and Building, 19(02), 181-196.

Vols, M, Tassenaar, P G and Jacobs, J P A M (2015) Anti-social behaviour and European protection against eviction. International Journal of Law in the Built Environment, 7(02), 148-61.

Vombatkere, S G (1986) Bridge Resting on an Ice Body at High Altitude. Journal of Construction Engineering and Management, 112(02), 287–96.

Voordijk, H (2023) Technical mediation and digital technologies in construction practice. Architectural Engineering and Design Management, 19(02), 110–24.

Vorasubin, P and Chareonngam, C (2007) Strategic assets driving financial capability of Thai construction firms. Journal of Financial Management of Property and Construction, 12(02), 87–94.

Waara, F (2008) Mitigating contractual hazards in public procurement: a study of Swedish local authorities. Construction Management and Economics, 26(02), 137–45.

Wadu Mesthrige Jayantha, Ganesan, S, Lau, S S Y, Wong, K C and Chau, K W (2004) Growth of finance, insurance and real estate (FIRE) and office space absorption in Hong Kong. Journal of Financial Management of Property and Construction, 9(02), 103–17.

Wagner, H E, Hilger, A P and Flash, P (2014) Improving Writing Skills of Construction Management Undergraduates: Developing Tools for Empirical Analysis of Writing to Create Writing-Enriched Construction Management Curriculum. International Journal of Construction Education and Research, 10(02), 111-25.

Wakchaure, S S and Jha, K N (2012) Determination of bridge health index using analytical hierarchy process. Construction Management and Economics, 30(02), 133-49.

Wakefield, R R and Sears, G A (1997) Petri Nets for Simulation and Modeling of Construction Systems . Journal of Construction Engineering and Management, 123(02), 105–12.

Walker, A and Hughes, W (1987) A project managed by a multi-disciplinary practice: a systems-based case study. Construction Management and Economics, 5(02), 123-40.

Walker, A and Hughes, W (1984) Private industrial project management: a systems-based case study. Construction Management and Economics, 2(02), 93-110.

Walker, A and Wing, C K (1999) The relationship between construction project management theory and transaction cost economics. Engineering, Construction and Architectural Management, 6(02), 166–76.

Walker, D H T (1997) Choosing an appropriate research methodology. Construction Management and Economics, 15(02), 149-59.

Walker, D H T (2016) Reflecting on 10 years of focus on innovation, organisational learning and knowledge management literature in a construction project management context. Construction Innovation, 16(02), 114-26.

Walker, D H T (1996) The contribution of the construction management team to good construction time performance: an Australian experience. Journal of Construction Procurement, 2(02), 4–18.

Walker, D H T and Rahmani, F (2016) Delivering a water treatment plant project using a collaborative project procurement approach. Construction Innovation, 16(02), 158-84.

Walker, D H T and Steinfort, P (2013) Using an improved rich pictures approach to improve project situational analysis in complex aid reconstruction development projects. International Journal of Disaster Resilience in the Built Environment, 4(02), 182-98.

Walker, G, Brown, S and Neven, L (2016) Thermal comfort in care homes: Vulnerability, responsibility and 'thermal care'. Building Research & Information, 44(02), 135-46.

Wall, J and Ahmed, V (2008) Lessons learned from a case study in deploying blended learning continuing professional development. Engineering, Construction and Architectural Management, 15(02), 185–202.

Wall, R, Ankrah, N and Charlson, J (2016) An investigation into the different styles of the lawyer and construction specialist when mediating construction disputes. International Journal of Law in the Built Environment, 8(02), 137-60.

Walsh, K D, Sawhney, A and Brown, A (2005) International Comparison of Cost for the Construction Sector: Purchasing Power Parity. Journal of Construction Engineering and Management, 131(02), 160–7.

Walsh, K D, Sawhney, A and Vachris, M A (2006) Improving inter-spatial comparison of construction costs. Engineering, Construction and Architectural Management, 13(02), 123–35.

Walters, E L, Thomas, T L, Corbett, S W, Williams, K L, Williams, T and Wittlake, W A (2013) A Convertible Use Rapidly Expandable model for disaster response. International Journal of Disaster Resilience in the Built Environment, 4(02), 199-214.

Wamsler, C and Brink, E (2016) The urban domino effect: a conceptualization of cities’ interconnectedness of risk. International Journal of Disaster Resilience in the Built Environment, 7(02), 80-113.

Wamuziri, S C and Clearie, A G F (2005) Economic feasibility of the proposed Second Forth Road Bridge using public private partnership procurement. Journal of Financial Management of Property and Construction, 10(02), 95–106.

Wang, B, Cui, Q and Zhang, S (2021) Noncompete Provision Design for Transportation PPP Projects. Journal of Construction Engineering and Management, 147(02).

Wang, C-H and Mei, Y-H (1998) Model for forecasting construction cost indices in Taiwan. Construction Management and Economics, 16(02), 147-57.

Wang, C-H, Tsai, C-C and Cheng, Y-Y (2007) Knowledge-based diagnosis model for PCM executing problems in public construction. Construction Management and Economics, 25(02), 129–42.

Wang, C, Gao, F, Cui, B, Huang, M M, Wu, M, Mao, L and Zheng, A (2024) Geometric quality assessment of precast concrete (PC) elements based on 3D structural light scanning. Architectural Engineering and Design Management, 20(02), 303–19.

Wang, C, Mohd-Rahim, F A, Chan, Y Y and Abdul-Rahman, H (2017) Fuzzy Mapping on Psychological Disorders in Construction Management. Journal of Construction Engineering and Management, 143(02).

Wang, L (2018) The fuzzy in evaluation of concrete structure engineering. Journal of Engineering, Design and Technology, 16(02), 327–38.

Wang, R, Lu, W and Wei, Y (2021) Owners’ use of contract-based power in construction project transactions: restrictions from process specificity and uncertainty. Construction Management and Economics, 39(02), 117–32.

Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (2000) Evaluation and management of foreign exchange and revenue risks in China's BOT projects. Construction Management and Economics, 18(02), 197-207.

Wang, W-C and Dzeng, R-J (2005) Applying cluster identification algorithm and simulation to generate probabilistic network schedules for design projects. Construction Management and Economics, 23(02), 199-213.

Wang, X, Shi, L, Wang, B and Kan, M (2019) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(02), 483–501.

Wang, Y, Xue, X, Yu, T and Wang, Y (2021) Mapping the dynamics of China’s prefabricated building policies from 1956 to 2019: a bibliometric analysis. Building Research & Information, 49(02), 216–33.

Wang, Z and Rezazadeh Azar, E (2019) BIM-based draft schedule generation in reinforced concrete-framed buildings. Construction Innovation , 19(02), 280–94.

Wantanakorn, D, Mawdesley, M J and Askew, W H (1999) Management errors in construction. Engineering, Construction and Architectural Management, 6(02), 112–20.

Ward, S C, Curtis, B and Chapman, C B (1991) Advantages of Management Contracting—Critical Analysis. Journal of Construction Engineering and Management, 117(02), 195–211.

Warren-Myers, G and McRae, E (2017) Volume Home Building: The Provision of Sustainability Information for New Homebuyers . Construction Economics and Building, 17(02), 24-40.

Warsame, A (2009) Organizational modes in the residential building sector in Sweden. Construction Management and Economics, 27(02), 153–63.

Warszawski, A (1990) Expert systems for crane selection. Construction Management and Economics, 8(02), 179-90.

Warszawski, A (1996) Strategic Planning in Construction Companies . Journal of Construction Engineering and Management, 122(02), 133–40.

Wasif, I, Josephson, P-E and Styhre, A (2008) Individual learning in construction projects: professions and their approaches. Construction Economics and Building, 8(02), 50-60.

Watts, G, Fernie, S and Dainty, A (2019) Paradox and legitimacy in construction: how CSR reports restrict CSR practice. International Journal of Building Pathology and Adaptation, 37(02), 231–46.

Wei, H, Minggang, H and Qun, H (1999) Quasi-static testing of composite masonry construction. Building Research & Information, 27(02), 120–3.

Weippert, A, Kajewski, S L and Tilley, P A (2002) Internet-based information and communication systems on remote construction projects: a case study analysis. Construction Innovation, 2(02), 103–16.

West, T and Worthington, A C (2006) Macroeconomic risk factors in Australian commercial real estate, listed property trust and property sector stock returns. Journal of Financial Management of Property and Construction, 11(02), 105–16.

Wesz, J G B, Formoso, C T and Tzortzopoulos, P (2018) Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(02), 134–52.

White, D and Fortune, J (2012) Using systems thinking to evaluate a major project: The case of the Gateshead Millennium Bridge. Engineering, Construction and Architectural Management, 19(02), 205-28.

Whiteman, W E and Irvvig, H G (1988) Disturbance Scheduling Technique for Managing Renovation Work. Journal of Construction Engineering and Management, 114(02), 191–213.

Whitman, C J, Prizeman, O, Walker, P and Gwilliam, J A (2019) Heritage retrofit and cultural empathy; a discussion of challenges regarding the energy performance of historic UK timber-framed dwellings. International Journal of Building Pathology and Adaptation, 38(02), 386–404.

Whittaker, J (1987) Equipment Rates from Revenue Requirements. Journal of Construction Engineering and Management, 113(02), 173–8.

Wickramaratne, S, Ruwanpura, J, Ranasinghe, U, Walawe-Durage, S, Adikariwattage, V and Wirasinghe, S C (2012) Ranking of natural disasters in Sri Lanka for mitigation planning. International Journal of Disaster Resilience in the Built Environment, 3(02), 115-32.

Wickramaratne, S, Wirasinghe, S C and Ruwanpura, J (2019) An update of proposed Sri Lanka warning system for east and west coast tsunamis. International Journal of Disaster Resilience in the Built Environment, 11(02), 169–86.

Wijesundera, D A and Harris, F C (1989) The selection of materials handling methods in construction by simulation. Construction Management and Economics, 7(02), 95-102.

Wijetunge, J (2010) Assessment of potential tsunamigenic seismic hazard to Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 1(02), 207–20.

Wijetunge, J J (2019) A multi-scenario assessment of the seismogenic tsunami hazard for Bangladesh. International Journal of Disaster Resilience in the Built Environment, 11(02), 156–68.

Wilkinson, S (2001) An analysis of the use of information technology for project management in the New Zealand construction industry. Construction Economics and Building, 1(02), 47-56.

Wilkinson, S, Chang-Richards, A Y, Sapeciay, Z and Costello, S B (2016) Improving construction sector resilience. International Journal of Disaster Resilience in the Built Environment, 7(02), 173-85.

Willar, D, Trigunarsyah, B and Coffey, V (2016) Organisational culture and quality management system implementation in Indonesian construction companies. Engineering, Construction and Architectural Management, 23(02), 114-33.

Williams, C C, Nadin, S and Windebank, J (2012) How much for cash?: Tackling the cash-in-hand culture in the European property and construction sector. Journal of Financial Management of Property and Construction, 17(02), 123-34.

Williams, T P (1994) Predicting Changes in Construction Cost Indexes Using Neural Networks. Journal of Construction Engineering and Management, 120(02), 306–20.

Wilson, H K and Cotgrave, A J (2020) Learning Space Design: The Presentation of a Framework for the Built Environment Discipline. International Journal of Construction Education and Research, 16(02), 132–48.

Winch, G M (2000) Institutional reform in British construction: partnering and private finance. Building Research & Information, 28(02), 141–55.

Winch, G M (2003) Integrated life-cycle analysis. Building Research & Information, 31(02), 107–18.

Winch, G M (2015) Project organizing as a problem in information. Construction Management and Economics, 33(02), 106-16.

Winch, G M (2006) Towards a theory of construction as production by projects. Building Research & Information, 34(02), 164–74.

Winch, G, Usmani, A and Edkins, A (1998) Towards total project quality: a gap analysis approach. Construction Management and Economics, 16(02), 193-207.

Windapo, A O (2013) Relationship between degree of risk, cost and level of compliance to occupational health and safety regulations in construction. Construction Economics and Building, 13(02), 67-82.

Witmer, A (2019) An ethnographic justification for establishment of a contextual engineering discipline. Journal of Engineering, Design and Technology , 18(02), 389–413.

Wolfgang, A and Alexis, M (2010) Designing a new rental housing law for Romania. International Journal of Law in the Built Environment, 2(02), 157–77.

Wolters, R S and Burleson, R C (1996) Merit Shop Recruitment and Selection Practices in Alabama . Journal of Construction Engineering and Management, 122(02), 152–7.

Wong, F K W, Chan, A P C, Yam, M C H, Wong, E Y S, Tse, K T C, Yip, K K C and Cheung, E (2009) Findings from a research study of construction safety in Hong Kong: Accidents related to fall of person from height. Journal of Engineering, Design and Technology, 7(02), 130–42.

Wong, F K W, Chan, S C M, Tse, R Y C and Love, P E D (2000) Improving safety knowledge through training: the case of Hong Kong. Journal of Construction Research, 1(02), 169–75.

Wong, F K W, Hui, E C M and Leung, B Y P (2001) A comparative study of the housing reforms in the major cities of China: Beijing, Shanghai, Guangzhou and Shenzhen. Journal of Financial Management of Property and Construction, 6(02), 95–107.

Wong, K-C and Walker, A (2000) Property rights implications of public-private joint ventures. Construction Management and Economics, 18(02), 131-8.

Wong. J, Chan, A and Chiang, Y H (2004) A critical review of forecasting models to predict manpower demand. Construction Economics and Building, 4(02), 43-56.

Wongbumru, T and Dewancker, B (2016) Post-occupancy evaluation of user satisfaction: a case study of “old” and “new” public housing schemes in Bangkok. Architectural Engineering and Design Management, 12(02), 107–24.

Wood, B and Kenley, R (2004) The effectiveness of the bills of quantities in Australia. Journal of Construction Research, 5(02), 291–309.

Wood, G and McDermott, P (2001) Building on trust: a co-operative approach to construction procurement. Journal of Construction Procurement, 7(02), 4–14.

Woodhead, R (1997) Exploring the hurdle rate in preparation for a Value Management Workshop Planning Session. Journal of Financial Management of Property and Construction, 2(02), 21–38.

Woodhead, R (2000) From individual perspectives to a global VM potential. Journal of Construction Research, 1(02), 87–90.

Woodhead, R M and Downs, C G (2002) Facilitation as a research method to improve value management capabilities. Journal of Construction Research, 3(02), 209–16.

Woodhead, W D and Salomonsson, G D (1983) A computer based system for recording and analysing building site labour input. Construction Papers, 2(02), 47–52.

Woodroffe, N J and Ariaratnam, S T (2009) Contractor Perspective on Factors for Evaluating Installation Options for Small-Diameter Utilities. Journal of Construction Engineering and Management, 135(02), 75–87.

Wright, G B and Jack, L B (2013) Property-level stormwater drainage systems: integrated flow simulation and whole-life costs. Building Research & Information, 41(02), 223-36.

Wu, M, Wing Chau, K, Shen, Q and Yin Shen, L (2012) Net Asset Value–Based Concession Duration Model for BOT Contracts. Journal of Construction Engineering and Management, 138(02), 304–8.

Wu, S, Clements-Croome, D, Fairey, V, Albany, B, Sidhu, J, Desmond, D and Neale, K (2006) Reliability in the whole life cycle of building systems. Engineering, Construction and Architectural Management, 13(02), 136–53.

Wyrick, D A and Eschenbach, T G (1989) Remote Oil and Gas Facility Construction. Journal of Construction Engineering and Management, 115(02), 228–36.

Xenidis, Y and Angelides, D (2005) The legal risks in build-operate-transfer projects. Journal of Construction Research, 6(02), 273–92.

Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(02), 27-35.

Xiao, H and Proverbs, D (2002) Construction time performance: an evaluation of contractors from Japan, the UK and the US. Engineering, Construction and Architectural Management, 9(02), 81–9.

Xiao, J, Li, X, Zhang, Z and Zhang, J (2018) Ontology-Based Knowledge Model to Support Construction Noise Control in China. Journal of Construction Engineering and Management, 144(02).

Xie, L-l, Yang, Y, Hu, Y and Chan, A P C (2014) Understanding project stakeholders’ perceptions of public participation in China's infrastructure and construction projects: Social effects, benefits, forms, and barriers. Engineering, Construction and Architectural Management, 21(02), 224-40.

Xin, J and Lam, K (2002) Building a house prices forecasting model in Hong Kong. Construction Economics and Building, 2(02), 57-70.

Xiong, Y and Kuang, Y (2008) Applying an Ant Colony Optimization Algorithm-Based Multiobjective Approach for Time–Cost Trade-Off. Journal of Construction Engineering and Management, 134(02), 153–6.

Xu, J, Meng, J, Zeng, Z, Wu, S and Shen, M (2013) Resource Sharing-Based Multiobjective Multistage Construction Equipment Allocation under Fuzzy Environment. Journal of Construction Engineering and Management, 139(02), 161–73.

Xu, J, Shi, Y and Zhao, S (2019) Reverse Logistics Network-Based Multiperiod Optimization for Construction and Demolition Waste Disposal. Journal of Construction Engineering and Management, 145(02).

Xu, M, Duffield, C and Ma, J (2011) Performance of mid-project reviews (MPRs): quantification based on fuzzy recognition. Built Environment Project and Asset Management, 1(02), 137-55.

Yan, L and Fu-Yan, L (2017) Investigation on influence of speed on rolling resistance of belt conveyor based on viscoelastic property of rubber. Journal of Engineering, Design and Technology, 15(02), 254-67.

Yang, F and Yang, M (2015) Efficiency of public goods provision in Wenchuan earthquake-stricken rural areas, Sichuan, China: A fuzzy comprehensive evaluation. International Journal of Disaster Resilience in the Built Environment, 6(02), 193-205.

Yang, I, Hsieh, Y and Kung, L (2012) Parallel Computing Platform for Multiobjective Simulation Optimization of Bridge Maintenance Planning. Journal of Construction Engineering and Management, 138(02), 215–26.

Yang, J, Shen, P Q, Bourne, L, Ho, C M-F and Xue, X (2011) A typology of operational approaches for stakeholder analysis and engagement. Construction Management and Economics, 29(02), 145–62.

Yao, H, Chen, Y, Chen, Y and Zhu, X (2019) Mediating Role of Risk Perception of Trust and Contract Enforcement in the Construction Industry. Journal of Construction Engineering and Management, 145(02).

Yates, D J and Hardcastle, C (2002) The causes of conflict and disputes in construction: a transaction cost economics perspective. Journal of Financial Management of Property and Construction, 7(02), 115–26.

Yates, J K (1993) Construction Decision Support System for Delay Analysis. Journal of Construction Engineering and Management, 119(02), 226–44.

Yates, J K and Aniftos, S (1997) International Standards and Construction . Journal of Construction Engineering and Management, 123(02), 127–37.

Ye, K, Shen, L and Lu, W (2014) A discriminant model for measuring competition intensity of construction market. Engineering, Construction and Architectural Management, 21(02), 152-69.

Ye, K, Shen, L and Tan, Y (2010) Response strategies to the competition in the Chinese construction market. Construction Management and Economics, 28(02), 24.

Ye, S and Liu, Y (2008) Study on Development Patterns of Infrastructure Projects. Journal of Construction Engineering and Management, 134(02), 94–102.

Yevu, S K and Yu, A T W (2019) The ecosystem of drivers for electronic procurement adoption for construction project procurement. Engineering, Construction and Architectural Management, 27(02), 411–40.

Yildirim, K, Hidayetoglu, M L and Sen, A (2012) Effects on sustainability of various skylight systems in buildings with an atrium. Smart and Sustainable Built Environment, 1(02), 139-52.

Yirenkyi-Fianko, A B and Chileshe, N (2015) An analysis of risk management in practice: the case of Ghana’s construction industry. Journal of Engineering, Design and Technology, 13(02), 240-59.

Yiu, T W, Liu, T and Kwok, L C (2018) Explicating the Role of Relationship in Construction Claim Negotiations. Journal of Construction Engineering and Management, 144(02).

Yogeshwaran, G, Perera, B and Ariyachandra, M M F (2018) Competencies expected of graduate quantity surveyors working in developing countries. Journal of Financial Management of Property and Construction, 23(02), 202–20.

Yohanis, Y G and Norton, B (1998) Estimating at the earliest stages of design the financial cost and operational energy requirement of buildings. Journal of Financial Management of Property and Construction, 3(02), 41–58.

Yoo, W, Ozer, H and Ham, Y (2019) System-Level Approach for Identifying Main Uncertainty Sources in Pavement Construction Life-Cycle Assessment for Quantifying Environmental Impacts. Journal of Construction Engineering and Management, 145(02).

Yoon, J H and Pishdad-Bozorgi, P (2022) State-of-the-Art Review of Blockchain-Enabled Construction Supply Chain. Journal of Construction Engineering and Management, 148(02).

Yousif, O and Zakaria, R (2022) A framework for integrating green highway performance data with the carbon footprint calculator in Malaysia. Construction Economics and Building, 22(02), 102-120.

Yu, A T W, Shen, Q, Kelly, J and Hunter, K (2008) Comparative Study of the Variables in Construction Project Briefing/Architectural Programming. Journal of Construction Engineering and Management, 134(02), 122–38.

Yu, W, Lin, T, Liu, S and Chang, P (2013) Is the Knowledge Management System Truly Cost Effective? Case Study of KM-Enabled Engineering Problem Solving. Journal of Construction Engineering and Management, 139(02), 216–24.

Yuan, Z, Wang, H, Yang, Y, Yi, C, Huang, D and Yu, D (2024) Improving the construction accuracy of precast components in prefabricated buildings by analyzing relevant factors from the perspective of supply chain: a system dynamics model. Architectural Engineering and Design Management, 20(02), 230–48.

Yusuf, G A and Mohamed, S F (2014) Perceived benefits of adopting a standard–based pricing mechanism for mechanical and electrical services installations. Construction Economics and Building, 14(02), 104-119.

Zahari, N F, Che-Ani, A I, Abdul Rashid, R B, Mohd Tahir, M A and Amat, S (2019) Factors contribute in development of the assessment framework for wheelchair accessibility in National Heritage Buildings in Malaysia. International Journal of Building Pathology and Adaptation, 38(02), 311–28.

Zaher, M, Greenwood, D and Marzouk, M (2018) Mobile augmented reality applications for construction projects. Construction Innovation, 18(02), 152–66.

Zainab, R, David, J E, Gary, D H and Tony, T (2011) Data flow analysis of plant and equipment health and safety management. Journal of Engineering, Design and Technology, 9(02), 178–203.

Zalejska – Jonsson, A and Muyingo, H (2019) Building inspection in multi-dwelling housing and the perception of building quality. Construction Economics and Building, 19(02), 144-159.

Zalejska Jonsson, A and Hungria Gunnelin, R (2019) Defects in newly constructed residential buildings: owners’ perspective. International Journal of Building Pathology and Adaptation, 37(02), 163–85.

Zanni, M A, Soetanto, R and Ruikar, K (2017) Towards a BIM-enabled sustainable building design process: roles, responsibilities, and requirements. Architectural Engineering and Design Management, 13(02), 101–29.

Zarghami, S A and Gunawan, I (2019) A domain-specific measure of centrality for water distribution networks. Engineering, Construction and Architectural Management, 27(02), 341–55.

Zayed, T and Liu, Y (2014) Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(02), 170-89.

Zayed, T M and Halpin, D (2001) Simulation of Concrete Batch Plant Production. Journal of Construction Engineering and Management, 127(02), 132–41.

Zeb, J and Froese, T (2017) Transaction formalism protocol tool in infrastructure management. Construction Innovation, 17(02), 180-203.

Zerjav, V, Hartmann, T and Achammer, C (2013) Managing the process of interdisciplinary design: identifying, enforcing, and anticipating decision-making frames. Architectural Engineering and Design Management, 9(02), 121-33.

Zhang, C, Chen, K, Yang, J, Fu, J, Wang, S and Xie, Y (2022) Reuse of Discharged Soil from Slurry Shield Tunnel Construction as Synchronous Grouting Material. Journal of Construction Engineering and Management, 148(02).

Zhang, H, Arens, E and Pasut, W (2011) Air temperature thresholds for indoor comfort and perceived air quality. Building Research & Information, 39(02), 134–44.

Zhang, H, Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(02), 159-69.

Zhang, J and Yuan, X (2021) Stochastic modelling of maintenance flexibility in Value for Money assessment of PPP road projects. Construction Management and Economics, 39(02), 173–91.

Zhang, L and Fan, W (2013) Improving performance of construction projects: A project manager's emotional intelligence approach. Engineering, Construction and Architectural Management, 20(02), 195-207.

Zhang, L, Fu, Y and Lu, W (2021) Contract Enforcement for Claimants’ Satisfaction with Construction Dispute Resolution: Moderating Role of Shadow of the Future, Fairness Perception, and Trust. Journal of Construction Engineering and Management, 147(02).

Zhang, P, Harris, F C and Olomolaiye, P O (1996) A computer-based model for optimizing the location of a single tower crane. Building Research & Information, 24(02), 113–23.

Zhang, P, Harris, F C, Olomolaiye, P O and Holt, G D (1999) Location Optimization for a Group of Tower Cranes. Journal of Construction Engineering and Management, 125(02), 115–22.

Zhang, X (2004) Concessionaire Selection: Methods and Criteria. Journal of Construction Engineering and Management, 130(02), 235–44.

Zhang, X (2006) Public Clients’ Best Value Perspectives of Public Private Partnerships in Infrastructure Development. Journal of Construction Engineering and Management, 132(02), 107–14.

Zhang, X and Kumaraswamy, M M (2001) Hong Kong Experience in Managing BOT Projects. Journal of Construction Engineering and Management, 127(02), 154–62.

Zhang, X Q, Kumaraswamy, M M, Zheng, W and Palaneeswaran, E (2002) Concessionaire Selection for Build-Operate-Transfer Tunnel Projects in Hong Kong. Journal of Construction Engineering and Management, 128(02), 155–63.

Zhang, X, Sexton, M G, Goulding, J S, Aouad, G and Kagioglou, M (2005) Performance modelling for the design of a hybrid concrete structural frame. Architectural Engineering and Design Management, 1(02), 83–91.

Zhang, X, Shen, L, Skitmore, M and Xia, B (2010) Key competitiveness indicators for new real estate developers. Journal of Financial Management of Property and Construction, 15(02), 143–57.

Zhang, Y and Tan, W (2019) The leading small group: an institutional innovation for PPP projects in China. Built Environment Project and Asset Management, 9(02), 291–301.

Zhang, Y, Yuan, J, Zhao, J, Cheng, L and Li, Q (2022) Hybrid Dynamic Pricing Model for Transport PPP Projects during the Residual Concession Period. Journal of Construction Engineering and Management, 148(02).

Zhang, Z, Koh, Z Y and Ling, F (2020) Benchmarking contractors’ financial performance: case study of Singapore. Journal of Financial Management of Property and Construction , 25(02), 183–99.

Zhao, D, McCoy, A P, Bulbul, T, Fiori, C and Nikkhoo, P (2015) Building collaborative construction skills through BIM-integrated learning environment. International Journal of Construction Education and Research, 11(02), 97-120.

Zhao, N and Ying, F (2019) Method selection: a conceptual framework for public sector PPP selection. Built Environment Project and Asset Management, 9(02), 214–32.

Zhao, T and Dungan, J M (2014) Improved Baseline Method to Calculate Lost Construction Productivity. Journal of Construction Engineering and Management, 140(02).

Zhao, Z Y, Shen, L Y and Zuo, J (2009) Performance and Strategy of Chinese Contractors in the International Market. Journal of Construction Engineering and Management, 135(02), 108–18.

Zheng, D X M and Ng, S T (2005) Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front. Journal of Construction Engineering and Management, 131(02), 176–86.

Zheng, D X M, Ng, S T and Kumaraswamy, M M (2004) Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization. Journal of Construction Engineering and Management, 130(02), 168–76.

Zheng, P and Dai, G (2013) A comparative study on static properties of a three-main-truss and three-cable-plane cable-stayed bridge. Journal of Engineering, Design and Technology, 11(02), 207-20.

Zheng, W, Shen, G, Wang, H and Lombardi, P (2015) Critical issues in spatial distribution of public housing estates and their implications on urban renewal in Hong Kong. Smart and Sustainable Built Environment, 4(02), 172-87.

Zhong, Y, Ling, F Y Y and Wu, P (2017) Using Multiple Attribute Value Technique for the Selection of Structural Frame Material to Achieve Sustainability and Constructability. Journal of Construction Engineering and Management, 143(02).

Zhou, B, Xue, Y, Li, M, Li, Z, Zhang, X and Tao, Y (2018) Longitudinal jet ventilation calculation and application of long highway tunnel. Journal of Engineering, Design and Technology, 16(02), 256–69.

Zhou, M, Liu, Y, Wang, K and Fahmi Hassanein, M (2020) New Asynchronous-Pouring Rapid-Construction Method for Long-Span Prestressed Concrete Box Girder Bridges with Corrugated Steel Webs. Journal of Construction Engineering and Management, 146(02).

Zhou, S, Ng, S T, Lee, S H, Xu, F J and Yang, Y (2019) A domain knowledge incorporated text mining approach for capturing user needs on BIM applications. Engineering, Construction and Architectural Management, 27(02), 458–82.

Zhu, F, Hu, H, Xu, F and Tang, N (2021) Predicting the Impact of Country-Related Risks on Cost Overrun for Overseas Infrastructure Projects. Journal of Construction Engineering and Management, 147(02).

Zhu, Y and Issa, R (2017) Computer simulation for construction education using the structure-behavior-function theory: A pilot study on learning estimating concepts. International Journal of Construction Education and Research, 13(02), 142-60.

Zhu, Z and Brilakis, I (2010) Machine Vision-Based Concrete Surface Quality Assessment. Journal of Construction Engineering and Management, 136(02), 210–8.

Ziegler, E H (2009) The case for megapolitan growth management in the twenty-first century: Regional urban planning and sustainable development in the USA. International Journal of Law in the Built Environment, 1(02), 105-29.

Zimmerman, A and Martin, M (2001) Post-occupancy evaluation: benefits and barriers. Building Research & Information, 29(02), 168–74.

Zohrehvandi, S, Vanhoucke, M, Soltani, R and Javadi, M (2019) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(02), 502–24.

Zolkafli, U K, Zakaria, N, Mohammad Mazlan, A and Ali, A S (2019) Maintenance work for heritage buildings in Malaysia: owners’ perspectives. International Journal of Building Pathology and Adaptation, 37(02), 186–95.

Zou, J and Zillante, G (2006) Relationship contracting: the South Australian experience - a case study. Construction Economics and Building, 6(02), 20-31.

Zou, J, Zillante, G and Coffey, V (2009) Project culture in the Chinese construction industry: perceptions of contractors. Construction Economics and Building, 9(02), 17-28.

Zou, P (2004) Knowledge management practice in two Australian architecture-engineering-construction (AEC) companies. Construction Economics and Building, 4(02), 19-32.

Zou, P X W and Couani, P (2012) Managing risks in green building supply chain. Architectural Engineering and Design Management, 8(02), 143-58.

Zou, P X W and Roslan, B A (2005) Different perspectives towards using web-based project management systems in construction: large enterprises versus small- and medium-sized enterprises. Architectural Engineering and Design Management, 1(02), 127–43.

Zou, P X W, Wang, S and Fang, D (2008) A life-cycle risk management framework for PPP infrastructure projects. Journal of Financial Management of Property and Construction, 13(02), 123–42.

Zouein, P P and Tommelein, I D (2001) Improvement Algorithm for Limited Space Scheduling. Journal of Construction Engineering and Management, 127(02), 116–24.

Zulu, S and Muleya, F (2019) A student perspective of ethics in the Zambian construction industry. Journal of Engineering, Design and Technology, 17(02), 266–82.

Zuluaga, C M, Albert, A and Winkel, M A (2020) Improving Safety, Efficiency, and Productivity: Evaluation of Fall Protection Systems for Bridge Work Using Wearable Technology and Utility Analysis. Journal of Construction Engineering and Management, 146(02).

Zuppa, D, Olbina, S and Issa, R (2016) Perceptions of trust in the US construction industry. Engineering, Construction and Architectural Management, 23(02), 211-36.

Zwick, D C and Miller, K R (2004) Project Buyout. Journal of Construction Engineering and Management, 130(02), 245–8.