Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 519 results ...

Abdallah, M, El-Rayes, K and Liu, L (2016) Minimizing Upgrade Cost to Achieve LEED Certification for Existing Buildings. Journal of Construction Engineering and Management, 142(02).

Abdelhamid, T S and Everett, J G (1999) Time Series Analysis for Construction Productivity Experiments. Journal of Construction Engineering and Management, 125(02), 87–95.

Abdul-Rahman, H, Berawi, M A, Berawi, A R, Mohamed, O, Othman, M and Yahya, I A (2006) Delay Mitigation in the Malaysian Construction Industry. Journal of Construction Engineering and Management, 132(02), 125–33.

AbouRizk, S and Shi, J (1994) Automated Construction‐Simulation Optimization. Journal of Construction Engineering and Management, 120(02), 374–85.

AbouRizk, S M and Dozzi, S P (1993) Application of Computer Simulation in Resolving Construction Disputes. Journal of Construction Engineering and Management, 119(02), 355–73.

AbouRizk, S M, Halpin, D W and Wilson, J R (1994) Fitting Beta Distributions Based on Sample Data. Journal of Construction Engineering and Management, 120(02), 288–305.

Abraham, D M and Dickinson, R J (1998) Disposal Costs for Environmentally Regulated Facilities: LCC Approach. Journal of Construction Engineering and Management, 124(02), 146–54.

Abudayyeh, O, Federicks, T, Palmquist, M and Torres, H N (2003) Analysis of Occupational Injuries and Fatalities in Electrical Contracting Industry. Journal of Construction Engineering and Management, 129(02), 152–8.

Aguado, A, Caño, A d, de la Cruz, M P, Gómez, D and Josa, A (2012) Sustainability Assessment of Concrete Structures within the Spanish Structural Concrete Code. Journal of Construction Engineering and Management, 138(02), 268–76.

Ahmadian Fard Fini, A, Akbarnezhad, A, Rashidi, T H and Waller, S T (2018) Dynamic Programming Approach toward Optimization of Workforce Planning Decisions. Journal of Construction Engineering and Management, 144(02).

Ahmed, M O, El-adaway, I H, Coatney, K T and Eid, M S (2016) Construction Bidding and the Winner’s Curse: Game Theory Approach. Journal of Construction Engineering and Management, 142(02).

Al-Gahtani, K S (2009) Float Allocation Using the Total Risk Approach. Journal of Construction Engineering and Management, 135(02), 88–95.

Al-Kaisy, A and Nassar, K (2009) Developing a Decision Support Tool for Nighttime Construction in Highway Projects. Journal of Construction Engineering and Management, 135(02), 119–25.

Albert, A, Hallowell, M R and Kleiner, B M (2014) Enhancing Construction Hazard Recognition and Communication with Energy-Based Cognitive Mnemonics and Safety Meeting Maturity Model: Multiple Baseline Study. Journal of Construction Engineering and Management, 140(02).

Aljassmi, H, Han, S and Davis, S (2016) Analysis of the Complex Mechanisms of Defect Generation in Construction Projects. Journal of Construction Engineering and Management, 142(02).

Allmon, E, Haas, C T, Borcherding, J D and Goodrum, P M (2000) U.S. Construction Labor Productivity Trends, 1970–1998. Journal of Construction Engineering and Management, 126(02), 97–104.

AlMaian, R Y, Needy, K L, Walsh, K D and Alves, T d C L (2016) A qualitative data analysis for supplier quality-management practices for engineer-procure-construct projects. Journal of Construction Engineering and Management, 142(02), 04015061.

Amirkhanian, S N and Baker, N J (1992) Expert System for Equipment Selection for Earth‐Moving Operations. Journal of Construction Engineering and Management, 118(02), 318–31.

Ammar, A, Hanna, A S, Nordheim, E V and Russell, J S (2003) Indicator Variables Model of Firm’s Size-Profitability Relationship of Electrical Contractors Using Financial and Economic Data. Journal of Construction Engineering and Management, 129(02), 192–7.

Anderson, S D, Fisher, D J and Rahman, S P (2000) Integrating Constructability into Project Development: A Process Approach. Journal of Construction Engineering and Management, 126(02), 81–88.

Anson, M and Wang, S Q (1998) Performance of Concrete Placing in Hong Kong Buildings. Journal of Construction Engineering and Management, 124(02), 116–24.

Arashpour, M, Wakefield, R, Blismas, N and Lee, E W M (2014) Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects. Journal of Construction Engineering and Management, 140(02).

Arboleda, C A and Abraham, D M (2004) Fatalities in Trenching Operations—Analysis Using Models of Accident Causation. Journal of Construction Engineering and Management, 130(02), 273–80.

Arditi, D, Elhassan, A and Toklu, Y C (2002) Constructability Analysis in the Design Firm. Journal of Construction Engineering and Management, 128(02), 117–26.

Ariaratnam, S T, Lueke, J S and Allouche, E N (1999) Utilization of Trenchless Construction Methods by Canadian Municipalities. Journal of Construction Engineering and Management, 125(02), 76–86.

Arroyo, P, Tommelein, I D and Ballard, G (2016) Selecting Globally Sustainable Materials: A Case Study Using Choosing by Advantages. Journal of Construction Engineering and Management, 142(02).

Art Chaovalitwongse, W, Wang, W, Williams, T P and Chaovalitwongse, P (2012) Data Mining Framework to Optimize the Bid Selection Policy for Competitively Bid Highway Construction Projects. Journal of Construction Engineering and Management, 138(02), 277–86.

Ashley, D B, Uehara, K and Robinson, B E (1983) Critical Decision Making During Construction. Journal of Construction Engineering and Management, 109(02), 146–62.

Au, T and Hendrickson, C (1986) Profit Measures for Construction Projects. Journal of Construction Engineering and Management, 112(02), 273–86.

Austin, R B, Pishdad-Bozorgi, P and de la Garza, J M (2016) Identifying and Prioritizing Best Practices to Achieve Flash Track Projects. Journal of Construction Engineering and Management, 142(02).

Avila, J, Rapp, R, Dunbar, S and Jackson, A T (2021) Burnout and Worklife in Disaster Restoration: Maslach Burnout Inventory and Areas of Worklife Survey. Journal of Construction Engineering and Management, 147(02).

Ayodele, O A, Chang-Richards, A and González, V (2020) Factors Affecting Workforce Turnover in the Construction Sector: A Systematic Review. Journal of Construction Engineering and Management, 146(02).

Ayyub, B M and Haldar, A (1984) Project Scheduling Using Fuzzy Set Concepts. Journal of Construction Engineering and Management, 110(02), 189–204.

Baba, K (1990) Principal Nature of Management in Japanese Construction Industry. Journal of Construction Engineering and Management, 116(02), 351–64.

Babaei, M, Rashidi-baqhi, A and Rashidi, M (2022) Estimating Project Cost under Uncertainty Using Universal Generating Function Method. Journal of Construction Engineering and Management, 148(02).

Bai, S, Li, M, Lu, Q, Tian, H and Qin, L (2022) Global Time Optimization Method for Dredging Construction Cycles of Trailing Suction Hopper Dredger Based on Grey System Model. Journal of Construction Engineering and Management, 148(02).

Bai, Y and Amirkhanian, S N (1994) Knowledge‐Based Expert System for Concrete Mix Design. Journal of Construction Engineering and Management, 120(02), 357–73.

Bai, Y and Bernold, L E (2001) Quality Control Parameters for Robotic Bridge Painting. Journal of Construction Engineering and Management, 127(02), 142–8.

Bakens, W (1997) International Trends in Building and Construction Research . Journal of Construction Engineering and Management, 123(02), 102–4.

Balali, V, Zalavadia, A and Heydarian, A (2020) Real-Time Interaction and Cost Estimating within Immersive Virtual Environments. Journal of Construction Engineering and Management, 146(02).

Ballesteros-Pérez, P, Phua, F T T and Mora-Melià, D (2019) Human Resource Allocation to Multiple Projects Based on Members’ Expertise, Group Heterogeneity, and Social Cohesion. Journal of Construction Engineering and Management, 145(02).

Baqerin, M H, Shafahi, Y and Kashani, H (2016) Application of Weibull Analysis to Evaluate and Forecast Schedule Performance in Repetitive Projects. Journal of Construction Engineering and Management, 142(02).

Barker, R, Childerhouse, P, Naim, M, Masat, J and Wilson, D (2004) Potential of Total Cycle Time Compression in Construction: Focus on Program Development and Design. Journal of Construction Engineering and Management, 130(02), 177–87.

Barnes, W C (1993) Microcomputers in Management of Construction Operations. Journal of Construction Engineering and Management, 119(02), 403–12.

Barraza, G A, Back, W E and Mata, F (2000) Probabilistic Monitoring of Project Performance Using SS-Curves. Journal of Construction Engineering and Management, 126(02), 142–8.

Battikha, M G (2002) QUALICON: Computer-Based System for Construction Quality Management. Journal of Construction Engineering and Management, 128(02), 164–73.

Bayat, M, Khanzadi, M and Nasirzadeh, F (2020) Bargaining Game Model to Determine Concessionary Items in Build-Operate-Transfer Contracts. Journal of Construction Engineering and Management, 146(02).

Beainy, F, Commuri, S and Zaman, M (2012) Quality Assurance of Hot Mix Asphalt Pavements Using the Intelligent Asphalt Compaction Analyzer. Journal of Construction Engineering and Management, 138(02), 178–87.

Bell, L C and McCullouch, B G (1988) Bar Code Applications in Construction. Journal of Construction Engineering and Management, 114(02), 263–78.

Bell, L C and McCullouch, B G (1983) Microcomputer Spreadsheet Applications. Journal of Construction Engineering and Management, 109(02), 214–23.

Bell, L C and Stukhart, G (1987) Costs and Benefits of Materials Management Systems. Journal of Construction Engineering and Management, 113(02), 222–34.

Beltrão, L M P and Carvalho, M T M (2019) Prioritizing Construction Risks Using Fuzzy AHP in Brazilian Public Enterprises. Journal of Construction Engineering and Management, 145(02).

Ben-Haim, Y and Laufer, A (1998) Robust Reliability of Projects with Activity-Duration Uncertainty. Journal of Construction Engineering and Management, 124(02), 125–32.

Bernold, L E (2007) Teaching Evaluations for Construction Engineering and Management: Opportunity to Move Us Forward. Journal of Construction Engineering and Management, 133(02), 146–56.

Bernold, L E and Chang, P (1992) Potential Gains through Welded‐Wire Fabric Reinforcement. Journal of Construction Engineering and Management, 118(02), 244–57.

Bernold, L E and Salim, M (1993) Placement‐Oriented Design and Delivery of Concrete Reinforcement. Journal of Construction Engineering and Management, 119(02), 323–35.

Bhandari, S, Hallowell, M R, Boven, L V, Welker, K M, Golparvar-Fard, M and Gruber, J (2020) Using Augmented Virtuality to Examine How Emotions Influence Construction-Hazard Identification, Risk Assessment, and Safety Decisions. Journal of Construction Engineering and Management, 146(02).

Bi, L, Ren, B, Zhong, D and Hu, L (2015) Real-Time Construction Schedule Analysis of Long-Distance Diversion Tunnels Based on Lithological Predictions Using a Markov Process. Journal of Construction Engineering and Management, 141(02).

Blackmon, R B and Gramopadhye, A K (1995) Improving Construction Safety by Providing Positive Feedback on Backup Alarms. Journal of Construction Engineering and Management, 121(02), 166–71.

Bowlby, W and Cohn, L F (1983) Prediction of Highway Construction Noise Levels. Journal of Construction Engineering and Management, 109(02), 163–80.

Boz, M A and El-adaway, I H (2015) Creating a Holistic Systems Framework for Sustainability Assessment of Civil Infrastructure Projects. Journal of Construction Engineering and Management, 141(02).

Brockman, J L (2014) Interpersonal Conflict in Construction: Cost, Cause, and Consequence. Journal of Construction Engineering and Management, 140(02).

Brown, D C (2003) Novel Method of Excavation. Journal of Construction Engineering and Management, 129(02), 222–5.

Brunso, T P and Siddiqi, K M (2003) Using Benchmarks and Metrics to Evaluate Project Delivery of Environmental Restoration Programs. Journal of Construction Engineering and Management, 129(02), 119–30.

Burati, J L, Matthews, M F and Kalidindi, S N (1991) Quality Management in Construction Industry. Journal of Construction Engineering and Management, 117(02), 341–59.

Carmichael, D G, Nguyen, T A and Shen, X (2019) Single Treatment of PPP Road Project Options. Journal of Construction Engineering and Management, 145(02).

Carr, R I (2000) . Journal of Construction Engineering and Management, 126(02), 105–13.

Carr, R I (2000) . Journal of Construction Engineering and Management, 126(02), 114–21.

Carr, R I (1993) Cost, Schedule, and Time Variances and Integration. Journal of Construction Engineering and Management, 119(02), 245–65.

Carr, R I and Maloney, W F (1983) Basic Research Needs in Construction Engineering. Journal of Construction Engineering and Management, 109(02), 181–9.

Carter, G and Smith, S D (2006) Safety Hazard Identification on Construction Projects. Journal of Construction Engineering and Management, 132(02), 197–205.

Cattaneo, S and Mola, F (2012) Assessing the Quality Control of Self-Consolidating Concrete Properties. Journal of Construction Engineering and Management, 138(02), 197–205.

Cha, H S and O’Connor, J T (2005) Optimizing Implementation of Value Management Processes for Capital Projects. Journal of Construction Engineering and Management, 131(02), 239–51.

Cha, H S, Kim, K H and Kim, C K (2012) Case Study on Selective Demolition Method for Refurbishing Deteriorated Residential Apartments. Journal of Construction Engineering and Management, 138(02), 294–303.

Chan, A P C, Chan, D W M, Chiang, Y H, Tang, B S, Chan, E H W and Ho, K S K (2004) Exploring Critical Success Factors for Partnering in Construction Projects. Journal of Construction Engineering and Management, 130(02), 188–98.

Chan, A P C, Ho, D C K and Tam, C M (2001) Design and Build Project Success Factors: Multivariate Analysis. Journal of Construction Engineering and Management, 127(02), 93–100.

Chan, W, Chua, D K H and Kannan, G (1996) Construction Resource Scheduling with Genetic Algorithms . Journal of Construction Engineering and Management, 122(02), 125–32.

Chang, A S (2001) Work-Time Model for Engineers. Journal of Construction Engineering and Management, 127(02), 163–72.

Chang, L and Hsie, M (1995) Developing Acceptance-Sampling Methods for Quality Construction. Journal of Construction Engineering and Management, 121(02), 246–53.

Chang, T C, Ibbs, C W and Crandall, K C (1990) Network Resource Allocation with Support of a Fuzzy Expert System. Journal of Construction Engineering and Management, 116(02), 239–60.

Chao, L and Kuo, C (2018) Neural-Network-Centered Approach to Determining Lower Limit of Combined Rate of Overheads and Markup. Journal of Construction Engineering and Management, 144(02).

Che Ibrahim, C K I, Belayutham, S, Mohammad, M Z and Ismail, S (2022) Development of a Conceptual Designer’s Knowledge, Skills, and Experience Index for Prevention through Design Practice in Construction. Journal of Construction Engineering and Management, 148(02).

Chehayeb, N N and AbouRizk, S M (1998) Simulation-Based Scheduling with Continuous Activity Relationships. Journal of Construction Engineering and Management, 124(02), 107–15.

Chen, H, Feng, Z, Liu, Y, Chen, B, Deng, T, Qin, Y and Xu, W (2023) Multiobjective Optimization of a 3D Laser Scanning Scheme for Engineering Structures Based on RF-NSGA-II. Journal of Construction Engineering and Management, 149(02).

Chen, Q, Jin, Z, Xia, B, Wu, P and Skitmore, M (2016) Time and Cost Performance of Design–Build Projects. Journal of Construction Engineering and Management, 142(02).

Chen, Q, Reichard, G and Beliveau, Y (2010) Object Model Framework for Interface Modeling and IT-Oriented Interface Management. Journal of Construction Engineering and Management, 136(02), 187–98.

Chen, S, Tian, Y, Jin, L and Xiang, L (2021) Estimating the Frequency of Exposure to Uncertain Hazards: Impact of Wind Conditions on Concrete Dam Construction. Journal of Construction Engineering and Management, 147(02).

Chen, Z, Abdullah, A B, Anumba, C J and Li, H (2014) ANP Experiment for Demolition Plan Evaluation. Journal of Construction Engineering and Management, 140(02).

Cheng, J C P, Chen, K and Chen, W (2020) State-of-the-Art Review on Mixed Reality Applications in the AECO Industry. Journal of Construction Engineering and Management, 146(02).

Chiang, Y H, Li, V J, Zhou, L, Wong, F and Lam, P (2016) Evaluating Sustainable Building-Maintenance Projects: Balancing Economic, Social, and Environmental Impacts in the Case of Hong Kong. Journal of Construction Engineering and Management, 142(02).

Cho, Y K, Bode, T, Song, J and Jeong, J (2012) Thermography-Driven Distress Prediction from Hot Mix Asphalt Road Paving Construction. Journal of Construction Engineering and Management, 138(02), 206–14.

Choi, B and Lee, S (2018) An Empirically Based Agent-Based Model of the Sociocognitive Process of Construction Workers’ Safety Behavior. Journal of Construction Engineering and Management, 144(02).

Choi, C, Ryu, K R and Shahandashti, M (2021) Predicting City-Level Construction Cost Index Using Linear Forecasting Models. Journal of Construction Engineering and Management, 147(02).

Choi, H, Cho, H and Seo, J W (2004) Risk Assessment Methodology for Underground Construction Projects. Journal of Construction Engineering and Management, 130(02), 258–72.

Choi, K, Lee, H W, Mao, Z, Lavy, S and Ryoo, B Y (2016) Environmental, Economic, and Social Implications of Highway Concrete Rehabilitation Alternatives. Journal of Construction Engineering and Management, 142(02).

Chong, D, Wang, Y, Guo, H and Lu, Y (2014) Volatile Organic Compounds Generated in Asphalt Pavement Construction and Their Health Effects on Workers. Journal of Construction Engineering and Management, 140(02).

Chua, D K H, Wang, Y and Tan, W T (2003) Impacts of Obstacles in East Asian Cross-Border Construction. Journal of Construction Engineering and Management, 129(02), 131–41.

Collier, C A and Jacques, D E (1984) Optimum Equipment Life by Minimum Life‐Cycle Costs. Journal of Construction Engineering and Management, 110(02), 248–65.

Correia, J M F, de Oliveira Neto, G C, Leite, R R and da Silva, D (2021) Plan to Overcome Barriers to Reverse Logistics in Construction and Demolition Waste: Survey of the Construction Industry. Journal of Construction Engineering and Management, 147(02).

Costa, S, Carvalho, M S, Pimentel, C and Duarte, C (2023) A Systematic Literature Review and Conceptual Framework of Construction Industrialization. Journal of Construction Engineering and Management, 149(02).

Cote, B, Robinson, B, Gabr, M A and Borden, R H (2013) Performance-Cost Analysis of Stabilized Undercut Subgrades. Journal of Construction Engineering and Management, 139(02), 121–7.

Cottrell, D S (2006) Contractor Process Improvement for Enhancing Construction Productivity. Journal of Construction Engineering and Management, 132(02), 189–96.

Cowie, G F (1987) Enough Scope Yields Better Estimates. Journal of Construction Engineering and Management, 113(02), 315–20.

Cox, R F, Issa, R R A and Ahrens, D (2003) Management’s Perception of Key Performance Indicators for Construction. Journal of Construction Engineering and Management, 129(02), 142–51.

Cox, R F, Issa, R R and Frey, A (2006) Proposed Subcontractor-Based Employee Motivational Model. Journal of Construction Engineering and Management, 132(02), 152–63.

Crowley, L G and Hancher, D E (1995) Evaluation of Competitive Bids. Journal of Construction Engineering and Management, 121(02), 238–45.

Crowley, L G and Hancher, D E (1995) Risk Assessment of Competitive Procurement. Journal of Construction Engineering and Management, 121(02), 230–7.

Crowley, L G, Lutz, J D and Burleson, R C (1997) Functional Illiteracy in Construction Industry . Journal of Construction Engineering and Management, 123(02), 162–70.

Dai, F and Lu, M (2010) Assessing the Accuracy of Applying Photogrammetry to Take Geometric Measurements on Building Products. Journal of Construction Engineering and Management, 136(02), 242–50.

Dang, T and Bargstädt, H (2016) 4D Relationships: The Missing Link in 4D Scheduling. Journal of Construction Engineering and Management, 142(02).

Darren Graham, L, Smith, S D and Dunlop, P (2005) Lognormal Distribution Provides an Optimum Representation of the Concrete Delivery and Placement Process. Journal of Construction Engineering and Management, 131(02), 230–8.

de Azevedo, R C, de Oliveira Lacerda, R T, Ensslin, L, Jungles, A E and Ensslin, S R (2013) Performance Measurement to Aid Decision Making in the Budgeting Process for Apartment-Building Construction: Case Study Using MCDA-C. Journal of Construction Engineering and Management, 139(02), 225–35.

De Marco, A, Rafele, C and Thaheem, M J (2016) Dynamic Management of Risk Contingency in Complex Design-Build Projects. Journal of Construction Engineering and Management, 142(02).

Dehghan, R and Ruwnapura, J Y (2014) Model of Trade-Off between Overlapping and Rework of Design Activities. Journal of Construction Engineering and Management, 140(02).

Deng, F and Smyth, H (2014) Nature of Firm Performance in Construction. Journal of Construction Engineering and Management, 140(02).

Diekmann, J E and Kim, M P (1992) SuperChange: Expert System for Analysis of Changes Claims. Journal of Construction Engineering and Management, 118(02), 399–411.

Dikmen, I, Birgonul, M T and Kiziltas, S (2005) Prediction of Organizational Effectiveness in Construction Companies. Journal of Construction Engineering and Management, 131(02), 252–61.

Dilger, W H, Tadros, G S and Giannelia, P (1992) Method Proposed for Construction of Multispan Cable‐Stayed Bridges. Journal of Construction Engineering and Management, 118(02), 273–82.

Ding, Z and Ng, F (2010) Personal Construct-Based Factors Affecting Interpersonal Trust in a Project Design Team. Journal of Construction Engineering and Management, 136(02), 227–34.

Distefano, M J and O’Brien, W J (2009) Comparative Analysis of Infrastructure Assessment Methodologies at the Small Unit Level. Journal of Construction Engineering and Management, 135(02), 96–107.

Doğan, S Z, Arditi, D and Murat Günaydin, H (2008) Using Decision Trees for Determining Attribute Weights in a Case-Based Model of Early Cost Prediction. Journal of Construction Engineering and Management, 134(02), 146–52.

Dozzi, S P, AbouRizk, S M and Schroeder, S L (1996) Utility-Theory Model for Bid Markup Decisions . Journal of Construction Engineering and Management, 122(02), 119–24.

Du, J, Shi, Y, Zou, Z and Zhao, D (2018) CoVR: Cloud-Based Multiuser Virtual Reality Headset System for Project Communication of Remote Users. Journal of Construction Engineering and Management, 144(02).

Dunston, P S and Bernold, L E (2000) Adaptive Control for Safe and Quality Rebar Fabrication. Journal of Construction Engineering and Management, 126(02), 122–9.

Easa, S M (1989) Resource Leveling in Construction by Optimization. Journal of Construction Engineering and Management, 115(02), 302–16.

East, E W and Kim, S (1993) Standardizing Scheduling Data Exchange. Journal of Construction Engineering and Management, 119(02), 215–25.

El Meouche, R, Abunemeh, M, Hijaze, I, Mebarki, A and Shahrour, I (2018) Developing Optimal Paths for Evacuating Risky Construction Sites. Journal of Construction Engineering and Management, 144(02).

El-Anwar, O and Chen, L (2013) Computing a Displacement Distance Equivalent to Optimize Plans for Postdisaster Temporary Housing Projects. Journal of Construction Engineering and Management, 139(02), 174–84.

El-Rayes, K and Moselhi, O (2001) Impact of Rainfall on the Productivity of Highway Construction. Journal of Construction Engineering and Management, 127(02), 125–31.

Elazouni, A M and Basha, I M (1996) Evaluating the Performance of Construction Equipment Operators in Egypt . Journal of Construction Engineering and Management, 122(02), 109–14.

Elazouni, A M and El-Razek, M E A (2000) Adapting Lift-Slab Technology to Construct Submerged Pile Caps. Journal of Construction Engineering and Management, 126(02), 149–57.

Elhakeem, A and Hegazy, T (2005) Graphical Approach for Manpower Planning in Infrastructure Networks. Journal of Construction Engineering and Management, 131(02), 168–75.

Elliott, M E and Heymsfield, E (2003) Inspection of Luling Bridge Cable Stays: Case Study. Journal of Construction Engineering and Management, 129(02), 226–30.

Elmasry, M, Zayed, T and Hawari, A (2019) Multi-Objective Optimization Model for Inspection Scheduling of Sewer Pipelines. Journal of Construction Engineering and Management, 145(02).

Enshassi, M S A, Walbridge, S, West, J S and Haas, C T (2020) Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory. Journal of Construction Engineering and Management, 146(02).

Ergen, E and Akinci, B (2008) Formalization of the Flow of Component-Related Information in Precast Concrete Supply Chains. Journal of Construction Engineering and Management, 134(02), 112–21.

Eriksson, P E (2008) Procurement Effects on Coopetition in Client-Contractor Relationships. Journal of Construction Engineering and Management, 134(02), 103–11.

Everett, J G (1999) Overexertion Injuries in Construction. Journal of Construction Engineering and Management, 125(02), 109–14.

Everett, J G and Frank, P B (1996) Costs of Accidents and Injuries to the Construction Industry . Journal of Construction Engineering and Management, 122(02), 158–64.

Everett, J G and Saito, H (1996) Construction Automation: Demands and Satisfiers in the United States and Japan . Journal of Construction Engineering and Management, 122(02), 147–51.

Everett, J G and Slocum, A H (1994) Automation and Robotics Opportunities: Construction versus Manufacturing. Journal of Construction Engineering and Management, 120(02), 443–52.

Fan, S (2012) Modified Time Impact Analysis Method. Journal of Construction Engineering and Management, 138(02), 227–33.

Farid, F (1990) Pricing Construction Contracts under Tax Reform Act of 1986. Journal of Construction Engineering and Management, 116(02), 300–15.

Farid, F and Koning, T L (1994) Simulation Verifies Queuing Program for Selecting Loader‐Truck Fleets. Journal of Construction Engineering and Management, 120(02), 386–404.

Farmer, I W (1996) Performance of Chain Trenchers in Mixed Ground . Journal of Construction Engineering and Management, 122(02), 115–8.

Federle, M O and Maloney, W F (1992) Substitutes for Leadership and Unionized Construction Carpenters. Journal of Construction Engineering and Management, 118(02), 332–48.

Finke, M R (1999) Window Analyses of Compensable Delays. Journal of Construction Engineering and Management, 125(02), 96–100.

Fisher, D J, Anderson, S D and Rahman, S P (2000) Integrating Constructability Tools into Constructability Review Process. Journal of Construction Engineering and Management, 126(02), 89–96.

Fong, P S and Lung, B W (2007) Interorganizational Teamwork in the Construction Industry. Journal of Construction Engineering and Management, 133(02), 157–68.

Forde, B and Stiemer, S F (1985) Steel Construction Evaluation by MLR‐Strategies. Journal of Construction Engineering and Management, 111(02), 149–56.

Fredericks, T, Abudayyeh, O, Palmquist, M and Torres, H N (2002) Mechanical Contracting Safety Issues. Journal of Construction Engineering and Management, 128(02), 186–93.

Fuller, J, Brown, C J and Crowley, R (2018) Performance-Based Maintenance Contracting in Florida: Evaluation by Surveys, Statistics, and Content Analysis. Journal of Construction Engineering and Management, 144(02).

Furuya, N, Yamaoka, R and Paulson, B C (1994) Construction of Akashi‐Kaikyo Bridge West Anchorage. Journal of Construction Engineering and Management, 120(02), 337–56.

Gambatese, J A and Rajendran, S (2012) Flagger Illumination during Nighttime Construction and Maintenance Operations. Journal of Construction Engineering and Management, 138(02), 250–7.

Gangolells, M, Casals, M, Forcada, N, Fuertes, A and Roca, X (2013) Model for Enhancing Integrated Identification, Assessment, and Operational Control of On-Site Environmental Impacts and Health and Safety Risks in Construction Firms. Journal of Construction Engineering and Management, 139(02), 138–47.

Gao, S, Song, X and Ding, R (2020) Promoting Information Transfer in Collaborative Projects through Network Structure Adjustment. Journal of Construction Engineering and Management, 146(02).

Gao, X, Pishdad-Bozorgi, P, Shelden, D R and Tang, S (2021) Internet of Things Enabled Data Acquisition Framework for Smart Building Applications. Journal of Construction Engineering and Management, 147(02).

Gerassis, S, Martín, J E, García, J T, Saavedra, A and Taboada, J (2017) Bayesian Decision Tool for the Analysis of Occupational Accidents in the Construction of Embankments. Journal of Construction Engineering and Management, 143(02).

Ghafoori, M and Abdallah, M (2022) Simulation-Based Optimization Model to Minimize Equivalent Annual Cost of Existing Buildings. Journal of Construction Engineering and Management, 148(02).

Ghodoosi, F, Abu-Samra, S, Zeynalian, M and Zayed, T (2018) Maintenance Cost Optimization for Bridge Structures Using System Reliability Analysis and Genetic Algorithms. Journal of Construction Engineering and Management, 144(02).

Glagola, C R and Sheedy, W M (2002) Partnering on Defense Contracts. Journal of Construction Engineering and Management, 128(02), 127–38.

Goh, Y M and Chua, D K H (2010) Case-Based Reasoning Approach to Construction Safety Hazard Identification: Adaptation and Utilization. Journal of Construction Engineering and Management, 136(02), 170–8.

Gomar, J E, Haas, C T and Morton, D P (2002) Assignment and Allocation Optimization of Partially Multiskilled Workforce. Journal of Construction Engineering and Management, 128(02), 103–9.

Grimm, C T (1984) Facade Topography in Masonry Failure Investigation. Journal of Construction Engineering and Management, 110(02), 145–51.

Gunduz, M and Elsherbeny, H A (2021) Critical Assessment of Contract Administration Using Multidimensional Fuzzy Logic Approach. Journal of Construction Engineering and Management, 147(02).

Guo, B H W, Yiu, T W, González, V A and Goh, Y M (2017) Using a Pressure-State-Practice Model to Develop Safety Leading Indicators for Construction Projects. Journal of Construction Engineering and Management, 143(02).

Gurmu, A T (2019) Tools for Measuring Construction Materials Management Practices and Predicting Labor Productivity in Multistory Building Projects. Journal of Construction Engineering and Management, 145(02).

Hadikusumo, B H W and Rowlinson, S (2004) Capturing Safety Knowledge Using Design-for-Safety-Process Tool. Journal of Construction Engineering and Management, 130(02), 281–9.

Hajjar, D and AbouRizk, S M (2002) Unified Modeling Methodology for Construction Simulation. Journal of Construction Engineering and Management, 128(02), 174–85.

Halligan, D W, Hester, W T and Thomas, H R (1987) Managing Unforeseen Site Conditions. Journal of Construction Engineering and Management, 113(02), 273–87.

Haltenhoff, C E (1986) Educating Professional Construction Managers. Journal of Construction Engineering and Management, 112(02), 153–62.

Hampson, K and Tatum, C B (1997) Technology Strategy and Competitive Performance in Bridge Construction . Journal of Construction Engineering and Management, 123(02), 153–61.

Han, K, Degol, J and Golparvar-Fard, M (2018) Geometry- and Appearance-Based Reasoning of Construction Progress Monitoring. Journal of Construction Engineering and Management, 144(02).

Handa, V K and Barcia, R M (1986) Construction Production Planning. Journal of Construction Engineering and Management, 112(02), 163–77.

Handa, V K and Rivers, D (1983) Downgrading Construction Incidents. Journal of Construction Engineering and Management, 109(02), 190–205.

Hanna, A S and Senouci, A B (1995) Design Optimization of Concrete-Slab Forms. Journal of Construction Engineering and Management, 121(02), 215–21.

Hanna, A S and Skiffington, M A (2010) Effect of Preconstruction Planning Effort on Sheet Metal Project Performance. Journal of Construction Engineering and Management, 136(02), 235–41.

Hanna, A S, Mikhail, G and Iskandar, K A (2017) State of Prefab Practice in the Electrical Construction Industry: Qualitative Assessment. Journal of Construction Engineering and Management, 143(02).

Harris, R B (1990) Packing Method for Resource Leveling (Pack). Journal of Construction Engineering and Management, 116(02), 331–50.

Hasan, A and Jha, K N (2016) Acceptance of the Incentive/Disincentive Contracting Strategy in Developing Construction Markets: Empirical Study from India. Journal of Construction Engineering and Management, 142(02).

Hasan, S, Al-Hussein, M, Hermann, U H and Safouhi, H (2010) Interactive and Dynamic Integrated Module for Mobile Cranes Supporting System Design. Journal of Construction Engineering and Management, 136(02), 179–86.

He, Q, Wang, T, Chan, A P C and Xu, J (2021) Developing a List of Key Performance Indictors for Benchmarking the Success of Construction Megaprojects. Journal of Construction Engineering and Management, 147(02).

He, W, Tang, W, Wei, Y, Duffield, C F and Lei, Z (2016) Evaluation of Cooperation during Project Delivery: Empirical Study on the Hydropower Industry in Southwest China. Journal of Construction Engineering and Management, 142(02).

He, X, Liu, R and Anumba, C J (2021) Data-Driven Insights on the Knowledge Gaps of Conceptual Cost Estimation Modeling. Journal of Construction Engineering and Management, 147(02).

Hegab, M Y and Smith, G R (2007) Delay Time Analysis in Microtunneling Projects. Journal of Construction Engineering and Management, 133(02), 191–5.

Hegazy, T, Elhakeem, A and Elbeltagi, E (2004) Distributed Scheduling Model for Infrastructure Networks. Journal of Construction Engineering and Management, 130(02), 160–7.

Hendrickson, C, Martinelli, D and Rehak, D (1987) Hierarchical Rule‐Based Activity Duration Estimation. Journal of Construction Engineering and Management, 113(02), 288–301.

Hinze, J and Bren, D (1996) Analysis of Fatalities and Injuries Due to Powerline Contacts . Journal of Construction Engineering and Management, 122(02), 177–82.

Hinze, J and Couey, J (1989) Weather in Construction Contracts. Journal of Construction Engineering and Management, 115(02), 270–83.

Hinze, J and Gambatese, J (2003) Factors That Influence Safety Performance of Specialty Contractors. Journal of Construction Engineering and Management, 129(02), 159–64.

Hinze, J and Hinze, M M (1986) Problems Associated with Removal of Asbestos. Journal of Construction Engineering and Management, 112(02), 211–9.

Hinze, J and Nelson, A (1996) Enhancing Performance of Soundless Chemical Demolition Agents . Journal of Construction Engineering and Management, 122(02), 193–5.

Hinze, J and Parker, R (1988) Productivity Study on Extruded Concrete Curbing Operations. Journal of Construction Engineering and Management, 114(02), 256–62.

Hinze, J and Raboud, P (1988) Safety on Large Building Construction Projects. Journal of Construction Engineering and Management, 114(02), 286–93.

Hinze, J and Russell, D B (1995) Analysis of Fatalities Recorded by OSHA. Journal of Construction Engineering and Management, 121(02), 209–14.

Hinze, J and Tracey, A (1994) The Contractor‐Subcontractor Relationship: The Subcontractor's View. Journal of Construction Engineering and Management, 120(02), 274–87.

Hinze, J, Huang, X and Terry, L (2005) The Nature of Struck-by Accidents. Journal of Construction Engineering and Management, 131(02), 262–8.

Ho, C M F (2013) Communication Makes a Corporate Code of Ethics Effective: Lessons from Hong Kong. Journal of Construction Engineering and Management, 139(02), 128–37.

Hong, Y, Hammad, A, Zhong, X, Wang, B and Akbarnezhad, A (2020) Comparative Modeling Approach to Capture the Differences in BIM Adoption Decision-Making Process in Australia and China. Journal of Construction Engineering and Management, 146(02).

Hossein Hashemi Doulabi, S, Seifi, A and Shariat, S Y (2011) Efficient Hybrid Genetic Algorithm for Resource Leveling via Activity Splitting. Journal of Construction Engineering and Management, 137(02), 137–46.

Hou, X, Zeng, Y and Xue, J (2020) Detecting Structural Components of Building Engineering Based on Deep-Learning Method. Journal of Construction Engineering and Management, 146(02).

Hsieh, T (1998) Impact of Subcontracting on Site Productivity: Lessons Learned in Taiwan. Journal of Construction Engineering and Management, 124(02), 91–100.

Huang, R and Halpin, D W (1995) Graphical-Based Method for Transient Evaluation of Construction Operations. Journal of Construction Engineering and Management, 121(02), 222–9.

Huang, X and Hinze, J (2006) Owner’s Role in Construction Safety. Journal of Construction Engineering and Management, 132(02), 164–73.

Huang, X and Hinze, J (2006) Owner’s Role in Construction Safety: Guidance Model. Journal of Construction Engineering and Management, 132(02), 174–81.

Hulme, T W and Burchell, A J (1992) Bored Tunneling for Singapore Metro. Journal of Construction Engineering and Management, 118(02), 363–84.

Hulshizer, A J and Desai, A J (1984) Shock Vibration Effects on Freshly Placed Concrete. Journal of Construction Engineering and Management, 110(02), 266–85.

Hwang, B and Lim, E J (2013) Critical Success Factors for Key Project Players and Objectives: Case Study of Singapore. Journal of Construction Engineering and Management, 139(02), 204–15.

Hwang, B, Zhao, X and Yang, K W (2019) Effect of BIM on Rework in Construction Projects in Singapore: Status Quo, Magnitude, Impact, and Strategies. Journal of Construction Engineering and Management, 145(02).

Hwang, S, Park, M, Lee, H, Lee, S and Kim, H (2013) Dynamic Feasibility Analysis of the Housing Supply Strategies in a Recession: Korean Housing Market. Journal of Construction Engineering and Management, 139(02), 148–60.

Hyari, K H (2016) Handling Unbalanced Bidding in Construction Projects: Prevention Rather Than Detection. Journal of Construction Engineering and Management, 142(02).

Ibbs, C W (1985) Product Specification Practices and Problems. Journal of Construction Engineering and Management, 111(02), 157–72.

Ibbs, C W, Bates, L C and Echeverry, D (1987) Owner‐Furnished Equipment (OFE) Contract Practices. Journal of Construction Engineering and Management, 113(02), 249–63.

Ibbs, W and Nguyen, L D (2007) Schedule Analysis under the Effect of Resource Allocation. Journal of Construction Engineering and Management, 133(02), 131–8.

Ibbs, W, Nguyen, L D and Simonian, L (2011) Concurrent Delays and Apportionment of Damages. Journal of Construction Engineering and Management, 137(02), 119–26.

Ioannou, P G (1988) Bidding Models—Symmetry and State of Information. Journal of Construction Engineering and Management, 114(02), 214–32.

Ioannou, P G (1989) Dynamic Probabilistic Decision Processes. Journal of Construction Engineering and Management, 115(02), 237–57.

Ioannou, P G and Liu, L Y (1993) Advanced Construction Technology System—ACTS. Journal of Construction Engineering and Management, 119(02), 288–306.

Isaac, S and Navon, R (2008) Feasibility Study of an Automated Tool for Identifying the Implications of Changes in Construction Projects. Journal of Construction Engineering and Management, 134(02), 139–45.

Islam, M S, Nepal, M P and Skitmore, M (2019) Modified Fuzzy Group Decision-Making Approach to Cost Overrun Risk Assessment of Power Plant Projects. Journal of Construction Engineering and Management, 145(02).

Iyer, K C and Sagheer, M (2010) Hierarchical Structuring of PPP Risks Using Interpretative Structural Modeling. Journal of Construction Engineering and Management, 136(02), 151–9.

Jaafari, A (1984) Criticism of CPM for Project Planning Analysis. Journal of Construction Engineering and Management, 110(02), 222–33.

Jafari, A, Valentin, V and Bogus, S M (2019) Identification of Social Sustainability Criteria in Building Energy Retrofit Projects. Journal of Construction Engineering and Management, 145(02).

Jafarzadeh, R, Ingham, J M, Wilkinson, S, González, V and Aghakouchak, A A (2014) Application of Artificial Neural Network Methodology for Predicting Seismic Retrofit Construction Costs. Journal of Construction Engineering and Management, 140(02).

Jarkas, A M (2016) Effect of Buildability on Labor Productivity: A Practical Quantification Approach. Journal of Construction Engineering and Management, 142(02).

Jarkas, A M (2012) Influence of Buildability Factors on Rebar Installation Labor Productivity of Columns. Journal of Construction Engineering and Management, 138(02), 258–67.

Jaselskis, E J and Ashley, D B (1991) Optimal Allocation of Project Management Resources for Achieving Success. Journal of Construction Engineering and Management, 117(02), 321–40.

Jaselskis, E J, Anderson, M R, Jahren, C T, Rodriguez, Y and Njos, S (1995) Radio-Frequency Identification Applications in Construction Industry. Journal of Construction Engineering and Management, 121(02), 189–96.

Jenny, R J (1983) Compressed Air Use in Soft Ground Tunneling. Journal of Construction Engineering and Management, 109(02), 206–13.

Jeong, H S, Abraham, D M and Lew, J J (2004) Evaluation of an Emerging Market in Subsurface Utility Engineering. Journal of Construction Engineering and Management, 130(02), 225–34.

Jia, F, Xiang, P and Chen, D (2022) Prioritizing the Operation and Maintenance Complexity of Mega Transportation Projects Based on Systems Thinking. Journal of Construction Engineering and Management, 148(02).

Jiang, H, Lin, P and Qiang, M (2016) Public-Opinion Sentiment Analysis for Large Hydro Projects. Journal of Construction Engineering and Management, 142(02).

Jin, R, Han, S, Hyun, C and Cha, Y (2016) Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects. Journal of Construction Engineering and Management, 142(02).

Jin, X (2010) Determinants of Efficient Risk Allocation in Privately Financed Public Infrastructure Projects in Australia. Journal of Construction Engineering and Management, 136(02), 138–50.

John, S T, Roy, B K, Sarkar, P and Davis, R (2020) IoT Enabled Real-Time Monitoring System for Early-Age Compressive Strength of Concrete. Journal of Construction Engineering and Management, 146(02).

Kadry, M, Osman, H and Georgy, M (2017) Causes of Construction Delays in Countries with High Geopolitical Risks. Journal of Construction Engineering and Management, 143(02).

Kajewski, S L (2005) Multilevel Formwork Load Distribution with Posttensioned Slabs. Journal of Construction Engineering and Management, 131(02), 203–10.

Kaminsky, J (2021) Who Are We Talking To? Situating Construction Engineering and Management Knowledge. Journal of Construction Engineering and Management, 147(02).

Kaminsky, J A (2018) National Culture Shapes Private Investment in Transportation Infrastructure Projects around the Globe. Journal of Construction Engineering and Management, 144(02).

Kaminsky, J and Javernick-Will, A (2015) Theorizing the Internal Social Sustainability of Sanitation Organizations. Journal of Construction Engineering and Management, 141(02).

Kang, L S and Paulson, B C (2000) Information Classification for Civil Engineering Projects by Uniclass. Journal of Construction Engineering and Management, 126(02), 158–67.

Kang, S and Seo, J (2013) GIS Method for Haul Road Layout Planning in Large Earthmoving Projects: Framework and Analysis. Journal of Construction Engineering and Management, 139(02), 236–46.

Kangari, R (1988) Business Failure in Construction Industry. Journal of Construction Engineering and Management, 114(02), 172–90.

Kangari, R (1995) Construction Documentation in Arbitration. Journal of Construction Engineering and Management, 121(02), 201–8.

Kangari, R and Yoshida, T (1989) Prototype Robotics in Construction Industry. Journal of Construction Engineering and Management, 115(02), 284–301.

Kangari, R, Farid, F and Elgharib, H M (1992) Financial Performance Analysis for Construction Industry. Journal of Construction Engineering and Management, 118(02), 349–61.

Karshenas, S (1989) Truck Capacity Selection for Earthmoving. Journal of Construction Engineering and Management, 115(02), 212–27.

Kartam, N A (1997) Integrating Safety and Health Performance into Construction CPM . Journal of Construction Engineering and Management, 123(02), 121–6.

Kasapoğlu, E (2014) Leadership Styles in Architectural Design Offices in Turkey. Journal of Construction Engineering and Management, 140(02).

Kashani, H, Ashuri, B, Shahandashti, S M and Lu, J (2015) Investment Valuation Model for Renewable Energy Systems in Buildings. Journal of Construction Engineering and Management, 141(02).

Kazaz, A and Birgonul, M T (2005) Determination of Quality Level in Mass Housing Projects in Turkey. Journal of Construction Engineering and Management, 131(02), 195–202.

Khalili, A and Chua, D K (2014) Integrated Prefabrication Configuration and Component Grouping for Resource Optimization of Precast Production. Journal of Construction Engineering and Management, 140(02).

Khanzadi, M, Nasirzadeh, F and Dashti, M S (2018) Fuzzy Cognitive Map Approach to Analyze Causes of Change Orders in Construction Projects. Journal of Construction Engineering and Management, 144(02).

Kim, C, Kim, H, Ryu, J and Kim, C (2011) Ubiquitous Sensor Network for Construction Material Monitoring. Journal of Construction Engineering and Management, 137(02), 158–65.

Kim, H, Ahn, C R and Yang, K (2017) Identifying Safety Hazards Using Collective Bodily Responses of Workers. Journal of Construction Engineering and Management, 143(02).

Kim, J and Ellis, R D (2010) Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm. Journal of Construction Engineering and Management, 136(02), 160–9.

Kim, T, Lee, H W and Hong, S (2016) Value Engineering for Roadway Expansion Project over Deep Thick Soft Soils. Journal of Construction Engineering and Management, 142(02).

Koehn, E and Brown, G (1985) Climatic Effects on Construction. Journal of Construction Engineering and Management, 111(02), 129–37.

Koehn, E and Brown, G (1986) International Labor Productivity Factors. Journal of Construction Engineering and Management, 112(02), 299–302.

Koehn, E and Caplan, S B (1987) Work Improvement Data for Small and Medium Size Contractors. Journal of Construction Engineering and Management, 113(02), 327–39.

Koehn, E and Espaillat, C A (1984) Costs and Benefits of MBE Rules in Construction. Journal of Construction Engineering and Management, 110(02), 235–47.

Koehn, E and Musser, K (1983) OSHA Regulations Effects on Construction. Journal of Construction Engineering and Management, 109(02), 233–44.

Kong, F and Dou, D (2021) Resource-Constrained Project Scheduling Problem under Multiple Time Constraints. Journal of Construction Engineering and Management, 147(02).

Koskela, L, Ferrantelli, A, Niiranen, J, Pikas, E and Dave, B (2019) Epistemological explanation of lean construction. Journal of Construction Engineering and Management, 145(02), 04018131 .

Kumamoto, T, Kameda, H, Hoshiya, M and Ishii, K (1990) Construction of Difficult Dry Dock in Yokohama, Japan. Journal of Construction Engineering and Management, 116(02), 201–20.

Kumaraswamy, M M and Morris, D A (2002) Build-Operate-Transfer-Type Procurement in Asian Megaprojects. Journal of Construction Engineering and Management, 128(02), 93–102.

Kwak, Y H (2002) Analyzing Asian Infrastructure Development Privatization Market. Journal of Construction Engineering and Management, 128(02), 110–6.

Labib, Y N, Lotfallah, W B, Hanna, A S and Boulos, N W (2021) Development and Application of Performance Index for Comparative Assessment of Public Capital Projects. Journal of Construction Engineering and Management, 147(02).

Langdon, R R and Sawang, S (2018) Construction Workers’ Well-Being: What Leads to Depression, Anxiety, and Stress?. Journal of Construction Engineering and Management, 144(02).

Lee, E and Thomas, D K (2007) State-of-Practice Technologies on Accelerated Urban Highway Rehabilitation: I-15 California Experience. Journal of Construction Engineering and Management, 133(02), 105–13.

Lee, S (2015) Determination of Priority Weights under Multiattribute Decision-Making Situations: AHP versus Fuzzy AHP. Journal of Construction Engineering and Management, 141(02).

Lei, Z, Han, S, Bouferguène, A, Taghaddos, H, Hermann, U and Al-Hussein, M (2015) Algorithm for Mobile Crane Walking Path Planning in Congested Industrial Plants. Journal of Construction Engineering and Management, 141(02).

Lemna, G J, Borcherding, J D and Tucker, R L (1986) Productive Foremen in Industrial Construction. Journal of Construction Engineering and Management, 112(02), 192–210.

Lerche, J, Enevoldsen, P and Seppänen, O (2022) Application of Takt and Kanban to Modular Wind Turbine Construction. Journal of Construction Engineering and Management, 148(02).

Lessing, J and Brege, S (2018) Industrialized Building Companies’ Business Models: Multiple Case Study of Swedish and North American Companies. Journal of Construction Engineering and Management, 144(02).

Leung, M, Bowen, P, Liang, Q and Famakin, I (2015) Development of a Job-Stress Model for Construction Professionals in South Africa and Hong Kong. Journal of Construction Engineering and Management, 141(02).

Leung, M, Chan, Y and Yu, J (2009) Integrated Model for the Stressors and Stresses of Construction Project Managers in Hong Kong. Journal of Construction Engineering and Management, 135(02), 126–34.

Leung, M, Yu, J and Chong, M L A (2016) Effects of Stress and Commitment on the Performance of Construction Estimation Participants in Hong Kong. Journal of Construction Engineering and Management, 142(02).

Leung, M, Zhang, H and Skitmore, M (2008) Effects of Organizational Supports on the Stress of Construction Estimation Participants. Journal of Construction Engineering and Management, 134(02), 84–93.

Li, G, Chen, C, Martek, I, Ao, Y and Dai, J (2021) Bid or No-Bid Decision Model for International Construction Projects: Evidential Reasoning Approach. Journal of Construction Engineering and Management, 147(02).

Li, H, Xu, Z and Demeulemeester, E (2015) Scheduling Policies for the Stochastic Resource Leveling Problem. Journal of Construction Engineering and Management, 141(02).

Li, P, Wang, Q, Guo, Z, Mei, T, Li, Q, Qiao, S and Zuo, W (2022) Identifying Falling-from-Height Hazards in Building Information Models: A Voxelization-Based Method. Journal of Construction Engineering and Management, 148(02).

Li, X, Lu, W, Xue, F, Wu, L, Zhao, R, Lou, J and Xu, J (2022) Blockchain-Enabled IoT-BIM Platform for Supply Chain Management in Modular Construction. Journal of Construction Engineering and Management, 148(02).

Liang, R, Zhang, J, Wu, C, Sheng, Z and Wang, X (2019) Joint-Venture Contractor Selection Using Competitive and Collaborative Criteria with Uncertainty. Journal of Construction Engineering and Management, 145(02).

Liao, C (2015) Optimal Inspection Strategies for Labor Inspection in the Construction Industry. Journal of Construction Engineering and Management, 141(02).

Liberatore, M J, Pollack-Johnson, B and Smith, C A (2001) Project Management in Construction: Software Use and Research Directions. Journal of Construction Engineering and Management, 127(02), 101–7.

Lim, T, Park, S, Lee, H and Lee, D (2016) Artificial Neural Network–Based Slip-Trip Classifier Using Smart Sensor for Construction Workplace. Journal of Construction Engineering and Management, 142(02).

Lines, B C, Sullivan, K T and Wiezel, A (2016) Support for Organizational Change: Change-Readiness Outcomes among AEC Project Teams. Journal of Construction Engineering and Management, 142(02).

Ling, F Y, Ibbs, C W and Hoo, W Y (2006) Determinants of International Architectural, Engineering, and Construction Firms’ Project Success in China. Journal of Construction Engineering and Management, 132(02), 206–14.

Lingard, H (2004) Work and Family Sources of Burnout in the Australian Engineering Profession: Comparison of Respondents in Dual- and Single-Earner Couples, Parents, and Nonparents. Journal of Construction Engineering and Management, 130(02), 290–8.

Lingard, H, Cooke, T and Blismas, N (2012) Do Perceptions of Supervisors’ Safety Responses Mediate the Relationship between Perceptions of the Organizational Safety Climate and Incident Rates in the Construction Supply Chain?. Journal of Construction Engineering and Management, 138(02), 234–41.

Liu, K, Su, Y, Pollack, J, Liang, H and Zhang, S (2022) Explaining the Formation Mechanism of Intrateam Knowledge Exchange Network in Offsite Construction Projects: A Social Cognitive Perspective. Journal of Construction Engineering and Management, 148(02).

Liu, X, Chen, W and Bowman, M D (1986) Shore‐Slab Interaction in Concrete Buildings. Journal of Construction Engineering and Management, 112(02), 227–44.

Liu, Y and Yeh, I (2016) Building Valuation Model of Enterprise Values for Construction Enterprise with Quantile Neural Networks. Journal of Construction Engineering and Management, 142(02).

Logcher, R D, Wang, M and Chen, F H (1989) Knowledge Processing for Construction Management Data Base. Journal of Construction Engineering and Management, 115(02), 196–211.

Lopez del Puerto, C, Clevenger, C M, Boremann, K and Gilkey, D P (2014) Exploratory Study to Identify Perceptions of Safety and Risk among Residential Latino Construction Workers as Distinct from Commercial and Heavy Civil Construction Workers. Journal of Construction Engineering and Management, 140(02).

Love, P E D, Davis, P R, Chevis, R and Edwards, D J (2011) Risk/Reward Compensation Model for Civil Engineering Infrastructure Alliance Projects. Journal of Construction Engineering and Management, 137(02), 127–36.

Love, P E D, Teo, P and Morrison, J (2018) Revisiting Quality Failure Costs in Construction. Journal of Construction Engineering and Management, 144(02).

Love, P E D, Tse, R Y C and Edwards, D J (2005) Time–Cost Relationships in Australian Building Construction Projects. Journal of Construction Engineering and Management, 131(02), 187–94.

Love, P E D, Veli, S, Davis, P, Teo, P and Morrison, J (2017) {[}See the Difference{]} in a Precast Facility: Changing Mindsets with an Experiential Safety Program. Journal of Construction Engineering and Management, 143(02).

Lu, M and Anson, M (2004) Establish Concrete Placing Rates Using Quality Control Records from Hong Kong Building Construction Projects. Journal of Construction Engineering and Management, 130(02), 216–24.

Lu, W, Peng, Y, Shen, Q and Li, H (2013) Generic Model for Measuring Benefits of BIM as a Learning Tool in Construction Tasks. Journal of Construction Engineering and Management, 139(02), 195–203.

Lu, W, Ye, K, Flanagan, R and Jewell, C (2014) Nexus between Contracting and Construction Professional Service Businesses: Empirical Evidence from International Market. Journal of Construction Engineering and Management, 140(02).

Lu, W, Zhang, L and Li, Z (2015) Influence of Negotiation Risk Attitude and Power on Behaviors and Outcomes When Negotiating Construction Claims. Journal of Construction Engineering and Management, 141(02).

Luiten, G T & and Tolman, F P (1997) Automating Communication in Civil Engineering . Journal of Construction Engineering and Management, 123(02), 113–20.

Lutz, J D, Chang, L and Napier, T R (1990) Evaluation of New Building Technology. Journal of Construction Engineering and Management, 116(02), 281–99.

Ma, H, Zeng, S, Lin, H and Zeng, R (2020) Impact of Public Sector on Sustainability of Public–Private Partnership Projects. Journal of Construction Engineering and Management, 146(02).

Ma, X, Chan, A P C, Li, Y, Zhang, B and Xiong, F (2020) Critical Strategies for Enhancing BIM Implementation in AEC Projects: Perspectives from Chinese Practitioners. Journal of Construction Engineering and Management, 146(02).

Mak, S and Picken, D (2000) Using Risk Analysis to Determine Construction Project Contingencies. Journal of Construction Engineering and Management, 126(02), 130–6.

Maloney, W F (2003) Labor-Management Cooperation and Customer Satisfaction. Journal of Construction Engineering and Management, 129(02), 165–72.

Maloney, W F and Jones, T W (1984) Labor‐Management Cooperation: Operation MOST. Journal of Construction Engineering and Management, 110(02), 205–21.

Maloney, W F and McFillen, J M (1987) Motivational Impact of Work Crews. Journal of Construction Engineering and Management, 113(02), 208–21.

Maloney, W F and McFillen, J M (1983) Research Needs in Construction Worker Performance. Journal of Construction Engineering and Management, 109(02), 245–54.

Martin, H and Lewis, T M (2014) Pinpointing Safety Leadership Factors for Safe Construction Sites in Trinidad and Tobago. Journal of Construction Engineering and Management, 140(02).

Marzouk, M and Moselhi, O (2003) Object-oriented Simulation Model for Earthmoving Operations. Journal of Construction Engineering and Management, 129(02), 173–81.

Maxwell, D A, Back, W E and Toon, J (1998) Optimization of Crew Configurations Using Activity-Based Costing. Journal of Construction Engineering and Management, 124(02), 162–8.

Mayer, Z and Kazakidis, V (2007) Decision Making in Flexible Mine Production System Design Using Real Options. Journal of Construction Engineering and Management, 133(02), 169–80.

McCowan, A K and Mohamed, S (2007) Decision Support System to Evaluate and Compare Concession Options. Journal of Construction Engineering and Management, 133(02), 114–23.

McCullouch, B G and Gunn, P (1993) Construction Field Data Acquisition with Pen‐Based Computers. Journal of Construction Engineering and Management, 119(02), 374–84.

McKim, R, Hegazy, T and Attalla, M (2000) Project Performance Control in Reconstruction Projects. Journal of Construction Engineering and Management, 126(02), 137–41.

Milberg, C T and Tommelein, I D (2020) Methods for Managing Tolerance Compatibility: Windows in Cast-in-Place Concrete. Journal of Construction Engineering and Management, 146(02).

Miller, M L and Bernold, L E (1991) Sensor‐Integrated Nailing for Building Construction. Journal of Construction Engineering and Management, 117(02), 213–25.

Mitropoulos, P and Guillama, V (2010) Analysis of Residential Framing Accidents, Activities, and Task Demands. Journal of Construction Engineering and Management, 136(02), 260–9.

Miyatake, Y and Kangari, R (1993) Experiencing Computer Integrated Construction. Journal of Construction Engineering and Management, 119(02), 307–22.

Mohamad Karimi, S, Jamshid Mousavi, S, Kaveh, A and Afshar, A (2007) Fuzzy Optimization Model for Earthwork Allocations with Imprecise Parameters. Journal of Construction Engineering and Management, 133(02), 181–90.

Montemanni, R, Toklu, N E, Toklu, & & and Toklu, Y C (2012) Aggregate Blending via Robust Linear Programming. Journal of Construction Engineering and Management, 138(02), 188–96.

Moon, S, Xu, S, Hou, L, Wu, C, Wang, X and Tam, V W Y (2018) RFID-Aided Tracking System to Improve Work Efficiency of Scaffold Supplier: Stock Management in Australasian Supply Chain. Journal of Construction Engineering and Management, 144(02).

Moselhi, O and Nicholas, M J (1990) Hybrid Expert System for Construction Planning and Scheduling. Journal of Construction Engineering and Management, 116(02), 221–38.

Mostafa, M A and El-Gohary, N M (2015) Semantic System for Stakeholder-Conscious Infrastructure Project Planning and Design. Journal of Construction Engineering and Management, 141(02).

Moussourakis, J and Haksever, C (2010) Project Compression with Nonlinear Cost Functions. Journal of Construction Engineering and Management, 136(02), 251–9.

Nam, C H and Tatum, C B (1992) Noncontractual Methods of Integration on Construction Projects. Journal of Construction Engineering and Management, 118(02), 385–98.

Nam, C H, Gasiorowski, J G and Tatum, C B (1991) Microlevel Study of Integration in High‐Strength Concrete Innovation. Journal of Construction Engineering and Management, 117(02), 294–309.

Navon, R, Rubinovitz, Y and Coffler, M (1996) Fully Automated Rebar CAD/CAM System: Economic Evaluation and Field Implementation . Journal of Construction Engineering and Management, 122(02), 101–8.

Ndekugri, I and Turner, A (1994) Building Procurement by Design and Build Approach. Journal of Construction Engineering and Management, 120(02), 243–56.

Neely, E S and Neathammer, R (1991) Life‐Cycle Maintenance Costs by Facility Use. Journal of Construction Engineering and Management, 117(02), 310–20.

Nepal, M P, Park, M and Son, B (2006) Effects of Schedule Pressure on Construction Performance. Journal of Construction Engineering and Management, 132(02), 182–8.

Ng, A W Y and Chan, A H S (2017) Mental Models of Construction Workers for Safety-Sign Representation. Journal of Construction Engineering and Management, 143(02).

Nicholls, R (1992) Construction of Grout‐Impregnated Fabric‐Reinforced Pipes. Journal of Construction Engineering and Management, 118(02), 283–302.

Nieto-Morote, A and Ruz-Vila, F (2012) Last Planner Control System Applied to a Chemical Plant Construction. Journal of Construction Engineering and Management, 138(02), 287–93.

Nishigaki, S, Vavrin, J, Kano, N, Haga, T, Kunz, J C and Law, K (1994) Humanware, Human Error, and Hiyari‐Hat: A Template of Unsafe Symptoms. Journal of Construction Engineering and Management, 120(02), 421–42.

Noktehdan, M, Shahbazpour, M, Zare, M R and Wilkinson, S (2019) Innovation Management and Construction Phases in Infrastructure Projects. Journal of Construction Engineering and Management, 145(02).

Nomura, Y, Hoshina, H, Shiomi, H and Umezu, T (1985) Pipe Jacking Method for Long Curve Construction. Journal of Construction Engineering and Management, 111(02), 138–48.

Noyce, D A and Hanna, A S (1997) Planned Schedule Compression Concept File For Electrical Contractors . Journal of Construction Engineering and Management, 123(02), 189–97.

O'Brien, J J, Kreitzberg, F C and Mikes, W F (1985) Network Scheduling Variations for Repetitive Work. Journal of Construction Engineering and Management, 111(02), 105–16.

O'Connor, J T, Hugo, F and Stamm, E M (1991) Improving Highway Specifications for Constructibility. Journal of Construction Engineering and Management, 117(02), 242–58.

O'Connor, J T, Rusch, S E and Schulz, M J (1987) Constructability Concepts for Engineering and Procurement. Journal of Construction Engineering and Management, 113(02), 235–48.

O’Connor, J T and Koo, H J (2021) Proactive Design Quality Assessment Tool for Building Projects. Journal of Construction Engineering and Management, 147(02).

Oh, E H, Naderpajouh, N, Hastak, M and Gokhale, S (2016) Integration of the Construction Knowledge and Expertise in Front-End Planning. Journal of Construction Engineering and Management, 142(02).

Okpala, D C and Aniekwu, A N (1988) Causes of High Costs of Construction in Nigeria. Journal of Construction Engineering and Management, 114(02), 233–44.

Olaniran, O J, Love, P E D, Edwards, D J, Olatunji, O and Matthews, J (2017) Chaos Theory: Implications for Cost Overrun Research in Hydrocarbon Megaprojects. Journal of Construction Engineering and Management, 143(02).

Padilla, E M and Carr, R I (1991) Resource Strategies for Dynamic Project Management. Journal of Construction Engineering and Management, 117(02), 279–93.

Paek, J H and Ock, J H (1996) Innovative Building Construction Technique: Modified Up/Down Method . Journal of Construction Engineering and Management, 122(02), 141–6.

Paek, J H, Lee, Y W and Napier, T R (1992) Selection of Design/Build Proposal Using Fuzzy‐Logic System. Journal of Construction Engineering and Management, 118(02), 303–17.

Palaneeswaran, E and Kumaraswamy, M M (2003) Knowledge Mining of Information Sources for Research in Construction Management. Journal of Construction Engineering and Management, 129(02), 182–91.

Panwar, A and Jha, K N (2021) Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model. Journal of Construction Engineering and Management, 147(02).

Park, J and Cho, Y K (2022) Point Cloud Information Modeling: Deep Learning–Based Automated Information Modeling Framework for Point Cloud Data. Journal of Construction Engineering and Management, 148(02).

Park, J, Kim, K and Cho, Y K (2017) Framework of Automated Construction-Safety Monitoring Using Cloud-Enabled BIM and BLE Mobile Tracking Sensors. Journal of Construction Engineering and Management, 143(02).

Park, Y, Gwak, H and Lee, D (2017) Dozer Workability Estimation Method for Economic Dozing. Journal of Construction Engineering and Management, 143(02).

Paulson, B C (1995) Computers and Construction—Midcareer Reflections. Journal of Construction Engineering and Management, 121(02), 197–200.

Paulson, B C, Chan, W T and Koo, C C (1987) Construction Operations Simulation by Microcomputer. Journal of Construction Engineering and Management, 113(02), 302–14.

Peng, J L, Yen, T, Lin, Y, Wu, K L and Chen, W F (1997) Performance of Scaffold Frame Shoring under Pattern Loads and Load Paths . Journal of Construction Engineering and Management, 123(02), 138–45.

Pin, T H and Scott, W F (1994) Bidding Model for Refurbishment Work. Journal of Construction Engineering and Management, 120(02), 257–73.

Ping Ho, S (2005) Bid Compensation Decision Model for Projects with Costly Bid Preparation. Journal of Construction Engineering and Management, 131(02), 151–9.

Pocock, J B, Hyun, C T, Liu, L Y and Kim, M K (1996) Relationship between Project Interaction and Performance Indicators . Journal of Construction Engineering and Management, 122(02), 165–76.

Poleacovschi, C, Javernick-Will, A, Tong, T and Wanberg, J (2019) Engineers Seeking Knowledge: Effect of Control Systems on Accessibility of Tacit and Codified Knowledge. Journal of Construction Engineering and Management, 145(02).

Praticò, F G and Giunta, M (2018) Proposal of a Key Performance Indicator for Railway Track Based on LCC and RAMS Analyses. Journal of Construction Engineering and Management, 144(02).

Praticò, F G, Casciano, A and Tramontana, D (2011) Pavement Life-Cycle Cost and Asphalt Binder Quality: Theoretical and Experimental Investigation. Journal of Construction Engineering and Management, 137(02), 99–107.

Que, B C (2002) Incorporating Practicability into Genetic Algorithm-Based Time-Cost Optimization. Journal of Construction Engineering and Management, 128(02), 139–43.

Radzi, A R, Rahman, R A, Doh, S I and Esa, M (2022) Construction Readiness for Highway Projects: Key Decision Criteria. Journal of Construction Engineering and Management, 148(02).

Rafiei, M H and Adeli, H (2016) A Novel Machine Learning Model for Estimation of Sale Prices of Real Estate Units. Journal of Construction Engineering and Management, 142(02).

Rasdorf, W J and Herbert, M J (1990) Bar Coding in Construction Engineering. Journal of Construction Engineering and Management, 116(02), 261–80.

Rasdorf, W, Grasso, B and Bridgers, M (2010) Public versus Private Perceptions on Hiring an External Program Manager. Journal of Construction Engineering and Management, 136(02), 219–26.

Rashid, K M and Behzadan, A H (2018) Risk Behavior-Based Trajectory Prediction for Construction Site Safety Monitoring. Journal of Construction Engineering and Management, 144(02).

Reda, R M (1990) RPM: Repetitive Project Modeling. Journal of Construction Engineering and Management, 116(02), 316–30.

Remold, L E (1989) Simulation of Nonsteady Construction Processes. Journal of Construction Engineering and Management, 115(02), 163–78.

Riggs, L S (1988) Educating Construction Managers. Journal of Construction Engineering and Management, 114(02), 279–85.

Rilett, L R (1998) Effect of Variability on End Product Specifications. Journal of Construction Engineering and Management, 124(02), 139–45.

Rilett, L R (1998) Identifying Component Variability of End Product Specification Tests. Journal of Construction Engineering and Management, 124(02), 133–8.

Riley, D R and Sanvido, V E (1997) Space Planning Method for Multistory Building Construction . Journal of Construction Engineering and Management, 123(02), 171–80.

Ringwald, R C (1987) Bunching Theory Applied to Minimize Cost. Journal of Construction Engineering and Management, 113(02), 321–6.

Rogge, D F (1984) Delay Reporting Within Cost Accounting System. Journal of Construction Engineering and Management, 110(02), 289–92.

Rosenbaum, S, Toledo, M and González, V (2014) Improving Environmental and Production Performance in Construction Projects Using Value-Stream Mapping: Case Study. Journal of Construction Engineering and Management, 140(02).

Rounds, J L and Chi, N (1985) Total Quality Management for Construction. Journal of Construction Engineering and Management, 111(02), 117–28.

Rounds, J L and Warning, G (1987) Impact of Computerizing Midsized Construction Companies. Journal of Construction Engineering and Management, 113(02), 183–90.

Rowings, J E and Kaspar, S L (1991) Constructability of Cable‐Stayed Bridges. Journal of Construction Engineering and Management, 117(02), 259–78.

Royer, K (1986) The Federal Government and the Critical Path. Journal of Construction Engineering and Management, 112(02), 220–5.

Russell, A D (1993) Computerized Daily Site Reporting. Journal of Construction Engineering and Management, 119(02), 385–402.

Russell, A D and Wong, W C M (1993) New Generation of Planning Structures. Journal of Construction Engineering and Management, 119(02), 196–214.

Russell, J S and Zhai, H (1996) Predicting Contractor Failure Using Stochastic Dynamics of Economic and Financial Variables . Journal of Construction Engineering and Management, 122(02), 183–91.

Russell, M M, Liu, M, Howell, G and Hsiang, S M (2015) Case Studies of the Allocation and Reduction of Time Buffer through Use of the Last Planner System. Journal of Construction Engineering and Management, 141(02).

Ryu, J, Diraneyya, M M, Haas, C T and Abdel-Rahman, E (2021) Analysis of the Limits of Automated Rule-Based Ergonomic Assessment in Bricklaying. Journal of Construction Engineering and Management, 147(02).

Sacks, R, Eastman, C M and Lee, G (2004) Process Model Perspectives on Management and Engineering Procedures in the Precast/Prestressed Concrete Industry. Journal of Construction Engineering and Management, 130(02), 206–15.

Sadeghpour, F, Moselhi, O and Alkass, S T (2006) Computer-Aided Site Layout Planning. Journal of Construction Engineering and Management, 132(02), 143–51.

Said, H (2016) Modeling and Likelihood Prediction of Prefabrication Feasibility for Electrical Construction Firms. Journal of Construction Engineering and Management, 142(02).

Said, H M and Bartusiak, J (2018) Regional Competition Analysis of Industrialized Homebuilding Industry. Journal of Construction Engineering and Management, 144(02).

Said, H M and Kandimalla, P (2018) Performance Measurement of Building Sheet-Metal Ductwork Prefabrication under Batch Production Settings. Journal of Construction Engineering and Management, 144(02).

Sakhakarmi, S, Park, J and Cho, C (2019) Enhanced Machine Learning Classification Accuracy for Scaffolding Safety Using Increased Features. Journal of Construction Engineering and Management, 145(02).

Sakka, Z I and El-Sayegh, S M (2007) Float Consumption Impact on Cost and Schedule in the Construction Industry. Journal of Construction Engineering and Management, 133(02), 124–30.

Salarian, A A, Etemadfard, H, Rahimzadegan, A and Ghalehnovi, M (2023) Investigating the Role of Clustering in Construction-Accident Severity Prediction Using a Heterogeneous and Imbalanced Data Set. Journal of Construction Engineering and Management, 149(02).

Sanboskani, H and Srour, I (2022) Using Advanced Statistical Methods to Identify the Drivers of Knowledge Sharing Intention among Construction Workers. Journal of Construction Engineering and Management, 148(02).

Sangiorgio, V, Uva, G and Fatiguso, F (2018) Optimized AHP to Overcome Limits in Weight Calculation: Building Performance Application. Journal of Construction Engineering and Management, 144(02).

Sanvido, V E (1988) Conceptual Construction Process Model. Journal of Construction Engineering and Management, 114(02), 294–310.

Sanvido, V E and Medeiros, D J (1990) Applying Computer‐Integrated Manufacturing Concepts to Construction. Journal of Construction Engineering and Management, 116(02), 365–79.

Sanvido, V E and Paulson, B C (1991) Site Analysis Using Controller‐Function Charts. Journal of Construction Engineering and Management, 117(02), 226–41.

Schaufelberger, J E and Wipadapisut, I (2003) Alternate Financing Strategies for Build-Operate-Transfer Projects. Journal of Construction Engineering and Management, 129(02), 205–13.

Schexnayder, C, Knutson, K and Fente, J (2005) Describing a Beta Probability Distribution Function for Construction Simulation. Journal of Construction Engineering and Management, 131(02), 221–9.

Severson, G D, Russell, J S and Jaselskis, E J (1994) Predicting Contract Surety Bond Claims Using Contractor Financial Data. Journal of Construction Engineering and Management, 120(02), 405–20.

Seyis, S, Ergen, E and Pizzi, E (2016) Identification of Waste Types and Their Root Causes in Green-Building Project Delivery Process. Journal of Construction Engineering and Management, 142(02).

Shaked, O and Warszawski, A (1995) Knowledge-Based System for Construction Planning of High-Rise Buildings. Journal of Construction Engineering and Management, 121(02), 172–82.

Shapira, A (1999) Contemporary Trends in Formwork Standards—A Case Study. Journal of Construction Engineering and Management, 125(02), 69–75.

Shapira, A, Shahar, Y and Raz, Y (2001) Design and Construction of High Multitier Shoring Towers: Case Study. Journal of Construction Engineering and Management, 127(02), 108–15.

Sharma, V, Caldas, C H and Mulva, S P (2020) Identification and Prioritization of Factors Affecting the Overall Project Cost of Healthcare Facilities. Journal of Construction Engineering and Management, 146(02).

Shash, A A (1998) Subcontractors' Bidding Decisions. Journal of Construction Engineering and Management, 124(02), 101–6.

Shehadeh, A, Alshboul, O and Hamedat, O (2022) Risk Assessment Model for Optimal Gain–Pain Share Ratio in Target Cost Contract for Construction Projects. Journal of Construction Engineering and Management, 148(02).

Shen, L and Song, W (1998) Competitive Tendering Practice in Chinese Construction. Journal of Construction Engineering and Management, 124(02), 155–61.

Shen, L Y and Wu, Y Z (2005) Risk Concession Model for Build/Operate/Transfer Contract Projects. Journal of Construction Engineering and Management, 131(02), 211–20.

Sherratt, F and Leicht, R (2020) Unpacking Ontological Perspectives in CEM Research: Everything Is Biased. Journal of Construction Engineering and Management, 146(02).

Shi, J J and Halpin, D W (2003) Enterprise Resource Planning for Construction Business Management. Journal of Construction Engineering and Management, 129(02), 214–21.

Shih, N and Huang, S (2006) 3D Scan Information Management System for Construction Management. Journal of Construction Engineering and Management, 132(02), 134–42.

Shohet, I M and Perelstein, E (2004) Decision Support Model for the Allocation of Resources in Rehabilitation Projects. Journal of Construction Engineering and Management, 130(02), 249–57.

Shokri, S, Ahn, S, Lee, S, Haas, C T and Haas, R C G (2016) Current Status of Interface Management in Construction: Drivers and Effects of Systematic Interface Management. Journal of Construction Engineering and Management, 142(02).

Shokri, S, Haas, C T, G. Haas, R C and Lee, S H (2016) Interface-Management Process for Managing Risks in Complex Capital Projects. Journal of Construction Engineering and Management, 142(02).

Sillars, D N and Kangari, R (1997) Japanese Construction Alliances . Journal of Construction Engineering and Management, 123(02), 146–52.

Skitmore, M, Drew, D and Ngai, S (2001) Bid-Spread. Journal of Construction Engineering and Management, 127(02), 149–53.

Smith, G R and Bohn, C M (1999) Small to Medium Contractor Contingency and Assumption of Risk. Journal of Construction Engineering and Management, 125(02), 101–8.

Smith, G R and Roth, R D (1991) Safety Programs and The Construction Manager. Journal of Construction Engineering and Management, 117(02), 360–71.

Son, J and Rojas, E M (2011) Impact of Optimism Bias Regarding Organizational Dynamics on Project Planning and Control. Journal of Construction Engineering and Management, 137(02), 147–57.

Srijaroen, C, Hoy, M, Horpibulsuk, S, Rachan, R and Arulrajah, A (2021) Soil–Cement Screw Pile: Alternative Pile for Low- and Medium-Rise Buildings in Soft Bangkok Clay. Journal of Construction Engineering and Management, 147(02).

Stamatiadis, N, Goodrum, P, Shocklee, E and Wang, C (2014) Quantitative Analysis of State Transportation Agency’s Experience with Constructability Reviews. Journal of Construction Engineering and Management, 140(02).

Stanford, M S and Molenaar, K R (2018) Influence of Simplified Procurement Methods on Competition for Public Sector Construction. Journal of Construction Engineering and Management, 144(02).

Stewart, J, Minchin, R E, Jaselskis, E J, Dayal, V and Smith, G (2004) Potential Construction Applications for Thermoset Composite Scrap Material. Journal of Construction Engineering and Management, 130(02), 199–205.

Stoy, C and Schalcher, H (2007) Residential Building Projects: Building Cost Indicators and Drivers. Journal of Construction Engineering and Management, 133(02), 139–45.

Sun, Y and Zhang, L (2015) Balancing Public and Private Stakeholder Interests in BOT Concessions: Minimum Revenue Guarantee and Royalty Scheme Applied to a Water Treatment Project in China. Journal of Construction Engineering and Management, 141(02).

Swei, O (2020) Forecasting Infidelity: Why Current Methods for Predicting Costs Miss the Mark. Journal of Construction Engineering and Management, 146(02).

Syed, A and Sonparote, R S (2020) Development and Early-Age Performance of an Innovative Prestressed Precast Concrete Pavement. Journal of Construction Engineering and Management, 146(02).

Sylvie, J R, Thomas, S R, Lee, S, Chapman, R E and Smith, R T (2013) Development and Interpretation of the Security Rating Index. Journal of Construction Engineering and Management, 139(02), 185–94.

Tatum, C B (1987) Balancing Engineering and Management in Construction Education. Journal of Construction Engineering and Management, 113(02), 264–72.

Tatum, C B (1986) Designing Project Organizations: An Expanded Process. Journal of Construction Engineering and Management, 112(02), 259–72.

Tatum, C B (1987) Improving Constructibility during Conceptual Planning. Journal of Construction Engineering and Management, 113(02), 191–207.

Tatum, C B (1983) Innovations in Nuclear Concrete Construction. Journal of Construction Engineering and Management, 109(02), 131–45.

Tatum, C B (1986) Potential Mechanisms for Construction Innovation. Journal of Construction Engineering and Management, 112(02), 178–91.

Tatum, C B and Cottrell, T E (1983) Resident Engineering in Power Plant Construction. Journal of Construction Engineering and Management, 109(02), 224–32.

Tatum, C B, Bauer, M F and Meade, A W (1989) Process of Innovation for Up/Down Construction at Rowes Wharf. Journal of Construction Engineering and Management, 115(02), 179–95.

Tavakoli, A, Taye, E D and Erktin, M (1989) Equipment Policy of Top 400 Contractors: A Survey. Journal of Construction Engineering and Management, 115(02), 317–29.

Telem, D, Shapira, A, Goren, Y D and Schexnayder, C J (2006) Moving a Reinforced-Concrete Building: Case Study. Journal of Construction Engineering and Management, 132(02), 115–24.

Thomas, H R and Raynar, K A (1997) Scheduled Overtime and Labor Productivity: Quantitative Analysis . Journal of Construction Engineering and Management, 123(02), 181–8.

Thomas, H R and Willenbrock, J H (1988) Managing Construction Research at Universities. Journal of Construction Engineering and Management, 114(02), 245–55.

Thomas, H R, Guevara, J M and Gustenhoven, C T (1984) Improving Productivity Estimates by Work Sampling. Journal of Construction Engineering and Management, 110(02), 178–88.

Thomas, H R, Heuer, D W and Filippelli, R L (1984) Settlement of Construction Jurisdictional Disputes. Journal of Construction Engineering and Management, 110(02), 165–77.

Thomas, H R, Horman, M J, de Souza, U E L and ZavÅ™ski, I (2002) Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(02), 144–54.

Thomas, H R, Mathews, C T and Ward, J G (1986) Learning Curve Models of Construction Productivity. Journal of Construction Engineering and Management, 112(02), 245–58.

Thomas, H R, Smith, G R and Mellott, R E (1994) Interpretation of Construction Contracts. Journal of Construction Engineering and Management, 120(02), 321–36.

Tiong, R L K (1995) Risks and Guarantees in BOT Tender. Journal of Construction Engineering and Management, 121(02), 183–8.

Tiong, R L K (1992) Strategies in Risk Management of On‐Demand Guarantees. Journal of Construction Engineering and Management, 118(02), 229–43.

Tiong, R L K, Yeo, K and McCarthy, S C (1992) Critical Success Factors in Winning BOT Contracts. Journal of Construction Engineering and Management, 118(02), 217–28.

Tokdemir, O B, Erol, H and Dikmen, I (2019) Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation. Journal of Construction Engineering and Management, 145(02).

Tommelein, I D and Zouein, P P (1993) Interactive Dynamic Layout Planning. Journal of Construction Engineering and Management, 119(02), 266–87.

Touran, A and Wiser, E P (1992) Monte Carlo Technique with Correlated Random Variables. Journal of Construction Engineering and Management, 118(02), 258–72.

Tran, D Q, Diraviam, G and Minchin, R E (2018) Performance of Highway Design-Bid-Build and Design-Build Projects by Work Types. Journal of Construction Engineering and Management, 144(02).

Trinh, M T and Feng, Y (2020) Impact of Project Complexity on Construction Safety Performance: Moderating Role of Resilient Safety Culture. Journal of Construction Engineering and Management, 146(02).

Trinh, M T, Feng, Y and Mohamed, S (2019) Framework for Measuring Resilient Safety Culture in Vietnam’s Construction Environment. Journal of Construction Engineering and Management, 145(02).

Trost, S M and Oberlender, G D (2003) Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression. Journal of Construction Engineering and Management, 129(02), 198–204.

Tserng, H P, Russell, J S, Hsu, C and Lin, C (2012) Analyzing the Role of National PPP Units in Promoting PPPs: Using New Institutional Economics and a Case Study. Journal of Construction Engineering and Management, 138(02), 242–9.

Tserng, H P, Yin, S Y L, Skibniewski, M J and Lee, M H (2010) Developing an ARIS-House-Based Method from Existing Information Systems to Project-Based Enterprise Resource Planning for General Contractor. Journal of Construction Engineering and Management, 136(02), 199–209.

Tucker, R L (1988) Perfection of the Buggy Whip. Journal of Construction Engineering and Management, 114(02), 157–71.

Tymvios, N and Gambatese, J A (2016) Perceptions about Design for Construction Worker Safety: Viewpoints from Contractors, Designers, and University Facility Owners. Journal of Construction Engineering and Management, 142(02).

Uddin, M, Mahboub, K C and Goodrum, P M (2011) Effects of Nonnormal Distributions on Highway Construction Acceptance Pay Factor Calculation. Journal of Construction Engineering and Management, 137(02), 108–18.

Ueki, M, Haas, C T and Seo, J (1999) Decision Tool for Microtunneling Method Selection. Journal of Construction Engineering and Management, 125(02), 123–31.

Valente, C P, Brandalise, F M P and Formoso, C T (2019) Model for Devising Visual Management Systems on Construction Sites. Journal of Construction Engineering and Management, 145(02).

Van Der Meulen, G J R and Money, A H (1984) The Bidding Game. Journal of Construction Engineering and Management, 110(02), 153–64.

Vanegas, J A, Bravo, E B and Halpin, D W (1993) Simulation Technologies for Planning Heavy Construction Processes. Journal of Construction Engineering and Management, 119(02), 336–54.

Vombatkere, S G (1986) Bridge Resting on an Ice Body at High Altitude. Journal of Construction Engineering and Management, 112(02), 287–96.

Wakefield, R R and Sears, G A (1997) Petri Nets for Simulation and Modeling of Construction Systems . Journal of Construction Engineering and Management, 123(02), 105–12.

Walsh, K D, Sawhney, A and Brown, A (2005) International Comparison of Cost for the Construction Sector: Purchasing Power Parity. Journal of Construction Engineering and Management, 131(02), 160–7.

Wang, B, Cui, Q and Zhang, S (2021) Noncompete Provision Design for Transportation PPP Projects. Journal of Construction Engineering and Management, 147(02).

Wang, C, Mohd-Rahim, F A, Chan, Y Y and Abdul-Rahman, H (2017) Fuzzy Mapping on Psychological Disorders in Construction Management. Journal of Construction Engineering and Management, 143(02).

Ward, S C, Curtis, B and Chapman, C B (1991) Advantages of Management Contracting—Critical Analysis. Journal of Construction Engineering and Management, 117(02), 195–211.

Warszawski, A (1996) Strategic Planning in Construction Companies . Journal of Construction Engineering and Management, 122(02), 133–40.

Whiteman, W E and Irvvig, H G (1988) Disturbance Scheduling Technique for Managing Renovation Work. Journal of Construction Engineering and Management, 114(02), 191–213.

Whittaker, J (1987) Equipment Rates from Revenue Requirements. Journal of Construction Engineering and Management, 113(02), 173–8.

Williams, T P (1994) Predicting Changes in Construction Cost Indexes Using Neural Networks. Journal of Construction Engineering and Management, 120(02), 306–20.

Wolters, R S and Burleson, R C (1996) Merit Shop Recruitment and Selection Practices in Alabama . Journal of Construction Engineering and Management, 122(02), 152–7.

Woodroffe, N J and Ariaratnam, S T (2009) Contractor Perspective on Factors for Evaluating Installation Options for Small-Diameter Utilities. Journal of Construction Engineering and Management, 135(02), 75–87.

Wu, M, Wing Chau, K, Shen, Q and Yin Shen, L (2012) Net Asset Value–Based Concession Duration Model for BOT Contracts. Journal of Construction Engineering and Management, 138(02), 304–8.

Wyrick, D A and Eschenbach, T G (1989) Remote Oil and Gas Facility Construction. Journal of Construction Engineering and Management, 115(02), 228–36.

Xiao, J, Li, X, Zhang, Z and Zhang, J (2018) Ontology-Based Knowledge Model to Support Construction Noise Control in China. Journal of Construction Engineering and Management, 144(02).

Xiong, Y and Kuang, Y (2008) Applying an Ant Colony Optimization Algorithm-Based Multiobjective Approach for Time–Cost Trade-Off. Journal of Construction Engineering and Management, 134(02), 153–6.

Xu, J, Meng, J, Zeng, Z, Wu, S and Shen, M (2013) Resource Sharing-Based Multiobjective Multistage Construction Equipment Allocation under Fuzzy Environment. Journal of Construction Engineering and Management, 139(02), 161–73.

Xu, J, Shi, Y and Zhao, S (2019) Reverse Logistics Network-Based Multiperiod Optimization for Construction and Demolition Waste Disposal. Journal of Construction Engineering and Management, 145(02).

Yang, I, Hsieh, Y and Kung, L (2012) Parallel Computing Platform for Multiobjective Simulation Optimization of Bridge Maintenance Planning. Journal of Construction Engineering and Management, 138(02), 215–26.

Yao, H, Chen, Y, Chen, Y and Zhu, X (2019) Mediating Role of Risk Perception of Trust and Contract Enforcement in the Construction Industry. Journal of Construction Engineering and Management, 145(02).

Yates, J K (1993) Construction Decision Support System for Delay Analysis. Journal of Construction Engineering and Management, 119(02), 226–44.

Yates, J K and Aniftos, S (1997) International Standards and Construction . Journal of Construction Engineering and Management, 123(02), 127–37.

Ye, S and Liu, Y (2008) Study on Development Patterns of Infrastructure Projects. Journal of Construction Engineering and Management, 134(02), 94–102.

Yiu, T W, Liu, T and Kwok, L C (2018) Explicating the Role of Relationship in Construction Claim Negotiations. Journal of Construction Engineering and Management, 144(02).

Yoo, W, Ozer, H and Ham, Y (2019) System-Level Approach for Identifying Main Uncertainty Sources in Pavement Construction Life-Cycle Assessment for Quantifying Environmental Impacts. Journal of Construction Engineering and Management, 145(02).

Yoon, J H and Pishdad-Bozorgi, P (2022) State-of-the-Art Review of Blockchain-Enabled Construction Supply Chain. Journal of Construction Engineering and Management, 148(02).

Yu, A T W, Shen, Q, Kelly, J and Hunter, K (2008) Comparative Study of the Variables in Construction Project Briefing/Architectural Programming. Journal of Construction Engineering and Management, 134(02), 122–38.

Yu, W, Lin, T, Liu, S and Chang, P (2013) Is the Knowledge Management System Truly Cost Effective? Case Study of KM-Enabled Engineering Problem Solving. Journal of Construction Engineering and Management, 139(02), 216–24.

Zayed, T M and Halpin, D (2001) Simulation of Concrete Batch Plant Production. Journal of Construction Engineering and Management, 127(02), 132–41.

Zhang, C, Chen, K, Yang, J, Fu, J, Wang, S and Xie, Y (2022) Reuse of Discharged Soil from Slurry Shield Tunnel Construction as Synchronous Grouting Material. Journal of Construction Engineering and Management, 148(02).

Zhang, L, Fu, Y and Lu, W (2021) Contract Enforcement for Claimants’ Satisfaction with Construction Dispute Resolution: Moderating Role of Shadow of the Future, Fairness Perception, and Trust. Journal of Construction Engineering and Management, 147(02).

Zhang, P, Harris, F C, Olomolaiye, P O and Holt, G D (1999) Location Optimization for a Group of Tower Cranes. Journal of Construction Engineering and Management, 125(02), 115–22.

Zhang, X (2004) Concessionaire Selection: Methods and Criteria. Journal of Construction Engineering and Management, 130(02), 235–44.

  • Type: Journal Article
  • Keywords: Infrastructure; Build/Operate/Transfer; Financing; Private sector; Partnerships; Construction industry; financial management; civil engineering; construction industry; public administration; decision making; international collaboration;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(235)
  • Abstract:
    Various innovative public private partnerships (PPPs) have been explored in worldwide infrastructure development in which BOT (build-operate-transfer) is the underlying concept. Selection of the right concessionaire, which is critical to the success of such BOT-type PPPs, depends on the quality of identifying and defining suitable project-specific criteria and the quality of formulating an efficient tender evaluation methodology. A systematic research approach (including literature review, case studies, interview/correspondence, and a structured questionnaire survey) has been adopted to draw experience and learn lessons from international PPP practices and to unearth and refine experiential and expert knowledge from worldwide experts and practitioners. Tender evaluation criteria and methods currently used in diverse types of PPP projects in both developed and developing countries are identified, compared, analyzed, and then generalized.

Zhang, X (2006) Public Clients’ Best Value Perspectives of Public Private Partnerships in Infrastructure Development. Journal of Construction Engineering and Management, 132(02), 107–14.

Zhang, X and Kumaraswamy, M M (2001) Hong Kong Experience in Managing BOT Projects. Journal of Construction Engineering and Management, 127(02), 154–62.

Zhang, X Q, Kumaraswamy, M M, Zheng, W and Palaneeswaran, E (2002) Concessionaire Selection for Build-Operate-Transfer Tunnel Projects in Hong Kong. Journal of Construction Engineering and Management, 128(02), 155–63.

Zhang, Y, Yuan, J, Zhao, J, Cheng, L and Li, Q (2022) Hybrid Dynamic Pricing Model for Transport PPP Projects during the Residual Concession Period. Journal of Construction Engineering and Management, 148(02).

Zhao, T and Dungan, J M (2014) Improved Baseline Method to Calculate Lost Construction Productivity. Journal of Construction Engineering and Management, 140(02).

Zhao, Z Y, Shen, L Y and Zuo, J (2009) Performance and Strategy of Chinese Contractors in the International Market. Journal of Construction Engineering and Management, 135(02), 108–18.

Zheng, D X M and Ng, S T (2005) Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front. Journal of Construction Engineering and Management, 131(02), 176–86.

Zheng, D X M, Ng, S T and Kumaraswamy, M M (2004) Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization. Journal of Construction Engineering and Management, 130(02), 168–76.

Zhong, Y, Ling, F Y Y and Wu, P (2017) Using Multiple Attribute Value Technique for the Selection of Structural Frame Material to Achieve Sustainability and Constructability. Journal of Construction Engineering and Management, 143(02).

Zhou, M, Liu, Y, Wang, K and Fahmi Hassanein, M (2020) New Asynchronous-Pouring Rapid-Construction Method for Long-Span Prestressed Concrete Box Girder Bridges with Corrugated Steel Webs. Journal of Construction Engineering and Management, 146(02).

Zhu, F, Hu, H, Xu, F and Tang, N (2021) Predicting the Impact of Country-Related Risks on Cost Overrun for Overseas Infrastructure Projects. Journal of Construction Engineering and Management, 147(02).

Zhu, Z and Brilakis, I (2010) Machine Vision-Based Concrete Surface Quality Assessment. Journal of Construction Engineering and Management, 136(02), 210–8.

Zouein, P P and Tommelein, I D (2001) Improvement Algorithm for Limited Space Scheduling. Journal of Construction Engineering and Management, 127(02), 116–24.

Zuluaga, C M, Albert, A and Winkel, M A (2020) Improving Safety, Efficiency, and Productivity: Evaluation of Fall Protection Systems for Bridge Work Using Wearable Technology and Utility Analysis. Journal of Construction Engineering and Management, 146(02).

Zwick, D C and Miller, K R (2004) Project Buyout. Journal of Construction Engineering and Management, 130(02), 245–8.