Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 126 results ...

Abidin, N Z, Yusof, N A and Othman, A A E (2013) Enablers and challenges of a sustainable housing industry in Malaysia. Construction Innovation, 13(01), 10-25.

Abrishami, S, Goulding, J, Pour, R F and Ganah, A (2015) Virtual generative BIM workspace for maximising AEC conceptual design innovation: A paradigm of future opportunities. Construction Innovation, 15(01), 24-41.

Abuzeinab, A, Arif, M, Qadri, M A and Kulonda, D (2018) Green business models in the construction sector: An analysis of outcomes and benefits. Construction Innovation, 18(01), 20-42.

Ahmed, S H and Suliman, S M (2020) A structure equation model of indicators driving BIM adoption in the Bahraini construction industry. Construction Innovation , 20(01), 61–78.

Ahuja, V and Thiruvengadam, V (2004) Project scheduling and monitoring: current research status. Construction Innovation, 4(01), 19–31.

Al Hattab, M, Zankoul, E, Barakat, M and Hamzeh, F (2018) Crane overlap and operational flexibility: Balancing utilization, duration, and safety. Construction Innovation, 18(01), 43-63.

Al-Sudairi, A A (2007) Evaluating the effect of construction process characteristics to the applicability of lean principles. Construction Innovation, 7(01), 99–121.

Alsharqawi, M, Zayed, T and Shami, A (2020) Ground penetrating radar-based deterioration assessment of RC bridge decks. Construction Innovation , 20(01), 1–17.

Alshawi, M and Faraj, I (2002) Integrated construction environments: technology and implementation. Construction Innovation, 2(01), 33–51.

Alvanchi, A and JavadiAghdam, S (2019) Job site weather index: an indicator for open environment construction projects. Construction Innovation , 19(01), 110–24.

Azadeh, A, Kalantari, M, Ahmadi, G and Eslami, H (2019) A flexible genetic algorithm-fuzzy regression approach for forecasting. Construction Innovation , 19(01), 71–88.

Babatunde, S O, Perera, S and Zhou, L (2016) Methodology for developing capability maturity levels for PPP stakeholder organisations using critical success factors. Construction Innovation, 16(01), 81-110.

Bayat, M, Khanzadi, M, Nasirzadeh, F and Chavoshian, A (2020) Financial conflict resolution model in BOT contracts using bargaining game theory. Construction Innovation , 20(01), 18–42.

Bendi, D, Rana, M Q, Arif, M, Goulding, J S and Kaushik, A K (2021) Understanding off-site readiness in Indian construction organisations. Construction Innovation, 21(01), 105–22.

Bendi, D, Rana, M Q, Arif, M, Goulding, J S and Sawhney, A (2021) An off-site construction readiness maturity model for the Indian construction sector. Construction Innovation, 21(01), 123–42.

Blismas, N and Wakefield, R (2009) Drivers, constraints and the future of offsite manufacture in Australia. Construction Innovation, 9(01), 72–83.

Bonev, M, Wörösch, M and Hvam, L (2015) Utilizing platforms in industrialized construction: A case study of a precast manufacturer. Construction Innovation, 15(01), 84-106.

Budde, B (2013) Challenges of coordination between climate and technology policies: A case study of strategies in Denmark and the UK. Construction Innovation, 13(01), 98-116.

Chan, A P C, Chiang, Y H, Mak, S W K, Choy, L H T and M.W.Wong, J (2006) Forecasting the demand for construction skills in Hong Kong. Construction Innovation, 6(01), 3–19.

Chen, L and Mohamed, S (2008) Impact of the internal business environment on knowledge management within construction organisations. Construction Innovation, 8(01), 61–81.

Chen, Z, Li, H and Wong, C T C (2003) Webfill before landfill: an e-commerce model for waste exchange in Hong Kong. Construction Innovation, 3(01), 27–43.

Chen, Z, Li, H, Kong, S C W and Xu, Q (2005) A knowledge-driven management approach to environmental-conscious construction. Construction Innovation, 5(01), 27–39.

Cheng, E W L, Li, H, Love, P and Irani, Z (2004) A learning culture for strategic partnering in construction. Construction Innovation, 4(01), 53–65.

Chun, C K, Heng, L and Skitmore, M (2012) The use of virtual prototyping for hazard identification in the early design stage. Construction Innovation, 12(01), 29–42.

Cooke, T (2013) Can knowledge sharing mitigate the effect of construction project complexity?. Construction Innovation, 13(01), 5-9.

Dave, B (2017) Business process management: A construction case study. Construction Innovation, 17(01), 50-67.

Davidson, C H (2009) The challenge of organizational design for manufactured construction. Construction Innovation, 9(01), 42–57.

Dobbelsteen, A v d, Arets, M and Nunes, R (2007) Sustainable design of supporting structures: Optimal structural spans and component combinations for effective improvement of environmental performance. Construction Innovation, 7(01), 54–71.

Doloi, H (2010) Benchmarking a new design management system using process simulation approach. Construction Innovation, 10(01), 59.

Dulaimi, M F (2005) The challenge of customer orientation in the construction industry. Construction Innovation, 5(01), 3–12.

Duren, J V, Dorée, A and Voordijk, H (2015) Perceptions of success in performance-based procurement: Differences between clients and contractors. Construction Innovation, 15(01), 107-28.

Eaton, D, Akbiyikli, R, Lemos, T d, Gunnigan, L, Kutanis, R O, Casensky, M, Ladra, J and Sawalhi, N E (2007) An examination of the suitability of a UK PFI model within the Czech Republic, the Republic of Ireland, Palestine (Gaza-West Bank), Portugal and Turkey. Construction Innovation, 7(01), 122–42.

Edwards, D J and Holt, G D (2010) The case for '3D triangulation' when applied to construction management research. Construction Innovation, 10(01), 25–41.

Elhag, T, Eapen, S and Ballal, T (2020) Moderating claims and disputes through collaborative procurement. Construction Innovation , 20(01), 79–95.

Elliman, T and Orange, G (2003) Developing distributed design capabilities in the construction supply chain. Construction Innovation, 3(01), 15–26.

Faraj, I (2001) Verification and spatial clearance of features in a product modelling environment. Construction Innovation, 1(01), 55–74.

Fellows, R (2010) New research paradigms in the built environment. Construction Innovation, 10(01), 5–13.

Firmenich, J (2017) Customisable framework for project risk management. Construction Innovation, 17(01), 68-89.

Fu, C, Kaya, S and Aouad, M K G (2007) The development of an IFC-based lifecycle costing prototype tool for building construction and maintenance: Integrating lifecycle costing to nD modelling. Construction Innovation, 7(01), 85–98.

Gary, D H and David, J E (2012) Innovation or business survival? A preliminary, qualitative study of UK construction plant supply chains. Construction Innovation, 12(01), 7–.

Georgy, M and Basily, S Y (2008) Using genetic algorithms in optimizing construction material delivery schedules. Construction Innovation, 8(01), 23–45.

Gohil, U, Carrillo, P, Ruikar, K and Anumba, C (2011) Value-enhanced collaborative working: case study of a small management advisory firm. Construction Innovation, 11(01), 43–60.

Grenzfurtner, W and Gronalt, M (2021) Continuous improvement of the industrialised housebuilding order fulfilment process. Construction Innovation, 21(01), 22–39.

Guven, G and Ergen, E (2013) Factors affecting the selection of data storage approach in radio frequency identification applications. Construction Innovation, 13(01), 117-38.

Habibi, S (2020) A review of ICT-based applications to monitor environmental parameters. Construction Innovation , 20(01), 112–27.

Hamid, Z A and Kamar, K A M (2012) Aspects of off-site manufacturing application towards sustainable construction in Malaysia. Construction Innovation, 12(01), 4–10.

Hao, J L, Hills, M J and Huang, T (2007) A simulation model using system dynamic method for construction and demolition waste management in Hong Kong. Construction Innovation, 7(01), 7–21.

Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(01), 7–22.

Hassan, N M, Al Maazmi, T, Al Hadhrami, A and Al Hosani, M (2016) Discrete event simulation: A vital tool for a concurrent life cycle design. Construction Innovation, 16(01), 67-80.

Hatipkarasulu, Y (2020) A conceptual approach to graphically compare construction schedules. Construction Innovation , 20(01), 43–60.

Heard, I, Love, P E D, Sing, M C P and Goerke, V (2017) Learning to build relationships for a better Australia: Indigenous reconciliation in action in the construction and resource sectors. Construction Innovation, 17(01), 4-24.

Holt, G D (2013) Construction business failure: conceptual synthesis of causal agents. Construction Innovation, 13(01), 50-76.

Holt, G D (2016) Historical British antecedents of innovative construction project organisation and social structures. Construction Innovation, 16(01), 46-66.

Holt, G D and Edwards, D J (2012) Innovation or business survival?: A preliminary, qualitative study of UK construction plant supply chains. Construction Innovation, 12(01), 99–122.

Hosseini, M R, Bosch-Sijtsema, P, Arashpour, M, Chileshe, N and Merschbrock, C (2018) A qualitative investigation of perceived impacts of virtuality on effectiveness of hybrid construction project teams. Construction Innovation, 18(01), 109-31.

Jang, H, Kim, K, Kim, J and Kim, J (2011) Labour productivity model for reinforced concrete construction projects. Construction Innovation, 11(01), 92–113.

Janné, M and Fredriksson, A (2019) Construction logistics governing guidelines in urban development projects. Construction Innovation, 19(01), 89–109.

Jeong, J G, Hastak, M and Syal, M (2009) Framework of manufacturer-retailer relationship in the manufactured housing construction. Construction Innovation, 9(01), 22–41.

Kähkönen, K and Rannisto, J (2015) Understanding fundamental and practical ingredients of construction project data management. Construction Innovation, 15(01), 7-23.

Kamara, J M, Augenbroe, G, Anumba, C J and Carrillo, P M (2002) Knowledge management in the architecture, engineering and construction industry. Construction Innovation, 2(01), 53–67.

Kanoglu, A and Arditi, D (2001) A computer-based information system for architectural design offices. Construction Innovation, 1(01), 15–29.

Khanzadi, M, Nasirzadeh, F, Mir, M and Nojedehi, P (2018) Prediction and improvement of labor productivity using hybrid system dynamics and agent-based modeling approach. Construction Innovation, 18(01), 2-19.

Killingsworth, J, Mehany, M H and Ladhari, H (2021) General contractors’ experience using off-site structural framing systems. Construction Innovation, 21(01), 40–63.

Kissi, J, Dainty, A and Liu, A (2012) Examining middle managers' influence on innovation in construction professional services firms: A tale of three innovations. Construction Innovation, 12(01), 11–28.

Kong, C W, Li, H and Love, P E D (2001) An e-commerce system for construction material procurement. Construction Innovation, 1(01), 43–54.

Linden, K A C v d, Kurvers, S S R, Raue, A A K and Boerstra, A A C (2007) Indoor climate guidelines in The Netherlands: Developments towards adaptive thermal comfort. Construction Innovation, 7(01), 72–84.

Lindgren, J and Emmitt, S (2017) Diffusion of a systemic innovation: A longitudinal case study of a Swedish multi-storey timber housebuilding system. Construction Innovation, 17(01), 25-44.

Ling, F Y Y and Tran, H B T (2012) Ingredients to engender trust in construction project teams in Vietnam. Construction Innovation, 12(01), 43–61.

Linner, T, Pan, W, Hu, R, Zhao, C, Iturralde, K, Taghavi, M, Trummer, J, Schlandt, M and Bock, T (2020) A technology management system for the development of single-task construction robots. Construction Innovation , 20(01), 96–111.

Love, P E D, Irani, Z, Li, H, Cheng, E W L and Tse, R Y C (2001) An empirical analysis of the barriers to implementing e-commerce in small-medium sized construction contractors in the state of Victoria, Australia. Construction Innovation, 1(01), 31–41.

Mahapatra, K, Gustavsson, L and Hemström, K (2012) Multi-storey wood-frame buildings in Germany, Sweden and the UK. Construction Innovation, 12(01), 62–85.

Majava, J, Haapasalo, H and Aaltonen, K (2019) Elaborating factors affecting visual control in a big room. Construction Innovation , 19(01), 34–47.

Majdalani, Z, Ajam, M and Mezher, T (2006) Sustainability in the construction industry: a Lebanese case study. Construction Innovation, 6(01), 33–46.

Marzouk, M (2006) Utility theory model for equipment selection. Construction Innovation, 6(01), 21–32.

Marzouk, M and Mohamed, E (2018) Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(01), 90-108.

Matsumoto, I T, Stapleton, J, Glass, J and Thorpe, T (2005) Developing a framework to measure organizational and employee skills development in a professional engineering design consultancy. Construction Innovation, 5(01), 53–66.

McCoy, A, Thabet, W and Badinelli, R (2011) Defining a commercialization model for residential construction innovation: industry case studies. Construction Innovation, 11(01), 114–33.

Mlecnik, E (2014) Which factors determine the success of strategic niche developments? Reflections from the emergence of a passive house network. Construction Innovation, 14(01), 36-51.

Mollaoglu, S, Chergia, C, Ergen, E and Syal, M (2016) Diffusion of green building guidelines as innovation in developing countries. Construction Innovation, 16(01), 11-29.

Moradi, S, Nasirzadeh, F and Golkhoo, F (2015) A hybrid SD-DES simulation approach to model construction projects. Construction Innovation, 15(01), 66-83.

  • Type: Journal Article
  • Keywords: discrete event simulation,process analysis,construction simulation,hybrid simulation,modelling,system dynamics
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/CI-10-2013-0045
  • Abstract:
    Purpose - The purpose of this research is to propose a hybrid simulation framework which can take into account both the continuous and operational variables affecting the performance of construction projects. Design/methodology/approach - System dynamics (SD) simulation paradigm is implemented for the modelling of the complex inter-related structure of continuous variables and discrete event simulation (DES) is implemented for the modelling of operational influencing factors. A hybrid modelling framework is then proposed through combination of SD and DES to simulate the construction projects. Findings - This paper discusses the deficiencies of two traditional simulation methods - SD and DES - for simulation of construction projects which can be compensated by implementing hybrid SD-DES model. Different types of basic hybrid structures and synchronisation methods of SD and DES models are introduced. Practical implications - The proposed hybrid framework discussed in this research will be beneficial to modellers to simulate construction projects. Originality/value - The paper introduces a theoretical framework for a hybrid continuous- discrete simulation approach which can take into account the dynamics of project environment arising from the complex inter-related structure of various continuous influencing factors as well as the construction operations. Different steps required to develop the hybrid SD-DES model and synchronisation of SD and DES simulation methods are illustrated.

Nahmens, I and Mullens, M (2009) The impact of product choice on lean homebuilding. Construction Innovation, 9(01), 84–100.

Ng, S T, Chen, S E, McGeorge, D, Lam, K-C and Evans, S (2001) Current state of IT usage by Australian subcontractors. Construction Innovation, 1(01), 3–13.

Ng, S T, Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(01), 46–60.

Ng, S T, Skitmore, M, Deng, M Z M and Nadeem, A (2004) Improving existing delay analysis techniques for the establishment of delay liabilities. Construction Innovation, 4(01), 3–17.

Ng, S T, Zheng, D X M and Xie, J Z (2013) Allocation of construction resources through a pull-driven approach. Construction Innovation, 13(01), 77-97.

Nitithamyong, P and Skibniewski, M J (2011) Success factors for the implementation of web-based construction project management systems: A cross-case analysis. Construction Innovation, 11(01), 14–42.

Ogunbiyi, O, Goulding, J S and Oladapo, A (2014) An empirical study of the impact of lean construction techniques on sustainable construction in the UK. Construction Innovation, 14(01), 88-107.

Onyido, T B C, Boyd, D and Thurairajah, N (2016) Developing SMEs as environmental businesses. Construction Innovation, 16(01), 30-45.

Ospina-Alvarado, A M and Castro-Lacouture, D (2010) Holistic analysis of fuel cells for residential construction in the rural USA. Construction Innovation, 10(01), 74.

Packham, G, Miller, C J, Thomas, B C and Brooksbank, D (2005) An examination of the management challenges faced by growing SCEs in South Wales. Construction Innovation, 5(01), 13–25.

Palos, S, Kiviniemi, A and Kuusisto, J (2014) Future perspectives on product data management in building information modeling. Construction Innovation, 14(01), 52-68.

Pan, W and Gibb, A G F (2009) Maintenance performance evaluation of offsite and in situ bathrooms. Construction Innovation, 9(01), 7–21.

Poirier, E, Staub-French, S and Forgues, D (2015) Embedded contexts of innovation: BIM adoption and implementation for a specialty contracting sme. Construction Innovation, 15(01), 42-65.

Polat, G (2009) Simulation-based efficiency assessment approach for rebar supply chains in Turkey. Construction Innovation, 9(01), 101–21.

Polat, G and Donmez, U (2010) ANP-based marketing activity selection model for construction companies. Construction Innovation, 10(01), 89–111.

Powl, A and Skitmore, M (2005) Factors hindering the performance of construction project managers. Construction Innovation, 5(01), 41–51.

Robeiro, F L and Love, P E D (2003) Value creation through an e-business strategy: implication for SMEs in construction. Construction Innovation, 3(01), 3–14.

Ross, A (2011) Supply chain management in an uncertain economic climate: a UK perspective. Construction Innovation, 11(01), 5–13.

Rowlinson, S (2017) Building information modelling, integrated project delivery and all that. Construction Innovation, 17(01), 45-9.

Sabharwal, A, Syal, M and Hastak, M (2009) Impact of manufactured housing component assembly redesign on facility layout and production process. Construction Innovation, 9(01), 58–71.

Saini, M, Arif, M and Kulonda, D J (2019) Challenges to transferring and sharing of tacit knowledge within a construction supply chain. Construction Innovation, 19(01), 15–33.

Saini, M, Arif, M and Kulonda, D J (2018) Critical factors for transferring and sharing tacit knowledge within lean and agile construction processes. Construction Innovation, 18(01), 64-89.

Sandberg, E and Bildsten, L (2011) Coordination and waste in industrialised housing. Construction Innovation, 11(01), 77–91.

Shari, Z and Soebarto, V (2014) Investigating sustainable practices in the Malaysian office building developments. Construction Innovation, 14(01), 17-37.

Shoar, S, Nasirzadeh, F and Zarandi, H R (2019) Quantitative assessment of risks on construction projects using fault tree analysis with hybrid uncertainties. Construction Innovation, 19(01), 48–70.

Shokri-Ghasabeh, M and Chileshe, N (2014) Knowledge management: Barriers to capturing lessons learned from Australian construction contractors' perspectives. Construction Innovation, 14(01), 108-34.

Stehn, L, Engström, S, Uusitalo, P and Lavikka, R (2021) Understanding industrialised house building as a company’s dynamic capabilities. Construction Innovation, 21(01), 5–21.

Sundling, R, Blomsterberg, & and Landin, A (2019) Enabling energy-efficient renovation: the case of vertical extension to buildings. Construction Innovation, 19(01), 2–14.

Tam, C M, Tong, T K L and Lau, C T (2003) ELECTRE III in evaluating performance of construction plants: case study on concrete vibrators. Construction Innovation, 3(01), 45–61.

Tam, V W Y and Shen, L Y (2010) On applications of an optimal price-time bidding model in Hong Kong foundation projects. Construction Innovation, 10(01), 14–24.

Tan, Y and Shen, L (2010) A fuzzy competence requirement (FCR) model for competitive bidding strategy. Construction Innovation, 10(01), 75–88.

Tao, L and Kumaraswamy, M (2012) Unveiling relationships between contractor inputs and performance outputs. Construction Innovation, 12(01), 86–98.

Tenpierik, M J, Cauberg, J J M and Thorsell, T I (2007) Integrating vacuum insulation panels in building constructions: an integral perspective. Construction Innovation, 7(01), 38–53.

Thunberg, M, Rudberg, M and Karrbom Gustavsson, T (2017) Categorising on-site problems: A supply chain management perspective on construction projects. Construction Innovation, 17(01), 90-111.

Timmeren, A v and Sidler, D (2007) The sustainable implant: Decentralised sanitation and energy reuse (Desaer) in the built environment. Construction Innovation, 7(01), 22–37.

Vestin, A, Säfsten, K and Löfving, M (2021) Smart factories for single-family wooden houses – a practitioner’s perspective. Construction Innovation, 21(01), 64–84.

Vidalakis, C, Abanda, F H and Oti, A H (2020) BIM adoption and implementation: focusing on SMEs. Construction Innovation , 20(01), 128–47.

Walker, D H T (2002) Enthusiasm, commitment and project alliancing: an Australian experience. Construction Innovation, 2(01), 15–31.

Wang, X and Chong, H-Y (2015) Setting new trends of integrated building information modelling for construction industry. Construction Innovation, 15(01), 6-18.

Whyte, J and Bouchlaghem, D (2002) Implementation of VR systems: a comparison between the early adoption of CAD and current uptake of VR. Construction Innovation, 2(01), 3–13.

Wong, A K D and Zhang, R (2013) Implementation of web-based construction project management system in China projects by Hong Kong developers. Construction Innovation, 13(01), 26-49.

Wong, A K D, Wong, F K W and Nadeem, A (2011) Government roles in implementing building information modelling systems: Comparison between Hong Kong and the United States. Construction Innovation, 11(01), 61–76.

Yang, J B (2004) Hybrid AI system for retaining wall selection. Construction Innovation, 4(01), 33–52.

Yang, Y and Pan, W (2021) Automated guided vehicles in modular integrated construction: potentials and future directions. Construction Innovation, 21(01), 85–104.

Zeb, J and Froese, T (2014) Infrastructure management transaction formalism protocol specification: A process development model. Construction Innovation, 14(01), 69-87.

Zhang, X, Goulding, J S, Sexton, M G, Aouad, G and Kagioglou, M (2006) HyCon: virtual prototyping in hybrid concrete construction frame design. Construction Innovation, 6(01), 47–60.